PROYECTO : "MEJORAMIENTO DE LA INFRAESTRUCTURA VIAL DE LA ASOCIACION DE VIVIENDA NUEVA ALBORADA, DISTRITO DE PAUCARPATA - AREQUIPA AREQUIPA - II ETAPA"
CLIENTE
FECHA
ITEM
DESCRIPCION
UND.
MEDIDAS
CANT.
LARGO
ANCHO ALTURA
PARCIAL
TOTAL
AREA
OBRAS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE EQUIPO
TRAZO, NIVELACION Y REPLANTEO
LIMPIEZA DE TERRENO MANUAL
CARTEL DE IDENTIFICACION DE OBRA
SEGURIDAD Y MANTENIMIENTO DE TRANSITO
OBRAS PROVISIONALES
CERCO PERIMETRICO
CAMPAMENTO DE OBRA , ALMACENES Y OFICINAS
GLB
M2
M2
UND
GLB
1.00
1.00
1.00
2.00
1.00
M
M2
1.00
1.00
1,503.00
1,503.00
7.00
7.00
60.00
25.00
1.00
10,521.00
10,521.00
2.00
1.00
1.00
10,521.00
10,521.00
2.00
1.00
60.00
25.00
60.00
25.00
1,680.00
650.00
1,625.02
1,680.00
650.00
1,625.02
6,072.00
6,072.00
6,072.00
6,072.00
5,520.00
6,072.00
6,072.00
6,072.00
6,072.00
5,520.00
2,760.00
319.45
2,760.00
319.45
1,735.86
1,574.51
1,735.86
1,574.51
3,847.80
3,847.80
3,847.80
582.60
20,953.00
3,847.80
3,847.80
3,847.80
582.60
20,953.00
PAVIMENTO 1
MOVIMIENTO DE TIERRAS
CORTE CON MAQUINARIA EN TERRENO NORMAL
RELLENO CON MATERIAL PROPIO
ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE D=5.00km
M3
M3
M3
PAVIMENTO FLEXIBLE
PERFILADO Y COMPACTADO DE LA SUB RAZANTE
SUB BASE MEJORADA E=15CM
BASE GRANULAR E=15CM
IMPRIMADO
CARPETA ASFALTICA EN CALIENTE
M2
M2
M2
M2
M2
1.00
1.00
1.00
1.00
1.00
920.00
920.00
920.00
920.00
920.00
PINTURA DE SEALIZACION
PINTURA EN SEALIZACION VIAL
PINTURA EN SEALIZACION HORIZONTAL
M
M2
3.00
25.00
920.00
PAVIMENTO 2
MOVIMIENTO DE TIERRAS
CORTE CON MAQUINARIA EN TERRENO NORMAL
ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE D=5.00km
PAVIMENTO RIGIDO
PERFILADO Y COMPACTADO DE LA SUB RAZANTE
SUB BASE MEJORADA E=15CM
BASE GRANULAR E=15CM
ENCOFRADO Y DESENCOFRADO NORMAL
ACERO ESTRUCTURAL TRABAJADO PARA LOSAS MACIZAS Fy=4200 kg/cm2
6.60
6.60
6.60
6.60
6.00
12.78
M3
##########
M3
1.30 #########
M2
M2
M2
M2
KG
1.00
1.00
1.00
1.00
1.00
583.00
583.00
583.00
2,913.00
20,953.00
6.60
6.60
6.60
0.20
PLANILLA DE METRADOS
PROYECTO : "MEJORAMIENTO DE LA INFRAESTRUCTURA VIAL DE LA ASOCIACION DE VIVIENDA NUEVA ALBORADA, DISTRITO DE PAUCARPATA - AREQUIPA AREQUIPA - II ETAPA"
CLIENTE
FECHA
ITEM
DESCRIPCION
CONCRETO F'C = 210 Kg/cm2 EN LOSAS MACIZAS
JUNTAS ASFALTICAS E=1.0", MEZCLA 1:3
UND.
MEDIDAS
CANT.
