DigIndy Tunnel System:

Deep Rock Tunnel


FALL CREEK TUNNEL

38th STREET

3.7 miles of 18-foot finished diameter tunnel


13 drop shafts
5,100 feet of 24-inch to 108-inch diameter consolidation sewers

65
K

REE

HI

TE

RI

VE

WHITE RIVER TUNNEL

Meridian St.

LC
FAL

5.3 miles of 18-foot finished diameter tunnel


7 drop shafts
5,000 feet of 54-inch to 108-inch diameter consolidation sewers

70

S RU

UE
POG

LOWER POGUES RUN TUNNEL

1.7 miles of 18-foot finished diameter tunnel


3 drop shafts
1,400 feet of 72-inch to 144-inch diameter consolidation sewers

t.
on S
t
g
n
i

E. Washington St.

PLEASANT RUN TUNNEL

INDIANAPOLIS

ash
W. W

6.6 miles of 18-foot finished diameter tunnel


7 drop shafts
26,000 feet of 24-inch to 72-inch diameter consolidation sewers

70

UN

TR
SAN

BELMONT AWTP

PLE

Peak primary and biological treatment rate upgraded to 300 MGD


Total peak disinfection treatment rate upgraded to 300 MGD
Peak headworks pumping rate upgraded to 330 MGD

W. Raymond St.

DEEP ROCK TUNNEL CONNECTOR

tuc
en

ve.
yA

7.6 miles of 18-foot finished diameter tunnel to Southport AWTP


Discharges to pump station at Southport AWTP
3 drop shafts

65

BELMONT AWTP

DEEP ROCK TUNNEL CONNECTOR PUMP STATION

Pumps CSO flow from tunnel to Southport AWTP


Pump station firm capacity of 90 MGD
Pump room is approximately 270 feet below grade

465

e.

v
son A

Madi

EAGLE CREEK TUNNEL


DEEP TUNNEL SYSTEM
FLOW DIRECTION

1.7 miles of 18-foot finished diameter tunnel


1 drop shaft
4,800 feet of consolidation sewers

PUMP STATION
ADVANCED WASTEWATER
TREATMENT PLANT (AWTP)
SOUTHPORT AWTP

CSO: Combined Sewer Overflow


MGD: Million Gallons per Day
AWTP: Advanced Wastewater Treatment Plant

Southport Rd.

NOT TO SCALE

Back to main page

SOUTHPORT AWTP

Secondary treatment rate upgrades to 250 MGD


Disinfection treatment rate upgrades to 250 MGD
Maximum pumping rate upgrades to 345 MGD