Partida
Partida N
03.02.04.02
DESCRIPCION
ACERO ESTRUCTURAL
N (mm)
CANT.
N ELEMENTOS
LONGITUD (M)
SUB TOTAL
PESO
(KG/ML)
KG.
TOTAL
151.77
53.85
Longitudinal
10.00
1.00
6.00
6.85
41.10
0.557
22.89
Transversal
10.00
1.00
1.00
52.10
52.10
0.557
29.02
Verticales
10.00
1.00
6.00
0.58
3.48
0.557
1.94
Acero Longitudinal
10.00
2.00
6.00
6.04
72.48
0.557
40.37
Vertical
10.00
2.00
24.00
1.50
72.00
0.557
40.10
Vertical
10.00
1.00
4.00
1.30
5.20
0.557
2.90
Horizontal
10.00
1.00
4.00
2.00
8.00
0.557
4.46
Vertical
10.00
1.00
1.00
6.10
6.10
0.557
3.40
Horizontal
10.00
1.00
1.00
12.02
12.02
0.557
6.70
N (mm)
CANT.
N ELEMENTOS
LONGITUD (M)
SUB TOTAL
PESO
(KG/ML)
TOTAL
ACERO EN MUROS
80.48
7.35
ACERO EN VERTEDERO
Partida
PASARELA ( 04Und. )
Partida N
03.11.03
10.09
DESCRIPCION
ACERO ESTRUCTURAL
KG
72.19
LOSA
72.19
longitudinal
10.00
4.00
11.00
1.44
63.36
0.557
35.29
Transversal
10.00
4.00
9.00
1.84
66.24
0.557
36.90
DESCRIPCION
Remuneraciones y Otros
1.01
Residente de obra
1.02
Maestro de Obra
1.03
Movilidad y Viaticos de Residente de Obra
1.04
Supervisor de Obra
1.05
Almacen y Guardian
1.06
Implementos de Seguridad
1.07
Expediente Tecnico
1.08
Liquidacion de Obra
1.09
Gastos de Comit de Obra
GASTOS GENERALES
268,187.17
COSTO
MENSUAL
2,400.00
1,500.00
200.00
3,000.00
600.00
400.00
4,200.00
3,000.00
150.00
NRO. DE
MESES
4.00
4.00
4.00
2.00
4.00
1.00
1.00
1.00
4.00
TOTAL
S/.
PORCENT.
%
9,600.00
6,000.00
800.00
6,000.00
2,400.00
400.00
4,200.00
3,000.00
600.00
33,000.00
12.30%
HOJA DE METRADO
Proyecto : SISTEMA DE RIEGO CANAL MAREPAMPA
Ubicacin: : Localidad: Dos de Mayo, Distrito: La Merced, Provincia: Aija, Regin: Ancash
CODIGO
DESCRIPCION
Und.
N Est. N V.
01.00.00
TRABAJOS PRELIMINARES
01.01.00
und
1.00
01.02.00
CAMPAMENTO DE OBRA
M2
1.00
10.00
02.00.00
CANAL DE CONDUCCION
02.01.00
02.01.01
ml
1.00
1.00
02.01.02
TRAZO Y REPLANTEO
ml
1.00
1.00
02.01.03
EXCAVACION MANUAL
m3
1.00
1.00
83.35
0.40
0.50
33.34
02.01.04
m3
1.00
1.00
83.35
0.40
0.50
33.34
02.01.05
m3
1.00
1.00
02.01.06
ml
1.00
1.00
83.35
02.01.07
MAMPOSTERIA DE PIEDRA
m3
1.00
1.00
83.35
02.01.08
CURADO Y SECADO
m2
1.00
1.00
83.35
02.01.09
ml
1.00
28.00
02.02.00
02.02.01
ml
1.00
02.02.02
TRAZO Y REPLANTEO
ml
1.00
02.02.03
EXCAVACION MANUAL
m3
1.00
02.02.04
m3
02.02.05
02.02.06
Parc.
