RAMP-UP / RAMP-DOWN SCHEDULE


Time

Flow
Capacity

Pump
Progress

Ramp Up schedule

Continuous Maximum Discharging Rate

Stripping
Cargo Tank

Ramp Down Schedule

RAW
Level

Pump Progress

Max Discharging Rate for minimum 10 hours


11000 m/hr

Full Rate

50min
0,800m

Stop 1st Pump

1P

45min
9600

m/hr Ramp-up

0,215m

Stop 2nd Pump 1S

8400

m/hr

Start 1S

0,800m

Stop 3rd Pump

2P

7200

m/hr

Start 4S

0,215m

Stop 4th Pump

2S

6000

m/hr

Start 3S

0,800m

Stop 5th Pump

3P

4800

m/hr

Start 2S

0,215m

Stop 6th Pump

3S

3600

m/hr

Start 1P

0,800m

Stop 7th Pump

4P

2400

m/hr

Start 4P

0,215m

Stop 8th Pump

4S

1200

m/hr

Start 3P

40min
35min
30min
25min
20min
15min
10min
Stripping pump stop schedule:

Iso. v/v opening & Filling v/v closing

5min
0

m/hr

No1 Stripping Pump @


No2 Stripping Pump @
No3 Stripping Pump @
No4 Stripping Pump @

Start 2P

0min

90min

135min

180min

50min

45min

40min

35min

30min

25min

20min

15min

10min

5min

Commence pump
starting sequence

0min

0min

20m
40m
45m
40m

Iso. v/v closing & Filling v/v opening


Allowable Minimum Flow at Continuous Running:
Rated Flow at Continuous Running:

Remarks:

650
1700

m/h
r
m/h
r

(i) Ramp Down schedule is prepared basis previous discharging operations with 3,0m trim by stern and we do not guarantee timing. Flow
CHIEF OFFICER
Rate and pump stop times are informative and for guidance only. Total full rate discharging will last not less than 10-hours