You are on page 1of 146

Job No

Sheet No

Rev

1
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Job Information
Engineer
Name:

mreh

Date:

31-Dec-14

Structure Type

Checked

Approved

SPACE FRAME

Number of Nodes
Number of Elements

99

Highest Node

121

138

Highest Beam

191

Number of Basic Load Cases

Number of Combination Load Cases

Included in this printout are data for:


The Whole Structure
All
Included in this printout are results for load cases:
Type
L/C
Primary

DEAD

Primary

LIVE

Primary

WIND

Combination

1*D

Combination

D+L

Combination

D+0.75L+0.75W

Combination

0.6D+W

Name

Basic Load Cases


Number

Name

DEAD

LIVE

WIND

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 1 of 146

Job No

Sheet No

Rev

2
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Chd

Date/Time

19-Jan-2015 14:29

Combination Load Cases


Comb.

Combination L/C Name

Primary

Primary L/C Name

Factor

1*D

DEAD

1.00

D+L

DEAD

1.00

LIVE

1.00

DEAD

1.00

LIVE

0.75

WIND

0.75

DEAD

0.60

WIND

1.00

D+0.75L+0.75W

0.6D+W

Node Displacement Summary


Node

L/C

Resultant

rX

rY

rZ

(mm)

(mm)

(mm)

(mm)

(rad)

(rad)

(rad)

Max X

1:DEAD

0.000

-0.009

-0.111

0.111

-0.000

0.000

0.000

Min X

1:DEAD

-0.009

-0.111

0.111

-0.000

0.000

0.000

Max Y

45

1:DEAD

0.000
0.000

0.000

0.000

0.000

0.000

0.000

0.000

Min Y

80

8:D+0.75L+0.75

0.000

-6.405

27.866

0.001

0.000

0.000

Max Z

45

1:DEAD

0.000

-27.120
0.000

0.000

0.000

0.000

0.000

0.000

Min Z

80

8:D+0.75L+0.75

0.000

-27.120

27.866

0.001

0.000

0.000

Max rX

81

8:D+0.75L+0.75

0.000

-15.531

-6.405
-5.635

16.522

0.009

0.000

0.000

Min rX

77

8:D+0.75L+0.75

0.000

-12.212

-5.558

13.417

0.000

0.000

Max rY

1:DEAD

0.000

-0.009

-0.111

0.111

-0.009
-0.000

0.000

0.000

Min rY

1:DEAD

0.000

-0.009

-0.111

0.111

-0.000

0.000

Max rZ

1:DEAD

0.000

-0.009

-0.111

0.111

-0.000

0.000
0.000

Min rZ

1:DEAD

0.000

-0.009

-0.111

0.111

-0.000

0.000

Max Rst

80

8:D+0.75L+0.75

0.000

-27.120

-6.405

27.866

0.001

0.000

0.000
0.000

0.000

Beam Displacement Detail Summary


Displacements shown in italic indicate the presence of an offset
Beam
L/C
d
X
(m)

(mm)

Resultant

(mm)

(mm)

(mm)

Max X

10

1:DEAD

0.775

0.002

-0.092

-0.605

0.612

Min X

14

1:DEAD

0.775

-0.095

-0.570

0.578

Max Y

74

1:DEAD

0.000

-0.002
0.000

0.000

0.000

0.000

Min Y

177

8:D+0.75L+0.75

2.300

-0.000

-5.372

42.304

Max Z

94

8:D+0.75L+0.75

1.250

0.000

-41.962
-0.034

0.551

0.552

Min Z

76

8:D+0.75L+0.75

2.100

0.000

-0.084

Max Rst

180

8:D+0.75L+0.75

2.300

0.001

-41.962

-6.620
-5.372

42.304

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

6.620

Print Run 2 of 146

Job No

Sheet No

Rev

3
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Chd

Date/Time

19-Jan-2015 14:29

Beam End Displacement Summary


Displacements shown in italic indicate the presence of an offset
Beam
Node
L/C
X
(mm)

Resultant

(mm)

(mm)

(mm)

Max X

1:DEAD

0.000

-0.009

-0.111

Min X

1:DEAD

-0.009

-0.111

0.111

Max Y

74

45

1:DEAD

0.000
0.000

0.111

0.000

0.000

0.000
27.866

Min Y

111

80

8:D+0.75L+0.75

0.000

74

45

1:DEAD

0.000

-27.120
0.000

-6.405

Max Z

0.000

0.000

Min Z

111

80

8:D+0.75L+0.75

0.000

-27.120

27.866

Max Rst

111

80

8:D+0.75L+0.75

0.000

-27.120

-6.405
-6.405

27.866

Beam End Force Summary


The signs of the forces at end B of each beam have been reversed. For example: this means that the Min Fx entry gives the largest tension
value for an beam.
Axial
Shear
Torsion
Bending
Beam
Node
L/C
Fx
Fy
Fz
Mx
My
Mz
(kN)

(kN)

Max Fx

79

50

8:D+0.75L+0.75

44.480

16.041

(kN)
0.000

(kNm)
0.000

(kNm)
0.000

(kNm)

Min Fx

1:DEAD

0.873

-0.000

0.000

0.000

0.000

Max Fy

128

19

8:D+0.75L+0.75

0.000
14.388

27.269

0.000

0.000

0.000

48.122

0.000

Min Fy

113

79

8:D+0.75L+0.75

14.413

-0.000

-0.000

7.543

181

115

8:D+0.75L+0.75

0.000

-26.862
2.849

-0.000

Max Fz

0.000

0.000

0.000

0.000

Min Fz

172

70

8:D+0.75L+0.75

0.000

2.849

0.000

0.000

0.000

Max Mx

1:DEAD

0.000

0.873

-0.000
-0.000

0.000

0.000

0.000

Min Mx

1:DEAD

0.000

0.873

-0.000

0.000

0.000

Max My

1:DEAD

0.000

0.873

-0.000

0.000
0.000

0.000

0.000

Min My

1:DEAD

0.000

0.873

-0.000

0.000

Max Mz

110

22

8:D+0.75L+0.75

14.388

27.269

0.000

0.000

0.000
0.000

48.122

Min Mz

79

19

8:D+0.75L+0.75

43.240

16.041

-0.000

-0.000

-0.000

-48.122

0.000

Beam Force Detail Summary


Sign convention as diagrams:- positive above line, negative below line except Fx where positive is compression. Distance d is given from beam
end A.
Axial
Shear
Torsion
Bending
Beam
L/C
d
Fx
Fy
Fz
Mx
My
Mz
(kN)

(kN)

Max Fx

79

8:D+0.75L+0.75

(m)
0.000

44.480

16.041

(kN)
0.000

(kNm)
0.000

(kNm)
0.000

(kNm)

Min Fx

1:DEAD

0.000

0.873

-0.000

0.000

0.000

0.000

Max Fy

128

8:D+0.75L+0.75

0.000

0.000
14.388

27.269

0.000

0.000

0.000

48.122

0.000

Min Fy

113

8:D+0.75L+0.75

0.528

14.413

-0.000

-0.000

7.543

181

8:D+0.75L+0.75

0.000

0.000

-26.862
2.849

-0.000

Max Fz

0.000

0.000

0.000

0.000

Min Fz

172

8:D+0.75L+0.75

0.000

0.000

2.849

0.000

0.000

0.000

Max Mx

1:DEAD

0.000

0.000

0.873

-0.000
-0.000

0.000

0.000

0.000

Min Mx

1:DEAD

0.000

0.000

0.873

-0.000

0.000

0.000

Max My

181

8:D+0.75L+0.75

1.395

0.000

-2.279

0.000

0.000
0.000

0.000

-0.393

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 3 of 146

Job No

Sheet No

Rev

4
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Chd

Date/Time

19-Jan-2015 14:29

Beam Force Detail Summary Cont...


Beam

L/C

Axial
Fx

Fy

Shear
Fz

Torsion
Mx

My

Bending
Mz

(m)

(kN)

(kN)

(kN)

(kNm)

(kNm)

(kNm)

Min My

172

8:D+0.75L+0.75

1.395

0.000

-2.279

-0.000

0.000

Max Mz

110

8:D+0.75L+0.75

0.000

14.388

27.269

0.000

0.000

-0.000
0.000

48.122

-0.393

Min Mz

79

8:D+0.75L+0.75

3.000

43.240

16.041

-0.000

-0.000

-0.000

-48.122

Y
X
Z

Load 8 : Displacement

Whole Structure Displacements 55mm:1m 8 D+0.75L+0.75W

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 4 of 146

Job No

Sheet No

Rev

5
Software licensed to
Job Title

steel roof canopy

Client

Part
Ref
By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

3D Rendered View

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 5 of 146

Job No

Sheet No

Rev

6
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Y
X
Z

Load 8 : Bending Z

Whole Structure Mz 40kNm:1m 8 D+0.75L+0.75W

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 6 of 146

Job No

Sheet No

Rev

7
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Y
X
Z

Load 8 : Shear Y

Whole Structure Fy 20kN:1m 8 D+0.75L+0.75W

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 7 of 146

Job No

Sheet No

Rev

8
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Y
X
Z

Load 8 : Axial Force

Whole Structure Fx 100kN:1m 8 D+0.75L+0.75W

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 8 of 146

Job No

Sheet No

Rev

9
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 1 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER
1 * | GERMAN SECTIONS
|
|
AX = 16.40 |
|
* | ST IPE140
|
|
--Z AY =
5.93 |
|DESIGN CODE * |
|
|
AZ =
6.78 |
| AISC-1989 * ===============================
===|===
SY = 12.33 |
|
*
SZ = 77.29 |
|
* |<---LENGTH (M)=
1.55 --->|
RY =
1.66 |
|*************
RZ =
5.74 |
|
|
|
1.1 (KNS-METRE)
|
|PARAMETER
|
L8 L8 L8
STRESSES
|
|IN KNS CMS
|
IN NEWTON MMS|
|--------------- +
L8
L8
-------------|
| KL/R-Y= 93.57 |
FA = 95.94 |
| KL/R-Z= 26.99 +
L8
L8
fa =
0.00 |
| UNL
= 100.00 |
FCZ = 148.93 |
| CB
=
1.00 +
L8
L8
FTZ = 148.93 |
| CMY
=
0.85 |
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |L0
L0 fbz = 14.28 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.1
Fey = 120.56 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =1449.43 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
0.00 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
9.591E-02
8
|
|
0.00 T
0.00
-1.10
0.78
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
1 ST
IPE140
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.096
8
0.00 T
0.00
-1.10
0.77

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 9 of 146

Job No

Sheet No

Rev

10
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 2 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER
2 * | GERMAN SECTIONS
|
|
AX = 16.40 |
|
* | ST IPE140
|
|
--Z AY =
5.93 |
|DESIGN CODE * |
|
|
AZ =
6.78 |
| AISC-1989 * ===============================
===|===
SY = 12.33 |
|
*
SZ = 77.29 |
|
* |<---LENGTH (M)=
4.60 --->|
RY =
1.66 |
|*************
RZ =
5.74 |
|
|
|
9.7 (KNS-METRE)
|
|PARAMETER
|
L8 L8 L8
STRESSES
|
|IN KNS CMS
|
IN NEWTON MMS|
|--------------- +
L8
L8
-------------|
| KL/R-Y= 277.70 |
FA = 13.69 |
| KL/R-Z= 80.09 +
L8
L8
fa =
0.00 |
| UNL
= 100.00 |
FCZ = 148.93 |
| CB
=
1.00 +
L8
L8
FTZ = 148.93 |
| CMY
=
0.85 |
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |L0
L0 fbz = 125.81 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.5
Fey = 13.69 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez = 164.57 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
0.00 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
8.447E-01
8
|
|
0.00 T
0.00
-9.72
2.30
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
2 ST
IPE140
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.845
8
0.00 T
0.00
-9.72
2.30

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 10 of 146

Job No

Sheet No

Rev

11
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 3 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER
3 * | GERMAN SECTIONS
|
|
AX = 16.40 |
|
* | ST IPE140
|
|
--Z AY =
5.93 |
|DESIGN CODE * |
|
|
AZ =
6.78 |
| AISC-1989 * ===============================
===|===
SY = 12.33 |
|
*
SZ = 77.29 |
|
* |<---LENGTH (M)=
4.60 --->|
RY =
1.66 |
|*************
RZ =
5.74 |
|
|
|
9.7 (KNS-METRE)
|
|PARAMETER
|
L8 L8 L8
STRESSES
|
|IN KNS CMS
|
IN NEWTON MMS|
|--------------- +
L8
L8
-------------|
| KL/R-Y= 277.70 |
FA = 13.69 |
| KL/R-Z= 80.09 +
L8
L8
fa =
0.00 |
| UNL
= 100.00 |
FCZ = 148.93 |
| CB
=
1.00 +
L8
L8
FTZ = 148.93 |
| CMY
=
0.85 |
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |L0
L0 fbz = 125.81 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.5
Fey = 13.69 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez = 164.57 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
0.00 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
8.447E-01
8
|
|
0.00 T
0.00
-9.72
2.30
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
3 ST
IPE140
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.845
8
0.00 T
0.00
-9.72
2.30

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 11 of 146

Job No

Sheet No

Rev

12
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 4 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER
4 * | GERMAN SECTIONS
|
|
AX = 16.40 |
|
* | ST IPE140
|
|
--Z AY =
5.93 |
|DESIGN CODE * |
|
|
AZ =
6.78 |
| AISC-1989 * ===============================
===|===
SY = 12.33 |
|
*
SZ = 77.29 |
|
* |<---LENGTH (M)=
1.55 --->|
RY =
1.66 |
|*************
RZ =
5.74 |
|
|
|
1.1 (KNS-METRE)
|
|PARAMETER
|
L8 L8 L8
STRESSES
|
|IN KNS CMS
|
IN NEWTON MMS|
|--------------- +
L8
L8
-------------|
| KL/R-Y= 93.57 |
FA = 95.94 |
| KL/R-Z= 26.99 +
L8
L8
fa =
0.00 |
| UNL
= 100.00 |
FCZ = 148.93 |
| CB
=
1.00 +
L8
L8
FTZ = 148.93 |
| CMY
=
0.85 |
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |L0
L0 fbz = 14.28 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.1
Fey = 120.56 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =1449.43 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
0.00 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
9.591E-02
8
|
|
0.00 T
0.00
-1.10
0.78
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
4 ST
IPE140
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.096
8
0.00 T
0.00
-1.10
0.77

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 12 of 146

Job No

Sheet No

Rev

13
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 5 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER
5 * | GERMAN SECTIONS
|
|
AX = 16.40 |
|
* | ST IPE140
|
|
--Z AY =
5.93 |
|DESIGN CODE * |
|
|
AZ =
6.78 |
| AISC-1989 * ===============================
===|===
SY = 12.33 |
|
*
SZ = 77.29 |
|
* |<---LENGTH (M)=
4.60 --->|
RY =
1.66 |
|*************
RZ =
5.74 |
|
|
|
9.7 (KNS-METRE)
|
|PARAMETER
|
L8 L8 L8
STRESSES
|
|IN KNS CMS
|
IN NEWTON MMS|
|--------------- +
L8
L8
-------------|
| KL/R-Y= 277.70 |
FA = 13.69 |
| KL/R-Z= 80.09 +
L8
L8
fa =
0.00 |
| UNL
= 100.00 |
FCZ = 148.93 |
| CB
=
1.00 +
L8
L8
FTZ = 148.93 |
| CMY
=
0.85 |
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |L0
L0 fbz = 125.81 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.5
Fey = 13.69 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez = 164.57 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
0.00 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
8.447E-01
8
|
|
0.00 T
0.00
-9.72
2.30
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
5 ST
IPE140
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.845
8
0.00 T
0.00
-9.72
2.30

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 13 of 146

Job No

Sheet No

Rev

14
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 6 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER
6 * | GERMAN SECTIONS
|
|
AX = 16.40 |
|
* | ST IPE140
|
|
--Z AY =
5.93 |
|DESIGN CODE * |
|
|
AZ =
6.78 |
| AISC-1989 * ===============================
===|===
SY = 12.33 |
|
*
SZ = 77.29 |
|
* |<---LENGTH (M)=
4.60 --->|
RY =
1.66 |
|*************
RZ =
5.74 |
|
|
|
9.7 (KNS-METRE)
|
|PARAMETER
|
L8 L8 L8
STRESSES
|
|IN KNS CMS
|
IN NEWTON MMS|
|--------------- +
L8
L8
-------------|
| KL/R-Y= 277.70 |
FA = 13.69 |
| KL/R-Z= 80.09 +
L8
L8
fa =
0.00 |
| UNL
= 100.00 |
FCZ = 148.93 |
| CB
=
1.00 +
L8
L8
FTZ = 148.93 |
| CMY
=
0.85 |
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |L0
L0 fbz = 125.81 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.5
Fey = 13.69 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez = 164.57 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
0.00 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
8.447E-01
8
|
|
0.00 T
0.00
-9.72
2.30
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
6 ST
IPE140
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.845
8
0.00 T
0.00
-9.72
2.30

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 14 of 146

Job No

Sheet No

Rev

15
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 7 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER
7 * | GERMAN SECTIONS
|
|
AX = 16.40 |
|
* | ST IPE140
|
|
--Z AY =
5.93 |
|DESIGN CODE * |
|
|
AZ =
6.78 |
| AISC-1989 * ===============================
===|===
SY = 12.33 |
|
*
SZ = 77.29 |
|
* |<---LENGTH (M)=
1.55 --->|
RY =
1.66 |
|*************
RZ =
5.74 |
|
|
|
1.1 (KNS-METRE)
|
|PARAMETER
|
L8 L8 L8
STRESSES
|
|IN KNS CMS
|
IN NEWTON MMS|
|--------------- +
L8
L8
-------------|
| KL/R-Y= 93.57 |
FA = 95.94 |
| KL/R-Z= 26.99 +
L8
L8
fa =
0.00 |
| UNL
= 100.00 |
FCZ = 148.93 |
| CB
=
1.00 +
L8
L8
FTZ = 148.93 |
| CMY
=
0.85 |
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |L0
L0 fbz = 14.28 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.1
Fey = 120.56 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =1449.43 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
0.00 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
9.591E-02
8
|
|
0.00 T
0.00
-1.10
0.78
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
7 ST
IPE140
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.096
8
0.00 T
0.00
-1.10
0.77

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 15 of 146

Job No

Sheet No

Rev

16
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 8 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER
8 * | GERMAN SECTIONS
|
|
AX = 16.40 |
|
* | ST IPE140
|
|
--Z AY =
5.93 |
|DESIGN CODE * |
|
|
AZ =
6.78 |
| AISC-1989 * ===============================
===|===
SY = 12.33 |
|
*
SZ = 77.29 |
|
* |<---LENGTH (M)=
4.60 --->|
RY =
1.66 |
|*************
RZ =
5.74 |
|
|
|
9.7 (KNS-METRE)
|
|PARAMETER
|
L8 L8 L8
STRESSES
|
|IN KNS CMS
|
IN NEWTON MMS|
|--------------- +
L8
L8
-------------|
| KL/R-Y= 277.70 |
FA = 13.69 |
| KL/R-Z= 80.09 +
L8
L8
fa =
0.00 |
| UNL
= 100.00 |
FCZ = 148.93 |
| CB
=
1.00 +
L8
L8
FTZ = 148.93 |
| CMY
=
0.85 |
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |L0
L0 fbz = 125.81 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.5
Fey = 13.69 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez = 164.57 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
0.00 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
8.447E-01
8
|
|
0.00 T
0.00
-9.72
2.30
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
8 ST
IPE140
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.845
8
0.00 T
0.00
-9.72
2.30

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 16 of 146

Job No

Sheet No

Rev

17
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 9 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER
9 * | GERMAN SECTIONS
|
|
AX = 16.40 |
|
* | ST IPE140
|
|
--Z AY =
5.93 |
|DESIGN CODE * |
|
|
AZ =
6.78 |
| AISC-1989 * ===============================
===|===
SY = 12.33 |
|
*
SZ = 77.29 |
|
* |<---LENGTH (M)=
4.60 --->|
RY =
1.66 |
|*************
RZ =
5.74 |
|
|
|
9.7 (KNS-METRE)
|
|PARAMETER
|
L8 L8 L8
STRESSES
|
|IN KNS CMS
|
IN NEWTON MMS|
|--------------- +
L8
L8
-------------|
| KL/R-Y= 277.70 |
FA = 13.69 |
| KL/R-Z= 80.09 +
L8
L8
fa =
0.00 |
| UNL
= 100.00 |
FCZ = 148.93 |
| CB
=
1.00 +
L8
L8
FTZ = 148.93 |
| CMY
=
0.85 |
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |L0
L0 fbz = 125.81 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.5
Fey = 13.69 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez = 164.57 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
0.00 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
8.447E-01
8
|
|
0.00 T
0.00
-9.72
2.30
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
9 ST
IPE140
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.845
8
0.00 T
0.00
-9.72
2.30

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 17 of 146

Job No

Sheet No

Rev

18
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 10 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 10 * | GERMAN SECTIONS
|
|
AX = 16.40 |
|
* | ST IPE140
|
|
--Z AY =
5.93 |
|DESIGN CODE * |
|
|
AZ =
6.78 |
| AISC-1989 * ===============================
===|===
SY = 12.33 |
|
*
SZ = 77.29 |
|
* |<---LENGTH (M)=
1.55 --->|
RY =
1.66 |
|*************
RZ =
5.74 |
|
|
|
1.1 (KNS-METRE)
|
|PARAMETER
|
L8 L8 L8
STRESSES
|
|IN KNS CMS
|
IN NEWTON MMS|
|--------------- +
L8
L8
-------------|
| KL/R-Y= 93.57 |
FA = 95.94 |
| KL/R-Z= 26.99 +
L8
L8
fa =
0.00 |
| UNL
= 100.00 |
FCZ = 148.93 |
| CB
=
1.00 +
L8
L8
FTZ = 148.93 |
| CMY
=
0.85 |
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |L0
L0 fbz = 14.28 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.1
Fey = 120.56 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =1449.43 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
0.00 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
9.591E-02
8
|
|
0.00 T
0.00
-1.10
0.77
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
10 ST
IPE140
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.096
8
0.00 T
0.00
-1.10
0.77

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 18 of 146

Job No

Sheet No

Rev

19
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 14 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 14 * | GERMAN SECTIONS
|
|
AX = 16.40 |
|
* | ST IPE140
|
|
--Z AY =
5.93 |
|DESIGN CODE * |
|
|
AZ =
6.78 |
| AISC-1989 * ===============================
===|===
SY = 12.33 |
|
*
SZ = 77.29 |
|
* |<---LENGTH (M)=
1.55 --->|
RY =
1.66 |
|*************
RZ =
5.74 |
|
|
|
1.1 (KNS-METRE)
|
|PARAMETER
|
L8 L8 L8
STRESSES
|
|IN KNS CMS
|
IN NEWTON MMS|
|--------------- +
L8
L8
-------------|
| KL/R-Y= 93.57 |
FA = 95.94 |
| KL/R-Z= 26.99 +
L8
L8
fa =
0.00 |
| UNL
= 100.00 |
FCZ = 148.93 |
| CB
=
1.00 +
L8
L8
FTZ = 148.93 |
| CMY
=
0.85 |
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |L0
L0 fbz = 14.28 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.1
Fey = 120.56 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =1449.43 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
0.00 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
9.591E-02
8
|
|
0.00 T
0.00
-1.10
0.77
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
14 ST
IPE140
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.096
8
0.00 T
0.00
-1.10
0.77

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 19 of 146

Job No

Sheet No

Rev

20
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 15 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 15 * | GERMAN SECTIONS
|
|
AX = 16.40 |
|
* | ST IPE140
|
|
--Z AY =
5.93 |
|DESIGN CODE * |
|
|
AZ =
6.78 |
| AISC-1989 * ===============================
===|===
SY = 12.33 |
|
*
SZ = 77.29 |
|
* |<---LENGTH (M)=
4.60 --->|
RY =
1.66 |
|*************
RZ =
5.74 |
|
|
|
9.7 (KNS-METRE)
|
|PARAMETER
|
L8 L8 L8
STRESSES
|
|IN KNS CMS
|
IN NEWTON MMS|
|--------------- +
L8
L8
-------------|
| KL/R-Y= 277.70 |
FA = 13.69 |
| KL/R-Z= 80.09 +
L8
L8
fa =
0.00 |
| UNL
= 100.00 |
FCZ = 148.93 |
| CB
=
1.00 +
L8
L8
FTZ = 148.93 |
| CMY
=
0.85 |
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |L0
L0 fbz = 125.81 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.5
Fey = 13.69 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez = 164.57 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
0.00 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
8.447E-01
8
|
|
0.00 T
0.00
-9.72
2.30
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
15 ST
IPE140
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.845
8
0.00 T
0.00
-9.72
2.30

