POBLACION ACTUAL
TASA DE CRECIMIENTO
PERIODO DE DISEO
POBLACION FUTURA
Pf = Po * ( 1+ r*t/100 )
DOTACION
CAUDAL DE AGUAS RESIDUALES
Qprom. = 0.80 * Pob.* Dot./1,000
CAUDAL MAXIMO HORARIO (M3/Sg)
Qmx. horario = 1.3 x 2 x Qprom.
1555 hab
1.5 %
20 aos
2022 hab
120 LT/HAB/DIA
194.064 m3/d
0.0058399 m3/d
4.974 km
83
0.0015164 m3/d
CAUDAL DE DISEO
0.00736 m3/s
7.3563 LT/seg
0.009
Lonqitud
Tramo
(m)
Pendiente
S
(m/m)
D
Teorico
(m)
D
Velocidad Pendiente
Comercial Tramo
S
(m)
(m/s)
(%)
60.00
48.00
22.00
54.80
61.70
24.10
23.15
48.45
0.02383
0.01167
0.09000
0.00529
0.04327
0.02697
0.01080
0.00537
0.088
0.100
0.068
0.116
0.078
0.086
0.102
0.116
0.160
0.160
0.160
0.160
0.160
0.160
0.160
0.160
1.53
1.18
2.45
0.89
1.89
1.59
1.15
0.89
23.83
11.67
90.00
5.29
43.27
26.97
10.80
5.37
71.98
6.42
13.40
40.50
0.09878
0.12928
0.05075
0.05037
0.067
0.064
0.076
0.076
2.53
2.78
2.00
1.99
98.78
129.28
50.75
50.37
39.00
49.60
0.05692
0.01815
0.074
0.092
0.160
0.160
0.160
0.160
0.160
0.160
0.160
2.08
1.38
56.92
18.15
22.40
0.23661
0.057
3.44
236.61
15.80
5.00
0.25633
0.37000
0.056
0.052
0.160
0.160
0.160
0.160
3.54
4.03
256.33
370.00
25.40
0.23976
0.057
3.46
239.76
20.00
42.00
0.19450
0.11000
0.059
0.066
0.160
0.160
0.160
0.160
3.21
2.63
194.50
110.00
7.70
0.32078
0.054
0.160
3.83
320.78
36.30
8.00
32.70
74.40
0.25152
0.08875
0.07003
0.12231
0.056
0.068
0.072
0.064
0.160
0.160
0.160
0.160
3.52
2.43
2.24
2.73
25.15
8.88
7.00
12.23
FONCODES
Caudal
Tramo
(m3/s)
0.00736
0.00736
0.00736
0.00736
0.00736
0.00736
0.00736
0.00736
0.00736
0.00736
0.00736
0.00736
0.00736
0.00736
0.00736
0.00736
0.00736
0.00736
0.00736
0.00736
Lonqitud
Tramo
(m)
43.69
63.52
51.35
4.73
43.88
62.99
57.79
60.33
34.30
32.27
30.68
65.70
55.62
54.02
52.18
26.27
36.00
71.02
36.51
91.05
Pendiente
S
(m/m)
0.06988
0.13652
0.23427
0.02030
0.04268
0.08376
0.09329
0.07094
0.09073
0.04038
0.18628
0.14391
0.12089
0.13512
0.07718
0.16361
0.19836
0.14313
0.09863
0.13017
D
Teorico
(m)
0.072
0.063
0.057
0.090
0.078
0.069
0.068
0.071
0.068
0.079
0.060
0.062
0.065
0.063
0.070
0.061
0.059
0.063
0.067
0.064
D
Velocidad Pendiente
Comercial Tramo
S
(m)
(m/s)
(%)
0.160
2.24
6.99
0.160
2.83
13.65
0.160
3.43
23.43
0.160
1.44
2.03
0.160
1.88
4.27
0.160
2.39
8.38
0.160
2.48
9.33
0.160
2.25
7.09
0.160
2.45
9.07
0.160
1.84
4.04
0.160
3.16
18.63
0.160
2.89
14.39
0.160
2.72
12.09
0.160
2.82
13.51
0.160
2.32
7.72
0.160
3.02
16.36
0.160
3.23
19.84
0.160
2.88
14.31
0.160
2.53
9.86
0.160
2.79
13.02
701.40
LONGITUD TOTAL TUB. UF S-25 DN 6"
LONGITUD TOTAL TUBERIA CSN 6"
TOTAL
LONGITUD TOTAL EMISOR
701.40 ml
0.00 ml
701.40 ml
1125.30 ml
TOTAL
1826.70 ml
FONCODES
1.52
1.16
2.50
0.87
1.90
1.59
1.13
0.87
2.59
2.87
2.02
2.01
2.11
1.37
3.60
3.71
4.26
3.62
3.34
2.70
4.03
3.68
2.49
2.28
2.81
FONCODES
2.28
2.93
3.59
1.43
1.89
2.44
2.54
2.29
2.51
1.85
3.29
2.99
2.80
2.92
2.36
3.13
3.37
2.98
2.59
2.88
INGESAN S.A.C.
