Cajamarca, 22 de junio

COTIZACIN TOTAL

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43

44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91

1
2
3
4
5

Cajamarca, 22 de junio del 2012


COTIZACIN TOTAL

DESCRIPCIN

ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 DE 1"


ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 DE 1/2"
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 DE 1/4"
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 DE 3/8"
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 DE 5/8"
GUA
AGUARRAS
ALAMBRE NEGRO RECOCIDO N 8
ARENA FINA
ARENA GRUESA
CABLE NRO 12
CABLE NRO 14
CAJA OCTOGONAL PVC DE 4"
CAJA RECTANGULAR FIERRO GALVANIZADO LIVIANO DE 4" X 2 1/8"
CAJA RECTANGULAR PLASTICO 4" X 2" X 2"
CEMENTO PORTLAND TIPO I (42.5 kg)
CERMICA 0.45 X 0.45 m ALTO TRANSITO
CINTA AISLANTE
CINTA TEFLN
CLAVOS PARA MADERA CON CABEZA DE 2"
CLAVOS PARA MADERA CON CABEZA DE 3"
CODO PVC 2'' X 90
CODO PVC 3/4'' X 90
CODO PVC SAL 2'' X 45
CODO PVC SAL 2'' X 90
CODO PVC SAL 4" X 90
CONTRAZCALO DE CERMICA DE .10 X .45 M
CURVAS PVC-SEL 3/4"
DRYWALL INC. INSTALC.
ESTACAS DE MADERA
FLUORESCENTE 2 X 40 PANTALLA ACRILICA TRANSP. ADOSAR INC/INSTALC.
FRAGUA PREMIUM
GIGANTOGRAFA DE OBRA 2.40 m X 4.80 m
IMPRIMANTE
INODORO FLUXMETRO BLANCO INC. COLOCACIN
INTERRUPTOR BIPOLAR DE 2 GOLPES
INTERRUPTOR THERMOMAGNTICO 2 X 40 A.
INTERRUPTOR UNIPOLAR DE 1 GOLPE
INTERRUPTOR UNIPOLAR DE 3 GOLPES
LADRILLO KING KONG DE ARCILLA DE 0.9 X .14 X .24 CM
LADRILLO PARA TECHO 8H DE 25X30X30 cm
LAVATORIO OVALINO BLANCO,,INC/ACC.Y COLOCACIN
LIJA DE FIERRO

UNIDAD

VAR
VAR
VAR
VAR
VAR
M3
GL
KG
M3
M3
RLL
RLL
PZA
U
U
BLS
M2
RLL
U
KG
KG
U
U
U
U
U
M
PZA
PLN
U
U
KG
U
GL
U
U
U
U
U
MILLAR
U
U
U

LIJA PARA PARED


LUMINARIA DOWNLIGTH
MADERA TORNILLO
NIPLE DE FIERRO GALVANIZADO DE 3/4"
PARANTES DE MADERA EUCALIPTO 3" X 6M
PEGAMENTO EN POLVO 25KG PORCELANATO
PEGAMENTO PVC
PIEDRA CHANCADA 1/2"
PINTURA ANTICORROSIVA
PINTURA ESMALTE SINTETICO
PINTURA LATEX
PUERTA DE MADERA DE CEDRO DE 0.70 m X 2.34 m /INC. INSTALACIN
PUERTA DE MADERA DE CEDRO DE 0.90 m X 2.34 m /INC. INSTALACION
PUERTA DE MADERA DE CEDRO DE 1.30 m X 2.36 m /INC. INSTALACION
PUERTA DE MADERA DE CEDRO DE 1.68 m X 2.60 m /INC. INSTALACION
PUERTA DE MADERA DE CEDRO DE 1.68 m X 2.64 m /INC. INSTALACION
PUERTA METLICA 0.55 X 1.65
RAMAL TEE DOBLE CON REDUCCIN PVC SAL DE 4" A 2"
REDUCCIN DE F.G. 2'' X 3/4''
REDUCCIN PVC SAL DE 4'' A 2''
REGISTRO DE BRONCE DE 2"
REGISTRO DE BRONCE DE 4"
SISTEMA DE CONEXIN POZO PUESTA A TIERRA INC. COLOCACIN
SOLDADURA CELLOCORD PUNTO AZUL 3/16
SUMIDERO CROMADO DE 2"
TABLERO ELECTRICO DE METAL
TEE PVC SAP 3/4''
TEE SANITARIA SIMPLE PVC-SAL 2"
TEE SANITARIA SIMPLE PVC-SAL 4"
TOMACORRIENTE DE DOBLE PLANO
TOPE CRUCETA 3mm C/JALADOR
TUBERA DE PVC SEL PARA INSTALACIONES ELCTRICAS DE 3/4"
TUBERA PVC SAL 2"
TUBERA PVC SAL 4"
TUBERA PVC SAP PRESION PARA GUA C-10R .3/4"
TUBO DE 2"
TUBO PVC SEL ESPIGA CAMPANA 3/4" X 3 M
UNION SIMPLE PVC SEL PARA INSTALACIONES ELCTRICAS 3/4"
UNION UNIVERSAL DE FIERRO GALVANIZADO DE 3/4" X 2''
URINARIO BLANCO INC/ACC. Y COLOCACIN
VALVULA DE CONTROL DE BRONCE DE 3/4"
VENTANA METLICA 1.70 X 1.98 M
VIDRIO TRANSPARENTE CRUDO MEDIO DOBLE
WAIPE
WINCHA DE 50 M
YEE PVC SAL DE 2''
YEE PVC SAL DE 4''
YESO 20 KG

PLG
U
P2
U
P2
BOL
GL
M3
GL
GL
GL
U
U
U
U
U
U
U
U
U
U
U
GLB
KG
U
U
U
U
U
U
U
M
U
U
U
M
U
U
U
U
U
U
P2
KG
U
U
U
BOL

EQUIPOS Y HERRAMIENTAS
MEZCLADORA DE CONCRETO 11 P3 (23 HP)
MOTOSOLDADORA DE 250 A
NIVEL
TEODOLITO
VIBRADOR DE CONCRETO 4 HP 1.25"

H.M.
H.M.
H.M.
H.M.
H.M.

COTIZACIONES

EMPRESACONSTRUYEND
O (MPC)

115.00
27.50
10.00
16.00
42.15
1.50
15.00
4.40

CELIS S.R.L.

FERRETERIA EL SOL

DORADEY
S.R.L.

113.00
27.20

118.00
28.00

115.00
26.50

15.30
42.10

16.50
43.00

15.50
42.00

4.30

5.00

4.50

T y S CHUGNAS SR. BRINGAS


S.R.L.
VILCA NORMAN

50.00
35.00

2.50
3.00
2.50
21.00
46.50
3.50
1.90
4.80
5.50
6.72
1.54
4.50
5.60
12.50
2.00
152.00
2.50
85.00
8.00
450.00
35.00

130.00
185.00
0.90
0.90
21.00

4.50

5.00
5.00

0.90
1.10
3.80

1.50
1.50
5.00

20.80

0.35

485.00
18.20
86.50
12.20
14.70
1100.00
1.80
2.20
7.00

21.50

50.00
70.00

30.00
25.00
22.00
86.00
30.00
25.00
86.00
65.00
35.00
38.00
38.50
550.00
700.00
650.00
800.00
800.00
350.00
6.50
6.80
2.94
7.20
8.20
800.00
18.00
9.00
90.00
1.30
5.00
9.30
10.50
3.50
1.50

46.00
26.00

30.00
25.00

2.30
10.70
9.50

8.20
20.80
8.20

9.00
20.00

40.00
6.50
0.80
5.00
138.00
15.00
250.00
3.50
6.00
60.00
5.30
6.30
18.00

20.00
20.00
25.00
20.00
15.00

2.05

3.00
9.00

2.80
9.00
19.00
10.00

68.00

PRECIO
UNITARIO
SR. SEGUNDO
SELECCIONAD
ALBERTO
O (No Inc. 18%
ROMERO
IGV)
LLANOS

50.00
40.00

480.00

NOTA

113.00
26.50
10.00
15.30
42.00
1.50
15.00
4.30
50.00
35.00
130.00 PARA METRO SE DIVIDE POR 100 METROS QUE TIENE EL ROLLO
185.00 PARA METRO SE DIVIDE POR 100 METROS QUE TIENE EL ROLLO
0.90
3.00
0.90
20.80
46.50
3.50
1.90
4.50
5.00
6.72
1.54
0.90
1.10
3.80
12.50
0.35
152.00
2.50
85.00
8.00
450.00
35.00
485.00
18.20
86.50
12.20
14.70
480.00 PARA UNIDAD SE DIVIDE POR 1000 UNIDADES
1.80
2.20
7.00

75.00

30.00
25.00
22.00
86.00
30.00
25.00
86.00
65.00
35.00
30.00
25.00
550.00
700.00
650.00
800.00
800.00
350.00
6.50
6.80
2.94
7.20
8.20
800.00
18.00
9.00
90.00
1.30
2.30
9.30
9.50
3.50
1.50
8.20
19.00
8.20
40.00
6.50
0.80
5.00
138.00
15.00
250.00
3.50
6.00
60.00
2.05
6.30
18.00

20.00
20.00
25.00
20.00
15.00

ALQUILADO
ALQUILADO
ALQUILADO
ALQUILADO
ALQUILADO

CLCULO PARA
COSTOS
UNITARIOS

UND.

1.3
1.85

M
M

0.48

CONSTRUCCION DEL SEGUNDO PISO PABELLON ''A''-

PROYECTO
Localidad: CAJAMARCA
Distrito: CAJAMARCA
Proyectista: Ing. Jean Pier Cotrina Arriaga

ANALISIS DE COSTOS UNITARIOS


PARTIDA:

TRABAJOS PRELIMINARES
ITEM:
01.01.01

DESCRIPCION:

Rendimiento:

2.0000

Cdigo

und/DIA

Descripcin Recurso
Mano de Obra
OPERARIO
PEN
Materiales
CLAVOS PARA MADERA CON CABEZA DE 2"
PARANTES DE MADERA EUCALIPTO 3" X 6M
GIGANTOGRAFA DE OBRA 2.40 m X 4.80 m
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

TRABAJOS PRELIMINARES
ITEM:
01.01.02

DESCRIPCION:

Rendimiento:

1,000.0000

Cdigo

m2/DIA

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL
PEN
TOPGRAFO
Materiales
YESO 20 KG
ESTACAS DE MADERA
WINCHA DE 50 M
Equipos
NIVEL
TEODOLITO
HERRAMIENTAS MANUALES

PARTIDA:

OBRAS DE CONCRETO SIMPLE


ITEM:
01.02.01
Rendimiento:

Cdigo

m2/DIA

200.0000

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL

PEN
Materiales
ARENA GRUESA
CEMENTO PORTLAND TIPO I (42.5 kg)
GUA
Equipos
HERRAMIENTAS MANUALES
MEZCLADORA DE CONCRETO 11 P3 (23 HP)

PARTIDA:

OBRAS DE CONCRETO ARMADO


ITEM:
01.03.01.01
Rendimiento:

Cdigo

kg/DIA

200.0000

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL
PEN
Materiales
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 DE 1"
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

OBRAS DE CONCRETO ARMADO


ITEM:
01.03.01.02
Rendimiento:

Cdigo

kg/DIA

200.0000

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL
PEN
Materiales
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 DE 3/8"
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

OBRAS DE CONCRETO ARMADO


ITEM:
01.03.01.03
Rendimiento:

Cdigo

m2/DIA

15.0000

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL
PEN
Materiales
ALAMBRE NEGRO RECOCIDO N 8
CLAVOS PARA MADERA CON CABEZA DE 3"
MADERA TORNILLO

Equipos
HERRAMIENTAS MANUALES

PARTIDA:

OBRAS DE CONCRETO ARMADO


ITEM:
01.03.01.04
Rendimiento:

Cdigo

m3/DIA

15.0000

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL
PEN
Materiales
PIEDRA CHANCADA 1/2"
ARENA GRUESA
CEMENTO PORTLAND TIPO I (42.5 kg)
GUA
Equipos
HERRAMIENTAS MANUALES
VIBRADOR DE CONCRETO 4 HP 1.25"
MEZCLADORA DE CONCRETO 11 P3 (23 HP)

PARTIDA:

OBRAS DE CONCRETO ARMADO


ITEM:
01.03.02.01
Rendimiento:

Cdigo

kg/DIA

200.0000

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL
PEN
Materiales
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 DE 1/2"
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

OBRAS DE CONCRETO ARMADO


ITEM:
01.03.02.02
Rendimiento:

Cdigo

kg/DIA

200.0000

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL
PEN
Materiales
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 DE 3/8"
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

OBRAS DE CONCRETO ARMADO


ITEM:
01.03.02.03
Rendimiento:

Cdigo

m2/DIA

15.0000

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL
PEN
Materiales
ALAMBRE NEGRO RECOCIDO N 8
CLAVOS PARA MADERA CON CABEZA DE 3"
MADERA TORNILLO
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

OBRAS DE CONCRETO ARMADO


ITEM:
01.03.02.04
Rendimiento:

Cdigo

m3/DIA

15.0000

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL
PEN
Materiales
PIEDRA CHANCADA 1/2"
ARENA GRUESA
CEMENTO PORTLAND TIPO I (42.5 kg)
GUA
Equipos
HERRAMIENTAS MANUALES
VIBRADOR DE CONCRETO 4 HP 1.25"
MEZCLADORA DE CONCRETO 11 P3 (23 HP)

PARTIDA:

OBRAS DE CONCRETO ARMADO


ITEM:
01.03.03.01
Rendimiento:

Cdigo

kg/DIA

200.0000

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL
PEN
Materiales
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 DE 1"
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

OBRAS DE CONCRETO ARMADO

ITEM:

01.03.03.02

Rendimiento:

kg/DIA

Cdigo

200.0000

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL
PEN
Materiales
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 DE 1/2"
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

OBRAS DE CONCRETO ARMADO


ITEM:
01.03.03.03
Rendimiento:

Cdigo

m2/DIA

15.0000

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL
PEN
Materiales
ALAMBRE NEGRO RECOCIDO N 8
CLAVOS PARA MADERA CON CABEZA DE 3"
MADERA TORNILLO
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

OBRAS DE CONCRETO ARMADO


ITEM:
01.03.03.04
Rendimiento:

Cdigo

m3/DIA

15.0000

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL
PEN
Materiales
PIEDRA CHANCADA 1/2"
ARENA GRUESA
CEMENTO PORTLAND TIPO I (42.5 kg)
GUA
Equipos
HERRAMIENTAS MANUALES
VIBRADOR DE CONCRETO 4 HP 1.25"
MEZCLADORA DE CONCRETO 11 P3 (23 HP)

PARTIDA:

OBRAS DE CONCRETO ARMADO


ITEM:
01.03.04.01

Rendimiento:
Cdigo

kg/DIA

200.0000

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL
PEN
Materiales
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 DE 1"
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

OBRAS DE CONCRETO ARMADO


ITEM:
01.03.04.02
Rendimiento:

Cdigo

kg/DIA

200.0000

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL
PEN
Materiales
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 DE 1/2"
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

OBRAS DE CONCRETO ARMADO


ITEM:
01.03.04.03
Rendimiento:

Cdigo

m2/DIA

15.0000

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL
PEN
Materiales
ALAMBRE NEGRO RECOCIDO N 8
CLAVOS PARA MADERA CON CABEZA DE 3"
MADERA TORNILLO
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

OBRAS DE CONCRETO ARMADO


ITEM:
01.03.04.04
Rendimiento:

Cdigo

m3/DIA

15.0000

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL
PEN

Materiales
PIEDRA CHANCADA 1/2"
ARENA GRUESA
CEMENTO PORTLAND TIPO I (42.5 kg)
GUA
Equipos
HERRAMIENTAS MANUALES
VIBRADOR DE CONCRETO 4 HP 1.25"
MEZCLADORA DE CONCRETO 11 P3 (23 HP)

PARTIDA:

OBRAS DE CONCRETO ARMADO


ITEM:
01.03.05.01
Rendimiento:

Cdigo

kg/DIA

200.0000

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL
PEN
Materiales
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 DE 1"
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

OBRAS DE CONCRETO ARMADO


ITEM:
01.03.05.02
Rendimiento:

Cdigo

kg/DIA

200.0000

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL
PEN
Materiales
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 DE 1/2"
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

OBRAS DE CONCRETO ARMADO


ITEM:
01.03.05.03
Rendimiento:

Cdigo

m2/DIA

15.0000

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL
PEN
Materiales
ALAMBRE NEGRO RECOCIDO N 8
CLAVOS PARA MADERA CON CABEZA DE 3"

MADERA TORNILLO
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

OBRAS DE CONCRETO ARMADO


ITEM:
01.03.05.04
Rendimiento:

Cdigo

m3/DIA

15.0000

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL
PEN
Materiales
PIEDRA CHANCADA 1/2"
ARENA GRUESA
CEMENTO PORTLAND TIPO I (42.5 kg)
GUA
Equipos
HERRAMIENTAS MANUALES
VIBRADOR DE CONCRETO 4 HP 1.25"
MEZCLADORA DE CONCRETO 11 P3 (23 HP)

PARTIDA:

OBRAS DE CONCRETO ARMADO


ITEM:
01.03.06.01
Rendimiento:

Cdigo

kg/DIA

200.0000

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL
PEN
Materiales
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 DE 1"
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

OBRAS DE CONCRETO ARMADO


ITEM:
01.03.06.02
Rendimiento:

Cdigo

kg/DIA

200.0000

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL
PEN
Materiales
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 DE 3/8"
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

OBRAS DE CONCRETO ARMADO


ITEM:
01.03.06.03
Rendimiento:

Cdigo

kg/DIA

200.0000

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL
PEN
Materiales
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 DE 1/2"
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

OBRAS DE CONCRETO ARMADO


ITEM:
01.03.06.04
Rendimiento:

Cdigo

m2/DIA

15.0000

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL
PEN
Materiales
ALAMBRE NEGRO RECOCIDO N 8
CLAVOS PARA MADERA CON CABEZA DE 3"
MADERA TORNILLO
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

OBRAS DE CONCRETO ARMADO


ITEM:
01.03.06.05
Rendimiento:

Cdigo

m3/DIA

12.0000

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL
PEN
Materiales
PIEDRA CHANCADA 1/2"
ARENA GRUESA
CEMENTO PORTLAND TIPO I (42.5 kg)
GUA
Equipos
HERRAMIENTAS MANUALES
VIBRADOR DE CONCRETO 4 HP 1.25"
MEZCLADORA DE CONCRETO 11 P3 (23 HP)

PARTIDA:

OBRAS DE CONCRETO ARMADO


ITEM:
01.03.07.01
Rendimiento:

Cdigo

kg/DIA

200.0000

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL
PEN
Materiales
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 DE 1/2"
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

OBRAS DE CONCRETO ARMADO


ITEM:
01.03.07.02
Rendimiento:

Cdigo

kg/DIA

200.0000

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL
PEN
Materiales
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 DE 3/8"
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

OBRAS DE CONCRETO ARMADO


ITEM:
01.03.07.03
Rendimiento:

Cdigo

m2/DIA

15.0000

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL
PEN
Materiales
ALAMBRE NEGRO RECOCIDO N 8
CLAVOS PARA MADERA CON CABEZA DE 3"
MADERA TORNILLO
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

OBRAS DE CONCRETO ARMADO


ITEM:
01.03.07.04
Rendimiento:

Cdigo

m3/DIA

15.0000

Descripcin Recurso
Mano de Obra

OPERARIO
OFICIAL
PEN
Materiales
PIEDRA CHANCADA 1/2"
ARENA GRUESA
CEMENTO PORTLAND TIPO I (42.5 kg)
GUA
Equipos
HERRAMIENTAS MANUALES
VIBRADOR DE CONCRETO 4 HP 1.25"
MEZCLADORA DE CONCRETO 11 P3 (23 HP)

PARTIDA:

OBRAS DE CONCRETO ARMADO


ITEM:
01.03.08.01
Rendimiento:

Cdigo

kg/DIA

260.0000

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL
PEN
Materiales
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 DE 1/2"
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

OBRAS DE CONCRETO ARMADO


ITEM:
01.03.08.02
Rendimiento:

Cdigo

kg/DIA

260.0000

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL
PEN
Materiales
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 DE 5/8"
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

OBRAS DE CONCRETO ARMADO


ITEM:
01.03.08.02
Rendimiento:

Cdigo

kg/DIA

260.0000

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL
PEN

Materiales
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 DE 1/4"
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

OBRAS DE CONCRETO ARMADO


ITEM:
01.03.08.04
Rendimiento:

Cdigo

m2/DIA

7.0000

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL
PEN
Materiales
ALAMBRE NEGRO RECOCIDO N 8
CLAVOS PARA MADERA CON CABEZA DE 3"
MADERA TORNILLO
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

OBRAS DE CONCRETO ARMADO


ITEM:
01.03.08.05
Rendimiento:

Cdigo

m3/DIA

12.0000

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL
PEN
Materiales
PIEDRA CHANCADA 1/2"
ARENA GRUESA
CEMENTO PORTLAND TIPO I (42.5 kg)
GUA
Equipos
HERRAMIENTAS MANUALES
VIBRADOR DE CONCRETO 4 HP 1.25"
MEZCLADORA DE CONCRETO 11 P3 (23 HP)

PARTIDA:
Partida

OBRAS DE CONCRETO ARMADO


ITEM:
01.03.08.06
Rendimiento:

und/DIA

1,200.0000

Descripcin Recurso
Mano de Obra
OPERARIO
PEN
Materiales
LADRILLO PARA TECHO 8H DE 25X30X30 cm

Equipos
HERRAMIENTAS MANUALES

PARTIDA:

MUROS Y TABIQUES DE ALBAILERIA


ITEM:
02.01.01
Rendimiento:

Cdigo

m2/DIA

7.5000

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL
PEN
Materiales
CLAVOS PARA MADERA CON CABEZA DE 3"
ARENA GRUESA
CEMENTO PORTLAND TIPO I (42.5 kg)
LADRILLO KING KONG DE ARCILLA DE 0.9 X .14 X .24 CM
MADERA TORNILLO
GUA
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

MUROS Y TABIQUES DE ALBAILERIA


ITEM:
02.01.02
Rendimiento:

Cdigo

m2/DIA

15.0000

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL
PEN
Materiales
CLAVOS PARA MADERA CON CABEZA DE 3"
ARENA GRUESA
CEMENTO PORTLAND TIPO I (42.5 kg)
LADRILLO KING KONG DE ARCILLA DE 0.9 X .14 X .24 CM
MADERA TORNILLO
GUA
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

MUROS Y TABIQUES DE ALBAILERIA


ITEM:
02.01.03
Rendimiento:

Cdigo

m2/DIA

15.0000

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL
PEN
Materiales
DRYWALL INC. INSTALC.