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 20 of 146

Job No

Sheet No

Rev

21
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 16 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 16 * | GERMAN SECTIONS
|
|
AX = 16.40 |
|
* | ST IPE140
|
|
--Z AY =
5.93 |
|DESIGN CODE * |
|
|
AZ =
6.78 |
| AISC-1989 * ===============================
===|===
SY = 12.33 |
|
*
SZ = 77.29 |
|
* |<---LENGTH (M)=
4.60 --->|
RY =
1.66 |
|*************
RZ =
5.74 |
|
|
|
9.7 (KNS-METRE)
|
|PARAMETER
|
L8 L8 L8
STRESSES
|
|IN KNS CMS
|
IN NEWTON MMS|
|--------------- +
L8
L8
-------------|
| KL/R-Y= 277.70 |
FA = 13.69 |
| KL/R-Z= 80.09 +
L8
L8
fa =
0.00 |
| UNL
= 100.00 |
FCZ = 148.93 |
| CB
=
1.00 +
L8
L8
FTZ = 148.93 |
| CMY
=
0.85 |
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |L0
L0 fbz = 125.81 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.5
Fey = 13.69 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez = 164.57 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
0.00 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
8.447E-01
8
|
|
0.00 T
0.00
-9.72
2.30
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
16 ST
IPE140
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.845
8
0.00 T
0.00
-9.72
2.30

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 21 of 146

Job No

Sheet No

Rev

22
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 17 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 17 * | GERMAN SECTIONS
|
|
AX = 16.40 |
|
* | ST IPE140
|
|
--Z AY =
5.93 |
|DESIGN CODE * |
|
|
AZ =
6.78 |
| AISC-1989 * ===============================
===|===
SY = 12.33 |
|
*
SZ = 77.29 |
|
* |<---LENGTH (M)=
1.55 --->|
RY =
1.66 |
|*************
RZ =
5.74 |
|
|
|
1.1 (KNS-METRE)
|
|PARAMETER
|
L8 L8 L8
STRESSES
|
|IN KNS CMS
|
IN NEWTON MMS|
|--------------- +
L8
L8
-------------|
| KL/R-Y= 93.57 |
FA = 95.94 |
| KL/R-Z= 26.99 +
L8
L8
fa =
0.00 |
| UNL
= 100.00 |
FCZ = 148.93 |
| CB
=
1.00 +
L8
L8
FTZ = 148.93 |
| CMY
=
0.85 |
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |L0
L0 fbz = 14.28 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.1
Fey = 120.56 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =1449.43 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
0.00 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
9.591E-02
8
|
|
0.00 T
0.00
-1.10
0.78
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
17 ST
IPE140
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.096
8
0.00 T
0.00
-1.10
0.77

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 22 of 146

Job No

Sheet No

Rev

23
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 18 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 18 * | GERMAN SECTIONS
|
|
AX = 16.40 |
|
* | ST IPE140
|
|
--Z AY =
5.93 |
|DESIGN CODE * |
|
|
AZ =
6.78 |
| AISC-1989 * ===============================
===|===
SY = 12.33 |
|
*
SZ = 77.29 |
|
* |<---LENGTH (M)=
4.60 --->|
RY =
1.66 |
|*************
RZ =
5.74 |
|
|
|
9.7 (KNS-METRE)
|
|PARAMETER
|
L8 L8 L8
STRESSES
|
|IN KNS CMS
|
IN NEWTON MMS|
|--------------- +
L8
L8
-------------|
| KL/R-Y= 277.70 |
FA = 13.69 |
| KL/R-Z= 80.09 +
L8
L8
fa =
0.00 |
| UNL
= 100.00 |
FCZ = 148.93 |
| CB
=
1.00 +
L8
L8
FTZ = 148.93 |
| CMY
=
0.85 |
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |L0
L0 fbz = 125.81 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.5
Fey = 13.69 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez = 164.57 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
0.00 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
8.447E-01
8
|
|
0.00 T
0.00
-9.72
2.30
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
18 ST
IPE140
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.845
8
0.00 T
0.00
-9.72
2.30

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 23 of 146

Job No

Sheet No

Rev

24
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 19 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 19 * | GERMAN SECTIONS
|
|
AX = 16.40 |
|
* | ST IPE140
|
|
--Z AY =
5.93 |
|DESIGN CODE * |
|
|
AZ =
6.78 |
| AISC-1989 * ===============================
===|===
SY = 12.33 |
|
*
SZ = 77.29 |
|
* |<---LENGTH (M)=
4.60 --->|
RY =
1.66 |
|*************
RZ =
5.74 |
|
|
|
9.7 (KNS-METRE)
|
|PARAMETER
|
L8 L8 L8
STRESSES
|
|IN KNS CMS
|
IN NEWTON MMS|
|--------------- +
L8
L8
-------------|
| KL/R-Y= 277.70 |
FA = 13.69 |
| KL/R-Z= 80.09 +
L8
L8
fa =
0.00 |
| UNL
= 100.00 |
FCZ = 148.93 |
| CB
=
1.00 +
L8
L8
FTZ = 148.93 |
| CMY
=
0.85 |
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |L0
L0 fbz = 125.81 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.5
Fey = 13.69 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez = 164.57 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
0.00 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
8.447E-01
8
|
|
0.00 T
0.00
-9.72
2.30
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
19 ST
IPE140
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.845
8
0.00 T
0.00
-9.72
2.30

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 24 of 146

Job No

Sheet No

Rev

25
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 20 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 20 * | GERMAN SECTIONS
|
|
AX = 16.40 |
|
* | ST IPE140
|
|
--Z AY =
5.93 |
|DESIGN CODE * |
|
|
AZ =
6.78 |
| AISC-1989 * ===============================
===|===
SY = 12.33 |
|
*
SZ = 77.29 |
|
* |<---LENGTH (M)=
1.55 --->|
RY =
1.66 |
|*************
RZ =
5.74 |
|
|
|
1.1 (KNS-METRE)
|
|PARAMETER
|
L8 L8 L8
STRESSES
|
|IN KNS CMS
|
IN NEWTON MMS|
|--------------- +
L8
L8
-------------|
| KL/R-Y= 93.57 |
FA = 95.94 |
| KL/R-Z= 26.99 +
L8
L8
fa =
0.00 |
| UNL
= 100.00 |
FCZ = 148.93 |
| CB
=
1.00 +
L8
L8
FTZ = 148.93 |
| CMY
=
0.85 |
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |L0
L0 fbz = 14.28 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.1
Fey = 120.56 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =1449.43 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
0.00 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
9.591E-02
8
|
|
0.00 T
0.00
-1.10
0.78
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
20 ST
IPE140
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.096
8
0.00 T
0.00
-1.10
0.77

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 25 of 146

Job No

Sheet No

Rev

26
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 21 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 21 * | GERMAN SECTIONS
|
|
AX = 16.40 |
|
* | ST IPE140
|
|
--Z AY =
5.93 |
|DESIGN CODE * |
|
|
AZ =
6.78 |
| AISC-1989 * ===============================
===|===
SY = 12.33 |
|
*
SZ = 77.29 |
|
* |<---LENGTH (M)=
4.60 --->|
RY =
1.66 |
|*************
RZ =
5.74 |
|
|
|
9.7 (KNS-METRE)
|
|PARAMETER
|
L8 L8 L8
STRESSES
|
|IN KNS CMS
|
IN NEWTON MMS|
|--------------- +
L8
L8
-------------|
| KL/R-Y= 277.70 |
FA = 13.69 |
| KL/R-Z= 80.09 +
L8
L8
fa =
0.00 |
| UNL
= 100.00 |
FCZ = 148.93 |
| CB
=
1.00 +
L8
L8
FTZ = 148.93 |
| CMY
=
0.85 |
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |L0
L0 fbz = 125.81 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.5
Fey = 13.69 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez = 164.57 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
0.00 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
8.447E-01
8
|
|
0.00 T
0.00
-9.72
2.30
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
21 ST
IPE140
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.845
8
0.00 T
0.00
-9.72
2.30

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 26 of 146

Job No

Sheet No

Rev

27
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 22 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 22 * | GERMAN SECTIONS
|
|
AX = 16.40 |
|
* | ST IPE140
|
|
--Z AY =
5.93 |
|DESIGN CODE * |
|
|
AZ =
6.78 |
| AISC-1989 * ===============================
===|===
SY = 12.33 |
|
*
SZ = 77.29 |
|
* |<---LENGTH (M)=
4.60 --->|
RY =
1.66 |
|*************
RZ =
5.74 |
|
|
|
9.7 (KNS-METRE)
|
|PARAMETER
|
L8 L8 L8
STRESSES
|
|IN KNS CMS
|
IN NEWTON MMS|
|--------------- +
L8
L8
-------------|
| KL/R-Y= 277.70 |
FA = 13.69 |
| KL/R-Z= 80.09 +
L8
L8
fa =
0.00 |
| UNL
= 100.00 |
FCZ = 148.93 |
| CB
=
1.00 +
L8
L8
FTZ = 148.93 |
| CMY
=
0.85 |
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |L0
L0 fbz = 125.81 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.5
Fey = 13.69 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez = 164.57 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
0.00 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
8.447E-01
8
|
|
0.00 T
0.00
-9.72
2.30
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
22 ST
IPE140
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.845
8
0.00 T
0.00
-9.72
2.30

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 27 of 146

Job No

Sheet No

Rev

28
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 23 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 23 * | GERMAN SECTIONS
|
|
AX = 16.40 |
|
* | ST IPE140
|
|
--Z AY =
5.93 |
|DESIGN CODE * |
|
|
AZ =
6.78 |
| AISC-1989 * ===============================
===|===
SY = 12.33 |
|
*
SZ = 77.29 |
|
* |<---LENGTH (M)=
1.55 --->|
RY =
1.66 |
|*************
RZ =
5.74 |
|
|
|
1.1 (KNS-METRE)
|
|PARAMETER
|
L8 L8 L8
STRESSES
|
|IN KNS CMS
|
IN NEWTON MMS|
|--------------- +
L8
L8
-------------|
| KL/R-Y= 93.57 |
FA = 95.94 |
| KL/R-Z= 26.99 +
L8
L8
fa =
0.00 |
| UNL
= 100.00 |
FCZ = 148.93 |
| CB
=
1.00 +
L8
L8
FTZ = 148.93 |
| CMY
=
0.85 |
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |L0
L0 fbz = 14.28 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.1
Fey = 120.56 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =1449.43 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
0.00 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
9.591E-02
8
|
|
0.00 T
0.00
-1.10
0.78
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
23 ST
IPE140
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.096
8
0.00 T
0.00
-1.10
0.77

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 28 of 146

Job No

Sheet No

Rev

29
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 74 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 74 * | GERMAN SECTIONS
|
|
AX = 53.80 |
|
* | ST HEA200
|
|
--Z AY = 11.79 |
|DESIGN CODE * |
|
|
AZ = 26.75 |
| AISC-1989 * ===============================
===|===
SY = 133.60 |
|
*
SZ = 388.63 |
|
* |<---LENGTH (M)=
3.00 --->|
RY =
4.98 |
|*************
RZ =
8.28 |
|
|
|
8.9 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|
L8
IN NEWTON MMS|
|--------------- +
-------------|
| KL/R-Y= 60.20 |
L8
FA = 120.53 |
| KL/R-Z= 36.21 +
L8
fa =
1.46 |
| UNL
= 300.00 |L8
L8
FCZ = 148.93 |
| CB
=
1.00 +
L8
FTZ = 148.93 |
| CMY
=
0.85 |
L8
FCY = 186.16 |
| CMZ
=
0.85 +
L8
FTY = 186.16 |
| FYLD = 24.82 |
L8 L8
fbz = 22.98 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
0.6
Fey = 291.27 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez = 804.90 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
3.84 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
1.664E-01
8
|
|
7.87 C
0.00
-8.93
3.00
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
74 ST
HEA200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.166
8
7.87 C
0.00
-8.93
3.00

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 29 of 146

Job No

Sheet No

Rev

30
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 75 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 75 * | GERMAN SECTIONS
|
|
AX = 53.80 |
|
* | ST HEA200
|
|
--Z AY = 11.79 |
|DESIGN CODE * |
|
|
AZ = 26.75 |
| AISC-1989 * ===============================
===|===
SY = 133.60 |
|
*
SZ = 388.63 |
|
* |<---LENGTH (M)=
3.00 --->|
RY =
4.98 |
|*************
RZ =
8.28 |
|
|
|
32.6 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|
L8 L8
IN NEWTON MMS|
|--------------- +
L8
-------------|
| KL/R-Y= 60.20 |
L8
FA = 120.53 |
| KL/R-Z= 36.21 +
fa =
5.43 |
| UNL
= 300.00 |
L8 L8
FCZ = 148.93 |
| CB
=
1.00 +
FTZ = 148.93 |
| CMY
=
0.85 |
L8
FCY = 186.16 |
| CMZ
=
0.85 +
L8 L8
FTY = 186.16 |
| FYLD = 24.82 |L0
fbz = 83.91 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -1.8
Fey = 291.27 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez = 804.90 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
9.22 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
6.085E-01
8
|
|
29.23 C
0.00
-32.61
3.00
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
75 ST
HEA200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.609
8
29.23 C
0.00
-32.61
3.00

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 30 of 146

Job No

Sheet No

Rev

31
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 76 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 76 * | GERMAN SECTIONS
|
|
AX = 53.80 |
|
* | ST HEA200
|
|
--Z AY = 11.79 |
|DESIGN CODE * |
|
|
AZ = 26.75 |
| AISC-1989 * ===============================
===|===
SY = 133.60 |
|
*
SZ = 388.63 |
|
* |<---LENGTH (M)=
3.00 --->|
RY =
4.98 |
|*************
RZ =
8.28 |
|
|
|
48.1 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|
L8
IN NEWTON MMS|
|--------------- +
L8 L8
-------------|
| KL/R-Y= 60.20 |
L8
FA = 120.53 |
| KL/R-Z= 36.21 +
L8
fa =
8.04 |
| UNL
= 300.00 |
L8
FCZ = 148.93 |
| CB
=
1.00 +
FTZ = 148.93 |
| CMY
=
0.85 |
L8 L8
FCY = 186.16 |
| CMZ
=
0.85 +
L8
FTY = 186.16 |
| FYLD = 24.82 |L0
fbz = 123.82 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -2.7
Fey = 291.27 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez = 804.90 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv = 13.60 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
8.981E-01
8
|
|
43.24 C
0.00
-48.12
3.00
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
76 ST
HEA200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.898
8
43.24 C
0.00
-48.12
3.00

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 31 of 146

Job No

Sheet No

Rev

32
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 77 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 77 * | GERMAN SECTIONS
|
|
AX = 53.80 |
|
* | ST HEA200
|
|
--Z AY = 11.79 |
|DESIGN CODE * |
|
|
AZ = 26.75 |
| AISC-1989 * ===============================
===|===
SY = 133.60 |
|
*
SZ = 388.63 |
|
* |<---LENGTH (M)=
3.00 --->|
RY =
4.98 |
|*************
RZ =
8.28 |
|
|
|
32.6 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|
L8
IN NEWTON MMS|
|--------------- +
L8 L8
-------------|
| KL/R-Y= 60.20 |
L8
FA = 120.53 |
| KL/R-Z= 36.21 +
L8
fa =
5.43 |
| UNL
= 300.00 |
L8
FCZ = 148.93 |
| CB
=
1.00 +
FTZ = 148.93 |
| CMY
=
0.85 |
L8 L8
FCY = 186.16 |
| CMZ
=
0.85 +
L8
FTY = 186.16 |
| FYLD = 24.82 |L0
fbz = 83.91 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -1.8
Fey = 291.27 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez = 804.90 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
9.22 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
6.085E-01
8
|
|
29.23 C
0.00
-32.61
3.00
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
77 ST
HEA200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.609
8
29.23 C
0.00
-32.61
3.00

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 32 of 146

Job No

Sheet No

Rev

33
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 78 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 78 * | GERMAN SECTIONS
|
|
AX = 53.80 |
|
* | ST HEA200
|
|
--Z AY = 11.79 |
|DESIGN CODE * |
|
|
AZ = 26.75 |
| AISC-1989 * ===============================
===|===
SY = 133.60 |
|
*
SZ = 388.63 |
|
* |<---LENGTH (M)=
3.00 --->|
RY =
4.98 |
|*************
RZ =
8.28 |
|
|
|
32.6 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|
L8
IN NEWTON MMS|
|--------------- +
L8 L8
-------------|
| KL/R-Y= 60.20 |
L8
FA = 120.53 |
| KL/R-Z= 36.21 +
L8
fa =
5.43 |
| UNL
= 300.00 |
L8 L8
FCZ = 148.93 |
| CB
=
1.00 +
FTZ = 148.93 |
| CMY
=
0.85 |
L8 L8
FCY = 186.16 |
| CMZ
=
0.85 +
L8 L8
FTY = 186.16 |
| FYLD = 24.82 |L0
fbz = 83.91 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -1.8
Fey = 291.27 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez = 804.90 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
9.22 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
6.085E-01
8
|
|
29.23 C
0.00
-32.61
3.00
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
78 ST
HEA200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.609
8
29.23 C
0.00
-32.61
3.00

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 33 of 146

Job No

Sheet No

Rev

34
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 79 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 79 * | GERMAN SECTIONS
|
|
AX = 53.80 |
|
* | ST HEA200
|
|
--Z AY = 11.79 |
|DESIGN CODE * |
|
|
AZ = 26.75 |
| AISC-1989 * ===============================
===|===
SY = 133.60 |
|
*
SZ = 388.63 |
|
* |<---LENGTH (M)=
3.00 --->|
RY =
4.98 |
|*************
RZ =
8.28 |
|
|
|
48.1 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|
L8
IN NEWTON MMS|
|--------------- +
L8 L8
-------------|
| KL/R-Y= 60.20 |
L8
FA = 120.53 |
| KL/R-Z= 36.21 +
fa =
8.04 |
| UNL
= 300.00 |
L8 L8
FCZ = 148.93 |
| CB
=
1.00 +
FTZ = 148.93 |
| CMY
=
0.85 |
L8
FCY = 186.16 |
| CMZ
=
0.85 +
L8 L8
FTY = 186.16 |
| FYLD = 24.82 |L0
fbz = 123.82 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -2.7
Fey = 291.27 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez = 804.90 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv = 13.60 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
8.981E-01
8
|
|
43.24 C
0.00
-48.12
3.00
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
79 ST
HEA200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.898
8
43.24 C
0.00
-48.12
3.00

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 34 of 146

Job No

Sheet No

Rev

35
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 80 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 80 * | GERMAN SECTIONS
|
|
AX = 53.80 |
|
* | ST HEA200
|
|
--Z AY = 11.79 |
|DESIGN CODE * |
|
|
AZ = 26.75 |
| AISC-1989 * ===============================
===|===
SY = 133.60 |
|
*
SZ = 388.63 |
|
* |<---LENGTH (M)=
3.00 --->|
RY =
4.98 |
|*************
RZ =
8.28 |
|
|
|
32.6 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|
L8
IN NEWTON MMS|
|--------------- +
L8 L8
-------------|
| KL/R-Y= 60.20 |
L8
FA = 120.53 |
| KL/R-Z= 36.21 +
fa =
5.43 |
| UNL
= 300.00 |
L8 L8
FCZ = 148.93 |
| CB
=
1.00 +
FTZ = 148.93 |
| CMY
=
0.85 |
L8
FCY = 186.16 |
| CMZ
=
0.85 +
L8 L8
FTY = 186.16 |
| FYLD = 24.82 |L0
fbz = 83.91 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -1.8
Fey = 291.27 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez = 804.90 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
9.22 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
6.085E-01
8
|
|
29.23 C
0.00
-32.61
3.00
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
80 ST
HEA200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.609
8
29.23 C
0.00
-32.61
3.00

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 35 of 146

Job No

Sheet No

Rev

36
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 81 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 81 * | GERMAN SECTIONS
|
|
AX = 53.80 |
|
* | ST HEA200
|
|
--Z AY = 11.79 |
|DESIGN CODE * |
|
|
AZ = 26.75 |
| AISC-1989 * ===============================
===|===
SY = 133.60 |
|
*
SZ = 388.63 |
|
* |<---LENGTH (M)=
3.00 --->|
RY =
4.98 |
|*************
RZ =
8.28 |
|
|
|
32.6 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|
L8 L8
IN NEWTON MMS|
|--------------- +
L8
-------------|
| KL/R-Y= 60.20 |
L8
FA = 120.53 |
| KL/R-Z= 36.21 +
L8
fa =
5.43 |
| UNL
= 300.00 |
L8
FCZ = 148.93 |
| CB
=
1.00 +
FTZ = 148.93 |
| CMY
=
0.85 |
L8 L8
FCY = 186.16 |
| CMZ
=
0.85 +
L8 L8
FTY = 186.16 |
| FYLD = 24.82 |L0
fbz = 83.91 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -1.8
Fey = 291.27 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez = 804.90 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
9.22 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
6.085E-01
8
|
|
29.23 C
0.00
-32.61
3.00
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
81 ST
HEA200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.609
8
29.23 C
0.00
-32.61
3.00

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 36 of 146

Job No

Sheet No

Rev

37
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 82 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 82 * | GERMAN SECTIONS
|
|
AX = 53.80 |
|
* | ST HEA200
|
|
--Z AY = 11.79 |
|DESIGN CODE * |
|
|
AZ = 26.75 |
| AISC-1989 * ===============================
===|===
SY = 133.60 |
|
*
SZ = 388.63 |
|
* |<---LENGTH (M)=
3.00 --->|
RY =
4.98 |
|*************
RZ =
8.28 |
|
|
|
48.1 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|
L8
IN NEWTON MMS|
|--------------- +
L8 L8
-------------|
| KL/R-Y= 60.20 |
L8
FA = 120.53 |
| KL/R-Z= 36.21 +
fa =
8.04 |
| UNL
= 300.00 |
L8 L8
FCZ = 148.93 |
| CB
=
1.00 +
FTZ = 148.93 |
| CMY
=
0.85 |
L8
FCY = 186.16 |
| CMZ
=
0.85 +
L8 L8
FTY = 186.16 |
| FYLD = 24.82 |L0
fbz = 123.82 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -2.7
Fey = 291.27 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez = 804.90 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv = 13.60 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
8.981E-01
8
|
|
43.24 C
0.00
-48.12
3.00
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
82 ST
HEA200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.898
8
43.24 C
0.00
-48.12
3.00

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 37 of 146

Job No

Sheet No

Rev

38
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 83 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 83 * | GERMAN SECTIONS
|
|
AX = 53.80 |
|
* | ST HEA200
|
|
--Z AY = 11.79 |
|DESIGN CODE * |
|
|
AZ = 26.75 |
| AISC-1989 * ===============================
===|===
SY = 133.60 |
|
*
SZ = 388.63 |
|
* |<---LENGTH (M)=
3.00 --->|
RY =
4.98 |
|*************
RZ =
8.28 |
|
|
|
31.6 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|
L8
IN NEWTON MMS|
|--------------- +
-------------|
| KL/R-Y= 60.20 |
L8
FA = 120.53 |
| KL/R-Z= 36.21 +
L8
fa =
5.28 |
| UNL
= 300.00 |L8
L8
FCZ = 148.93 |
| CB
=
1.00 +
L8
FTZ = 148.93 |
| CMY
=
0.85 |
L8
FCY = 186.16 |
| CMZ
=
0.85 +
L8
FTY = 186.16 |
| FYLD = 24.82 |
L8 L8
fbz = 81.29 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
2.0
Fey = 291.27 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez = 804.90 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv = 13.58 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
5.897E-01
8
|
|
28.43 C
0.00
-31.59
3.00
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
83 ST
HEA200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.590
8
28.43 C
0.00
-31.59
3.00

