Observation
Hazards and Consequences

Item
01
01

Immediate action:

Worker was working in the hazardous


Chemical area.

Provide PPE to the workers

Chemicals hazard, i.e, Calcium Carbonate,


Hydro-Chloric Acid, Calcium Chloride, coal
and Flocculent.
Calcium Chloride is irritant to skin and eyes.
Hydro-Chloric Acid is corrosive to the eyes,
skin, and mucous membranes. Lung and skin
problems such as black lung disease, is
caused by inhaling coal dust.

03
02

Control Measures
Immediate/longer term action

Observation:

Hazard & Consequences:

00218445

Health surveillance

3 Month

Long Term:
Exposure limit to chemical will decrease
by job rotation.

Immediate action:

House-keeping was not good in the ware


house of the Calcium Chloride and in bagging
section. As calcium chloride prills and mud
had combined to form the slippery surface.

On urgent basis clean the floor clean and


keep it clean all the time.

Hazard & Consequences:

Ensure proper housekeeping of the


Workplace on daily basis.

1|Page

Immediate

Short term:

Observation

Slip hazards, collision hazards between


forklift and pedestrian and forklift with fixed
structure.
Can cause severe injury to pedestrian or
damaging of forklift truck.

Time
Scale

Short term:

Long Term:
Monitor and check workplace regularly.
Make employees aware of the hazards
by providing information and training.

Regularly

Immediate

One week

Regular

INTERNATIONAL GENERAL
CERTIFICATE
(2014 specification)

Candidates observation sheet

IGC3 THE HEALTH AND


SAFETY PRACTICAL APPLICATION

Student Name:

Muahammad Kaiser Faheem

Student Number:

Place Inspected:

Ittehad Chemical Ltd. Lahore

Date of Inspection: 02 / 02 / 2014.

Observation
Hazards and Consequences

Item
03

Control Measures
Immediate/longer term action

Observation

Immediate action:

From main gate to plant area there was two


ways route for the vehicle and the pedestrian
was using the same route. The forklift truck
was running in the way and collision with
vehicles and pedestrian can cause injury.

Provide signages stop , speed limit 5


km

Hazard & Consequences:

Segregate the area for vehicles &


pedestrians by barriers

Collision hazard
Personal Injury, pedestrian injury, , property
damage,
Because of one way from main gate to plant
area, collision with pedestrian, vehicles, can
cause injury

04

00218445

Two weeks

One month

Long Term:
Provide separate entry & exit routes with
solid partition in between pedestrian and
vehicle.

Immediate action:

Light was inadequate in the plant area and in


workplace, and can cause injury to worker.
Inadequate lighting can cause a hazard of
slip or trip due to uneven ground, due to
slippery action of calcium chloride on the
floor.

Install adequate lighting within the


Workplace so that people can able to
see any hazards.

Hazard & Consequences:

Use natural lights such as roof lights,


Where natural light is not satisfactory.
Use artificial lighting.

Short term:

Long Term:
Periodic maintenance and inspections of
artificial lighting and replacing them from
time to time.

2|Page

Immediate

Short term:

Observation

Trip and slip hazards


Due to slip or trip, a severe injury can be
happened.

Time Scale

Immediate

Two Week

Ongoing

INTERNATIONAL GENERAL
CERTIFICATE
(2014 specification)

Candidates observation sheet

IGC3 THE HEALTH AND


SAFETY PRACTICAL APPLICATION

Student Name:

Muahammad Kaiser Faheem

Student Number:

Place Inspected:

Ittehad Chemical Ltd. Lahore

Date of Inspection: 02 / 02 / 2014.

Observation
Hazards and Consequences

Item
05

Immediate action:

Blowers were creating a large noisy sound


during Operation.

Minimise work exposure limit

Noise Hazard.
Noise at work can cause hearing loss that
can be temporary or permanent. Hearing loss
is not the only problem. People may develop
tinnitus (ringing, whistling, buzzing or
humming in the ears).

06

Short term:

Long Term:

Calcium Chloride dust was coming out from


many damaged or leaked lines, from fine
collector and from dust blower.

Welding of the lines those have


leakages.

Short term:
Replace the lines those are too much
damaged with new lines.