METRADO
1.- NOMBRE DEL PROYECTO
2.- PROVINCIA
3.- REGION
Partida
N
01
01.01
Especificaciones
N de
veces
Largo
MEDIDAS
Ancho
Altura
Parcial
Total
Und.
RED COLECTORA
OBRAS PRELIMINARES
TRAZO, REPLANTEO Y NIVELACIN EN REDES DE
705.36
705.36
705.36
ML
MOVIMIENTO DE TIERRAS
EXCAVACIN DE ZANJA PARA TUBERAS Aprom=0.60
141.36
141.36
141.36
ML
01.02.02
564.00
564.00
564.00
ML
01.02.03
141.36
141.36
141.36
ML
01.02.04
564.00
564.00
564.00
ML
705.36
705.36
705.36
ML
705.36
705.36
705.36
ML
705.36
705.36
705.36
ML
705.36
705.36
705.36
ML
12.00
12.00
12.00
UND
5.00
5.00
5.00
UND
2.00
2.00
2.00
UND
1,125.30
1,125.30
1,125.30
ML
01.02.05
01.02.06
01.03
PRUEBA HIDRAULICA
02
02.01
CONSTRUCCION DE BUZONES
EMISOR
OBRAS PRELIMINARES
TRAZO, REPLANTEO Y NIVELACIN EN REDES DE
MOVIMIENTO DE TIERRAS
EXCAVACIN DE ZANJA PARA TUBERAS Aprom=0.60
750.30
750.30
750.30
ML
02.02.02
225.00
225.00
225.00
ML
02.02.03
150.00
150.00
150.00
ML
02.02.04
750.30
750.30
750.30
ML
02.02.05
225.00
225.00
225.00
ML
02.02.06
150.00
150.00
150.00
ML
1,125.30
1,125.30
1,125.30
ML
1,125.30
1,125.30
1,125.30
ML
1,125.30
1,125.30
1,125.30
ML
02.02.07
02.02.08
02.03
INGESAN S.A.C.
METRADO
INSTALACION RED DE DESAGUE BARRIO ALTO HUASCAR, C.P.
RINCONADA, ANANEA
SAN ANTONIO DE PUTINA
PUNO
N de
veces
Especificaciones
Parcial
03
CAMARA DE REJAS
03.01
OBRAS PRELIMINARES
15.00
15.00
15.00
1,125.30
1,125.30
1,125.30
ML
8.00
8.00
8.00
ML
2.40
4.32
4.32
M2
4.32
M3
1.80
UND
MOVIMIENTO DE TIERRAS
EXCAVACION PARA CIMIENTOS ZAPATAS EN TERRENO
LOSA FONDO
2.40
1.80
0.20
0.86
0.86
M2
MURO
2.40
1.80
0.80
3.46
3.46
M3
8.40
M2
2.40
1.00
2.40
4.80
M2
1.80
1.00
1.80
3.60
M2
2.40
1.80
4.32
4.32
M2
2.30
1.70
0.78
M3
1.76
M3
CONCRETO SIMPLE
03.04
Und.
03.02.01 NORMAL
03.03
Total
CONSTRUCCION DE BUZONES
03.02
Altura
PRUEBA HIDRAULICA
MEDIDAS
Ancho
Largo
CONCRETO ARMADO
0.20
0.78
2.10
0.15
1.45
0.46
0.91
M3
1.50
0.15
1.45
0.33
0.65
M3
0.90
0.15
1.45
0.20
0.20
M3
2.10
1.50
0.10
0.32
0.32
M3
INGESAN S.A.C.
