DESCRIPCION
CRONOGRAMA VALORIZADO
EXPEDIENTE TECNICO
UND
MES 1
PRESUP.
TRABAJOS PRELIMINARES
01.01
GLB
593.22 x
01.02
GLB
1271.19 x
01.03
M2
423.73 x
01.04
GLB
1694.92 x
01.05
GLB
1016.95 x
01.06
M2
01.07
M2
MOVIMIENTO DE TIERRAS
2.01
M3
1034.75
2.02
M2
1016.95
CONCRETO SIMPLE
3.01
M3
7970.34
3.02
M3
1694.92
3.03
M2
152.54
3.04
M2
3389.83
3.05
M2
2243.64
3.06
M3
25355.93
3.07
M2
869.49
CONCRETO ARMADO
4.01
4.02
KG
3619.66
M3
5747.03
4.03
M2
3737.29
4.04
4.05
KG
724.58
M3
638.56
4.06
M2
805.08
4.07
4.08
KG
837.29
M3
1787.97
4.09
M2
711.86
4.10
KG
5313.56
MES 2
MES 3
MES 4
6,906.79
1271.19
635.59
x
x
2,051.70
x
x
41,676.69
x
x
x
103,069.23
x
x
x
x
x
x
x
x
x
x
x
x
x
4.11
M3
15325.42
4.12
M2
15856.78
4.13
4.14
UND
8298.31
KG
3619.66
4.15
M3
5747.03
4.16
4.17
M2
4111.02
KG
901.69
4.18
KG
14491.53
4.19
4.20
M2
7662.71
M3
3132.2
5.01
M2
5.02
M2
6.03
ML
1525.15
6.04
TARRAJEO EN EXTERIORES
M2
3143.9
6.05
M2
19830.51
6.06
ML
1293.1
x
x
REVESTIMINETOS
7.01
CARPINTERIA DE MADERA
8.01
UND
423.73
8.02
UND
677.97
8.03
UND
584.75
8.04
UND
1059.32
CERRAJERIA
9.01
PZA
127.12
9.02
PZA
203.39
9.03
PZA
610.17
10
PINTURA
10.01
11
11.01
x
x
x
x
x
x
x
x
x
x
x
x
44,324.26
29132.31
15191.95
x
x
25,792.66
4,881.36
M2
4881.36
2,745.77
940.68
5,949.15
M2
5949.15
7,436.44
PZA
76.27
11.02
PZA
3050.85
11.03
PZA
203.39
11.04
PZA
3279.66
11.05
PZA
152.54
11.06
PZA
542.37
11.07
PZA
114.41
11.08
PZA
16.95
12
INSTALACIONES SANITARIAS
12.01
PZA
74.58
12.02
ML
413.56
12.03
PZA
91.53
12.04
PZA
30.51
12.05
PZA
162.71
12.06
PTO
76.27
12.07
PTO
76.27
12.08
PTO
8.47
12.09
PTO
8.47
12.10
PZA
14.83
12.11
PZA
7.63
12.12
ML
63.56
12.13
ML
38.14
12.14
ML
183.05
12.15
ML
13
13.01
13.02
13.03
13.04
PTO
22.88
13.05
PTO
6.78
13.06
PZA
43.22
13.07
PZA
71.19
13.08
PZA
63.56
14
1,341.11
91.53
1,035.59
ML
596.61
ML
195.76
PTO
35.59
786.44
14.01
ML
457.63
14.02
ML
305.08
14.03
PTO
17.8
14.04
PTO
5.93
15
INSTALACIONES ELECTRICA
15.01
15.02
ML
2118.64
PZA
177.97
15.03
POZO A TIERRA
GLB
1525.42
15.04
15.05
PTO
20.34
PTO
10.17
15.06
PTO
38.14
15.07
15.08
PTO
48.31
PTO
84.75
15.09
PTO
35.59
15.10
15.11
PTO
73.73
PTO
10.17
15.12
PTO
20.34
16
TABLERO Y CUCHILLAS
16.01
GLB
135.59
16.02
GLB
67.8
17
17.01
PTO
88.98
17.02
PTO
122.03
18
VARIOS
18.01
UND
2542.37
18.02
GLB
154.24
18.03
GLB
238.98
18.04
GLB
535.59 x
4,163.57
203.39
211.01
3,471.18
COSTO DIRECTO
VALORIZACION
256,987.02
S/.