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 38 of 146

Job No

Sheet No

Rev

39
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 84 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 84 * | GERMAN SECTIONS
|
|
AX = 53.80 |
|
* | ST HEA200
|
|
--Z AY = 11.79 |
|DESIGN CODE * |
|
|
AZ = 26.75 |
| AISC-1989 * ===============================
===|===
SY = 133.60 |
|
*
SZ = 388.63 |
|
* |<---LENGTH (M)=
3.00 --->|
RY =
4.98 |
|*************
RZ =
8.28 |
|
|
|
8.9 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|
L8
IN NEWTON MMS|
|--------------- +
-------------|
| KL/R-Y= 60.20 |
L8
FA = 120.53 |
| KL/R-Z= 36.21 +
L8
fa =
1.46 |
| UNL
= 300.00 |L8
L8
FCZ = 148.93 |
| CB
=
1.00 +
L8
FTZ = 148.93 |
| CMY
=
0.85 |
L8
FCY = 186.16 |
| CMZ
=
0.85 +
L8
FTY = 186.16 |
| FYLD = 24.82 |
L8 L8
fbz = 22.98 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
0.6
Fey = 291.27 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez = 804.90 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
3.84 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
1.664E-01
8
|
|
7.87 C
0.00
-8.93
3.00
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
84 ST
HEA200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.166
8
7.87 C
0.00
-8.93
3.00

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 39 of 146

Job No

Sheet No

Rev

40
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 85 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 85 * | GERMAN SECTIONS
|
|
AX = 53.80 |
|
* | ST HEA200
|
|
--Z AY = 11.79 |
|DESIGN CODE * |
|
|
AZ = 26.75 |
| AISC-1989 * ===============================
===|===
SY = 133.60 |
|
*
SZ = 388.63 |
|
* |<---LENGTH (M)=
2.50 --->|
RY =
4.98 |
|*************
RZ =
8.28 |
|
|
|
8.5 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|
L8
IN NEWTON MMS|
|--------------- +
L8
-------------|
| KL/R-Y= 50.17 |
L8
FA = 126.80 |
| KL/R-Z= 30.18 +
L8
fa =
1.55 |
| UNL
= 250.00 |
FCZ = 163.82 |
| CB
=
1.00 +L8
L8
FTZ = 163.82 |
| CMY
=
0.85 |
L8
L8
FCY = 186.16 |
| CMZ
=
0.85 +
L8
FTY = 186.16 |
| FYLD = 24.82 |
L8
fbz = 21.83 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.5
Fey = 419.42 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =1159.06 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
3.84 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
1.455E-01
8
|
|
8.31 C
0.00
8.49
2.50
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
85 ST
HEA200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.145
8
8.31 C
0.00
8.49
2.50

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 40 of 146

Job No

Sheet No

Rev

41
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 86 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 86 * | GERMAN SECTIONS
|
|
AX = 53.80 |
|
* | ST HEA200
|
|
--Z AY = 11.79 |
|DESIGN CODE * |
|
|
AZ = 26.75 |
| AISC-1989 * ===============================
===|===
SY = 133.60 |
|
*
SZ = 388.63 |
|
* |<---LENGTH (M)=
2.50 --->|
RY =
4.98 |
|*************
RZ =
8.28 |
|
|
|
27.2 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|
L8
IN NEWTON MMS|
|--------------- +
L8 L8
-------------|
| KL/R-Y= 50.17 |
L8
FA = 126.80 |
| KL/R-Z= 30.18 +
fa =
5.43 |
| UNL
= 250.00 |
L8
FCZ = 163.82 |
| CB
=
1.00 +
FTZ = 163.82 |
| CMY
=
0.85 |
L8
FCY = 186.16 |
| CMZ
=
0.85 +
L8
FTY = 186.16 |
| FYLD = 24.82 |L0
fbz = 69.93 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -1.5
Fey = 419.42 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =1159.06 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
9.22 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
4.697E-01
8
|
|
29.23 C
0.00
27.18
2.50
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
86 ST
HEA200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.470
8
29.23 C
0.00
27.18
2.50

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 41 of 146

Job No

Sheet No

Rev

42
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 87 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 87 * | GERMAN SECTIONS
|
|
AX = 53.80 |
|
* | ST HEA200
|
|
--Z AY = 11.79 |
|DESIGN CODE * |
|
|
AZ = 26.75 |
| AISC-1989 * ===============================
===|===
SY = 133.60 |
|
*
SZ = 388.63 |
|
* |<---LENGTH (M)=
2.50 --->|
RY =
4.98 |
|*************
RZ =
8.28 |
|
|
|
40.1 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|
L8
IN NEWTON MMS|
|--------------- +
L8 L8
-------------|
| KL/R-Y= 50.17 |
L8
FA = 126.80 |
| KL/R-Z= 30.18 +
fa =
8.04 |
| UNL
= 250.00 |
L8 L8
FCZ = 163.82 |
| CB
=
1.00 +
FTZ = 163.82 |
| CMY
=
0.85 |
L8
FCY = 186.16 |
| CMZ
=
0.85 +
L8 L8
FTY = 186.16 |
| FYLD = 24.82 |L0
fbz = 103.19 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -2.2
Fey = 419.42 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =1159.06 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv = 13.60 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
6.933E-01
8
|
|
43.24 C
0.00
40.10
2.50
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
87 ST
HEA200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.693
8
43.24 C
0.00
40.10
2.50

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 42 of 146

Job No

Sheet No

Rev

43
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 88 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 88 * | GERMAN SECTIONS
|
|
AX = 53.80 |
|
* | ST HEA200
|
|
--Z AY = 11.79 |
|DESIGN CODE * |
|
|
AZ = 26.75 |
| AISC-1989 * ===============================
===|===
SY = 133.60 |
|
*
SZ = 388.63 |
|
* |<---LENGTH (M)=
2.50 --->|
RY =
4.98 |
|*************
RZ =
8.28 |
|
|
|
27.2 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|
L8
IN NEWTON MMS|
|--------------- +
L8 L8
-------------|
| KL/R-Y= 50.17 |
L8
FA = 126.80 |
| KL/R-Z= 30.18 +
fa =
5.43 |
| UNL
= 250.00 |
L8 L8
FCZ = 163.82 |
| CB
=
1.00 +
FTZ = 163.82 |
| CMY
=
0.85 |
L8
FCY = 186.16 |
| CMZ
=
0.85 +
L8 L8
FTY = 186.16 |
| FYLD = 24.82 |L0
fbz = 69.93 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -1.5
Fey = 419.42 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =1159.06 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
9.22 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
4.697E-01
8
|
|
29.23 C
0.00
27.18
2.50
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
88 ST
HEA200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.470
8
29.23 C
0.00
27.18
2.50

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 43 of 146

Job No

Sheet No

Rev

44
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 89 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 89 * | GERMAN SECTIONS
|
|
AX = 53.80 |
|
* | ST HEA200
|
|
--Z AY = 11.79 |
|DESIGN CODE * |
|
|
AZ = 26.75 |
| AISC-1989 * ===============================
===|===
SY = 133.60 |
|
*
SZ = 388.63 |
|
* |<---LENGTH (M)=
2.50 --->|
RY =
4.98 |
|*************
RZ =
8.28 |
|
|
|
27.2 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|
L8
IN NEWTON MMS|
|--------------- +
L8 L8
-------------|
| KL/R-Y= 50.17 |
L8
FA = 126.80 |
| KL/R-Z= 30.18 +
L8
fa =
5.43 |
| UNL
= 250.00 |
L8 L8
FCZ = 163.82 |
| CB
=
1.00 +
FTZ = 163.82 |
| CMY
=
0.85 |
L8 L8
FCY = 186.16 |
| CMZ
=
0.85 +
L8
FTY = 186.16 |
| FYLD = 24.82 |L0
fbz = 69.93 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -1.5
Fey = 419.42 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =1159.06 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
9.22 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
4.697E-01
8
|
|
29.23 C
0.00
27.18
2.50
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
89 ST
HEA200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.470
8
29.23 C
0.00
27.18
2.50

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 44 of 146

Job No

Sheet No

Rev

45
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 90 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 90 * | GERMAN SECTIONS
|
|
AX = 53.80 |
|
* | ST HEA200
|
|
--Z AY = 11.79 |
|DESIGN CODE * |
|
|
AZ = 26.75 |
| AISC-1989 * ===============================
===|===
SY = 133.60 |
|
*
SZ = 388.63 |
|
* |<---LENGTH (M)=
2.50 --->|
RY =
4.98 |
|*************
RZ =
8.28 |
|
|
|
40.1 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|
L8
IN NEWTON MMS|
|--------------- +
L8 L8
-------------|
| KL/R-Y= 50.17 |
L8
FA = 126.80 |
| KL/R-Z= 30.18 +
fa =
8.04 |
| UNL
= 250.00 |
L8 L8
FCZ = 163.82 |
| CB
=
1.00 +
FTZ = 163.82 |
| CMY
=
0.85 |
L8 L8
FCY = 186.16 |
| CMZ
=
0.85 +
L8 L8
FTY = 186.16 |
| FYLD = 24.82 |L0
fbz = 103.19 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -2.2
Fey = 419.42 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =1159.06 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv = 13.60 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
6.933E-01
8
|
|
43.24 C
0.00
40.10
2.50
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
90 ST
HEA200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.693
8
43.24 C
0.00
40.10
2.50

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 45 of 146

Job No

Sheet No

Rev

46
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 91 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 91 * | GERMAN SECTIONS
|
|
AX = 53.80 |
|
* | ST HEA200
|
|
--Z AY = 11.79 |
|DESIGN CODE * |
|
|
AZ = 26.75 |
| AISC-1989 * ===============================
===|===
SY = 133.60 |
|
*
SZ = 388.63 |
|
* |<---LENGTH (M)=
2.50 --->|
RY =
4.98 |
|*************
RZ =
8.28 |
|
|
|
27.2 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|
L8
IN NEWTON MMS|
|--------------- +
L8 L8
-------------|
| KL/R-Y= 50.17 |
L8
FA = 126.80 |
| KL/R-Z= 30.18 +
fa =
5.43 |
| UNL
= 250.00 |
L8 L8
FCZ = 163.82 |
| CB
=
1.00 +
FTZ = 163.82 |
| CMY
=
0.85 |
L8
FCY = 186.16 |
| CMZ
=
0.85 +
L8 L8
FTY = 186.16 |
| FYLD = 24.82 |L0
fbz = 69.93 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -1.5
Fey = 419.42 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =1159.06 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
9.22 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
4.697E-01
8
|
|
29.23 C
0.00
27.18
2.50
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
91 ST
HEA200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.470
8
29.23 C
0.00
27.18
2.50

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 46 of 146

Job No

Sheet No

Rev

47
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 92 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 92 * | GERMAN SECTIONS
|
|
AX = 53.80 |
|
* | ST HEA200
|
|
--Z AY = 11.79 |
|DESIGN CODE * |
|
|
AZ = 26.75 |
| AISC-1989 * ===============================
===|===
SY = 133.60 |
|
*
SZ = 388.63 |
|
* |<---LENGTH (M)=
2.50 --->|
RY =
4.98 |
|*************
RZ =
8.28 |
|
|
|
27.2 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|
L8
IN NEWTON MMS|
|--------------- +
L8 L8
-------------|
| KL/R-Y= 50.17 |
L8
FA = 126.80 |
| KL/R-Z= 30.18 +
fa =
5.43 |
| UNL
= 250.00 |
L8
FCZ = 163.82 |
| CB
=
1.00 +
FTZ = 163.82 |
| CMY
=
0.85 |
L8
FCY = 186.16 |
| CMZ
=
0.85 +
L8
FTY = 186.16 |
| FYLD = 24.82 |L0
fbz = 69.93 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -1.5
Fey = 419.42 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =1159.06 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
9.22 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
4.697E-01
8
|
|
29.23 C
0.00
27.18
2.50
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
92 ST
HEA200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.470
8
29.23 C
0.00
27.18
2.50

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 47 of 146

Job No

Sheet No

Rev

48
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 93 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 93 * | GERMAN SECTIONS
|
|
AX = 53.80 |
|
* | ST HEA200
|
|
--Z AY = 11.79 |
|DESIGN CODE * |
|
|
AZ = 26.75 |
| AISC-1989 * ===============================
===|===
SY = 133.60 |
|
*
SZ = 388.63 |
|
* |<---LENGTH (M)=
2.50 --->|
RY =
4.98 |
|*************
RZ =
8.28 |
|
|
|
40.1 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|
L8 L8
IN NEWTON MMS|
|--------------- +
L8
-------------|
| KL/R-Y= 50.17 |
L8
FA = 126.80 |
| KL/R-Z= 30.18 +
fa =
8.04 |
| UNL
= 250.00 |
L8 L8
FCZ = 163.82 |
| CB
=
1.00 +
FTZ = 163.82 |
| CMY
=
0.85 |
L8 L8
FCY = 186.16 |
| CMZ
=
0.85 +
L8 L8
FTY = 186.16 |
| FYLD = 24.82 |L0
fbz = 103.19 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -2.2
Fey = 419.42 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =1159.06 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv = 13.60 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
6.933E-01
8
|
|
43.24 C
0.00
40.10
2.50
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
93 ST
HEA200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.693
8
43.24 C
0.00
40.10
2.50

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 48 of 146

Job No

Sheet No

Rev

49
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 94 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 94 * | GERMAN SECTIONS
|
|
AX = 53.80 |
|
* | ST HEA200
|
|
--Z AY = 11.79 |
|DESIGN CODE * |
|
|
AZ = 26.75 |
| AISC-1989 * ===============================
===|===
SY = 133.60 |
|
*
SZ = 388.63 |
|
* |<---LENGTH (M)=
2.50 --->|
RY =
4.98 |
|*************
RZ =
8.28 |
|
|
|
30.0 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|
L8
IN NEWTON MMS|
|--------------- +
L8
-------------|
| KL/R-Y= 50.17 |
L8
FA = 126.80 |
| KL/R-Z= 30.18 +
L8
fa =
5.58 |
| UNL
= 250.00 |
FCZ = 163.82 |
| CB
=
1.00 +L8
L8
FTZ = 163.82 |
| CMY
=
0.85 |
L8
L8
FCY = 186.16 |
| CMZ
=
0.85 +
L8
FTY = 186.16 |
| FYLD = 24.82 |
L8
fbz = 77.24 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -1.7
Fey = 419.42 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =1159.06 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv = 13.58 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
5.155E-01
8
|
|
30.02 C
0.00
30.02
2.50
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
94 ST
HEA200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.515
8
30.02 C
0.00
30.02
2.50

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 49 of 146

Job No

Sheet No

Rev

50
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 95 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 95 * | GERMAN SECTIONS
|
|
AX = 53.80 |
|
* | ST HEA200
|
|
--Z AY = 11.79 |
|DESIGN CODE * |
|
|
AZ = 26.75 |
| AISC-1989 * ===============================
===|===
SY = 133.60 |
|
*
SZ = 388.63 |
|
* |<---LENGTH (M)=
2.50 --->|
RY =
4.98 |
|*************
RZ =
8.28 |
|
|
|
8.5 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|
L8
IN NEWTON MMS|
|--------------- +
L8
-------------|
| KL/R-Y= 50.17 |
L8
FA = 126.80 |
| KL/R-Z= 30.18 +
L8
fa =
1.55 |
| UNL
= 250.00 |
FCZ = 163.82 |
| CB
=
1.00 +L8
L8
FTZ = 163.82 |
| CMY
=
0.85 |
L8
L8
FCY = 186.16 |
| CMZ
=
0.85 +
L8
FTY = 186.16 |
| FYLD = 24.82 |
L8
fbz = 21.83 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.5
Fey = 419.42 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =1159.06 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
3.84 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
1.455E-01
8
|
|
8.31 C
0.00
8.49
2.50
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
95 ST
HEA200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.145
8
8.31 C
0.00
8.49
2.50

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 50 of 146

Job No

Sheet No

Rev

51
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 96 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 96 * | GERMAN SECTIONS
|
|
AX = 41.90 |
|
* |
TAP ERED
|
|
--Z AY = 21.76 |
|DESIGN CODE * |
|
|
AZ = 11.45 |
| AISC-1989 * ===============================
===|===
SY = 28.51 |
|
*
SZ = 477.91 |
|
* |<---LENGTH (M)=
1.50 --->|
RY =
2.01 |
|*************
RZ = 11.69 |
|
|
|
8.5 (KNS-METRE)
|
|PARAMETER
|L8
STRESSES
|
|IN KNS CMS
|
L8
IN NEWTON MMS|
|--------------- +
L8 L8
-------------|
| KL/R-Y= 74.81 |
L8
FA = 115.54 |
| KL/R-Z= 12.83 +
fa =
1.16 |
| UNL
= 150.00 |
L8 L8
FCZ = 147.02 |
| CB
=
1.00 +
FTZ = 147.02 |
| CMY
=
0.85 |
L8
FCY = 148.93 |
| CMZ
=
0.85 +
L8 L8
FTY = 148.93 |
| FYLD = 24.82 |
L8 fbz = 17.75 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
0.6
Fey = 188.64 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =6415.52 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
2.38 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
1.308E-01
8
|
|
4.86 C
0.00
8.49
0.00
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
96
TAP ERED
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.131
8
4.86 C
0.00
8.49
0.00

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 51 of 146

Job No

Sheet No

Rev

52
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 97 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 97 * | GERMAN SECTIONS
|
|
AX = 28.50 |
|
* | ST IPE200
|
|
--Z AY = 10.38 |
|DESIGN CODE * |
|
|
AZ = 11.40 |
| AISC-1989 * ===============================
===|===
SY = 28.40 |
|
*
SZ = 194.30 |
|
* |<---LENGTH (M)=
0.53 --->|
RY =
2.23 |
|*************
RZ =
8.26 |
|
|
|
1.4 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|
L8
IN NEWTON MMS|
|--------------- +
-------------|
| KL/R-Y= 23.65 |L8
L8
FA = 140.58 |
| KL/R-Z=
6.39 +
L8
L8
fa =
1.69 |
| UNL
= 52.80 |
FCZ = 163.82 |
| CB
=
1.00 +
L8
L8
FTZ = 163.82 |
| CMY
=
0.85 |
L8
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |
L8 L8
fbz =
7.43 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
0.1
Fey =1886.59 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez=0.2581E+5|
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
4.48 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
5.740E-02
8
|
|
4.82 C
0.00
-1.44
0.53
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
97 ST
IPE200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.057
8
4.82 C
0.00
-1.44
0.53

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 52 of 146

Job No

Sheet No

Rev

53
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 98 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 98 * | GERMAN SECTIONS
|
|
AX = 41.90 |
|
* |
TAP ERED
|
|
--Z AY = 21.76 |
|DESIGN CODE * |
|
|
AZ = 11.45 |
| AISC-1989 * ===============================
===|===
SY = 28.51 |
|
*
SZ = 477.91 |
|
* |<---LENGTH (M)=
1.50 --->|
RY =
2.01 |
|*************
RZ = 11.69 |
|
|
|
8.9 (KNS-METRE)
|
|PARAMETER
|L8
STRESSES
|
|IN KNS CMS
|
L8
IN NEWTON MMS|
|--------------- +
L8 L8
-------------|
| KL/R-Y= 74.81 |
L8
FA = 115.54 |
| KL/R-Z= 12.83 +
fa =
1.00 |
| UNL
= 150.00 |
L8 L8
FCZ = 147.02 |
| CB
=
1.00 +
FTZ = 147.02 |
| CMY
=
0.85 |
L8
FCY = 148.93 |
| CMZ
=
0.85 +
L8 L8
FTY = 148.93 |
| FYLD = 24.82 |
L8 fbz = 18.69 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
0.9
Fey = 188.64 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =6415.52 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
2.43 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
1.358E-01
8
|
|
4.21 C
0.00
8.93
0.00
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
98
TAP ERED
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.136
8
4.21 C
0.00
8.93
0.00

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 53 of 146

Job No

Sheet No

Rev

54
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 99 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 99 * | GERMAN SECTIONS
|
|
AX = 28.50 |
|
* | ST IPE200
|
|
--Z AY = 10.38 |
|DESIGN CODE * |
|
|
AZ = 11.40 |
| AISC-1989 * ===============================
===|===
SY = 28.40 |
|
*
SZ = 194.30 |
|
* |<---LENGTH (M)=
2.03 --->|
RY =
2.23 |
|*************
RZ =
8.26 |
|
|
|
4.7 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|
L8 L8
IN NEWTON MMS|
|--------------- +
L8
-------------|
| KL/R-Y= 90.89 |
L8
FA = 98.13 |
| KL/R-Z= 24.57 +
L8
fa =
1.62 |
| UNL
= 202.89 |
L8
FCZ = 148.93 |
| CB
=
1.00 +
FTZ = 148.93 |
| CMY
=
0.85 |
L8 L8
FCY = 186.16 |
| CMZ
=
0.85 +
L8
FTY = 186.16 |
| FYLD = 24.82 |L8
fbz = 24.02 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
1.3
Fey = 127.78 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =1748.37 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
1.32 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
1.778E-01
8
|
|
4.62 C
0.00
-4.67
2.03
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
99 ST
IPE200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.178
8
4.62 C
0.00
-4.67
2.03

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 54 of 146

Job No

Sheet No

Rev

55
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 100 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 100 * | GERMAN SECTIONS
|
|
AX = 28.50 |
|
* | ST IPE200
|
|
--Z AY = 10.38 |
|DESIGN CODE * |
|
|
AZ = 11.40 |
| AISC-1989 * ===============================
===|===
SY = 28.40 |
|
*
SZ = 194.30 |
|
* |<---LENGTH (M)=
2.03 --->|
RY =
2.23 |
|*************
RZ =
8.26 |
|
|
|
4.7 (KNS-METRE)
|
|PARAMETER
|L8
STRESSES
|
|IN KNS CMS
|
L8 L8
IN NEWTON MMS|
|--------------- +
L8
-------------|
| KL/R-Y= 90.97 |
L8
FA = 98.07 |
| KL/R-Z= 24.59 +
L8
fa =
1.56 |
| UNL
= 203.06 |
L8
FCZ = 148.93 |
| CB
=
1.00 +
FTZ = 148.93 |
| CMY
=
0.85 |
L8 L8
FCY = 186.16 |
| CMZ
=
0.85 +
L8
FTY = 186.16 |
| FYLD = 24.82 |
L8 fbz = 24.02 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
1.0
Fey = 127.56 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =1745.44 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
1.42 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
1.772E-01
8
|
|
4.44 C
0.00
-4.67
0.00
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
100 ST
IPE200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.177
8
4.44 C
0.00
-4.67
0.00

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 55 of 146

Job No

Sheet No

Rev

56
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 101 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 101 * | GERMAN SECTIONS
|
|
AX = 28.50 |
|
* | ST IPE200
|
|
--Z AY = 10.38 |
|DESIGN CODE * |
|
|
AZ = 11.40 |
| AISC-1989 * ===============================
===|===
SY = 28.40 |
|
*
SZ = 194.30 |
|
* |<---LENGTH (M)=
0.53 --->|
RY =
2.23 |
|*************
RZ =
8.26 |
|
|
|
1.3 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|L8
IN NEWTON MMS|
|--------------- +
L8
L8
-------------|
| KL/R-Y= 23.65 |
L8
FA = 140.58 |
| KL/R-Z=
6.39 +
L8
fa =
1.49 |
| UNL
= 52.80 |
L8
L8
FCZ = 163.82 |
| CB
=
1.00 +
L8
FTZ = 163.82 |
| CMY
=
0.85 |
L8
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |
L8
fbz =
6.82 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
0.0
Fey =1886.59 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez=0.2581E+5|
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
4.70 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
5.221E-02
8
|
|
4.23 C
0.00
1.33
0.53
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
101 ST
IPE200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.052
8
4.23 C
0.00
1.33
0.53

