EXECUTIVE PROGRESS MEETING NO.

20 13 FEB 2012

MSHEIREB DOWNTOWN DOHA PROJECT


PHASE 2 Design Presentation
Feb 2013

PHASE 2 Design Presentation

EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

PHASE 2 Design Presentation

EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

PHASE 2 Design Presentation

EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

Building
Name

Basement Layout

N02

No. of
Net Foot
No. of
floors
Building Type Print
Basement including
(m2)
GF
Steel Roof
5
Galleria Roof 5302
@ lvl 3
Retail
(Cinema)

N03

N04

U01
U02
U06
U07P

5
5
5
5

6
3
12
3

U07

11

V01
P08
P11

4
4
4

3
4
4

P16P

Hotel
(Podium)

987

P16

19

Hotel (Tower)

1837

Retail
/Residential
Retail/Office
Retail
Office
Podium
Retail
/Residential
Retail
Retail/Office
Retail/Office

4796
2761
2583
2479
1413
2872
2522
2125
1085
787

PHASE 2 Design Presentation


EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

Basement Finishing
the interior finishing , for basements been identified as :

BOH (Back Of House ) finishing include (not limited to):

see specification 09 06 10

Vehicular surface - Shall have traffic coating which stops at the curbs; Multi-layered systems
composed of high solids epoxy based components , BOH - 16
Slab soffit, columns and exposed reinforced concrete walls will have an anticarbonation coating

Pavement concrete finish in most areas , BOH - 17


Plant room floors Hydraulic cement underlayment and sealer (same as plant rooms above
grade) , BOH - 18
Plant room walls painted block work , BOH - 18
Electrical rooms epoxy flooring finish. Up on Kahramaa specification.

PHASE 2 Design Presentation


EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

Common areas finishing : such as (not limited to) :


see specification 09 06 05 01 / 02 Basement finishes and sanitary works

wcs and shower rooms : ceramic tiles for wall and floors , moisture resistant plaster board for ceiling.
Ablution : ceramic tiles for wall and floors , wood flooring , moisture resistant plaster board for ceiling.
Prayer rooms : carpet for flooring ,wood cladding & paint for walls and moisture resistant plaster board for
ceiling.

Walls , unless mentioned : paint

PHASE 2 Design Presentation

Basement 5 - Parking usage

EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

PHASE 2 Design Presentation

Basement 4 - Parking usage

EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

PHASE 2 Design Presentation

Basement 3 - Parking usage

EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

PHASE 2 Design Presentation

Basement 2 - Parking usage

EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

PHASE 2 Design Presentation

Basement 1 Parking usage

EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

PHASE 2 Design Presentation

EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

Floors Up grade:
1.Galleria and Bridges
the Galleria is a closed / covered path that combine N04 , N03 , U01 and U02 retails to be as one unit.

2. Pedestrian walk ways and Tram path.


3. Bridges.
4. Retails.

5. Residential
6. Office
7. Hotel

PHASE 2 Design Presentation


EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

PHASE 2 Design Presentation


EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

First Level

PHASE 2 Design Presentation


EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

Second Level

PHASE 2 Design Presentation

1. Galleria and Bridges

EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

PHASE 2 Design Presentation


EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

Landscaping and flooring finishing

Walls and Elevation finishing.

Ceiling and roof finishing .

External finishing

Ground floor.

First floor and bridges.

PHASE 2 Design Presentation


EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

1. Landscaping and flooring finishing:


stone paving with different types , colors and sizes.
Stone stairs.
Colonnade : stone flooring
Bridges : timber and glass laminated flooring

Delicate grey
Omani stone

Gold leaf
Granite

Benches : wood bespoke finish

Lime stone

Timber
Flooring

Bench
Wood bespoke

PHASE 2 Design Presentation


EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

2. Walls and Elevation finishing:


Galleria roof walls finishing :
- Glazing for edges and interfaces with external walls
- Plaster boards with paint for internal sidewalls
Bridges and Colonnade :
- Glass Balustrade and Timber Rail
- Bronze stainless steel cladding
- Stone
- Acoustical boards and plaster
- Gypsum boards and plaster
- Glazing for shop fronts
- EIFS System

PHASE 2 Design Presentation


EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

3. Ceiling and Roof finishing :


Galleria soffit :
- Acoustical boards and plaster
- Glazing for roof skylights
Bridges soffits :
Stainless steel Bronze finish
Colonnade soffit:
- Acoustical boards and plaster
- stone cladding for drop beams

