You are on page 1of 7

COASTAL REGULATION ZONE III

The site belongs to Category III (CRZ III), Areas that are relatively undisturbed and those which do not
belong to either Category-I or II. These will include coastal zone in the rural areas (developed and
undeveloped) and also areas within Municipal limits or in other legally designated urban areas which are
not substantially built up.

No development zone is
upto minimum of 50m.
No construction shall be permitted within
this zone upto 200m from high tide line
except for repairs of existing
authorised structures not exceeding
existing FSI, existing plinth
Area and existing density.

Height of the built structure can be of G+1


Permissible FSI is 0.8
Minimum set backs can b e of 4.5m wit 7m
on the front

ACTIVITIES PERMISSIBLE IN THIS ZONE


agriculture, horticulture, gardens, pastures,
parks, play fields, forestry.
facilities for generating power by non
conventional energy sources, desalination
plants, weather radars and construction of
airstrips.
Construction of dispensaries, schools, public
rain shelters, community toilets, bridges,
roads

Health clubs and recreational Recreational club


centres
Corporation Limit,
Municipalities, IT
Corridor

1 two wheeler and 1Car


Space for every 75sqm of
floor

1 car space for every 100sqm


of floor or 1 car space for
every 75sqm of floor

Panchayat Areas

1 two wheeler and 1Car


Space for every 50sqm of
floor

SITE TRANSMISSION

SITE LOCATION
In Nemmeli village, thiruporur taluk

Site in 2012

Site in 2005

LOCATING THE SITE

REACHABILITY FROM
OTHER LOCATIONS
Chennai city -37.2km 40mins

Meenambakam
airport

Chennai-Vandalur -68.7km 1hr32mins


Chennai Meenambakam airport -43.4Km 43 mims

Bus route via thiruporur old mahabalipuram road


kelambakam kovalam road covelong
vada nammeli site at ecr

Vandalur

The Site

Route from chennai airport to site


Nearest bus route from
thiruporur to site

Site
Thiruporur
ECR viewpoint

TRAFFIC PATTERN

Slope gradient

0-2
2-4
4-8
8-10
10-12

SLOPE ANALYSIS
Here the slope gradients are calculated in order to
understand the features of contours
and thereby applying for design

Site in 2012

Nearby Tourist spots


-Mahabalipuram 21 km, covelong 30 km, Sriperumbudur 38km, kanchipuram 43km
-the visitors have chances to move out of the site as many other resorts are available nearby
IMMEDIATE SURROUNDINGS

SITE

Nearest landmark,
opposite to site- Slipin hotel

Due to aftereffects of tsunami , the site was turned into a


barren land in 2007 with no evidence of building space

Private road of 7m adjacent to ECR road,


runs toward the beach

Since the site is sloping towards the beach, with soil


condition to be partly sandy,
water logging on site is avoided

In the current year the site has a variety of vegetation


which includes cashuarina grove, banyan,
palm trees and small shrubs. They tend to act as wind
breakers to the site.
ANALYSIS OVER CLIMATE
Existing vegetation
-plantions increase the vegetative cover
-bind the soil tightly
-acts as barriers to wind, conditions like tsunami and cyclones.
-reduce noise level from the road side
The coast is affected by gales and cyclones during
North East Monsoon while the annual rainfall is 200mm.

Sun path
Possible breeze direction to the
site is from the beach

noise
Best views

Breeze direction from beach

DRAINAGE PATTERN

Both the monsoons occur here.


in summer heat is considerably mitigated in the
coastal area by sea breeze.

Drainage pattern
along steep slopes

View towards the road

Highest temperatures
_summer April and May - up to 40 deg.C
_winter -not below 18 deg.C
View towards the beach

Site acces

Highest part of the


site, a clear view
toward the beach is
achievable

Since the slope


being gradua and
very closer to road,
can be used for
parking l

Gradual

Steep

7m wide road,
adjacent to ecr
road, can be given
as private access to
the site

Buildings can face N-S direction to avoid


direct heat and light
Breeze from the sea shd be promising

Distant view towards


cashuarina plantations

Site acces

Gentle

Possibility of gaining a
seclded spot, can be
suitable for swimming
pool
This area is visible from
the road level n from
rest of the contour
intervals
Heat gain probably will be more due to
morning and evening sun
Contour interval of 42m length is suitable
for having space for restaurent or outdoor
activity.
Can be opted for semi-private spaces

Cut and fill methods need not be


employed

Building envelop
Semi-private spaces
Possibilities of parking
Outdoor spaces

AR 5-100 Architectural Design

Site Analysis + Zoning

Vignesh
1010039
semester 5

You might also like