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 56 of 146

Job No

Sheet No

Rev

57
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 102 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 102 * | GERMAN SECTIONS
|
|
AX = 41.90 |
|
* |
TAP ERED
|
|
--Z AY = 21.76 |
|DESIGN CODE * |
|
|
AZ = 11.45 |
| AISC-1989 * ===============================
===|===
SY = 28.51 |
|
*
SZ = 477.91 |
|
* |<---LENGTH (M)=
1.50 --->|
RY =
2.01 |
|*************
RZ = 11.69 |
|
|
|
30.0 (KNS-METRE)
|
|PARAMETER
|L8
STRESSES
|
|IN KNS CMS
|
L8
IN NEWTON MMS|
|--------------- +
L8 L8
-------------|
| KL/R-Y= 74.81 |
L8
FA = 115.54 |
| KL/R-Z= 12.83 +
fa =
4.09 |
| UNL
= 150.00 |
L8 L8
FCZ = 147.02 |
| CB
=
1.00 +
FTZ = 147.02 |
| CMY
=
0.85 |
L8
FCY = 148.93 |
| CMZ
=
0.85 +
L8 L8
FTY = 148.93 |
| FYLD = 24.82 |
L8 fbz = 62.81 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
2.3
Fey = 188.64 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =6415.52 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
8.13 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
4.626E-01
8
|
|
17.14 C
0.00
30.02
0.00
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
102
TAP ERED
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.463
8
17.14 C
0.00
30.02
0.00

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 57 of 146

Job No

Sheet No

Rev

58
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 103 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 103 * | GERMAN SECTIONS
|
|
AX = 28.50 |
|
* | ST IPE200
|
|
--Z AY = 10.38 |
|DESIGN CODE * |
|
|
AZ = 11.40 |
| AISC-1989 * ===============================
===|===
SY = 28.40 |
|
*
SZ = 194.30 |
|
* |<---LENGTH (M)=
0.53 --->|
RY =
2.23 |
|*************
RZ =
8.26 |
|
|
|
5.3 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|
L8
IN NEWTON MMS|
|--------------- +
-------------|
| KL/R-Y= 23.65 |L8
L8
FA = 140.58 |
| KL/R-Z=
6.39 +
L8
L8
fa =
6.00 |
| UNL
= 52.80 |
FCZ = 163.82 |
| CB
=
1.00 +
L8
L8
FTZ = 163.82 |
| CMY
=
0.85 |
L8
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |
L8 L8
fbz = 27.29 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
0.5
Fey =1886.59 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez=0.2581E+5|
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv = 16.55 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
2.093E-01
8
|
|
17.11 C
0.00
-5.30
0.53
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
103 ST
IPE200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.209
8
17.11 C
0.00
-5.30
0.53

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 58 of 146

Job No

Sheet No

Rev

59
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 104 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 104 * | GERMAN SECTIONS
|
|
AX = 41.90 |
|
* |
TAP ERED
|
|
--Z AY = 21.76 |
|DESIGN CODE * |
|
|
AZ = 11.45 |
| AISC-1989 * ===============================
===|===
SY = 28.51 |
|
*
SZ = 477.91 |
|
* |<---LENGTH (M)=
1.50 --->|
RY =
2.01 |
|*************
RZ = 11.69 |
|
|
|
31.6 (KNS-METRE)
|
|PARAMETER
|L8
STRESSES
|
|IN KNS CMS
|
L8
IN NEWTON MMS|
|--------------- +
L8 L8
-------------|
| KL/R-Y= 74.81 |
L8
FA = 115.54 |
| KL/R-Z= 12.83 +
fa =
3.56 |
| UNL
= 150.00 |
L8 L8
FCZ = 147.02 |
| CB
=
1.00 +
FTZ = 147.02 |
| CMY
=
0.85 |
L8
FCY = 148.93 |
| CMZ
=
0.85 +
L8 L8
FTY = 148.93 |
| FYLD = 24.82 |
L8 fbz = 66.10 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
3.3
Fey = 188.64 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =6415.52 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
8.31 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
4.804E-01
8
|
|
14.93 C
0.00
31.59
0.00
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
104
TAP ERED
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.480
8
14.93 C
0.00
31.59
0.00

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 59 of 146

Job No

Sheet No

Rev

60
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 105 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 105 * | GERMAN SECTIONS
|
|
AX = 28.50 |
|
* | ST IPE200
|
|
--Z AY = 10.38 |
|DESIGN CODE * |
|
|
AZ = 11.40 |
| AISC-1989 * ===============================
===|===
SY = 28.40 |
|
*
SZ = 194.30 |
|
* |<---LENGTH (M)=
2.03 --->|
RY =
2.23 |
|*************
RZ =
8.26 |
|
|
|
16.8 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|
L8 L8
IN NEWTON MMS|
|--------------- +
L8
-------------|
| KL/R-Y= 90.89 |
L8
FA = 98.13 |
| KL/R-Z= 24.57 +
L8
fa =
5.75 |
| UNL
= 202.89 |
L8
FCZ = 148.93 |
| CB
=
1.00 +
FTZ = 148.93 |
| CMY
=
0.85 |
L8 L8
FCY = 186.16 |
| CMZ
=
0.85 +
L8
FTY = 186.16 |
| FYLD = 24.82 |L8
fbz = 86.50 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
4.7
Fey = 127.78 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =1748.37 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
5.25 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
6.394E-01
8
|
|
16.38 C
0.00
-16.81
2.03
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
105 ST
IPE200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.639
8
16.38 C
0.00
-16.81
2.03

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 60 of 146

Job No

Sheet No

Rev

61
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 106 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 106 * | GERMAN SECTIONS
|
|
AX = 28.50 |
|
* | ST IPE200
|
|
--Z AY = 10.38 |
|DESIGN CODE * |
|
|
AZ = 11.40 |
| AISC-1989 * ===============================
===|===
SY = 28.40 |
|
*
SZ = 194.30 |
|
* |<---LENGTH (M)=
2.03 --->|
RY =
2.23 |
|*************
RZ =
8.26 |
|
|
|
16.8 (KNS-METRE)
|
|PARAMETER
|L8
STRESSES
|
|IN KNS CMS
|
L8 L8
IN NEWTON MMS|
|--------------- +
L8
-------------|
| KL/R-Y= 90.97 |
L8
FA = 98.07 |
| KL/R-Z= 24.59 +
L8
fa =
5.50 |
| UNL
= 203.06 |
L8
FCZ = 148.93 |
| CB
=
1.00 +
FTZ = 148.93 |
| CMY
=
0.85 |
L8 L8
FCY = 186.16 |
| CMZ
=
0.85 +
L8
FTY = 186.16 |
| FYLD = 24.82 |
L8 fbz = 86.50 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
3.8
Fey = 127.56 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =1745.44 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
5.62 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
6.369E-01
8
|
|
15.69 C
0.00
-16.81
0.00
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
106 ST
IPE200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.637
8
15.69 C
0.00
-16.81
0.00

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 61 of 146

Job No

Sheet No

Rev

62
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 107 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 107 * | GERMAN SECTIONS
|
|
AX = 28.50 |
|
* | ST IPE200
|
|
--Z AY = 10.38 |
|DESIGN CODE * |
|
|
AZ = 11.40 |
| AISC-1989 * ===============================
===|===
SY = 28.40 |
|
*
SZ = 194.30 |
|
* |<---LENGTH (M)=
0.53 --->|
RY =
2.23 |
|*************
RZ =
8.26 |
|
|
|
4.8 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|L8
IN NEWTON MMS|
|--------------- +
L8
L8
-------------|
| KL/R-Y= 23.65 |
L8
FA = 140.58 |
| KL/R-Z=
6.39 +
L8
fa =
5.25 |
| UNL
= 52.80 |
L8
L8
FCZ = 163.82 |
| CB
=
1.00 +
L8
FTZ = 163.82 |
| CMY
=
0.85 |
L8
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |
L8
fbz = 24.66 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.1
Fey =1886.59 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez=0.2581E+5|
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv = 17.03 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
1.878E-01
8
|
|
14.95 C
0.00
4.79
0.53
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
107 ST
IPE200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.188
8
14.95 C
0.00
4.79
0.53

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 62 of 146

Job No

Sheet No

Rev

63
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 108 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 108 * | GERMAN SECTIONS
|
|
AX = 41.90 |
|
* |
TAP ERED
|
|
--Z AY = 21.76 |
|DESIGN CODE * |
|
|
AZ = 11.45 |
| AISC-1989 * ===============================
===|===
SY = 28.51 |
|
*
SZ = 477.91 |
|
* |<---LENGTH (M)=
1.50 --->|
RY =
2.01 |
|*************
RZ = 11.69 |
|
|
|
40.1 (KNS-METRE)
|
|PARAMETER
|L8
STRESSES
|
|IN KNS CMS
|
L8
IN NEWTON MMS|
|--------------- +
L8 L8
-------------|
| KL/R-Y= 74.81 |
L8
FA = 115.54 |
| KL/R-Z= 12.83 +
fa =
4.21 |
| UNL
= 150.00 |
L8 L8
FCZ = 147.02 |
| CB
=
1.00 +
FTZ = 147.02 |
| CMY
=
0.85 |
L8
FCY = 148.93 |
| CMZ
=
0.85 +
L8 L8
FTY = 148.93 |
| FYLD = 24.82 |
L8 fbz = 83.91 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
0.4
Fey = 188.64 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =6415.52 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv = 11.63 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
6.072E-01
8
|
|
17.63 C
0.00
40.10
0.00
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
108
TAP ERED
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.607
8
17.63 C
0.00
40.10
0.00

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 63 of 146

Job No

Sheet No

Rev

64
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 109 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 109 * | GERMAN SECTIONS
|
|
AX = 28.50 |
|
* | ST IPE200
|
|
--Z AY = 10.38 |
|DESIGN CODE * |
|
|
AZ = 11.40 |
| AISC-1989 * ===============================
===|===
SY = 28.40 |
|
*
SZ = 194.30 |
|
* |<---LENGTH (M)=
0.53 --->|
RY =
2.23 |
|*************
RZ =
8.26 |
|
|
|
10.6 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|
L8
IN NEWTON MMS|
|--------------- +
L8
-------------|
| KL/R-Y= 23.65 |
L8
FA = 140.58 |
| KL/R-Z=
6.39 +
L8
fa =
6.18 |
| UNL
= 52.80 |
FCZ = 163.82 |
| CB
=
1.00 +
L8
FTZ = 163.82 |
| CMY
=
0.85 |L8
L8
FCY = 186.16 |
| CMZ
=
0.85 +
L8
FTY = 186.16 |
| FYLD = 24.82 |
L8 L8
fbz = 54.70 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.3
Fey =1886.59 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez=0.2581E+5|
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv = 23.87 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
3.779E-01
8
|
|
17.60 C
0.00
-10.63
0.53
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
109 ST
IPE200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.378
8
17.60 C
0.00
-10.63
0.53

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 64 of 146

Job No

Sheet No

Rev

65
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 110 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 110 * | GERMAN SECTIONS
|
|
AX = 41.90 |
|
* |
TAP ERED
|
|
--Z AY = 21.76 |
|DESIGN CODE * |
|
|
AZ = 11.45 |
| AISC-1989 * ===============================
===|===
SY = 28.51 |
|
*
SZ = 477.91 |
|
* |<---LENGTH (M)=
1.50 --->|
RY =
2.01 |
|*************
RZ = 11.69 |
|
|
|
48.1 (KNS-METRE)
|
|PARAMETER
|L8
STRESSES
|
|IN KNS CMS
|
L8
IN NEWTON MMS|
|--------------- +
L8 L8
-------------|
| KL/R-Y= 74.81 |
L8
FA = 115.54 |
| KL/R-Z= 12.83 +
fa =
3.43 |
| UNL
= 150.00 |
L8 L8
FCZ = 147.02 |
| CB
=
1.00 +
FTZ = 147.02 |
| CMY
=
0.85 |
L8
FCY = 148.93 |
| CMZ
=
0.85 +
L8 L8
FTY = 148.93 |
| FYLD = 24.82 |
L8 fbz = 100.69 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
5.3
Fey = 188.64 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =6415.52 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv = 12.53 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
7.146E-01
8
|
|
14.39 C
0.00
48.12
0.00
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
110
TAP ERED
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.715
8
14.39 C
0.00
48.12
0.00

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 65 of 146

Job No

Sheet No

Rev

66
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 111 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 111 * | GERMAN SECTIONS
|
|
AX = 28.50 |
|
* | ST IPE200
|
|
--Z AY = 10.38 |
|DESIGN CODE * |
|
|
AZ = 11.40 |
| AISC-1989 * ===============================
===|===
SY = 28.40 |
|
*
SZ = 194.30 |
|
* |<---LENGTH (M)=
2.03 --->|
RY =
2.23 |
|*************
RZ =
8.26 |
|
|
|
26.2 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|
L8 L8
IN NEWTON MMS|
|--------------- +
L8
-------------|
| KL/R-Y= 90.89 |
L8
FA = 98.13 |
| KL/R-Z= 24.57 +
L8
fa =
5.80 |
| UNL
= 202.89 |
L8
FCZ = 148.93 |
| CB
=
1.00 +
FTZ = 148.93 |
| CMY
=
0.85 |
L8 L8
FCY = 186.16 |
| CMZ
=
0.85 +
L8
FTY = 186.16 |
| FYLD = 24.82 |L8
fbz = 134.83 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
9.8
Fey = 127.78 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =1748.37 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
7.18 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
9.645E-01
8
|
|
16.53 C
0.00
-26.20
2.03
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
111 ST
IPE200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.964
8
16.53 C
0.00
-26.20
2.03

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 66 of 146

Job No

Sheet No

Rev

67
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 112 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 112 * | GERMAN SECTIONS
|
|
AX = 28.50 |
|
* | ST IPE200
|
|
--Z AY = 10.38 |
|DESIGN CODE * |
|
|
AZ = 11.40 |
| AISC-1989 * ===============================
===|===
SY = 28.40 |
|
*
SZ = 194.30 |
|
* |<---LENGTH (M)=
2.03 --->|
RY =
2.23 |
|*************
RZ =
8.26 |
|
|
|
26.2 (KNS-METRE)
|
|PARAMETER
|L8
STRESSES
|
|IN KNS CMS
|
L8 L8
IN NEWTON MMS|
|--------------- +
L8
-------------|
| KL/R-Y= 90.97 |
L8
FA = 98.07 |
| KL/R-Z= 24.59 +
L8
fa =
5.43 |
| UNL
= 203.06 |
L8
FCZ = 148.93 |
| CB
=
1.00 +
FTZ = 148.93 |
| CMY
=
0.85 |
L8 L8
FCY = 186.16 |
| CMZ
=
0.85 +
L8
FTY = 186.16 |
| FYLD = 24.82 |
L8 fbz = 134.83 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
5.5
Fey = 127.56 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =1745.44 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
9.08 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
9.608E-01
8
|
|
15.49 C
0.00
-26.20
0.00
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
112 ST
IPE200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.961
8
15.49 C
0.00
-26.20
0.00

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 67 of 146

Job No

Sheet No

Rev

68
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 113 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 113 * | GERMAN SECTIONS
|
|
AX = 28.50 |
|
* | ST IPE200
|
|
--Z AY = 10.38 |
|DESIGN CODE * |
|
|
AZ = 11.40 |
| AISC-1989 * ===============================
===|===
SY = 28.40 |
|
*
SZ = 194.30 |
|
* |<---LENGTH (M)=
0.53 --->|
RY =
2.23 |
|*************
RZ =
8.26 |
|
|
|
7.5 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|L8
IN NEWTON MMS|
|--------------- +
L8
-------------|
| KL/R-Y= 23.65 |
L8
L8
FA = 140.58 |
| KL/R-Z=
6.39 +
L8
fa =
5.06 |
| UNL
= 52.80 |
L8
FCZ = 163.82 |
| CB
=
1.00 +
L8
L8
FTZ = 163.82 |
| CMY
=
0.85 |
L8
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |
L8
fbz = 38.82 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
0.1
Fey =1886.59 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez=0.2581E+5|
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv = 25.88 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
2.729E-01
8
|
|
14.41 C
0.00
7.54
0.53
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
113 ST
IPE200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.273
8
14.41 C
0.00
7.54
0.53

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 68 of 146

Job No

Sheet No

Rev

69
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 114 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 114 * | GERMAN SECTIONS
|
|
AX = 41.90 |
|
* |
TAP ERED
|
|
--Z AY = 21.76 |
|DESIGN CODE * |
|
|
AZ = 11.45 |
| AISC-1989 * ===============================
===|===
SY = 28.51 |
|
*
SZ = 477.91 |
|
* |<---LENGTH (M)=
1.50 --->|
RY =
2.01 |
|*************
RZ = 11.69 |
|
|
|
27.2 (KNS-METRE)
|
|PARAMETER
|L8
STRESSES
|
|IN KNS CMS
|
L8
IN NEWTON MMS|
|--------------- +
L8 L8
-------------|
| KL/R-Y= 74.81 |
L8
FA = 115.54 |
| KL/R-Z= 12.83 +
fa =
2.85 |
| UNL
= 150.00 |
L8 L8
FCZ = 147.02 |
| CB
=
1.00 +
FTZ = 147.02 |
| CMY
=
0.85 |
L8
FCY = 148.93 |
| CMZ
=
0.85 +
L8 L8
FTY = 148.93 |
| FYLD = 24.82 |
L8 fbz = 56.86 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
0.3
Fey = 188.64 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =6415.52 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
7.92 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
4.115E-01
8
|
|
11.95 C
0.00
27.18
0.00
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
114
TAP ERED
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.411
8
11.95 C
0.00
27.18
0.00

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 69 of 146

Job No

Sheet No

Rev

70
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 115 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 115 * | GERMAN SECTIONS
|
|
AX = 28.50 |
|
* | ST IPE200
|
|
--Z AY = 10.38 |
|DESIGN CODE * |
|
|
AZ = 11.40 |
| AISC-1989 * ===============================
===|===
SY = 28.40 |
|
*
SZ = 194.30 |
|
* |<---LENGTH (M)=
0.53 --->|
RY =
2.23 |
|*************
RZ =
8.26 |
|
|
|
7.2 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|
L8
IN NEWTON MMS|
|--------------- +
L8
-------------|
| KL/R-Y= 23.65 |
L8
FA = 140.58 |
| KL/R-Z=
6.39 +
L8
fa =
4.18 |
| UNL
= 52.80 |
FCZ = 163.82 |
| CB
=
1.00 +
L8
FTZ = 163.82 |
| CMY
=
0.85 |L8
L8
FCY = 186.16 |
| CMZ
=
0.85 +
L8
FTY = 186.16 |
| FYLD = 24.82 |
L8 L8
fbz = 36.94 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.2
Fey =1886.59 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez=0.2581E+5|
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv = 16.09 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
2.553E-01
8
|
|
11.92 C
0.00
-7.18
0.53
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
115 ST
IPE200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.255
8
11.92 C
0.00
-7.18
0.53

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 70 of 146

Job No

Sheet No

Rev

71
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 116 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 116 * | GERMAN SECTIONS
|
|
AX = 41.90 |
|
* |
TAP ERED
|
|
--Z AY = 21.76 |
|DESIGN CODE * |
|
|
AZ = 11.45 |
| AISC-1989 * ===============================
===|===
SY = 28.51 |
|
*
SZ = 477.91 |
|
* |<---LENGTH (M)=
1.50 --->|
RY =
2.01 |
|*************
RZ = 11.69 |
|
|
|
32.6 (KNS-METRE)
|
|PARAMETER
|L8
STRESSES
|
|IN KNS CMS
|
L8
IN NEWTON MMS|
|--------------- +
L8 L8
-------------|
| KL/R-Y= 74.81 |
L8
FA = 115.54 |
| KL/R-Z= 12.83 +
fa =
2.33 |
| UNL
= 150.00 |
L8 L8
FCZ = 147.02 |
| CB
=
1.00 +
FTZ = 147.02 |
| CMY
=
0.85 |
L8
FCY = 148.93 |
| CMZ
=
0.85 +
L8 L8
FTY = 148.93 |
| FYLD = 24.82 |
L8 fbz = 68.24 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
3.6
Fey = 188.64 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =6415.52 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
8.53 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
4.843E-01
8
|
|
9.75 C
0.00
32.61
0.00
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
116
TAP ERED
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.484
8
9.75 C
0.00
32.61
0.00

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 71 of 146

Job No

Sheet No

Rev

72
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 117 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 117 * | GERMAN SECTIONS
|
|
AX = 28.50 |
|
* | ST IPE200
|
|
--Z AY = 10.38 |
|DESIGN CODE * |
|
|
AZ = 11.40 |
| AISC-1989 * ===============================
===|===
SY = 28.40 |
|
*
SZ = 194.30 |
|
* |<---LENGTH (M)=
2.03 --->|
RY =
2.23 |
|*************
RZ =
8.26 |
|
|
|
17.7 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|
L8 L8
IN NEWTON MMS|
|--------------- +
L8
-------------|
| KL/R-Y= 90.89 |
L8
FA = 98.13 |
| KL/R-Z= 24.57 +
L8
fa =
3.93 |
| UNL
= 202.89 |
L8
FCZ = 148.93 |
| CB
=
1.00 +
FTZ = 148.93 |
| CMY
=
0.85 |
L8 L8
FCY = 186.16 |
| CMZ
=
0.85 +
L8
FTY = 186.16 |
| FYLD = 24.82 |L8
fbz = 91.18 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
6.6
Fey = 127.78 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =1748.37 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
4.79 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
6.523E-01
8
|
|
11.20 C
0.00
-17.72
2.03
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
117 ST
IPE200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.652
8
11.20 C
0.00
-17.72
2.03

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 72 of 146

Job No

Sheet No

Rev

73
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 118 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 118 * | GERMAN SECTIONS
|
|
AX = 28.50 |
|
* | ST IPE200
|
|
--Z AY = 10.38 |
|DESIGN CODE * |
|
|
AZ = 11.40 |
| AISC-1989 * ===============================
===|===
SY = 28.40 |
|
*
SZ = 194.30 |
|
* |<---LENGTH (M)=
2.03 --->|
RY =
2.23 |
|*************
RZ =
8.26 |
|
|
|
17.7 (KNS-METRE)
|
|PARAMETER
|L8
STRESSES
|
|IN KNS CMS
|
L8 L8
IN NEWTON MMS|
|--------------- +
L8
-------------|
| KL/R-Y= 90.97 |
L8
FA = 98.07 |
| KL/R-Z= 24.59 +
L8
fa =
3.68 |
| UNL
= 203.06 |
L8
FCZ = 148.93 |
| CB
=
1.00 +
FTZ = 148.93 |
| CMY
=
0.85 |
L8 L8
FCY = 186.16 |
| CMZ
=
0.85 +
L8
FTY = 186.16 |
| FYLD = 24.82 |
L8 fbz = 91.18 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
3.7
Fey = 127.56 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =1745.44 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
6.08 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
6.498E-01
8
|
|
10.50 C
0.00
-17.72
0.00
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
118 ST
IPE200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.650
8
10.50 C
0.00
-17.72
0.00

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 73 of 146

Job No

Sheet No

Rev

74
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 119 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 119 * | GERMAN SECTIONS
|
|
AX = 28.50 |
|
* | ST IPE200
|
|
--Z AY = 10.38 |
|DESIGN CODE * |
|
|
AZ = 11.40 |
| AISC-1989 * ===============================
===|===
SY = 28.40 |
|
*
SZ = 194.30 |
|
* |<---LENGTH (M)=
0.53 --->|
RY =
2.23 |
|*************
RZ =
8.26 |
|
|
|
5.1 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|L8
IN NEWTON MMS|
|--------------- +
L8
-------------|
| KL/R-Y= 23.65 |
L8
L8
FA = 140.58 |
| KL/R-Z=
6.39 +
L8
fa =
3.43 |
| UNL
= 52.80 |
L8
FCZ = 163.82 |
| CB
=
1.00 +
L8
L8
FTZ = 163.82 |
| CMY
=
0.85 |
L8
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |
L8
fbz = 26.24 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
0.0
Fey =1886.59 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez=0.2581E+5|
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv = 17.49 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
1.846E-01
8
|
|
9.77 C
0.00
5.10
0.53
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
119 ST
IPE200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.185
8
9.77 C
0.00
5.10
0.53

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 74 of 146

Job No

Sheet No

Rev

75
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 120 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 120 * | GERMAN SECTIONS
|
|
AX = 41.90 |
|
* |
TAP ERED
|
|
--Z AY = 21.76 |
|DESIGN CODE * |
|
|
AZ = 11.45 |
| AISC-1989 * ===============================
===|===
SY = 28.51 |
|
*
SZ = 477.91 |
|
* |<---LENGTH (M)=
1.50 --->|
RY =
2.01 |
|*************
RZ = 11.69 |
|
|
|
27.2 (KNS-METRE)
|
|PARAMETER
|L8
STRESSES
|
|IN KNS CMS
|
L8
IN NEWTON MMS|
|--------------- +
L8 L8
-------------|
| KL/R-Y= 74.81 |
L8
FA = 115.54 |
| KL/R-Z= 12.83 +
fa =
2.85 |
| UNL
= 150.00 |
L8 L8
FCZ = 147.02 |
| CB
=
1.00 +
FTZ = 147.02 |
| CMY
=
0.85 |
L8
FCY = 148.93 |
| CMZ
=
0.85 +
L8 L8
FTY = 148.93 |
| FYLD = 24.82 |
L8 fbz = 56.86 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
0.3
Fey = 188.64 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =6415.52 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
7.92 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
4.115E-01
8
|
|
11.95 C
0.00
27.18
0.00
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
120
TAP ERED
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.411
8
11.95 C
0.00
27.18
0.00