GRC cladding system for the external surface

PHASE 2 Design Presentation

2. Pedestrian walk ways and Tram path.


- Stone flooring

3. Bridges out of Galleria:


- Terracotta cladding system
- GRC panels

EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

PHASE 2 Design Presentation

EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

Typical Interior finishes for all Buildings:


Entrance and lobbies:

Floors : lime stone , Entrance matting

Walls : decorative plaster, armourcoat finish , Lime stone , Wood Cladding Panels for lift lobbies ,
frameless glass walls

Ceiling : Acoustic gypsum boards and plaster , wood for lift lobbies

Prayer rooms :

Floors : Carpet , timber tiles for ablution lobby

Walls: Glass reinforced Plastic , Wood cladding panels , paint with pattern

Ceiling: Gypsum boards and plaster moisture resistant

PHASE 2 Design Presentation

EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

Typical Wcs , ablution ,Shower rooms and Toilet:

Floors : Porcelain / Ceramic tiles

Walls : Plastic laminate , Mirrors , Ceramic tiles , stone for vanity top

Ceiling :Gypsum boards and plaster moisture resistant

Apartments and Offices:

Floors :Porcelain / Ceramic tiles , carpet for offices

Walls: window shutters , glass mosaic for bath rooms , Porcelain / Ceramic tiles for kitchen ,
Granite counter top , plaster boards with paint

Ceiling: plaster board with paint

PHASE 2 Design Presentation


EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

4. Retails:
- Interior finish : by user
- Exterior finish :by contractor

PHASE 2 Design Presentation


EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

General information :

PHASE 2 Design Presentation


EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

PHASE 2 Design Presentation

EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

PHASE 2 Design Presentation


EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

PHASE 2 Design Presentation

EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

PHASE 2 Design Presentation

EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

PHASE 2 Design Presentation

EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

PHASE 2 Design Presentation

EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

The Internal Finishing for cinema as per BOQ

Walls : acoustical panels and plaster


Precast concrete steps and stair cases
Epoxy resin flooring
Rails and balustrades
Stone and EIFS external finishing
Fall arrest system and ladders
Timber : skirting , architrave , picture rail , cornices,
All MEP exposed fixtures
screens

PHASE 2 Design Presentation

5. Residential and Retails:


N04 : Retail and Residential Building
General information :
Residential (Including 89 Sq. M. Gym): 6,722 Sq. M. GFA
Location: G.F / 1.F / 1.F Mezz / 2.F / 2.F. Mezz / 3.F / 4.F / 5.F
Retail :4,958 Sq.M. GFA
Location: G.F / 1.F / 1.F. Mezz / 2.F
Unit Mix (27 Residential Units Total)
6 Units, 1 Bed (22%) Unit Range: 104.38 - 150.33 Sq.M.
16 Units, 2 Bed (59%) Unit Range: 119.29 - 181.32 Sq.M.
2 Units, 3 Bed (4%) Unit Range: 150.43 Sq.M.
3 Units, 4 Bed (15%) Unit Range: 204.29 - 290.29 Sq.M.
56 Dedicated Parking Spaces
Building Height: 33.95 Meter (G +) + 7

EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

PHASE 2 Design Presentation


Exterior finishes:
Natural Limestone cladding, Hazlime cream / Honed
Natural Limestone Cladding, Hazlime cream / Textured
Exterior Render Insulated Rain screen System, Sto-Ventec color:
cream to match main stone Faade cladding
Exterior Ceramic Tiling, Mosa Colors range: Blue / Turquoise
Window system, Double glazed, Bronze anodized aluminum
windows
Bronze Anodized Aluminum cladding system.
Glass railing.
Glazing shop fronts and curtain walls

EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

PHASE 2 Design Presentation

Interior finishes:

1. Main Entrance Lobby

EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

PHASE 2 Design Presentation

EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

2.MAIN ENTRANCE LIFT LOBBY & LIFT CAR


MAIN ENTRANCE LIFT LOBBY FINISHING

Lift Car Finishing

PHASE 2 Design Presentation

3. TYPICAL LIFT LOBBY & RESIDENTIAL ENTRANCE

EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

PHASE 2 Design Presentation

EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

4. RESIDENTIAL FINISHING

LOUNGE & DINING

BEDROOM

KITCHEN

BATH ROOM

PHASE 2 Design Presentation

EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

5.GYMNASIUM & CHANGING ROOM

GYMNASIUM FINISHES

BATHROOM FIXTURE AND FITTINGS

BATHROOM AND CHANGING ROOM FINISHES

PHASE 2 Design Presentation

6.MEETING ROOM

EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

PHASE 2 Design Presentation

EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

800
0

7.ROOF LEVEL POOL TERRACE

80
00

PHASE 2 Design Presentation

U07 : Retail and Residential Building


General information :
Residential Accommodation : 14,377 Sq.M.
Location: G.F / 1.F to 11.F
Retail : 17,093 Sq.M

Location: G.F / 1.F / 2.F / 3.F


Unit Mix (72 Residential Units)
22 Unit, 1 Bed (31%) Unit Range: 104.08 - 150.69 Sq.M.
34 Unit, 2 Bed (47%) Unit Range: 135.38 - 169.46 Sq.M.
14 Unit, 3 bed (19%) Unit Range: 203.31 - 232.62 Sq.M.

2 Unit, 4 bed (3%) Unit Range: 314.70 Sq.M.


136 Dedicated Parking Spaces
Building Height: 59.6 Meter (56.3 M) (G + 10 + Plant room)

EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

PHASE 2 Design Presentation

Exterior finishes:
Stone Rain screen Cladding, Ivory Lace, Honed
External Rain screen Render System , Sto-Ventec, Color: to match RAL 1015, Light Ivory
Window system, Double glazed, Bronze anodized aluminum windows
Bronze Anodized Aluminum cladding system
Glass railing
Glazing shop fronts

EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

PHASE 2 Design Presentation

Interior finishes:

1.MAIN ENTRANCE LOBBY

EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

PHASE 2 Design Presentation

2.lift lobby & lift CAR

EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

LIFT CAR FINISHES

LIFT LOBBY FINISHES

01. SF-001 Floor Crema Marfil, honed - Dar Al Rokham


02. SF-001 Lift Lobby Crema Marfil, honed Dar Al
Rokham
03. DP001 Wal finishes Armourcoat Armuralia
Armoucoat
04. SF-001 Skirting Cema Marfil, honed Dar Al Rokham
05. DMT-001 Lift doors Bronze coloured stainless steel panel
The Inbox In colour
06. Lift control button Bronze coloured stainless steel panel
The Inbox in colour
07. SF-001 Conceal door Crema Marfil, honed Dar Al
Rokham
08. AGP-001 Ceiling Acoustic ceiling RAL 9010 TBC
09. LTV-A1-15 Recess luminaire module - Zumbtobel

01. SF-001 Floor Crema Marfil, honed - Dar Al Rokham


02. DGL-002 Side walls Ultrawhite backpainted glass Chelsea
Artisans
03. SF-001 Skirting Cema Marfil, honed Dar Al Rokham
04. M2-002 Rear wall Bronze tinted Mirror Chelsea Artisans
05. DMT-001 Handrail, rear wall and back of lift control button Bronze
coloured stainless steel panel The Inbox in colour
06.SF-001 rear wall skirting Crema Marfil, honed Dar Al Rokham
07. DMT-001 Lift doors Bronze coloured stainless steelpanel The
Inbox in colour
08. GB-001 Ceiling Painted P-001 (RAL 9010) plasterboard ceiling
09. Inicative decorative pattern film in between acrylic sheet, back lit with
LED fitting

PHASE 2 Design Presentation

3.RESIDENTIAL ENTRANCE

EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

PHASE 2 Design Presentation

EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

4.RESIDENTIAL FINISHING

LOUNGE & DINING

KITCHEN

PHASE 2 Design Presentation

EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

BEDROOM

BATH ROOM

PHASE 2 Design Presentation

5.GYM & MEETING ROOM

GYM

EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

MEETING ROOM

PHASE 2 Design Presentation

TOILET

EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

CHANGING ROOM

PHASE 2 Design Presentation

EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

6.ROOF LEVEL POOL TERRACE

1. / 2.

7. / 8. / 9.

3.

4. / 5.

10.

11.

6.

12.