TOTAL
1.00
1.00
80.00
80.00
83.35
83.35
83.35
83.35
83.35
83.35
16.67
16.67
8.00
0.30
5.00
11.67
11.67
83.35
83.35
30.01
30.01
225.05
225.05
1.60
44.80
44.80
1.00
1596.91
1596.91
1596.91
1.00
1596.91
1596.91
1596.91
1.00
615.32
615.32
1.00
1.00
505.11
505.11
m3
1.00
1.00
ml
1.00
1.00
1596.91
02.02.07
ENCOFRADO Y DESENCOFRADO
m2
1.00
4.00
1596.91
02.02.08
m3
1.00
1.00
1596.91
02.02.09
m2
1.00
1.00
1596.91
0.35
02.02.10
CURADO Y SECADO
m2
1.00
1.00
1596.91
1.45
02.02.11
ml
1.00
554.00
03.00.00
OBRAS DE ARTE
03.01.00
CAPTACION
03.01.01
LIMPIEZA DE TERRENO
m2
1.00
1.00
03.01.02
m3
1.00
1.00
03.02.00
DESARENADOR ( 01 Und.)
03.02.01
LIMPIEZA DE TERRENO
m2
1.00
03.02.02
TRAZO Y REPLANTEO
m2
1.00
03.02.03
MOVIMIENTO DE TIERRAS
2.70
1.20
0.40
132.25
1596.91
1596.91
638.76
638.76
348.13
1836.45
1836.45
2315.52
2315.52
803.30
803.30
44.00
44.00
44.00
5.00
2.00
2.00
1.00
10.77
10.77
10.77
1.00
11.77
11.77
11.77
11.77
11.77
4.71
4.71
EXCAVACION MANUAL
m3
1.00
1.00
03.02.03.02
m3
1.00
1.00
03.02.03.03
m3
1.00
1.00
03.02.03.04
m2
1.00
1.00
Muros Exteriores
1.00
Muros Interiores
0.22
110.21
348.13
03.02.03.01
0.40
1.45
0.40
1.00
11.77
0.40
7.06
7.06
10.77
10.77
10.77
2.00
6.21
12.42
12.42
1.00
2.00
5.05
10.10
10.10
Muro de Salida
1.00
2.00
2.44
4.88
4.88
Canal de limpia
1.00
3.00
3.28
0.85
8.36
8.36
Vertedero
1.00
2.00
1.50
0.30
0.90
0.90
03.02.04
03.02.04.01
ENCOFRADO Y DESENCOFRADO
03.02.04.02
0.36
16.67
ACERO ESTRUCTURAL
m2
36.66
151.77
KG
03.02.04.04
m3
17.74
Muros
1.00
2.00
Base
1.00
2.00
Cimiento
1.00
1.00
Muro de Salida
1.00
1.00
2.33
0.15
Canal de limpia(muros)
1.00
1.00
3.30
0.15
Canal de limpia(Base)
1.00
1.00
3.30
Vertedero
1.00
1.00
Aliviadero
1.00
1.00
0.15
1.80
0.15
5.05
0.30
1.52
1.52
0.16
0.16
15.12
15.12
0.85
0.30
0.30
0.80
0.40
0.40
0.40
0.15
0.20
0.20
1.50
0.10
0.30
0.05
0.05
0.15
0.40
0.20
0.01
0.15
100.77
m2
0.01
32.18
Muros Interiores
1.00
2.00
5.05
10.10
10.10
Base
1.00
1.00
10.77
10.77
10.77
Muro de Salida
1.00
1.00
2.43
2.43
2.43
Canal de limpia(muros)
1.00
2.00
5.28
5.28
3.30
0.80
HOJA DE METRADO
Proyecto : SISTEMA DE RIEGO CANAL MAREPAMPA
Ubicacin: : Localidad: Dos de Mayo, Distrito: La Merced, Provincia: Aija, Regin: Ancash
CODIGO
03.02.05
DESCRIPCION
Und.
N Est. N V.
