HOJA DE METRADOS (ACERO)

Proyecto
Ubicacin
Fecha
Partida

SISTEMA DE RIEGO CANAL MAREPAMPA


: Localidad: Dos de Mayo , Distrito: La Merced, Provincia: Aija, Regin: Ancash
: Febrero del 2008
DESARENADOR

Partida N
03.02.04.02

DESCRIPCION
ACERO ESTRUCTURAL

N (mm)

CANT.

N ELEMENTOS

LONGITUD (M)

SUB TOTAL

PESO
(KG/ML)

KG.

TOTAL
151.77

ACERO EN LOSA DE FONDO

53.85

Longitudinal

10.00

1.00

6.00

6.85

41.10

0.557

22.89

Transversal

10.00

1.00

1.00

52.10

52.10

0.557

29.02

Verticales

10.00

1.00

6.00

0.58

3.48

0.557

1.94

Acero Longitudinal

10.00

2.00

6.00

6.04

72.48

0.557

40.37

Vertical

10.00

2.00

24.00

1.50

72.00

0.557

40.10

Vertical

10.00

1.00

4.00

1.30

5.20

0.557

2.90

Horizontal

10.00

1.00

4.00

2.00

8.00

0.557

4.46

Vertical

10.00

1.00

1.00

6.10

6.10

0.557

3.40

Horizontal

10.00

1.00

1.00

12.02

12.02

0.557

6.70

N (mm)

CANT.

N ELEMENTOS

LONGITUD (M)

SUB TOTAL

PESO
(KG/ML)

TOTAL

ACERO EN MUROS

80.48

ACERO EN MURO DE LIMPIA

7.35

ACERO EN VERTEDERO

Partida

PASARELA ( 04Und. )

Partida N
03.11.03

10.09

DESCRIPCION
ACERO ESTRUCTURAL

KG

72.19

LOSA

72.19

longitudinal

10.00

4.00

11.00

1.44

63.36

0.557

35.29

Transversal

10.00

4.00

9.00

1.84

66.24

0.557

36.90

PROYECTO SISTEMA DE RIEGO CANAL MAREPAMPA


Ubicacin
Fecha

: Localidad: Dos de Mayo, Distrito: La Merced, Provincia: Aija, Regin: Ancash


Febrero del 2008

DESAGREGADO DE GASTOS GENERALES


TOTAL COSTO DIRECTO S/.
ITEM

DESCRIPCION

Remuneraciones y Otros
1.01
Residente de obra
1.02
Maestro de Obra
1.03
Movilidad y Viaticos de Residente de Obra
1.04
Supervisor de Obra
1.05
Almacen y Guardian
1.06
Implementos de Seguridad
1.07
Expediente Tecnico
1.08
Liquidacion de Obra
1.09
Gastos de Comit de Obra
GASTOS GENERALES

268,187.17
COSTO
MENSUAL

2,400.00
1,500.00
200.00
3,000.00
600.00
400.00
4,200.00
3,000.00
150.00

NRO. DE
MESES

4.00
4.00
4.00
2.00
4.00
1.00
1.00
1.00
4.00

TOTAL
S/.

PORCENT.
%

9,600.00
6,000.00
800.00
6,000.00
2,400.00
400.00
4,200.00
3,000.00
600.00
33,000.00

12.30%

HOJA DE METRADO
Proyecto : SISTEMA DE RIEGO CANAL MAREPAMPA
Ubicacin: : Localidad: Dos de Mayo, Distrito: La Merced, Provincia: Aija, Regin: Ancash

CODIGO

DESCRIPCION

Und.

N Est. N V.

