HOJA
Proyecto
D E M E T R A D OS
"MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DE LA AVENIDA ORIENTE CUADRAS 01 A LA 13, CALLE TORRE TAGLE CUADRAS 8 Y 9, CALLE HIPOLITO UNANUE CUADRAS 7 Y8 Y PASAJE N 01 CUADRAS 1
SECTOR NUEVO HORIZONTE, CIUDAD DE JAEN, PROVINCIA DE JAEN - CAJAMARCA"
ITEM
01
01.01
DESCRIPCION
PAVIMENTO RIGIDO
CONSTRUCCIONES PROVISIONALES
Und.
01.01.01
und
01.02
01.02.01
INSTALACIONES PROVISIONALES
AGUA PARA LA CONSTRUCCION
GBL
01.02.02
01.03
01.03.01
GBL
01.04
01.04.01
01.04.02
GBL
01.04.03
GBL
01.05
MOVIMIENTO DE TIERRAS
01.05.01
N VECES
LARGO (M)
ANCHO (M)
ALTURA (M)
AREA (M2)
ML.
ANCHO (M)
8,869.16
972.47
972.47
1,501.27
1,501.27
1,442.37
1,442.37
UND
m3
ML
1,079.83
212.90
208.07
01.05.04
8,869.16
1.00
972.47
1.00
1,501.27
1.00
1,442.37
1.00
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
3,547.66
431.93
388.99
85.16
600.51
83.23
576.95
79.78
m3
5,794.21
f. esponj. %
1.25
7,242.77
1,079.83
1.00
212.90
1.00
208.07
1.00
199.46
1.00
8,869.16
1,079.83
972.47
212.90
1,501.27
208.07
1,442.37
199.46
972.47
1,501.27
1,442.37
PAVIMENTO
SUB BASE GRANULAR E=0.25M
TOTAL PAVIMENTO CONCRETO
AV. ORIENTE
PASAJE N 01
CALLE TORRE TAGLE
CALLE HIPOLITO UNANUE
restando el area
PARCIAL
rea m2
8,869.16
m2
m2
01.06
01.06.01
ALTURA H
m2
AREA VIA
m3
PARCIAL (M3)
8,869.16
PARCIAL
m2
DETALLE
AVENIDA ORIENTE
LONGITUD DEL TRAMO KM0+00 AL KM 01+079.83
Sobreancho 1m. 0.50m c/lado
PASAJE N 01
01.05.02
OTROS
m3
Cunetas
m2
11,935.14
8,869.16
972.47
1,501.27
1,442.37
-850.13
f. esponj. %
1.25
14,485.53
14,485.53
h=0.25m
0.25
2,983.79
01.06.03
01.06.04
01.06.05
01.07.00
01.07.01
01.07.02
"MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DE LA AVENIDA ORIENTE CUADRAS 01 A LA 13, CALLE TORRE TAGLE CUADRAS 8 Y 9, CALLE HIPOLITO UNANUE CUADRAS 7 Y8 Y PASAJE N 01 CUADRAS 1
SECTOR NUEVO HORIZONTE, CIUDAD DE JAEN, PROVINCIA DE JAEN - CAJAMARCA"
BASE GRANULAR E=0.20M
TOTAL PAVIMENTO CONCRETO
AV. ORIENTE
PASAJE N 01
CALLE TORRE TAGLE
CALLE HIPOLITO UNANUE
restando el area
IMPRIMACION ASFALTICA CON RC-250
TOTAL PAVIMENTO CONCRETO
AV. ORIENTE
PASAJE N 01
CALLE TORRE TAGLE
CALLE HIPOLITO UNANUE
restando el area
CARPETA ASFALTICA E=3.5"
TOTAL PAVIMENTO CONCRETO
AV. ORIENTE
PASAJE N 01
CALLE TORRE TAGLE
CALLE HIPOLITO UNANUE
restando el area
MARCAS EN EL PAVIMENTO
AV. ORIENTE
PASAJE N 01
CALLE TORRE TAGLE
CALLE HIPOLITO UNANUE
Cunetas
Cunetas
Cunetas
02.00.00
02.01.00
36.00
4.00
4.00
4.00
kg
02.02.00
SARDINELES
TRAZO, NIVELACION Y REPLANTEO
AVENIDA ORIENTE
PASAJE N 01
CALLE TORRE TAGLE
CALLE HIPOLITO UNANUE
EXCAVACION DE ZANJAS PARA SARDINEL
AVENIDA ORIENTE
PASAJE N 01
CALLE TORRE TAGLE
CALLE HIPOLITO UNANUE
2.40
2.40
2.40
2.40
7.00
4.50
6.00
7.00
1,127.87
604.80
43.20
57.60
67.20
0.10
N ELEM. C
LARGO (M)
6.00
6.00
6.00
1.75
1.65
7.40
6.00
7.00
2.00
7.00
0.60
PZAS. X ELEM.
DIAM.
KG/ML.
30.00
30.00
12.00
3/8"
3/8"
3/8"
AREA
0.25
0.56
0.56
0.56
m3
176.40
166.32
298.37
10.50
m2
14.00
ml.
2,441.86
0.00
407.90
382.79
2,441.86
0.00
407.90
382.79
m3
1.00
1.00
1.00
1.00
m3
02.04.00
m2
2,441.86
0.00
407.90
382.79
0.30
0.30
0.30
0.30
0.45
0.45
0.45
0.45
% esp.