Canal de limpia(Base)
1.00
1.00
1.50
Vertedero
1.00
2.00
1.50
Aliviadero
1.00
2.00
1.50
0.40
Parc.
TOTAL
0.60
0.60
0.80
2.40
2.40
0.20
0.60
0.60
INSTALACION DE ACCESORIOS
Gbl
1.00
1.00
Und
1.00
1.00
1.00
1.00
Und
1.00
1.00
1.00
1.00
ml
1.00
1.00
6.30
6.30
1.00
03.02.06
03.03.00
03.03.01
LIMPIEZA DE TERRENO
m2
5.00
1.00
2.16
0.70
1.51
7.56
03.03.02
TRAZO Y REPLANTEO
m2
5.00
1.00
2.16
0.70
1.51
7.56
03.03.03
MOVIMIENTO DE TIERRAS
2.16
0.70
6.30
03.03.03.01
EXCAVACION MANUAL
m3
5.00
1.00
1.32
6.58
03.03.03.02
m3
1.00
1.00
0.30
1.97
1.97
03.03.03.03
m3
1.00
1.00
1.20
5.52
5.52
03.03.03.04
m2
5.00
1.00
1.51
7.56
Muros
5.00
2.00
0.15
1.95
0.59
2.93
Base
5.00
1.00
0.20
0.87
0.17
0.87
Caida vertical
5.00
1.00
0.20
0.12
0.59
1.00
03.03.04
03.03.04.01
03.03.05
2.16
0.87
0.70
m3
4.38
INSTALACION DE ACCESORIOS
Gbl
ml
1.00
1.00
Und
1.00
1.00
0.40
1.47
1.00
1.00
1.00
1.00
1.00
03.04.00
03.04.01
LIMPIEZA DE TERRENO
m2
1.00
1.00
23.20
1.05
24.36
24.36
03.04.02
TRAZO Y REPLANTEO
m2
1.00
1.00
23.20
1.05
24.36
24.36
03.04.03
MOVIMIENTO DE TIERRAS
5.06
5.06
03.04.03.01
EXCAVACION MANUAL
m3
1.00
1.00
03.04.03.02
m3
1.00
1.00
03.04.03.03
m2
1.00
1.00
Muros Exteriores
1.00
2.00
14.26
28.52
28.52
Muros Interiores
1.00
2.00
9.46
18.92
18.92
Base
1.00
2.00
4.72
9.44
03.04.04
03.04.04.01
03.04.04.02
03.04.04.03
03.04.05
1.05
4.82
0.30
23.20
1.05
1.52
1.52
24.36
24.36
m2
56.88
m3
Muros
1.00
2.00
0.20
14.26
5.70
Cimiento
1.00
1.00
1.05
4.84
5.08
m2
5.70
5.08
23.02
Muros Interiores
1.00
2.00
Base
1.00
1.00
6.30
1.00
9.46
INSTALACION DE ACCESORIOS
Gbl
ml
1.00
1.00
Und
1.00
1.00
ml
1.00
1.00
12.00
9.44
10.79
0.65
18.92
18.92
4.10
4.10
1.00
1.00
1.00
1.00
1.00
12.00
12.00
03.04.06
03.05.00
03.05.01
LIMPIEZA DE TERRENO
m2
1.00
1.00
8.88
1.05
9.32
9.32
03.05.02
TRAZO Y REPLANTEO
m2
1.00
1.00
8.88
1.05
9.32
9.32
03.05.03
MOVIMIENTO DE TIERRAS
1.97
1.97
0.59
0.59
9.32
9.32
03.05.03.01
EXCAVACION MANUAL
m3
1.00
1.00
03.05.03.02
m3
1.00
1.00
03.05.03.03
m2
1.00
1.00
Muros Exteriores
1.00
2.00
5.95
11.90
11.90
Muros Interiores
1.00
2.00
4.03
8.06
8.06
Base
1.00
2.00
1.88
3.76
3.76
Muros
1.00
2.00
0.20
5.95
2.38
Cimiento
1.00
1.00
1.05
1.88
1.97
03.05.04
03.05.04.01
03.05.04.02
03.05.04.03
1.05
1.88
0.30
8.88
1.05
m2
23.72
m3
m2
4.35
2.38
1.97
13.83
HOJA DE METRADO
Proyecto : SISTEMA DE RIEGO CANAL MAREPAMPA
Ubicacin: : Localidad: Dos de Mayo, Distrito: La Merced, Provincia: Aija, Regin: Ancash
CODIGO
03.05.05
DESCRIPCION
Und.
