Professional Documents
Culture Documents
DE EJECUCION DE OBRA
OBRA : MEJORAMIENTO E IMPLEMENTACION DE LA IEI RAMON CASTILLA , CC.NN BAJO ALDEA - PERENE - CHANCHAMAYO, JUNIN
MONTO TOTAL DE COSTO DIRECTO :
Lugar : Distrito de Perene, Chanchamayo, Junn
Fianancia: MUNICIPALIDAD DISTRITAL DE PERENE
FECHA
: Perene, Abril 2013
P R I M E R
M E S
S E G U N D O
M E S
TERCER
1. Semana 2. Semana 3. Semana 4. Semana 1. Semana 2. Semana 3. Semana 4. Semana 1. Semana
DESCRIPCION
1.00
1.01
ESTRUCTURAS
OBRAS PROVISIONALES
29,669.80
1.02
TRABAJOS PRELIMINARES
4,894.88
1.03
MOVIMIENTO DE TIERRAS
11,204.06
7,469.37
1.04
3,889.34
3,889.34
2,592.89
2,592.89
1.05
21,921.02
14,614.02
14,614.02
1.06
ESTRUCTURA DE MADERA
2.00
2.01
ARQUITECTURA
MUROS Y TAB. DE ALBAILERIA
2.02
REVESTIMIENTOS
2.03
CIELORASOS
2.04
PISOS Y PAVIMENTOS
2.05
ZOCALOS Y CONTRAZOCALOS
463.18
2.06
CARPINTERIA DE MADERA
931.04
4,883.99
4,069.99
10,960.51
10,960.51
29,043.98
29,043.98
4,069.99
3,255.99
6,118.43
14,521.99
6,118.43
4,862.71
4,078.95
4,078.95
3,825.74
3,825.74
4,862.71
4,862.71
M E S
2.07
CARPINTERIA METALICA
3,137.57
2.08
CERRAJERIA
2.09
VIDRIOS Y CRISTALES
2.10
PINTURAS
3.00
3.01
INSTALACIONES SANITARIAS
SISTEMA AGUA DE LLUVIA
4.00
4.02
INSTALACIONES ELECTRICAS
SALIDA PARA ALUMBRADO
652.66
4.03
980.10
4.04
112.14
4.06
4.07
4.10
CAJA DE DERIVACIONES
4.11
5.00
VARIOS
3,137.57
4,706.35
4,706.35
5,395.69
5,395.69
1,398.25
3,262.59
92.07
1,797.58
2,538.18
2,538.18
P R I M E R
M E S
S E G U N D O
M E S
1. Semana 2. Semana 3. Semana 4. Semana 1. Semana 2. Semana 3. Semana 4. Semana 1. Semana
DESCRIPCION
1.00
1.01
ESTRUCTURAS
INSTALACIONES PROVISIONALES
1,807.89
1.01
OBRAS PROVISIONALES
387.64
TERCER
M E S
1.02
TRABAJOS PRELIMINARES
2,854.89
1.03
MOVIMIENTO DE TIERRAS
2,155.08
923.60
1.04
1,284.25
1,284.25
1,284.25
1,284.25
1.05
7,145.41
7,145.41
7,145.41
1.06
ESTRUCTURA DE MADERA
2.00
2.01
ARQUITECTURA
MUROS Y TAB. DE ALBAILERIA
2.02
2.03
CIELORASOS
2.04
PISOS Y PAVIMENTOS
2.05
ZOCALOS Y CONTRAZOCALOS
553.32
2.06
CARPINTERIA DE MADERA
1,538.63