1.25
329.65
0.00
55.07
51.68
436.39
H(m.)
caras
AVENIDA ORIENTE
2.00
2,441.86
PASAJE N 01
CALLE TORRE TAGLE
CALLE HIPOLITO UNANUE
2.00
2.00
2.00
0.00
407.90
382.79
0.09
6.00
02.03.00
02.05.00
3.5"=9CM
m2
m2
2,387.03
11,935.14
m2
11,935.14
8,869.16
972.47
1,501.27
1,442.37
-850.13
m3
7M. DE ANCHO
transversal
01.07.04
0.20
m2
11,935.14
8,869.16
972.47
1,501.27
1,442.37
-850.13
m2
JIBAS
ENCOFRADO Y DESENCOFRADO DE JIBAS
AVENIDA ORIENTE
longitudinal
CONCRETO F'C= 210 KG/CM2 EN JIBAS
AVENIDA ORIENTE
h=0.20m
m2
11,935.14
8,869.16
972.47
1,501.27
1,442.37
-850.13
m3
AVENIDA ORIENTE
01.07.03
D E M E T R A D OS
0.35
0.35
0.35
0.35
1,709.30
0.00
285.53
267.95
m3
base
sardinel
LARGO
2,441.86
2,441.86
ANCHO
0.30
0.15
ALTO
0.30
0.30
PARCIAL
219.77
109.88
base
sardinel
0.00
0.00
0.30
0.15
0.30
0.30
0.00
0.00
base
sardinel
407.90
407.90
0.30
0.15
0.30
0.30
36.71
18.36
base
sardinel
382.79
382.79
0.30
0.15
0.30
0.30
34.45
17.23
PASAJE N 01
02.07.00
02.08.00
03.00.00
03.01.00
03.02.00
D E M E T R A D OS
"MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DE LA AVENIDA ORIENTE CUADRAS 01 A LA 13, CALLE TORRE TAGLE CUADRAS 8 Y 9, CALLE HIPOLITO UNANUE CUADRAS 7 Y8 Y PASAJE N 01 CUADRAS 1
SECTOR NUEVO HORIZONTE, CIUDAD DE JAEN, PROVINCIA DE JAEN - CAJAMARCA"
SELLADO DE JUNTAS CON ASFALTO
AVENIDA ORIENTE
PASAJE N 01
CALLE TORRE TAGLE
CALLE HIPOLITO UNANUE
CURADO DE CONCRETO CON ADITIVO
AVENIDA ORIENTE
PASAJE N 01
CALLE TORRE TAGLE
CALLE HIPOLITO UNANUE
PINTADO DE SARDINELES
AVENIDA ORIENTE
PASAJE N 01
CALLE TORRE TAGLE
CALLE HIPOLITO UNANUE
RAMPAS
Lado izquierdo
Lado derecho
PASAJE N 01
VEREDAS
Lado izquierdo
Lado derecho
CALLE TORRE TAGLE
VEREDAS
Lado izquierdo
Lado derecho
RAMPAS
Lado izquierdo
Lado derecho
CALLE HIPOLITO UNANUE
VEREDAS
Lado izquierdo
Lado derecho
RAMPAS
Lado izquierdo
Lado derecho
N JUNTAS
698.00
0.00
0.275
0.275
0.275
0.275
117.00
110.00
698.28
0.28
117.28
110.28
m2
1.00
1.00
1.00
1.00
2,441.86
0.00
407.90
382.79
1.00
1.00
1.00
1.00
2,441.86
0.00
407.90
382.79
0.35
0.35
0.35
0.35
854.65
0.00
142.77
133.98
2,441.86
0.00
407.90
382.79
m2
m2
5.35
30.63
3.56
10.84
4.55
15.28
cant.
5.35
30.63
3.56
10.84
4.55
15.28
long.
1.00
1.00
ancho
AREA M2
109.45
93.12
73.70
121.85
91.81
94.06
102.82
93.20
70.42
124.98
628.76
233.64
164.99
195.82
417.18
127.67
140.14
89.33
54.72
383.85
217.49
107.05
522.95
LONG. ML
86.70
88.29
AREA M2
4,259.00
109.45
93.12
73.70
121.85
91.81
94.06
102.82
93.20
70.42
124.98
628.76
233.64
164.99
195.82
417.18
127.67
140.14
89.33
54.72
383.85
217.49
107.05
522.95
209.99
1.20
1.20
104.04
105.95
470.51
1.00
1.00
240.73
229.78
AREA M2
1.00
1.00
3.00
3.00
1.00
1.00
4.00
4.00
240.73
229.78
518.64
293.95
224.69
LONG. ML
1.00
1.00
7.20
1.20
1.20
AREA M2
431.30
216.86
214.44
LONG. ML
1.00
1.00
293.95
224.69
3.60
3.60
216.86
214.44
9.60
1.20
1.20
4.80
4.80
03.04.00
"MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DE LA AVENIDA ORIENTE CUADRAS 01 A LA 13, CALLE TORRE TAGLE CUADRAS 8 Y 9, CALLE HIPOLITO UNANUE CUADRAS 7 Y8 Y PASAJE N 01 CUADRAS 1
SECTOR NUEVO HORIZONTE, CIUDAD DE JAEN, PROVINCIA DE JAEN - CAJAMARCA"
CORTE MANUAL DE TERRENO HASTA 0.20 MT
Veredas
m2
areas
5,679.45
5,679.45
Rampas
areas
226.79
226.79
m2
Veredas y Rampas
03.05.00
03.06.00
03.07.00
D E M E T R A D OS
IDEM
m3
m2
Lado derecho
PASAJE N 01
Lado izquierdo
Lado derecho
CALLE TORRE TAGLE
Lado izquierdo
Lado derecho
CALLE HIPOLITO UNANUE
Lado izquierdo
Lado derecho
VEREDAS Y RAMPAS DE CONCRETO 140 KG/CM2 E=4"
area m2
5,679.45
226.79
70.21
5,679.45
226.79
1.00
1.00
5,679.45
226.79
ml.