Six Month

Immediate

Two Week

Regularly

Keep routine monitoring and inspection


of the lines

Immediate action:

Worker was working in the carpenter


workshop to form wooden material for pallet
formation.

Provide PPE to the worker.

Hazard & Consequences:

Provide safeguard to the sander.

3|Page

Two Week

Long Term:

Observation

Contact Hazards
Can cause injury to worker

Immediate

Eliminate/ Substitute with less noise


blower.

Immediate action:

Dust hazard.
Calcium Chloride Power
Irritant, Causes irritation to skin, eyes and
respiratory organs. Harmful if inhaled or
swallowed. Effects can be possible
coughing, sneezing, asthma and blocked
filters of machines.

Time Scale

Fit sound-proof enclosure, Acoustic


shielding. Fit silencers, balance machine,
or mount on anti-vibration mountings.

Observation

Hazard & Consequences:

07

Control Measures
Immediate/longer term action

Observation

Hazard & Consequences:

00218445

Long Term:

Immediate

One Month

INTERNATIONAL GENERAL
CERTIFICATE
(2014 specification)

Candidates observation sheet

IGC3 THE HEALTH AND


SAFETY PRACTICAL APPLICATION

Student Name:

Muahammad Kaiser Faheem

Student Number:

Place Inspected:

Ittehad Chemical Ltd. Lahore

Date of Inspection: 02 / 02 / 2014.

Observation
Hazards and Consequences

Item
08

Immediate action:

Worker was lifting the large buckets of lime


powder from the lime heap and was mixing
with calcium chloride solution to neutralize it
in neutralization tank repeatedly.

Provide job rotation with other riggers

Short term:
Provide trolley

Install conveyer from heap of lime to lime


tank.

Observation

Immediate action:

Hazard & Consequences:


Electrical hazard
Electric shock, Fire & explosion
Hand vibration syndrome, Noise

Observation
Chemical sewage drain system was made of
sanitary and at some points cover was not
installed and light was not good at those
Points.

Hazard & Consequences:


Falling hazard into sewage drains.
Can cause serious injury or death

4|Page

Time Scale

Immediate
One week
Two Month

Long Term:

Manual Handling,
Can cause back bone problem, slip disc
issue, Hernia, can cause musculoskeletal
disorders (MSDs).

Employee using hand drill machine with


broken handle & corroded flex

10

Control Measures
Immediate/longer term action

Observation

Hazard & Consequences:

09

00218445

Immediate

Repair the handle & change the flex

Short term:
Inform the maintenance staff to do the
pre use check before using electrical
equipments

Weekly

Long Term:
Conduct monthly inspection of all
electrical equipments & repair if needed.

Immediate action:
Immediately barricade the open points.

Short term:
Close the open points by sanitary work
or by keeping covers made of any
material

Long Term:
Erect proper and good sewage drain
system & properly out of passage area.

1 month
Immediate
Two week

Two month

INTERNATIONAL GENERAL
CERTIFICATE
(2014 specification)

Candidates observation sheet

IGC3 THE HEALTH AND


SAFETY PRACTICAL APPLICATION

Student Name:

Muahammad Kaiser Faheem

Student Number:

Place Inspected:

Ittehad Chemical Ltd. Lahore

Date of Inspection: 02 / 02 / 2014.

Observation
Hazards and Consequences

Item
11

Observation

Hazard & Consequences:


Ergonomic Hazard,

Immediate action:
Short term:
Make the assessment of workplace to
provide standard DSE arrangements to
suit the worker.

WRULD, Eyes strain, Back pain,


Cervical spondylosis

Long Term:

Observation

Immediate:

Observed that there was no notice board to


give the information about procedures and
different information to workers to update.

Hazard & Consequences:


Disciplinary Hazard.
Lack of knowledge and information
(Regulatory, Company policies, & working
procedures), un competent workers, and
development of negative culture.

13

Control Measures
Immediate/longer term action
Provide frequent breaks

Observed one employee sitting in office in


odd posture in front of computer

12

00218445

Observation

There must be a supervisor who


informed to workers about rules and laws
about their specific job.

One month

One month

Immediate

Short Term:
There must be one notice board
containing company policy, Rules &
Regulations and other information.