METRADO
1.- NOMBRE DEL PROYECTO
2.- PROVINCIA
3.- REGION
Partida
N
03.04.04
Especificaciones
Largo
MEDIDAS
Ancho
Altura
Parcial
03.05
0.20
0.46
0.92
M2
1.70
0.20
0.34
0.68
M2
23.49
M2
2.10
1.45
3.05
12.18
M2
1.50
1.45
2.18
8.70
M2
0.90
1.45
1.31
2.61
M2
2.88
M2
1.80
1.20
2.16
2.16
M2
2.10
0.10
0.21
0.42
M2
1.50
0.10
0.15
0.30
M2
135.27
84.37
KG
2.16
2.16
M2
23.49
M2
3.05
12.18
M2
2.18
8.70
M2
1.31
2.61
M2
6.03
M2
3.15
3.15
M2
1.80
1.20
03.05.02 E=1.5cm
03.06
2.10
1.45
1.50
1.45
0.90
1.45
2.10
2.10
0.10
0.21
0.42
M2
1.50
0.10
0.15
0.30
M2
1.80
2.16
2.16
M2
1.50
23.59
KG
23.59
KG
1.20
OTROS
P. Acero 3/8
M2
03.05.01 Fondo
03.05.03
1.60
2.30
Und.
Total
4.07
0.58
2.36
INGESAN S.A.C.
METRADO
1.- NOMBRE DEL PROYECTO
2.- PROVINCIA
3.- REGION
Partida
N
04.01
Especificaciones
Largo
MEDIDAS
Ancho
Altura
Parcial
Total
Und.
OBRAS PRELIMINARES
TRAZO, REPLANTEO Y NIVELACIN EN REDES DE
15.76
15.76
15.76
ML
15.76
15.76
15.76
ML
15.76
15.76
15.76
ML
15.76
15.76
15.76
ML
15.76
15.76
15.76
ML
15.76
15.76
15.76
ML
15.76
15.76
15.76
ML
1.60
1.60
2.56
2.56
M2
05.02.01 NORMAL
1.60
1.60
0.92
2.36
2.36
M3
3.20
0.92
2.94
5.89
M2
1.60
2.56
2.56
M2
0.27
0.27
M3
0.82
M3
MOVIMIENTO DE TIERRAS
EXCAVACIN DE ZANJA PARA TUBERAS Aprom=0.60
PRUEBA HIDRAULICA
05
05.01
05.02
MOVIMIENTO DE TIERRAS
EXCAVACION PARA CIMIENTOS ZAPATAS EN TERRENO
05.03
CONCRETO SIMPLE
05.04
AREA
CONCRETO ARMADO
1.60
1.83
0.15
05.04.03 PISO
1.50
0.15
1.05
0.24
0.24
M3
0.80
0.15
1.25
0.15
0.30
M3
0.92
0.10
1.25
0.12
0.23
M3
0.80
0.12
0.55
0.05
0.05
M3
1.50
1.50
2.25
2.25
M2
INGESAN S.A.C.
METRADO
1.- NOMBRE DEL PROYECTO
2.- PROVINCIA
3.- REGION
Partida
N
Especificaciones
Largo
MEDIDAS
Ancho
Altura
Parcial
05.05
1.58
3.15
M2
0.80
1.25
1.00
4.00
M2
0.92
1.25
1.15
4.60
M2
0.80
0.55
0.44
0.88
M2
48.78
48.78
KG
0.27
M2
0.27
M2
12.63
M2
AREA
1.83
0.15
0.27
05.05.02 E=1.5cm
06.03
1.58
3.15
M2
0.80
1.25
1.00
4.00
M2
0.92
1.25
1.15
4.60
M2
0.80
0.55
0.44
0.88
M2
1.00
2.00
UND
18.00
18.00
36.00
ML
18.00
18.00
36.00
ML
18.00
18.00
36.00
ML
18.00
18.00
36.00
ML
18.00
18.00
36.00
ML
18.00
18.00
36.00
ML
MOVIMIENTO DE TIERRAS
06.02.04
1.05
OBRAS PRELIMINARES
TRAZO, REPLANTEO Y NIVELACIN EN REDES DE
06.02.03
1.50
06.02.02
OTROS
05.06.01 Esp.
06.02
M2
1.05
06.01
12.63
1.50
06
Und.
05.05.01 Fondo
05.06
Total
INGESAN S.A.C.
METRADO
INSTALACION RED DE DESAGUE BARRIO ALTO HUASCAR, C.P.
RINCONADA, ANANEA
SAN ANTONIO DE PUTINA
PUNO
N de
veces
Especificaciones
07.01
07.02.01
Parcial
Total
Und.
