PLANILLA DE METRADOS

PROYECTO : "MEJORAMIENTO DE LA INFRAESTRUCTURA VIAL DE LA ASOCIACION DE VIVIENDA NUEVA ALBORADA, DISTRITO DE PAUCARPATA - AREQUIPA AREQUIPA - II ETAPA"
CLIENTE
FECHA

: MUNICIPALIDAD DISTRITAL DE PAUCARPATA


: SETIEMBRE DEL 2014

ITEM

DESCRIPCION

UND.

MEDIDAS

CANT.
LARGO

ANCHO ALTURA

PARCIAL

TOTAL

AREA

OBRAS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE EQUIPO
TRAZO, NIVELACION Y REPLANTEO
LIMPIEZA DE TERRENO MANUAL
CARTEL DE IDENTIFICACION DE OBRA
SEGURIDAD Y MANTENIMIENTO DE TRANSITO
OBRAS PROVISIONALES
CERCO PERIMETRICO
CAMPAMENTO DE OBRA , ALMACENES Y OFICINAS

GLB
M2
M2
UND
GLB

1.00
1.00
1.00
2.00
1.00

M
M2

1.00
1.00

1,503.00
1,503.00

7.00
7.00

60.00
25.00

1.00
10,521.00
10,521.00
2.00
1.00

1.00
10,521.00
10,521.00
2.00
1.00

60.00
25.00

60.00
25.00

1,680.00
650.00
1,625.02

1,680.00
650.00
1,625.02

6,072.00
6,072.00
6,072.00
6,072.00
5,520.00

6,072.00
6,072.00
6,072.00
6,072.00
5,520.00

2,760.00
319.45

2,760.00
319.45

1,735.86
1,574.51

1,735.86
1,574.51

3,847.80
3,847.80
3,847.80
582.60
20,953.00

3,847.80
3,847.80
3,847.80
582.60
20,953.00

PAVIMENTO 1
MOVIMIENTO DE TIERRAS
CORTE CON MAQUINARIA EN TERRENO NORMAL
RELLENO CON MATERIAL PROPIO
ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE D=5.00km

M3
M3
M3

1.00 ######### ####### #######


650.00
1.30 #########

PAVIMENTO FLEXIBLE
PERFILADO Y COMPACTADO DE LA SUB RAZANTE
SUB BASE MEJORADA E=15CM
BASE GRANULAR E=15CM
IMPRIMADO
CARPETA ASFALTICA EN CALIENTE

M2
M2
M2
M2
M2

1.00
1.00
1.00
1.00
1.00

920.00
920.00
920.00
920.00
920.00

PINTURA DE SEALIZACION
PINTURA EN SEALIZACION VIAL
PINTURA EN SEALIZACION HORIZONTAL

M
M2

3.00
25.00

920.00

PAVIMENTO 2
MOVIMIENTO DE TIERRAS
CORTE CON MAQUINARIA EN TERRENO NORMAL
ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE D=5.00km
PAVIMENTO RIGIDO
PERFILADO Y COMPACTADO DE LA SUB RAZANTE
SUB BASE MEJORADA E=15CM
BASE GRANULAR E=15CM
ENCOFRADO Y DESENCOFRADO NORMAL
ACERO ESTRUCTURAL TRABAJADO PARA LOSAS MACIZAS Fy=4200 kg/cm2

6.60
6.60
6.60
6.60
6.00

12.78

M3
##########
M3
1.30 #########

M2
M2
M2
M2
KG

1.00
1.00
1.00
1.00
1.00

583.00
583.00
583.00
2,913.00
20,953.00

6.60
6.60
6.60
0.20

PLANILLA DE METRADOS
PROYECTO : "MEJORAMIENTO DE LA INFRAESTRUCTURA VIAL DE LA ASOCIACION DE VIVIENDA NUEVA ALBORADA, DISTRITO DE PAUCARPATA - AREQUIPA AREQUIPA - II ETAPA"
CLIENTE
FECHA

: MUNICIPALIDAD DISTRITAL DE PAUCARPATA


: SETIEMBRE DEL 2014

ITEM

DESCRIPCION
CONCRETO F'C = 210 Kg/cm2 EN LOSAS MACIZAS
JUNTAS ASFALTICAS E=1.0", MEZCLA 1:3

UND.

MEDIDAS

CANT.