PV001b Main paved area, lower level Limestone Butter silk, flamed finish, grouted joint, fully bonded
PV002a Upper pool deck Limestone Butter silk, flamed finish, grouted joint, fully bonded
PV002b Edging band in pavement - Limestone gold veil, Antique
PV002c Skirting band to raised walls Limestone - Gold veil, Honed finish
PV002e Paving Limestone Gold veil, Sandblast, grouted joints, fully bonded
PV003a Pool coping Tropical oro, flamed finish, butt jointed, fully bonded
PV003b Step tread/Step riser Limestone Tropical oro, flamed finish, grout joints, fully bonded/Tropical oro,
Flamed finish, butt jointed, fully bonded
8. PV003c Nib wall coping to raised pool deck Limestone Tropical oro, Flamed finish, Grout jointed, fully bonded
9. PV003d Detail banding in paving on riser pool deck Limestone Tropical oro, flamed finish, butt jointed, fully
bonded
10. PV003h Wall coping Limestone Tropical oro, honed finish, grout jointed, fully bonded
11. PV003k Stone seating on 200 series block wall Limestone Tropical oro, Honed finish, grouted joints, fully
bonded
12. PCT001a Pool tile Tropical oro, sandblast finish, grouted joints, fully bonded
1.
2.
3.
4.
5.
6.
7.

section

PHASE 2 Design Presentation


EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

6. OFFICES:
U01 : Office and Retail Building
General information
Commercial Office Accommodation :960 Sq.M.
Location: G.F / 1.F / 1.F. Mezz / 2.F / 3.F / 4.F / 5.F / 6.F
Retail : 4,648 Sq.M.

Location: G.F / 1.F / 1.F. Mezz / 2.F


140 Dedicated Parking Spaces
Building Height:
40.5 Meter (37.3 M) (GF) + 6 + Plant Level)

PHASE 2 Design Presentation


EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

Exterior finishes:
Delicato Grey marble, Honed finish
Delicato Grey marble, Sandblasted finish
Golden Leaf granite
Render system
Window system, Double glazed
Bronze anodized aluminum cladding
system
Glazed Railing

PHASE 2 Design Presentation


EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

U06 : Office and Retail Building


General information
Commercial Office Accommodation :15,290 Sq.M.
Location: G.F / 1.F / 2.F / 3.F to 11.F
Retail : 68 Sq.M.

Location: G.F
209 Dedicated Parking Spaces
Building Height: 65.8 M (60.4 M) (G + 11 + Plant room

PHASE 2 Design Presentation


EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

Exterior finishes:
Leo Beige marble Honed finish
Leo Beige marble, Sandblasted finish
Golden Leaf granite, Sandblasted finish
marble, Polished finish
Window system, Double glazed, Bronze
anodized aluminum windows
Bronze anodized aluminum cladding system
Glazed Railing

PHASE 2 Design Presentation


EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

P11 : Office and Retail Building


General information

Commercial Office : 3,271 Sq.M.


Location: B1 / G.F / 1.F / 2.F / 3.F / 4.F / 5.F

Retail : 568 Sq.M.


Location: B1 / G.F

44 Dedicated Parking Spaces

Building Height: 26.45 Meter (23.9 M)


(B1, Souk Level) , G + 4 + Plant room)

PHASE 2 Design Presentation


EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

Exterior finishes:
Natural Stone Cladding, Turkish Limestone,
Hazlime, Honed
Render Insulated Rain screen System, Sto-Ventec

A, Color to match base color of stone


Window system, Double glazed, Bronze anodized
aluminum windows
Bronze anodized aluminum cladding system

PHASE 2 Design Presentation


EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

P08 : Office and Retail Building


General information
Commercial Office Accommodation :3,365 Sq.M.
Location: G.F / 1.F / 2.F / 3.F / 4.F
Ground and Souk Level Retail :70 Sq.M.
Location: G.F
49 Dedicated Parking Spaces
Building Height: 23.85 Meter (19.3 M) (G + 3 + Plant room)

PHASE 2 Design Presentation


EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

Exterior finishes:
Natural Stone Cladding, Turkish Limestone, Hazlime, Honed
Render Insulated Rain screen System, Sto-Ventec A, Color: to
match base color of stone
Window system, Double glazed,
Bronze anodized aluminum windows
Bronze anodized aluminum cladding system

PHASE 2 Design Presentation


EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

Interior finishes:

U01 Main Lobby

P08 Main Lobby

P11 Main Lobby

PHASE 2 Design Presentation


EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

1.MAIN ENTRANCE LOBBY

PHASE 2 Design Presentation


EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

2. ENTRANCE LIFT LOBBY & LIFT CAR

LIFT CAR

LIFT LOBBY

PHASE 2 Design Presentation


EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

3.TYPICAL PUBLIC BATHROOM

PHASE 2 Design Presentation


EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

4.TYPICAL OFFICE FINISHING

PHASE 2 Design Presentation


EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

HOTEL P16

M Gallery
Hotel.