Largo(m) Ancho(m) Alto(m) Area(m2) Factor

01.00.00

TRABAJOS PRELIMINARES

01.01.00

CARTEL IDENTIFICACION DE OBRA

und

1.00

01.02.00

CAMPAMENTO DE OBRA

M2

1.00

10.00

02.00.00

CANAL DE CONDUCCION

02.01.00

CANAL RECTANGULAR DE MAMPOSTERIA DE PIEDRA

02.01.01

LIMPIEZA DE LA LINEA DE CONDUCCION

ml

1.00

1.00

02.01.02

TRAZO Y REPLANTEO

ml

1.00

1.00

02.01.03

EXCAVACION MANUAL

m3

1.00

1.00

83.35

0.40

0.50

33.34

02.01.04

RELLENO CON MATERIAL PROPIO

m3

1.00

1.00

83.35

0.40

0.50

33.34

02.01.05

ELIMINACION DE MATERIAL EXCEDENTE

m3

1.00

1.00

02.01.06

NIVELADO, APIZONADO Y COMPACTADO

ml

1.00

1.00

83.35

02.01.07

MAMPOSTERIA DE PIEDRA

m3

1.00

1.00

83.35

02.01.08

CURADO Y SECADO

m2

1.00

1.00

83.35

02.01.09

JUNTAS ASFALTICAS DE 1"X2" C/ 3.00m EN CANAL

ml

1.00

28.00

02.02.00

CANAL RECTANGULAR DE CONCRETO

02.02.01

LIMPIEZA DE LA LINEA DE CONDUCCION

ml

1.00

02.02.02

TRAZO Y REPLANTEO

ml

1.00

02.02.03

EXCAVACION MANUAL

m3

1.00

02.02.04

RELLENO CON MATERIAL PROPIO

m3

02.02.05

ELIMINACION DE MATERIAL EXCEDENTE

02.02.06

Parc.

TOTAL

1.00

1.00

80.00

80.00

83.35

83.35

83.35

83.35

83.35

83.35

16.67

16.67

8.00

0.30

5.00

11.67

11.67

83.35

83.35

30.01

30.01

225.05

225.05

1.60

44.80

44.80

1.00

1596.91

1596.91

1596.91

1.00

1596.91

1596.91

1596.91

1.00

615.32

615.32

1.00

1.00

505.11

505.11

m3

1.00

1.00

NIVELADO, APIZONADO Y COMPACTADO

ml

1.00

1.00

1596.91

02.02.07

ENCOFRADO Y DESENCOFRADO

m2

1.00

4.00

1596.91

02.02.08

CONCRETO Fc= 14 Mpa

m3

1.00

1.00

1596.91

02.02.09

TARRAJEO CON IMPERMEABILIZANTE

m2

1.00

1.00

1596.91

0.35

02.02.10

CURADO Y SECADO

m2

1.00

1.00

1596.91

1.45

02.02.11

JUNTAS ASFALTICAS DE 1"X2" C/ 3.00m EN CANAL

ml

1.00

554.00

03.00.00

OBRAS DE ARTE

03.01.00

CAPTACION

03.01.01

LIMPIEZA DE TERRENO

m2

1.00

1.00

03.01.02

ENROCADO DE PROTECCION Y DESVIACION

m3

1.00

1.00

03.02.00

DESARENADOR ( 01 Und.)

03.02.01

LIMPIEZA DE TERRENO

m2

1.00

03.02.02

TRAZO Y REPLANTEO

m2

1.00

03.02.03

MOVIMIENTO DE TIERRAS

2.70

1.20
0.40

132.25

1596.91

1596.91

638.76

638.76
348.13

1836.45

1836.45

2315.52

2315.52

803.30

803.30

44.00

44.00

44.00

5.00

2.00

2.00

1.00

10.77

10.77

10.77

1.00

11.77

11.77

11.77

11.77

11.77

4.71

4.71

EXCAVACION MANUAL

m3

1.00

1.00

03.02.03.02

RELLENO CON MATERIAL PROPIO

m3

1.00

1.00

03.02.03.03

ELIMINACION DE MATERIAL EXCEDENTE

m3

1.00

1.00

03.02.03.04

NIVELADO, APIZONADO Y COMPACTADO

m2

1.00

1.00

Muros Exteriores

1.00

Muros Interiores

0.22

110.21

348.13

03.02.03.01

0.40

1.45

0.40

1.00

11.77
0.40

7.06

7.06

10.77

10.77

10.77

2.00

6.21

12.42

12.42

1.00

2.00

5.05

10.10

10.10

Muro de Salida

1.00

2.00

2.44

4.88

4.88

Canal de limpia

1.00

3.00

3.28

0.85

8.36

8.36

Vertedero

1.00

2.00

1.50

0.30

0.90

0.90

03.02.04

OBRAS DE CONCRETO ARMADO

03.02.04.01

ENCOFRADO Y DESENCOFRADO

03.02.04.02

0.36

16.67

ACERO ESTRUCTURAL

m2

36.66

151.77

KG

Ver hoja Adjunta


03.02.04.03

03.02.04.04

CONCRETO Fc=21 MPa.