Equipos
HERRAMIENTAS MANUALES

PARTIDA:

REVOQUES ENLUCIDOS Y MOLDURAS


ITEM:
02.02.01
Rendimiento:

Cdigo

m2/DIA

20.0000

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL
PEN
Materiales
CLAVOS PARA MADERA CON CABEZA DE 3"
ARENA FINA
CEMENTO PORTLAND TIPO I (42.5 kg)
MADERA TORNILLO
GUA
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

REVOQUES ENLUCIDOS Y MOLDURAS


ITEM:
02.02.02
Rendimiento:

Cdigo

m2/DIA

18.0000

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL
PEN
Materiales
CLAVOS PARA MADERA CON CABEZA DE 3"
ARENA FINA
CEMENTO PORTLAND TIPO I (42.5 kg)
MADERA TORNILLO
GUA
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

REVOQUES ENLUCIDOS Y MOLDURAS


ITEM:
02.02.03
Rendimiento:

Cdigo

m2/DIA

18.0000

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL
PEN
Materiales
CLAVOS PARA MADERA CON CABEZA DE 3"
ARENA FINA

CEMENTO PORTLAND TIPO I (42.5 kg)


MADERA TORNILLO
GUA
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

REVOQUES ENLUCIDOS Y MOLDURAS


ITEM:
02.02.04
Rendimiento:

Cdigo

m2/DIA

18.0000

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL
PEN
Materiales
CLAVOS PARA MADERA CON CABEZA DE 3"
ARENA FINA
CEMENTO PORTLAND TIPO I (42.5 kg)
MADERA TORNILLO
GUA
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

REVOQUES ENLUCIDOS Y MOLDURAS


ITEM:
02.02.05
Rendimiento:

Cdigo

m2/DIA

18.0000

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL
PEN
Materiales
CLAVOS PARA MADERA CON CABEZA DE 3"
ARENA FINA
CEMENTO PORTLAND TIPO I (42.5 kg)
MADERA TORNILLO
GUA
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

REVOQUES ENLUCIDOS Y MOLDURAS


ITEM:
02.02.06
Rendimiento:

Cdigo

m2/DIA

18.0000

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL
PEN

Materiales
CLAVOS PARA MADERA CON CABEZA DE 3"
ARENA FINA
CEMENTO PORTLAND TIPO I (42.5 kg)
MADERA TORNILLO
GUA
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

REVOQUES ENLUCIDOS Y MOLDURAS


ITEM:
02.02.07
Rendimiento:

Cdigo

m2/DIA

15.0000

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL
PEN
Materiales
CLAVOS PARA MADERA CON CABEZA DE 3"
ARENA FINA
CEMENTO PORTLAND TIPO I (42.5 kg)
MADERA TORNILLO
GUA
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

REVOQUES ENLUCIDOS Y MOLDURAS


ITEM:
02.02.08
Rendimiento:

Cdigo

m2/DIA

12.0000

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL
PEN
Materiales
CLAVOS PARA MADERA CON CABEZA DE 3"
ARENA FINA
CEMENTO PORTLAND TIPO I (42.5 kg)
MADERA TORNILLO
GUA
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

REVOQUES ENLUCIDOS Y MOLDURAS


ITEM:
02.02.09
Rendimiento:

Cdigo

m2/DIA

15.0000

Descripcin Recurso
Mano de Obra
OPERARIO

OFICIAL
PEN
Materiales
CLAVOS PARA MADERA CON CABEZA DE 3"
ARENA FINA
CEMENTO PORTLAND TIPO I (42.5 kg)
MADERA TORNILLO
GUA
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

REVOQUES ENLUCIDOS Y MOLDURAS


ITEM:
02.02.10
Rendimiento:

Cdigo

m2/DIA

15.0000

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL
PEN
Materiales
CLAVOS PARA MADERA CON CABEZA DE 3"
ARENA FINA
CEMENTO PORTLAND TIPO I (42.5 kg)
MADERA TORNILLO
GUA
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

REVOQUES ENLUCIDOS Y MOLDURAS


ITEM:
02.02.11
Rendimiento:

Cdigo

m/DIA

20.0000

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL
Materiales
ARENA FINA
CEMENTO PORTLAND TIPO I (42.5 kg)
GUA
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

PISOS Y PAVIMENTOS
ITEM:
02.03.01
Rendimiento:

Cdigo

m2/DIA

8.0000

Descripcin Recurso
Mano de Obra
OPERARIO

PEN
Materiales
FRAGUA PREMIUM
PEGAMENTO EN POLVO 25KG PORCELANATO
CERMICA 0.45 X 0.45 m ALTO TRANSITO
TOPE CRUCETA 3mm C/JALADOR
WAIPE
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

ZOCALOS Y CONTRAZOCALOS
ITEM:
02.04.01
Rendimiento:

Cdigo

m/DIA

4.0000

Descripcin Recurso
Mano de Obra
OPERARIO
PEN
Materiales
FRAGUA PREMIUM
CONTRAZCALO DE CERMICA DE .10 X .45 M
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

CARPINTERIA DE MADERA
ITEM:
02.05.01
Rendimiento:

Cdigo

und/DIA

2.0000

Descripcin Recurso
Mano de Obra
OPERARIO
PEN
Materiales
PUERTA DE MADERA DE CEDRO DE 1.30 m X 2.36 m /INC. INSTALACION
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

CARPINTERIA DE MADERA
ITEM:
02.05.02
Rendimiento:

Cdigo

und/DIA

2.0000

Descripcin Recurso
Mano de Obra
OPERARIO
PEN
Materiales
PUERTA DE MADERA DE CEDRO DE 1.68 m X 2.64 m /INC. INSTALACION
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

CARPINTERIA DE MADERA
ITEM:
02.05.03
Rendimiento:

Cdigo

und/DIA

2.0000

Descripcin Recurso
Mano de Obra
OPERARIO
PEN
Materiales
PUERTA DE MADERA DE CEDRO DE 1.68 m X 2.60 m /INC. INSTALACION
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

CARPINTERIA DE MADERA
ITEM:
02.05.04
Rendimiento:

Cdigo

und/DIA

2.0000

Descripcin Recurso
Mano de Obra
OPERARIO
PEN
Materiales
PUERTA DE MADERA DE CEDRO DE 0.90 m X 2.34 m /INC. INSTALACION
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

CARPINTERIA DE MADERA
ITEM:
02.05.05
Rendimiento:

Cdigo

und/DIA

2.0000

Descripcin Recurso
Mano de Obra
OPERARIO
PEN
Materiales
PUERTA DE MADERA DE CEDRO DE 0.70 m X 2.34 m /INC. INSTALACIN
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

CARPINTERIA METALICA
ITEM:
02.06.01
Rendimiento:

Cdigo

und/DIA

2.0000

Descripcin Recurso
Mano de Obra
OPERARIO
PEN

Materiales
SOLDADURA CELLOCORD PUNTO AZUL 3/16
PUERTA METLICA 0.55 X 1.65
Equipos
HERRAMIENTAS MANUALES
MOTOSOLDADORA DE 250 A

PARTIDA:

CARPINTERIA METALICA
ITEM:
02.06.02
Rendimiento:

Cdigo

und/DIA

5.0000

Descripcin Recurso
Mano de Obra
OPERARIO
PEN

Materiales
SOLDADURA CELLOCORD PUNTO AZUL 3/16
VENTANA METLICA 1.70 X 1.98 M
Equipos
HERRAMIENTAS MANUALES
MOTOSOLDADORA DE 250 A

PARTIDA:

CARPINTERIA METALICA
ITEM:
02.06.03
Rendimiento:

Cdigo

m/DIA

10.0000

Descripcin Recurso
Mano de Obra
OPERARIO
PEN
Materiales
TUBO DE 2"
SOLDADURA CELLOCORD PUNTO AZUL 3/16
Equipos
HERRAMIENTAS MANUALES
MOTOSOLDADORA DE 250 A

PARTIDA:

VIDRIOS, CRISTALES Y SIMILARES


ITEM:
02.07.01
Rendimiento:

Cdigo

p2/DIA

60.0000

Descripcin Recurso
Mano de Obra
OPERARIO
PEN
Materiales
VIDRIO TRANSPARENTE CRUDO MEDIO DOBLE
Equipos

HERRAMIENTAS MANUALES

PARTIDA:

PINTURA
ITEM:

02.08.01

Rendimiento:

m2/DIA

Cdigo

33.0000

Descripcin Recurso
Mano de Obra
OPERARIO
PEN
Materiales
LIJA PARA PARED
PINTURA LATEX
IMPRIMANTE
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

PINTURA
ITEM:

02.08.02

Rendimiento:

m2/DIA

Cdigo

35.0000

Descripcin Recurso
Mano de Obra
OPERARIO
PEN
Materiales
LIJA DE FIERRO
PINTURA ESMALTE SINTETICO
PINTURA ANTICORROSIVA
AGUARRAS
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

ACCESORIOS SANITARIOS
ITEM:
02.09.01
Rendimiento:

Cdigo

und/DIA

4.0000

Descripcin Recurso
Mano de Obra
OPERARIO
PEN
Materiales
LAVATORIO OVALINO BLANCO,,INC/ACC.Y COLOCACIN
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

ACCESORIOS SANITARIOS
ITEM:
02.09.02
Rendimiento:

und/DIA

3.0000

Cdigo

Descripcin Recurso
Mano de Obra
OPERARIO
PEN
Materiales
INODORO FLUXMETRO BLANCO INC. COLOCACIN
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

ACCESORIOS SANITARIOS
ITEM:
02.09.03
Rendimiento:

Cdigo

und/DIA

3.0000

Descripcin Recurso
Mano de Obra
OPERARIO
PEN
Materiales
URINARIO BLANCO INC/ACC. Y COLOCACIN
Equipos
HERRAMIENTAS MANUALES

ITEM:

03.01.

Rendimiento:

pto/DIA

Cdigo

4.0000

Descripcin Recurso
Mano de Obra
OPERARIO
PEN
Materiales
CURVAS PVC-SEL 3/4"
CAJA OCTOGONAL PVC DE 4"
TUBO PVC SEL ESPIGA CAMPANA 3/4" X 3 M
Equipos
HERRAMIENTAS MANUALES

Cdigo

ITEM:

03.02.

Rendimiento:

pto/DIA

3.0000

Descripcin Recurso
Mano de Obra
OPERARIO
PEN
Materiales
CURVAS PVC-SEL 3/4"
TOMACORRIENTE DE DOBLE PLANO
CAJA RECTANGULAR FIERRO GALVANIZADO LIVIANO DE 4" X 2 1/8"

Equipos
HERRAMIENTAS MANUALES

ITEM:

03.03.

Rendimiento:

pto/DIA

Cdigo

4.0000

Descripcin Recurso
Mano de Obra
OPERARIO
PEN
Materiales
CURVAS PVC-SEL 3/4"
CINTA AISLANTE
CAJA RECTANGULAR PLASTICO 4" X 2" X 2"
TUBO PVC SEL ESPIGA CAMPANA 3/4" X 3 M
Equipos
HERRAMIENTAS MANUALES

ITEM:

03.04.

Rendimiento:

und/DIA

Cdigo

4.0000

Descripcin Recurso
Mano de Obra
OPERARIO
Materiales
INTERRUPTOR BIPOLAR DE 2 GOLPES
Equipos
HERRAMIENTAS MANUALES

ITEM:

03.05.

Rendimiento:

und/DIA

Cdigo

4.0000

Descripcin Recurso
Mano de Obra
OPERARIO
Materiales
INTERRUPTOR UNIPOLAR DE 1 GOLPE
Equipos
HERRAMIENTAS MANUALES

Cdigo

ITEM:

03.06.

Rendimiento:

und/DIA

4.0000

Descripcin Recurso

Mano de Obra
OPERARIO
Materiales
INTERRUPTOR UNIPOLAR DE 3 GOLPES
Equipos
HERRAMIENTAS MANUALES

ITEM:

03.07.

Rendimiento:

m/DIA

Cdigo

120.0000

Descripcin Recurso
Mano de Obra
OPERARIO
PEN
Materiales
TUBERA DE PVC SEL PARA INSTALACIONES ELCTRICAS DE 3/4"
CURVAS PVC-SEL 3/4"
UNION SIMPLE PVC SEL PARA INSTALACIONES ELCTRICAS 3/4"
Equipos
HERRAMIENTAS MANUALES

ITEM:

03.08.

Rendimiento:

m/DIA

Cdigo

40.0000

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL
Materiales
CABLE NRO 14
Equipos
HERRAMIENTAS MANUALES

Cdigo

ITEM:

03.09.

Rendimiento:

m/DIA

40.0000

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL
Materiales
CABLE NRO 12
Equipos
HERRAMIENTAS MANUALES

ITEM:

03.10.

Rendimiento:

und/DIA

Cdigo

15.0000

Descripcin Recurso
Mano de Obra
OPERARIO
Materiales
FLUORESCENTE 2 X 40 PANTALLA ACRILICA TRANSP. ADOSAR INC/INSTALC.
Equipos
HERRAMIENTAS MANUALES

ITEM:

03.11.

Rendimiento:

und/DIA

Cdigo

3.0000

Descripcin Recurso
Mano de Obra
OPERARIO
Materiales
LUMINARIA DOWNLIGTH
Equipos
HERRAMIENTAS MANUALES

ITEM:

03.12.

Rendimiento:

und/DIA

Cdigo

1.0000

Descripcin Recurso
Mano de Obra
OPERARIO
Materiales
TABLERO ELECTRICO DE METAL
Equipos
HERRAMIENTAS MANUALES

Cdigo

ITEM:

03.13.

Rendimiento:

und/DIA

16.0000

Descripcin Recurso
Mano de Obra
OPERARIO
PEN
Materiales
INTERRUPTOR THERMOMAGNTICO 2 X 40 A.
Equipos
HERRAMIENTAS MANUALES

ITEM:

03.14.

Rendimiento:

glb/DIA

Cdigo

1.0000

Descripcin Recurso
Materiales
SISTEMA DE CONEXIN POZO PUESTA A TIERRA INC. COLOCACIN

PARTIDA:

SISTEMA DE GUA FRIA


ITEM:
04.01.01
Rendimiento:

Cdigo

m/DIA

25.0000

Descripcin Recurso
Mano de Obra
OPERARIO
PEN
Materiales
TUBERA PVC SAP PRESION PARA GUA C-10R .3/4"
PEGAMENTO PVC
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

SISTEMA DE GUA FRIA


ITEM:
04.01.02
Rendimiento:

Cdigo

und/DIA

8.0000

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL
Materiales
CINTA TEFLN
NIPLE DE FIERRO GALVANIZADO DE 3/4"
UNION UNIVERSAL DE FIERRO GALVANIZADO DE 3/4" X 2''
VALVULA DE CONTROL DE BRONCE DE 3/4"
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

SISTEMA DE GUA FRIA


ITEM:
04.01.03
Rendimiento:

Cdigo

und/DIA

20.0000

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL
Materiales
PEGAMENTO PVC

CODO PVC 3/4'' X 90


Equipos
HERRAMIENTAS MANUALES

PARTIDA:

SISTEMA DE GUA FRIA


ITEM:
04.01.04
Rendimiento:

Cdigo

und/DIA

20.0000

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL
Materiales
CINTA TEFLN
TEE PVC SAP 3/4''
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

SISTEMA DE GUA FRIA


ITEM:
04.01.05
Rendimiento:

Cdigo

und/DIA

20.0000

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL
Materiales
PEGAMENTO PVC
CODO PVC 2'' X 90
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

SISTEMA DE GUA FRIA


ITEM:
04.01.06
Rendimiento:

Cdigo

und/DIA

20.0000

Descripcin Recurso
Mano de Obra
OPERARIO
OFICIAL
Materiales
CINTA TEFLN
REDUCCIN DE F.G. 2'' X 3/4''
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

SISTEMA DE DESAGUE
ITEM:
04.02.01

Rendimiento:
Cdigo

m/DIA

15.0000

Descripcin Recurso
Mano de Obra
OPERARIO
PEN
Materiales
TUBERA PVC SAL 2"
PEGAMENTO PVC
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

SISTEMA DE DESAGUE
ITEM:
04.02.02
Rendimiento:

Cdigo

m/DIA

15.0000

Descripcin Recurso
Mano de Obra
OPERARIO
PEN
Materiales
TUBERA PVC SAL 4"
PEGAMENTO PVC
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

SISTEMA DE DESAGUE
ITEM:
04.02.03
Rendimiento:

Cdigo

und/DIA

8.0000

Descripcin Recurso
Mano de Obra
OPERARIO
PEN
Materiales
CODO PVC SAL 2'' X 90
TEE SANITARIA SIMPLE PVC-SAL 2"
REGISTRO DE BRONCE DE 2"
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

SISTEMA DE DESAGUE
ITEM:
04.02.04
Rendimiento:

Cdigo

pza/DIA

8.0000

Descripcin Recurso
Mano de Obra
OPERARIO
PEN
Materiales

CODO PVC SAL 4" X 90


TEE SANITARIA SIMPLE PVC-SAL 4"
REGISTRO DE BRONCE DE 4"
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

SISTEMA DE DESAGUE
ITEM:
04.02.05
Rendimiento:

Cdigo

pto/DIA

2.0000

Descripcin Recurso
Mano de Obra
OPERARIO
PEN
Materiales
TUBERA PVC SAL 2"
CODO PVC SAL 2'' X 90
PEGAMENTO PVC
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

SISTEMA DE DESAGUE
ITEM:
04.02.06
Rendimiento:

Cdigo

pza/DIA

3.0000

Descripcin Recurso
Mano de Obra
OPERARIO
PEN
Materiales
TUBERA PVC SAL 2"
RAMAL TEE DOBLE CON REDUCCIN PVC SAL DE 4" A 2"
CODO PVC SAL 2'' X 90
SUMIDERO CROMADO DE 2"
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

SISTEMA DE DESAGUE
ITEM:
04.02.07
Rendimiento:

Cdigo

und/DIA

25.0000

Descripcin Recurso
Mano de Obra
OPERARIO
Materiales
PEGAMENTO PVC
CODO PVC SAL 2'' X 45
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

SISTEMA DE DESAGUE
ITEM:
04.02.08
Rendimiento:

Cdigo

und/DIA

25.0000

Descripcin Recurso
Mano de Obra
OPERARIO
Materiales
PEGAMENTO PVC
CODO PVC SAL 2'' X 90
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

SISTEMA DE DESAGUE
ITEM:
04.02.09
Rendimiento:

Cdigo

und/DIA

25.0000

Descripcin Recurso
Mano de Obra
OPERARIO
Materiales
PEGAMENTO PVC
CODO PVC SAL 4" X 90
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

SISTEMA DE DESAGUE
ITEM:
04.02.10
Rendimiento:

Cdigo

und/DIA

12.0000

Descripcin Recurso
Mano de Obra
OPERARIO
Materiales
PEGAMENTO PVC
REDUCCIN PVC SAL DE 4'' A 2''
Equipos
HERRAMIENTAS MANUALES

PARTIDA:

SISTEMA DE DESAGUE
ITEM:
04.02.11
Rendimiento:

Cdigo

und/DIA

12.0000

Descripcin Recurso
Mano de Obra
OPERARIO
Materiales
PEGAMENTO PVC

YEE PVC SAL DE 2''


Equipos
HERRAMIENTAS MANUALES

PARTIDA:

SISTEMA DE DESAGUE
ITEM:
04.02.12
Rendimiento:

Cdigo

und/DIA

12.0000

Descripcin Recurso
Mano de Obra
OPERARIO
Materiales
PEGAMENTO PVC
YEE PVC SAL DE 4''
Equipos
HERRAMIENTAS MANUALES

CION DEL SEGUNDO PISO PABELLON ''A''- UPN


Provincia:
Regin:
Fecha:

CAJAMARCA
CAJAMARCA
Cajamarca, junio 2012

ANALISIS DE COSTOS UNITARIOS


CARTEL DE IDENTIFICACION OBRA (2.40 m X 4.80 m)
Costo unitario directo por : und
Unidad
hh
hh

A DE 2"
3" X 6M
4.80 m

Cuadrilla

Cantidad

1.00
2.00

4.0000
8.0000

kg
und
und

0.2000
4.0000
1.0000

%mo

3.0000

TRAZO Y REPLANTEO
Costo unitario directo por : m2
Unidad
hh
hh
hh
hh

Cuadrilla

Cantidad

1.00
1.00
2.00
1.00

0.0080
0.0080
0.0160
0.0080

bol
und
und

he
hm
%mo

0.0100
0.0500
0.0080

2.00
1.00

0.0160
0.0080
3.0000

ESTRUCTURAS
CONCRETO PARA FALSO PISO f'c=100kg/cm2 C:H=1:10, E= 0.05 m.
Costo unitario directo por : m2
Unidad
hh
hh

Cuadrilla

Cantidad

1.00
1.00

0.0400
0.0400

hh

4.00

m3
bol
m3

(23 HP)

%mo
hm

0.1600

0.0280
0.3927
0.0800

0.10

5.0000
0.0040

ESTRUCTURAS
ACERO REFUERZO F'y= 4200 kg/cm 1" EN COLUMNA C1
Costo unitario directo por : kg
Unidad
hh
hh
hh

2 GRADO 60 DE 1"

Cuadrilla

Cantidad

1.00
1.00
1.00

0.0400
0.0400
0.0400

kg

1.1000

%mo

3.0000

ESTRUCTURAS
ACERO REFUERZO F'y= 4200 kg/cm 3/8" EN COLUMNA C1
Costo unitario directo por : kg
Unidad
hh
hh
hh

2 GRADO 60 DE 3/8"

Cuadrilla

Cantidad

1.00
1.00
1.00

0.0400
0.0400
0.0400

kg

1.0300

%mo

3.0000

ESTRUCTURAS
ENCOFRADO Y DESENCOFRADO EN COLUMNA C1

A DE 3"

Costo unitario directo por : m2


Unidad
hh
hh
hh

kg
kg
p2

Cuadrilla

Cantidad

1.00
1.00
0.50

0.5333
0.5333
0.2667

0.2600
0.2600
2.9800

%mo

3.0000

ESTRUCTURAS
CONCRETO f'c=280 kg/cm2 EN COLUMNA C1
Costo unitario directo por : m3
Unidad
hh
hh
hh

Cuadrilla

Cantidad

3.00
2.00
8.00

1.6000
1.0667
4.2667

m3
m3
bol
m3

(23 HP)

%mo
hm
hm

0.5600
0.4500
13.3400
0.0850

0.46
1.00

3.0000
0.2430
0.5333

ESTRUCTURAS
ACERO REFUERZO F'y= 4200 kg/cm 1/2" EN COLUMNA Ca
Costo unitario directo por : kg
Unidad
hh
hh
hh

2 GRADO 60 DE 1/2"

Cuadrilla

Cantidad

1.00
1.00
1.00

0.0400
0.0400
0.0400

kg

1.0500

%mo

3.0000

ESTRUCTURAS
ACERO REFUERZO F'y= 4200 kg/cm 3/8" EN COLUMNA Ca
Costo unitario directo por : kg
Unidad
hh
hh
hh

2 GRADO 60 DE 3/8"

Cuadrilla

Cantidad

1.00
1.00
1.00

0.0400
0.0400
0.0400

kg

1.0300

%mo

3.0000

ESTRUCTURAS
ENCOFRADO Y DESENCOFRADO EN COLUMNA Ca
Costo unitario directo por : m2
Unidad
hh
hh
hh

A DE 3"

Cuadrilla

Cantidad

1.00
1.00
0.50

0.5333
0.5333
0.2667

kg
kg
p2

0.2600
0.2600
2.9800

%mo

3.0000

ESTRUCTURAS
CONCRETO f'c=280 kg/cm2 EN COLUMNA Ca
Costo unitario directo por : m3
Unidad
hh
hh
hh

Cuadrilla

Cantidad

3.00
2.00
8.00

1.6000
1.0667
4.2667

m3
m3
bol
m3

%mo
hm
hm

(23 HP)

0.5600
0.4500
13.3400
0.0850

0.46
1.00

3.0000
0.2430
0.5333

ESTRUCTURAS
ACERO REFUERZO F'y= 4200 kg/cm 1" EN PLACA DE 0.80 X 0.25 m.
Costo unitario directo por : kg
Unidad
hh
hh
hh

2 GRADO 60 DE 1"

ESTRUCTURAS

Cuadrilla

Cantidad

1.00
1.00
1.00

0.0400
0.0400
0.0400

kg

1.1000

%mo

3.0000

ACERO REFUERZO F'y= 4200 kg/cm 1/2" EN PLACA DE 0.80 X 0.25 m.