2.00
UND
18.00
18.00
36.00
ML
72.00
2,664.00
5,328.00
M2
LAGUNA ESTABILIZACION
OBRAS PRELIMINARES
Altura
PRUEBA HIDRAULICA
07
MEDIDAS
Ancho
06.05
Largo
MOVIMIENTO DE TIERRAS
CORTE EN TERRENO SEMIROCOSO O ROCA SUELTA CON
EQUIPO (TRACTOR)
37.00
Area de Corte
Longitud
LAGUNA PRIMARIA 1
188.18
38.80
7,301.38
7,301.38
LAGUNA PRIMARIA 2
188.18
38.80
7,301.38
7,301.38
14,602.77
Area de Relleno
Longitud
LAGUNA PRIMARIA 1
137.78
33.20
4,574.30
4,574.30
LAGUNA PRIMARIA 2
137.78
33.20
4,574.30
4,574.30
M3
9,148.59
M3
6,528.00
M2
LAGUNA PRIMARIA 1
Area Lateral
Perimetro 1
34.00
2
Area Fondo
Perimetro 2
66.00
57.00
Apotema
3.78
128.52
257.04
3.78
249.48
498.96
1,254.00
2,508.00
22.00
3,264.00
LAGUNA PRIMARIA 2
Area Lateral
Perimetro 1
34.00
2
Area Fondo
Perimetro 2
66.00
57.00
Apotema
3.78
128.52
257.04
3.78
249.48
498.96
1,254.00
2,508.00
22.00
3,264.00
6,437.28
COMPACTACION = 1.20
LAGUNA PRIMARIA 1
Area Lateral
Perimetro 1
2
2
Perimetro 2
31.00
63.00
M2
Apotema
3.78
117.18
234.36
3.78
238.14
476.28
INGESAN S.A.C.
METRADO
INSTALACION RED DE DESAGUE BARRIO ALTO HUASCAR, C.P.
RINCONADA, ANANEA
SAN ANTONIO DE PUTINA
PUNO
N de
veces
Especificaciones
Area Fondo
Largo
57.00
MEDIDAS
Ancho
Altura
22.00
Parcial
1,254.00
Total
Und.
2,508.00
3,218.64
LAGUNA PRIMARIA 2
Area Lateral
Perimetro 1
31.00
2
Area Fondo
Perimetro 2
63.00
57.00
Apotema
3.78
117.18
234.36
3.78
238.14
476.28
1,254.00
2,508.00
22.00
3,218.64
3,121.83
3,121.83
Area Lateral
Perimetro 1
LAGUNA PRIMARIA 2
Area Lateral
08
08.01
Perimetro 1
378.00
756.00
378.00
756.00
10.70
21.40
ML
Apotema
100.00
3.78
5.35
2.00
5.35
1.20
2.05
13.16
26.32
M3
5.35
2.00
0.20
2.14
4.28
M3
3.91
M3
MOVIMIENTO DE TIERRAS
CONCRETO ARMADO
08.04.03
M2
Apotema
3.78
Perimetro 2
1,512.00
OBRAS PRELIMINARES
08.03
100.00
M3
ESTRUCTURA DE SALIDA
08.02
Perimetro 2
3,121.83
1.60
0.15
1.85
0.44
1.78
M3
2.65
0.15
1.85
0.74
1.47
M3
1.20
0.15
1.85
0.33
0.67
M3
6.55
0.20
1.31
5.24
M2
52.17
M2
1.60
1.85
2.96
23.68
M2
2.65
1.85
4.90
19.61
M2
INGESAN S.A.C.
METRADO
1.- NOMBRE DEL PROYECTO
2.- PROVINCIA
3.- REGION
Partida
N
Especificaciones
Largo
MEDIDAS
Ancho
1.20
Altura
1.85
Parcial
Total
Und.
2.22
8.88
M2
167.15
334.31
KG
OTROS
08.09.01
1.00
1.00
2.00
UND
08.09.02
BAFLE DE MADERA
1.00
1.00
2.00
UND
08.09.03
1.00
1.00
2.00
UND
08.09.04
ARCILLA COMPACTADA
0.70
0.11
0.22
M3
10.00
10.00
20.00
ML
10.00
10.00
20.00
ML
10.00
10.00
20.00
ML
10.00
10.00
20.00
ML
10.00
10.00
20.00
ML
10.00
10.00
20.00
ML
80
6.00
3.60
288.00
M2
09.00
06.01
OBRAS PRELIMINARES
TRAZO, REPLANTEO Y NIVELACIN EN REDES DE
06.02
06.02.03
06.02.04
06.03
10
10.01
1.55
MOVIMIENTO DE TIERRAS
0.10
CONEXIONES DOMICILIARIAS
OBRAS PRELIMINARES
0.60
INGESAN S.A.C.