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 75 of 146

Job No

Sheet No

Rev

76
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 121 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 121 * | GERMAN SECTIONS
|
|
AX = 28.50 |
|
* | ST IPE200
|
|
--Z AY = 10.38 |
|DESIGN CODE * |
|
|
AZ = 11.40 |
| AISC-1989 * ===============================
===|===
SY = 28.40 |
|
*
SZ = 194.30 |
|
* |<---LENGTH (M)=
0.53 --->|
RY =
2.23 |
|*************
RZ =
8.26 |
|
|
|
7.2 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|
L8
IN NEWTON MMS|
|--------------- +
L8
-------------|
| KL/R-Y= 23.65 |
L8
FA = 140.58 |
| KL/R-Z=
6.39 +
L8
fa =
4.18 |
| UNL
= 52.80 |
FCZ = 163.82 |
| CB
=
1.00 +
L8
FTZ = 163.82 |
| CMY
=
0.85 |L8
L8
FCY = 186.16 |
| CMZ
=
0.85 +
L8
FTY = 186.16 |
| FYLD = 24.82 |
L8 L8
fbz = 36.94 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.2
Fey =1886.59 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez=0.2581E+5|
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv = 16.09 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
2.553E-01
8
|
|
11.92 C
0.00
-7.18
0.53
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
121 ST
IPE200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.255
8
11.92 C
0.00
-7.18
0.53

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 76 of 146

Job No

Sheet No

Rev

77
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 122 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 122 * | GERMAN SECTIONS
|
|
AX = 41.90 |
|
* |
TAP ERED
|
|
--Z AY = 21.76 |
|DESIGN CODE * |
|
|
AZ = 11.45 |
| AISC-1989 * ===============================
===|===
SY = 28.51 |
|
*
SZ = 477.91 |
|
* |<---LENGTH (M)=
1.50 --->|
RY =
2.01 |
|*************
RZ = 11.69 |
|
|
|
32.6 (KNS-METRE)
|
|PARAMETER
|L8
STRESSES
|
|IN KNS CMS
|
L8
IN NEWTON MMS|
|--------------- +
L8 L8
-------------|
| KL/R-Y= 74.81 |
L8
FA = 115.54 |
| KL/R-Z= 12.83 +
fa =
2.33 |
| UNL
= 150.00 |
L8 L8
FCZ = 147.02 |
| CB
=
1.00 +
FTZ = 147.02 |
| CMY
=
0.85 |
L8
FCY = 148.93 |
| CMZ
=
0.85 +
L8 L8
FTY = 148.93 |
| FYLD = 24.82 |
L8 fbz = 68.24 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
3.6
Fey = 188.64 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =6415.52 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
8.53 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
4.843E-01
8
|
|
9.75 C
0.00
32.61
0.00
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
122
TAP ERED
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.484
8
9.75 C
0.00
32.61
0.00

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 77 of 146

Job No

Sheet No

Rev

78
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 123 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 123 * | GERMAN SECTIONS
|
|
AX = 28.50 |
|
* | ST IPE200
|
|
--Z AY = 10.38 |
|DESIGN CODE * |
|
|
AZ = 11.40 |
| AISC-1989 * ===============================
===|===
SY = 28.40 |
|
*
SZ = 194.30 |
|
* |<---LENGTH (M)=
2.03 --->|
RY =
2.23 |
|*************
RZ =
8.26 |
|
|
|
17.7 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|
L8 L8
IN NEWTON MMS|
|--------------- +
L8
-------------|
| KL/R-Y= 90.89 |
L8
FA = 98.13 |
| KL/R-Z= 24.57 +
L8
fa =
3.93 |
| UNL
= 202.89 |
L8
FCZ = 148.93 |
| CB
=
1.00 +
FTZ = 148.93 |
| CMY
=
0.85 |
L8 L8
FCY = 186.16 |
| CMZ
=
0.85 +
L8
FTY = 186.16 |
| FYLD = 24.82 |L8
fbz = 91.18 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
6.6
Fey = 127.78 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =1748.37 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
4.79 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
6.523E-01
8
|
|
11.20 C
0.00
-17.72
2.03
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
123 ST
IPE200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.652
8
11.20 C
0.00
-17.72
2.03

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 78 of 146

Job No

Sheet No

Rev

79
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 124 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 124 * | GERMAN SECTIONS
|
|
AX = 28.50 |
|
* | ST IPE200
|
|
--Z AY = 10.38 |
|DESIGN CODE * |
|
|
AZ = 11.40 |
| AISC-1989 * ===============================
===|===
SY = 28.40 |
|
*
SZ = 194.30 |
|
* |<---LENGTH (M)=
2.03 --->|
RY =
2.23 |
|*************
RZ =
8.26 |
|
|
|
17.7 (KNS-METRE)
|
|PARAMETER
|L8
STRESSES
|
|IN KNS CMS
|
L8 L8
IN NEWTON MMS|
|--------------- +
L8
-------------|
| KL/R-Y= 90.97 |
L8
FA = 98.07 |
| KL/R-Z= 24.59 +
L8
fa =
3.68 |
| UNL
= 203.06 |
L8
FCZ = 148.93 |
| CB
=
1.00 +
FTZ = 148.93 |
| CMY
=
0.85 |
L8 L8
FCY = 186.16 |
| CMZ
=
0.85 +
L8
FTY = 186.16 |
| FYLD = 24.82 |
L8 fbz = 91.18 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
3.7
Fey = 127.56 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =1745.44 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
6.08 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
6.498E-01
8
|
|
10.50 C
0.00
-17.72
0.00
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
124 ST
IPE200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.650
8
10.50 C
0.00
-17.72
0.00

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 79 of 146

Job No

Sheet No

Rev

80
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 125 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 125 * | GERMAN SECTIONS
|
|
AX = 28.50 |
|
* | ST IPE200
|
|
--Z AY = 10.38 |
|DESIGN CODE * |
|
|
AZ = 11.40 |
| AISC-1989 * ===============================
===|===
SY = 28.40 |
|
*
SZ = 194.30 |
|
* |<---LENGTH (M)=
0.53 --->|
RY =
2.23 |
|*************
RZ =
8.26 |
|
|
|
5.1 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|L8
IN NEWTON MMS|
|--------------- +
L8
-------------|
| KL/R-Y= 23.65 |
L8
L8
FA = 140.58 |
| KL/R-Z=
6.39 +
L8
fa =
3.43 |
| UNL
= 52.80 |
L8
FCZ = 163.82 |
| CB
=
1.00 +
L8
L8
FTZ = 163.82 |
| CMY
=
0.85 |
L8
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |
L8
fbz = 26.24 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
0.0
Fey =1886.59 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez=0.2581E+5|
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv = 17.49 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
1.846E-01
8
|
|
9.77 C
0.00
5.10
0.53
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
125 ST
IPE200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.185
8
9.77 C
0.00
5.10
0.53

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 80 of 146

Job No

Sheet No

Rev

81
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 126 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 126 * | GERMAN SECTIONS
|
|
AX = 41.90 |
|
* |
TAP ERED
|
|
--Z AY = 21.76 |
|DESIGN CODE * |
|
|
AZ = 11.45 |
| AISC-1989 * ===============================
===|===
SY = 28.51 |
|
*
SZ = 477.91 |
|
* |<---LENGTH (M)=
1.50 --->|
RY =
2.01 |
|*************
RZ = 11.69 |
|
|
|
40.1 (KNS-METRE)
|
|PARAMETER
|L8
STRESSES
|
|IN KNS CMS
|
L8
IN NEWTON MMS|
|--------------- +
L8 L8
-------------|
| KL/R-Y= 74.81 |
L8
FA = 115.54 |
| KL/R-Z= 12.83 +
fa =
4.21 |
| UNL
= 150.00 |
L8 L8
FCZ = 147.02 |
| CB
=
1.00 +
FTZ = 147.02 |
| CMY
=
0.85 |
L8
FCY = 148.93 |
| CMZ
=
0.85 +
L8 L8
FTY = 148.93 |
| FYLD = 24.82 |
L8 fbz = 83.91 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
0.4
Fey = 188.64 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =6415.52 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv = 11.63 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
6.072E-01
8
|
|
17.63 C
0.00
40.10
0.00
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
126
TAP ERED
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.607
8
17.63 C
0.00
40.10
0.00

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 81 of 146

Job No

Sheet No

Rev

82
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 127 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 127 * | GERMAN SECTIONS
|
|
AX = 28.50 |
|
* | ST IPE200
|
|
--Z AY = 10.38 |
|DESIGN CODE * |
|
|
AZ = 11.40 |
| AISC-1989 * ===============================
===|===
SY = 28.40 |
|
*
SZ = 194.30 |
|
* |<---LENGTH (M)=
0.53 --->|
RY =
2.23 |
|*************
RZ =
8.26 |
|
|
|
10.6 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|
L8
IN NEWTON MMS|
|--------------- +
L8
-------------|
| KL/R-Y= 23.65 |
L8
FA = 140.58 |
| KL/R-Z=
6.39 +
L8
fa =
6.18 |
| UNL
= 52.80 |
FCZ = 163.82 |
| CB
=
1.00 +
L8
FTZ = 163.82 |
| CMY
=
0.85 |L8
L8
FCY = 186.16 |
| CMZ
=
0.85 +
L8
FTY = 186.16 |
| FYLD = 24.82 |
L8 L8
fbz = 54.70 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.3
Fey =1886.59 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez=0.2581E+5|
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv = 23.87 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
3.779E-01
8
|
|
17.60 C
0.00
-10.63
0.53
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
127 ST
IPE200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.378
8
17.60 C
0.00
-10.63
0.53

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 82 of 146

Job No

Sheet No

Rev

83
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 128 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 128 * | GERMAN SECTIONS
|
|
AX = 41.90 |
|
* |
TAP ERED
|
|
--Z AY = 21.76 |
|DESIGN CODE * |
|
|
AZ = 11.45 |
| AISC-1989 * ===============================
===|===
SY = 28.51 |
|
*
SZ = 477.91 |
|
* |<---LENGTH (M)=
1.50 --->|
RY =
2.01 |
|*************
RZ = 11.69 |
|
|
|
48.1 (KNS-METRE)
|
|PARAMETER
|L8
STRESSES
|
|IN KNS CMS
|
L8
IN NEWTON MMS|
|--------------- +
L8 L8
-------------|
| KL/R-Y= 74.81 |
L8
FA = 115.54 |
| KL/R-Z= 12.83 +
fa =
3.43 |
| UNL
= 150.00 |
L8 L8
FCZ = 147.02 |
| CB
=
1.00 +
FTZ = 147.02 |
| CMY
=
0.85 |
L8
FCY = 148.93 |
| CMZ
=
0.85 +
L8 L8
FTY = 148.93 |
| FYLD = 24.82 |
L8 fbz = 100.69 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
5.3
Fey = 188.64 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =6415.52 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv = 12.53 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
7.146E-01
8
|
|
14.39 C
0.00
48.12
0.00
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
128
TAP ERED
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.715
8
14.39 C
0.00
48.12
0.00

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 83 of 146

Job No

Sheet No

Rev

84
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 129 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 129 * | GERMAN SECTIONS
|
|
AX = 28.50 |
|
* | ST IPE200
|
|
--Z AY = 10.38 |
|DESIGN CODE * |
|
|
AZ = 11.40 |
| AISC-1989 * ===============================
===|===
SY = 28.40 |
|
*
SZ = 194.30 |
|
* |<---LENGTH (M)=
2.03 --->|
RY =
2.23 |
|*************
RZ =
8.26 |
|
|
|
26.2 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|
L8 L8
IN NEWTON MMS|
|--------------- +
L8
-------------|
| KL/R-Y= 90.89 |
L8
FA = 98.13 |
| KL/R-Z= 24.57 +
L8
fa =
5.80 |
| UNL
= 202.89 |
L8
FCZ = 148.93 |
| CB
=
1.00 +
FTZ = 148.93 |
| CMY
=
0.85 |
L8 L8
FCY = 186.16 |
| CMZ
=
0.85 +
L8
FTY = 186.16 |
| FYLD = 24.82 |L8
fbz = 134.83 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
9.8
Fey = 127.78 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =1748.37 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
7.18 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
9.645E-01
8
|
|
16.53 C
0.00
-26.20
2.03
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
129 ST
IPE200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.964
8
16.53 C
0.00
-26.20
2.03

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 84 of 146

Job No

Sheet No

Rev

85
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 130 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 130 * | GERMAN SECTIONS
|
|
AX = 28.50 |
|
* | ST IPE200
|
|
--Z AY = 10.38 |
|DESIGN CODE * |
|
|
AZ = 11.40 |
| AISC-1989 * ===============================
===|===
SY = 28.40 |
|
*
SZ = 194.30 |
|
* |<---LENGTH (M)=
2.03 --->|
RY =
2.23 |
|*************
RZ =
8.26 |
|
|
|
26.2 (KNS-METRE)
|
|PARAMETER
|L8
STRESSES
|
|IN KNS CMS
|
L8 L8
IN NEWTON MMS|
|--------------- +
L8
-------------|
| KL/R-Y= 90.97 |
L8
FA = 98.07 |
| KL/R-Z= 24.59 +
L8
fa =
5.43 |
| UNL
= 203.06 |
L8
FCZ = 148.93 |
| CB
=
1.00 +
FTZ = 148.93 |
| CMY
=
0.85 |
L8 L8
FCY = 186.16 |
| CMZ
=
0.85 +
L8
FTY = 186.16 |
| FYLD = 24.82 |
L8 fbz = 134.83 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
5.5
Fey = 127.56 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =1745.44 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
9.08 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
9.608E-01
8
|
|
15.49 C
0.00
-26.20
0.00
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
130 ST
IPE200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.961
8
15.49 C
0.00
-26.20
0.00

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 85 of 146

Job No

Sheet No

Rev

86
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 131 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 131 * | GERMAN SECTIONS
|
|
AX = 28.50 |
|
* | ST IPE200
|
|
--Z AY = 10.38 |
|DESIGN CODE * |
|
|
AZ = 11.40 |
| AISC-1989 * ===============================
===|===
SY = 28.40 |
|
*
SZ = 194.30 |
|
* |<---LENGTH (M)=
0.53 --->|
RY =
2.23 |
|*************
RZ =
8.26 |
|
|
|
7.5 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|L8
IN NEWTON MMS|
|--------------- +
L8
-------------|
| KL/R-Y= 23.65 |
L8
L8
FA = 140.58 |
| KL/R-Z=
6.39 +
L8
fa =
5.06 |
| UNL
= 52.80 |
L8
FCZ = 163.82 |
| CB
=
1.00 +
L8
L8
FTZ = 163.82 |
| CMY
=
0.85 |
L8
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |
L8
fbz = 38.82 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
0.1
Fey =1886.59 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez=0.2581E+5|
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv = 25.88 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
2.729E-01
8
|
|
14.41 C
0.00
7.54
0.53
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
131 ST
IPE200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.273
8
14.41 C
0.00
7.54
0.53

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 86 of 146

Job No

Sheet No

Rev

87
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 132 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 132 * | GERMAN SECTIONS
|
|
AX = 41.90 |
|
* |
TAP ERED
|
|
--Z AY = 21.76 |
|DESIGN CODE * |
|
|
AZ = 11.45 |
| AISC-1989 * ===============================
===|===
SY = 28.51 |
|
*
SZ = 477.91 |
|
* |<---LENGTH (M)=
1.50 --->|
RY =
2.01 |
|*************
RZ = 11.69 |
|
|
|
27.2 (KNS-METRE)
|
|PARAMETER
|L8
STRESSES
|
|IN KNS CMS
|
L8
IN NEWTON MMS|
|--------------- +
L8 L8
-------------|
| KL/R-Y= 74.81 |
L8
FA = 115.54 |
| KL/R-Z= 12.83 +
fa =
2.85 |
| UNL
= 150.00 |
L8 L8
FCZ = 147.02 |
| CB
=
1.00 +
FTZ = 147.02 |
| CMY
=
0.85 |
L8
FCY = 148.93 |
| CMZ
=
0.85 +
L8 L8
FTY = 148.93 |
| FYLD = 24.82 |
L8 fbz = 56.86 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
0.3
Fey = 188.64 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =6415.52 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
7.92 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
4.115E-01
8
|
|
11.95 C
0.00
27.18
0.00
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
132
TAP ERED
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.411
8
11.95 C
0.00
27.18
0.00

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 87 of 146

Job No

Sheet No

Rev

88
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 133 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 133 * | GERMAN SECTIONS
|
|
AX = 28.50 |
|
* | ST IPE200
|
|
--Z AY = 10.38 |
|DESIGN CODE * |
|
|
AZ = 11.40 |
| AISC-1989 * ===============================
===|===
SY = 28.40 |
|
*
SZ = 194.30 |
|
* |<---LENGTH (M)=
0.53 --->|
RY =
2.23 |
|*************
RZ =
8.26 |
|
|
|
7.2 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|
L8
IN NEWTON MMS|
|--------------- +
L8
-------------|
| KL/R-Y= 23.65 |
L8
FA = 140.58 |
| KL/R-Z=
6.39 +
L8
fa =
4.18 |
| UNL
= 52.80 |
FCZ = 163.82 |
| CB
=
1.00 +
L8
FTZ = 163.82 |
| CMY
=
0.85 |L8
L8
FCY = 186.16 |
| CMZ
=
0.85 +
L8
FTY = 186.16 |
| FYLD = 24.82 |
L8 L8
fbz = 36.94 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.2
Fey =1886.59 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez=0.2581E+5|
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv = 16.09 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
2.553E-01
8
|
|
11.92 C
0.00
-7.18
0.53
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
133 ST
IPE200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.255
8
11.92 C
0.00
-7.18
0.53

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 88 of 146

Job No

Sheet No

Rev

89
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 134 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 134 * | GERMAN SECTIONS
|
|
AX = 41.90 |
|
* |
TAP ERED
|
|
--Z AY = 21.76 |
|DESIGN CODE * |
|
|
AZ = 11.45 |
| AISC-1989 * ===============================
===|===
SY = 28.51 |
|
*
SZ = 477.91 |
|
* |<---LENGTH (M)=
1.50 --->|
RY =
2.01 |
|*************
RZ = 11.69 |
|
|
|
32.6 (KNS-METRE)
|
|PARAMETER
|L8
STRESSES
|
|IN KNS CMS
|
L8
IN NEWTON MMS|
|--------------- +
L8 L8
-------------|
| KL/R-Y= 74.81 |
L8
FA = 115.54 |
| KL/R-Z= 12.83 +
fa =
2.33 |
| UNL
= 150.00 |
L8 L8
FCZ = 147.02 |
| CB
=
1.00 +
FTZ = 147.02 |
| CMY
=
0.85 |
L8
FCY = 148.93 |
| CMZ
=
0.85 +
L8 L8
FTY = 148.93 |
| FYLD = 24.82 |
L8 fbz = 68.24 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
3.6
Fey = 188.64 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =6415.52 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
8.53 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
4.843E-01
8
|
|
9.75 C
0.00
32.61
0.00
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
134
TAP ERED
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.484
8
9.75 C
0.00
32.61
0.00

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 89 of 146

Job No

Sheet No

Rev

90
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 135 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 135 * | GERMAN SECTIONS
|
|
AX = 28.50 |
|
* | ST IPE200
|
|
--Z AY = 10.38 |
|DESIGN CODE * |
|
|
AZ = 11.40 |
| AISC-1989 * ===============================
===|===
SY = 28.40 |
|
*
SZ = 194.30 |
|
* |<---LENGTH (M)=
2.03 --->|
RY =
2.23 |
|*************
RZ =
8.26 |
|
|
|
17.7 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|
L8 L8
IN NEWTON MMS|
|--------------- +
L8
-------------|
| KL/R-Y= 90.89 |
L8
FA = 98.13 |
| KL/R-Z= 24.57 +
L8
fa =
3.93 |
| UNL
= 202.89 |
L8
FCZ = 148.93 |
| CB
=
1.00 +
FTZ = 148.93 |
| CMY
=
0.85 |
L8 L8
FCY = 186.16 |
| CMZ
=
0.85 +
L8
FTY = 186.16 |
| FYLD = 24.82 |L8
fbz = 91.18 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
6.6
Fey = 127.78 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =1748.37 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
4.79 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
6.523E-01
8
|
|
11.20 C
0.00
-17.72
2.03
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
135 ST
IPE200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.652
8
11.20 C
0.00
-17.72
2.03

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 90 of 146

Job No

Sheet No

Rev

91
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 136 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 136 * | GERMAN SECTIONS
|
|
AX = 28.50 |
|
* | ST IPE200
|
|
--Z AY = 10.38 |
|DESIGN CODE * |
|
|
AZ = 11.40 |
| AISC-1989 * ===============================
===|===
SY = 28.40 |
|
*
SZ = 194.30 |
|
* |<---LENGTH (M)=
2.03 --->|
RY =
2.23 |
|*************
RZ =
8.26 |
|
|
|
17.7 (KNS-METRE)
|
|PARAMETER
|L8
STRESSES
|
|IN KNS CMS
|
L8 L8
IN NEWTON MMS|
|--------------- +
L8
-------------|
| KL/R-Y= 90.97 |
L8
FA = 98.07 |
| KL/R-Z= 24.59 +
L8
fa =
3.68 |
| UNL
= 203.06 |
L8
FCZ = 148.93 |
| CB
=
1.00 +
FTZ = 148.93 |
| CMY
=
0.85 |
L8 L8
FCY = 186.16 |
| CMZ
=
0.85 +
L8
FTY = 186.16 |
| FYLD = 24.82 |
L8 fbz = 91.18 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
3.7
Fey = 127.56 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =1745.44 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
6.08 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
6.498E-01
8
|
|
10.50 C
0.00
-17.72
0.00
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
136 ST
IPE200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.650
8
10.50 C
0.00
-17.72
0.00

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 91 of 146

Job No

Sheet No

Rev

92
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 137 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 137 * | GERMAN SECTIONS
|
|
AX = 28.50 |
|
* | ST IPE200
|
|
--Z AY = 10.38 |
|DESIGN CODE * |
|
|
AZ = 11.40 |
| AISC-1989 * ===============================
===|===
SY = 28.40 |
|
*
SZ = 194.30 |
|
* |<---LENGTH (M)=
0.53 --->|
RY =
2.23 |
|*************
RZ =
8.26 |
|
|
|
5.1 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|L8
IN NEWTON MMS|
|--------------- +
L8
-------------|
| KL/R-Y= 23.65 |
L8
L8
FA = 140.58 |
| KL/R-Z=
6.39 +
L8
fa =
3.43 |
| UNL
= 52.80 |
L8
FCZ = 163.82 |
| CB
=
1.00 +
L8
L8
FTZ = 163.82 |
| CMY
=
0.85 |
L8
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |
L8
fbz = 26.24 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
0.0
Fey =1886.59 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez=0.2581E+5|
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv = 17.49 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
1.846E-01
8
|
|
9.77 C
0.00
5.10
0.53
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
137 ST
IPE200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.185
8
9.77 C
0.00
5.10
0.53