Costo unitario directo por : kg
Unidad
hh
hh
hh

2 GRADO 60 DE 1/2"

Cuadrilla

Cantidad

1.00
1.00
1.00

0.0400
0.0400
0.0400

kg

1.0500

%mo

3.0000

ESTRUCTURAS
ENCOFRADO Y DESENCOFRADO EN PLACA DE 0.80 X 0.25 m.
Costo unitario directo por : m2
Unidad
hh
hh
hh

A DE 3"

Cuadrilla

Cantidad

1.00
1.00
0.50

0.5333
0.5333
0.2667

kg
kg
p2

0.2600
0.2600
2.9800

%mo

3.0000

ESTRUCTURAS
CONCRETO f'c=280 kg/cm2 EN PLACA DE 0.80 X 0.25 m.
Costo unitario directo por : m3
Unidad
hh
hh
hh

Cuadrilla

Cantidad

3.00
2.00
8.00

1.6000
1.0667
4.2667

m3
m3
bol
m3

(23 HP)

%mo
hm
hm

ESTRUCTURAS
ACERO REFUERZO F'y= 4200 kg/cm 1" EN PLACA DE 1.10 X 0.25 m.

0.5600
0.4500
13.3400
0.0850

0.46
1.00

3.0000
0.2430
0.5333

Costo unitario directo por : kg


Unidad
hh
hh
hh

2 GRADO 60 DE 1"

Cuadrilla

Cantidad

1.00
1.00
1.00

0.0400
0.0400
0.0400

kg

1.1000

%mo

3.0000

ESTRUCTURAS
ACERO REFUERZO F'y= 4200 kg/cm 1/2" EN PLACA DE 1.10 X 0.25 m.
Costo unitario directo por : kg
Unidad
hh
hh
hh

2 GRADO 60 DE 1/2"

Cuadrilla

Cantidad

1.00
1.00
1.00

0.0400
0.0400
0.0400

kg

1.0500

%mo

3.0000

ESTRUCTURAS
ENCOFRADO Y DESENCOFRADO EN PLACA DE 1.10 X 0.25 m.
Costo unitario directo por : m2
Unidad
hh
hh
hh

A DE 3"

Cuadrilla

Cantidad

1.00
1.00
0.50

0.5333
0.5333
0.2667

kg
kg
p2

0.2600
0.2600
2.9800

%mo

3.0000

ESTRUCTURAS
CONCRETO f'c=280 kg/cm2 EN PLACA DE 1.10 X 0.25 m.
Costo unitario directo por : m3
Unidad
hh
hh
hh

Cuadrilla

Cantidad

3.00
2.00
8.00

1.6000
1.0667
4.2667

m3
m3
bol
m3

(23 HP)

%mo
hm
hm

0.5600
0.4500
13.3400
0.0850

0.46
1.00

3.0000
0.2430
0.5333

ESTRUCTURAS
ACERO REFUERZO F'y= 4200 kg/cm 1" EN PLACAS TIPO T
Costo unitario directo por : kg
Unidad
hh
hh
hh

2 GRADO 60 DE 1"

Cuadrilla

Cantidad

1.00
1.00
1.00

0.0400
0.0400
0.0400

kg

1.1000

%mo

3.0000

ESTRUCTURAS
ACERO REFUERZO F'y= 4200 kg/cm 1/2" EN PLACAS TIPO T
Costo unitario directo por : kg
Unidad
hh
hh
hh

2 GRADO 60 DE 1/2"

Cuadrilla

Cantidad

1.00
1.00
1.00

0.0400
0.0400
0.0400

kg

1.0500

%mo

3.0000

ESTRUCTURAS
ENCOFRADO Y DESENCOFRADO EN PLACAS TIPO T

A DE 3"

Costo unitario directo por : m2


Unidad
hh
hh
hh

kg
kg

Cuadrilla

Cantidad

1.00
1.00
0.50

0.5333
0.5333
0.2667

0.2600
0.2600

p2

2.9800

%mo

3.0000

ESTRUCTURAS
CONCRETO f'c=280 kg/cm2 EN PLACAS TIPO T
Costo unitario directo por : m3
Unidad
hh
hh
hh

Cuadrilla

Cantidad

3.00
2.00
8.00

1.6000
1.0667
4.2667

m3
m3
bol
m3

(23 HP)

%mo
hm
hm

0.5600
0.4500
13.3400
0.0850

0.46
1.00

3.0000
0.2430
0.5333

ESTRUCTURAS
ACERO REFUERZO F'y= 4200 kg/cm 1" VIGAS
Costo unitario directo por : kg
Unidad
hh
hh
hh

2 GRADO 60 DE 1"

Cuadrilla

Cantidad

1.00
1.00
1.00

0.0400
0.0400
0.0400

kg

1.1000

%mo

3.0000

ESTRUCTURAS
ACERO REFUERZO F'y= 4200 kg/cm 3/8" VIGAS
Costo unitario directo por : kg
Unidad
hh
hh
hh

2 GRADO 60 DE 3/8"

Cuadrilla

Cantidad

1.00
1.00
1.00

0.0400
0.0400
0.0400

kg

1.0300

%mo

3.0000

ESTRUCTURAS
ACERO REFUERZO F'y= 4200 kg/cm 1/2" VIGAS
Costo unitario directo por : kg
Unidad
hh
hh
hh

2 GRADO 60 DE 1/2"

Cuadrilla

Cantidad

1.00
1.00
1.00

0.0400
0.0400
0.0400

kg

1.0500

%mo

3.0000

ESTRUCTURAS
ENCOFRADO Y DESENCOFRADO VIGAS
Costo unitario directo por : m2
Unidad
hh
hh
hh

A DE 3"

Cuadrilla

Cantidad

1.00
1.00
0.50

0.5333
0.5333
0.2667

kg
kg
p2

0.2600
0.2600
2.9800

%mo

3.0000

ESTRUCTURAS
CONCRETO f'c=280 kg/cm2 VIGAS

(23 HP)

Costo unitario directo por : m3


Unidad
hh
hh
hh

Cuadrilla

Cantidad

3.00
2.00
8.00

1.6000
1.0667
4.2667

m3
m3
bol
m3

%mo
hm
hm

0.5600
0.4500
13.3400
0.0850

0.46
1.00

3.0000
0.2430
0.5333

ESTRUCTURAS
ACERO REFUERZO F'y= 4200 kg/cm 1/2" ESCALERA
Costo unitario directo por : kg
Unidad
hh
hh
hh

2 GRADO 60 DE 1/2"

Cuadrilla

Cantidad

1.00
1.00
1.00

0.0400
0.0400
0.0400

kg

1.0500

%mo

3.0000

ESTRUCTURAS
ACERO REFUERZO F'y= 4200 kg/cm 3/8" ESCALERA
Costo unitario directo por : kg
Unidad
hh
hh
hh

2 GRADO 60 DE 3/8"

Cuadrilla

Cantidad

1.00
1.00
1.00

0.0400
0.0400
0.0400

kg

1.0300

%mo

3.0000

ESTRUCTURAS
ENCOFRADO Y DESENCOFRADO ESCALERA
Costo unitario directo por : m2
Unidad
hh
hh
hh

A DE 3"

Cuadrilla

Cantidad

1.00
1.00
0.50

0.5333
0.5333
0.2667

kg
kg
p2

0.2600
0.2600
2.9800

%mo

3.0000

ESTRUCTURAS
CONCRETO f'c=280 kg/cm2 ESCALERA
Costo unitario directo por : m3
Unidad

Cuadrilla

Cantidad

hh
hh
hh

3.00
2.00
8.00

m3
m3
bol
m3

(23 HP)

%mo
hm
hm

1.6000
1.0667
4.2667

0.5600
0.4500
13.3400
0.0850

0.46
1.00

3.0000
0.2430
0.5333

ESTRUCTURAS
ACERO CORRUGADO FY= 4200 kg/cm2 DE 1/2" PARA LOSA
Costo unitario directo por : kg
Unidad
hh
hh
hh

2 GRADO 60 DE 1/2"

Cuadrilla

Cantidad

1.00
1.00
1.00

0.0400
0.0400
0.0400

kg

1.0500

%mo

3.0000

ESTRUCTURAS
ACERO CORRUGADO FY= 4200 kg/cm2 DE 5/8" PARA LOSA
Costo unitario directo por : kg
Unidad
hh
hh
hh

2 GRADO 60 DE 5/8"

Cuadrilla

Cantidad

1.00
1.00
1.00

0.0400
0.0400
0.0400

kg

1.0700

%mo

3.0000

ESTRUCTURAS
ACERO CORRUGADO FY= 4200 kg/cm2 DE 1/4" PARA LOSA
Costo unitario directo por : kg
Unidad
hh
hh
hh

Cuadrilla

Cantidad

1.00
1.00
1.00

0.0400
0.0400
0.0400

2 GRADO 60 DE 1/4"

kg

1.0100

%mo

3.0000

ESTRUCTURAS
ENCOFRADO Y DESENCOFRADO EN LOSAS
Costo unitario directo por : m2
Unidad
hh
hh
hh

A DE 3"

Cuadrilla

Cantidad

1.00
1.00
0.50

0.5333
0.5333
0.2667

kg
kg
p2

0.2600
0.2600
2.9800

%mo

3.0000

ESTRUCTURAS
CONCRETO f'c=280 kg/cm2 EN LOSA
Costo unitario directo por : m3
Unidad
hh
hh
hh

Cuadrilla

Cantidad

3.00
2.00
8.00

1.6000
1.0667
4.2667

m3
m3
bol
m3

(23 HP)

%mo
hm
hm

0.5600
0.4500
13.3400
0.0850

0.46
1.00

3.0000
0.2430
0.5333

ESTRUCTURAS
LADRILLO HUECO DE ARCILLA h = 25 cm PARA TECHO ALIGERADO

0X30 cm

Costo unitario directo por : und


Unidad
hh
hh

und

Cuadrilla

Cantidad

1.00
5.00

0.0067
0.0333

1.0100

%mo

3.0000

ARQUITECTURA
MURO DE CABEZA KK LADRILLO DE ARCILLA MORTERO 1:5 CEMENTO: ARENA
Costo unitario directo por : m2
Unidad
hh
hh
hh

A DE 3"

E 0.9 X .14 X .24 CM

Cuadrilla

Cantidad

1.00
1.00
0.30

1.0667
1.0667
0.3200

kg
m3
bol
und
p2
m3

0.0200
0.0300
0.1000
44.0000
0.2500
0.0070

%mo

3.0000

ARQUITECTURA
MURO DE SOGA LADRILLO K.K. DE ARCILLA MEZCLA 1.5, JUNTA 1.5 cm
Costo unitario directo por : m2
Unidad
hh
hh
hh

A DE 3"

E 0.9 X .14 X .24 CM

Cuadrilla

Cantidad

1.00
1.00
0.30

0.5333
0.5333
0.1600

kg
m3
bol
und
p2
m3

0.0200
0.0300
0.1000
56.0000
0.2500
0.0070

%mo

3.0000

ARQUITECTURA
MURO DE DRYWALL
Costo unitario directo por : m2
Unidad
hh
hh
hh

pln

Cuadrilla

Cantidad

1.00
1.00
0.30

0.5333
0.5333
0.1600

0.2900

%mo

3.0000

ARQUITECTURA
TARRAJEO DE MUROS INTERIORES Y EXTERIORES MEZCLA C.A. 1:5
Costo unitario directo por : m2
Unidad
hh
hh
hh

A DE 3"

Cuadrilla

Cantidad

2.00
1.00
1.00

0.8000
0.4000
0.4000

kg
m3
bol
p2
m3

0.0220
0.0200
0.1200
0.2500
0.0035

%mo

3.0000

ARQUITECTURA
TARRAJEO DE COLUMNA C1
EQ. 18.0000
Unidad
hh
hh
hh

A DE 3"

Costo unitario directo por : m2


Cuadrilla

Cantidad

2.00
1.00
1.00

0.8889
0.4444
0.4444

kg
m3
bol
p2
m3

0.0220
0.0200
0.1200
0.2500
0.0035

%mo

3.0000

ARQUITECTURA
TARRAJEO DE COLUMNA Ca

A DE 3"

Costo unitario directo por : m2


Unidad
hh
hh
hh

kg
m3

Cuadrilla

Cantidad

2.00
1.00
1.00

0.8889
0.4444
0.4444

0.0220
0.0200

bol
p2
m3

0.1200
0.2500
0.0035

%mo

3.0000

ARQUITECTURA
TARRAJEO DE PLACA .80 m x .25 m
Costo unitario directo por : m2
Unidad
hh
hh
hh

A DE 3"

Cuadrilla

Cantidad

2.00
1.00
1.00

0.8889
0.4444
0.4444

kg
m3
bol
p2
m3

0.0220
0.0200
0.1200
0.2500
0.0035

%mo

3.0000

ARQUITECTURA
TARRAJEO DE PLACA 1.10 m x .25 m
Costo unitario directo por : m2
Unidad
hh
hh
hh

A DE 3"

Cuadrilla

Cantidad

2.00
1.00
1.00

0.8889
0.4444
0.4444

kg
m3
bol
p2
m3

0.0220
0.0200
0.1200
0.2500
0.0035

%mo

3.0000

ARQUITECTURA
TARRAJEO DE PLACA TIPO T
Costo unitario directo por : m2
Unidad
hh
hh
hh

Cuadrilla

Cantidad

2.00
1.00
1.00

0.8889
0.4444
0.4444

A DE 3"

kg
m3
bol
p2
m3

0.0220
0.0200
0.1200
0.2500
0.0035

%mo

3.0000

ARQUITECTURA
TARRAJEO DE VIGAS
Costo unitario directo por : m2
Unidad
hh
hh
hh

A DE 3"

Cuadrilla

Cantidad

2.00
1.00
1.00

1.0667
0.5333
0.5333

kg
m3
bol
p2
m3

0.0220
0.0200
0.1200
0.2500
0.0035

%mo

3.0000

ARQUITECTURA
TARRAJEO DE CIELO RASO
Costo unitario directo por : m2
Unidad
hh
hh
hh

A DE 3"

Cuadrilla

Cantidad

2.00
1.00
1.00

1.3333
0.5333
0.5333

kg
m3
bol
p2
m3

0.0220
0.0200
0.1200
0.2500
0.0035

%mo

3.0000

ARQUITECTURA
REVESTIMIENTO DE FONDO DE ESCALERA MEZCLA 1:5 C.A.
Costo unitario directo por : m2
Unidad
hh

Cuadrilla

Cantidad

2.00

1.0667

hh
hh

A DE 3"

1.00
1.00

0.5333
0.5333

kg
m3
bol
p2
m3

0.0220
0.0200
0.1200
0.2500
0.0035

%mo

3.0000

ARQUITECTURA
REVESTIMIENTO DE PASOS Y CONTRAPASOS DE ESCALERA MEZCLA 1:4 C.A. E: 0.03 M
Costo unitario directo por : m2
Unidad
hh
hh
hh

A DE 3"

Cuadrilla

Cantidad

2.00
1.00
1.00

1.0667
0.5333
0.5333

kg
m3
bol
p2
m3

0.0220
0.0200
0.1200
0.2500
0.0035

%mo

3.0000

ARQUITECTURA
VESTIDURA DE DERRAMES
Costo unitario directo por : m
Unidad
hh
hh

Cuadrilla

Cantidad

1.00
1.00

0.4000
0.4000

m3
bol
m3

0.0020
0.0358
0.0600

%mo

5.0000

ARQUITECTURA
PISO CERAMICO .45 m X .45 m
Costo unitario directo por : m2
Unidad
hh

Cuadrilla

Cantidad

1.00

1.0000

hh

ELANATO
SITO

0.30

0.3000

kg
bol
m2
und
kg

0.1500
0.2600
1.0500
0.0800
0.0500

%mo

3.0000

ARQUITECTURA
CONTRAZOCALO DE CERAMICO DE .10 X .45 m
Costo unitario directo por : m
Unidad
hh
hh

10 X .45 M

Cuadrilla

Cantidad

1.00
0.30

2.0000
0.6000

kg
m

0.3700
1.0500

%mo

3.0000

ARQUITECTURA
PUERTA DE MADERA CEDRO DE 1.30 X 2.36 INC/COLOCACION
Costo unitario directo por : und
Unidad
hh
hh

1.30 m X 2.36 m /INC. INSTALACION

Cuadrilla

Cantidad

1.00
0.30

4.0000
1.2000

und

1.0000

%mo

3.0000

ARQUITECTURA
PUERTA DE MADERA CEDRO DE 1.68 m X 2.64 m INC/COLOCACION

1.68 m X 2.64 m /INC. INSTALACION

Costo unitario directo por : und


Unidad
hh
hh

Cuadrilla

Cantidad

1.00
0.30

4.0000
1.2000

und

1.0000

%mo

3.0000

ARQUITECTURA
PUERTA DE MADERA CEDRO DE 1.68 m X 2.60m INC/COLOCACION
Costo unitario directo por : und
Unidad
hh
hh

1.68 m X 2.60 m /INC. INSTALACION

Cuadrilla

Cantidad

1.00
0.30

4.0000
1.2000

und

1.0000

%mo

3.0000

ARQUITECTURA
PUERTA DE MADERA CEDRO DE 0.90 m X 2.34m INC/COLOCACION
Costo unitario directo por : und
Unidad
hh
hh

0.90 m X 2.34 m /INC. INSTALACION

Cuadrilla

Cantidad

1.00
0.30

4.0000
1.2000

und

1.0000

%mo

3.0000

ARQUITECTURA
PUERTA DE MADERA CEDRO DE 0.70 m X 2.34m INC/COLOCACION
Costo unitario directo por : und
Unidad
hh
hh

0.70 m X 2.34 m /INC. INSTALACIN

Cuadrilla

Cantidad

1.00
0.30

4.0000
1.2000

und

1.0000

%mo

3.0000

ARQUITECTURA
PUERTA METALICA 0.55 X 1.65. M
Costo unitario directo por : und
Unidad
hh
hh

Cuadrilla

Cantidad

1.00
0.30

4.0000
1.2000

ZUL 3/16

kg
und

%mo
hm

0.1800
1.0000

1.00

3.0000
4.0000

ARQUITECTURA
VENTANA METALICA DE 1.70 m X 1.98 m
Costo unitario directo por : und
Unidad
hh
hh

ZUL 3/16

Cuadrilla

Cantidad

1.00
0.30

1.6000
0.4800

kg
und

%mo
hm

0.1800
1.0000

1.00

3.0000
1.6000

ARQUITECTURA
BARANDAS METALICA tub. de 2"
Costo unitario directo por : m
Unidad
hh
hh

ZUL 3/16

Cuadrilla

Cantidad

1.00
0.30

0.8000
0.2400

m
kg

%mo
hm

1.0300
0.1900

1.00

3.0000
0.8000

ARQUITECTURA
VIDRIO SEMIDOBLE INCOLORO CRUDO

DIO DOBLE

Costo unitario directo por : p2


Unidad
hh
hh

p2

Cuadrilla

Cantidad

1.00
0.25

0.1333
0.0333

1.0500

%mo

3.0000

ARQUITECTURA
PINTURA LATEX DOS MANOS EN MUROS INT. EXT., C1, Ca, PLACAS, VIGAS, CIELO RASO
Costo unitario directo por : m2
Unidad
hh
hh

Cuadrilla

Cantidad

1.00
1.00

0.2424
0.2424

plg
gal
gal

0.2500
0.0400
0.1000

%mo

3.0000

ARQUITECTURA
PINTURA ESMALTE EN CARPINTERIA METALICA
Costo unitario directo por : m2
Unidad
hh
hh

Cuadrilla

Cantidad

1.00
1.00

0.2286
0.2286

und
gal
gal
gal

0.8000
0.0500
0.0500
0.0600

%mo

3.0000

ARQUITECTURA
LAVATORIO OVALINOS BLANCO INC. COLOCACIN
Costo unitario directo por : und
Unidad
hh
hh

CC.Y COLOCACIN

Cuadrilla

Cantidad

1.00
0.50

2.0000
1.0000

und

1.0000

%mo

3.0000

ARQUITECTURA
INODORO FLUXMETRO BLANCO INC. COLOCACIN
Costo unitario directo por : und

Unidad
hh
hh

C. COLOCACIN

Cuadrilla

Cantidad

1.25
0.63

3.3333
1.6667

und

1.0000

%mo

3.0000

ARQUITECTURA
URINARIO BLANCO (INCLUYE COLOCACION)
Costo unitario directo por : und
Unidad
hh
hh

OCACIN

Cuadrilla

Cantidad

1.25
0.63

3.3333
1.6667

und

1.0000

%mo

3.0000

INSTALACIONES ELECTRICAS
SALIDAS DE TECHO (CENTROS DE LUZ)
Costo unitario directo por : pto
Unidad
hh
hh

4" X 3 M

Cuadrilla

Cantidad

1.25
1.25

2.5000
2.5000

pza
pza
pza

1.0000
1.0000
1.6000

%mo

3.0000

INSTALACIONES ELECTRICAS
SALIDA DE TOMACORRIENTE DOBLE PUESTA A TIERRA

NIZADO LIVIANO DE 4" X 2 1/8"

Costo unitario directo por : pto


Unidad
hh
hh

pza
und
und

Cuadrilla

Cantidad

1.00
1.00

2.6667
2.6667

1.0000
1.0000
1.0000

%mo

3.0000

INSTALACIONES ELECTRICAS
SALIDA PARA INTERRUPTORES
Costo unitario directo por : pto
Unidad
hh
hh

2" X 2"
4" X 3 M

Cuadrilla

Cantidad

1.00
1.00

2.0000
2.0000

pza
rll
und
pza

1.0000
0.1000
1.0000
1.9000

%mo

3.0000

INSTALACIONES ELECTRICAS
INTERRUPTOR BIPOLAR DE 2 GOLPES
Costo unitario directo por : pto
Unidad
hh

Cuadrilla

Cantidad

1.00

2.0000

und

1.0000

%mo

3.0000

INSTALACIONES ELECTRICAS
INTERRUPTOR UNIPOLAR DE 1 GOLPE
Costo unitario directo por : pto
Unidad
hh

Cuadrilla

Cantidad

1.00

2.0000

und

1.0000

%mo

3.0000

INSTALACIONES ELECTRICAS
INTERRUPTOR UNIPOLAR DE 3 GOLPES
Costo unitario directo por : pto
Unidad

Cuadrilla

Cantidad

hh

PES

1.00

2.0000

und

1.0000

%mo

3.0000

INSTALACIONES ELECTRICAS
TUBERA PVC-SEL D= 3/4"
Costo unitario directo por : m
Unidad
hh
hh

CIONES ELCTRICAS DE 3/4"

LACIONES ELCTRICAS 3/4"

Cuadrilla

Cantidad

1.00
1.00

0.0667
0.0667

m
pza
pza

1.0500
0.1000
0.3300

%mo

3.0000

INSTALACIONES ELECTRICAS
RED DE ALUMBRADO CABLE NRO 14
Costo unitario directo por : m
Unidad
hh
hh

Cuadrilla

Cantidad

1.00
1.00

0.2000
0.2000

1.0500

%mo

3.0000

INSTALACIONES ELECTRICAS
RED DE TOMACORRIENTES CABLE NRO 12
Costo unitario directo por : m
Unidad
hh
hh

Cuadrilla

Cantidad

1.00
1.00

0.2000
0.2000

1.0500

%mo

3.0000

INSTALACIONES ELECTRICAS
FLUORESCENTE 2 X 40 W, ADOSADA A CIELO RASO
Costo unitario directo por : und
Unidad
hh

CRILICA TRANSP. ADOSAR INC/INSTALC.

