WORK DESCRIPTION
BASEMENT :
REMARKS
10
11
12
13
14
15
16
17
18
19
WORK DESCRIPTION
REMARKS
10
11
12
13
14
15
16
17
18
19
BASEMENT :
1. RETAINING WALL
a. Continue installation of forms
c. Concrete Pouring Phase 2
2. SHEAR WALL & RC WALL- South Core
a. Continue formworks at SW/W-1
b. Concrete Pouring 1st Lift
3. SHEAR WALL & RC WALL- North Core
a. Preparation (formworks & rebar installation)
coordinated w/ MEPS
b. Concrete Pouring 1st Lift
4. WATER TANK WALL
a. Continue formworks
b. Concrete Pouring
7. COLUMNS
a. Preparation (formworks & rebar installation)
coordinated w/ MEPS
b. Concrete Pouring of 1st lift of Columns Phase 2
10
11
12
13
14
15
16
17
18
19