9494.08
75431.37
108401.52
32015.13
LORIZADO
MES 5
x
x
x
MES 6
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
2015.13
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
21616.1
10028.82
Cdigo Rubros
Unidad metrado
Rendimiento
Dias
TRABAJOS PRELIMINARES
1
ACARREO DE MATERIAL PARA 1 PISO
GLB
1
1
1
2
ACARREO DE MATERIAL PARA 2 PISO
GLB
1
1
1
3
LIMPIEZA DE TERRENO MANUAL
M2
250
250
1
4
MOV Y DESMOVILIZACION DE EQ Y HERRAMIENTAS
GLB
2
0.5
4
5
OFICINA TECNICA Y ALMACEN
GLB
1
0.5
2
6
TRAZO NIVELES Y REPLANTEO DURANTE LA OBRA
M2
500
300
2
7
TRAZO NIVELES Y REPLANTEO PRELIMINAR
M2
250
300
1
MOVIMIENTOS DE TIERRAS
8
EXCAV DE ZANJA PARA CIMIENTOS
M3
66
3.5
19
9
NIVELACION Y APISONADO PARA FALSO PISO
M2
240
300
1
OBRAS DE CONCRETO SIMPLE
10
CIMIENTOS CORRIDOS-MEZCLA 1:10 CEMENTO-HORMIGON
M3
66
25
3
11
CONCRETO 100KG/CM2 P/FALSA COLUMNA (MONTANTES)
M3
8
10
1
12
ENCOGRADO P/FALSA COLUMNA (MONTANTE DE AGUA /DESAGUE
M2
6
10
1
13
FALSO PISO DE 4 PULG.
M2
200
100
2
14
PULIDO DE FALSO PISO O CONTRAPISO
M2
150
80
2
15
SOBRECIMIENTO CONCRETO 1:8 +25% PM
M3
35.2
12
3
16
SOBRECIMIENTO-ENCOFRADO Y DESENCOFRADO NORMAL
M2
45
14
4
OBRAS DE CONCRETO ARMADO
17
COLUMNAS ACERO CORRUGADO Fy=4200KG/CM2 GRADO
KG
2248
250
9
18
COLUMNAS-CONCRETO Fc=175 KG/CM2
M3
18
10
2
19
COLUMNAS-ENCOFRADO Y DESENCOFRADO NORMAL
M2
126
30
5
20
COLUMNETA-ACERO CORRUGADO Fy=4200KG/CM2 GRADO
KG
450
250
2
21
COLUMNETA CONCRETO Fc=100 KG/CM2
M3
2
10
1
22
COLUMNETA-ENCOFRADO Y DESENCOFRADO NOMAL
M2
25
30
1
23
ESCALERAS-ACERO CORRUGADO Fy=4200KG/CM2 GRADO
KG
520
250
3
24
ESCALERAS-CONCRETO Fc=175 KG/CM2
M3
5.6
10
1
25
ESCALERAS-ENCOFRADO Y DESENCOFRADO NOMAL
M2
24
30
1
LOSAS ALIGERADAS-ACERO CORRUGADO Fy=4200KG/CM2
26
KG
3300
250
14
GRADO
27
LOSAS ALIGERADAS-CONCRETO Fc=175 KG/CM2
M3
48
25
2
28
LOSAS ALIGERADAS-ENCOFRADO Y DESENCOFRADO NOMAL
M2
486
30
17
29
LOSAS ALIGERADAS-LADRILLO HUECO DE ARCILLA H=12C
UND
2880
30
96
33
PLACAS- ACERO CORRUGADO Fy=4200KG/CM2 GRADO