Cuadrilla

Cantidad

1.00

0.5333

und

1.0000

%mo

3.0000

INSTALACIONES ELECTRICAS
LUMINARIA DOWN LIGHT ADOASADA A CIELO RASO
Costo unitario directo por : und
Unidad
hh

Cuadrilla

Cantidad

0.06

0.1600

und

1.0000

%mo

3.0000

INSTALACIONES ELECTRICAS
TABLERO ELECTRICO GABINETE METALICO PARA DISTRIBUCION
Costo unitario directo por : und
Unidad
hh

Cuadrilla

Cantidad

1.00

8.0000

und

1.0000

%mo

3.0000

INSTALACIONES ELECTRICAS
INTERRUPTOR THERMOMAGNETICO MONOFASICA 2 X 40 A.

O 2 X 40 A.

Costo unitario directo por : und


Unidad
hh
hh

Cuadrilla

Cantidad

1.00
0.50

0.5000
0.2500

und

1.0000

%mo

3.0000

INSTALACIONES ELECTRICAS
POZO PUESTA A TIERRA
Costo unitario directo por : glb
Unidad

TA A TIERRA INC. COLOCACIN

Cuadrilla

glb

Cantidad
1.0000

INSTALACIONES SANITARIAS
RED DE DISTRIBUCION TUB. PVC SAP DE 3/4"
Costo unitario directo por : m
Unidad
hh
hh

GUA C-10R .3/4"

Cuadrilla

Cantidad

1.00
1.00

0.3200
0.3200

m
gal

1.0300
0.0040

%mo

3.0000

INSTALACIONES SANITARIAS
VALVULA DE CONTROL DE 3/4"
Costo unitario directo por : pza
Unidad
hh
hh

3/4"
ANIZADO DE 3/4" X 2''
DE 3/4"

Cuadrilla

Cantidad

1.00
1.00

1.0000
1.0000

und
und
und
und

1.0000
2.0000
2.0000
1.0000

%mo

3.0000

INSTALACIONES SANITARIAS
CODO PVC 3/4'' X 90
Costo unitario directo por : pza
Unidad
hh
hh

und

Cuadrilla

Cantidad

1.00
1.00

0.4000
0.4000

0.0040

und

1.0000

%mo

3.0000

INSTALACIONES SANITARIAS
TEE PVC SAP 3/4''
Costo unitario directo por : pza
Unidad
hh
hh

Cuadrilla

Cantidad

1.00
1.00

0.4000
0.4000

und
und

1.0000
1.0000

%mo

3.0000

INSTALACIONES SANITARIAS
CODO PVC 2'' X 90
Costo unitario directo por : pza
Unidad
hh
hh

Cuadrilla

Cantidad

1.00
1.00

0.4000
0.4000

und
und

0.0040
1.0000

%mo

3.0000

INSTALACIONES SANITARIAS
REDUCCIN DE F.G. 2'' X 3/4''
Costo unitario directo por : pza
Unidad
hh
hh

INSTALACIONES SANITARIAS
TUBERA PVC SAL 2"

Cuadrilla

Cantidad

1.00
1.00

0.4000
0.4000

und
und

1.0000
1.0000

%mo

3.0000

Costo unitario directo por : m


Unidad
hh
hh

Cuadrilla

Cantidad

1.00
2.00

0.5333
1.0667

und
gal

0.3500
0.0040

%mo

3.0000

INSTALACIONES SANITARIAS
TUBERA PVC SAL 4"
Costo unitario directo por : m
Unidad
hh
hh

Cuadrilla

Cantidad

1.00
2.00

0.5333
1.0667

und
gal

0.3500
0.0040

%mo

3.0000

INSTALACIONES SANITARIAS
REGISTRO DE BRONCE 2"
Costo unitario directo por : und
Unidad
hh
hh

Cuadrilla

Cantidad

1.00
1.00

1.0000
1.0000

und
und
und

1.0000
1.0000
1.0000

%mo

3.0000

INSTALACIONES SANITARIAS
REGISTRO DE BRONCE 4"
Costo unitario directo por : pza
Unidad
hh
hh

Cuadrilla

Cantidad

1.00
0.50

1.0000
0.5000

und
und
und

1.0000
1.0000
1.0000

%mo

3.0000

INSTALACIONES SANITARIAS
SALIDA PVC PARA VENTILACION DE 2"
Costo unitario directo por : pto
Unidad
hh
hh

Cuadrilla

Cantidad

1.00
1.00

4.0000
4.0000

m
und
gal

2.5000
1.0000
0.0040

%mo

3.0000

INSTALACIONES SANITARIAS
SUMIDEROS DE 2"
Costo unitario directo por : pza
Unidad
hh
hh

N PVC SAL DE 4" A 2"

Cuadrilla

Cantidad

1.00
0.50

2.6667
1.3333

m
und
und
und

1.0000
1.0000
1.0000
1.0000

%mo

5.0000

INSTALACIONES SANITARIAS
CODO PVC SAP 2'' X 45 DESAGUE
Costo unitario directo por : pza
Unidad
hh

Cuadrilla

Cantidad

0.50

0.1600

gal
und

0.0040
1.0000

%mo

3.0000

INSTALACIONES SANITARIAS
CODO PVC SAL 2'' X 90 DESAGUE
Costo unitario directo por : pza
Unidad
hh

Cuadrilla

Cantidad

0.50

0.1600

gal
und

0.0040
1.0000

%mo

3.0000

INSTALACIONES SANITARIAS
CODO PVC SAL 4'' X 90 DESAGUE
Costo unitario directo por : pza
Unidad
hh

Cuadrilla

Cantidad

0.50

0.1600

gal
und

0.0040
1.0000

%mo

3.0000

INSTALACIONES SANITARIAS
REDUCCIN PVC SAL DE 4'' A 2''
Costo unitario directo por : pza
Unidad
hh

Cuadrilla

Cantidad

0.50

0.3333

gal
und

0.0040
1.0000

%mo

3.0000

INSTALACIONES SANITARIAS
YEE PVC SAL DE 2''
Costo unitario directo por : pza
Unidad
hh

gal

Cuadrilla

Cantidad

0.50

0.3333

0.0040

und

1.0000

%mo

3.0000

INSTALACIONES SANITARIAS
YEE PVC SAL DE 4''
Costo unitario directo por : pza
Unidad
hh

Cuadrilla

Cantidad

0.50

0.3333

gal
und

0.0040
1.0000

%mo

3.0000

731.91
Precio S/.

Parcial S/.

15.22
11.93

60.88
95.44
156.32

60.88
95.44

4.50
30.00
450.00

0.90
120.00
450.00
570.90

0.90
120.00
450.00

156.32

4.69
4.69

4.69

1.91
Precio S/.

Parcial S/.

15.22
13.23
11.93
16.65

0.12
0.11
0.19
0.13
0.55

38.09
33.11
59.71
41.67

18.00
2.50
60.00

0.18
0.13
0.48
0.79

56.31
39.11
150.16

25.00
20.00
0.55

0.40
0.16
0.02
0.58

125.14
50.05
5.16

12.55
Precio S/.

Parcial S/.

15.22
13.23

0.61
0.53

110.49
96.04

11.93

1.91
3.05

346.41

35.00
20.80
1.50

0.98
8.17
0.12
9.27

177.85
1482.36
21.78

3.05
20.00

0.15
0.08
0.23

27.65
14.52

8.64
Precio S/.

Parcial S/.

15.22
13.23
11.93

0.61
0.53
0.48
1.62

42.07
36.57
32.97

6.34

6.97
6.97

481.90

1.62

0.05
0.05

3.35

4.79
Precio S/.

Parcial S/.

15.22
13.23
11.93

0.61
0.53
0.48
1.62

8.55
7.43
6.70

3.04

3.13
3.13

43.96

1.62

0.05
0.05

0.68

42.18
Precio S/.

Parcial S/.

15.22
13.23
11.93

8.12
7.06
3.18
18.35

73.62
64.00
28.85

4.30
5.00
7.00

1.12
1.30
20.86

10.14
11.79
189.20

23.28
18.35

0.55
0.55

4.99

436.11
Precio S/.

Parcial S/.

15.22
13.23
11.93

24.35
14.11
50.90
89.37

35.80
20.74
74.82

65.00
35.00
20.80
1.50

36.40
15.75
277.47
0.13
329.75

53.51
23.15
407.88
0.19

89.37
15.00
20.00

2.68
3.65
10.67
16.99

3.94
5.36
15.68

4.78
Precio S/.

Parcial S/.

15.22
13.23
11.93

0.61
0.53
0.48
1.62

109.38
95.08
85.74

2.97

3.12
3.12

560.30

1.62

0.05
0.05

8.71

4.79
Precio S/.

Parcial S/.

15.22
13.23
11.93

0.61
0.53
0.48
1.62

18.53
16.10
14.52

3.04

3.13
3.13

95.28

1.62

0.05
0.05

1.47

42.18
Precio S/.

Parcial S/.

15.22
13.23
11.93

8.12
7.06
3.18
18.35

257.81
224.10
101.04

4.30
5.00
7.00

1.12
1.30
20.86
23.28

35.51
41.29
662.51

18.35

0.55
0.55

17.49

436.11
Precio S/.

Parcial S/.

15.22
13.23
11.93

24.35
14.11
50.90
89.37

33.12
19.19
69.23

65.00
35.00
20.80
1.50

36.40
15.75
277.47
0.13
329.75

49.50
21.42
377.36
0.17

89.37
15.00
20.00

2.68
3.65
10.67
16.99

3.65
4.96
14.51

8.64
Precio S/.

Parcial S/.

15.22
13.23
11.93

0.61
0.53
0.48
1.62

105.88
92.04
82.99

6.34

6.97
6.97

1212.92

1.62

0.05
0.05

8.43

4.78
Precio S/.

Parcial S/.

15.22
13.23
11.93

0.61
0.53
0.48
1.62

38.62
33.57
30.27

2.97

3.12
3.12

197.84

1.62

0.05
0.05

3.07

42.18
Precio S/.

Parcial S/.

15.22
13.23
11.93

8.12
7.06
3.18
18.35

59.50
51.72
23.32

4.30
5.00
7.00

1.12
1.30
20.86
23.28

8.19
9.53
152.90

18.35

0.55
0.55

4.04

436.11
Precio S/.

Parcial S/.

15.22
13.23
11.93

24.35
14.11
50.90
89.37

17.05
9.88
35.63

65.00
35.00
20.80
1.50

36.40
15.75
277.47
0.13
329.75

25.48
11.03
194.23
0.09

89.37
15.00
20.00

2.68
3.65
10.67
16.99

1.88
2.55
7.47

8.64
Precio S/.

Parcial S/.

15.22
13.23
11.93

0.61
0.53
0.48
1.62

247.06
214.76
193.66

6.34

6.97
6.97

2830.19

1.62

0.05
0.05

19.66

4.78
Precio S/.

Parcial S/.

15.22
13.23
11.93

0.61
0.53
0.48
1.62

64.37
55.95
50.45

2.97

3.12
3.12

329.72

1.62

0.05
0.05

5.12

42.18
Precio S/.

Parcial S/.

15.22
13.23
11.93

8.12
7.06
3.18
18.35

153.01
133.01
59.97

4.30
5.00
7.00

1.12
1.30
20.86
23.28

21.07
24.51
393.21

18.35

0.55
0.55

10.38

436.11
Precio S/.

Parcial S/.

15.22
13.23
11.93

24.35
14.11
50.90

46.76
27.10
97.73

89.37
65.00
35.00
20.80
1.50

36.40
15.75
277.47
0.13
329.75

69.89
30.24
532.75
0.24

89.37
15.00
20.00

2.68
3.65
10.67
16.99

5.15
7.00
20.48

8.64
Precio S/.

Parcial S/.

15.22
13.23
11.93

0.61
0.53
0.48
1.62

2647.11
2301.00
2074.90

6.34

6.97
6.97

30323.51

1.62

0.05
0.05

210.69
210.69

4.78
Precio S/.

Parcial S/.

15.22
13.23
11.93

0.61
0.53
0.48
1.62

203.84
177.19
159.78

2.97

3.12
3.12

1044.14

1.62

0.05
0.05

16.22

42.18
Precio S/.

Parcial S/.

15.22
13.23
11.93

8.12
7.06
3.18
18.35

45.46
39.51
17.82

4.30
5.00

1.12
1.30

6.26
7.28

7.00

20.86
23.28

116.82

18.35

0.55
0.55

3.08

436.11
Precio S/.

Parcial S/.

15.22
13.23
11.93

24.35
14.11
50.90
89.37

475.84
275.75
994.61

65.00
35.00
20.80
1.50

36.40
15.75
277.47
0.13
329.75

711.26
307.76
5421.80
2.49

89.37
15.00
20.00

2.68
3.65
10.67
16.99

52.39
71.22
208.41

8.64
Precio S/.

Parcial S/.

15.22
13.23
11.93

0.61
0.53
0.48
1.62

1349.98
1173.47
1058.16

6.34

6.97
6.97

15464.43

1.62

0.05
0.05

107.45

4.79
Precio S/.

Parcial S/.

15.22
13.23
11.93

0.61
0.53
0.48
1.62

450.95
391.99
353.47

3.04

3.13
3.13

2319.34

1.62

0.05

35.89

0.05

4.78
Precio S/.

Parcial S/.

15.22
13.23
11.93

0.61
0.53
0.48
1.62

43.15
37.51
33.82

2.97

3.12
3.12

221.04

1.62

0.05
0.05

3.43

42.18
Precio S/.

Parcial S/.

15.22
13.23
11.93

8.12
7.06
3.18
18.35

1428.65
1241.86
559.91

4.30
5.00
7.00

1.12
1.30
20.86
23.28

196.77
228.80
3671.36

18.35

0.55
0.55

96.91

436.11
Precio S/.

Parcial S/.

15.22
13.23
11.93

24.35
14.11
50.90
89.37

715.95
414.89
1496.50

65.00
35.00
20.80
1.50

36.40
15.75
277.47
0.13
329.75

1070.16
463.05
8157.68
3.75

89.37
15.00
20.00

2.68
3.65
10.67
16.99

78.82
107.16
313.58

4.78
Precio S/.

Parcial S/.

15.22
13.23
11.93

0.61
0.53
0.48
1.62

182.51
158.65
143.06

2.97

3.12
3.12

934.90

1.62

0.05
0.05

14.53

4.79
Precio S/.

Parcial S/.

15.22
13.23
11.93

0.61
0.53
0.48
1.62

59.26
51.51
46.45

3.04

3.13
3.13

304.79

1.62

0.05
0.05

4.72

42.18
Precio S/.

Parcial S/.

15.22
13.23
11.93

8.12
7.06
3.18
18.35

1826.40
1587.60
715.80

4.30
5.00
7.00

1.12
1.30
20.86
23.28

251.55
292.50
4693.50

18.35

0.55
0.55

123.89

436.11
Precio S/.

Parcial S/.

15.22
13.23
11.93

24.35
14.11
50.90
89.37

235.48
136.46
492.22

65.00
35.00
20.80
1.50

36.40
15.75
277.47
0.13
329.75

351.99
152.30
2683.15
1.23

89.37
15.00
20.00

2.68
3.65
10.67
16.99

25.92
35.25
103.14

4.78
Precio S/.

Parcial S/.

15.22
13.23
11.93

0.61
0.53
0.48
1.62

482.77
419.65
378.41

2.97

3.12
3.12

2472.94

1.62

0.05
0.05

38.43

4.88
Precio S/.

Parcial S/.

15.22
13.23
11.93

0.61
0.53
0.48
1.62

105.82
91.99
82.95

3.01

3.22
3.22

559.82

1.62

0.05
0.05

8.42

6.15
Precio S/.

Parcial S/.

15.22
13.23
11.93

0.61
0.53
0.48
1.62

171.44
149.02
134.38

4.44

4.48
4.48

1262.81

1.62

0.05
0.05

13.65

42.18
Precio S/.

Parcial S/.

15.22
13.23
11.93

8.12
7.06
3.18
18.35

2290.71
1991.20
897.77

4.30
5.00
7.00

1.12
1.30
20.86
23.28

315.50
366.86
5886.69

18.35

0.55
0.55

155.39

436.11
Precio S/.

Parcial S/.

15.22
13.23
11.93

24.35
14.11
50.90
89.37

1987.12
1151.54
4153.55

65.00
35.00
20.80
1.50

36.40
15.75
277.47
0.13
329.75

2970.24
1285.20
22641.72
10.40

89.37
15.00
20.00

2.68
3.65
10.67
16.99

218.77
297.43
870.35

2.33
Precio S/.

Parcial S/.

15.22
11.93

0.10
0.40
0.50

229.90
901.02

1.80

1.82
1.82

4119.15

0.50

0.01
0.01

33.93

61.30
Precio S/.

Parcial S/.

15.22
13.23
11.93

16.23
14.11
3.82
34.16

2593.49
2254.39
609.86

5.00
35.00
20.80
0.48
7.00
1.50

0.10
1.05
2.08
21.12
1.75
0.01
26.11

15.98
167.74
332.28
3373.92
279.56
1.68

34.16

1.02
1.02

163.73

49.47
Precio S/.

Parcial S/.

15.22
13.23
11.93

8.12
7.06
1.91
17.08

825.05
717.17
194.01

5.00
35.00
20.80
0.48
7.00
1.50

0.10
1.05
2.08
26.88
1.75
0.01
31.87

10.16
106.72
211.41
2732.08
177.87
1.07

17.08

0.51
0.51

52.09

61.67
Precio S/.

Parcial S/.

15.22
13.23
11.93

8.12
7.06
1.91
17.08

666.76
579.58
156.79

152.00

44.08

3620.73

44.08
17.08

0.51
0.51

42.09

28.27
Precio S/.

Parcial S/.

15.22
13.23
11.93

12.18
5.29
4.77
22.24

6362.93
2765.49
2493.75

5.00
50.00
20.80
7.00
1.50

0.11
1.00
2.50
1.75
0.01
5.36

57.48
522.58
1304.36
914.52
2.74

22.24

0.67
0.67

348.67

30.81
Precio S/.

Parcial S/.

15.22
13.23
11.93

13.53
5.88
5.30
24.71

112.15
48.75
43.96

5.00
50.00
20.80
7.00
1.50

0.11
1.00
2.50
1.75
0.01
5.36

0.91
8.29
20.69
14.51
0.04

24.71

0.74
0.74

6.15

30.81
Precio S/.

Parcial S/.

15.22
13.23
11.93

13.53
5.88
5.30
24.71

392.74
170.70
153.92

5.00
50.00

0.11
1.00

3.19
29.03

20.80
7.00
1.50

2.50
1.75
0.01
5.36

72.46
50.80
0.15

24.71

0.74
0.74

21.52

30.81
Precio S/.

Parcial S/.

15.22
13.23
11.93

13.53
5.88
5.30
24.71

90.64
39.40
35.52

5.00
50.00
20.80
7.00
1.50

0.11
1.00
2.50
1.75
0.01
5.36

0.74
6.70
16.72
11.73
0.04

24.71

0.74
0.74

4.97

30.81
Precio S/.

Parcial S/.

15.22
13.23
11.93

13.53
5.88
5.30
24.71

233.10
101.31
91.36

5.00
50.00
20.80
7.00
1.50

0.11
1.00
2.50
1.75
0.01
5.36

1.90
17.23
43.01
30.15
0.09

24.71

0.74
0.74

12.77

30.81
Precio S/.

Parcial S/.

15.22
13.23
11.93

13.53
5.88
5.30
24.71

75.76
32.93
29.69

5.00
50.00
20.80
7.00
1.50

0.11
1.00
2.50
1.75
0.01
5.36

0.62
5.60
13.98
9.80
0.03

24.71

0.74
0.74

4.15

35.90
Precio S/.

Parcial S/.

15.22
13.23
11.93

16.23
7.06
6.36
29.65

2857.30
1241.86
1119.83

5.00
50.00
20.80
7.00
1.50

0.11
1.00
2.50
1.75
0.01
5.36

19.36
176.00
439.30
308.00
0.92

29.65

0.89
0.89

156.57

40.08
Precio S/.

Parcial S/.

15.22
13.23
11.93

20.29
7.06
6.36
33.71

5861.93
2038.20
1837.92

5.00
50.00
20.80
7.00
1.50

0.11
1.00
2.50
1.75
0.01
5.36

31.77
288.86
720.99
505.51
1.52

33.71

1.01
1.01

292.14

35.90
Precio S/.

Parcial S/.

15.22

16.23

343.69

13.23
11.93

7.06
6.36
29.65

149.38
134.70

5.00
50.00
20.80
7.00
1.50

0.11
1.00
2.50
1.75
0.01
5.36

2.33
21.17
52.84
37.05
0.11

29.65

0.89
0.89

18.83

35.90
Precio S/.

Parcial S/.