N Est. N V.
Muros Interiores
1.00
2.00
Base
1.00
1.00
8.88
1.00
INSTALACION DE ACCESORIOS
Gbl
ml
1.00
1.00
Und
1.00
1.00
ml
1.00
1.00
4.03
0.65
Parc.
TOTAL
8.06
8.06
5.77
5.77
1.00
1.00
1.00
1.00
1.00
12.00
12.00
03.05.06
03.06.00
03.06.01
LIMPIEZA DE TERRENO
m2
12.00
1.00
4.21
4.21
50.52
03.06.02
TRAZO Y REPLANTEO
m2
12.00
1.00
4.21
4.21
50.52
03.06.03
MOVIMIENTO DE TIERRAS
5.25
63.04
18.91
18.91
03.06.03.01
EXCAVACION MANUAL
m3
12.00
1.00
03.06.03.02
m3
12.00
1.00
03.06.03.03
m3
12.00
1.00
03.06.03.04
m2
12.00
1.00
Muros
12.00
2.00
Base
12.00
1.00
03.06.04
03.06.04.01
03.06.05
12.00
5.15
0.85
1.20
0.30
44.13
4.21
4.21
50.52
0.20
4.45
1.78
21.36
0.85
1.31
1.11
13.36
m3
34.72
INSTALACION DE ACCESORIOS
Gbl
ml
1.00
1.00
Und
1.00
1.00
ml
12.00
1.00
4.00
1.00
1.00
1.00
1.00
1.00
1.00
4.00
48.00
03.06.06
03.07.00
03.07.01
LIMPIEZA DE TERRENO
m2
1.00
1.00
13.58
1.05
14.26
14.26
03.07.02
TRAZO Y REPLANTEO
m2
1.00
1.00
13.58
1.05
14.26
14.26
03.07.03
MOVIMIENTO DE TIERRAS
3.01
3.01
03.07.03.01
EXCAVACION MANUAL
m3
1.00
1.00
03.07.03.02
m3
1.00
1.00
03.07.03.03
m2
1.00
1.00
Muros Exteriores
1.00
2.00
8.59
17.18
17.18
Muros Interiores
1.00
2.00
5.72
11.44
11.44
Base
1.00
2.00
2.87
5.74
5.74
Muros
1.00
2.00
0.20
8.59
3.44
3.44
Cimiento
1.00
1.00
1.05
2.87
3.01
3.01
Muros Interiores
1.00
2.00
5.72
11.44
11.44
Base
1.00
1.00
13.58
8.83
8.83
1.50
03.07.04
03.07.04.01
03.07.04.02
03.07.04.03
03.07.05
1.05
2.87
0.30
13.58
1.05
0.90
0.90
14.26
14.26
m2
34.36
m3
6.45
m2
20.27
INSTALACION DE ACCESORIOS
Gbl
ml
1.00
1.00
Und
1.00
1.00
ml
1.00
1.00
18.00
0.65
1.00
1.50
1.50
1.00
1.00
18.00
18.00
03.07.06
03.08.00
03.08.01
LIMPIEZA DE TERRENO
m2
1.00
1.00
16.35
0.90
14.72
14.72
03.08.02
TRAZO Y REPLANTEO
m2
1.00
1.00
16.35
0.90
14.72
14.72
03.08.03
MOVIMIENTO DE TIERRAS
3.08
3.08
03.08.03.01
EXCAVACION MANUAL
m3
1.00
1.00
03.08.03.02
m3
1.00
1.00
03.08.03.03
m2
1.00
1.00
Muros Exteriores
1.00
2.00
9.29
18.58
18.58
Muros Interiores
1.00
2.00
5.89
11.78
11.78
Base
1.00
2.00
3.42
6.84
6.84
Muros
1.00
2.00
0.20
9.29
3.72
3.72
Cimiento
1.00
1.00
0.90
3.42
3.08
3.08
03.08.04
03.08.04.01
03.08.04.02
03.08.04.03
0.90
3.42
0.30
16.35
0.90
0.92
0.92
14.72
14.72
m2
37.20
m3
m2
6.79
19.96
HOJA DE METRADO
Proyecto : SISTEMA DE RIEGO CANAL MAREPAMPA
Ubicacin: : Localidad: Dos de Mayo, Distrito: La Merced, Provincia: Aija, Regin: Ancash
CODIGO
03.08.05
DESCRIPCION
Und.