One week

Long Term:
Conduct inspection and provide training
to employee and keep them update
about company rules, laws and job
related information.

Immediate:
Following good hygiene practices.

Hazard & Consequences:

Training to employees and give them


information about personal hygiene.

5|Page

Immediate

Provide DSE instead of Computer.

There were no proper washing areas for


workers.
Biological Hazard.
Biological hazards due to poor personal
hygiene can cause health problems such as
infections and diseases.

Time Scale

Ongoing
Immediate

Short Term:
One week

Long Term:
Build up a washing area for workers
nearby workers changing room/ locker
area and provide proper ventilation
system.

One Month

INTERNATIONAL GENERAL
CERTIFICATE
(2014 specification)

Candidates observation sheet

IGC3 THE HEALTH AND


SAFETY PRACTICAL APPLICATION

Student Name:

Muahammad Kaiser Faheem

Student Number:

Place Inspected:

Ittehad Chemical Ltd. Lahore

Date of Inspection: 02 / 02 / 2014.

Observation
Hazards and Consequences

Item
14

Control Measures
Immediate/longer term action

Observation

Immediate:

Observed that in the reaction area to form


calcium chloride solution from hydro chloric
acid and calcium carbonate. The hydro
chloric storage tank foundation was damaged
and fumes were coming out from top of tanks
and acid drain valve was leaked.

Provide PPE to the worker and shower


water in the leakage point to avoid from
fumes.

Hazard & Consequences:


Falling, Health hazard and chemical hazard.
Can cause severe injury to worker in case of
falling of tank because of weak and damaged
foundation.
Exposure to high fumes can cause breathe
problem & can lead to chronic injury, worker
can be senseless before reach to safe place,
or can slip/ trip or fall on same level in
running to take breathe in safe environment.

15

00218445

Short Term:
Install line at top of tank and put the line
in the vessel filled with water so fumes
could absorb in water and water can be
drained. And install new valve.

The Chemical mist from the exhaust vent of


scrubber was generating liquid droplets and
those were falling around the plant area and
on the worker at workplace, such mist being
absorbed through the skin and mucus
membrane of eye and can cause skin
problems such as dermatitis and irritation.

Wear personal protective equipments


Such as coveralls and gloves.
Using cream to form a barrier to prevent
hazardous chemical getting into the body
and skin.

6|Page

Three week

One Month

Shift acid storage tanks to away from the


workplace and with strong foundation
and proper fumes collection system.

Immediate:

Health and chemical hazard,


The Chemical liquids such solvents being
absorbed through the skin and mucus
membrane of eye and can cause skin
problems such as dermatitis and irritation.

Immediate

Long Term:

Observation

Hazard & Consequences:

Time Scale

Short Term:

Immediate

One week

Adopting good hygiene practices.


Minimize the frequency and duration of
Being exposed to mist.
Long Term
Provide mist collector or mist absorber at
the discharge of scrubber.

Three
Month

INTERNATIONAL GENERAL
CERTIFICATE
(2014 specification)

Candidates observation sheet

IGC3 THE HEALTH AND


SAFETY PRACTICAL APPLICATION

Student Name:

Muahammad Kaiser Faheem

Student Number:

Place Inspected:

Ittehad Chemical Ltd. Lahore

Date of Inspection: 02 / 02 / 2014.

Observation
Hazards and Consequences

Item
16

00218445

Control Measures
Immediate/longer term action

Observation

Immediate:

Combustion air fan and moving parts cover


was open in hot air coal furnace plant.

Provide awareness to every worker at


workplace about it. And provide personal
protective equipments

Hazard & Consequences:

Short Term:

Entanglement hazard
Worker can came in entanglement with the
moving parts of the combustion air fan and
can cause sever injury.

Provide temporary cover to the moving


parts of the combustion air fan

Long Term:

Time Scale

Immediate

Two Day

One Month

Install proper fixed safe guard to the


moving parts of the combustion air fan.

17

Observation

Immediate:

Trailing Cables were laid down on the floor


and leading to the panel of welding work.

Secure trailing cables left unattended on


the floor surfaces. remove
Obstructions in the walkway.

Hazard & Consequences:


Risk of slip, trip and fall of workers in the
workplace area which may cause cuts and
bone fractures.