2.07
CARPINTERIA METALICA
2.08
CERRAJERIA
2.09
VIDRIOS Y CRISTALES
2.10
PINTURAS
1,988.78
1,988.78
7,145.41
7,145.41
22,317.07
11,158.54
1,988.78
1,988.78
2,677.61
11,158.54
2,677.61
3,098.51
2,005.42
2,005.42
2,677.61
2,677.61
2,280.03
2,280.03
3,098.51
3,098.51
2,005.42
2,005.42
482.67
482.67
3.00
3.01
INSTALACIONES SANITARIAS
SISTEMA AGUA FRIA Y CONTRAINCENDIO P
332.57
665.14
3.01
171.55
343.10
3.01
100.47
200.93
3.01
672.54
1,345.08
3.01
1,586.69
3,173.39
3.01
161.69
323.37
4.00
4.02
INSTALACIONES ELECTRICAS
SALIDA PARA ALUMBRADO
4.08
4.10
CAJA DE DERIVACIONES
4.11
5.00
VARIOS
1,650.21
1,650.21
413.00
P R I M E R
M E S
S E G U N D O
M E S
QUINCENA DE MES
1. Semana 2. Semana 3. Semana 4. Semana 1. Semana 2. Semana 3. Semana 4. Semana 1. Semana
DESCRIPCION
1.00
1.01
907.89
1.02
TRABAJOS PRELIMINARES
564.91
1.03
MOVIMIENTO DE TIERRAS
1,198.02
1.04
1,701.19
1,701.19
1.05
3,812.40
2,859.30
2,859.30
1.06
ESTRUCTURA DE MADERA
1,844.95
2,459.93
1,844.95
2.00
2.01
ARQUITECTURA
MUROS Y TAB. DE ALBAILERIA
1,201.54
1,602.05
1,201.54
2.02
REVOQUES Y ENLUCIDOS
2.03
CIELORASO
2.04
PISOS Y PAVIMENTOS
2.05
ZOCALOS Y CONTRAZOCALOS
2.06
1,666.91
1,666.91
833.46
583.70
1,316.16
658.08
1,122.68
1,122.68
561.34
CARPINTERIA DE MADERA
1,009.08
1,009.08
504.54
2.07
CARPINTERIA METALICA
324.58
243.43
2.08
CERRAJERIA
2.09
PINTURAS
2.10
VIDRIOS Y SIMILARES
3.00
3.01
INSTALACIONES SANITARIAS
SISTEMA DE AGUA FRIA
3.02
3.03
3.04
3.05
1,629.06
4.00
21.00
INSTALACIONES ELECTRICAS
SALIDA PARA ALUMBRADO
187.17
22.00
3.01
2.09
CAJAS DE DERIVACIONES
1,316.16
583.70
243.43
697.60
863.53
863.53
431.77
214.83
1,281.37
771.84
771.84
970.45
1,769.44
1,281.37
1,455.67
1,769.44
2,443.60
187.17
59.40
1,083.60
47.11
47.11
23.56
1,083.60
2.10
250.08
5.00
5.01
VARIOS
VARIOS
6.00
6.01
6.02
MOVIMIENTO DE TIERRAS
619.78
6.03
75.84
75.84
6.04
1,929.44
1,447.08
6.05
MUROS Y TABIQUES
445.45
445.45
6.06
REVOQUES Y ENLUCIDOS
395.88
395.88
6.07
INSTALACIONES SANITARIAS
329.76
329.76
6.08
FILTROS
123.85
123.85
754.73
754.73
377.36
61.27
PART.