04.00.00
04.01.00
1,079.83
1,079.83
0.20
0.20
215.966
215.966
212.90
212.90
0.20
0.20
42.58
42.58
208.07
208.07
0.20
0.20
41.614
41.614
199.46
199.46
0.20
0.20
39.892
39.892
5,679.45
226.79
m2
Veredas
Rampas
03.10.00
709.93
28.35
8.78
M2
1.00
1.00
Veredas y rampas
03.09.00
% esp.
1.25
1.25
1.25
m2
Veredas
Rampas
0.10
0.10
0.10
ml.
Veredas y rampas
03.08.00
03.03.00
ancho
5,679.45
226.79
m2
1.00
1.00
caras
ml.
5,679.45
226.79
ancho
Cantidad
2.00
1.00
1.00
1.00
Largo (m)
1,079.83
425.80
416.14
398.92
N juntas c/ 3ml.
720
142
139
133
Long. (m)
1.80
1.20
1.20
1.20
Parcial
1,295.80
170.32
166.46
159.57
1.00
1.00
Largo (m)
86.70
88.29
29
29
1.20
1.20
34.68
35.32
4.00
4.00
1.00
1.00
2
2
1.20
1.20
2.40
2.40
4.00
4.00
1.00
1.00
2
2
1.20
1.20
2.40
2.40
Largo (m)
1,079.83
212.90
208.07
199.46
Ancho (m)
0.50
0.50
0.50
0.50
5,679.45
226.79
Parcial
1,079.83
212.90
208.07
199.46
04.02.00
D E M E T R A D OS
"MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DE LA AVENIDA ORIENTE CUADRAS 01 A LA 13, CALLE TORRE TAGLE CUADRAS 8 Y 9, CALLE HIPOLITO UNANUE CUADRAS 7 Y8 Y PASAJE N 01 CUADRAS 1
SECTOR NUEVO HORIZONTE, CIUDAD DE JAEN, PROVINCIA DE JAEN - CAJAMARCA"
CUNETAS - ENCOFRADO Y DESENCOFRADO
m2
Longitudinal
AVENIDA ORIENTE
1.00
1,079.83
PASAJE N 01
CALLE TORRE TAGLE
CALLE HIPOLITO UNANUE
1.00
1.00
1.00
212.90
208.07
199.46
0.20
0.20
0.20
0.20
215.97
42.58
41.61
39.89
309
61
59
57
cant.
1.00
1.00
1.00
1.00
0.50
0.50
0.50
0.50
long.
1,079.83
212.90
208.07
199.46
0.20
0.20
0.20
0.20
ancho
0.50
0.50
0.50
0.50
30.85
6.08
5.94
5.70
1.00
1.00
1.00
1.00
1,079.83
212.90
208.07
199.46
1,079.83
212.90
208.07
309
61
59
57
0.50
0.50
0.50
0.50
154.26
30.41
29.72
28.49
Transversal
04.03.00
04.04.00
04.05.00
AVENIDA ORIENTE
PASAJE N 01
CALLE TORRE TAGLE
CALLE HIPOLITO UNANUE
CONCRETO EN CUNETAS F'C=175 KG/CM2
AVENIDA ORIENTE
PASAJE N 01
CALLE TORRE TAGLE
CALLE HIPOLITO UNANUE
SELLADO DE JUNTAS CON ASFALTO
Longitudinal
AVENIDA ORIENTE
PASAJE N 01
CALLE TORRE TAGLE
CALLE HIPOLITO UNANUE
Transversal
AVENIDA ORIENTE
PASAJE N 01
CALLE TORRE TAGLE
CALLE HIPOLITO UNANUE
CURADO DE CONCRETO CON ADITIVO
m3
m2
05.01.00
cant.
long.