15.22
13.23
11.93

16.23
7.06
6.36
29.65

226.47
98.43
88.76

5.00
50.00
20.80
7.00
1.50

0.11
1.00
2.50
1.75
0.01
5.36

1.53
13.95
34.82
24.41
0.07

29.65

0.89
0.89

12.41

12.88
Precio S/.

Parcial S/.

15.22
13.23

6.09
5.29
11.38

1735.08
1508.22

50.00
20.80
1.50

0.10
0.74
0.09
0.93

28.50
212.22
25.65

11.38

0.57
0.57

162.17

76.47
Precio S/.

Parcial S/.

15.22

15.22

2762.13

11.93

3.58
18.80

649.52

8.00
25.00
46.50
3.50
6.00

1.20
6.50
48.83
0.28
0.30
57.11

217.78
1179.62
8860.76
50.81
54.44

18.80

0.56
0.56

102.35

54.81
Precio S/.

Parcial S/.

15.22
11.93

30.44
7.16
37.60

4433.28
1042.49

8.00
12.50

2.96
13.13
16.09

431.09
1911.53

37.60

1.13
1.13

164.27

727.45
Precio S/.

Parcial S/.

15.22
11.93

60.88
14.32
75.20

243.52
57.26

650.00

650.00
650.00

2600.00

75.20

2.26
2.26

9.02

877.45
Precio S/.

Parcial S/.

15.22
11.93

60.88
14.32
75.20

60.88
14.32

800.00

800.00
800.00

800.00

75.20

2.26

2.26

2.26

877.45
Precio S/.

Parcial S/.

15.22
11.93

60.88
14.32
75.20

60.88
14.32

800.00

800.00
800.00

800.00

75.20

2.26
2.26

2.26

777.45
Precio S/.

Parcial S/.

15.22
11.93

60.88
14.32
75.20

121.76
28.63

700.00

700.00
700.00

1400.00

75.20

2.26
2.26

4.51

627.45
Precio S/.

Parcial S/.

15.22
11.93

60.88
14.32
75.20

121.76
28.63

550.00

550.00
550.00

1100.00

75.20

2.26
2.26

4.51

510.69
Precio S/.

Parcial S/.

15.22
11.93

60.88
14.32
75.20

121.76
28.63

18.00
350.00

3.24
350.00
353.24

6.48
700.00

75.20
20.00

2.26
80.00
82.26

4.51
160.00

316.22
Precio S/.

Parcial S/.

15.22
11.93

24.35
5.73
30.08

389.63
91.62

18.00
250.00

3.24
250.00
253.24

51.84
4000.00

30.08
20.00

0.90
32.00
32.90

14.44
512.00

76.52
Precio S/.

Parcial S/.

15.22
11.93

12.18
2.86
15.04

547.92
128.84

40.00
18.00

41.20
3.42
44.62

1854.00
153.90

15.04
20.00

0.86
16.00
16.86

38.70
720.00

6.17
Precio S/.

Parcial S/.

15.22
11.93

2.03
0.40
2.43

1176.40
230.53

3.50

3.68
3.68

2130.40

2.43

0.07
0.07

42.21

11.90
Precio S/.

Parcial S/.

15.22
11.93

3.69
2.89
6.58

3779.87
2962.80

2.50
25.00
35.00

0.63
1.00
3.50
5.13

640.28
1024.44
3585.54

6.58

0.20
0.20

202.28

12.54
Precio S/.

Parcial S/.

15.22
11.93

3.48
2.73
6.21

303.53
237.92

2.50
30.00
35.00
15.00

2.00
1.50
1.75
0.90
6.15

174.50
130.88
152.69
78.53

6.21

0.19
0.19

16.24

341.44
Precio S/.

Parcial S/.

15.22
11.93

30.44
11.93
42.37

91.32
35.79

297.80

297.80
297.80

893.40

42.37

1.27
1.27

3.81

557.74

Precio S/.

Parcial S/.

15.22
11.93

50.73
19.88
70.62

152.20
59.65

485.00

485.00
485.00

1455.00

70.62

2.12
2.12

6.36

210.74
Precio S/.

Parcial S/.

15.22
11.93

50.73
19.88
70.62

101.47
39.77

138.00

138.00
138.00

276.00

70.62

2.12
2.12

4.24

81.56
Precio S/.

Parcial S/.

15.22
11.93

38.05
29.83
67.88

2283.00
1789.50

0.35
0.90
6.50

0.35
0.90
10.40
11.65

21.00
54.00
624.00

67.88

2.04
2.04

122.18

87.42
Precio S/.

Parcial S/.

15.22
11.93

40.59
31.81
72.40

1095.84
858.96

0.35
9.50
3.00

0.35
9.50
3.00

9.45
256.50
81.00

12.85
72.40

2.17
2.17

58.64

69.88
Precio S/.

Parcial S/.

15.22
11.93

30.44
23.86
54.30

395.72
310.18

0.35
3.50
0.90
6.50

0.35
0.35
0.90
12.35
13.95

4.55
4.55
11.70
160.55

54.30

1.63
1.63

21.18

49.55
Precio S/.

Parcial S/.

15.22

30.44
30.44

152.20

18.20

18.20
18.20

91.00

30.44

0.91
0.91

4.57

43.55
Precio S/.

Parcial S/.

15.22

30.44
30.44

91.32

12.20

12.20
12.20

36.60

30.44

0.91
0.91

2.74

46.05
Precio S/.

Parcial S/.

15.22

30.44
30.44

152.20

14.70

14.70
14.70

73.50

30.44

0.91
0.91

4.57

3.74
Precio S/.

Parcial S/.

15.22
11.93

1.01
0.80
1.81

240.34
188.39

1.50
0.35
0.80

1.58
0.04
0.26
1.87

373.07
8.29
62.53

1.81

0.05
0.05

12.86

7.23
Precio S/.

Parcial S/.

15.22
13.23

3.04
2.65
5.69

589.38
512.32

1.30

1.37
1.37

264.29

5.69

0.17
0.17

33.05

7.80
Precio S/.

Parcial S/.

15.22
13.23

3.04
2.65
5.69

852.69
741.20

1.85

1.94
1.94

544.13

5.69

0.17
0.17

47.82

93.36
Precio S/.

Parcial S/.

15.22

8.12
8.12

332.81

85.00

85.00
85.00

3485.00

8.12

0.24
0.24

9.98

87.51
Precio S/.

Parcial S/.

15.22

2.44
2.44

46.27

85.00

85.00
85.00

1615.00

2.44

0.07
0.07

1.39

215.41
Precio S/.

Parcial S/.

15.22

121.76
121.76

121.76

90.00

90.00
90.00

90.00

121.76

3.65
3.65

3.65

97.41
Precio S/.

Parcial S/.

15.22
11.93

7.61
2.98
10.59

7.61
2.98

86.50

86.50
86.50

86.50

10.59

0.32

0.32

0.32

800.00
Precio S/.

Parcial S/.

800.00

800.00
800.00

800.00

11.56
Precio S/.

Parcial S/.

15.22
11.93

4.87
3.82
8.69

85.18
66.77

2.20
86.00

2.27
0.34
2.61

39.63
6.02

8.69

0.26
0.26

4.56

78.87
Precio S/.

Parcial S/.

15.22
13.23

15.22
13.23
28.45

30.44
26.46

0.84
2.10
5.46
33.61

0.84
4.20
10.92
33.61
49.57

1.68
8.40
21.84
67.22

28.45

0.85
0.85

1.71

13.61
Precio S/.

Parcial S/.

15.22
13.23

6.09
5.29
11.38

97.41
84.67

86.00

0.34

5.50

1.54

1.54
1.88

24.64

11.38

0.34
0.34

5.46

13.86
Precio S/.

Parcial S/.

15.22
13.23

6.09
5.29
11.38

18.26
15.88

0.84
1.30

0.84
1.30
2.14

2.52
3.90

11.38

0.34
0.34

1.02

18.79
Precio S/.

Parcial S/.

15.22
13.23

6.09
5.29
11.38

6.09
5.29

86.00
6.72

0.34
6.72
7.06

0.34
6.72

11.38

0.34
0.34

0.34

19.36
Precio S/.

Parcial S/.

15.22
13.23

6.09
5.29
11.38

6.09
5.29

0.84
6.80

0.84
6.80
7.64

0.84
6.80

11.38

0.34
0.34

0.34

24.68
Precio S/.

Parcial S/.

15.22
11.93

8.12
12.73
20.84

1353.57
2121.95

8.20
86.00

2.87
0.34
3.21

478.57
57.36

20.84

0.63
0.63

104.27

28.46
Precio S/.

Parcial S/.

15.22
11.93

8.12
12.73
20.84

43.75
68.59

19.00
86.00

6.65
0.34
6.99

35.84
1.85

20.84

0.63
0.63

3.37

38.56
Precio S/.

Parcial S/.

15.22
11.93

15.22
11.93
27.15

30.44
23.86

1.10
2.30
7.20

1.10
2.30
7.20
10.60

2.20
4.60
14.40

27.15

0.81
0.81

1.63

43.12
Precio S/.

Parcial S/.

15.22
11.93

15.22
5.97
21.19

15.22
5.97

3.80
9.30
8.20

3.80
9.30
8.20
21.30

3.80
9.30
8.20

21.19

0.64
0.64

0.64

133.80
Precio S/.

Parcial S/.

15.22
11.93

60.88
47.72
108.60

121.76
95.44

8.20
1.10
86.00

20.50
1.10
0.34
21.94

41.00
2.20
0.69

108.60

3.26
3.26

6.52

84.12
Precio S/.

Parcial S/.

15.22
11.93

40.59
15.91
56.49

40.59
15.91

8.20
6.50
1.10
9.00

8.20
6.50
1.10
9.00
24.80

8.20
6.50
1.10
9.00

56.49

2.82
2.82

2.82

3.75
Precio S/.

Parcial S/.

15.22

2.44
2.44

4.87

86.00
0.90

0.34
0.90
1.24

0.69
1.80

2.44

0.07
0.07

0.15

3.95
Precio S/.

Parcial S/.

15.22

2.44
2.44

14.61

86.00
1.10

0.34
1.10
1.44

2.06
6.60

2.44

0.07
0.07

0.44

6.65
Precio S/.

Parcial S/.

15.22

2.44
2.44

7.31

86.00
3.80

0.34
3.80
4.14

1.03
11.40

2.44

0.07
0.07

0.22

8.51
Precio S/.

Parcial S/.

15.22

5.07
5.07

10.15

86.00
2.94

0.34
2.94
3.28

0.69
5.88

5.07

0.15
0.15

0.30

10.87
Precio S/.

Parcial S/.

15.22

5.07
5.07

35.51

86.00

0.34

2.41

5.30

5.30
5.64

37.10

5.07

0.15
0.15

1.07

11.87
Precio S/.

Parcial S/.

15.22

5.07
5.07

20.29

86.00
6.30

0.34
6.30
6.64

1.38
25.20

5.07

0.15
0.15

0.61

CONSTRUCCION DEL SEGUNDO PISO PABE

PROYECTO
Localidad: CAJAMARCA
Distrito: CAJAMARCA
Proyectista: Ing. Jean Pier Cotrina Arriaga

RELACIN DE INSUMOS
ITEM

DESCRIPCIN
MANO DE OBRA
1 TOPGRAFO
2 OFICIAL
3 OPERARIO
4 PEN
MATERIALES
1 ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 DE 1"
2 ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 DE 1/2"
3 ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 DE 1/4"
4 ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 DE 3/8"
5 ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 DE 5/8"
6 GUA
7 AGUARRAS
8 ALAMBRE NEGRO RECOCIDO N 8
9 ARENA FINA
10 ARENA GRUESA
11 CABLE NRO 12
12 CABLE NRO 14
13 CAJA OCTOGONAL PVC DE 4"
14 CAJA RECTANGULAR FIERRO GALVANIZADO LIVIANO DE 4" X 2 1/8"
15 CAJA RECTANGULAR PLASTICO 4" X 2" X 2"
16 CEMENTO PORTLAND TIPO I (42.5 kg)
17 CERMICA 0.45 X 0.45 m ALTO TRANSITO
18 CINTA AISLANTE
19 CINTA TEFLN
20 CLAVOS PARA MADERA CON CABEZA DE 2"
21 CLAVOS PARA MADERA CON CABEZA DE 3"
22 CODO PVC 2'' X 90
23 CODO PVC 3/4'' X 90
24 CODO PVC SAL 2'' X 45
25 CODO PVC SAL 2'' X 90
26 CODO PVC SAL 4" X 90
27 CONTRAZCALO DE CERMICA DE .10 X .45 M
28 CURVAS PVC-SEL 3/4"
29 DRYWALL INC. INSTALC.
30 ESTACAS DE MADERA
31 FLUORESCENTE 2 X 40 PANTALLA ACRILICA TRANSP. ADOSAR INC/INSTALC.
32 FRAGUA PREMIUM
33 GIGANTOGRAFA DE OBRA 2.40 m X 4.80 m
34 IMPRIMANTE
35 INODORO FLUXMETRO BLANCO INC. COLOCACIN

36 INTERRUPTOR BIPOLAR DE 2 GOLPES


37 INTERRUPTOR THERMOMAGNTICO 2 X 40 A.
38 INTERRUPTOR UNIPOLAR DE 1 GOLPE
39 INTERRUPTOR UNIPOLAR DE 3 GOLPES
40 LADRILLO KING KONG DE ARCILLA DE 0.9 X .14 X .24 CM
41 LADRILLO PARA TECHO 8H DE 25X30X30 cm
42 LAVATORIO OVALINO BLANCO,,INC/ACC.Y COLOCACIN
43 LIJA DE FIERRO
44 LIJA PARA PARED
45 LUMINARIA DOWNLIGTH
46 MADERA TORNILLO
47 NIPLE DE FIERRO GALVANIZADO DE 3/4"
48 PARANTES DE MADERA EUCALIPTO 3" X 6M
49 PEGAMENTO EN POLVO 25KG PORCELANATO
50 PEGAMENTO PVC
51 PIEDRA CHANCADA 1/2"
52 PINTURA ANTICORROSIVA
53 PINTURA ESMALTE SINTETICO
54 PINTURA LATEX
55 PUERTA DE MADERA DE CEDRO DE 0.70 m X 2.34 m /INC. INSTALACIN
56 PUERTA DE MADERA DE CEDRO DE 0.90 m X 2.34 m /INC. INSTALACION
57 PUERTA DE MADERA DE CEDRO DE 1.30 m X 2.36 m /INC. INSTALACION
58 PUERTA DE MADERA DE CEDRO DE 1.68 m X 2.60 m /INC. INSTALACION
59 PUERTA DE MADERA DE CEDRO DE 1.68 m X 2.64 m /INC. INSTALACION
60 PUERTA METLICA 0.55 X 1.65
61 RAMAL TEE DOBLE CON REDUCCIN PVC SAL DE 4" A 2"
62 REDUCCIN DE F.G. 2'' X 3/4''
63 REDUCCIN PVC SAL DE 4'' A 2''
64 REGISTRO DE BRONCE DE 2"
65 REGISTRO DE BRONCE DE 4"
66 SISTEMA DE CONEXIN POZO PUESTA A TIERRA INC. COLOCACIN
67 SOLDADURA CELLOCORD PUNTO AZUL 3/16
68 SUMIDERO CROMADO DE 2"
69 TABLERO ELECTRICO DE METAL
70 TEE PVC SAP 3/4''
71 TEE SANITARIA SIMPLE PVC-SAL 2"
72 TEE SANITARIA SIMPLE PVC-SAL 4"
73 TOMACORRIENTE DE DOBLE PLANO
74 TOPE CRUCETA 3mm C/JALADOR
75 TUBERA DE PVC SEL PARA INSTALACIONES ELCTRICAS DE 3/4"
76 TUBERA PVC SAL 2"
77 TUBERA PVC SAL 4"
78 TUBERA PVC SAP PRESION PARA GUA C-10R .3/4"
79 TUBO DE 2"
80 TUBO PVC SEL ESPIGA CAMPANA 3/4" X 3 M
81 UNION SIMPLE PVC SEL PARA INSTALACIONES ELCTRICAS 3/4"
82 UNION UNIVERSAL DE FIERRO GALVANIZADO DE 3/4" X 2''
83 URINARIO BLANCO INC/ACC. Y COLOCACIN
84 VALVULA DE CONTROL DE BRONCE DE 3/4"
85 VENTANA METLICA 1.70 X 1.98 M
86 VIDRIO TRANSPARENTE CRUDO MEDIO DOBLE
87 WAIPE
88 WINCHA DE 50 M
89 YEE PVC SAL DE 2''
90 YEE PVC SAL DE 4''
91 YESO 20 KG

EQUIPOS Y HERRAMIENTAS
1 HERRAMIENTAS MANUALES
2 MEZCLADORA DE CONCRETO 11 P3 (23 HP)
3 MOTOSOLDADORA DE 250 A
4 NIVEL
5 TEODOLITO
6 VIBRADOR DE CONCRETO 4 HP 1.25"

UNDO PISO PABELLON ''A''- UPN


Provincia:
Regin:
Hecho por:

N DE INSUMOS
UNIDAD
H.H.
H.H.
H.H.
H.H.

APORTE
122174.12
41.67
26158.09
61601.02
34373.35

KG
KG
KG
KG
KG
M3
GL
KG
M3
M3
M
M
PZA
U
U
BLS
M2
RLL
U
KG
KG
U
U
U
U
U
M
PZA
PLN
U
U
KG
U
GL
U

196488.89
50312.95
5760.87
1262.81
2763.38
559.82
74.46
78.53
845.00
1117.91
2746.45
544.13
264.29
54.00
81.00
11.70
45374.01
8860.76
4.55
5.04
0.90
1128.53
6.72
24.64
1.80
12.10
15.20
1911.53
43.29
3620.73
39.11
3485.00
648.87
450.00
3585.54
1455.00

CAJAMARCA
CAJAMARCA
Cajamarca, junio 2012

U
U
U
U
U
U
U
U
PLG
U
P2
U
P2
BOL
GL
M3
GL
GL
GL
U
U
U
U
U
U
U
U
U
U
U
GLB
KG
U
U
U
U
U
U
U
M
U
U
U
U
U
U
U
U
U
U
P2
KG
U
U
U
BOL

91.00
86.50
36.60
73.50
6106.00
4119.15
893.40
174.50
640.28
1615.00
18130.10
8.40
120.00
1179.62
80.02
5302.02
152.69
130.88
1024.44
1100.00
1400.00
2600.00
800.00
800.00
700.00
6.50
6.80
5.88
14.40
8.20
800.00
212.22
9.00
90.00
3.90
4.60
9.30
256.50
50.81
373.07
527.77
35.84
39.63
1854.00
784.55
62.53
21.84
276.00
67.22
4000.00
2130.40
54.44
150.16
37.10
25.20
56.31

H.M.
H.M.
H.M.
H.M.
H.M.
H.M.
Total:

7426.91
3760.66
1568.13
1392.00
125.14
50.05
530.93
326089.92
0.00

PROYECTO:

CONSTRUCCION DEL SEGUNDO PISO PABELLON ''A''- UPN

Localidad:
Distrito:
Proyectista:

PRESUPUESTO DE OBRA
Item
01.00.00
01.01.00
01.01.01
01.01.02
01.02.00
01.02.01
01.03.00
01.03.01
01.03.01.01
01.03.01.02
01.03.01.03
01.03.01.04
01.03.02
01.03.02.01
01.03.02.02
01.03.02.03
01.03.02.04
01.03.03
01.03.03.01
01.03.03.02
01.03.03.03
01.03.03.04
01.03.04
01.03.04.01
01.03.04.02
01.03.04.03
01.03.04.04
01.03.05
01.03.05.01
01.03.05.02
01.03.05.03
01.03.05.04
01.03.06
01.03.06.01
01.03.06.02
01.03.06.03
01.03.06.04
01.03.06.05
01.03.07
01.03.07.01
01.03.07.02
01.03.07.03
01.03.07.04
01.03.08
01.03.08.01
01.03.08.02
01.03.08.03
01.03.08.04
01.03.08.05
01.03.08.06

02.00.00
02.01.00
02.01.01
02.01.02
02.01.03
02.02.00
02.02.01
02.02.02
02.02.03
02.02.04
02.02.05
02.02.06
02.02.07
02.02.08
02.02.09
02.02.10
02.02.11
02.03.00
02.03.01
02.04.00
02.04.01
02.05.00
02.05.01
02.05.02
02.05.03
02.05.04
02.05.05
02.06.00
02.06.01
02.06.02
02.06.03
02.07.00
02.07.01
02.08.00
02.08.01
01.08.02
02.09.00
02.09.01
02.09.02
02.09.03
03.00.00
03.01.00
03.02.00
03.03.00
03.04.00
03.05.00
03.06.00
03.07.00
03.08.00
03.09.00
03.10.00
03.11.00
03.12.00
03.13.00
03.14.00
04.00.00
04.01.00

04.01.01
04.01.02
04.01.03
04.01.04
04.01.05
04.01.06
04.02.00
04.02.01
04.02.02
04.02.03
04.02.04
04.02.05
04.02.06
04.02.07
04.02.08
04.02.09
04.02.10
04.02.11
04.02.12

PROYECTO:

CONSTRUCCION DEL SEGUNDO PISO PABELLON ''A''- UPN

CAJAMARCA
CAJAMARCA
Ing. Jean Pier Cotrina Arriaga

PRESUPUESTO DE OBRA
Descripcin
ESTRUCTURAS
TRABAJOS PRELIMINARES
CARTEL DE IDENTIFICACION OBRA (2.40 m X 4.80 m)
TRAZO Y REPLANTEO
OBRAS DE CONCRETO SIMPLE
CONCRETO PARA FALSO PISO f'c=100kg/cm2 C:H=1:10, E= 0.05 m.
OBRAS DE CONCRETO ARMADO
COLUMNA C1
ACERO REFUERZO F'y= 4200 kg/cm 1"
ACERO REFUERZO F'y= 4200 kg/cm 3/8"
ENCOFRADO Y DESENCOFRADO
CONCRETO f'c=280 kg/cm2
COLUMNA Ca
ACERO REFUERZO F'y= 4200 kg/cm 1/2"
ACERO REFUERZO F'y= 4200 kg/cm 3/8"
ENCOFRADO Y DESENCOFRADO
CONCRETO f'c=280 kg/cm2
PLACA DE .80 m x .25 m
ACERO REFUERZO F'y= 4200 kg/cm 1"
ACERO REFUERZO F'y= 4200 kg/cm 1/2"
ENCOFRADO Y DESENCOFRADO
CONCRETO f'c=280 kg/cm2
PLACA DE 1.10 m x .25 m
ACERO REFUERZO F'y= 4200 kg/cm 1"
ACERO REFUERZO F'y= 4200 kg/cm 1/2"
ENCOFRADO Y DESENCOFRADO
CONCRETO f'c=280 kg/cm2
PLACA TIPO T
ACERO REFUERZO F'y= 4200 kg/cm 1"
ACERO REFUERZO F'y= 4200 kg/cm 1/2"
ENCOFRADO Y DESENCOFRADO
CONCRETO f'c=280 kg/cm2
VIGAS
ACERO REFUERZO F'y= 4200 kg/cm 1"
ACERO REFUERZO F'y= 4200 kg/cm 3/8"
ACERO REFUERZO F'y= 4200 kg/cm 1/2"
ENCOFRADO Y DESENCOFRADO
CONCRETO f'c=280 kg/cm2
ESCALERAS
ACERO REFUERZO F'y= 4200 kg/cm 1/2"
ACERO REFUERZO F'y= 4200 kg/cm 3/8"
ENCOFRADO Y DESENCOFRADO
CONCRETO f'c=280 kg/cm2
LOSAS ALIGERADAS
ACERO CORRUGADO FY= 4200 kg/cm2 DE 1/2" PARA LOSA
ACERO CORRUGADO FY= 4200 kg/cm2 DE 5/8" PARA LOSA
ACERO CORRUGADO FY= 4200 kg/cm2 DE 1/4" PARA LOSA
ENCOFRADO Y DESENCOFRADO EN LOSAS
CONCRETO f'c=280 kg/cm2
LADRILLO HUECO DE ARCILLA h = 25 cm PARA TECHO ALIGERADO