Short Term:

Two days

Ensure proper housekeeping of the


Workplace on daily basis. Make plans to
reroute electrical cables.

Long Term:
Monitor and check cables. make
employees aware of the hazards by
Providing instructions and supervision.

7|Page

Immediate

7 Days

INTERNATIONAL GENERAL
CERTIFICATE
(2014 specification)

Candidates observation sheet

IGC3 THE HEALTH AND


SAFETY PRACTICAL APPLICATION

Student Name:

Muahammad Kaiser Faheem

Student Number:

Place Inspected:

Ittehad Chemical Ltd. Lahore

Date of Inspection: 02 / 02 / 2014.

Observation
Hazards and Consequences

Item
18

Observation

Control Measures
Immediate/longer term action
Immediate:
Inspection of all fire extinguishers,

Few fire extinguishers are empty. This can


cause delay while extinguishing fire during
any fire emergency.

Hazard & Consequences:

19

00218445

Short Term:
Replace empty fire extinguisher with new
fire extinguisher.

Long Term:

Discipline Hazards.
Can increase the severity of accident.

Indent new fire extinguishers.

Observation

Immediate:

Rigger was not present during lifting of pipes


also there was no tag lines attached with the
suspended load.

Rigger should be present at the worksite


all the time during lifting process; tag line
should be attached with the suspended
load to control.

Hazard & Consequences:


Falling and collapse Hazard
Can lead to personal injury due to improper
lifting, persons caught between pipe and pipe
layer during lifting and equipment damage.

Short Term:

Immediate
Two days
One Month

Immediately

Two Week

All personnel should be trained for lifting


safety process.
Proper lifting practice should be
prepared and should be followed by all
personnel.

Long Term:
Monitor lifting activities regularly.

8|Page

Time Scale

Regular

INTERNATIONAL GENERAL
CERTIFICATE
(2014 specification)

Candidates observation sheet

IGC3 THE HEALTH AND


SAFETY PRACTICAL APPLICATION

Student Name:

Muahammad Kaiser Faheem

Student Number:

Place Inspected:

Ittehad Chemical Ltd. Lahore

Date of Inspection: 02 / 02 / 2014.

Observation
Hazards and Consequences

Item
20

21

00218445

Control Measures
Immediate/longer term action

Observation

Immediate:

Duct was cracked so scaffolding work was


carried out to maintenance work on duct
between prill tower and cyclone.

Fixed the guard rail & toe board

Hazard & Consequences:

Scaffold training (erection & dismantling )

Substandard scaffolding guard rail & toe


board are missing which will allow the
workers, tools or material to fall from height
thereby seriously injuring the other workers.

Long Term:

Observation:

Immediate:

Welding work was carried out in the erection


of new quench cooler design, burner duct
designing and cooling tower fan cover
designing in the welding house.

Making people aware of the hazard.


Providing personal protective equipments
such as safety goggles to protect against
ultra violet radiations emitted.

Hazard & Consequences:


Risk of inhaling welding fumes which can
cause the disease known as blue metal fever
and high temperatures during welding activity
can cause burns.

Short Term:

Immediate

One Week

Regular

Strict monitoring & supervision of


scaffolding operation.

Short Term:

One week

Two week

Redesign the workplace and ensure


sufficient ventilation to avoid the danger of
inhaling welding fumes

Long Term:
Install local exhaust ventilation to
eliminate the possibility of breathing
welding fumes.

9|Page

Time Scale

Two month

INTERNATIONAL GENERAL
CERTIFICATE
(2014 specification)

Candidates observation sheet

IGC3 THE HEALTH AND


SAFETY PRACTICAL APPLICATION

Student Name:

Muahammad Kaiser Faheem

Student Number:

Place Inspected:

Ittehad Chemical Ltd. Lahore

Date of Inspection: 02 / 02 / 2014.

Observation
Hazards and Consequences

Item
22

Observation:
During process of drying of calcium chloride
solution to form calcium chloride prills,
problem came inside the prill or drying tower,
there was one way to go and come from inside
prill tower. Worker entered to prill tower to
check nozzle and also fluidized bed checking
was required due to parameters variation.
Inside bed environment was hot and
temperature was too high.

Hazard & Consequences:


Environment Hazard and confined space
hazard.
May cause heat exhaustion and heat stroke.