m3

17.74

Muros

1.00

2.00

Base

1.00

2.00

Cimiento

1.00

1.00

Muro de Salida

1.00

1.00

2.33

0.15

Canal de limpia(muros)

1.00

1.00

3.30

0.15

Canal de limpia(Base)

1.00

1.00

3.30

Vertedero

1.00

1.00

Aliviadero

1.00

1.00

TARRAJEO CON IMPERMEABILIZANTE

0.15
1.80

0.15

5.05
0.30

1.52

1.52

0.16

0.16

15.12

15.12

0.85

0.30

0.30

0.80

0.40

0.40

0.40

0.15

0.20

0.20

1.50

0.10

0.30

0.05

0.05

0.15

0.40

0.20

0.01

0.15

100.77

m2

0.01
32.18

Muros Interiores

1.00

2.00

5.05

10.10

10.10

Base

1.00

1.00

10.77

10.77

10.77

Muro de Salida

1.00

1.00

2.43

2.43

2.43

Canal de limpia(muros)

1.00

2.00

5.28

5.28

3.30

0.80

HOJA DE METRADO
Proyecto : SISTEMA DE RIEGO CANAL MAREPAMPA
Ubicacin: : Localidad: Dos de Mayo, Distrito: La Merced, Provincia: Aija, Regin: Ancash

CODIGO

03.02.05

DESCRIPCION

Und.

N Est. N V.

Largo(m) Ancho(m) Alto(m) Area(m2) Factor

Canal de limpia(Base)

1.00

1.00

1.50

Vertedero

1.00

2.00

1.50

Aliviadero

1.00

2.00

1.50

0.40

Parc.

TOTAL

0.60

0.60

0.80

2.40

2.40

0.20

0.60

0.60

INSTALACION DE ACCESORIOS

Gbl

1.00

1.00

Compuerta de Fierro con Volante 1.00x0.40m

Und

1.00

1.00

1.00

1.00

Compuerta de Fierro con Volante 0.65x0.35m

Und

1.00

1.00

1.00

1.00

ml

1.00

1.00

6.30

6.30

1.00

03.02.06

JUNTAS ASFALTICAS DE 1"X2"

03.03.00

CAIDAS PEQUEAS ( 05 Und.)

03.03.01

LIMPIEZA DE TERRENO

m2

5.00

1.00

2.16

0.70

1.51

7.56

03.03.02

TRAZO Y REPLANTEO

m2

5.00

1.00

2.16

0.70

1.51

7.56

03.03.03

MOVIMIENTO DE TIERRAS
2.16

0.70

6.30

03.03.03.01

EXCAVACION MANUAL

m3

5.00

1.00

1.32

6.58

03.03.03.02

RELLENO CON MATERIAL PROPIO

m3

1.00

1.00

0.30

1.97

1.97

03.03.03.03

ELIMINACION DE MATERIAL EXCEDENTE

m3

1.00

1.00

1.20

5.52

5.52

03.03.03.04

NIVELADO, APIZONADO Y COMPACTADO

m2

5.00

1.00

1.51

7.56

Muros

5.00

2.00

0.15

1.95

0.59

2.93

Base

5.00

1.00

0.20

0.87

0.17

0.87

Caida vertical

5.00

1.00

0.20

0.12

0.59

1.00

03.03.04
03.03.04.01

03.03.05

2.16

0.87

0.70

OBRAS DE CONCRETO SIMPLE


MAMPOSTERIA DE PIEDRA

m3

4.38

INSTALACION DE ACCESORIOS

Gbl

Tuberia PVC - SAL = 4"

ml

1.00

1.00

Und

1.00

1.00

Tapon Metalico Para Tuberia = 4"

0.40

1.47

1.00
1.00

1.00

1.00

1.00

03.04.00

CAIDA INCLINADA ( RAPIDA 01 )

03.04.01

LIMPIEZA DE TERRENO

m2

1.00

1.00

23.20

1.05

24.36

24.36

03.04.02

TRAZO Y REPLANTEO

m2

1.00

1.00

23.20

1.05

24.36

24.36

03.04.03

MOVIMIENTO DE TIERRAS
5.06

5.06

03.04.03.01

EXCAVACION MANUAL

m3

1.00

1.00

03.04.03.02

RELLENO CON MATERIAL PROPIO

m3

1.00

1.00

03.04.03.03

NIVELADO, APIZONADO Y COMPACTADO

m2

1.00

1.00

Muros Exteriores

1.00

2.00

14.26

28.52

28.52

Muros Interiores

1.00

2.00

9.46

18.92

18.92

Base

1.00

2.00

4.72

9.44

03.04.04
03.04.04.01

03.04.04.02

03.04.04.03

03.04.05

1.05

4.82
0.30

23.20

1.05

1.52

1.52

24.36

24.36

OBRAS DE CONCRETO SIMPLE


ENCOFRADO Y DESENCOFRADO

CONCRETO CICLOPEO f`c = 17.5MPa +30% PM.