ancho
1.00
1.00
1.00
1.00
1,079.83
212.90
208.07
199.46
0.50
0.50
0.50
0.50
JARDINES
AVENIDA ORIENTE
PASAJE N 01
CALLE TORRE TAGLE
CALLE HIPOLITO UNANUE
CORTE MANUAL DE TERRENO HASTA 0.05 MT
AVENIDA ORIENTE
PASAJE N 01
CALLE TORRE TAGLE
CALLE HIPOLITO UNANUE
107.98
21.29
20.81
19.95
AVENIDA ORIENTE
PASAJE N 01
CALLE TORRE TAGLE
CALLE HIPOLITO UNANUE
05.00.00
espesor
0.20
0.20
0.20
0.20
539.92
106.45
104.04
99.73
m2
8.75
16.40
6.56
53.24
60.37
6.55
11.18
44.84
49.99
48.73
74.00
31.14
104.92
302.93
78.50
69.18
173.68
164.27
268.92
44.91
87.79
80.75
110.35
100.92
118.40
20.07
50.84
5.95
11.67
21.45
0.00
530.49
462.87
8.75
16.40
6.56
53.24
60.37
6.55
11.18
44.84
49.99
48.73
74.00
31.14
104.92
302.93
78.50
69.18
173.68
164.27
268.92
44.91
87.79
80.75
110.35
100.92
118.40
20.07
50.84
5.95
11.67
21.45
0.00
530.49
462.87
m2
2,227.25
0.00
530.49
462.87
2,227.25
0.00
530.49
462.87
05.03.00
05.04.00
06.00.00
06.01.00
06.02.00
"MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DE LA AVENIDA ORIENTE CUADRAS 01 A LA 13, CALLE TORRE TAGLE CUADRAS 8 Y 9, CALLE HIPOLITO UNANUE CUADRAS 7 Y8 Y PASAJE N 01 CUADRAS 1
SECTOR NUEVO HORIZONTE, CIUDAD DE JAEN, PROVINCIA DE JAEN - CAJAMARCA"
RELLENO CON TIERRA DE CHACRA / JARDINERIA
AVENIDA ORIENTE
PASAJE N 01
CALLE TORRE TAGLE
CALLE HIPOLITO UNANUE
m3
SEMBRO DE GRASS
AVENIDA ORIENTE
PASAJE N 01
CALLE TORRE TAGLE
CALLE HIPOLITO UNANUE
m2
und
VARIOS
LIMPIEZA FINAL DE OBRA
LOSA DE CONCRETO
SARDINELES DE CONCRETO
MEDIDAS DE MITIGACION IMPACTO AMBIENTAL - RIEGO
RENDIMIENTO=67 M3/DIA
0.05
0.05
0.05
0.05
2,227.25
0.00
530.49
462.87
111.36
0.00
26.52
23.14
2,227.25
0.00
530.49
462.87
2,227.25
0.00
530.49
462.87
c/5m.
c/5m.
c/5m.
c/5m.
1,079.83
212.90
208.07
199.46
veces
216.00
43.00
42.00
40.00
216.00
43.00
42.00
40.00
M2
m2
ML.
3,232.55
11,935.14
484.88
0.15
m3
area de pavimento
TOTAL
06.03.00
D E M E T R A D OS
m2
11,935.14
und.
06.04.00
AVENIDA ORIENTE
PASAJE N 01
CALLE TORRE TAGLE
CALLE HIPOLITO UNANUE
SEALES INFORMATIVAS
und.
13.00
2.00
2.00
2.00
4.00
06.05.00
SEALES PREVENTIVAS
und.
2.00
06.06.00
PLACA RECORDATORIA
und
1.00
lts/m2
35.00
lts.
417,729.90
m3
417.73
1.00
1.00
1.00
12,785.27
1.00
1.00
1.00
5,794.21
7,242.77
14,485.53
14,485.53
2,983.79
11,935.14
1,127.87
772.80
0.60
641.09
10.50
14.00
3,232.55
436.39
545.49
2,262.79
436.39
1,131.39
3,232.55
70.21
5,906.24
5,906.24
747.06
680.10
5,906.24
5,906.24
5,906.24
1,871.74
1,700.26
388.63
170.03
1,743.69
850.13
3,220.61
3,220.61
3,220.61
341.00
12,420.02
417.73
19.00
4.00
2.00
1.00
D E M E T R A D OS
"MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DE LA AVENIDA ORIENTE CUADRAS 01 A LA 13, CALLE TORRE TAGLE CUADRAS 8 Y 9, CALLE HIPOLITO UNANUE CUADRAS 7 Y8 Y PASAJE N 01 CUAD
SECTOR NUEVO HORIZONTE, CIUDAD DE JAEN, PROVINCIA DE JAEN - CAJAMARCA"
ITEM
01
01.01
DESCRIPCION
PAVIMENTO RIGIDO
CONSTRUCCIONES PROVISIONALES
Und.
01.01.01
und
01.02
01.02.01
INSTALACIONES PROVISIONALES
AGUA PARA LA CONSTRUCCION
GBL
01.02.02
01.03
01.03.01
GBL
01.04
01.04.01
01.04.02
GBL
01.04.03
GBL
01.05
MOVIMIENTO DE TIERRAS
01.05.01
N VECES
LARGO (M)
ANCHO (M)
ALTURA (M)
AREA (M2)
ML.