23

Observation:
Excavation work was carried out for the
installing new ID fan blower in the coal
furnace plant. And area was not barricade.

00218445

Control Measures
Immediate/longer term action
Immediate:

Immediate

Provision of adequate welfare facilities


such as drinking water. Providing
refugees and moderate environment to
worker after coming out that heated
confined space.

Three week

Short Term:
Install strainer in the feed line, if any
blockage piece came in feed line can
remove outside the Prill or drying tower to
provide safe work system to worker.

Six Month

Long Term:
Install camera inside the Prill or drying
tower to watch the fluidized bed height
and condition of spoilage or non spoilage.

Immediate:

Immediate

Use stop blocks to prevent vehicles


Overrunning. Barriers and signs to
Prevent people falling into excavations.
One week

Hazard & Consequences:

Short Term:

Falling Hazard
Risk of people, material and equipments falling
into the excavations and the possible results
could be fatalities.

Organizing a good traffic management


system in place. Traffic routes should be
clearly marked.

Long Term:
Excavations must be inspected at the
Beginning of the shift on daily basis.
All personnel need to be trained and
competent to carry out their tasks safely.

10 | P a g e

Time Scale

Two week

INTERNATIONAL GENERAL
CERTIFICATE
(2014 specification)

Candidates observation sheet

IGC3 THE HEALTH AND


SAFETY PRACTICAL APPLICATION

Student Name:

Muahammad Kaiser Faheem

Student Number:

Place Inspected:

Ittehad Chemical Ltd. Lahore

Date of Inspection: 02 / 02 / 2014.

Observation
Hazards and Consequences

Item
24

Observation:
The electrical system in the main electrical
panel room was open & unattended

Hazard & Consequences:


Fire & explosion
Electrocution
Short circuit

25

26

00218445

Control Measures
Immediate/longer term action
Immediate:

Lock out tag out procedure should be


used in case of any maintenance or
troubleshooting
It should be under control of permit to
work system

Immediate:

To install filter pressure in the chemical area,


the construction work was under progress and
worker was using drill machine.

Provide Gloves to the worker

Hazard & Consequences:

Provide training and supervision

Vibration Hazard
Hand arm vibration syndrome, numbness and
blanching of fingers, reduction in the dexterity

Long Term:

Observation:

Immediate:

Worker was smoking in the warehouse of fuel


storage.

Place prohibition sign for no smoking

Fire hazard and discipline hazard.


Result in severe injuries and property
damage

Short Term:

Immediate

One Week

Regular

Provide job rotation after intervals

Short Term:

Immediate

One Week

Provide training and supervision to the


employees

Long Term:
Install smoke detector in the warehouse

11 | P a g e

Immediate

The electrical system should be always


locked & secured

Observation:

Hazard & Consequences:

Time Scale

Two week

INTERNATIONAL GENERAL
CERTIFICATE
(2014 specification)

Candidates observation sheet

IGC3 THE HEALTH AND


SAFETY PRACTICAL APPLICATION

Student Name:

Muahammad Kaiser Faheem

Student Number:

00218445

Place Inspected:

Ittehad Chemical Ltd. Lahore

Date of Inspection: 02 / 02 / 2014.

Good Practices:

Good Practices

Maintain

Keep it up

Providence of door to door pick and drop


service to workers service from company side is a good
practice, it must be continue and maintain.

Maintain it because it is good


practice.

Keep up

Store house and maintenance workshop was


away from hazardous area and it was well ventilated
and managed everything in good order is a good
practice.

Maintain it because it is good


practice.

Keep up

Chemical and flammable chemical store house


was separated and was little away from the plant area
and was out of any hazards range, and was well
cleaned.

Maintain it because it is good


practice.

Keep up

Drinking water filters changed after regular


intervals is a good practice to maintain good health of
employees.

Maintain it because it is good


practice.

Keep up

Medical facilities are good and quick service in


case of any emergency is a good thing to maintain
good standard of health and safety standards.

Maintain it because it is good


practice.

Keep up

Canteen was near to rest rooms and well


maintains and comfort and cleaned and hygienic foods
were provided.

Maintain it because it is good


practice.

Keep up

12 | P a g e

You might also like