KG
2248
250
9
34
PLACAS- CONCRETO Fc=175 KG/CM2
M3
18
10
2
35
PLACAS-ENCOFRADO Y DESENCOFRADO NOMAL
M2
126
30
5
36
SOBRECIMIENTO-ACERO CORRUGADO Fy=4200KG/CM2 GRADO
KG
560
250
3
37
VIGAS- ACERO CORRUGADO Fy=4200KG/CM2 GRADO
KG
9000
250
36
38
VIGAS- CONCRETO Fc=175 KG/CM2
M2
24
20
2
39
VIGAS-ENCOFRADO Y DESENCOFRADO NOMAL
M3
96
30
4
MUROS Y TABIQUERIA DE ALBAILERIA
42
MURO DE LADRILLO KK DE SOGA
M2
392.87
320
2
43
MURO DE LADRILLO PANDERETA, DE CANTO
M2
210.9
380
1
REVOQUES, ENLUCIDOS Y MOLDURAS
46
TARRAJEO DE ESCALERA C.A 1:4 E=1 PULG
ML
76
12
7
47
TARRAJEO EN EXTERIORES
M2
162
15
11
48
TARRAJEO EN INTERIORES ACABADOS CON CEMENTO-ARENA
M2
1200
20
60
49
VESTIDURA DE DERRAMES A=0.15M C:A; 1:5
ML
98
12
9
REVESTIMINETOS
61
EMPASTADO Y ESCARCHADO DE CIELORASO
M2
320
12
27
CARPINTERIA DE MADERA
SUMIN. E INST Y ACABADO DE PUERTA COCINA 0.80X2.10MDF
66
UND
2
2
1
3MM
67
SUMIN. E INST Y ACABADO DE PUERTA PRINCIPAL 0.90X2.40MDF
UND
1
2
1
68
SUMIN. E INST Y ACABADO DE PUERTA BAO 0.70X2.10 MDF 3MM
UND
3
2
2
SUMIN. E INST Y ACABADO DE PUERTA DORMITORIO
69
UND
5
2
3
0.80X2.10MDF
CERRAJERIA
80
BISAGRA ALUMINIZADAS CAPUCHINAS DE 3X3
PZA
10
10
1
81
CERRADURA DE PUERTA PRINCIPAL
PZA
2
10
1
82
CERRADURAS INTERIORES PERILLA
PZA
9
10
1
PINTURA
83
PINTURA EN INETERIORES 2 MANOS
M2
1200
45
27
APARATOS SANITARIOS Y ACCESORIOS
84
COLOCACION DE ACCESORIOS CORRIENTES
PZA
3
8
1
85
COLOCACION DE APARATOS SANITARIOS
PZA
9
4
3
DUCHAS CROMADAS DE CABEZA GIRATORIA Y LLAVE
86
PZA
2
8
1
MEZCLADORA
87
INODORO TANQUE BAJO VLANCO
PZA
9
4
3
88
JABONERA DE LOSA PARA ADORSAR TREBOL
89
LAVADERO DE COCINA DE ACERO INOXIDABLE
93
PAPELERA DE LOSA PARA ADOSAR TREBOL
94
TOALLERO DE LOSA PARA ADOSAR T/GANCHO DOBLE TREI
INSTALACIONES SANITARIAS
95
CAJA DE REGISTRO DESAGUE 12 PULGA.X24PULG
96
REFUERZO EN MONTANTES DE DESAGUE Y VENTILACION
97
REGISTROS DE BRONCE DE 2 PULG.
98
REGISTROS DE BRONCE DE 2 PULG.; 2 PISOS
99
REGISTROS DE BRONCE DE 4 PULG.