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 92 of 146

Job No

Sheet No

Rev

93
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 138 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 138 * | GERMAN SECTIONS
|
|
AX = 41.90 |
|
* |
TAP ERED
|
|
--Z AY = 21.76 |
|DESIGN CODE * |
|
|
AZ = 11.45 |
| AISC-1989 * ===============================
===|===
SY = 28.51 |
|
*
SZ = 477.91 |
|
* |<---LENGTH (M)=
1.50 --->|
RY =
2.01 |
|*************
RZ = 11.69 |
|
|
|
27.2 (KNS-METRE)
|
|PARAMETER
|L8
STRESSES
|
|IN KNS CMS
|
L8
IN NEWTON MMS|
|--------------- +
L8 L8
-------------|
| KL/R-Y= 74.81 |
L8
FA = 115.54 |
| KL/R-Z= 12.83 +
fa =
2.85 |
| UNL
= 150.00 |
L8 L8
FCZ = 147.02 |
| CB
=
1.00 +
FTZ = 147.02 |
| CMY
=
0.85 |
L8
FCY = 148.93 |
| CMZ
=
0.85 +
L8 L8
FTY = 148.93 |
| FYLD = 24.82 |
L8 fbz = 56.86 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
0.3
Fey = 188.64 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =6415.52 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
7.92 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
4.115E-01
8
|
|
11.95 C
0.00
27.18
0.00
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
138
TAP ERED
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.411
8
11.95 C
0.00
27.18
0.00

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 93 of 146

Job No

Sheet No

Rev

94
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 139 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 139 * | GERMAN SECTIONS
|
|
AX = 28.50 |
|
* | ST IPE200
|
|
--Z AY = 10.38 |
|DESIGN CODE * |
|
|
AZ = 11.40 |
| AISC-1989 * ===============================
===|===
SY = 28.40 |
|
*
SZ = 194.30 |
|
* |<---LENGTH (M)=
0.53 --->|
RY =
2.23 |
|*************
RZ =
8.26 |
|
|
|
7.2 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|
L8
IN NEWTON MMS|
|--------------- +
L8
-------------|
| KL/R-Y= 23.65 |
L8
FA = 140.58 |
| KL/R-Z=
6.39 +
L8
fa =
4.18 |
| UNL
= 52.80 |
FCZ = 163.82 |
| CB
=
1.00 +
L8
FTZ = 163.82 |
| CMY
=
0.85 |L8
L8
FCY = 186.16 |
| CMZ
=
0.85 +
L8
FTY = 186.16 |
| FYLD = 24.82 |
L8 L8
fbz = 36.94 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.2
Fey =1886.59 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez=0.2581E+5|
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv = 16.09 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
2.553E-01
8
|
|
11.92 C
0.00
-7.18
0.53
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
139 ST
IPE200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.255
8
11.92 C
0.00
-7.18
0.53

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 94 of 146

Job No

Sheet No

Rev

95
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 140 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 140 * | GERMAN SECTIONS
|
|
AX = 41.90 |
|
* |
TAP ERED
|
|
--Z AY = 21.76 |
|DESIGN CODE * |
|
|
AZ = 11.45 |
| AISC-1989 * ===============================
===|===
SY = 28.51 |
|
*
SZ = 477.91 |
|
* |<---LENGTH (M)=
1.50 --->|
RY =
2.01 |
|*************
RZ = 11.69 |
|
|
|
32.6 (KNS-METRE)
|
|PARAMETER
|L8
STRESSES
|
|IN KNS CMS
|
L8
IN NEWTON MMS|
|--------------- +
L8 L8
-------------|
| KL/R-Y= 74.81 |
L8
FA = 115.54 |
| KL/R-Z= 12.83 +
fa =
2.33 |
| UNL
= 150.00 |
L8 L8
FCZ = 147.02 |
| CB
=
1.00 +
FTZ = 147.02 |
| CMY
=
0.85 |
L8
FCY = 148.93 |
| CMZ
=
0.85 +
L8 L8
FTY = 148.93 |
| FYLD = 24.82 |
L8 fbz = 68.24 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
3.6
Fey = 188.64 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =6415.52 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
8.53 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
4.843E-01
8
|
|
9.75 C
0.00
32.61
0.00
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
140
TAP ERED
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.484
8
9.75 C
0.00
32.61
0.00

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 95 of 146

Job No

Sheet No

Rev

96
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 141 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 141 * | GERMAN SECTIONS
|
|
AX = 28.50 |
|
* | ST IPE200
|
|
--Z AY = 10.38 |
|DESIGN CODE * |
|
|
AZ = 11.40 |
| AISC-1989 * ===============================
===|===
SY = 28.40 |
|
*
SZ = 194.30 |
|
* |<---LENGTH (M)=
2.03 --->|
RY =
2.23 |
|*************
RZ =
8.26 |
|
|
|
17.7 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|
L8 L8
IN NEWTON MMS|
|--------------- +
L8
-------------|
| KL/R-Y= 90.89 |
L8
FA = 98.13 |
| KL/R-Z= 24.57 +
L8
fa =
3.93 |
| UNL
= 202.89 |
L8
FCZ = 148.93 |
| CB
=
1.00 +
FTZ = 148.93 |
| CMY
=
0.85 |
L8 L8
FCY = 186.16 |
| CMZ
=
0.85 +
L8
FTY = 186.16 |
| FYLD = 24.82 |L8
fbz = 91.18 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
6.6
Fey = 127.78 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =1748.37 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
4.79 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
6.523E-01
8
|
|
11.20 C
0.00
-17.72
2.03
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
141 ST
IPE200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.652
8
11.20 C
0.00
-17.72
2.03

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 96 of 146

Job No

Sheet No

Rev

97
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 142 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 142 * | GERMAN SECTIONS
|
|
AX = 28.50 |
|
* | ST IPE200
|
|
--Z AY = 10.38 |
|DESIGN CODE * |
|
|
AZ = 11.40 |
| AISC-1989 * ===============================
===|===
SY = 28.40 |
|
*
SZ = 194.30 |
|
* |<---LENGTH (M)=
2.03 --->|
RY =
2.23 |
|*************
RZ =
8.26 |
|
|
|
17.7 (KNS-METRE)
|
|PARAMETER
|L8
STRESSES
|
|IN KNS CMS
|
L8 L8
IN NEWTON MMS|
|--------------- +
L8
-------------|
| KL/R-Y= 90.97 |
L8
FA = 98.07 |
| KL/R-Z= 24.59 +
L8
fa =
3.68 |
| UNL
= 203.06 |
L8
FCZ = 148.93 |
| CB
=
1.00 +
FTZ = 148.93 |
| CMY
=
0.85 |
L8 L8
FCY = 186.16 |
| CMZ
=
0.85 +
L8
FTY = 186.16 |
| FYLD = 24.82 |
L8 fbz = 91.18 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
3.7
Fey = 127.56 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =1745.44 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
6.08 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
6.498E-01
8
|
|
10.50 C
0.00
-17.72
0.00
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
142 ST
IPE200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.650
8
10.50 C
0.00
-17.72
0.00

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 97 of 146

Job No

Sheet No

Rev

98
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 143 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 143 * | GERMAN SECTIONS
|
|
AX = 28.50 |
|
* | ST IPE200
|
|
--Z AY = 10.38 |
|DESIGN CODE * |
|
|
AZ = 11.40 |
| AISC-1989 * ===============================
===|===
SY = 28.40 |
|
*
SZ = 194.30 |
|
* |<---LENGTH (M)=
0.53 --->|
RY =
2.23 |
|*************
RZ =
8.26 |
|
|
|
5.1 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|L8
IN NEWTON MMS|
|--------------- +
L8
-------------|
| KL/R-Y= 23.65 |
L8
L8
FA = 140.58 |
| KL/R-Z=
6.39 +
L8
fa =
3.43 |
| UNL
= 52.80 |
L8
FCZ = 163.82 |
| CB
=
1.00 +
L8
L8
FTZ = 163.82 |
| CMY
=
0.85 |
L8
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |
L8
fbz = 26.24 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
0.0
Fey =1886.59 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez=0.2581E+5|
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv = 17.49 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
1.846E-01
8
|
|
9.77 C
0.00
5.10
0.53
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
143 ST
IPE200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.185
8
9.77 C
0.00
5.10
0.53

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 98 of 146

Job No

Sheet No

Rev

99
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 144 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 144 * | GERMAN SECTIONS
|
|
AX = 41.90 |
|
* |
TAP ERED
|
|
--Z AY = 21.76 |
|DESIGN CODE * |
|
|
AZ = 11.45 |
| AISC-1989 * ===============================
===|===
SY = 28.51 |
|
*
SZ = 477.91 |
|
* |<---LENGTH (M)=
1.50 --->|
RY =
2.01 |
|*************
RZ = 11.69 |
|
|
|
40.1 (KNS-METRE)
|
|PARAMETER
|L8
STRESSES
|
|IN KNS CMS
|
L8
IN NEWTON MMS|
|--------------- +
L8 L8
-------------|
| KL/R-Y= 74.81 |
L8
FA = 115.54 |
| KL/R-Z= 12.83 +
fa =
4.21 |
| UNL
= 150.00 |
L8 L8
FCZ = 147.02 |
| CB
=
1.00 +
FTZ = 147.02 |
| CMY
=
0.85 |
L8
FCY = 148.93 |
| CMZ
=
0.85 +
L8 L8
FTY = 148.93 |
| FYLD = 24.82 |
L8 fbz = 83.91 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
0.4
Fey = 188.64 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =6415.52 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv = 11.63 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
6.072E-01
8
|
|
17.63 C
0.00
40.10
0.00
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
144
TAP ERED
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.607
8
17.63 C
0.00
40.10
0.00

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 99 of 146

Job No

Sheet No

Rev

100
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 145 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 145 * | GERMAN SECTIONS
|
|
AX = 28.50 |
|
* | ST IPE200
|
|
--Z AY = 10.38 |
|DESIGN CODE * |
|
|
AZ = 11.40 |
| AISC-1989 * ===============================
===|===
SY = 28.40 |
|
*
SZ = 194.30 |
|
* |<---LENGTH (M)=
0.53 --->|
RY =
2.23 |
|*************
RZ =
8.26 |
|
|
|
10.6 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|
L8
IN NEWTON MMS|
|--------------- +
L8
-------------|
| KL/R-Y= 23.65 |
L8
FA = 140.58 |
| KL/R-Z=
6.39 +
L8
fa =
6.18 |
| UNL
= 52.80 |
FCZ = 163.82 |
| CB
=
1.00 +
L8
FTZ = 163.82 |
| CMY
=
0.85 |L8
L8
FCY = 186.16 |
| CMZ
=
0.85 +
L8
FTY = 186.16 |
| FYLD = 24.82 |
L8 L8
fbz = 54.70 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.3
Fey =1886.59 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez=0.2581E+5|
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv = 23.87 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
3.779E-01
8
|
|
17.60 C
0.00
-10.63
0.53
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
145 ST
IPE200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.378
8
17.60 C
0.00
-10.63
0.53

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 100 of 146

Job No

Sheet No

Rev

101
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 146 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 146 * | GERMAN SECTIONS
|
|
AX = 41.90 |
|
* |
TAP ERED
|
|
--Z AY = 21.76 |
|DESIGN CODE * |
|
|
AZ = 11.45 |
| AISC-1989 * ===============================
===|===
SY = 28.51 |
|
*
SZ = 477.91 |
|
* |<---LENGTH (M)=
1.50 --->|
RY =
2.01 |
|*************
RZ = 11.69 |
|
|
|
48.1 (KNS-METRE)
|
|PARAMETER
|L8
STRESSES
|
|IN KNS CMS
|
L8
IN NEWTON MMS|
|--------------- +
L8 L8
-------------|
| KL/R-Y= 74.81 |
L8
FA = 115.54 |
| KL/R-Z= 12.83 +
fa =
3.43 |
| UNL
= 150.00 |
L8 L8
FCZ = 147.02 |
| CB
=
1.00 +
FTZ = 147.02 |
| CMY
=
0.85 |
L8
FCY = 148.93 |
| CMZ
=
0.85 +
L8 L8
FTY = 148.93 |
| FYLD = 24.82 |
L8 fbz = 100.69 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
5.3
Fey = 188.64 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =6415.52 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv = 12.53 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
7.146E-01
8
|
|
14.39 C
0.00
48.12
0.00
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
146
TAP ERED
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.715
8
14.39 C
0.00
48.12
0.00

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 101 of 146

Job No

Sheet No

Rev

102
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 147 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 147 * | GERMAN SECTIONS
|
|
AX = 28.50 |
|
* | ST IPE200
|
|
--Z AY = 10.38 |
|DESIGN CODE * |
|
|
AZ = 11.40 |
| AISC-1989 * ===============================
===|===
SY = 28.40 |
|
*
SZ = 194.30 |
|
* |<---LENGTH (M)=
2.03 --->|
RY =
2.23 |
|*************
RZ =
8.26 |
|
|
|
26.2 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|
L8 L8
IN NEWTON MMS|
|--------------- +
L8
-------------|
| KL/R-Y= 90.89 |
L8
FA = 98.13 |
| KL/R-Z= 24.57 +
L8
fa =
5.80 |
| UNL
= 202.89 |
L8
FCZ = 148.93 |
| CB
=
1.00 +
FTZ = 148.93 |
| CMY
=
0.85 |
L8 L8
FCY = 186.16 |
| CMZ
=
0.85 +
L8
FTY = 186.16 |
| FYLD = 24.82 |L8
fbz = 134.83 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
9.8
Fey = 127.78 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =1748.37 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
7.18 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
9.645E-01
8
|
|
16.53 C
0.00
-26.20
2.03
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
147 ST
IPE200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.964
8
16.53 C
0.00
-26.20
2.03

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 102 of 146

Job No

Sheet No

Rev

103
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 148 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 148 * | GERMAN SECTIONS
|
|
AX = 28.50 |
|
* | ST IPE200
|
|
--Z AY = 10.38 |
|DESIGN CODE * |
|
|
AZ = 11.40 |
| AISC-1989 * ===============================
===|===
SY = 28.40 |
|
*
SZ = 194.30 |
|
* |<---LENGTH (M)=
2.03 --->|
RY =
2.23 |
|*************
RZ =
8.26 |
|
|
|
26.2 (KNS-METRE)
|
|PARAMETER
|L8
STRESSES
|
|IN KNS CMS
|
L8 L8
IN NEWTON MMS|
|--------------- +
L8
-------------|
| KL/R-Y= 90.97 |
L8
FA = 98.07 |
| KL/R-Z= 24.59 +
L8
fa =
5.43 |
| UNL
= 203.06 |
L8
FCZ = 148.93 |
| CB
=
1.00 +
FTZ = 148.93 |
| CMY
=
0.85 |
L8 L8
FCY = 186.16 |
| CMZ
=
0.85 +
L8
FTY = 186.16 |
| FYLD = 24.82 |
L8 fbz = 134.83 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
5.5
Fey = 127.56 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =1745.44 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
9.08 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
9.608E-01
8
|
|
15.49 C
0.00
-26.20
0.00
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
148 ST
IPE200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.961
8
15.49 C
0.00
-26.20
0.00

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 103 of 146

Job No

Sheet No

Rev

104
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 149 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 149 * | GERMAN SECTIONS
|
|
AX = 28.50 |
|
* | ST IPE200
|
|
--Z AY = 10.38 |
|DESIGN CODE * |
|
|
AZ = 11.40 |
| AISC-1989 * ===============================
===|===
SY = 28.40 |
|
*
SZ = 194.30 |
|
* |<---LENGTH (M)=
0.53 --->|
RY =
2.23 |
|*************
RZ =
8.26 |
|
|
|
7.5 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|L8
IN NEWTON MMS|
|--------------- +
L8
-------------|
| KL/R-Y= 23.65 |
L8
L8
FA = 140.58 |
| KL/R-Z=
6.39 +
L8
fa =
5.06 |
| UNL
= 52.80 |
L8
FCZ = 163.82 |
| CB
=
1.00 +
L8
L8
FTZ = 163.82 |
| CMY
=
0.85 |
L8
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |
L8
fbz = 38.82 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
0.1
Fey =1886.59 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez=0.2581E+5|
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv = 25.88 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
2.729E-01
8
|
|
14.41 C
0.00
7.54
0.53
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
149 ST
IPE200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.273
8
14.41 C
0.00
7.54
0.53

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 104 of 146

Job No

Sheet No

Rev

105
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 150 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 150 * | GERMAN SECTIONS
|
|
AX = 41.90 |
|
* |
TAP ERED
|
|
--Z AY = 21.76 |
|DESIGN CODE * |
|
|
AZ = 11.45 |
| AISC-1989 * ===============================
===|===
SY = 28.51 |
|
*
SZ = 477.91 |
|
* |<---LENGTH (M)=
1.50 --->|
RY =
2.01 |
|*************
RZ = 11.69 |
|
|
|
27.2 (KNS-METRE)
|
|PARAMETER
|L8
STRESSES
|
|IN KNS CMS
|
L8
IN NEWTON MMS|
|--------------- +
L8 L8
-------------|
| KL/R-Y= 74.81 |
L8
FA = 115.54 |
| KL/R-Z= 12.83 +
fa =
2.85 |
| UNL
= 150.00 |
L8 L8
FCZ = 147.02 |
| CB
=
1.00 +
FTZ = 147.02 |
| CMY
=
0.85 |
L8
FCY = 148.93 |
| CMZ
=
0.85 +
L8 L8
FTY = 148.93 |
| FYLD = 24.82 |
L8 fbz = 56.86 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
0.3
Fey = 188.64 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =6415.52 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
7.92 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
4.115E-01
8
|
|
11.95 C
0.00
27.18
0.00
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
150
TAP ERED
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.411
8
11.95 C
0.00
27.18
0.00

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 105 of 146

Job No

Sheet No

Rev

106
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 151 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 151 * | GERMAN SECTIONS
|
|
AX = 28.50 |
|
* | ST IPE200
|
|
--Z AY = 10.38 |
|DESIGN CODE * |
|
|
AZ = 11.40 |
| AISC-1989 * ===============================
===|===
SY = 28.40 |
|
*
SZ = 194.30 |
|
* |<---LENGTH (M)=
0.53 --->|
RY =
2.23 |
|*************
RZ =
8.26 |
|
|
|
7.2 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|
L8
IN NEWTON MMS|
|--------------- +
L8
-------------|
| KL/R-Y= 23.65 |
L8
FA = 140.58 |
| KL/R-Z=
6.39 +
L8
fa =
4.18 |
| UNL
= 52.80 |
FCZ = 163.82 |
| CB
=
1.00 +
L8
FTZ = 163.82 |
| CMY
=
0.85 |L8
L8
FCY = 186.16 |
| CMZ
=
0.85 +
L8
FTY = 186.16 |
| FYLD = 24.82 |
L8 L8
fbz = 36.94 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.2
Fey =1886.59 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez=0.2581E+5|
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv = 16.09 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
2.553E-01
8
|
|
11.92 C
0.00
-7.18
0.53
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
151 ST
IPE200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.255
8
11.92 C
0.00
-7.18
0.53

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 106 of 146

Job No

Sheet No

Rev

107
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 152 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 152 * | GERMAN SECTIONS
|
|
AX = 41.90 |
|
* |
TAP ERED
|
|
--Z AY = 21.76 |
|DESIGN CODE * |
|
|
AZ = 11.45 |
| AISC-1989 * ===============================
===|===
SY = 28.51 |
|
*
SZ = 477.91 |
|
* |<---LENGTH (M)=
1.50 --->|
RY =
2.01 |
|*************
RZ = 11.69 |
|
|
|
32.6 (KNS-METRE)
|
|PARAMETER
|L8
STRESSES
|
|IN KNS CMS
|
L8
IN NEWTON MMS|
|--------------- +
L8 L8
-------------|
| KL/R-Y= 74.81 |
L8
FA = 115.54 |
| KL/R-Z= 12.83 +
fa =
2.33 |
| UNL
= 150.00 |
L8 L8
FCZ = 147.02 |
| CB
=
1.00 +
FTZ = 147.02 |
| CMY
=
0.85 |
L8
FCY = 148.93 |
| CMZ
=
0.85 +
L8 L8
FTY = 148.93 |
| FYLD = 24.82 |
L8 fbz = 68.24 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
3.6
Fey = 188.64 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =6415.52 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
8.53 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
4.843E-01
8
|
|
9.75 C
0.00
32.61
0.00
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
152
TAP ERED
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.484
8
9.75 C
0.00
32.61
0.00

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 107 of 146

Job No

Sheet No

Rev

108
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 153 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 153 * | GERMAN SECTIONS
|
|
AX = 28.50 |
|
* | ST IPE200
|
|
--Z AY = 10.38 |
|DESIGN CODE * |
|
|
AZ = 11.40 |
| AISC-1989 * ===============================
===|===
SY = 28.40 |
|
*
SZ = 194.30 |
|
* |<---LENGTH (M)=
2.03 --->|
RY =
2.23 |
|*************
RZ =
8.26 |
|
|
|
17.7 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|
L8 L8
IN NEWTON MMS|
|--------------- +
L8
-------------|
| KL/R-Y= 90.89 |
L8
FA = 98.13 |
| KL/R-Z= 24.57 +
L8
fa =
3.93 |
| UNL
= 202.89 |
L8
FCZ = 148.93 |
| CB
=
1.00 +
FTZ = 148.93 |
| CMY
=
0.85 |
L8 L8
FCY = 186.16 |
| CMZ
=
0.85 +
L8
FTY = 186.16 |
| FYLD = 24.82 |L8
fbz = 91.18 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
6.6
Fey = 127.78 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =1748.37 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
4.79 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
6.523E-01
8
|
|
11.20 C
0.00
-17.72
2.03
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
153 ST
IPE200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.652
8
11.20 C
0.00
-17.72
2.03

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 108 of 146

Job No

Sheet No

Rev

109
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 154 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 154 * | GERMAN SECTIONS
|
|
AX = 28.50 |
|
* | ST IPE200
|
|
--Z AY = 10.38 |
|DESIGN CODE * |
|
|
AZ = 11.40 |
| AISC-1989 * ===============================
===|===
SY = 28.40 |
|
*
SZ = 194.30 |
|
* |<---LENGTH (M)=
2.03 --->|
RY =
2.23 |
|*************
RZ =
8.26 |
|
|
|
17.7 (KNS-METRE)
|
|PARAMETER
|L8
STRESSES
|
|IN KNS CMS
|
L8 L8
IN NEWTON MMS|
|--------------- +
L8
-------------|
| KL/R-Y= 90.97 |
L8
FA = 98.07 |
| KL/R-Z= 24.59 +
L8
fa =
3.68 |
| UNL
= 203.06 |
L8
FCZ = 148.93 |
| CB
=
1.00 +
FTZ = 148.93 |
| CMY
=
0.85 |
L8 L8
FCY = 186.16 |
| CMZ
=
0.85 +
L8
FTY = 186.16 |
| FYLD = 24.82 |
L8 fbz = 91.18 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
3.7
Fey = 127.56 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =1745.44 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
6.08 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
6.498E-01
8
|
|
10.50 C
0.00
-17.72
0.00
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
154 ST
IPE200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.650
8
10.50 C
0.00
-17.72
0.00

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 109 of 146

Job No

Sheet No

Rev

110
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 155 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 155 * | GERMAN SECTIONS
|
|
AX = 28.50 |
|
* | ST IPE200
|
|
--Z AY = 10.38 |
|DESIGN CODE * |
|
|
AZ = 11.40 |
| AISC-1989 * ===============================
===|===
SY = 28.40 |
|
*
SZ = 194.30 |
|
* |<---LENGTH (M)=
0.53 --->|
RY =
2.23 |
|*************
RZ =
8.26 |
|
|
|
5.1 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|L8
IN NEWTON MMS|
|--------------- +
L8
-------------|
| KL/R-Y= 23.65 |
L8
L8
FA = 140.58 |
| KL/R-Z=
6.39 +
L8
fa =
3.43 |
| UNL
= 52.80 |
L8
FCZ = 163.82 |
| CB
=
1.00 +
L8
L8
FTZ = 163.82 |
| CMY
=
0.85 |
L8
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |
L8
fbz = 26.24 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
0.0
Fey =1886.59 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez=0.2581E+5|
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv = 17.49 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
1.846E-01
8
|
|
9.77 C
0.00
5.10
0.53
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
155 ST
IPE200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.185
8
9.77 C
0.00
5.10
0.53