METRADO
1.- NOMBRE DEL PROYECTO
2.- PROVINCIA
3.- REGION
Partida
N
10.02
Especificaciones
Largo
MEDIDAS
Ancho
Altura
Parcial
Total
Und.
MOVIMIENTO DE TIERRAS
EXCAVACIN DE ZANJA PARA TUBERAS Aprom=0.60
80
6.00
6.00
480.00
ML
80
6.00
6.00
480.00
ML
80
6.00
6.00
480.00
ML
80
6.00
6.00
480.00
ML
80
6.00
6.00
480.00
ML
80
0.30
0.03
2.16
M3
80
1.00
1.00
80.00
UND
80
1.00
1.00
80.00
UND
1.00
1.00
1.00
GBL
10.02.02
10.03
10.03.04
11
11.01
0.30
0.30
FLETE TERRESTRE
FLETE TERRESTRE
FONCODES
METRADO DE ACERO
1/4"
Peso (kg) 0.248
Partida
N
03
Descripcion
Diseo
del
fierro
3/8"
0.560
1/2"
0.994
N de
elemtos.
iguales
5/8"
1.552
3/4"
2.235
N de
Long. Longitud
piezas x
Por
total
elemento pieza
(m)
CAMARA DE REJAS
1
1
1
1
1
1
1
10
22
3
31
10
6
15
2.95
0.65
2.00
1.75
0.85
0.65
1.60
29.50
14.30
6.00
54.25
8.50
3.90
24.00
78.652
16.520
8.008
3.360
30.380
4.760
2.184
13.440
3/8
3/8
3/8
3/8
3/8
3/8
1
2
2
1
2
1
12
12
6
6
7
7
3.40
0.65
0.70
3.40
0.85
1.50
40.80
15.60
8.40
20.40
11.90
10.50
60.256
22.848
8.736
4.704
11.424
6.664
5.880
3/8
3/8
1
1
5
8
1.00
0.55
5.00
4.40
5.264
2.800
2.464
71.568
05.04.05FONDO Y PARED
3/8
3/8
3/8
3/8
3/8
3/8
1
1
1
1
1
1
9
6
11
13
3
3
4.05
4.25
5.00
0.35
0.75
1.35
36.45
25.50
55.00
4.55
2.25
4.05
Area Lateral
71.568
20.412
14.280
30.800
2.548
1.260
2.268
151.625
07.02.05MUROS
08
kg
3/8
3/8
3/8
3/8
3/8
3/8
3/8
03.04.07PARED CAMARA DE REJAS
Peso
144.172
05
1"
3.973
1/2
1/2
1/2
1
1
1
18
14
14
5.13
2.43
1.87
92.34
34.02
26.18
151.625
91.786
33.816
26.023
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
2
2
2
2
2
2
4
4
4
2
18
35
16
30
14
18
18
19
19
18
5.19
5.91
6.00
6.00
6.00
5.49
5.09
5.17
4.95
5.05
186.84
413.70
192.00
360.00
168.00
197.64
366.48
392.92
376.20
181.80
2,818.57
185.719
411.218
190.848
357.840
166.992
196.454
364.281
390.562
373.943
180.709
1/2
19
5.35
203.30
ESTRUCTURA DE SALIDA
#REF! MUROS
805.657
202.08
FONCODES
Partida
N
Descripcion
Diseo
del
fierro
N de
elemtos.
iguales
1/2
2
1/2
2
1/2
2
N de
Long. Longitud
piezas x
Por
total
elemento pieza
(m)
19
5.59
212.42
17
5.64
191.76
18
5.64
203.04
#REF! PASARELA
1/4
3/8
3
3
24
4
0.55
4.50
39.60
54.00
#REF! #REF!
Peso
kg
211.15
190.61
201.82
40.061
9.821
30.240
55.247
2
2
2
4
1
8
2.08
3.95
1.94
16.64
7.90
31.04
55.247
16.540
7.853
30.854
8.184
2
2
6
6
0.75
2.00
9.00
24.00
#REF! #REF!