ARQUITECTURA
MUROS Y TABIQUES DE ALBAILERIA
MURO DECABEZA KK LADRILLO DE ARCILLA MORTERO 1:5 CEMENTO: ARENA
MURO DE SOGA LADRILLO K.K. DE ARCILLA MEZCLA 1.5, JUNTA 1.5 cm
MURO DE DRYWALL
REVOQUES, ENLUCIDOS Y MOLDURAS
TARRAJEO DE MUROS INTERIORES Y EXTERIORES MEZCLA C.A. 1:5
TARRAJEO DE COLUMNA C1
TARRAJEO DE COLUMNA Ca
TARRAJEO DE PLACA .80 m x .25 m
TARRAJEO DE PLACA 1.10 m x .25 m
TARRAJEO DE PLACA TIPO T
TARRAJEO DE VIGAS
TARRAJEO DE CIELO RASO
REVESTIMIENTO DE FONDO DE ESCALERA MEZCLA 1:5 C.A.
REVESTIMIENTO DE PASOS Y CONTRAPASOS DE ESCALERA MEZCLA 1:4 C.A. E: 0.03 M
VESTIDURA DE DERRAMES
PISOS Y PAVIMENTOS
PISO CERAMICO .45 m X .45 m
ZOCALOS Y CONTRAZOCALOS
CONTRAZOCALO DE CERAMICO DE .10 X .45 m
CARPINTERIA DE MADERA
PUERTA DE MADERA CEDRO DE 1.30 X 2.36 INC/COLOCACION
PUERTA DE MADERA CEDRO DE 1.68 m X 2.64 m INC/COLOCACION
PUERTA DE MADERA CEDRO DE 1.68 m X 2.60m INC/COLOCACION
PUERTA DE MADERA CEDRO DE 0.90 m X 2.34m INC/COLOCACION
PUERTA DE MADERA CEDRO DE 0.70 m X 2.34m INC/COLOCACION
CARPINTERIA METALICA
PUERTA METALICA 0.55 X 1.65. M
VENTANA METALICA DE 1.70 m X 1.98 m
BARANDAS METALICA tub. de 2"
VIDRIOS, CRISTALES Y SIMILARES
VIDRIO SEMIDOBLE INCOLORO CRUDO
PINTURA
PINTURA LATEX DOS MANOS EN MUROS INT. EXT., C1, Ca, PLACAS, VIGAS, CIELO RASO
PINTURA ESMALTE EN CARPINTERIA METALICA
ACCESORIOS SANITARIOS
LAVATORIO OVALINOS BLANCO INC. COLOCACION
INODORO FLUXMETRO BLANCO INC. COLOCACIN
URINARIO BLANCO (INCLUYE COLOCACION)
INSTALACIONES ELECTRICAS
SALIDAS DE TECHO (CENTROS DE LUZ)
SALIDA DE TOMACORRIENTE DOBLE PUESTA A TIERRA
SALIDA PARA INTERRUPTORES
INTERRUPTOR BIPOLAR DE 2 GOLPES
INTERRUPTOR UNIPOLAR DE 1 GOLPE
INTERRUPTOR UNIPOLAR DE 3 GOLPES
TUBERA PVC-SEL D= 3/4"
RED DE ALUMBRADO CABLE NRO 14
RED DE TOMACORRIENTES CABLE NRO 12
FLUORESCENTE 2 X 40 W, ADOSADA A CIELO RASO
LUMINARIA DOWN LIGHT ADOASADA A CIELO RASO
TABLERO ELECTRICO GABINETE METALICO PARA DISTRIBUCION
INTERRUPTOR THERMOMAGNETICO MONOFASICA 2 X 40 A.
POZO PUESTA A TIERRA
INSTALACIONES SANITARIAS
SISTEMA DE AGUA FRIA

RED DE DISTRIBUCION TUB. PVC SAP DE 3/4"


VALVULA DE CONTROL DE 3/4"
CODO PVC 3/4'' X 90
TEE PVC SAP 3/4''
CODO PVC 2'' X 90
REDUCCIN DE F.G. 2'' X 3/4''
SISTEMA DE DESAGUE
TUBERA PVC SAL 2"
TUBERA PVC SAL 4"
REGISTRO DE BRONCE 2"
REGISTRO DE BRONCE 4"
SALIDA PVC PARA VENTILACION DE 2"
SUMIDEROS DE 2"
CODO PVC SAP 2'' X 45 DESAGUE
CODO PVC SAL 2'' X 90 DESAGUE
CODO PVC SAL 4'' X 90 DESAGUE
REDUCCIN PVC SAL DE 4'' A 2''
YEE PVC SAL DE 2''
YEE PVC SAL DE 4''

LON ''A''- UPN


CAJAMARCA
CAJAMARCA
Cajamarca, junio 2012

Provincia:
Regin:
Fecha:

OBRA
Und.

Metrado

Precio S/.

und
m2

1.00
312.84

S/.
S/.

731.91
1.91

m2

181.48

S/.

12.55

kg
kg
m2
m3

69.10
14.04
9.07
1.47

S/.
S/.
S/.
S/.

8.64
4.79
42.18
436.11

kg
kg
m2
m3

179.67
30.43
31.76
1.36

S/.
S/.
S/.
S/.

4.78
4.79
42.18
436.11

kg
kg
m2
m3

173.92
63.44
7.33
0.70

S/.
S/.
S/.
S/.

8.64
4.78
42.18
436.11

kg
kg
m2
m3

405.82
105.73
18.85
1.92

S/.
S/.
S/.
S/.

8.64
4.78
42.18
436.11

kg
kg
m2
m3

4,348.08
334.82
5.60
19.54

S/.
S/.
S/.
S/.

8.64
4.78
42.18
436.11

kg
kg
kg
m2
m3

2,217.44
740.72
70.88
176.00
29.40

S/.
S/.
S/.
S/.
S/.

8.64
4.79
4.78
42.18
436.11

kg
kg
m2
m3

299.79
97.34
225.00
9.67

S/.
S/.
S/.
S/.

4.78
4.79
42.18
436.11

kg
kg
kg
m2
m3
und

792.99
173.82
281.60
282.20
81.60
2,265.76

S/.
S/.
S/.
S/.
S/.
S/.

4.78
4.88
6.15
42.18
436.11
2.33

S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.

Parcial S/.
182,258.62
1,330.43
731.91
598.52
2,277.08
2,277.08
178,651.10
1,687.86
596.86
67.32
382.60
641.08
2,937.96
859.21
145.91
1,339.74
593.11
2,420.12
1,502.26
303.38
309.20
305.27
5,643.43
3,505.33
505.62
795.16
837.33
47,916.13
37,557.22
1,601.16
236.23
8,521.53
43,289.89
19,153.48
3,551.65
338.96
7,424.26
12,821.54
15,608.77
1,433.64
466.73
9,491.24
4,217.15
59,146.93
3,792.20
849.00
1,731.29
11,904.13
35,586.31
5,284.00

m2
m2
m2

159.75
101.64
82.14

S/.
S/.
S/.

61.30
49.47
61.67

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m

522.58
8.29
29.03
6.70
17.23
5.60
176.00
288.86
21.17
13.95
285.00

S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.

28.27
30.81
30.81
30.81
30.81
30.81
35.90
40.08
35.90
35.90
12.88

m2

181.48

S/.

76.47

145.64

S/.

54.81

und
und
und
und
und

4.00
1.00
1.00
2.00
2.00

S/.
S/.
S/.
S/.
S/.

727.45
877.45
877.45
777.45
627.45

und
und
m

2.00
16.00
45.00

S/.
S/.
S/.

510.69
316.22
76.52

p2

579.70

S/.

6.17

m2
m2

1,024.44
87.25

S/.
S/.

11.90
12.54

und
und
und

3.00
3.00
2.00

S/.
S/.
S/.

341.44
557.74
210.74

S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.

118,396.30
19,886.21
9,792.63
5,027.63
5,065.95
39,663.19
14,772.53
255.45
894.52
206.45
530.92
172.56
6,319.14
11,578.84
760.09
500.86
3,671.84
13,877.41
13,877.41
7,982.67
7,982.67
7,474.52
2,909.81
877.45
877.45
1,554.90
1,254.90
9,524.28
1,021.38
5,059.53
3,443.36
3,579.54
3,579.54
13,289.49
12,195.21
1,094.28
3,119.00
1,024.32
1,673.21
421.47

pto
pto
pto
und
und
und
m
m
m
und
und
und
und
glb

60.00
27.00
13.00
5.00
3.00
5.00
236.87
193.62
280.12
41.00
19.00
1.00
1.00
1.00

S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.

81.56
87.42
69.88
49.55
43.55
46.05
3.74
7.23
7.80
93.36
87.51
215.41
97.41
800.00

S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.

19,844.83
4,893.68
2,360.39
908.43
247.77
130.66
230.27
885.49
1,399.04
2,185.83
3,827.79
1,662.66
215.41
97.41
800.00

S/.
S/.

5,590.18
657.33

m
und
und
und
und
und

17.49
2.00
16.00
3.00
1.00
1.00

S/.
S/.
S/.
S/.
S/.
S/.

11.56
78.87
13.61
13.86
18.79
19.36

m
m
pza
pza
pto
pza
und
und
und
und
und
und

166.75
5.39
2.00
1.00
2.00
1.00
2.00
6.00
3.00
2.00
7.00
4.00

S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.

24.68
28.46
38.56
43.12
133.80
84.12
3.75
3.95
6.65
8.51
10.87
11.87

COSTO DIRECTO:

S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.

202.16
157.75
217.69
41.58
18.79
19.36
4,932.85
4,115.71
153.41
77.13
43.12
267.60
84.12
7.50
23.71
19.96
17.02
76.09
47.48

S/.

326,089.92

TOTAL COSTO DIRECTO

S/. 326,089.92

GASTOS GENERALES 18.42%

S/. 60,072.84

UTILIDAD 10%

S/. 32,608.99

COSTO DE LA OBRA

S/. 418,771.75

IGV (18%)

S/. 75,378.92

VALOR REFERENCIAL

S/. 494,150.67

SUPERVISIN 7%

S/. 34,590.55

GASTOS DE LIQUIDACIN

S/. 3,000.00

GASTOS DE EXPEDIENTE TCNICO

S/. 10,000.00

TOTAL DEL PRESUPUESTO:

S/. 541,741.22

FRMUL
NDICE

NDICE

Fi
Fi
Fi
Fi
Fi
Ac y Vr
Ac y Vr
Fi
Ce y Ag
Ce y Ag
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ce y Ag
Ac y Vr
Ac y Vr
Ac y Vr
Fi
Fi
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr

03
03
03
03
03
39
39
02
03
03
07
07
12
12
12
21
24
30
30
02
02
72
72
72
72
72
24
72
42
43
11
30
02
30
10

Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ce y Ag
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr

12
12
12
12
17
17
10
37
37
11
43
65
43
30
30
5
54
54
54
43
43
43
43
43
43
72
72
72
72
72
12
30
65
12
72
72
72
12
62
72
72
72
72
72
72

Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Ac y Vr
Eq y Mo
Gg
Eq y Mo

72
72
10
77
30
30
30
49
72
72
30
48
39
47

FRMULA POLINMICA
DESCRIPCION
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 DE 1"
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 DE 1/2"
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 DE 1/4"
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 DE 3/8"
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 DE 5/8"
GUA
AGUARRAS
ALAMBRE NEGRO RECOCIDO N 8
ARENA FINA
ARENA GRUESA
CABLE NRO 12
CABLE NRO 14
CAJA OCTOGONAL PVC DE 4"
CAJA RECTANGULAR FIERRO GALVANIZADO LIVIANO DE 4" X 2 1/8"
CAJA RECTANGULAR PLASTICO 4" X 2" X 2"
CEMENTO PORTLAND TIPO I (42.5 kg)
CERMICA 0.45 X 0.45 m ALTO TRANSITO
CINTA AISLANTE
CINTA TEFLN
CLAVOS PARA MADERA CON CABEZA DE 2"
CLAVOS PARA MADERA CON CABEZA DE 3"
CODO PVC 2'' X 90
CODO PVC 3/4'' X 90
CODO PVC SAL 2'' X 45
CODO PVC SAL 2'' X 90
CODO PVC SAL 4" X 90
CONTRAZCALO DE CERMICA DE .10 X .45 M
CURVAS PVC-SEL 3/4"
DRYWALL INC. INSTALC.
ESTACAS DE MADERA
FLUORESCENTE 2 X 40 PANTALLA ACRILICA TRANSP. ADOSAR INC/INSTALC.
FRAGUA PREMIUM
GIGANTOGRAFA DE OBRA 2.40 m X 4.80 m
IMPRIMANTE
INODORO FLUXMETRO BLANCO INC. COLOCACIN

INTERRUPTOR BIPOLAR DE 2 GOLPES


INTERRUPTOR THERMOMAGNTICO 2 X 40 A.
INTERRUPTOR UNIPOLAR DE 1 GOLPE
INTERRUPTOR UNIPOLAR DE 3 GOLPES
LADRILLO KING KONG DE ARCILLA DE 0.9 X .14 X .24 CM
LADRILLO PARA TECHO 8H DE 25X30X30 cm
LAVATORIO OVALINO BLANCO,,INC/ACC.Y COLOCACIN
LIJA DE FIERRO
LIJA PARA PARED
LUMINARIA DOWNLIGTH
MADERA TORNILLO
NIPLE DE FIERRO GALVANIZADO DE 3/4"
PARANTES DE MADERA EUCALIPTO 3" X 6M
PEGAMENTO EN POLVO 25KG PORCELANATO
PEGAMENTO PVC
PIEDRA CHANCADA 1/2"
PINTURA ANTICORROSIVA
PINTURA ESMALTE SINTETICO
PINTURA LATEX
PUERTA DE MADERA DE CEDRO DE 0.70 m X 2.34 m /INC. INSTALACIN
PUERTA DE MADERA DE CEDRO DE 0.90 m X 2.34 m /INC. INSTALACION
PUERTA DE MADERA DE CEDRO DE 1.30 m X 2.36 m /INC. INSTALACION
PUERTA DE MADERA DE CEDRO DE 1.68 m X 2.60 m /INC. INSTALACION
PUERTA DE MADERA DE CEDRO DE 1.68 m X 2.64 m /INC. INSTALACION
PUERTA METLICA 0.55 X 1.65
RAMAL TEE DOBLE CON REDUCCIN PVC SAL DE 4" A 2"
REDUCCIN DE F.G. 2'' X 3/4''
REDUCCIN PVC SAL DE 4'' A 2''
REGISTRO DE BRONCE DE 2"
REGISTRO DE BRONCE DE 4"
SISTEMA DE CONEXIN POZO PUESTA A TIERRA INC. COLOCACIN
SOLDADURA CELLOCORD PUNTO AZUL 3/16
SUMIDERO CROMADO DE 2"
TABLERO ELECTRICO DE METAL
TEE PVC SAP 3/4''
TEE SANITARIA SIMPLE PVC-SAL 2"
TEE SANITARIA SIMPLE PVC-SAL 4"
TOMACORRIENTE DE DOBLE PLANO
TOPE CRUCETA 3mm C/JALADOR
TUBERA DE PVC SEL PARA INSTALACIONES ELCTRICAS DE 3/4"
TUBERA PVC SAL 2"
TUBERA PVC SAL 4"
TUBERA PVC SAP PRESION PARA GUA C-10R .3/4"
TUBO DE 2"
TUBO PVC SEL ESPIGA CAMPANA 3/4" X 3 M

UNION SIMPLE PVC SEL PARA INSTALACIONES ELCTRICAS 3/4"


UNION UNIVERSAL DE FIERRO GALVANIZADO DE 3/4" X 2''
URINARIO BLANCO INC/ACC. Y COLOCACIN
VALVULA DE CONTROL DE BRONCE DE 3/4"
VENTANA METLICA 1.70 X 1.98 M
VIDRIO TRANSPARENTE CRUDO MEDIO DOBLE
WAIPE
WINCHA DE 50 M
YEE PVC SAL DE 2''
YEE PVC SAL DE 4''
YESO 20 KG
EQUIPOS Y HERRAMIENTAS
GASTOS GENERALES Y UTILIDAD
MANO DE OBRA
Subtotal(Costo Directo+Gastos Generales+Utilidad)

COSTOS

INCIDENCIA

S/. 50,312.95
S/. 5,760.87
S/. 1,262.81
S/. 2,763.38
S/. 559.82
S/. 74.46
S/. 78.53
S/. 845.00
S/. 1,117.91
S/. 2,746.45
S/. 544.13
S/. 264.29
S/. 54.00
S/. 81.00
S/. 11.70
S/. 45,374.01
S/. 8,860.76
S/. 4.55
S/. 5.04
S/. 0.90
S/. 1,128.53
S/. 6.72
S/. 24.64
S/. 1.80
S/. 12.10
S/. 15.20
S/. 1,911.53
S/. 43.29
S/. 3,620.73
S/. 39.11
S/. 3,485.00
S/. 648.87
S/. 450.00
S/. 3,585.54
S/. 1,455.00

0.12014
0.01376
0.00302
0.00660
0.00134
0.00018
0.00019
0.00202
0.00267
0.00656
0.00130
0.00063
0.00013
0.00019
0.00003
0.10835
0.02116
0.00001
0.00001
0.00000
0.002695
0.00002
0.00006
0.00000
0.00003
0.00004
0.00456
0.00010
0.00865
0.00009
0.00832
0.00155
0.00107
0.00856
0.00347

AGRUPAMIENTO

k=

S/. 91.00
S/. 86.50
S/. 36.60
S/. 73.50
S/. 6,106.00
S/. 4,119.15
S/. 893.40
S/. 174.50
S/. 640.28
S/. 1,615.00
S/. 18,130.10
S/. 8.40
S/. 120.00
S/. 1,179.62
S/. 80.02
S/. 5,302.02
S/. 152.69
S/. 130.88
S/. 1,024.44
S/. 1,100.00
S/. 1,400.00
S/. 2,600.00
S/. 800.00
S/. 800.00
S/. 700.00
S/. 6.50
S/. 6.80
S/. 5.88
S/. 14.40
S/. 8.20
S/. 800.00
S/. 212.22
S/. 9.00
S/. 90.00
S/. 3.90
S/. 4.60
S/. 9.30
S/. 256.50
S/. 50.81
S/. 373.07
S/. 527.77
S/. 35.84
S/. 39.63
S/. 1,854.00
S/. 784.55

0.00022
0.00021
0.00009
0.00018
0.01458
0.00984
0.00213
0.00042
0.00153
0.00386
0.04329
0.00002
0.00029
0.00282
0.00019
0.01266
0.00036
0.00031
0.00245
0.00263
0.00334
0.00621
0.00191
0.00191
0.00167
0.00002
0.00002
0.00001
0.00003
0.00002
0.00191
0.00051
0.00002
0.00021
0.00001
0.00001
0.00002
0.00061
0.00012
0.00089
0.00126
0.00009
0.00009
0.00443
0.00187

S/. 62.53
S/. 21.84
S/. 276.00
S/. 67.22
S/. 4,000.00
S/. 2,130.40
S/. 54.44
S/. 150.16
S/. 37.10
S/. 25.20
S/. 56.31
S/. 7,426.91
S/. 92,681.83
S/. 122,174.12

0.00015
0.00005
0.00066
0.00016
0.00955
0.00509
0.00013
0.00036
0.00009
0.00006
0.00013
0.01773
0.22132
0.29174

S/. 418,771.75

1.000

0.31 *Eqr y Mor / Eqo y Moo +

0.13 *Cer y Agr / Ceo y Ago +

Donde:
Ce y Ag: Cemento y Agregados
Ac y Vr: Accesorios y Varios
Fi: Fierro
Eq y Mo: Equipos y herramientas, Mano de Obra
Gg: Gastos Generales y utilidad

0.19 *Acr y Vrr / Aco y Vro +

Agregados

herramientas, Mano de Obra


es y utilidad

0.15 *Fir/Fio +

0.22 *Ggr/Ggo

1.00

ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 DE 1"


ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 DE 1/2"
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 DE 1/4"
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 DE 3/8"
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 DE 5/8"
GUA
AGUARRAS
ALAMBRE NEGRO RECOCIDO N 8
ARENA FINA
ARENA GRUESA
CABLE NRO 12
CABLE NRO 14
CAJA OCTOGONAL PVC DE 4"
CAJA RECTANGULAR FIERRO GALVANIZADO LIVIANO DE 4" X 2 1/8"
CAJA RECTANGULAR PLASTICO 4" X 2" X 2"
CEMENTO PORTLAND TIPO I (42.5 kg)
CERMICA 0.45 X 0.45 m ALTO TRANSITO
CINTA AISLANTE
Err:509
CINTA TEFLN
CLAVOS PARA MADERA CON CABEZA DE 2"
CLAVOS PARA MADERA CON CABEZA DE 3"
CODO PVC 2'' X 90
CODO PVC 3/4'' X 90
CODO PVC SAL 2'' X 45
CODO PVC SAL 2'' X 90
CODO PVC SAL 4" X 90
CONTRAZCALO DE CERMICA DE .10 X .45 M
CURVAS PVC-SEL 3/4"
DRYWALL INC. INSTALC.