m2

56.88

m3

Muros

1.00

2.00

0.20

14.26

5.70

Cimiento

1.00

1.00

1.05

4.84

5.08

TARRAJEO CON IMPERMEABILIZANTE

m2

5.70
5.08
23.02

Muros Interiores

1.00

2.00

Base

1.00

1.00

6.30
1.00

9.46

INSTALACION DE ACCESORIOS

Gbl

Tuberia PVC - SAL = 4"

ml

1.00

1.00

Und

1.00

1.00

ml

1.00

1.00

12.00

Tapon Metalico Para Tuberia = 4"

9.44
10.79

0.65

18.92

18.92

4.10

4.10
1.00

1.00

1.00

1.00

1.00

12.00

12.00

03.04.06

JUNTAS ASFALTICAS DE 1"X2"

03.05.00

CAIDA INCLINADA ( RAPIDA 02 )

03.05.01

LIMPIEZA DE TERRENO

m2

1.00

1.00

8.88

1.05

9.32

9.32

03.05.02

TRAZO Y REPLANTEO

m2

1.00

1.00

8.88

1.05

9.32

9.32

03.05.03

MOVIMIENTO DE TIERRAS
1.97

1.97

0.59

0.59

9.32

9.32

03.05.03.01

EXCAVACION MANUAL

m3

1.00

1.00

03.05.03.02

RELLENO CON MATERIAL PROPIO

m3

1.00

1.00

03.05.03.03

NIVELADO, APIZONADO Y COMPACTADO

m2

1.00

1.00

Muros Exteriores

1.00

2.00

5.95

11.90

11.90

Muros Interiores

1.00

2.00

4.03

8.06

8.06

Base

1.00

2.00

1.88

3.76

3.76

Muros

1.00

2.00

0.20

5.95

2.38

Cimiento

1.00

1.00

1.05

1.88

1.97

03.05.04
03.05.04.01

03.05.04.02

03.05.04.03

1.05

1.88
0.30

8.88

1.05

OBRAS DE CONCRETO SIMPLE


ENCOFRADO Y DESENCOFRADO

CONCRETO CICLOPEO f`c = 17.5MPa +30% PM.

TARRAJEO CON IMPERMEABILIZANTE

m2

23.72

m3

m2

4.35
2.38
1.97
13.83

HOJA DE METRADO
Proyecto : SISTEMA DE RIEGO CANAL MAREPAMPA
Ubicacin: : Localidad: Dos de Mayo, Distrito: La Merced, Provincia: Aija, Regin: Ancash

CODIGO

03.05.05

DESCRIPCION

Und.

N Est. N V.

Largo(m) Ancho(m) Alto(m) Area(m2) Factor

Muros Interiores

1.00

2.00

Base

1.00

1.00

8.88
1.00

INSTALACION DE ACCESORIOS

Gbl

Tuberia PVC - SAL = 4"

ml

1.00

1.00

Und

1.00

1.00

ml

1.00

1.00

Tapon Metalico Para Tuberia = 4"

4.03
0.65

Parc.

TOTAL

8.06

8.06

5.77

5.77
1.00

1.00

1.00

1.00

1.00

12.00

12.00

03.05.06

JUNTAS ASFALTICAS DE 1"X2"

03.06.00

CAIDAS VERTICALES SIN OBSTACULO ( 12 Und.)