P R I M E R
M E S
S E G U N D O
M E S
1. Semana 2. Semana 3. Semana 4. Semana 1. Semana 2. Semana 3. Semana 4. Semana 1. Semana
DESCRIPCION
1.00
1.01
ESTRUCTURAS
INSTALACIONES PROVISIONALES
300.00
1.01
OBRAS PROVISIONALES
878.04
1.02
TRABAJOS PRELIMINARES
6,553.22
1.03
MOVIMIENTO DE TIERRAS
5,425.78
3,617.18
1.04
10,619.36
10,619.36
7,079.58
7,079.58
TERCER
M E S
1.05
22,430.30
14,953.54
14,953.54
11,215.15
11,215.15
2.00
2.01
ARQUITECTURA
MUROS Y TAB. DE ALBAILERIA
6,433.28
5,361.06
5,361.06
4,288.85
2.02
REVOQUES, ENLUCIDOS
1,645.55
1,645.55
1,097.03
1,097.03
2.07
CARPINTERIA METALICA
1,466.69
1,466.69
2,200.04
2,200.04
2.08
CERRAJERIA
2.10
PINTURAS
73.19
73.19
2.11
VARIOS
288.32
288.32
3.00
3.01
OBRAS COMPLEMENTARIAS
SISTEMA DE DRENAJES
3.02
MOVIMIENTO DE TIERRAS
1,553.71
1,553.71
1,035.80
1,035.80
3.03
11,598.91
11,598.91
7,732.60
7,732.60
4.00
4.01
4.02
1,173.12
1,173.12
782.08
782.08
4.03
INSTALACIONES ESPECIALES
2,882.76
2,882.76
1,921.84
1,921.84
4.04
2,151.18
2,151.18
4.05
CONDUCTORES EN TUBERIAS
806.45
806.45
4.06
575.44
575.44
4.07
ARTEFACTOS ELECTRICOS
267.36
267.36
4.08
792.79
792.79
581.83
1,520.91
484.86
1,267.43
484.86
1,267.43
387.89
1,013.94
5.00
6.00
990.00
825.00
825.00
660.00
141.12
117.60
117.60
94.08
11,146.61
11,146.61
7.00
7.01
7.01.1
ACCESO PRINCIPAL
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO
7.1.2
234.36
234.36
156.24
156.24
7.1.3
51.03
51.03
34.02
34.02
7.02
7.02.01
MOVIMIENTO DE TIERRAS
NIVELACION DE TERRENO
97.13
97.13
7.03
7.03.01
CONCRETO RIGIDO
CONCRETO DE LOSA FC = 175 KG/CM2. + PASTA
P
DE 2.5 M. DE ACABADO
2,518.98
2,518.98
7.03.02
ENCOFRADO Y DESENCOFRADO
184.69
184.69
7.04
VARIOS
PINTURA ESPECIAL DE ALTO
TRANSITO DE DEMARCACION E=
0.10 M.
293.71
293.71
7.04.01
P R I M E R
M E S
1. Semana 2. Semana 3. Semana 4. Semana
DESCRIPCION
1.00
1.01
ESTRUCTURAS
INSTALACIONES PROVISIONALES
923.70
1.02
TRABAJOS PRELIMINARES
6,523.00
2.00
MOVIMIENTO DE TIERRAS
6,182.05
2,649.45
3.00
4,393.62
1,882.98
4.00
8,847.27
8,847.27
5.00
CARPINTERIA METALICA
5,931.24
6.00
PINTURAS
2,042.70
7.00
VARIOS
3,091.82
8,847.27
8,847.27
P R I M E R
M E S
S E G U N D O
M E S
1. Semana 2. Semana 3. Semana 4. Semana 1. Semana 2. Semana 3. Semana 4. Semana 1. Semana
DESCRIPCION
1.00
1.01
ESTRUCTURAS
OBRAS PROVISIONALES
4,086.71
1.02
TRABAJOS PRELIMINARES
833.38
1.03
MOVIMIENTO DE TIERRAS
1,173.93
782.62
1.04
174.15
174.15
116.10
116.10
1.05
2,242.55
1,495.03
1,495.03
1.06
ESTRUCTURA DE MADERA
2.00
2.01
ARQUITECTURA
MUROS Y TAB. DE ALBAILERIA
2.02
REVESTIMIENTOS
110.83
92.36
1,121.27
1,121.27
27,059.36
27,059.36
92.36
73.88
1,275.77
13,529.68
1,275.77
850.51
850.51
TERCER
M E S
2.03
CIELORASOS
2.04
PISOS Y PAVIMENTOS
2.05
ZOCALOS Y CONTRAZOCALOS
1,016.23
2.06
CARPINTERIA DE MADERA
131.14
2.07
CARPINTERIA METALICA
2.08
CERRAJERIA
2.09
VIDRIOS Y CRISTALES
2.10
PINTURAS
3.00
3.01
INSTALACIONES SANITARIAS
REDES DE DISTRIBUCION Y MONTANTES P
3.02
4.00
4.02
INSTALACIONES ELECTRICAS
SALIDA PARA ALUMBRADO
4.07
4.08
4.10
CAJA DE DERIVACIONES
4.11
5.00
VARIOS
2,142.07
661.31
661.31
6,935.94
6,935.94
2,142.07
2,142.07
991.96
991.96
7,721.09
7,721.09
1,115.36
2,602.52
1,369.35
2,433.21
227.09
PARTIDA
DESCRIPCION
P R I M E R
M E S
S E G U N D O
M E S
1. Semana 2. Semana 3. Semana 4. Semana 1. Semana 2. Semana 3. Semana 4. Semana
227.09
MOBILIARIOS
1.00 MOBILIARIOS
13,062.50
13,062.50
13,062.50
13,062.50
9,000.00
9,000.00
EQUIPOS
2.00 EQUIPAMIENTO SALA DE COMPUTACION
9,000.00
9,000.00
142,592.84
170,002.00
PARTIDA
P R I M E R
M E S
1. Semana 2. Semana 3. Semana 4. Semana
DESCRIPCION
MITIGACION AMBIENTAL
840.00
P
137,148.94
840.00
840.00
840.00
2,366.40
2,366.40
1,183.20
118,553.20
109,082.10
113,916.68
478,700.93
35.10
35.10
91,073.55
105,362.55
509,030.93
41.89
76.99
114,316.55
s/.