100 SALIDA DE DESAGUE EN PVC DE 2 PULG.
101 SALIDA DE DESAGUE EN PVC DE 2 PULG.; 2 PISOS
102 SALIDA DE DESAGUE EN PVC DE 4 PULG.
103 SALIDA DE DESAGUE EN PVC DE 4 PULG; 2 PISOS
104 SOMBRERO VENTILACION PVC DE 2PULG.
105 SUMIDERO DE BRONCE DE 2 PULG VC1
106 TUBERIA DE PVC SAL 2PULG.
107 TUBERIA DE PVC SAL 2PULG.; 2 PISOS
108 TUBERIA DE PVC SAL 4PULG.
109 TUBERIA DE PVC SAL 4PULG.; 2 PISOS
SISTEMA DE AGUA FRIA Y CONTRAINCENDIO
112
RED DE DISTRIBUCION DE TUBERIA DE 3/4 PULG. PVC-SAP, 1PISO
113
RED DE DISTRIBUCION DE TUBERIA DE 3/4 PULG. PVC-SAP, 2PISO
114
SALIDA DE AGUA FRIA PULG. 1 PISO
115
SALIDA DE AGUA FRIA PULG. 2 PISO
116
SALIDA GRIFO JARDIN
117
VALVULA DE COMPUERTA DE BRONCE DE PULG
118
VALVULA DE COMPUERTA DE BRONCE DE 1 PULG
119
VALVULA DE COMPUERTA DE BRONCE DE 3/4 PULG
SISTEMA DE AGUA CALIENTE
120 RED DE DISTRIBUCCION DE AGUA CALIENTE TUBO CPVC D=1
121 RED DE DISTRIBUCCION DE AGUA CALIENTE TUBO CPVC D=1
124 SALIDA DE AGUA CALIENTE CON TUBERIA, CPVC PULG.
125 SALIDA DE AGUA CALIENTE CON TUBERIA, CPVC PULG.
INSTALACIONES ELECTRICA
126 ALIMENTADOR DE TABLERO DE DISTRIBUCCION
130 CAJA DE PASO DE FG PESADA 100X55MM
131 POZO A TIERRA
132 SALIDA DE LUZ PARED CON INTERRUPTOR DE CONMUTACION
133 SALIDA DE LUZ PARED CON INTERRUPTOR DE CONMUTACION
134 SALIDA PARA CENTRO DE LUZ CON INTER. DE COMUTACION
135 SALIDA PARA CENTRO DE LUZ CON INTER. DE COMUTACION
137 SALIDA PARA THERMA ELECTRICO 2 PISO
138 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE APRUEBA
139 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE APRUEBA
140 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE, TT, 1PISO
141 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE, TT, 2PISO
TABLERO Y CUCHILLAS
142 TABLEROS Y CUCHILLAS PARA LA CASA DE 1 PISOS
143 TABLEROS Y CUCHILLAS PARA LA CASA DE 2 PISOS
SALIDA PARA COMUNICACIONES Y SEALES
144 SALIDA PARA TIMBRE TIPO DONG
145 SALIDA PARA TV Y TELEFONO DOIRECTO( DE SERVICIO PUBLICO)
VARIOS
154 ENSAYO DE CONCRETO A LA COMPRESION
155 LIMPIEZA DE CASA DE 1 PISO PARA ENTREGA
156 LIMPIEZA DE CASA DE 2 PISO PARA ENTREGA
158 SEGURIDAD EN OBRA PARA 1 PISO
PZA
PZA
PZA
9
2
9
2
8
8
8
8
2
1
2
1
PZA
ML
PZA
PZA
PZA
PTO
PTO
PTO
PTO
PZA
PZA
ML
ML
ML
ML
4
30.5
6
2
6
6
6
2
2
5
2
25
15
54
27
4
4
4
4
4
4
4
4
4
4
4
15
15
15
15
1
8
2
1
2
2
2
1
1
2
1
2
1
4
2
ML
ML
PTO
PTO
PTO
PZA
PZA
PZA
128
42
14
9
2
6
3
6
30
30
4
4
4
4
4
4
5
2
4
3
1
2
1
2
ML
ML
PTO
PTO
18
12
6
2
18
18
4
4
1
1
2
1
ML
PZA
GLB
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
25
14
1
8
4
15
19
2
14
29
4
12
4
4
4
4
4
4
4
4
4
4
4
4
7
4
1
2
1
4
5
1
4
8
1
3
GLB
GLB
2
1
4
4
1
1
PTO
PTO
3
18
4
8
1
3
UND
GLB
GLB
GLB
20
1
1
1
20
1
1
1
1
1
1
1
cuadrilla semana
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
4
1
1
1
1
2
1
1
1
1
1
1
1
1
3
1
1
2
1
1
1
1
1
1
1
1
1
1
2
1
1
1
1
1
1
1
1
1
1
1
1
0
3
1
0
1
1
1
1
1
1
1
0
2
1
1
1
1
1
1
1
1
2
1
3
4
2
1
1
1
3
1
1
0
1
1
0
1
2
3
2
0
2
0
1
1
1
1
0
1
1
1
0
2
0
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
0
1
2
1
1
1
1
1
1
1
1
1
1
1
1
1
0
1
1
1
1
1
1
1
1
0
1
1
1
1
0
1
1
1
1
1
1
1
1
1
2
1
1
0
1
1
0
1
1
0
1
1
1
1