ESTACAS DE MADERA
FLUORESCENTE 2 X 40 PANTALLA ACRILICA TRANSP. ADOSAR INC/INSTALC.
FRAGUA PREMIUM
GIGANTOGRAFA DE OBRA 2.40 m X 4.80 m
IMPRIMANTE
INODORO FLUXMETRO BLANCO INC. COLOCACIN
INTERRUPTOR BIPOLAR DE 2 GOLPES
INTERRUPTOR THERMOMAGNTICO 2 X 40 A.
INTERRUPTOR UNIPOLAR DE 1 GOLPE
INTERRUPTOR UNIPOLAR DE 3 GOLPES
LADRILLO KING KONG DE ARCILLA DE 0.9 X .14 X .24 CM
LADRILLO KING KONG DE ARCILLA DE 0.9 X .14 X .24 CM
LADRILLO PARA TECHO 8H DE 25X30X30 cm
LAVATORIO OVALINO BLANCO,,INC/ACC.Y COLOCACIN
LIJA DE FIERRO
LIJA PARA PARED
LUMINARIA DOWNLIGTH
MADERA TORNILLO
NIPLE DE FIERRO GALVANIZADO DE 3/4"
PARANTES DE MADERA EUCALIPTO 3" X 6M
PEGAMENTO EN POLVO 25KG PORCELANATO
PEGAMENTO PVC
PIEDRA CHANCADA 1/2"
PINTURA ANTICORROSIVA
PINTURA ESMALTE SINTETICO
PINTURA LATEX
PUERTA DE MADERA DE CEDRO DE 0.70 m X 2.34 m /INC. INSTALACIN
PUERTA DE MADERA DE CEDRO DE 0.90 m X 2.34 m /INC. INSTALACION
PUERTA DE MADERA DE CEDRO DE 1.30 m X 2.36 m /INC. INSTALACION
PUERTA DE MADERA DE CEDRO DE 1.68 m X 2.60 m /INC. INSTALACION
PUERTA DE MADERA DE CEDRO DE 1.68 m X 2.64 m /INC. INSTALACION
PUERTA METLICA 0.55 X 1.65
RAMAL TEE DOBLE CON REDUCCIN PVC SAL DE 4" A 2"
REDUCCIN DE F.G. 2'' X 3/4''
REDUCCIN PVC SAL DE 4'' A 2''
REGISTRO DE BRONCE DE 2"
REGISTRO DE BRONCE DE 4"
SISTEMA DE CONEXIN POZO PUESTA A TIERRA INC. COLOCACIN
SOLDADURA CELLOCORD PUNTO AZUL 3/16
SUMIDERO CROMADO DE 2"
TABLERO ELECTRICO DE METAL
TEE PVC SAP 3/4''
TEE SANITARIA SIMPLE PVC-SAL 2"
TEE SANITARIA SIMPLE PVC-SAL 4"
TOMACORRIENTE DE DOBLE PLANO
TOPE CRUCETA 3mm C/JALADOR
TUBERA DE PVC SEL PARA INSTALACIONES ELCTRICAS DE 3/4"
TUBERA PVC SAL 2"
TUBERA PVC SAL 4"
TUBERA PVC SAP PRESION PARA GUA C-10R .3/4"
TUBO DE 2"
TUBO PVC SEL ESPIGA CAMPANA 3/4" X 3 M
UNION SIMPLE PVC SEL PARA INSTALACIONES ELCTRICAS 3/4"
UNION UNIVERSAL DE FIERRO GALVANIZADO DE 3/4" X 2''
URINARIO BLANCO INC/ACC. Y COLOCACIN
VALVULA DE CONTROL DE BRONCE DE 3/4"
VENTANA METLICA 1.70 X 1.98 M

VIDRIO TRANSPARENTE CRUDO MEDIO DOBLE


WAIPE
WINCHA DE 50 M
YEE PVC SAL DE 2''
YEE PVC SAL DE 4''
YESO 20 KG

TOPGRAFO
OFICIAL
OPERARIO
PEN

HERRAMIENTAS MANUALES
MEZCLADORA DE CONCRETO 11 P3 (23 HP)
MOTOSOLDADORA DE 250 A
NIVEL
TEODOLITO
VIBRADOR DE CONCRETO 4 HP 1.25"

50312.95
5760.87
1262.81
2763.38
559.82
74.46
78.53
845.00
1117.91
2746.45
544.13
264.29
54.00
81.00
11.70
45374.01
8860.76
4.55
0.00
5.04
0.90
1128.53
6.72
24.64
1.80
12.10
15.20
1911.53
43.29
3620.73

39.11
3485.00
648.87
450.00
3585.54
1455.00
91.00
86.50
36.60
73.50
6106.00
6106.00
4119.15
893.40
174.50
640.28
1615.00
18130.10
8.40
120.00
1179.62
80.02
5302.02
152.69
130.88
1024.44
1100.00
1400.00
2600.00
800.00
800.00
700.00
6.50
6.80
5.88
14.40
8.20
800.00
212.22
9.00
90.00
3.90
4.60
9.30
256.50
50.81
373.07
527.77
35.84
39.63
1854.00
784.55
62.53
21.84
276.00
67.22
4000.00

2130.40
54.44
150.16
37.10
25.20
56.31
202594.90

ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 DE 1"


ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 DE 1/2"
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 DE 1/4"
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 DE 3/8"
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 DE 5/8"
GUA
AGUARRAS
ALAMBRE NEGRO RECOCIDO N 8
ARENA FINA
ARENA GRUESA
CABLE NRO 12
CABLE NRO 14
CAJA OCTOGONAL PVC DE 4"
CAJA RECTANGULAR FIERRO GALVANIZADO LIVIANO DE 4" X 2 1/8"
CAJA RECTANGULAR PLASTICO 4" X 2" X 2"
CEMENTO PORTLAND TIPO I (42.5 kg)
CERMICA 0.45 X 0.45 m ALTO TRANSITO
CINTA AISLANTE
Err:509
CINTA TEFLN
CLAVOS PARA MADERA CON CABEZA DE 2"
CLAVOS PARA MADERA CON CABEZA DE 3"
CODO PVC 2'' X 90
CODO PVC 3/4'' X 90
CODO PVC SAL 2'' X 45
CODO PVC SAL 2'' X 90
CODO PVC SAL 4" X 90
CONTRAZCALO DE CERMICA DE .10 X .45 M
CURVAS PVC-SEL 3/4"
DRYWALL INC. INSTALC.
ESTACAS DE MADERA
FLUORESCENTE 2 X 40 PANTALLA ACRILICA TRANSP. ADOSAR INC/INSTALC.
FRAGUA PREMIUM
GIGANTOGRAFA DE OBRA 2.40 m X 4.80 m
IMPRIMANTE
INODORO FLUXMETRO BLANCO INC. COLOCACIN
INTERRUPTOR BIPOLAR DE 2 GOLPES
INTERRUPTOR THERMOMAGNTICO 2 X 40 A.
INTERRUPTOR UNIPOLAR DE 1 GOLPE
INTERRUPTOR UNIPOLAR DE 3 GOLPES
LADRILLO KING KONG DE ARCILLA DE 0.9 X .14 X .24 CM
LADRILLO PARA TECHO 8H DE 25X30X30 cm
LAVATORIO OVALINO BLANCO,,INC/ACC.Y COLOCACIN
LIJA DE FIERRO
LIJA PARA PARED
LUMINARIA DOWNLIGTH
MADERA TORNILLO
NIPLE DE FIERRO GALVANIZADO DE 3/4"
PARANTES DE MADERA EUCALIPTO 3" X 6M
PEGAMENTO EN POLVO 25KG PORCELANATO
PEGAMENTO PVC
PIEDRA CHANCADA 1/2"
PINTURA ANTICORROSIVA
PINTURA ESMALTE SINTETICO
PINTURA LATEX
PUERTA DE MADERA DE CEDRO DE 0.70 m X 2.34 m /INC. INSTALACIN
PUERTA DE MADERA DE CEDRO DE 0.90 m X 2.34 m /INC. INSTALACION

PUERTA DE MADERA DE CEDRO DE 1.30 m X 2.36 m /INC. INSTALACION


PUERTA DE MADERA DE CEDRO DE 1.68 m X 2.60 m /INC. INSTALACION
PUERTA DE MADERA DE CEDRO DE 1.68 m X 2.64 m /INC. INSTALACION
PUERTA METLICA 0.55 X 1.65
RAMAL TEE DOBLE CON REDUCCIN PVC SAL DE 4" A 2"
REDUCCIN DE F.G. 2'' X 3/4''
REDUCCIN PVC SAL DE 4'' A 2''
REGISTRO DE BRONCE DE 2"
REGISTRO DE BRONCE DE 4"
SISTEMA DE CONEXIN POZO PUESTA A TIERRA INC. COLOCACIN
SOLDADURA CELLOCORD PUNTO AZUL 3/16
SUMIDERO CROMADO DE 2"
TABLERO ELECTRICO DE METAL
TEE PVC SAP 3/4''
TEE SANITARIA SIMPLE PVC-SAL 2"
TEE SANITARIA SIMPLE PVC-SAL 4"
TOMACORRIENTE DE DOBLE PLANO
TOPE CRUCETA 3mm C/JALADOR
TUBERA DE PVC SEL PARA INSTALACIONES ELCTRICAS DE 3/4"
TUBERA PVC SAL 2"
TUBERA PVC SAL 4"
TUBERA PVC SAP PRESION PARA GUA C-10R .3/4"
TUBO DE 2"
TUBO PVC SEL ESPIGA CAMPANA 3/4" X 3 M
UNION SIMPLE PVC SEL PARA INSTALACIONES ELCTRICAS 3/4"
UNION UNIVERSAL DE FIERRO GALVANIZADO DE 3/4" X 2''
URINARIO BLANCO INC/ACC. Y COLOCACIN
VALVULA DE CONTROL DE BRONCE DE 3/4"
VENTANA METLICA 1.70 X 1.98 M
VIDRIO TRANSPARENTE CRUDO MEDIO DOBLE
WAIPE
WINCHA DE 50 M
YEE PVC SAL DE 2''
YEE PVC SAL DE 4''
YESO 20 KG

50312.95
5760.87
1262.81
2763.38
559.82
74.46
78.53
845.00
1117.91
2746.45
544.13
264.29
54.00
81.00
11.70
45374.01
8860.76
4.55
0.00
5.04
0.90
1128.53
6.72
24.64
1.80
12.10
15.20
1911.53
43.29
3620.73
39.11
3485.00
648.87
450.00
3585.54
1455.00
91.00
86.50
36.60
73.50
6106.00
4119.15
893.40
174.50
640.28
1615.00
18130.10
8.40
120.00
1179.62
80.02
5302.02
152.69
130.88
1024.44
1100.00
1400.00

ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 DE 1"


ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 DE 1/2"
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 DE 1/4"
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 DE 3/8"
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 DE 5/8"
GUA
AGUARRAS
ALAMBRE NEGRO RECOCIDO N 8
ARENA FINA
ARENA GRUESA
CABLE NRO 12
CABLE NRO 14
CAJA OCTOGONAL PVC DE 4"
CAJA RECTANGULAR FIERRO GALVANIZADO LIVIANO DE 4" X 2 1/8"
CAJA RECTANGULAR PLASTICO 4" X 2" X 2"
CEMENTO PORTLAND TIPO I (42.5 kg)
CERMICA 0.45 X 0.45 m ALTO TRANSITO
CINTA AISLANTE
CINTA DE SEALIZACIN DE PELIGRO INC. COLOCACIN
CINTA TEFLN
CLAVOS PARA MADERA CON CABEZA DE 2"
CLAVOS PARA MADERA CON CABEZA DE 3"
CODO PVC 2'' X 90
CODO PVC 3/4'' X 90
CODO PVC SAL 2'' X 45
CODO PVC SAL 2'' X 90
CODO PVC SAL 4" X 90
CONTRAZCALO DE CERMICA DE .10 X .45 M
CURVAS PVC-SEL 3/4"
DRYWALL INC. INSTALC.
ESTACAS DE MADERA
FLUORESCENTE 2 X 40 PANTALLA ACRILICA TRANSP. ADOSAR INC/IN
FRAGUA PREMIUM
GIGANTOGRAFA DE OBRA 2.40 m X 4.80 m
IMPRIMANTE
INODORO FLUXMETRO BLANCO INC. COLOCACIN
INTERRUPTOR BIPOLAR DE 2 GOLPES
INTERRUPTOR THERMOMAGNTICO 2X 40 A
INTERRUPTOR UNIPOLAR DE 1 GOLPE
INTERRUPTOR UNIPOLAR DE 3 GOLPES
LADRILLO KING KONG DE ARCILLA DE 0.9 X .14 X .24 CM
LADRILLO PARA TECHO 8H DE 25X30X30 cm
LAVATORIO OVALINO BLANCO,,INC/ACC.Y COLOCACIN
LIJA DE FIERRO
LIJA PARA PARED
LUMINARIA DOWNLIGTH
MADERA TORNILLO
NIPLE DE FIERRO GALVANIZADO DE 3/4"
PARANTES DE MADERA EUCALIPTO 3" X 6M
PEGAMENTO EN POLVO 25KG PORCELANATO
PEGAMENTO PVC
PIEDRA CHANCADA 1/2"
PINTURA ANTICORROSIVA
PINTURA ESMALTE SINTETICO
PINTURA LATEX
PUERTA DE MADERA DE CEDRO DE 0.70 m X 2.34 m /INC. INSTALACI
PUERTA DE MADERA DE CEDRO DE 0.90 m X 2.34 m /INC. INSTALACIO

2600.00
800.00
800.00
700.00
6.50
6.80
5.88
14.40
8.20
800.00
212.22
9.00
90.00
3.90
4.60
9.30
256.50
50.81
373.07
527.77
35.84
39.63
1854.00
784.55
62.53
21.84
276.00
67.22
4000.00
2130.40
54.44
150.16
37.10
25.20
56.31
196488.89
S/.

-129,601.03

PUERTA DE MADERA DE CEDRO DE 1.30 m X 2.36 m /INC. INSTALACIO


PUERTA DE MADERA DE CEDRO DE 1.68 m X 2.60 m /INC. INSTALACIO
PUERTA DE MADERA DE CEDRO DE 1.68 m X 2.64 m /INC. INSTALACIO
PUERTA METLICA 0.55 X 1.65
RAMAL TEE DOBLE CON REDUCCIN PVC SAL DE 4" A 2"
REDUCCIN DE F.G. 2'' X 3/4''
REDUCCIN PVC SAL DE 4'' A 2''
REGISTRO DE BRONCE DE 2"
REGISTRO DE BRONCE DE 4"
SISTEMA DE CONEXIN POZO PUESTA A TIERRA INC. COLOCACIN
SOLDADURA CELLOCORD PUNTO AZUL 3/16
SUMIDERO CROMADO DE 2"
TABLERO ELECTRICO DE METAL
TEE PVC SAP 3/4''
TEE SANITARIA SIMPLE PVC-SAL 2"
TEE SANITARIA SIMPLE PVC-SAL 4"
TOMACORRIENTE DE DOBLE PLANO
TOPE CRUCETA 3mm C/JALADOR
TUBERA DE PVC SEL PARA INSTALACIONES ELCTRICAS DE 3/4"
TUBERA PVC SAL 2"
TUBERA PVC SAL 4"
TUBERA PVC SAP PRESION PARA GUA C-10R .3/4"
TUBO DE 2"
TUBO PVC SEL ESPIGA CAMPANA 3/4" X 3 M
UNION SIMPLE PVC SEL PARA INSTALACIONES ELCTRICAS 3/4"
UNION UNIVERSAL DE FIERRO GALVANIZADO DE 3/4" X 2''
URINARIO BLANCO INC/ACC. Y COLOCACIN
VALVULA DE CONTROL DE BRONCE DE 3/4"
VENTANA METLICA 1.70 X 1.98 M
VIDRIO TRANSPARENTE CRUDO MEDIO DOBLE
WAIPE
WINCHA DE 50 M
YEE PVC SAL DE 2''
YEE PVC SAL DE 4''
YESO 20 KG

GRADO 60 DE 1"
GRADO 60 DE 1/2"
GRADO 60 DE 1/4"
GRADO 60 DE 3/8"
GRADO 60 DE 5/8"

IZADO LIVIANO DE 4" X 2 1/8"

O INC. COLOCACIN

RILICA TRANSP. ADOSAR INC/INSTALC.

. COLOCACIN

0.9 X .14 X .24 CM

C.Y COLOCACIN

70 m X 2.34 m /INC. INSTALACIN


90 m X 2.34 m /INC. INSTALACION

30 m X 2.36 m /INC. INSTALACION


68 m X 2.60 m /INC. INSTALACION
68 m X 2.64 m /INC. INSTALACION

PVC SAL DE 4" A 2"

A A TIERRA INC. COLOCACIN

IONES ELCTRICAS DE 3/4"

UA C-10R .3/4"

ACIONES ELCTRICAS 3/4"


NIZADO DE 3/4" X 2''

PROYECTO

CONSTRUCCION DEL SEGUNDO PISO PABELLON ''A''- UP

Localidad: CAJAMARCA
Distrito: CAJAMARCA
Proyectista: Ing. Jean Pier Cotrina Arriaga
GASTOS GENERALES

DESAGREGADO DE GASTOS GENERALES


1 GASTO GENERALES FIJOS
1.1 Movilizacin y Desmovilizacin
1.2 Caseta
1.3 Gastos Notariales y Financieros
1.4 Gastos de Licitacin
TOTAL GASTOS FIJOS

A.1

A.2

A.3

A.4

A.5

A.6

A.7

2 GASTOS GENERALES VARIABLES


Direccin Tcnica, Administrativa y Auxiliar
- Personal Profesional y Tcnico
Ing. Residente
Administrador
Maestro de Obra
Sub Total
- Personal Administrativo y Auxiliar
(1) Almacenero de Obra
(1) Guardian (noche)
Sub Total
Gastos No Incluidos en Costos Directos
- Alquiler de camioneta
- Seguros contra todo tipo de riesgos
Sub Total
Gastos de Equipos de proteccin personal
(Estos gastos ya se contemplan en Costos HH)
Sub Total
Alquiler y Mantenimiento de oficina central
- Alquiler oficina central
- Mantenimiento y servicio
- Impresos, Utiles de escritorio y Oficina
Sub Total
Honorarios del personal de oficina central
- Gerente General
- Secretaria
- Contador
Sub Total
Adelanto en Efectivo
Carta Fianza Adelanto
Tiempo de retencin 3 meses
0.05 x 3 x 0.20 x N / 12
N = Costo Directo
Fiel Cumplimiento
Carta Fianza Fiel Cumplimiento
Tiempo de retencin 3 meses
0.05 x 3 x 0.1x N / 12
N = Costo Directo
TOTAL GASTOS VARIABLES

GASTOS GENERALES
COSTO DIRECTO

I. GASTOS GENERALES
1. GASTO FIJOS
2. GASTO VARIABLES
TOTAL

UCCION DEL SEGUNDO PISO PABELLON ''A''- UPN


Provincia:
Regin:
Hecho por:

CAJAMARCA
CAJAMARCA
Cajamarca, junio 2012

GASTOS GENERALES

Estimado
Estimado
Estimado
Estimado

S/.

Meses
4500
3000
2200

S/.

S/.
S/.
S/.
S/.
S/.

700.00
2,000.00
500.00
250.00
3,450.00

S/.
S/.
S/.
S/.

18,000.00
9,000.00
6,600.00
33,600.00

S/.
S/.
S/.

3,600.00
3,600.00
7,200.00

0.5
1

S/.
S/.
S/.

9,450.00
650.00
10,100.00

S/.
S/.

Coef. Part.
4
3
3

1
1
1

Meses
1200
1200

S/.

3
3
Meses

210
650
S/.

3
1
Veces

0
S/.

Personas
0

Meses
500
500
500

S/.

3
3
3

S/.
S/.
S/.
S/.

1,500.00
1,500.00
1,500.00
4,500.00

3
3
3

S/.
S/.
S/.
S/.

12,000.00
4,500.00
7,500.00
24,000.00

S/.

815.22

S/.

407.61

S/.

56,622.84

Meses
4000
1500
2500

20

10

S/.

326089.92

S/.

% Costo Directo

S/.
S/.

3,450.00
56,622.84

1.06
17.36

S/.

60,072.84

18.42

S/.