LARGO ANCHO ALTURA


583.00
6.00
0.20
1,747.00

M3
M

1.00
1.00

M
M2

3.00
18.00

583.00

M3
M2
M3

1.00
1.00
1.30

35.00
35.00
35.00

1.20

CONCRETO EN ZAPATAS
CONCRETO DE NIVELACION (SOLADO)
ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS Fy=4200 kg/cm2
ENCOFRADO Y DESENCOFRADO NORMAL EN ZAPATAS
CONCRETO F'C = 210 Kg/cm2 EN ZAPATAS

M2
KG
M2
M3

1.00
636.00
1.00
1.00

25.00

1.20

74.06
30.00

1.20

0.30
0.30

CONCRETO EN MUROS
ACERO ESTRUCTURAL TRABAJADO PARA MUROS Fy=4200 kg/cm2
ENCOFRADO Y DESENCOFRADO NORMAL EN MUROS
CONCRETO F'C = 210 Kg/cm2 EN MUROS
JUNTAS ASFALTICAS E=1.0", MEZCLA 1:3

KG
M2
M3
M

642.14
1.00
1.00
12.00

0.25

4.60
2.00

PINTURA DE SEALIZACION
PINTURA EN SEALIZACION VIAL
PINTURA EN SEALIZACION HORIZONTAL
MURO DE CONTENCION
MOVIMIENTO DE TIERRAS
EXCAVACION C/MAQUINARIA EN TERRENO NORMAL
REFINE, NIVELACION Y COMPACTADO C/EQUIPO
RELLENO MANUAL COMPACTADO CON MATERIAL PROPIO

VARIOS
NIVELACION DE BUZONES
IMPACTO AMBIENTAL
ROTURA DE TUBERIAS EN OBRA
LIMPIEZA FINAL DE OBRA

UND
GLB
GLB
M2

1.00
0.75
1.00
1.00

PARCIAL

12.78

55.00
25.00
3.60

2.76
2.21

14.00

1,503.00

8.00

TOTAL

AREA
699.60
1,747.00

699.60
1,747.00

1,749.00
230.00

1,749.00
230.00

96.67
42.00
100.69

96.67
42.00
100.69

30.00
636.00
22.22
10.80

30.00
636.00
22.22
10.80

642.14
253.00
12.50
43.24

642.14
253.00
12.50
43.24

14.00
0.75
1.00
12,024.00

14.00
0.75
1.00
12,024.00

PLANILLA DE METRADOS (ACERO)


PROYECTO : "MEJORAMIENTO DE LA INFRAESTRUCTURA VIAL DE LA ASOCIACION DE VIVIENDA NUEVA ALBORADA, DISTRITO DE PAUCARPATA AREQUIPA AREQUIPA - II ETAPA"
CLIENTE
: MUNICIPALIDAD DISTRITAL DE PAUCARPATA
FECHA
: JUNIO DEL 2014

ELEMENTO - DESCRIPCION

LOSA DEPAVIMENTO RIGIDO


ACERO LONG.
ACERO LONG.
ACERO EN JUNTAS TRANSVERSALES
ACERO EN JUNTAS LONGITUDINALES

3/8
3/8
5/8
5/8

N VECES

388.00
388.00
194.00
194.00

N BARRAS

LONG.
BARRA

10.00
10.00
16.00
8.00

3.00
3.00
1.00
1.00

Longitud (m)
Peso (Kg/m)
Peso (Kg)
TOTAL (kg)

ELEMENTO - DESCRIPCION
MURO DE CONTENCION (ZAPATAS)
ACERO LONG.
ACERO TRANSV SUP EN ZAPATAS
ACERO TRANSV INF EN ZAPATAS

3/8
1/2
1/2

N VECES

35.00
35.00
35.00

N BARRAS

N VECES

N BARRAS

LONGITUD X DIAMETRO
1/2"
5/8"

3,104.00
1,552.00

23,280.00
0.58
13,503.00

1.02
-

4,656.00
1.60
7,450.00

20,95

LONG.
BARRA

8.00
5.00
4.00

3/8"
11,640.00
11,640.00

0.25
-

1/4"

1.00
1.80
1.80

Longitud (m)
Peso (Kg/m)
Peso (Kg)
TOTAL (kg)

ELEMENTO - DESCRIPCION

1/4"

LONG.
BARRA

3/8"

LONGITUD X DIAMETRO
1/2"
5/8"

280.00
315.00
252.00

0.25
-

280.00
0.58
163.00

567.00
1.02
579.00

1.60
-

74

1/4"

3/8"

LONGITUD X DIAMETRO
1/2"
5/8"

MURO DE CONTENCION (MURO)


ACERO LONG.
ACERO LONG.
ACERO PRINCIPAL EN MURO
ACERO DE MONTAJE EN MURO

3/8
1/2
1/2
3/8

35.00
35.00
35.00
35.00

5.00
6.00
5.00
4.00

Longitud (m)
Peso (Kg/m)
Peso (Kg)
TOTAL (kg)

1.00
1.00
2.26
2.20

175.00
210.00
394.98
308.56

0.25
-

483.56
0.58
281.00

604.98
1.02
618.00

1.60
-

89

TRITO DE PAUCARPATA -

DIAMETRO
3/4"

2.26
-

1"

4.00
20,953.00

DIAMETRO
3/4"

2.26
-

1"

4.00
742.00

DIAMETRO
3/4"

1"

2.26
-

4.00
899.00