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 110 of 146

Job No

Sheet No

Rev

111
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 156 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 156 * | GERMAN SECTIONS
|
|
AX = 41.90 |
|
* |
TAP ERED
|
|
--Z AY = 21.76 |
|DESIGN CODE * |
|
|
AZ = 11.45 |
| AISC-1989 * ===============================
===|===
SY = 28.51 |
|
*
SZ = 477.91 |
|
* |<---LENGTH (M)=
1.50 --->|
RY =
2.01 |
|*************
RZ = 11.69 |
|
|
|
8.5 (KNS-METRE)
|
|PARAMETER
|L8
STRESSES
|
|IN KNS CMS
|
L8
IN NEWTON MMS|
|--------------- +
L8 L8
-------------|
| KL/R-Y= 74.81 |
L8
FA = 115.54 |
| KL/R-Z= 12.83 +
fa =
1.16 |
| UNL
= 150.00 |
L8 L8
FCZ = 147.02 |
| CB
=
1.00 +
FTZ = 147.02 |
| CMY
=
0.85 |
L8
FCY = 148.93 |
| CMZ
=
0.85 +
L8 L8
FTY = 148.93 |
| FYLD = 24.82 |
L8 fbz = 17.75 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
0.6
Fey = 188.64 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =6415.52 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
2.38 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
1.308E-01
8
|
|
4.86 C
0.00
8.49
0.00
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
156
TAP ERED
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.131
8
4.86 C
0.00
8.49
0.00

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 111 of 146

Job No

Sheet No

Rev

112
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 157 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 157 * | GERMAN SECTIONS
|
|
AX = 28.50 |
|
* | ST IPE200
|
|
--Z AY = 10.38 |
|DESIGN CODE * |
|
|
AZ = 11.40 |
| AISC-1989 * ===============================
===|===
SY = 28.40 |
|
*
SZ = 194.30 |
|
* |<---LENGTH (M)=
0.53 --->|
RY =
2.23 |
|*************
RZ =
8.26 |
|
|
|
1.4 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|
L8
IN NEWTON MMS|
|--------------- +
-------------|
| KL/R-Y= 23.65 |L8
L8
FA = 140.58 |
| KL/R-Z=
6.39 +
L8
L8
fa =
1.69 |
| UNL
= 52.80 |
FCZ = 163.82 |
| CB
=
1.00 +
L8
L8
FTZ = 163.82 |
| CMY
=
0.85 |
L8
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |
L8 L8
fbz =
7.43 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
0.1
Fey =1886.59 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez=0.2581E+5|
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
4.48 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
5.740E-02
8
|
|
4.82 C
0.00
-1.44
0.53
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
157 ST
IPE200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.057
8
4.82 C
0.00
-1.44
0.53

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 112 of 146

Job No

Sheet No

Rev

113
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 158 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 158 * | GERMAN SECTIONS
|
|
AX = 41.90 |
|
* |
TAP ERED
|
|
--Z AY = 21.76 |
|DESIGN CODE * |
|
|
AZ = 11.45 |
| AISC-1989 * ===============================
===|===
SY = 28.51 |
|
*
SZ = 477.91 |
|
* |<---LENGTH (M)=
1.50 --->|
RY =
2.01 |
|*************
RZ = 11.69 |
|
|
|
8.9 (KNS-METRE)
|
|PARAMETER
|L8
STRESSES
|
|IN KNS CMS
|
L8
IN NEWTON MMS|
|--------------- +
L8 L8
-------------|
| KL/R-Y= 74.81 |
L8
FA = 115.54 |
| KL/R-Z= 12.83 +
fa =
1.00 |
| UNL
= 150.00 |
L8 L8
FCZ = 147.02 |
| CB
=
1.00 +
FTZ = 147.02 |
| CMY
=
0.85 |
L8
FCY = 148.93 |
| CMZ
=
0.85 +
L8 L8
FTY = 148.93 |
| FYLD = 24.82 |
L8 fbz = 18.69 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
0.9
Fey = 188.64 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =6415.52 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
2.43 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
1.358E-01
8
|
|
4.21 C
0.00
8.93
0.00
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
158
TAP ERED
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.136
8
4.21 C
0.00
8.93
0.00

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 113 of 146

Job No

Sheet No

Rev

114
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 159 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 159 * | GERMAN SECTIONS
|
|
AX = 28.50 |
|
* | ST IPE200
|
|
--Z AY = 10.38 |
|DESIGN CODE * |
|
|
AZ = 11.40 |
| AISC-1989 * ===============================
===|===
SY = 28.40 |
|
*
SZ = 194.30 |
|
* |<---LENGTH (M)=
2.03 --->|
RY =
2.23 |
|*************
RZ =
8.26 |
|
|
|
4.7 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|
L8 L8
IN NEWTON MMS|
|--------------- +
L8
-------------|
| KL/R-Y= 90.89 |
L8
FA = 98.13 |
| KL/R-Z= 24.57 +
L8
fa =
1.62 |
| UNL
= 202.89 |
L8
FCZ = 148.93 |
| CB
=
1.00 +
FTZ = 148.93 |
| CMY
=
0.85 |
L8 L8
FCY = 186.16 |
| CMZ
=
0.85 +
L8
FTY = 186.16 |
| FYLD = 24.82 |L8
fbz = 24.02 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
1.3
Fey = 127.78 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =1748.37 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
1.32 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
1.778E-01
8
|
|
4.62 C
0.00
-4.67
2.03
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
159 ST
IPE200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.178
8
4.62 C
0.00
-4.67
2.03

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 114 of 146

Job No

Sheet No

Rev

115
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 160 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 160 * | GERMAN SECTIONS
|
|
AX = 28.50 |
|
* | ST IPE200
|
|
--Z AY = 10.38 |
|DESIGN CODE * |
|
|
AZ = 11.40 |
| AISC-1989 * ===============================
===|===
SY = 28.40 |
|
*
SZ = 194.30 |
|
* |<---LENGTH (M)=
2.03 --->|
RY =
2.23 |
|*************
RZ =
8.26 |
|
|
|
4.7 (KNS-METRE)
|
|PARAMETER
|L8
STRESSES
|
|IN KNS CMS
|
L8 L8
IN NEWTON MMS|
|--------------- +
L8
-------------|
| KL/R-Y= 90.97 |
L8
FA = 98.07 |
| KL/R-Z= 24.59 +
L8
fa =
1.56 |
| UNL
= 203.06 |
L8
FCZ = 148.93 |
| CB
=
1.00 +
FTZ = 148.93 |
| CMY
=
0.85 |
L8 L8
FCY = 186.16 |
| CMZ
=
0.85 +
L8
FTY = 186.16 |
| FYLD = 24.82 |
L8 fbz = 24.02 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
1.0
Fey = 127.56 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =1745.44 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
1.42 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
1.772E-01
8
|
|
4.44 C
0.00
-4.67
0.00
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
160 ST
IPE200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.177
8
4.44 C
0.00
-4.67
0.00

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 115 of 146

Job No

Sheet No

Rev

116
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 161 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 161 * | GERMAN SECTIONS
|
|
AX = 28.50 |
|
* | ST IPE200
|
|
--Z AY = 10.38 |
|DESIGN CODE * |
|
|
AZ = 11.40 |
| AISC-1989 * ===============================
===|===
SY = 28.40 |
|
*
SZ = 194.30 |
|
* |<---LENGTH (M)=
0.53 --->|
RY =
2.23 |
|*************
RZ =
8.26 |
|
|
|
1.3 (KNS-METRE)
|
|PARAMETER
|
L8 STRESSES
|
|IN KNS CMS
|L8
IN NEWTON MMS|
|--------------- +
L8
L8
-------------|
| KL/R-Y= 23.65 |
L8
FA = 140.58 |
| KL/R-Z=
6.39 +
L8
fa =
1.49 |
| UNL
= 52.80 |
L8
L8
FCZ = 163.82 |
| CB
=
1.00 +
L8
FTZ = 163.82 |
| CMY
=
0.85 |
L8
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |
L8
fbz =
6.82 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00
0.0
Fey =1886.59 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez=0.2581E+5|
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
4.70 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
5.221E-02
8
|
|
4.23 C
0.00
1.33
0.53
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
161 ST
IPE200
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.052
8
4.23 C
0.00
1.33
0.53

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 116 of 146

Job No

Sheet No

Rev

117
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 162 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 162 * | GERMAN SECTIONS
|
|
AX = 16.40 |
|
* | ST IPE140
|
|
--Z AY =
5.93 |
|DESIGN CODE * |
|
|
AZ =
6.78 |
| AISC-1989 * ===============================
===|===
SY = 12.33 |
|
*
SZ = 77.29 |
|
* |<---LENGTH (M)=
1.55 --->|
RY =
1.66 |
|*************
RZ =
5.74 |
|
|
|
1.1 (KNS-METRE)
|
|PARAMETER
|
L8 L8 L8
STRESSES
|
|IN KNS CMS
|
IN NEWTON MMS|
|--------------- +
L8
L8
-------------|
| KL/R-Y= 93.57 |
FA = 95.94 |
| KL/R-Z= 26.99 +
L8
L8
fa =
0.00 |
| UNL
= 100.00 |
FCZ = 148.93 |
| CB
=
1.00 +
L8
L8
FTZ = 148.93 |
| CMY
=
0.85 |
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |L0
L0 fbz = 14.28 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.1
Fey = 120.56 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =1449.43 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
0.00 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
9.591E-02
8
|
|
0.00 T
0.00
-1.10
0.78
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
162 ST
IPE140
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.096
8
0.00 T
0.00
-1.10
0.77

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 117 of 146

Job No

Sheet No

Rev

118
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 163 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 163 * | GERMAN SECTIONS
|
|
AX = 16.40 |
|
* | ST IPE140
|
|
--Z AY =
5.93 |
|DESIGN CODE * |
|
|
AZ =
6.78 |
| AISC-1989 * ===============================
===|===
SY = 12.33 |
|
*
SZ = 77.29 |
|
* |<---LENGTH (M)=
4.60 --->|
RY =
1.66 |
|*************
RZ =
5.74 |
|
|
|
9.7 (KNS-METRE)
|
|PARAMETER
|
L8 L8 L8
STRESSES
|
|IN KNS CMS
|
IN NEWTON MMS|
|--------------- +
L8
L8
-------------|
| KL/R-Y= 277.70 |
FA = 13.69 |
| KL/R-Z= 80.09 +
L8
L8
fa =
0.00 |
| UNL
= 100.00 |
FCZ = 148.93 |
| CB
=
1.00 +
L8
L8
FTZ = 148.93 |
| CMY
=
0.85 |
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |L0
L0 fbz = 125.81 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.5
Fey = 13.69 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez = 164.57 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
0.00 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
8.447E-01
8
|
|
0.00 T
0.00
-9.72
2.30
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
163 ST
IPE140
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.845
8
0.00 T
0.00
-9.72
2.30

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 118 of 146

Job No

Sheet No

Rev

119
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 164 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 164 * | GERMAN SECTIONS
|
|
AX = 16.40 |
|
* | ST IPE140
|
|
--Z AY =
5.93 |
|DESIGN CODE * |
|
|
AZ =
6.78 |
| AISC-1989 * ===============================
===|===
SY = 12.33 |
|
*
SZ = 77.29 |
|
* |<---LENGTH (M)=
4.60 --->|
RY =
1.66 |
|*************
RZ =
5.74 |
|
|
|
9.7 (KNS-METRE)
|
|PARAMETER
|
L8 L8 L8
STRESSES
|
|IN KNS CMS
|
IN NEWTON MMS|
|--------------- +
L8
L8
-------------|
| KL/R-Y= 277.70 |
FA = 13.69 |
| KL/R-Z= 80.09 +
L8
L8
fa =
0.00 |
| UNL
= 100.00 |
FCZ = 148.93 |
| CB
=
1.00 +
L8
L8
FTZ = 148.93 |
| CMY
=
0.85 |
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |L0
L0 fbz = 125.81 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.5
Fey = 13.69 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez = 164.57 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
0.00 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
8.447E-01
8
|
|
0.00 T
0.00
-9.72
2.30
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
164 ST
IPE140
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.845
8
0.00 T
0.00
-9.72
2.30

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 119 of 146

Job No

Sheet No

Rev

120
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 165 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 165 * | GERMAN SECTIONS
|
|
AX = 16.40 |
|
* | ST IPE140
|
|
--Z AY =
5.93 |
|DESIGN CODE * |
|
|
AZ =
6.78 |
| AISC-1989 * ===============================
===|===
SY = 12.33 |
|
*
SZ = 77.29 |
|
* |<---LENGTH (M)=
1.55 --->|
RY =
1.66 |
|*************
RZ =
5.74 |
|
|
|
1.1 (KNS-METRE)
|
|PARAMETER
|
L8 L8 L8
STRESSES
|
|IN KNS CMS
|
IN NEWTON MMS|
|--------------- +
L8
L8
-------------|
| KL/R-Y= 93.57 |
FA = 95.94 |
| KL/R-Z= 26.99 +
L8
L8
fa =
0.00 |
| UNL
= 100.00 |
FCZ = 148.93 |
| CB
=
1.00 +
L8
L8
FTZ = 148.93 |
| CMY
=
0.85 |
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |L0
L0 fbz = 14.28 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.1
Fey = 120.56 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =1449.43 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
0.00 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
9.591E-02
8
|
|
0.00 T
0.00
-1.10
0.78
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
165 ST
IPE140
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.096
8
0.00 T
0.00
-1.10
0.77

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 120 of 146

Job No

Sheet No

Rev

121
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 166 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 166 * | GERMAN SECTIONS
|
|
AX = 16.40 |
|
* | ST IPE140
|
|
--Z AY =
5.93 |
|DESIGN CODE * |
|
|
AZ =
6.78 |
| AISC-1989 * ===============================
===|===
SY = 12.33 |
|
*
SZ = 77.29 |
|
* |<---LENGTH (M)=
4.60 --->|
RY =
1.66 |
|*************
RZ =
5.74 |
|
|
|
9.7 (KNS-METRE)
|
|PARAMETER
|
L8 L8 L8
STRESSES
|
|IN KNS CMS
|
IN NEWTON MMS|
|--------------- +
L8
L8
-------------|
| KL/R-Y= 277.70 |
FA = 13.69 |
| KL/R-Z= 80.09 +
L8
L8
fa =
0.00 |
| UNL
= 100.00 |
FCZ = 148.93 |
| CB
=
1.00 +
L8
L8
FTZ = 148.93 |
| CMY
=
0.85 |
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |L0
L0 fbz = 125.81 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.5
Fey = 13.69 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez = 164.57 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
0.00 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
8.447E-01
8
|
|
0.00 T
0.00
-9.72
2.30
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
166 ST
IPE140
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.845
8
0.00 T
0.00
-9.72
2.30

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 121 of 146

Job No

Sheet No

Rev

122
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 167 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 167 * | GERMAN SECTIONS
|
|
AX = 16.40 |
|
* | ST IPE140
|
|
--Z AY =
5.93 |
|DESIGN CODE * |
|
|
AZ =
6.78 |
| AISC-1989 * ===============================
===|===
SY = 12.33 |
|
*
SZ = 77.29 |
|
* |<---LENGTH (M)=
4.60 --->|
RY =
1.66 |
|*************
RZ =
5.74 |
|
|
|
9.7 (KNS-METRE)
|
|PARAMETER
|
L8 L8 L8
STRESSES
|
|IN KNS CMS
|
IN NEWTON MMS|
|--------------- +
L8
L8
-------------|
| KL/R-Y= 277.70 |
FA = 13.69 |
| KL/R-Z= 80.09 +
L8
L8
fa =
0.00 |
| UNL
= 100.00 |
FCZ = 148.93 |
| CB
=
1.00 +
L8
L8
FTZ = 148.93 |
| CMY
=
0.85 |
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |L0
L0 fbz = 125.81 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.5
Fey = 13.69 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez = 164.57 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
0.00 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
8.447E-01
8
|
|
0.00 T
0.00
-9.72
2.30
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
167 ST
IPE140
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.845
8
0.00 T
0.00
-9.72
2.30

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 122 of 146

Job No

Sheet No

Rev

123
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 168 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 168 * | GERMAN SECTIONS
|
|
AX = 16.40 |
|
* | ST IPE140
|
|
--Z AY =
5.93 |
|DESIGN CODE * |
|
|
AZ =
6.78 |
| AISC-1989 * ===============================
===|===
SY = 12.33 |
|
*
SZ = 77.29 |
|
* |<---LENGTH (M)=
1.55 --->|
RY =
1.66 |
|*************
RZ =
5.74 |
|
|
|
1.1 (KNS-METRE)
|
|PARAMETER
|
L8 L8 L8
STRESSES
|
|IN KNS CMS
|
IN NEWTON MMS|
|--------------- +
L8
L8
-------------|
| KL/R-Y= 93.57 |
FA = 95.94 |
| KL/R-Z= 26.99 +
L8
L8
fa =
0.00 |
| UNL
= 100.00 |
FCZ = 148.93 |
| CB
=
1.00 +
L8
L8
FTZ = 148.93 |
| CMY
=
0.85 |
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |L0
L0 fbz = 14.28 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.1
Fey = 120.56 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =1449.43 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
0.00 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
9.591E-02
8
|
|
0.00 T
0.00
-1.10
0.78
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
168 ST
IPE140
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.096
8
0.00 T
0.00
-1.10
0.77

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 123 of 146

Job No

Sheet No

Rev

124
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 169 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 169 * | GERMAN SECTIONS
|
|
AX = 16.40 |
|
* | ST IPE140
|
|
--Z AY =
5.93 |
|DESIGN CODE * |
|
|
AZ =
6.78 |
| AISC-1989 * ===============================
===|===
SY = 12.33 |
|
*
SZ = 77.29 |
|
* |<---LENGTH (M)=
4.60 --->|
RY =
1.66 |
|*************
RZ =
5.74 |
|
|
|
9.7 (KNS-METRE)
|
|PARAMETER
|
L8 L8 L8
STRESSES
|
|IN KNS CMS
|
IN NEWTON MMS|
|--------------- +
L8
L8
-------------|
| KL/R-Y= 277.70 |
FA = 13.69 |
| KL/R-Z= 80.09 +
L8
L8
fa =
0.00 |
| UNL
= 100.00 |
FCZ = 148.93 |
| CB
=
1.00 +
L8
L8
FTZ = 148.93 |
| CMY
=
0.85 |
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |L0
L0 fbz = 125.81 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.5
Fey = 13.69 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez = 164.57 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
0.00 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
8.447E-01
8
|
|
0.00 T
0.00
-9.72
2.30
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
169 ST
IPE140
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.845
8
0.00 T
0.00
-9.72
2.30

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 124 of 146

Job No

Sheet No

Rev

125
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 170 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 170 * | GERMAN SECTIONS
|
|
AX = 16.40 |
|
* | ST IPE140
|
|
--Z AY =
5.93 |
|DESIGN CODE * |
|
|
AZ =
6.78 |
| AISC-1989 * ===============================
===|===
SY = 12.33 |
|
*
SZ = 77.29 |
|
* |<---LENGTH (M)=
4.60 --->|
RY =
1.66 |
|*************
RZ =
5.74 |
|
|
|
9.7 (KNS-METRE)
|
|PARAMETER
|
L8 L8 L8
STRESSES
|
|IN KNS CMS
|
IN NEWTON MMS|
|--------------- +
L8
L8
-------------|
| KL/R-Y= 277.70 |
FA = 13.69 |
| KL/R-Z= 80.09 +
L8
L8
fa =
0.00 |
| UNL
= 100.00 |
FCZ = 148.93 |
| CB
=
1.00 +
L8
L8
FTZ = 148.93 |
| CMY
=
0.85 |
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |L0
L0 fbz = 125.81 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.5
Fey = 13.69 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez = 164.57 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
0.00 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
8.447E-01
8
|
|
0.00 T
0.00
-9.72
2.30
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
170 ST
IPE140
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.845
8
0.00 T
0.00
-9.72
2.30

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 125 of 146

Job No

Sheet No

Rev

126
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 171 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 171 * | GERMAN SECTIONS
|
|
AX = 16.40 |
|
* | ST IPE140
|
|
--Z AY =
5.93 |
|DESIGN CODE * |
|
|
AZ =
6.78 |
| AISC-1989 * ===============================
===|===
SY = 12.33 |
|
*
SZ = 77.29 |
|
* |<---LENGTH (M)=
1.55 --->|
RY =
1.66 |
|*************
RZ =
5.74 |
|
|
|
1.1 (KNS-METRE)
|
|PARAMETER
|
L8 L8 L8
STRESSES
|
|IN KNS CMS
|
IN NEWTON MMS|
|--------------- +
L8
L8
-------------|
| KL/R-Y= 93.57 |
FA = 95.94 |
| KL/R-Z= 26.99 +
L8
L8
fa =
0.00 |
| UNL
= 100.00 |
FCZ = 148.93 |
| CB
=
1.00 +
L8
L8
FTZ = 148.93 |
| CMY
=
0.85 |
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |L0
L0 fbz = 14.28 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.1
Fey = 120.56 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =1449.43 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
0.00 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
9.591E-02
8
|
|
0.00 T
0.00
-1.10
0.77
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
171 ST
IPE140
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.096
8
0.00 T
0.00
-1.10
0.77

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 126 of 146

Job No

Sheet No

Rev

127
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 172 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 172 * | GERMAN SECTIONS
|
|
AX = 16.40 |
|
* | ST IPE140
|
|
--Z AY =
5.93 |
|DESIGN CODE * |
|
|
AZ =
6.78 |
| AISC-1989 * ===============================
===|===
SY = 12.33 |
|
*
SZ = 77.29 |
|
* |<---LENGTH (M)=
1.55 --->|
RY =
1.66 |
|*************
RZ =
5.74 |
|
|
|
1.1 (KNS-METRE)
|
|PARAMETER
|
L8 L8 L8
STRESSES
|
|IN KNS CMS
|
IN NEWTON MMS|
|--------------- +
L8
L8
-------------|
| KL/R-Y= 93.57 |
FA = 95.94 |
| KL/R-Z= 26.99 +
L8
L8
fa =
0.00 |
| UNL
= 100.00 |
FCZ = 148.93 |
| CB
=
1.00 +
L8
L8
FTZ = 148.93 |
| CMY
=
0.85 |
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |L0
L0 fbz = 14.28 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.1
Fey = 120.56 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =1449.43 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
0.00 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
9.591E-02
8
|
|
0.00 T
0.00
-1.10
0.78
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
172 ST
IPE140
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.096
8
0.00 T
0.00
-1.10
0.77

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 127 of 146

Job No

Sheet No

Rev

128
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 173 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 173 * | GERMAN SECTIONS
|
|
AX = 16.40 |
|
* | ST IPE140
|
|
--Z AY =
5.93 |
|DESIGN CODE * |
|
|
AZ =
6.78 |
| AISC-1989 * ===============================
===|===
SY = 12.33 |
|
*
SZ = 77.29 |
|
* |<---LENGTH (M)=
4.60 --->|
RY =
1.66 |
|*************
RZ =
5.74 |
|
|
|
9.7 (KNS-METRE)
|
|PARAMETER
|
L8 L8 L8
STRESSES
|
|IN KNS CMS
|
IN NEWTON MMS|
|--------------- +
L8
L8
-------------|
| KL/R-Y= 277.70 |
FA = 13.69 |
| KL/R-Z= 80.09 +
L8
L8
fa =
0.00 |
| UNL
= 100.00 |
FCZ = 148.93 |
| CB
=
1.00 +
L8
L8
FTZ = 148.93 |
| CMY
=
0.85 |
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |L0
L0 fbz = 125.81 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.5
Fey = 13.69 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez = 164.57 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
0.00 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
8.447E-01
8
|
|
0.00 T
0.00
-9.72
2.30
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
173 ST
IPE140
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.845
8
0.00 T
0.00
-9.72
2.30

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 128 of 146

Job No

Sheet No

Rev

129
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 174 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 174 * | GERMAN SECTIONS
|
|
AX = 16.40 |
|
* | ST IPE140
|
|
--Z AY =
5.93 |
|DESIGN CODE * |
|
|
AZ =
6.78 |
| AISC-1989 * ===============================
===|===
SY = 12.33 |
|
*
SZ = 77.29 |
|
* |<---LENGTH (M)=
4.60 --->|
RY =
1.66 |
|*************
RZ =
5.74 |
|
|
|
9.7 (KNS-METRE)
|
|PARAMETER
|
L8 L8 L8
STRESSES
|
|IN KNS CMS
|
IN NEWTON MMS|
|--------------- +
L8
L8
-------------|
| KL/R-Y= 277.70 |
FA = 13.69 |
| KL/R-Z= 80.09 +
L8
L8
fa =
0.00 |
| UNL
= 100.00 |
FCZ = 148.93 |
| CB
=
1.00 +
L8
L8
FTZ = 148.93 |
| CMY
=
0.85 |
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |L0
L0 fbz = 125.81 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.5
Fey = 13.69 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez = 164.57 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
0.00 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
8.447E-01
8
|
|
0.00 T
0.00
-9.72
2.30
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
174 ST
IPE140
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.845
8
0.00 T
0.00
-9.72
2.30