Msheireb
Street.

Dhow
Roundabout.

Pedestrian
Tunnel Entrance.

Souk Waqif.

PHASE 2 Design Presentation


EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

General information
Hotel area : 24,742 Sq.M.
Room :
215 Key, Average Room Size is 40 Sq.M.
Location: B3 / B2 / B1 / G.F / 1.F to 19.F

Retail : 272 Sq.M.


Location: (B1) Souk Level

239 Valet and Staff Parking Spaces


Building Height: 79.55 Meter (G+19)

The finishing up on ID final design


The finishing will be done by the nominated
subcontractor

P16

PHASE 2 Design Presentation


EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

ACCOMMODATION

Reception Hall and Majlis

Ballroom / Multi-function Room

Business Centre with Boardroom and Syndicate Rooms

Spa and Gym

Retail Units at Souk Underpass Level

Outdoor Pool with Terrace and

RESTAURANT
Tea and Pastry Lounge with Exterior Terrace

Specialty Restaurant
All Day Dining Restaurant.
Exterior Sky Lounge on the 19th Floor

PHASE 2 Design Presentation


EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

THE MAIN ENTRANCE

Main Entrance.
Entrance Hall

Reception Area.

PHASE 2 Design Presentation


EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

Exterior finishes:
Natural Stone Cladding, Turkish Limestone, Hazlime, Honed
Render Insulated Rain screen System, Sto-Ventec A, Color: to
match base color of stone

Window system, Double glazed,


Bronze anodized aluminum windows
Bronze anodized aluminum cladding system
Glazed Railing

PHASE 2 Design Presentation


EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

Hotel general finishing


Landscaping
stone with different types and sizes :
- Paving and stair areas .
- Main Entrance and Roof Terrace , Main Pool Terrace .
- under seating and planters
- pool and wall copping .
- lounge area tile
- Hotel Entrance area

Hotel Main Entrance

Design Image

PHASE 2 Design Presentation


EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

Majlis:

THE TEA & PASTRY LOUNGE

PHASE 2 Design Presentation


EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

THE SPECIALTY RESTAURANT

PUBLIC WASHROOM

GROUND FLOOR LIFT LOBBY

PHASE 2 Design Presentation


EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

THE ALL DAY DINING RESTAURANT

THE BALLROOM

THE SKY LOUNGE

PHASE 2 Design Presentation


EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

THE POOL DECK & POOL SIDE RESTAURANT


THE SPA

PHASE 2 Design Presentation


EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

A TYPICAL GUEST ROOM

TYPICAL LIFT LOBBY AND


GUEST CORRIDOR

PHASE 2 Design Presentation


EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

THE ROYAL SUITE

A TYPICAL GUEST SUITE

PHASE 2 Design Presentation


EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

THE CONTRACTOR SCOPE OF WORK


THE FIT OUT DESIGN TO BE FINISHED BY 17 JUNE 2013

PHASE 2 Design Presentation


EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

PHASE 2 Design Presentation


EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

PHASE 2 BULLETIN SCHEDULE FOR COMPLETION

PHASE 2 Design Presentation


EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

PHASE 2 Design Presentation


EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

PHASE 2 Design Presentation


EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

PHASE 2 Design Presentation


EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

PHASE 2 Design Presentation


EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

SOUK UNDERPASS
General information
Retail : 534 Sq.M.
12 Retail Units
Location: Souk Level (B1)
(Clear) Height:
3.66 M (One level)

PHASE 2 Design Presentation


EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

Interior finishes (Images):

Ceilings:

stone
Advertising screens

Stone walls

Stone flooring and stairs

PHASE 2 Design Presentation


EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

THE UNDERPASS CONNECTION TOWARDS SOUK WAQIF

PHASE 2 Design Presentation


EXECUTIVE PROGRESS MEETING NO. 20 13 FEB 2012

THANK YOU