You are on page 1of 4

Date: 11/23/14

Time Observation Form

Operator/Process: Stephanine DeJesus


Disassemble

Part #: MA581
Component Task

Observers: Timothy Ellis

Open Battery Casing, Remove Battery connector from pin header


then remove battery.

4.12

4.07

4.21

4.18

4.19

4.15

Unscrew both screws with a Phillips Head screwdriver (1/16th


inch screw) Then remove bottom housing of phone.
Unscrew the 3 screws that connects the circuit board to the
3
top housing.
Partially remove circuit board from top housing , then
4
unscrew the two screws that connects the speaker.
Remove keyboard from top housing
5

7.20

8.03

7.35

7.24

7.28

7.18

7.44

7.56

8.12

7.39

7.48

7.41

6.13

6.19

6.11

7.11

6.17

6.15

3.27

3.22

3.05

3.25

3.01

3.07

7.54

7.22

7.77

7.20

7.28

7.17

35.70

36.29

36.61

36.37

35.41

35.13

1
2

Sort disasseble parts.

Task
Time

Task Observations
/ End of Task

4.16

Place Battery on Table

7.24

Place Housing on Table

7.43

Grabs circuit board

6.15

Place circuit board on


table

3.04

Place keyboard on table

7.22

Yells Done

7
8
9
10
11
12
13
14
Operator Cycle Time seconds

35.24
0.58735
102.154

Lowest Repeatable

STANDARDIZED WORK SHEET

Type of Assembly Operation

DEPT:

JOB LOCATION:

AREA NAME:

Laurel Basement

PROCESS:

DATE:

11/23/2014

WORK SEQUENCE LAYOUT/VISUAL AIDS

APPROVAL

Assembly

DiaAssembly
TAKT TIME:

NOT A CONTROLLED DOCUMENT/ REFERENCE ONLY

Number of Operators

1st

2nd

Operator Number

3rd

MODEL STYLE:

25.2
CYCLE TIME:

PRODUCT #:

35.24
IN PROCESS STOCK

MA581
SAFETY AND ERGONOMICS

QUALITY CHECK

ERROR PROOFING

KEY

DEVICE
ELEMENT
TIMES

WORK STEPS

STEP

WALK TIMES

KEY POINTS

Open Battery Casing, Remove Battery connector from pin header then
remove battery.

4.16

Place Battery on Table

Unscrew both screws with a Phillips Head screwdriver (1/16th inch


screw) Then remove bottom housing of phone.

7.24

Place Housing on Table

Unscrew the 3 screws that connects the circuit board to the top
housing.

7.43

Grabs circuit board

Partially remove circuit board from top housing , then unscrew the two
screws that connects the speaker.

6.15

Place circuit board on table

Remove keyboard from top housing

3.04

Place keyboard on table

Sort disasseble parts.

7.22

Yells Done

7
8
9
10
Non Cyclical tasks

Total Time
PERSONAL
PROTECTIVE
EQUIPMENT

SAFETY

SAFETY

SAFETY

LOCKS

GLASSES

SHOES

GLOVES

35.241
HEARING

FACE

PROTECTION

MASK

APRON

SLEEVES

AIR

CYCLE TIME (Seconds)

HOOD

35.24
AUTHOR:

FOR REFERENCE ONLY

file: 253510293.xls.ms_office

STANDARDIZED WORK SHEET

Assembly

Process

DEPARTMENT:

RB

JOB LOCATION:

AREA NAME:

VS

B-Line B

NOT A CONTROLLED DOCUMENT/ REFERENCE ONLY

DATE:

8/5/2014

40

35.24

35
30

Takt Time, 25.2

25

Operator 1

20

Takt Time

15
10
5
0
PERSONAL
PROTECTIVE
EQUIPMENT

SAFETY

SAFETY

SAFETY

LOCKS

GLASSES

SHOES

GLOVES

HEARING

FACE

PROTECTION

MASK

APRON

SLEEVES

AIR

CYCLE TIME (Seconds)

QUALITY CHECK

SAFETY

STANDARD WIP

TAKT TIME

HOOD

35.24
AUTHOR: Timothy Ellis

FOR REFERENCE ONLY

ERROR PROOF

E
Number of pieces

25

file: 253510293.xls.ms_office

Operator 1
Takt Time

35.24
25.2

25.2

You might also like