1,283,115.16
Aulas + Direccin
TERCER M E S
2. Semana 3. Semana 4. Semana
TOTAL
PROGRAMADO
31,219.80
4,894.88
18,673.43
12,778.43
65,831.12
76,892.09
16,279.96
20,394.76
3,825.74
3,825.74
4,862.71
15,302.94
19,720.77
926.36
926.36
2,315.89
1,862.09
1,862.09
4,655.22
15,687.84
5,395.69
433.05
433.05
866.10
2,114.58
2,114.58
4,229.15
5,395.69
21,902.52
4,660.84
489.49
489.49
1,631.64
980.10
112.14
184.14
184.14
460.34
3,595.16
3,595.16
9,064.84
2,538.18
293.67
293.67
587.34
1,789.49
1,789.49
3,578.97
2,538.18
10,134.78
362855.89
TERCER M E S
2. Semana 3. Semana 4. Semana
TOTAL
PROGRAMADO
1,807.89
387.64
1,807.89
387.64
332.57
1,330.27
171.55
686.19
2,854.89
3,078.68
5,137.00
35,727.07
44,634.14
7,955.11
10,710.45
9,120.10
12,394.04
1,106.64
3,077.26
8,021.66
433.05
14,737.94
1,930.68
1,330.27
686.19
100.47
401.86
401.86
2,854.89
3,078.68
5,137.00
35,727.07
44,634.14
7,955.11
10,710.45
2,280.03
2,280.03
9,120.10
3,098.51
12,394.04
276.66
276.66
1,106.64
769.32
769.32
3,077.26
8,021.66
482.67
216.53
216.53
433.05
7,368.97
7,368.97
14,737.94
482.67
1,930.68
672.54
2,690.16
2,690.16
1,586.69
6,346.77
6,346.77
161.69
646.74
646.74
1,650.21
QUINCENA DE MES
2. Semana
826.01
413.00
1,652.01
4,697.52
4,697.52
9,395.04
103.34
103.34
206.67
688.92
688.92
1,377.84
1,650.21
6,600.85
TOTAL
PROGRAMADO
1,457.89
564.91
1,198.02
3,361.81
8,758.09
6,471.70
4,005.13
1,652.01
9,395.04
206.67
1,377.84
6,600.85
194,448.64
4,167.28
1,167.39
3,319.38
2,806.70
2,522.70
811.44
697.60
2,190.06
214.83
2,562.74
1,543.67
2,420.56
3,538.87
4,072.66
374.34
59.40
2,171.70
117.78
250.08
1,665.59
61.27
619.78
145.43
1,447.08
4,597.80
890.89
858.95
659.52
247.69
70,573.65
TERCER M E S
2. Semana 3. Semana 4. Semana
TOTAL
PROGRAMADO
3,500.00
878.04
6,553.22
9,042.96
34,858.67
66,901.30
21,444.25
5,485.17
7,333.45
350.16
350.16
700.32
73.19
73.19
292.76
288.32
288.32
1,153.27
1,939.43
5,179.02
35,460.08
5,069.71
3,910.41
9,609.20
2,151.18
2,151.18
8,604.73
806.45
806.45
3,225.81
575.44
575.44
2,301.76
267.36
267.36
1,069.43
792.79
792.79
3,171.14
11,146.61
11,146.61
44,586.45
3,300.00
470.40
781.20
170.10
97.13
97.13
388.50
2,518.98
2,518.98
10,075.91
184.69
184.69
738.75
293.71
293.71
1,174.84
299370.28
TOTAL
PROGRAMADO
1,573.70
6,523.00
8,831.50
6,276.60
30,998.86
5,931.24
2,042.70
3,091.82
65,269.42
TERCER M E S
2. Semana 3. Semana 4. Semana
TOTAL
PROGRAMADO
4,720.84
833.38
1,956.55
498.67
6,481.71
69,102.93
369.42
4,252.56
6,935.94
6,935.94
27,743.74
2,142.07
8,626.77
2,032.46
2,032.46
5,081.14
262.28
262.28
655.70
3,306.53
7,721.09
250.25
250.25
500.50
856.46
856.46
1,712.91
7,721.09
31,401.57
3,717.88
1,027.01
4,866.42
227.09
200.00
200.00
1,027.01
3,423.38
4,866.42
12,241.80
102.99
102.99
205.98
413.34
413.34
826.68
2,151.15
2,151.15
4,302.30
227.09
908.34
193071.28
TOTAL
PROGRAMADO
52,250.00
36,000.00
88,250.00
TOTAL
PROGRAMADO
3,360.00
5,916.00
9,276.00
79,603.20
89,200.24
23,959.90
307,079.89
23.01
100.00
1,283,115.16