ANCHO (M)
8,869.16
972.47
972.47
1,501.27
1,501.27
1,442.37
1,442.37
UND
m3
ML
1,079.83
212.90
208.07
01.05.04
1,442.37
AVENIDA ORIENTE
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
3,547.66
431.93
388.99
85.16
600.51
83.23
576.95
79.78
m3
5,794.21
f. esponj. %
1.25
7,242.77
1,079.83
1.00
212.90
1.00
208.07
1.00
199.46
1.00
m2
m2
01.06.01
8,869.16
1.00
972.47
1.00
1,501.27
1.00
1,442.37
1.00
8,869.16
1,079.83
972.47
212.90
1,501.27
208.07
1,442.37
199.46
972.47
LOSA DE CONCRETO
PARCIAL
rea m2
8,869.16
1,501.27
01.06
ALTURA H
m2
AREA VIA
m3
PARCIAL (M3)
8,869.16
PARCIAL
m2
DETALLE
AVENIDA ORIENTE
LONGITUD DEL TRAMO KM0+00 AL KM 01+079.83
Sobreancho 1m. 0.50m c/lado
PASAJE N 01
01.05.02
OTROS
14,485.53
f. esponj. %
1.25
14,485.53
ALTO (M)
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
PARCIAL
647.90
431.93
127.74
54.75
124.84
83.23
119.68
79.78
m2
Long.
Transv
PASAJE N 01
CALLE TORRE TAGLE
CALLE HIPOLITO UNANUE
Pgina 13
LARGO (M)
1,079.83
308.52
212.90
60.83
208.07
59.45
199.46
56.99
ANCHO (M)
3.00
7.00
3.00
4.50
3.00
7.00
3.00
7.00
HOJA
Proyecto
ITEM
01.06.02
01.06.03
"MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DE LA AVENIDA ORIENTE CUADRAS 01 A LA 13, CALLE TORRE TAGLE CUADRAS 8 Y 9, CALLE HIPOLITO UNANUE CUADRAS 7 Y8 Y PASAJE N 01 CUAD
SECTOR NUEVO HORIZONTE, CIUDAD DE JAEN, PROVINCIA DE JAEN - CAJAMARCA"
DESCRIPCION
CONCRETO F'C= 210 KG/CM2 E=8" = 20 CM
TOTAL PAVIMENTO CONCRETO
Und.
m2
N VECES
AV. ORIENTE
PASAJE N 01
CALLE TORRE TAGLE
CALLE HIPOLITO UNANUE
restando el area
Cunetas
01.06.05
01.07.00
01.07.01
01.07.02
n veces
long.
2.00
PASAJE N 01
Transv
long.
Transv
long.
1.00
2.00
1.00
Transv
long.
2.00
1.00
2.00
Transv
1.00
m2
MARCAS EN EL PAVIMENTO
AVENIDA ORIENTE
PASAJE N 01
CALLE TORRE TAGLE
CALLE HIPOLITO UNANUE
m2
36.00
4.00
4.00
4.00
JIBAS
ENCOFRADO Y DESENCOFRADO DE JIBAS
AVENIDA ORIENTE
m2
kg
01.07.04
02.00.00
02.01.00
02.02.00
OTROS
PARCIAL
ancho
1.00
7.00
1.00
4.50
1.00
7.00
1.00
7.00
parcial
2,159.66
2,159.66
425.80
273.73
416.14
416.14
398.92
398.92
2.40
2.40
2.40
2.40
7.00
4.50
6.00
7.00
604.80
43.20
57.60
67.20
0.10
N ELEM. C
LARGO (M)
6.00
6.00
6.00
1.75
1.65
7.40
6.00
7.00
2.00
7.00
0.60
PZAS. X ELEM.
DIAM.
KG/ML.
30.00
30.00
12.00
3/8"
3/8"
3/8"
AREA
0.25
0.56
0.56
0.56
176.40
166.32
298.37
10.50
m2
14.00
ml.
2,441.86
0.00
407.90
382.79
2,441.86
0.00
407.90
382.79
m3
1.00
1.00
1.00
1.00
m3
02.04.00
m2
2,441.86
0.00
407.90
382.79
0.30
0.30
0.30
0.30
0.45
0.45
0.45
0.45
% esp.
1.25
caras
AVENIDA ORIENTE
PASAJE N 01
CALLE TORRE TAGLE
CALLE HIPOLITO UNANUE
SARDINELES DE CONCRETO FC=175 KG/CM2
AVENIDA ORIENTE
ml
1,079.83
308.52
212.90
60.83
208.07
59.45
199.46
56.99
m3
02.03.00
02.05.00
ALTURA (M)
8,869.16
972.47
1,501.27
1,442.37
-850.13
6.00
7M. DE ANCHO
transversal
longitudinal
CONCRETO F'C= 210 KG/CM2 EN JIBAS
AVENIDA ORIENTE
ANCHO (M)
11,935.14
AVENIDA ORIENTE
01.07.03
LARGO (M)
12,785.27
8,869.16
972.47
1,501.27
1,442.37
-850.13
AVENIDA ORIENTE
01.06.04
D E M E T R A D OS
2.00
2.00
2.00
2.00
2,441.86
0.00
407.90
382.79
329.65
0.00
55.07
51.68
436.39
H(m.)