N Est. N V.
Muros Interiores
1.00
2.00
Base
1.00
1.00
16.35
1.50
INSTALACION DE ACCESORIOS
Gbl
ml
1.00
1.00
Und
1.00
1.00
ml
1.00
1.00
5.89
0.50
Parc.
TOTAL
11.78
11.78
8.18
8.18
1.00
1.50
1.50
1.00
1.00
22.00
22.00
03.08.06
03.09.00
03.09.01
LIMPIEZA DE TERRENO
m2
4.00
1.00
1.19
1.19
4.76
03.09.02
TRAZO Y REPLANTEO
m2
4.00
1.00
1.19
1.19
4.76
03.09.03
MOVIMIENTO DE TIERRAS
22.00
03.09.03.01
EXCAVACION MANUAL
m3
4.00
1.00
0.88
3.52
03.09.03.02
m3
4.00
1.00
0.30
1.06
1.06
03.09.03.03
m3
4.00
1.00
1.20
1.27
9.86
03.09.03.04
m2
4.00
1.00
2.24
8.98
Muros
4.00
2.00
0.15
1.95
0.59
2.34
Base
4.00
1.00
0.20
0.62
0.12
0.50
03.09.04
03.09.04.01
03.09.05
2.00
4.08
0.55
0.80
0.55
m3
2.84
INSTALACION DE ACCESORIOS
Gbl
ml
1.00
1.00
Und
1.00
1.00
1.00
1.50
03.10.00
03.10.01
TRAZO Y REPLANTEO
m2
40
1.00
03.10.02
EXCAVACION MANUAL
m3
40
1.00
0.75
03.10.03
ENCOFRADO Y DESENCOFRADO
m2
40
1.00
0.75
03.10.04
m3
Muro
40
2.00
0.75
Base
40
1.00
0.75
40
1.00
0.75
40.00
1.00
Laterales
4.00
4.00
1.50
Base
4.00
1.00
1.50
4.00
1.00
1.50
m3
1.00
1.00
220.00
03.10.05
m2
03.10.06
COMPUERTAS
und
PASARELA ( 04 Und. )
03.11.01
ENCOFRADO Y DESENCOFRADO
0.40
0.45
1.50
1.50
1.00
1.00
0.40
16.00
0.10
0.03
1.35
0.40
0.30
12.00
0.10
0.50
0.08
0.25
0.10
0.02
0.02
0.40
0.30
12.00
0.17
40.00
1.00
m2
03.11.02
m3
03.11.03
ACERO ESTRUCTURAL
KG
0.15
40.00
13.20
0.20
1.20
4.80
2.10
8.40
0.17
0.26
1.02
72.19
0.72
158.40
158.40
1.40
MURO DE SOSTENIMIENTO
03.12.01
MAMPOSTERIA DE PIEDRA
04.00.00
FLETE
04.01.00
FLETE TERRESTRE
GBL
1.00
1.00
1.00
1.00
04.02.00
FLETE RURAL
GBL
1.00
1.00
1.00
1.00