You are on page 1of 2

S.No.

Describe the Requirement

1 Delivery time

2 Durability

3 Good quality of the product

4 Eco friendly

5 Affordability of the product

6 Customized Automobile parts

7 conformance to ISO 9001:2008

8 Component Design Assistance

9 Warranty of the product

11 Material Handling of the product

12 Reliability

customer feedback must be


13 processed and considered

14 safety of operation

15 Ease of Maintainance

16 scope for future development

10

11

12

Enter customer rating for


competitor C's product

Enter customer rating for


competitor B's product

Enter customer rating for


competitor A's product

Enter customer rating for


our product

2
3

9
9

9
3

3
4

4
5

5
3

5
4

3
9

0
0

9
9

Goal/Quality Plan (1-5)

use of laser technology for


designing
3

9
9

Our product
Competitor A's product
Competitor B's product
Competitor C's product
Our product
Competitor A's product
Competitor B's product
Competitor C's product

15

3
9

14

9
3

Transportation Intermodal Freight Transport

compliance to safety standards


13

9
9

close relation with collaboration companies

Maintainance Testing

Customer Relationship Management

Just in Time Material Handling

Reliability/Testing
8

10 Design Requirements

Inventory

Research and Development

Cost economics

Team Management

IS0 9001:2008 Safety standards

Recyclable Material processing

Lean Manufacturing Manager:


Customer Requirements
(Reflecting component/ object
behavior related to customer needs)

quality control/Assurance

Engineering / Software Solutions


Responding to Customer
Requirements

Importance Rating (1-5)

Object / Component Oriented Requirements Analysis


Program for Networked Lean Manufacturing by Paul G. Ranky
1992-2014

9
9
3

9
3

0 sec switch
Less than 30 sec
switch
Refresh every 2
minutes
Refresh every 2
minutes
320x240 pixels or
better
320x240 pixels or
better
Win, Linux,
Solaris, or OSX
Response within
12 msec
Response within
24 msec

Less than 24 hrs

Within 27 msec
GUI, iconized,
multimedia
Less than 3
minutes

Within 27 msec

Within 27 msec

Within 27 msec

Target Values (List here the


parameters that specify engineering
solutions accurately. If you don't know
the range of the acceptable values, use
our Taguchi Calculator Program for
Designing an Experiment)

21

Our product

Competitor A's product

Competitor B's product

Competitor C's product

0
1

Absolute Importance Rating

10

11

12

13

14

15

16

17

18

19

20

13

4.4

12

10

12

3.4

6.3

3.9

2.9

5.9

4.9

3.9

Enter Competitor A's ratings (1-5); Graph

Enter Competitor B's ratings (1-5); Graph

4
3

3
2

4
3

5
3

4
2

5
2

4
1

4
1

3
2

2
3

3
4

2
3

3
4

4
3

3
2

4
3

Relative Importance Rating


Enter Our Product ratings (1=Low, 5=High)

Enter Competitor C's ratings (1-5); Graph

453 154 433 175 357 411 118 219 138 102 207 279 171 138 141

You might also like