0.35
0.35
0.35
0.35
1,709.30
0.00
285.53
267.95
m3
base
sardinel
LARGO
2,441.86
2,441.86
ANCHO
0.30
0.15
ALTO
0.30
0.30
PARCIAL
219.77
109.88
base
sardinel
0.00
0.00
0.30
0.15
0.30
0.30
0.00
0.00
base
sardinel
407.90
407.90
0.30
0.15
0.30
0.30
36.71
18.36
base
sardinel
382.79
382.79
0.30
0.15
0.30
0.30
34.45
17.23
PASAJE N 01
Pgina 14
HOJA
Proyecto
ITEM
02.06.00
02.07.00
02.08.00
03.00.00
03.01.00
03.02.00
D E M E T R A D OS
"MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DE LA AVENIDA ORIENTE CUADRAS 01 A LA 13, CALLE TORRE TAGLE CUADRAS 8 Y 9, CALLE HIPOLITO UNANUE CUADRAS 7 Y8 Y PASAJE N 01 CUAD
SECTOR NUEVO HORIZONTE, CIUDAD DE JAEN, PROVINCIA DE JAEN - CAJAMARCA"
DESCRIPCION
SELLADO DE JUNTAS CON ASFALTO
AVENIDA ORIENTE
PASAJE N 01
CALLE TORRE TAGLE
CALLE HIPOLITO UNANUE
CURADO DE CONCRETO CON ADITIVO
AVENIDA ORIENTE
PASAJE N 01
CALLE TORRE TAGLE
CALLE HIPOLITO UNANUE
Und.
m
PINTADO DE SARDINELES
AVENIDA ORIENTE
PASAJE N 01
CALLE TORRE TAGLE
CALLE HIPOLITO UNANUE
N VECES
N JUNTAS
698.00
0.00
LARGO (M)
ANCHO (M)
ALTURA (M)
0.275
0.275
0.275
0.275
117.00
110.00
OTROS
PARCIAL
698.28
0.28
117.28
110.28
m2
1.00
1.00
1.00
1.00
2,441.86
0.00
407.90
382.79
1.00
1.00
1.00
1.00
2,441.86
0.00
407.90
382.79
0.35
0.35
0.35
0.35
854.65
0.00
142.77
133.98
2,441.86
0.00
407.90
382.79
m2
m2
5.35
30.63
3.56
10.84
4.55
15.28
cant.
RAMPAS
Lado izquierdo
Lado derecho
PASAJE N 01
VEREDAS
Lado izquierdo
Lado derecho
5.35
30.63
3.56
10.84
4.55
15.28
long.
1.00
1.00
ancho
AREA M2
109.45
93.12
73.70
121.85
91.81
94.06
102.82
93.20
70.42
124.98
628.76
233.64
164.99
195.82
417.18
127.67
140.14
89.33
54.72
383.85
217.49
107.05
522.95
LONG. ML
86.70
88.29
AREA M2
4,259.00
109.45
93.12
73.70
121.85
91.81
94.06
102.82
93.20
70.42
124.98
628.76
233.64
164.99
195.82
417.18
127.67
140.14
89.33
54.72
383.85
217.49
107.05
522.95
209.99
1.20
1.20
104.04
105.95
470.51
1.00
1.00
240.73
229.78
AREA M2
1.00
1.00
3.00
3.00
1.00
1.00
4.00
4.00
Pgina 15
240.73
229.78
518.64
293.95
224.69
LONG. ML
1.00
1.00
7.20
1.20
1.20
AREA M2
431.30
216.86
214.44
LONG. ML
1.00
1.00
293.95
224.69
3.60
3.60
216.86
214.44
9.60
1.20
1.20
4.80
4.80
HOJA
Proyecto
ITEM
03.03.00
03.04.00
03.05.00
03.06.00
D E M E T R A D OS
"MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DE LA AVENIDA ORIENTE CUADRAS 01 A LA 13, CALLE TORRE TAGLE CUADRAS 8 Y 9, CALLE HIPOLITO UNANUE CUADRAS 7 Y8 Y PASAJE N 01 CUAD
SECTOR NUEVO HORIZONTE, CIUDAD DE JAEN, PROVINCIA DE JAEN - CAJAMARCA"
DESCRIPCION
CORTE MANUAL DE TERRENO HASTA 0.20 MT
Veredas
Und.
m2
areas
Rampas
areas
m2
Veredas y Rampas
ELIMINACION MATERIAL EXCEDENTE C/MAQUINA
Veredas y Rampas
Veredas
Rampas
Demolicion
ENCOFRADO Y DESENCOFRADO P/GRADA Y/O PISO
AV. ORIENTE
Lado izquierdo
N VECES
LARGO (M)
226.79
226.79
709.93
28.35
8.78
1,079.83
1,079.83
0.20
0.20
215.966
215.966
212.90
212.90
0.20
0.20
42.58
42.58
208.07
208.07
0.20
0.20
41.614
41.614
199.46
199.46
0.20
0.20
39.892
39.892
1.00
1.00
M2
5,679.45
226.79
ml.
5,679.45
226.79
ancho
1.00
1.00
ml.
5,679.45
226.79
ancho
Cantidad
2.00
1.00
1.00
1.00
Largo (m)
1,079.83
425.80
416.14
398.92
N juntas c/ 3ml.
720
142
139
133
Long. (m)
1.80
1.20
1.20
1.20
Parcial
1,295.80
170.32
166.46
159.57
1.00
1.00
Largo (m)
86.70
88.29
29
29
1.20
1.20
34.68
35.32
4.00
4.00
1.00
1.00
2
2
1.20
1.20
2.40
2.40
4.00
4.00
1.00
1.00
2
2
1.20
1.20
2.40
2.40
Largo (m)
1,079.83
212.90
208.07
199.46
Ancho (m)
0.50
0.50
0.50
0.50
5,679.45
226.79
m2
04.01.00
5,679.45
226.79
m2
1.00
1.00
caras
AVENIDA ORIENTE
PASAJE N 01
CALLE TORRE TAGLE
CALLE HIPOLITO UNANUE
CUNETAS - ENCOFRADO Y DESENCOFRADO
% esp.