56,622.84

CONSTRUCCION DEL SEGUNDO PISO PABELLON ''A''- UP

PROYECTO

Prop.:
Ubic.:
Localidad: CAJAMARCA
Distrito: CAJAMARCA
Proyectista: Ing. Jean Pier Cotrina Arriaga

PRESUPUESTO GENERAL DE OBRA


TOTAL COSTO DIRECTO

S/. 326,089.92

GASTOS GENERALES 18.42%

S/. 60,072.84

UTILIDAD 10%

S/. 32,608.99

COSTO DE LA OBRA

S/. 418,771.75

IGV (18%)

S/. 75,378.92

VALOR REFERENCIAL

S/. 494,150.67

SUPERVISIN 7%

S/. 34,590.55

GASTOS DE LIQUIDACIN

S/. 3,000.00

GASTOS DE EXPEDIENTE TCNICO

S/. 10,000.00

TOTAL DEL PRESUPUESTO:

S/. 541,741.22

O PABELLON ''A''- UPN

L DE OBRA

Provincia:
Regin:
Fecha:

CAJAMARCA
CAJAMARCA
Cajamarca, junio 2012

CRONOGRA
PROYECTO
Localidad:
Distrito:
Proyectista:

PRESUPUE
Item
01.00.00
01.01.00
01.01.01
01.01.02
01.02.00
01.02.01
01.03.00
01.03.01
01.03.01.01
01.03.01.02
01.03.01.03
01.03.01.04
01.03.02
01.03.02.01
01.03.02.02
01.03.02.03
01.03.02.04
01.03.03
01.03.03.01
01.03.03.02
01.03.03.03
01.03.03.04
01.03.04
01.03.04.01
01.03.04.02
01.03.04.03
01.03.04.04
01.03.05
01.03.05.01
01.03.05.02
01.03.05.03
01.03.05.04
01.03.06
01.03.06.01
01.03.06.02
01.03.06.03
01.03.06.04
01.03.06.05
01.03.07
01.03.07.01
01.03.07.02
01.03.07.03
01.03.07.04
01.03.08
01.03.08.01
01.03.08.02
01.03.08.03
01.03.08.04
01.03.08.05

01.03.08.06
02.00.00
02.01.00
02.01.01
02.01.02
02.01.03
02.02.00
02.02.01
02.02.02
02.02.03
02.02.04
02.02.05
02.02.06
02.02.07
02.02.08
02.02.09
02.02.10
02.02.11
02.03.00
02.03.01
02.04.00
02.04.01
02.05.00
02.05.01
02.05.02
02.05.03
02.05.04
02.05.05
02.06.00
02.06.01
02.06.02
02.06.03
02.07.00
02.07.01
02.08.00
02.08.01
01.08.02
02.09.00
02.09.01
02.09.02
02.09.03
03.00.00
03.01.00
03.02.00
03.03.00
03.04.00
03.05.00
03.06.00
03.07.00
03.08.00
03.09.00
03.10.00
03.11.00
03.12.00
03.13.00
03.14.00
04.00.00

04.01.00
04.01.01
04.01.02
04.01.03
04.01.04
04.01.05
04.01.06
04.02.00
04.02.01
04.02.02
04.02.03
04.02.04
04.02.05
04.02.06
04.02.07
04.02.08
04.02.09
04.02.10
04.02.11
04.02.12

RESUMEN DE PRESUPUESTO
ESTRUCTURAS

ARQUITECTURA

INSTALACIONES ELECTRICAS

INSTALACIONES SANITARIAS

COSTO DIRECTO

I. GASTOS GENERALES
1. GASTO FIJOS
2. GASTO VARIABLES
UTILIDAD 10%
Sub Total=
IGV(18%)=
VALOR REFERENCIAL
SUPERVISIN 7%
GASTOS DE LIQUIDACIN

GASTOS DE EXPEDIENTE TCNICO


PRESUPUESTO TOTAL
AVANCE MESUAL
AVANCE ACUMULADO

CRONOGRAMA VALORIZADO
CONSTRUCCION DEL SEGUNDO PISO
CAJAMARCA
CAJAMARCA
Ing. Jean Pier Cotrina Arriaga

PRESUPUESTO DE OBRA
Descripcin
ESTRUCTURAS
TRABAJOS PRELIMINARES
CARTEL DE IDENTIFICACION OBRA (2.40 m X 4.80 m)
TRAZO Y REPLANTEO
OBRAS DE CONCRETO SIMPLE
CONCRETO PARA FALSO PISO f'c=100kg/cm2 C:H=1:10, E= 0.05 m.
OBRAS DE CONCRETO ARMADO
COLUMNA C1
ACERO REFUERZO F'y= 4200 kg/cm 1"
ACERO REFUERZO F'y= 4200 kg/cm 3/8"
ENCOFRADO Y DESENCOFRADO
CONCRETO f'c=280 kg/cm2
COLUMNA Ca
ACERO REFUERZO F'y= 4200 kg/cm 1/2"
ACERO REFUERZO F'y= 4200 kg/cm 3/8"
ENCOFRADO Y DESENCOFRADO
CONCRETO f'c=280 kg/cm2
PLACA DE .80 m x .25 m
ACERO REFUERZO F'y= 4200 kg/cm 1"
ACERO REFUERZO F'y= 4200 kg/cm 1/2"
ENCOFRADO Y DESENCOFRADO
CONCRETO f'c=280 kg/cm2
PLACA DE 1.10 m x .25 m
ACERO REFUERZO F'y= 4200 kg/cm 1"
ACERO REFUERZO F'y= 4200 kg/cm 1/2"
ENCOFRADO Y DESENCOFRADO
CONCRETO f'c=280 kg/cm2
PLACA TIPO T
ACERO REFUERZO F'y= 4200 kg/cm 1"
ACERO REFUERZO F'y= 4200 kg/cm 1/2"
ENCOFRADO Y DESENCOFRADO
CONCRETO f'c=280 kg/cm2
VIGAS
ACERO REFUERZO F'y= 4200 kg/cm 1"
ACERO REFUERZO F'y= 4200 kg/cm 3/8"
ACERO REFUERZO F'y= 4200 kg/cm 1/2"
ENCOFRADO Y DESENCOFRADO
CONCRETO f'c=280 kg/cm2
ESCALERAS
ACERO REFUERZO F'y= 4200 kg/cm 1/2"
ACERO REFUERZO F'y= 4200 kg/cm 3/8"
ENCOFRADO Y DESENCOFRADO
CONCRETO f'c=280 kg/cm2
LOSAS ALIGERADAS
ACERO CORRUGADO FY= 4200 kg/cm2 DE 1/2" PARA LOSA
ACERO CORRUGADO FY= 4200 kg/cm2 DE 5/8" PARA LOSA
ACERO CORRUGADO FY= 4200 kg/cm2 DE 1/4" PARA LOSA
ENCOFRADO Y DESENCOFRADO EN LOSAS
CONCRETO f'c=280 kg/cm2

Und.

und
m2
m2

kg
kg
m2
m3
kg
kg
m2
m3
kg
kg
m2
m3
kg
kg
m2
m3
kg
kg
m2
m3
kg
kg
kg
m2
m3
kg
kg
m2
m3
kg
kg
kg
m2
m3

LADRILLO HUECO DE ARCILLA h = 25 cm PARA TECHO ALIGERADO


ARQUITECTURA
MUROS Y TABIQUES DE ALBAILERIA
MURO DECABEZA KK LADRILLO DE ARCILLA MORTERO 1:5 CEMENTO: ARENA
MURO DE SOGA LADRILLO K.K. DE ARCILLA MEZCLA 1.5, JUNTA 1.5 cm
MURO DE DRYWALL
REVOQUES, ENLUCIDOS Y MOLDURAS
TARRAJEO DE MUROS INTERIORES Y EXTERIORES MEZCLA C.A. 1:5
TARRAJEO DE COLUMNA C1
TARRAJEO DE COLUMNA Ca
TARRAJEO DE PLACA .80 m x .25 m
TARRAJEO DE PLACA 1.10 m x .25 m
TARRAJEO DE PLACA TIPO T
TARRAJEO DE VIGAS
TARRAJEO DE CIELO RASO
REVESTIMIENTO DE FONDO DE ESCALERA MEZCLA 1:5 C.A.
REVESTIMIENTO DE PASOS Y CONTRAPASOS DE ESCALERA MEZCLA 1:4 C.A. E: 0.03 M
VESTIDURA DE DERRAMES
PISOS Y PAVIMENTOS
PISO CERAMICO .45 m X .45 m
ZOCALOS Y CONTRAZOCALOS
CONTRAZOCALO DE CERAMICO DE .10 X .45 m
CARPINTERIA DE MADERA
PUERTA DE MADERA CEDRO DE 1.30 X 2.36 INC/COLOCACION
PUERTA DE MADERA CEDRO DE 1.68 m X 2.64 m INC/COLOCACION
PUERTA DE MADERA CEDRO DE 1.68 m X 2.60m INC/COLOCACION
PUERTA DE MADERA CEDRO DE 0.90 m X 2.34m INC/COLOCACION
PUERTA DE MADERA CEDRO DE 0.70 m X 2.34m INC/COLOCACION
CARPINTERIA METALICA
PUERTA METALICA 0.55 X 1.65. M
VENTANA METALICA DE 1.70 m X 1.98 m
BARANDAS METALICA tub. de 2"
VIDRIOS, CRISTALES Y SIMILARES
VIDRIO SEMIDOBLE INCOLORO CRUDO
PINTURA
PINTURA LATEX DOS MANOS EN MUROS INT. EXT., C1, Ca, PLACAS, VIGAS, CIELO RASO
PINTURA ESMALTE EN CARPINTERIA METALICA
ACCESORIOS SANITARIOS
LAVATORIO OVALINOS BLANCO INC. COLOCACION
INODORO FLUXMETRO BLANCO INC. COLOCACIN

und

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m
m2
m
und
und
und
und
und
und
und
m
p2
m2
m2
und
und

URINARIO BLANCO (INCLUYE COLOCACION)

und

INSTALACIONES ELECTRICAS
SALIDAS DE TECHO (CENTROS DE LUZ)
SALIDA DE TOMACORRIENTE DOBLE PUESTA A TIERRA
SALIDA PARA INTERRUPTORES
INTERRUPTOR BIPOLAR DE 2 GOLPES
INTERRUPTOR UNIPOLAR DE 1 GOLPE
INTERRUPTOR UNIPOLAR DE 3 GOLPES
TUBERA PVC-SEL D= 3/4"
RED DE ALUMBRADO CABLE NRO 14
RED DE TOMACORRIENTES CABLE NRO 12
FLUORESCENTE 2 X 40 W, ADOSADA A CIELO RASO
LUMINARIA DOWN LIGHT ADOASADA A CIELO RASO
TABLERO ELECTRICO GABINETE METALICO PARA DISTRIBUCION
INTERRUPTOR THERMOMAGNETICO MONOFASICA 2 X 40 A.

pto
pto
pto
und
und
und
m
m
m
und
und
und
und

POZO PUESTA A TIERRA

glb

INSTALACIONES SANITARIAS

SISTEMA DE AGUA FRIA


RED DE DISTRIBUCION TUB. PVC SAP DE 3/4"
VALVULA DE CONTROL DE 3/4"
CODO PVC 3/4'' X 90
TEE PVC SAP 3/4''
CODO PVC 2'' X 90
REDUCCIN DE F.G. 2'' X 3/4''
SISTEMA DE DESAGUE
TUBERA PVC SAL 2"
TUBERA PVC SAL 4"
REGISTRO DE BRONCE 2"
REGISTRO DE BRONCE 4"
SALIDA PVC PARA VENTILACION DE 2"
SUMIDEROS DE 2"
CODO PVC SAP 2'' X 45 DESAGUE
CODO PVC SAL 2'' X 90 DESAGUE
CODO PVC SAL 4'' X 90 DESAGUE
REDUCCIN PVC SAL DE 4'' A 2''
YEE PVC SAL DE 2''
YEE PVC SAL DE 4''

m
und
und
und
und
und
m
m
pza
pza
pto
pza
und
und
und
und
und
und

RESUMEN DE PRESUPUESTO
ESTRUCTURAS

S/. 182,258.62

ARQUITECTURA

S/. 118,396.30

INSTALACIONES ELECTRICAS

S/. 19,844.83

INSTALACIONES SANITARIAS

S/. 5,590.18

COSTO DIRECTO

S/.

326,089.92

OS GENERALES

S/. 60,072.84

O FIJOS

S/. 3,450.00

O VARIABLES

S/. 56,622.84

D 10%

S/. 32,608.99

l=

S/. 418,771.75

S/. 75,378.92

EFERENCIAL

S/. 494,150.67

SIN 7%

S/. 34,590.55

DE LIQUIDACIN

S/. 3,000.00

DE EXPEDIENTE TCNICO

S/. 10,000.00
PRESUPUESTO TOTAL
AVANCE MESUAL
AVANCE ACUMULADO

S/. 541,741.22

OGRAMA VALORIZADO
CCION DEL SEGUNDO PISO PABELLON ''A''- UPN
Provincia:
Regin:
Fecha:

CAJAMARCA
CAJAMARCA
Cajamarca, junio 2012

SUPUESTO DE OBRA
Metrado

Precio S/.

1.00
312.84
0.00
181.48

S/.
S/.

731.91
1.91

S/.

12.55

69.10 S/.
14.04 S/.
9.07 S/.
1.47 S/.

8.64
4.79
42.18
436.11

179.67 S/.
30.43 S/.
31.76 S/.
1.36 S/.

4.78
4.79
42.18
436.11

173.92 S/.
63.44 S/.
7.33 S/.
0.70 S/.

8.64
4.78
42.18
436.11

405.82 S/.
105.73 S/.
18.85 S/.
1.92 S/.
0.00
4,348.08 S/.
334.82 S/.
5.60 S/.
19.54 S/.

8.64
4.78
42.18
436.11

2,217.44 S/.
740.72 S/.
70.88 S/.
176.00 S/.
29.40 S/.

8.64
4.79
4.78
42.18
436.11

299.79 S/.
97.34 S/.
225.00 S/.
9.67 S/.

4.78
4.79
42.18
436.11

792.99 S/.
173.82 S/.
281.60 S/.
282.20 S/.
81.60 S/.

4.78
4.88
6.15
42.18
436.11

8.64
4.78
42.18
436.11

Parcial S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.

182,258.62
1,330.43
731.91
598.52
2,277.08
2,277.08
178,651.10
1,687.86
596.86
67.32
382.60
641.08
2,937.96
859.21
145.91
1,339.74
593.11
2,420.12
1,502.26
303.38
309.20
305.27
5,643.43
3,505.33
505.62
795.16
837.33
47,916.13
37,557.22
1,601.16
236.23
8,521.53
43,289.89
19,153.48
3,551.65
338.96
7,424.26
12,821.54
15,608.77
1,433.64
466.73
9,491.24
4,217.15
59,146.93
3,792.20
849.00
1,731.29
11,904.13
35,586.31

1er mes

S/.
S/.

731.91
598.52

S/.

2,277.08

S/.
S/.
S/.
S/.

596.86
67.32
382.60
641.08

S/.
S/.
S/.
S/.

859.21
145.91
1,339.74
593.11

S/.
S/.
S/.
S/.

1,502.26
303.38
309.20
305.27

S/.
S/.
S/.
S/.

3,505.33
505.62
795.16
837.33

S/.
S/.
S/.
S/.

37,557.22
1,601.16
236.23
8,521.53

S/.
S/.
S/.
S/.
S/.

19,153.48
3,551.65
338.96
7,424.26
12,821.54

2do mes

S/.
S/.
S/.
S/.

1,433.64
466.73
9,491.24
4,217.15

S/.
S/.
S/.
S/.
S/.

3,792.20
849.00
1,731.29
11,904.13
35,586.31

3er mes

2,265.76

S/.

2.33

S/.

5,284.00
118,396.30
19,886.21
9,792.63
5,027.63
5,065.95
39,663.19
14,772.53
255.45
894.52
206.45
530.92
172.56
6,319.14
11,578.84
760.09
500.86
3,671.84
13,877.41
13,877.41
7,982.67
7,982.67
7,474.52
2,909.81
877.45
877.45
1,554.90
1,254.90
9,524.28
1,021.38
5,059.53
3,443.36
3,579.54
3,579.54
13,289.49
12,195.21
1,094.28
3,119.00
1,024.32
1,673.21

159.75
101.64
82.14

S/.
S/.
S/.

61.30
49.47
61.67

522.58
8.29
29.03
6.70
17.23
5.60
176.00
288.86
21.17
13.95
285.00

S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.

28.27
30.81
30.81
30.81
30.81
30.81
35.90
40.08
35.90
35.90
12.88

181.48

S/.

76.47

145.64

S/.

54.81

4.00
1.00
1.00
2.00
2.00
0.00
2.00
16.00
45.00

S/.
S/.
S/.
S/.
S/.

727.45
877.45
877.45
777.45
627.45

S/.
S/.
S/.

510.69
316.22
76.52

579.70 S/.
0.00
1,024.44 S/.
87.25 S/.

6.17
11.90
12.54

3.00
3.00

S/.
S/.

341.44
557.74

S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.

2.00

S/.

210.74

S/.

60.00
27.00
13.00
5.00
3.00
5.00
236.87
193.62
280.12
41.00
19.00
1.00
1.00

S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.

81.56
87.42
69.88
49.55
43.55
46.05
3.74
7.23
7.80
93.36
87.51
215.41
97.41

1.00

S/.

800.00

S/.

5,284.00

S/.
S/.
S/.

9,792.63
5,027.63
5,065.95

S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.

14,772.53
255.45
894.52
206.45
530.92
172.56
6,319.14
11,578.84
760.09
500.86
3,671.84
S/.

13,877.41

S/.

7,982.67

S/.
S/.
S/.
S/.
S/.

2,909.81
877.45
877.45
1,554.90
1,254.90

S/.
S/.
S/.

1,021.38
5,059.53
3,443.36

S/.

3,579.54

S/.
S/.

12,195.21
1,094.28

S/.
S/.

1,024.32
1,673.21

421.47

S/.

421.47

S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.

19,844.83
4,893.68
2,360.39
908.43
247.77
130.66
230.27
885.49
1,399.04
2,185.83
3,827.79
1,662.66
215.41
97.41

S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.

4,893.68
2,360.39
908.43
247.77
130.66
230.27
885.49
1,399.04
2,185.83
3,827.79
1,662.66
215.41
97.41

S/.

800.00

S/.

800.00

S/.

5,590.18

17.49 S/.
2.00 S/.
16.00 S/.
3.00 S/.
1.00 S/.
1.00 S/.

11.56
78.87
13.61
13.86
18.79
19.36

166.75 S/.
5.39 S/.
2.00 S/.
1.00 S/.
2.00 S/.
1.00 S/.
2.00 S/.
6.00 S/.
3.00 S/.
2.00 S/.
7.00 S/.
4.00 S/.

24.68
28.46
38.56
43.12
133.80
84.12
3.75
3.95
6.65
8.51
10.87
11.87

COSTO DIRECTO:

S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.

657.33
202.16
157.75
217.69
41.58
18.79
19.36
4,932.85
4,115.71
153.41
77.13
43.12
267.60
84.12
7.50
23.71
19.96
17.02
76.09
47.48

S/.

326,089.92

Avance

58.79%

41.21%

S/. 107,158.25

S/. 75,100.37
53.90%
S/. 63,810.63

46.10%
54,585.67
100%
S/. 19,844.83
100%
S/. 5,590.18

S/. 107,158.25

S/. 138,911.00

S/. 80,020.67

S/. 21,025.49

S/. 21,025.49

S/. 18,021.85

S/. 32,608.99

S/. 75,378.92

S/. 12,106.69

S/.

12,106.69

S/. 10,377.16
S/. 3,000.00

S/.
S/.
S/.
S/.
S/.
S/.

202.16
157.75
217.69
41.58
18.79
19.36

S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.

4,115.71
153.41
77.13
43.12
267.60
84.12
7.50
23.71
19.96
17.02
76.09
47.48

107502.91

134305.10

84281.91

32.97%

41.19%

25.85%

S/. 10,000.00
S/. 258,278.34

S/.

172,043.18

S/. 111,419.69

47.68%

31.76%

20.57%

47.68%

79.43%

100.00%

Total
S/.
S/.

S/.
S/.
S/.

S/.

S/.

S/.

S/.

S/.

S/.

S/.

182,258.62
1,330.43
731.91
598.52
2,277.08
2277.08
178,651.10
1,687.86
596.86
67.32
382.60
641.08
2,937.96
859.21
145.91
1339.74
593.11
2,420.12
1502.26
303.38
309.20
305.27
5,643.43
3505.33
505.62
795.16
837.33
47,916.13
37557.22
1601.16
236.23
8521.53
43,289.89
19153.48
3551.65
338.96
7424.26
12821.54
15,608.77
1433.64
466.73
9491.24
4217.15
59,146.93
3792.20
849.00
1731.29
11904.13
35586.31

185889.08
109292.77
58.79

100

5284.00
S/.
S/.

S/.

S/.
S/.
S/.

S/.

S/.
S/.

S/.

118,396.30
19,886.21
9792.63
5027.63
5065.95
39,663.19
14772.53
255.45
894.52
206.45
530.92
172.56
6319.14
11578.84
760.09
500.86
3671.84
13,877.41
13877.41
7,982.67
7982.67
7,474.52
2909.81
877.45
877.45
1554.90
1254.90
9,524.28
1021.38
5059.53
3443.36
3,579.54
3579.54
13,289.49
12195.21
1094.28
3,119.00
1024.32
1673.21
421.47

S/.

19,844.83
4893.68
2360.39
908.43
247.77
130.66
230.27
885.49
1399.04
2185.83
3827.79
1662.66
215.41
97.41
800.00

S/.

5,590.18

S/.

S/.

S/.

657.33
202.16
157.75
217.69
41.58
18.79
19.36
4,932.85
4115.71
153.41
77.13
43.12
267.60
84.12
7.50
23.71
19.96
17.02
76.09
47.48
326,089.92
100.00%

CRONOGRAMA DE DESEMBOLSOS
CONSTRUCCION DEL SEGUNDO PISO PABELLON ''A''- UPN

RUBRO

DESEMBOLSOS

TOTAL

MES N 1

1. CONSTRUCCION DEL SEGUNDO PISO DEL PABELLON A DE LA U.P.N.


1.1 COSTO DIRECTO
Mano de obra

S/. 122,174.12

S/. 42,760.94

Materiales

S/. 196,488.89

S/. 49,122.22

S/. 7,426.91

S/. 2,228.07

S/. 326,089.92

S/. 94,111.24

Equipos / herramientas

2. GASTOS GENERALES
GASTO GENERALES FIJOS

S/. 3,450.00

S/. 1,150

Movilizacin y Desmovilizacin

S/. 700.00

S/. 233.33

Caseta

S/. 2,000.00

S/. 666.67

Gastos Notariales y Financieros

S/. 500.00

S/. 166.67

Gastos de Licitacin

S/. 250.00

S/. 83.33

GASTOS GENERALES VARIABLES

S/. 56,622.84

S/. 19,281.89

Direccin Tcnica, Administrativa y Auxiliar

S/. 40,800

S/.

13,600.00

- Personal Profesional y Tcnico

S/. 33,600

S/.

11,200.00

S/. 18,000.00

S/.

6,000.00

Administrador

S/. 9,000.00

S/.

3,000.00

Maestro de Obra

S/. 6,600.00

S/.

2,200.00

Ing. Residente

- Personal Administrativo y Auxiliar

S/. 7,200

S/.

2,400.00

(1) Almacenero de Obra

S/. 3,600.00

S/.

1,200.00

(1) Guardian (noche)

S/. 3,600.00

S/.

1,200.00

Gastos No Incluidos en Costos Directos

S/. 10,100

S/.

3,366.67

- Alquiler de camioneta

S/. 9,450.00

S/.

3,150.00

- Seguros contra todo tipo de riesgos

S/. 650.00

S/.

216.67

Gastos de Equipos de proteccin personal

S/. 0

(Estos gastos ya se contemplan en Costos HH)

S/. 0

S/. 0
S/. 0

Alquiler y Mantenimiento de oficina central

S/. 4,500

1500

- Alquiler oficina central

S/. 1,500.00

500

- Mantenimiento y servicio

S/. 1,500.00

500

- Impresos, Utiles de escritorio y Oficina

S/. 1,500.00

500

Honorarios del personal de oficina central

S/. 24,000

8000

- Gerente General

S/. 12,000.00

4000

- Secretaria

S/. 4,500.00

1500

- Contador

S/. 7,500.00

2500

Adelanto en Efectivo

S/. 815.22

S/. 815.22

S/. 815.22

S/. 815.22

Carta Fianza Adelanto


Tiempo de retencin 3 meses
0.05 x 3 x 0.20 x N / 12
N = Costo Directo
Fiel Cumplimiento

S/. 407.61

Carta Fianza Fiel Cumplimiento


Tiempo de retencin 3 meses
0.05 x 3 x 0.1x N / 12
N = Costo Directo

S/. 407.61

2. GASTOS SUPERVISIN
-Supervisin

S/. 34,590.55

S/. 11,530.18

''- UPN

DESEMBOLSOS
MES N 2

MES N 3

S/. 42,760.94

S/. 36,652.24

S/. 78,595.56

S/. 68,771.11

S/. 2,599.42

S/. 2,599.42

S/. 123,955.92

S/. 108,022.77

S/. 1,150

S/. 1,150

S/. 233.33

S/. 233.33

S/. 666.67

S/. 666.67

S/. 166.67

S/. 166.67

S/. 83.33

S/. 83.33

S/. 19,281.89

S/. 19,281.89

S/.

13,600.00 S/.

13,600.00

S/.

11,200.00

S/.

11,200.00

S/.

6,000.00

S/.

6,000.00

S/.

3,000.00

S/.

3,000.00

S/.

2,200.00

S/.

2,200.00

S/.

2,400.00

S/.

2,400.00

S/.

1,200.00

S/.

1,200.00

S/.

1,200.00

S/.

1,200.00

S/.

3,366.67

S/.

3,366.67

S/.

3,150.00

S/.

3,150.00

S/.

216.67

S/.

216.67

S/. 0

S/. 0

S/. 0

S/. 0

1500

1500

500

500

500

500

500

500

8000

8000

4000

4000

1500

1500

2500

2500

S/. 11,530.18