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 129 of 146

Job No

Sheet No

Rev

130
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 175 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 175 * | GERMAN SECTIONS
|
|
AX = 16.40 |
|
* | ST IPE140
|
|
--Z AY =
5.93 |
|DESIGN CODE * |
|
|
AZ =
6.78 |
| AISC-1989 * ===============================
===|===
SY = 12.33 |
|
*
SZ = 77.29 |
|
* |<---LENGTH (M)=
1.55 --->|
RY =
1.66 |
|*************
RZ =
5.74 |
|
|
|
1.1 (KNS-METRE)
|
|PARAMETER
|
L8 L8 L8
STRESSES
|
|IN KNS CMS
|
IN NEWTON MMS|
|--------------- +
L8
L8
-------------|
| KL/R-Y= 93.57 |
FA = 95.94 |
| KL/R-Z= 26.99 +
L8
L8
fa =
0.00 |
| UNL
= 100.00 |
FCZ = 148.93 |
| CB
=
1.00 +
L8
L8
FTZ = 148.93 |
| CMY
=
0.85 |
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |L0
L0 fbz = 14.28 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.1
Fey = 120.56 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =1449.43 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
0.00 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
9.591E-02
8
|
|
0.00 T
0.00
-1.10
0.78
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
175 ST
IPE140
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.096
8
0.00 T
0.00
-1.10
0.77

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 130 of 146

Job No

Sheet No

Rev

131
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 176 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 176 * | GERMAN SECTIONS
|
|
AX = 16.40 |
|
* | ST IPE140
|
|
--Z AY =
5.93 |
|DESIGN CODE * |
|
|
AZ =
6.78 |
| AISC-1989 * ===============================
===|===
SY = 12.33 |
|
*
SZ = 77.29 |
|
* |<---LENGTH (M)=
4.60 --->|
RY =
1.66 |
|*************
RZ =
5.74 |
|
|
|
9.7 (KNS-METRE)
|
|PARAMETER
|
L8 L8 L8
STRESSES
|
|IN KNS CMS
|
IN NEWTON MMS|
|--------------- +
L8
L8
-------------|
| KL/R-Y= 277.70 |
FA = 13.69 |
| KL/R-Z= 80.09 +
L8
L8
fa =
0.00 |
| UNL
= 100.00 |
FCZ = 148.93 |
| CB
=
1.00 +
L8
L8
FTZ = 148.93 |
| CMY
=
0.85 |
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |L0
L0 fbz = 125.81 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.5
Fey = 13.69 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez = 164.57 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
0.00 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
8.447E-01
8
|
|
0.00 T
0.00
-9.72
2.30
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
176 ST
IPE140
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.845
8
0.00 T
0.00
-9.72
2.30

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 131 of 146

Job No

Sheet No

Rev

132
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 177 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 177 * | GERMAN SECTIONS
|
|
AX = 16.40 |
|
* | ST IPE140
|
|
--Z AY =
5.93 |
|DESIGN CODE * |
|
|
AZ =
6.78 |
| AISC-1989 * ===============================
===|===
SY = 12.33 |
|
*
SZ = 77.29 |
|
* |<---LENGTH (M)=
4.60 --->|
RY =
1.66 |
|*************
RZ =
5.74 |
|
|
|
9.7 (KNS-METRE)
|
|PARAMETER
|
L8 L8 L8
STRESSES
|
|IN KNS CMS
|
IN NEWTON MMS|
|--------------- +
L8
L8
-------------|
| KL/R-Y= 277.70 |
FA = 13.69 |
| KL/R-Z= 80.09 +
L8
L8
fa =
0.00 |
| UNL
= 100.00 |
FCZ = 148.93 |
| CB
=
1.00 +
L8
L8
FTZ = 148.93 |
| CMY
=
0.85 |
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |L0
L0 fbz = 125.81 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.5
Fey = 13.69 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez = 164.57 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
0.00 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
8.447E-01
8
|
|
0.00 T
0.00
-9.72
2.30
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
177 ST
IPE140
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.845
8
0.00 T
0.00
-9.72
2.30

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 132 of 146

Job No

Sheet No

Rev

133
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 178 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 178 * | GERMAN SECTIONS
|
|
AX = 16.40 |
|
* | ST IPE140
|
|
--Z AY =
5.93 |
|DESIGN CODE * |
|
|
AZ =
6.78 |
| AISC-1989 * ===============================
===|===
SY = 12.33 |
|
*
SZ = 77.29 |
|
* |<---LENGTH (M)=
1.55 --->|
RY =
1.66 |
|*************
RZ =
5.74 |
|
|
|
1.1 (KNS-METRE)
|
|PARAMETER
|
L8 L8 L8
STRESSES
|
|IN KNS CMS
|
IN NEWTON MMS|
|--------------- +
L8
L8
-------------|
| KL/R-Y= 93.57 |
FA = 95.94 |
| KL/R-Z= 26.99 +
L8
L8
fa =
0.00 |
| UNL
= 100.00 |
FCZ = 148.93 |
| CB
=
1.00 +
L8
L8
FTZ = 148.93 |
| CMY
=
0.85 |
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |L0
L0 fbz = 14.28 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.1
Fey = 120.56 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =1449.43 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
0.00 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
9.591E-02
8
|
|
0.00 T
0.00
-1.10
0.78
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
178 ST
IPE140
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.096
8
0.00 T
0.00
-1.10
0.77

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 133 of 146

Job No

Sheet No

Rev

134
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 179 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 179 * | GERMAN SECTIONS
|
|
AX = 16.40 |
|
* | ST IPE140
|
|
--Z AY =
5.93 |
|DESIGN CODE * |
|
|
AZ =
6.78 |
| AISC-1989 * ===============================
===|===
SY = 12.33 |
|
*
SZ = 77.29 |
|
* |<---LENGTH (M)=
4.60 --->|
RY =
1.66 |
|*************
RZ =
5.74 |
|
|
|
9.7 (KNS-METRE)
|
|PARAMETER
|
L8 L8 L8
STRESSES
|
|IN KNS CMS
|
IN NEWTON MMS|
|--------------- +
L8
L8
-------------|
| KL/R-Y= 277.70 |
FA = 13.69 |
| KL/R-Z= 80.09 +
L8
L8
fa =
0.00 |
| UNL
= 100.00 |
FCZ = 148.93 |
| CB
=
1.00 +
L8
L8
FTZ = 148.93 |
| CMY
=
0.85 |
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |L0
L0 fbz = 125.81 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.5
Fey = 13.69 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez = 164.57 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
0.00 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
8.447E-01
8
|
|
0.00 T
0.00
-9.72
2.30
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
179 ST
IPE140
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.845
8
0.00 T
0.00
-9.72
2.30

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 134 of 146

Job No

Sheet No

Rev

135
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 180 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 180 * | GERMAN SECTIONS
|
|
AX = 16.40 |
|
* | ST IPE140
|
|
--Z AY =
5.93 |
|DESIGN CODE * |
|
|
AZ =
6.78 |
| AISC-1989 * ===============================
===|===
SY = 12.33 |
|
*
SZ = 77.29 |
|
* |<---LENGTH (M)=
4.60 --->|
RY =
1.66 |
|*************
RZ =
5.74 |
|
|
|
9.7 (KNS-METRE)
|
|PARAMETER
|
L8 L8 L8
STRESSES
|
|IN KNS CMS
|
IN NEWTON MMS|
|--------------- +
L8
L8
-------------|
| KL/R-Y= 277.70 |
FA = 13.69 |
| KL/R-Z= 80.09 +
L8
L8
fa =
0.00 |
| UNL
= 100.00 |
FCZ = 148.93 |
| CB
=
1.00 +
L8
L8
FTZ = 148.93 |
| CMY
=
0.85 |
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |L0
L0 fbz = 125.81 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.5
Fey = 13.69 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez = 164.57 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
0.00 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
8.447E-01
8
|
|
0.00 T
0.00
-9.72
2.30
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
180 ST
IPE140
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.845
8
0.00 T
0.00
-9.72
2.30

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 135 of 146

Job No

Sheet No

Rev

136
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 181 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 181 * | GERMAN SECTIONS
|
|
AX = 16.40 |
|
* | ST IPE140
|
|
--Z AY =
5.93 |
|DESIGN CODE * |
|
|
AZ =
6.78 |
| AISC-1989 * ===============================
===|===
SY = 12.33 |
|
*
SZ = 77.29 |
|
* |<---LENGTH (M)=
1.55 --->|
RY =
1.66 |
|*************
RZ =
5.74 |
|
|
|
1.1 (KNS-METRE)
|
|PARAMETER
|
L8 L8 L8
STRESSES
|
|IN KNS CMS
|
IN NEWTON MMS|
|--------------- +
L8
L8
-------------|
| KL/R-Y= 93.57 |
FA = 95.94 |
| KL/R-Z= 26.99 +
L8
L8
fa =
0.00 |
| UNL
= 100.00 |
FCZ = 148.93 |
| CB
=
1.00 +
L8
L8
FTZ = 148.93 |
| CMY
=
0.85 |
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |L0
L0 fbz = 14.28 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.1
Fey = 120.56 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =1449.43 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
0.00 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
9.591E-02
8
|
|
0.00 T
0.00
-1.10
0.77
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
181 ST
IPE140
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.096
8
0.00 T
0.00
-1.10
0.77

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 136 of 146

Job No

Sheet No

Rev

137
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 182 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 182 * | GERMAN SECTIONS
|
|
AX = 16.40 |
|
* | ST IPE140
|
|
--Z AY =
5.93 |
|DESIGN CODE * |
|
|
AZ =
6.78 |
| AISC-1989 * ===============================
===|===
SY = 12.33 |
|
*
SZ = 77.29 |
|
* |<---LENGTH (M)=
1.55 --->|
RY =
1.66 |
|*************
RZ =
5.74 |
|
|
|
1.1 (KNS-METRE)
|
|PARAMETER
|
L8 L8 L8
STRESSES
|
|IN KNS CMS
|
IN NEWTON MMS|
|--------------- +
L8
L8
-------------|
| KL/R-Y= 93.57 |
FA = 95.94 |
| KL/R-Z= 26.99 +
L8
L8
fa =
0.00 |
| UNL
= 100.00 |
FCZ = 148.93 |
| CB
=
1.00 +
L8
L8
FTZ = 148.93 |
| CMY
=
0.85 |
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |L0
L0 fbz = 14.28 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.1
Fey = 120.56 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =1449.43 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
0.00 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
9.591E-02
8
|
|
0.00 T
0.00
-1.10
0.78
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
182 ST
IPE140
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.096
8
0.00 T
0.00
-1.10
0.77

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 137 of 146

Job No

Sheet No

Rev

138
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 183 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 183 * | GERMAN SECTIONS
|
|
AX = 16.40 |
|
* | ST IPE140
|
|
--Z AY =
5.93 |
|DESIGN CODE * |
|
|
AZ =
6.78 |
| AISC-1989 * ===============================
===|===
SY = 12.33 |
|
*
SZ = 77.29 |
|
* |<---LENGTH (M)=
4.60 --->|
RY =
1.66 |
|*************
RZ =
5.74 |
|
|
|
9.7 (KNS-METRE)
|
|PARAMETER
|
L8 L8 L8
STRESSES
|
|IN KNS CMS
|
IN NEWTON MMS|
|--------------- +
L8
L8
-------------|
| KL/R-Y= 277.70 |
FA = 13.69 |
| KL/R-Z= 80.09 +
L8
L8
fa =
0.00 |
| UNL
= 100.00 |
FCZ = 148.93 |
| CB
=
1.00 +
L8
L8
FTZ = 148.93 |
| CMY
=
0.85 |
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |L0
L0 fbz = 125.81 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.5
Fey = 13.69 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez = 164.57 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
0.00 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
8.447E-01
8
|
|
0.00 T
0.00
-9.72
2.30
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
183 ST
IPE140
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.845
8
0.00 T
0.00
-9.72
2.30

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 138 of 146

Job No

Sheet No

Rev

139
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 184 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 184 * | GERMAN SECTIONS
|
|
AX = 16.40 |
|
* | ST IPE140
|
|
--Z AY =
5.93 |
|DESIGN CODE * |
|
|
AZ =
6.78 |
| AISC-1989 * ===============================
===|===
SY = 12.33 |
|
*
SZ = 77.29 |
|
* |<---LENGTH (M)=
4.60 --->|
RY =
1.66 |
|*************
RZ =
5.74 |
|
|
|
9.7 (KNS-METRE)
|
|PARAMETER
|
L8 L8 L8
STRESSES
|
|IN KNS CMS
|
IN NEWTON MMS|
|--------------- +
L8
L8
-------------|
| KL/R-Y= 277.70 |
FA = 13.69 |
| KL/R-Z= 80.09 +
L8
L8
fa =
0.00 |
| UNL
= 100.00 |
FCZ = 148.93 |
| CB
=
1.00 +
L8
L8
FTZ = 148.93 |
| CMY
=
0.85 |
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |L0
L0 fbz = 125.81 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.5
Fey = 13.69 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez = 164.57 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
0.00 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
8.447E-01
8
|
|
0.00 T
0.00
-9.72
2.30
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
184 ST
IPE140
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.845
8
0.00 T
0.00
-9.72
2.30

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 139 of 146

Job No

Sheet No

Rev

140
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 185 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 185 * | GERMAN SECTIONS
|
|
AX = 16.40 |
|
* | ST IPE140
|
|
--Z AY =
5.93 |
|DESIGN CODE * |
|
|
AZ =
6.78 |
| AISC-1989 * ===============================
===|===
SY = 12.33 |
|
*
SZ = 77.29 |
|
* |<---LENGTH (M)=
1.55 --->|
RY =
1.66 |
|*************
RZ =
5.74 |
|
|
|
1.1 (KNS-METRE)
|
|PARAMETER
|
L8 L8 L8
STRESSES
|
|IN KNS CMS
|
IN NEWTON MMS|
|--------------- +
L8
L8
-------------|
| KL/R-Y= 93.57 |
FA = 95.94 |
| KL/R-Z= 26.99 +
L8
L8
fa =
0.00 |
| UNL
= 100.00 |
FCZ = 148.93 |
| CB
=
1.00 +
L8
L8
FTZ = 148.93 |
| CMY
=
0.85 |
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |L0
L0 fbz = 14.28 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.1
Fey = 120.56 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =1449.43 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
0.00 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
9.591E-02
8
|
|
0.00 T
0.00
-1.10
0.78
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
185 ST
IPE140
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.096
8
0.00 T
0.00
-1.10
0.77

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 140 of 146

Job No

Sheet No

Rev

141
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 186 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 186 * | GERMAN SECTIONS
|
|
AX = 16.40 |
|
* | ST IPE140
|
|
--Z AY =
5.93 |
|DESIGN CODE * |
|
|
AZ =
6.78 |
| AISC-1989 * ===============================
===|===
SY = 12.33 |
|
*
SZ = 77.29 |
|
* |<---LENGTH (M)=
4.60 --->|
RY =
1.66 |
|*************
RZ =
5.74 |
|
|
|
9.7 (KNS-METRE)
|
|PARAMETER
|
L8 L8 L8
STRESSES
|
|IN KNS CMS
|
IN NEWTON MMS|
|--------------- +
L8
L8
-------------|
| KL/R-Y= 277.70 |
FA = 13.69 |
| KL/R-Z= 80.09 +
L8
L8
fa =
0.00 |
| UNL
= 100.00 |
FCZ = 148.93 |
| CB
=
1.00 +
L8
L8
FTZ = 148.93 |
| CMY
=
0.85 |
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |L0
L0 fbz = 125.81 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.5
Fey = 13.69 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez = 164.57 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
0.00 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
8.447E-01
8
|
|
0.00 T
0.00
-9.72
2.30
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
186 ST
IPE140
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.845
8
0.00 T
0.00
-9.72
2.30

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 141 of 146

Job No

Sheet No

Rev

142
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 187 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 187 * | GERMAN SECTIONS
|
|
AX = 16.40 |
|
* | ST IPE140
|
|
--Z AY =
5.93 |
|DESIGN CODE * |
|
|
AZ =
6.78 |
| AISC-1989 * ===============================
===|===
SY = 12.33 |
|
*
SZ = 77.29 |
|
* |<---LENGTH (M)=
4.60 --->|
RY =
1.66 |
|*************
RZ =
5.74 |
|
|
|
9.7 (KNS-METRE)
|
|PARAMETER
|
L8 L8 L8
STRESSES
|
|IN KNS CMS
|
IN NEWTON MMS|
|--------------- +
L8
L8
-------------|
| KL/R-Y= 277.70 |
FA = 13.69 |
| KL/R-Z= 80.09 +
L8
L8
fa =
0.00 |
| UNL
= 100.00 |
FCZ = 148.93 |
| CB
=
1.00 +
L8
L8
FTZ = 148.93 |
| CMY
=
0.85 |
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |L0
L0 fbz = 125.81 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.5
Fey = 13.69 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez = 164.57 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
0.00 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
8.447E-01
8
|
|
0.00 T
0.00
-9.72
2.30
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
187 ST
IPE140
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.845
8
0.00 T
0.00
-9.72
2.30

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 142 of 146

Job No

Sheet No

Rev

143
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 188 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 188 * | GERMAN SECTIONS
|
|
AX = 16.40 |
|
* | ST IPE140
|
|
--Z AY =
5.93 |
|DESIGN CODE * |
|
|
AZ =
6.78 |
| AISC-1989 * ===============================
===|===
SY = 12.33 |
|
*
SZ = 77.29 |
|
* |<---LENGTH (M)=
1.55 --->|
RY =
1.66 |
|*************
RZ =
5.74 |
|
|
|
1.1 (KNS-METRE)
|
|PARAMETER
|
L8 L8 L8
STRESSES
|
|IN KNS CMS
|
IN NEWTON MMS|
|--------------- +
L8
L8
-------------|
| KL/R-Y= 93.57 |
FA = 95.94 |
| KL/R-Z= 26.99 +
L8
L8
fa =
0.00 |
| UNL
= 100.00 |
FCZ = 148.93 |
| CB
=
1.00 +
L8
L8
FTZ = 148.93 |
| CMY
=
0.85 |
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |L0
L0 fbz = 14.28 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.1
Fey = 120.56 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =1449.43 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
0.00 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
9.591E-02
8
|
|
0.00 T
0.00
-1.10
0.78
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
188 ST
IPE140
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.096
8
0.00 T
0.00
-1.10
0.77

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 143 of 146

Job No

Sheet No

Rev

144
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 189 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 189 * | GERMAN SECTIONS
|
|
AX = 16.40 |
|
* | ST IPE140
|
|
--Z AY =
5.93 |
|DESIGN CODE * |
|
|
AZ =
6.78 |
| AISC-1989 * ===============================
===|===
SY = 12.33 |
|
*
SZ = 77.29 |
|
* |<---LENGTH (M)=
4.60 --->|
RY =
1.66 |
|*************
RZ =
5.74 |
|
|
|
9.7 (KNS-METRE)
|
|PARAMETER
|
L8 L8 L8
STRESSES
|
|IN KNS CMS
|
IN NEWTON MMS|
|--------------- +
L8
L8
-------------|
| KL/R-Y= 277.70 |
FA = 13.69 |
| KL/R-Z= 80.09 +
L8
L8
fa =
0.00 |
| UNL
= 100.00 |
FCZ = 148.93 |
| CB
=
1.00 +
L8
L8
FTZ = 148.93 |
| CMY
=
0.85 |
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |L0
L0 fbz = 125.81 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.5
Fey = 13.69 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez = 164.57 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
0.00 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
8.447E-01
8
|
|
0.00 T
0.00
-9.72
2.30
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
189 ST
IPE140
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.845
8
0.00 T
0.00
-9.72
2.30

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 144 of 146

Job No

Sheet No

Rev

145
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 190 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 190 * | GERMAN SECTIONS
|
|
AX = 16.40 |
|
* | ST IPE140
|
|
--Z AY =
5.93 |
|DESIGN CODE * |
|
|
AZ =
6.78 |
| AISC-1989 * ===============================
===|===
SY = 12.33 |
|
*
SZ = 77.29 |
|
* |<---LENGTH (M)=
4.60 --->|
RY =
1.66 |
|*************
RZ =
5.74 |
|
|
|
9.7 (KNS-METRE)
|
|PARAMETER
|
L8 L8 L8
STRESSES
|
|IN KNS CMS
|
IN NEWTON MMS|
|--------------- +
L8
L8
-------------|
| KL/R-Y= 277.70 |
FA = 13.69 |
| KL/R-Z= 80.09 +
L8
L8
fa =
0.00 |
| UNL
= 100.00 |
FCZ = 148.93 |
| CB
=
1.00 +
L8
L8
FTZ = 148.93 |
| CMY
=
0.85 |
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |L0
L0 fbz = 125.81 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.5
Fey = 13.69 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez = 164.57 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
0.00 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
8.447E-01
8
|
|
0.00 T
0.00
-9.72
2.30
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
190 ST
IPE140
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.845
8
0.00 T
0.00
-9.72
2.30

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 145 of 146

Job No

Sheet No

Rev

146
Part

Software licensed to
Job Title

Ref

steel roof canopy

Client

By

mreh

Date31-Dec-14

File

roof canopy.std11.std

Date/Time

Chd

19-Jan-2015 14:29

Steel Design (Track 2) Beam 191 Check 1


|--------------------------------------------------------------------------|
|
Y
PROPERTIES
|
|*************
|
IN CMS UNIT |
|
* |=============================|
===|===
------------ |
|MEMBER 191 * | GERMAN SECTIONS
|
|
AX = 16.40 |
|
* | ST IPE140
|
|
--Z AY =
5.93 |
|DESIGN CODE * |
|
|
AZ =
6.78 |
| AISC-1989 * ===============================
===|===
SY = 12.33 |
|
*
SZ = 77.29 |
|
* |<---LENGTH (M)=
1.55 --->|
RY =
1.66 |
|*************
RZ =
5.74 |
|
|
|
1.1 (KNS-METRE)
|
|PARAMETER
|
L8 L8 L8
STRESSES
|
|IN KNS CMS
|
IN NEWTON MMS|
|--------------- +
L8
L8
-------------|
| KL/R-Y= 93.57 |
FA = 95.94 |
| KL/R-Z= 26.99 +
L8
L8
fa =
0.00 |
| UNL
= 100.00 |
FCZ = 148.93 |
| CB
=
1.00 +
L8
L8
FTZ = 148.93 |
| CMY
=
0.85 |
FCY = 186.16 |
| CMZ
=
0.85 +
FTY = 186.16 |
| FYLD = 24.82 |L0
L0 fbz = 14.28 |
| NSF
=
1.00 +---+---+---+---+---+---+---+---+---+---|
fby =
0.00 |
| DFF
=
0.00 -0.1
Fey = 120.56 |
| dff=
0.00
ABSOLUTE MZ ENVELOPE
Fez =1449.43 |
|
(WITH LOAD NO.)
FV = 99.28 |
|
fv =
0.00 |
|
|
|
MAX FORCE/ MOMENT SUMMARY (KNS-METRE)
|
|
------------------------|
|
|
|
AXIAL
SHEAR-Y
SHEAR-Z
MOMENT-Y
MOMENT-Z
|
|
|
|
VALUE
0.0
0.0
0.0
0.0
0.0
|
|
LOCATION
0.0
0.0
0.0
0.0
0.0
|
|
LOADING
0
0
0
0
0
|
|
|
|**************************************************************************|
|*
*|
|*
DESIGN SUMMARY (KNS-METRE)
*|
|*
-------------*|
|*
*|
|*
RESULT/
CRITICAL COND/
RATIO/
LOADING/
*|
|
FX
MY
MZ
LOCATION
|
|
======================================================
|
|
PASS
AISC- H1-3
9.591E-02
8
|
|
0.00 T
0.00
-1.10
0.77
|
|*
*|
|**************************************************************************|
|
|
|--------------------------------------------------------------------------|
191 ST
IPE140
(GERMAN SECTIONS)
PASS
AISC- H1-3
0.096
8
0.00 T
0.00
-1.10
0.77

Print Time/Date: 19/01/2015 14:39

STAAD.Pro V8i (SELECTseries 5) 20.07.10.41

Print Run 146 of 146

You might also like