1.25
1.25
1.25
ml.
m2
04.00.00
04.02.00
0.10
0.10
0.10
m2
03.10.00
PARCIAL
5,679.45
area m2
5,679.45
226.79
70.21
Veredas y rampas
Veredas
Rampas
03.09.00
OTROS
m3
Veredas y rampas
Veredas
Rampas
03.08.00
ALTURA (M)
5,679.45
Lado derecho
PASAJE N 01
Lado izquierdo
Lado derecho
CALLE TORRE TAGLE
Lado izquierdo
Lado derecho
CALLE HIPOLITO UNANUE
Lado izquierdo
Lado derecho
03.07.00
ANCHO (M)
5,679.45
226.79
Parcial
1,079.83
212.90
208.07
199.46
m2
Longitudinal
AVENIDA ORIENTE
PASAJE N 01
CALLE TORRE TAGLE
1.00
1.00
1.00
1,079.83
212.90
208.07
0.20
0.20
0.20
215.97
42.58
41.61
1.00
199.46
0.20
39.89
Transversal
AVENIDA ORIENTE
PASAJE N 01
CALLE TORRE TAGLE
CALLE HIPOLITO UNANUE
309
61
59
57
0.50
0.50
0.50
0.50
0.20
0.20
0.20
0.20
30.85
6.08
5.94
5.70
Pgina 16
HOJA
Proyecto
ITEM
04.03.00
04.04.00
04.05.00
05.00.00
05.01.00
D E M E T R A D OS
"MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DE LA AVENIDA ORIENTE CUADRAS 01 A LA 13, CALLE TORRE TAGLE CUADRAS 8 Y 9, CALLE HIPOLITO UNANUE CUADRAS 7 Y8 Y PASAJE N 01 CUAD
SECTOR NUEVO HORIZONTE, CIUDAD DE JAEN, PROVINCIA DE JAEN - CAJAMARCA"
DESCRIPCION
CONCRETO EN CUNETAS F'C=175 KG/CM2
AVENIDA ORIENTE
PASAJE N 01
CALLE TORRE TAGLE
CALLE HIPOLITO UNANUE
SELLADO DE JUNTAS CON ASFALTO
Longitudinal
AVENIDA ORIENTE
PASAJE N 01
CALLE TORRE TAGLE
CALLE HIPOLITO UNANUE
Transversal
AVENIDA ORIENTE
PASAJE N 01
CALLE TORRE TAGLE
CALLE HIPOLITO UNANUE
Und.
m3
m2
N VECES
cant.
1.00
1.00
1.00
1.00
LARGO (M)
long.
1,079.83
212.90
208.07
199.46
ALTURA (M)
espesor
0.20
0.20
0.20
0.20
OTROS
PARCIAL
1.00
1.00
1.00
1.00
1,079.83
212.90
208.07
199.46
1,079.83
212.90
208.07
309
61
59
57
0.50
0.50
0.50
0.50
154.26
30.41
29.72
28.49
107.98
21.29
20.81
19.95
cant.
1.00
1.00
1.00
1.00
JARDINES
AVENIDA ORIENTE
PASAJE N 01
CALLE TORRE TAGLE
CALLE HIPOLITO UNANUE
CORTE MANUAL DE TERRENO HASTA 0.05 MT
AVENIDA ORIENTE
PASAJE N 01
CALLE TORRE TAGLE
CALLE HIPOLITO UNANUE
ANCHO (M)
ancho
0.50
0.50
0.50
0.50
long.
1,079.83
212.90
208.07
199.46
ancho
0.50
0.50
0.50
0.50
539.92
106.45
104.04
99.73
m2
8.75
16.40
6.56
53.24
60.37
6.55
11.18
44.84
49.99
48.73
74.00
31.14
104.92
302.93
78.50
69.18
173.68
164.27
268.92
44.91
87.79
80.75
110.35
100.92
118.40
20.07
50.84
5.95
11.67
21.45
0.00
530.49
462.87
8.75
16.40
6.56
53.24
60.37
6.55
11.18
44.84
49.99
48.73
74.00
31.14
104.92
302.93
78.50
69.18
173.68
164.27
268.92
44.91
87.79
80.75
110.35
100.92
118.40
20.07
50.84
5.95
11.67
21.45
0.00
530.49
462.87
m2
2,227.25
0.00
530.49
462.87
Pgina 17
2,227.25
0.00
530.49
462.87
HOJA
Proyecto
ITEM
05.02.00
05.03.00
05.04.00
06.00.00
06.01.00
06.02.00
"MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DE LA AVENIDA ORIENTE CUADRAS 01 A LA 13, CALLE TORRE TAGLE CUADRAS 8 Y 9, CALLE HIPOLITO UNANUE CUADRAS 7 Y8 Y PASAJE N 01 CUAD
SECTOR NUEVO HORIZONTE, CIUDAD DE JAEN, PROVINCIA DE JAEN - CAJAMARCA"
DESCRIPCION
RELLENO CON TIERRA DE CHACRA / JARDINERIA
AVENIDA ORIENTE
PASAJE N 01
CALLE TORRE TAGLE
CALLE HIPOLITO UNANUE
Und.