03.06.01

LIMPIEZA DE TERRENO

m2

12.00

1.00

4.21

4.21

50.52

03.06.02

TRAZO Y REPLANTEO

m2

12.00

1.00

4.21

4.21

50.52

03.06.03

MOVIMIENTO DE TIERRAS
5.25

63.04

18.91

18.91

03.06.03.01

EXCAVACION MANUAL

m3

12.00

1.00

03.06.03.02

RELLENO CON MATERIAL PROPIO

m3

12.00

1.00

03.06.03.03

ELIMINACION DE MATERIAL EXCEDENTE

m3

12.00

1.00

03.06.03.04

NIVELADO, APIZONADO Y COMPACTADO

m2

12.00

1.00

Muros

12.00

2.00

Base

12.00

1.00

03.06.04
03.06.04.01

03.06.05

12.00

5.15

0.85

1.20
0.30

44.13
4.21

4.21

50.52

0.20

4.45

1.78

21.36

0.85

1.31

1.11

13.36

OBRAS DE CONCRETO SIMPLE


MAMPOSTERIA DE PIEDRA

m3

34.72

INSTALACION DE ACCESORIOS

Gbl

Tuberia PVC - SAL = 4"

ml

1.00

1.00

Und

1.00

1.00

ml

12.00

1.00

4.00

Tapon Metalico Para Tuberia = 4"

1.00
1.00

1.00

1.00

1.00

1.00

4.00

48.00

03.06.06

JUNTAS ASFALTICAS DE 1"X2"

03.07.00

CAIDA INCLINADA ( RAPIDA 03 )

03.07.01

LIMPIEZA DE TERRENO

m2

1.00

1.00

13.58

1.05

14.26

14.26

03.07.02

TRAZO Y REPLANTEO

m2

1.00

1.00

13.58

1.05

14.26

14.26

03.07.03

MOVIMIENTO DE TIERRAS
3.01

3.01

03.07.03.01

EXCAVACION MANUAL

m3

1.00

1.00

03.07.03.02

RELLENO CON MATERIAL PROPIO

m3

1.00

1.00

03.07.03.03

NIVELADO, APIZONADO Y COMPACTADO

m2

1.00

1.00

Muros Exteriores

1.00

2.00

8.59

17.18

17.18

Muros Interiores

1.00

2.00

5.72

11.44

11.44

Base

1.00

2.00

2.87

5.74

5.74

Muros

1.00

2.00

0.20

8.59

3.44

3.44

Cimiento

1.00

1.00

1.05

2.87

3.01

3.01

Muros Interiores

1.00

2.00

5.72

11.44

11.44

Base

1.00

1.00

13.58

8.83

8.83

1.50

03.07.04
03.07.04.01

03.07.04.02

03.07.04.03

03.07.05

1.05

2.87
0.30

13.58

1.05

0.90

0.90

14.26

14.26

OBRAS DE CONCRETO SIMPLE


ENCOFRADO Y DESENCOFRADO

CONCRETO CICLOPEO f`c = 17.5MPa +30% PM.

TARRAJEO CON IMPERMEABILIZANTE

m2

34.36

m3

6.45

m2

20.27

INSTALACION DE ACCESORIOS

Gbl

Tuberia PVC - SAL = 4"

ml

1.00

1.00

Und

1.00

1.00

ml

1.00

1.00

18.00

Tapon Metalico Para Tuberia = 4"

0.65

1.00
1.50

1.50

1.00

1.00

18.00

18.00

03.07.06

JUNTAS ASFALTICAS DE 1"X2"

03.08.00

CAIDA INCLINADA ( RAPIDA 04 )

03.08.01

LIMPIEZA DE TERRENO

m2

1.00

1.00

16.35

0.90

14.72

14.72

03.08.02

TRAZO Y REPLANTEO

m2

1.00

1.00

16.35

0.90

14.72

14.72

03.08.03

MOVIMIENTO DE TIERRAS
3.08

3.08

03.08.03.01

EXCAVACION MANUAL

m3

1.00

1.00

03.08.03.02

RELLENO CON MATERIAL PROPIO

m3

1.00

1.00

03.08.03.03

NIVELADO, APIZONADO Y COMPACTADO

m2

1.00

1.00

Muros Exteriores

1.00

2.00

9.29

18.58

18.58

Muros Interiores

1.00

2.00

5.89

11.78

11.78

Base

1.00

2.00

3.42

6.84

6.84

Muros

1.00

2.00

0.20

9.29

3.72

3.72

Cimiento

1.00

1.00

0.90

3.42

3.08

3.08

03.08.04
03.08.04.01

03.08.04.02

03.08.04.03

0.90

3.42
0.30

16.35

0.90

0.92

0.92

14.72

14.72

OBRAS DE CONCRETO SIMPLE


ENCOFRADO Y DESENCOFRADO

CONCRETO CICLOPEO f`c = 17.5MPa +30% PM.