M3
M
1.00
1.00
M
M2
3.00
18.00
583.00
M3
M2
M3
1.00
1.00
1.30
35.00
35.00
35.00
1.20
CONCRETO EN ZAPATAS
CONCRETO DE NIVELACION (SOLADO)
ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS Fy=4200 kg/cm2
ENCOFRADO Y DESENCOFRADO NORMAL EN ZAPATAS
CONCRETO F'C = 210 Kg/cm2 EN ZAPATAS
M2
KG
M2
M3
1.00
636.00
1.00
1.00
25.00
1.20
74.06
30.00
1.20
0.30
0.30
CONCRETO EN MUROS
ACERO ESTRUCTURAL TRABAJADO PARA MUROS Fy=4200 kg/cm2
ENCOFRADO Y DESENCOFRADO NORMAL EN MUROS
CONCRETO F'C = 210 Kg/cm2 EN MUROS
JUNTAS ASFALTICAS E=1.0", MEZCLA 1:3
KG
M2
M3
M
642.14
1.00
1.00
12.00
0.25
4.60
2.00
PINTURA DE SEALIZACION
PINTURA EN SEALIZACION VIAL
PINTURA EN SEALIZACION HORIZONTAL
MURO DE CONTENCION
MOVIMIENTO DE TIERRAS
EXCAVACION C/MAQUINARIA EN TERRENO NORMAL
REFINE, NIVELACION Y COMPACTADO C/EQUIPO
RELLENO MANUAL COMPACTADO CON MATERIAL PROPIO
VARIOS
NIVELACION DE BUZONES
IMPACTO AMBIENTAL
ROTURA DE TUBERIAS EN OBRA
LIMPIEZA FINAL DE OBRA
UND
GLB
GLB
M2
1.00
0.75
1.00
1.00
PARCIAL
12.78
55.00
25.00
3.60
2.76
2.21
14.00
1,503.00
8.00
TOTAL
AREA
699.60
1,747.00
699.60
1,747.00
1,749.00
230.00
1,749.00
230.00
96.67
42.00
100.69
96.67
42.00
100.69
30.00
636.00
22.22
10.80
30.00
636.00
22.22
10.80
642.14
253.00
12.50
43.24
642.14
253.00
12.50
43.24
14.00
0.75
1.00
12,024.00
14.00
0.75
1.00
12,024.00
ELEMENTO - DESCRIPCION
3/8
3/8
5/8
5/8
N VECES
388.00
388.00
194.00
194.00
N BARRAS
LONG.
BARRA
10.00
10.00
16.00
8.00
3.00
3.00
1.00
1.00
Longitud (m)
Peso (Kg/m)
Peso (Kg)
TOTAL (kg)
ELEMENTO - DESCRIPCION
MURO DE CONTENCION (ZAPATAS)
ACERO LONG.
ACERO TRANSV SUP EN ZAPATAS
ACERO TRANSV INF EN ZAPATAS
3/8
1/2
1/2
N VECES
35.00
35.00
35.00
N BARRAS
N VECES
N BARRAS
LONGITUD X DIAMETRO
1/2"
5/8"
3,104.00
1,552.00
23,280.00
0.58
13,503.00
1.02
-
4,656.00
1.60
7,450.00
20,95
LONG.
BARRA
8.00
5.00
4.00
3/8"
11,640.00
11,640.00
0.25
-
1/4"
1.00
1.80
1.80
Longitud (m)
Peso (Kg/m)
Peso (Kg)
TOTAL (kg)
ELEMENTO - DESCRIPCION
1/4"
LONG.
BARRA
3/8"
LONGITUD X DIAMETRO
1/2"
5/8"
280.00
315.00
252.00
0.25
-
280.00
0.58
163.00
567.00
1.02
579.00
1.60
-
74
1/4"
3/8"
LONGITUD X DIAMETRO
1/2"
5/8"
3/8
1/2
1/2
3/8
35.00
35.00
35.00
35.00
5.00
6.00
5.00
4.00
Longitud (m)
Peso (Kg/m)
Peso (Kg)
TOTAL (kg)
1.00
1.00
2.26
2.20
175.00
210.00
394.98
308.56
0.25
-
483.56
0.58
281.00
604.98
1.02
618.00
1.60
-
89
TRITO DE PAUCARPATA -
DIAMETRO
3/4"
2.26
-
1"
4.00
20,953.00
DIAMETRO
3/4"
2.26
-
1"
4.00
742.00
DIAMETRO
3/4"
1"
2.26
-
4.00
899.00