m3
SEMBRO DE GRASS
AVENIDA ORIENTE
PASAJE N 01
CALLE TORRE TAGLE
CALLE HIPOLITO UNANUE
m2
und
VARIOS
LIMPIEZA FINAL DE OBRA
LOSA DE CONCRETO
SARDINELES DE CONCRETO
MEDIDAS DE MITIGACION IMPACTO AMBIENTAL - RIEGO
RENDIMIENTO=67 M3/DIA
N VECES
LARGO (M)
ANCHO (M)
ALTURA (M)
OTROS
0.05
0.05
0.05
0.05
2,227.25
0.00
530.49
462.87
PARCIAL
111.36
0.00
26.52
23.14
2,227.25
0.00
530.49
462.87
2,227.25
0.00
530.49
462.87
c/5m.
c/5m.
c/5m.
c/5m.
1,079.83
212.90
208.07
199.46
veces
216.00
43.00
42.00
40.00
216.00
43.00
42.00
40.00
M2
m2
ML.
3,232.55
11,935.14
484.88
0.15
m3
area de pavimento
TOTAL
06.03.00
D E M E T R A D OS
m2
11,935.14
und.
06.04.00
AVENIDA ORIENTE
PASAJE N 01
CALLE TORRE TAGLE
CALLE HIPOLITO UNANUE
SEALES INFORMATIVAS
und.
13.00
2.00
2.00
2.00
4.00
06.05.00
SEALES PREVENTIVAS
und.
2.00
06.06.00
PLACA RECORDATORIA
und
1.00
Pgina 18
lts/m2
35.00
lts.
417,729.90
m3
417.73
1.00
1.00
1.00
12,785.27
1.00
1.00
1.00
5,794.21
7,242.77
14,485.53
14,485.53
1,669.85
TOTAL
Pgina 19
6,648.97
11,935.14
772.80
0.60
641.09
10.50
14.00
3,232.55
436.39
545.49
2,262.79
436.39
Pgina 20
1,131.39
3,232.55
70.21
5,906.24
Pgina 21
5,906.24
747.06
680.10
5,906.24
5,906.24
5,906.24
1,871.74
1,700.26
388.63
Pgina 22
1,743.69
850.13
3,220.61
3,220.61
Pgina 23
3,220.61
341.00
12,420.02
417.73
19.00
4.00
2.00
1.00
Pgina 24
RESUMEN D E M E T R A D OS
Obra
ITEM
DESCRIPCION
01
PAVIMENTO RIGIDO
Und.
01.01.01
und
01.02.01
01.02.02
01.03.01
01.04.01
01.04.02
01.04.03
GBL
GBL
m2
UND
GBL
GBL
01.05.01
m3
01.05.02
01.05.03
m3
m2
01.05.04
m2
01.06
LOSA DE CONCRETO
01.06.01
m2
01.06.02
01.06.03
01.06.04
01.06.05
01.07.00
01.07.01
01.07.02
01.07.03
02.00.00
02.01.00
02.02.00
02.03.00
m2
m
m2
m2
02.04.00
m2
02.05.00
02.06.00
02.07.00
03.00.00
03.01.00
03.02.00
m3
m
m
03.03.00
m2
03.04.00
m2
03.05.00
03.06.00
03.07.00
03.08.00
03.09.00
03.10.00
04.00.00
m3
m2
m2
m2
m2
m
04.01.00
m2
04.02.00
04.03.00
m2
m2
m2
kg
m3
ml.
m3
m3
m2
m2
RESUMEN D E M E T R A D OS
Obra
ITEM
04.04.00
04.05.00
04.06.00
04.07.00
04.08.00
05.00.00
DESCRIPCION
ELIMINACION MATERIAL EXCEDENTE C/MAQUINA
ENCOFRADO Y DESENCOFRADO P/RAMPA
RAMPA DE CONCRETO 140 KG/CM2 E=4"
ACABADO FROTACHADO - PULIDO EN RAMPAS
CURADO DE CONCRETO CON ADITIVO
OBRAS DE CANALIZACION
Und.
m3
m2
m2
m2
m2
05.01.00
05.02.00
m2
05.03.00
05.04.00
06.00.00
06.01.00
06.02.00
06.03.00
06.04.00
07.00.00
07.01.00
m3
m
07.02.00
m3
07.03.00
und.
07.04.00
PLACA RECORDATORIA
und
m2
m3
m2
und
m2
E T R A D OS
1.00
1.00
1.00
3,174.60
1.00
1.00
1.00
2,091.37
2,614.21
3,174.60
3,174.60
481.26
3,015.05
2,406.30
3,015.05
211.20
0.54
313.82
0.60
893.33
120.60
150.75
625.33
127.30
71.23
893.33
60.03
664.49
664.49
664.49
138.44
77.69
664.49
664.49
664.49
216.00
38.11
38.11
38.11
E T R A D OS
311.62
71.42
31.16
357.12
602.27
30.11
602.27
100.00
4,575.36
111.11
4.00
1.00