TARRAJEO CON IMPERMEABILIZANTE

m2

37.20

m3

m2

6.79

19.96

HOJA DE METRADO
Proyecto : SISTEMA DE RIEGO CANAL MAREPAMPA
Ubicacin: : Localidad: Dos de Mayo, Distrito: La Merced, Provincia: Aija, Regin: Ancash

CODIGO

03.08.05

DESCRIPCION

Und.

N Est. N V.

Largo(m) Ancho(m) Alto(m) Area(m2) Factor

Muros Interiores

1.00

2.00

Base

1.00

1.00

16.35
1.50

INSTALACION DE ACCESORIOS

Gbl

Tuberia PVC - SAL = 4"

ml

1.00

1.00

Und

1.00

1.00

ml

1.00

1.00

Tapon Metalico Para Tuberia = 4"

5.89
0.50

Parc.

TOTAL

11.78

11.78

8.18

8.18
1.00

1.50

1.50

1.00

1.00

22.00

22.00

03.08.06

JUNTAS ASFALTICAS DE 1"X2"

03.09.00

CAIDAS PEQUEAS ( 04 Und.)

03.09.01

LIMPIEZA DE TERRENO

m2

4.00

1.00

1.19

1.19

4.76

03.09.02

TRAZO Y REPLANTEO

m2

4.00

1.00

1.19

1.19

4.76

03.09.03

MOVIMIENTO DE TIERRAS

22.00

03.09.03.01

EXCAVACION MANUAL

m3

4.00

1.00

0.88

3.52

03.09.03.02

RELLENO CON MATERIAL PROPIO

m3

4.00

1.00

0.30

1.06

1.06

03.09.03.03

ELIMINACION DE MATERIAL EXCEDENTE

m3

4.00

1.00

1.20

1.27

9.86

03.09.03.04

NIVELADO, APIZONADO Y COMPACTADO

m2

4.00

1.00

2.24

8.98

Muros

4.00

2.00

0.15

1.95

0.59

2.34

Base

4.00

1.00

0.20

0.62

0.12

0.50

03.09.04
03.09.04.01

03.09.05

2.00

4.08

0.55

0.80

0.55

OBRAS DE CONCRETO SIMPLE


MAMPOSTERIA DE PIEDRA

m3

2.84

INSTALACION DE ACCESORIOS

Gbl

Tuberia PVC - SAL = 4"

ml

1.00

1.00

Und

1.00

1.00

Tapon Metalico Para Tuberia = 4"

1.00
1.50

03.10.00

TOMAS LATERALES ( 40 Und. )

03.10.01

TRAZO Y REPLANTEO

m2

40

1.00

03.10.02

EXCAVACION MANUAL

m3

40

1.00

0.75

03.10.03

ENCOFRADO Y DESENCOFRADO

m2

40

1.00

0.75

03.10.04

CONCRETO Fc=14 MPa.

m3

Muro

40

2.00

0.75

Base

40

1.00

0.75

40

1.00

0.75

40.00

1.00

Laterales

4.00

4.00

1.50

Base

4.00

1.00

1.50

4.00

1.00

1.50

m3

1.00

1.00

220.00

03.10.05

TARRAJEO CON IMPERMEABILIZANTE

m2

03.10.06

COMPUERTAS

und

Compuertas de fierro con V. 0.25x0.40 m.


03.11.00

PASARELA ( 04 Und. )

03.11.01

ENCOFRADO Y DESENCOFRADO

0.40
0.45

1.50

1.50

1.00

1.00

0.40

16.00

0.10

0.03

1.35

0.40

0.30

12.00

0.10

0.50

0.08

0.25

0.10

0.02

0.02

0.40

0.30

12.00

0.17

40.00
1.00

m2

03.11.02

CONCRETO Fc=14 MPa.

m3

03.11.03

ACERO ESTRUCTURAL

KG

0.15

40.00

13.20
0.20

1.20

4.80

2.10

8.40

0.17

0.26

1.02
72.19

0.72

158.40

158.40

1.40

Ver hoja Adjunta


03.12.00

MURO DE SOSTENIMIENTO

03.12.01

MAMPOSTERIA DE PIEDRA

04.00.00

FLETE

04.01.00

FLETE TERRESTRE

GBL

1.00

1.00

1.00

1.00

04.02.00

FLETE RURAL

GBL

1.00

1.00

1.00

1.00

158.40