8.184
2.232
5.952
1,183.321
#REF! MUROS
1/2
1/2
1/2
1/2
3
2
2
3
27
35
6
6
1.75
1.75
9.00
7.55
141.75
122.50
108.00
135.90
505.101
140.900
121.765
107.352
135.085
1/2
1/2
1
1
29
35
9.00
6.75
261.00
236.25
586.243
259.434
234.833
1/2
3/8
4
2
4
29
4.66
0.55
74.56
31.90
91.977
74.113
17.864
#REF! FONDO
FONCODES
FONCODES
FONCODES / DEPI
1- DATOS GENERALES
A-POR PESO
MATERIALES
CEMENTO
FIERRO, CLAV. ETC
MADERA
LADRILLO
CALAMINA
YESO
TAPA BUZON
OTROS
MAQUINARIA Y EQUIP
UNIDAD
BL.
KG
P2
UN
UN
BL
UN
KG
KG
TAPA DE FIERRO
BOMBA MANUAL
UN
UN
AFECTO IGV
2,045.00
6,397.50
2,550.30
27.00
75.00
301.50
PESO.UNIT.
42.50
1.00
1.50
4.50
3.00
25.00
130.00
1.00
1.00
PESO.TOTAL
86,912.50
6,397.50
3,825.45
675.00
9,750.00
301.50
15.00
120.00
PESO TOTAL
107,861.95
B-POR VOLUMEN
EN AGREGADOS Y MADERA
DESCRIPC.
UNIDAD
ARENA
M3
PIEDRA
M3
HORMIGN
M3
MADERA
P2
VOLUMEN TOTAL
CAPACIDAD DEL CAMION (M3)
NUMERO DE VIAJES
REDONDEO
AFECTOS IGV
SIN IGV
125.20
173.80
328.80
3.60
627.81
8.00
78.48
78.50
EN TUBERIA
UNIDAD DE (2.20 M. x 3.00 M.) DE CARROCERIA, CON H= 1.50 M.
CAPACIDAD DEL CAMION EN TUBOS / VIAJE
ML
No de tubos
Tub, 1/2"
5,050.00
U
Tub, 3/4"
4,200.00
U
Tub, 1"
3,360.00
U
Tub,1 1/2"
1,690.00
U
Tub 2:"
994.00
U
Tub, 3"
470.00
U
Tub 4":
259.00
U
1,324.60
Tub 6:" U-PVC
110.00
U
5,916.00
Tub 8" U-PVC
65.00
U
Tub 6'; CSN
160.00
U
Tub 8'; CSN
80.00
U
NUMERO TOTAL DE VIAJES
REDONDEO
TUBERIA EN VOLUMEN
2- FLETE TERRESTRE
UNIDAD DE TRANSPORTE
No VIAJES
264.92
1,183.20
1.02
10.76
11.78
12.00
187
SIN IGV
6,280.00
2,160.00
4,101.52
6,280.00
FLETE TERRESTRE
FLETE FLUVIAL
FLETE EN ACEMILA
FLETES TOTALES S/.
AFECTO IGV
4,101.52
SIN IGV
6,280.00
4,101.52
6,280.00
8.00
80.00
10,000.00
Volumen / tubo
0.00175
0.00314
0.00493
0.01063
0.01729
0.03545
0.06006
0.14450
0.24200
0.00440
0.09380
Peso/tubo
Peso en Kg
0.50
0.75
1.00
1.75
2.68
6.41
15.91
10.60
2,808.15
170.97
15.53
18,375.10
26.17
50.00
100.00
21,183.25
18,375.10
FONCODES
POBLACION ACTUAL
TASA DE CRECIMIENTO
PERIODO DE DISEO
POBLACION FUTURA
Pf = Po * ( 1+ r*t/100 )
DOTACION
CAUDAL DE AGUAS RESIDUALES
Qprom. = 0.80 * Pob.* Dot./1,000
CAUDAL MAXIMO HORARIO (M3/Sg)
Qmx. horario = 1.3 x 2 x Qprom.
500 hab
1.5 %
20 aos
650 hab
70 LT/HAB/DIA
36.4 m3/d
0.0010954 m3/d
0.194 km
2
5.37E-05 m3/d
CAUDAL DE DISEO
0.00115 m3/s
0.014
Lonqitud
Tramo
(m)
Pendiente
S
(m/m)
D
Teorico
(m)
D
Velocidad Pendiente
Comercial Tramo
S
(m)
(m/s)
(%o)
0.150
0.150
0.150
0.00
FONCODES