Professional Documents
Culture Documents
for
Lau
nc
COMPLETED
STAKE TREE
TURTLE BASKING PLATFORM
SECTOR 4
PORCUPINE CRIB
Sh
all
ow
Date: 11/14/14
Fl
lat
Unnamed Tributary
FELLED SHORELINE TREE
NOTE :
F
llow
Sha
SECTOR 1
Boat Mooring
and Fishing Pier
ch
Laun
at
CONIFER STRING
POST CLUSTER
SECTOR 3
SPIDER HUMPS
l
nne
Cha
am
Stre
SEC
POST STUMPS
TOR
ch
Laun
8 Spider Humps
8 Rock Star Structures
6'-12' of water
40*12.249
#10
76*18.488
LAKE SUBSTRATE
PLAN VIEW
1' - 3'
LAKE SUBSTRATE
NOTES:
RECOMMENDED DENSITY IS 20 TONS/ACRE
PLACED IN 1-3 TON HUMPS
LIMESTONE CAN SUBSTITUTE SANDSTONE
NOT TO SCALE
ALL SIZES ARE APPROXIMATE
FIT IN FIELD
PFBC 3/26/02
MBS 09
PLAN VIEW
SECTION VIEW
17'
2'
NORMAL
WATER LEVEL
NOTES
NOT TO SCALE
ALL SIZES ARE APPROXIMATE
FIT IN FIELD
MBS 09
4' MINIMUM
NOTES:
LUMBER MUST BE TRUE DIMENSIONAL
LUMBER MUST BE GREEN (FRESH CUT)
YELLOW POPLAR MAY BE SUBSTITUTED FOR HEMLOCK
PROFILE VIEW
17'
SUGGESTED EQUIPMENT:
PFBC HABITAT
ENHANCEMENT
STRUCTURE SIGN
LAKE SUBSTRATE
CENTER REQUIRE'S
3 TONS OF SANDSTONE
LAKE SUBSTRATE
MATERIALS:
EXCAVATOR
SKIDSTEER OR FRONTLOADER
GAS POWERED DRILL
SLEDGEHAMMER
PFBC 4/01/08
PLAN VIEW
SECTION VIEW
LAKE SUBSTRATE
PROFILE VIEW
MBS 09
2'
PFBC HABITAT
ENHANCEMENT
STRUCTURE SIGN
HEMLOCK BOARDS
NORMAL
WATER LEVEL
LAKE SUBSTRATE
NOTES
NOTES:
LUMBER MUST BE TRUE DIMENSIONAL
LUMBER MUST BE GREEN (FRESH CUT)
YELLOW POPLAR MAY BE SUBSTITUTED FOR HEMLOCK
NOT TO SCALE
ALL SIZES ARE APPROXIMATE
FIT IN FIELD
SUGGESTED EQUIPMENT:
EXCAVATOR
SKIDSTEER OR FRONTLOADER
NAILGUN OR CLAW HAMMER
PFBC 04/01/06
8'
NOTES
NOTES:
POSTS ARE POUNDED INTO A DRY LAKE BOTTOM
POSTS ARE PLACED USING A EXCAVATOR
25 ACQ POST EQUAL 1 POST CLUSTER
SOME SUBSTRATES MAY NEED TO BE AUGERED
NOT TO SCALE
ALL SIZES ARE APPROXIMATE
FIT IN FIELD
PFBC HABITAT
ENHANCEMENT
STRUCTURE SIGN
NORMAL
WATER LEVEL
LAKE SUBSTRATE
PFBC 3/26/02
1'
4'
3'
MBS 09
NORMAL
WATER LEVEL
SUGGESTED EQUIPMENT:
EXCAVATOR
SKIDSTEER WITH FORKS
CHAINSAW
OPTIONAL: AUGER BIT FOR THE SKIDSTEER
NOT TO SCALE
ALL SIZES ARE APPROXIMATE
FIT IN FIELD
48"
NOTES:
POST STUMPS ARE POUNDED INTO A DRY LAKE BOTTOM
POST STUMPS ARE PLACED USING A EXCAVATOR
A POST STUMP IS TYPICALLY 1 POST CUT IN HALF
A WHOLE POST CAN BE USED IN DEEP WATER DEPTHS
25 ACQ POST EQUAL 1 POST STUMP CLUSTER
SOME SUBSTRATES MAY NEED TO BE AUGERED
MATERIALS:
ACQ POST 6" X 8' - 1 PIECE
LAKE SUBSTRATE
PROFILE VIEW
75 DEGREE ANGLE
NORMAL
WATER LEVEL
SECTION VIEW
24"
LAKE SUBSTRATE
PLAN VIEW
PFBC 03/17/08
MBS 09
9"
SECTION VIEW
PLAN VIEW
32"
13"
11"
PROFILE VIEW
1/2" AIR RELEASE HOLES
9"
SUGGESTED EQUIPMENT:
ELECTRIC DRILL, SABER SAW, CIRCULAR SAW
7/16" SOCKET AND RATCHET, CLAW HAMMER
MASONARY BIT 5/16", WOOD BIT 1/2"
MBS 09
NOTES:
LUMBER MUST BE TRUE DIMENSIONAL
LUMBER MUST BE GREEN (FRESH CUT)
YELLOW POPLAR MAY BE SUBSTITUTED FOR HEMLOCK
BOX SHOULD BE PLACED IN 3' - 5' OF WATER
CAN BE PLACED BY EXCAVATING A HOLE OR BY BOAT
NOT TO SCALE
ALL SIZES ARE APPROXIMATE
FIT IN FIELD
MATERIALS:
ROUGH CUT HEMLOCK LUMBER 1" X 9" X 8' - 2.5 PIECES
CONCRETE PATIO BLOCK 16" X 16" X 2" - 2 PIECES
18"
ENTRANCE HOLE
6"
PFBC 10/22/99
8' MINIMUM
NOTES
ROOT WADS WIL BE ENTRENCHED INTO THE SUBSTRATE
REMEMBER TO CALL THE PA DIG HOTLINE
4' MINIMUM
PFBC 11/20/13
MBS 13