You are on page 1of 28

12

10

0
1

CALENDARIO DE AVANCE DE OBRA VALORIZADO


Presupuesto 0303013 AMPLIACION Y MEJORAMIENTO DE LA INFRAESTRUCTURA DE LA INSTITUCION EDUCATIVA LOS ALGARROBOS DEL AA.HH. LOS ALGARROBOS - DISTRITO DE PIURA
Cliente

GOBIERNO REGIONAL PIURA

Contratista

CONSORCIO PIURA

Lugar

PIURA - PIURA - PIURA

Item

Descripcin

Und. Metrado Precio S/.

Parcial S/.

1 MES

2 MES

3 MES

4 MES

5 MES

6 MES

7 MES

8 MES

9 MES

DEL 12 AL
31 MARZO
2013

DEL 01 AL
30 ABRIL
2013

DEL 01 AL
31 MAYO
2013

DEL 01 AL
30 JUNIO
2013

DEL 01 AL
31 JULIO
2013

DEL 01 AL 31
AGOSTO
2013

DEL 01 AL 30
SETIEMBRE
2013

DEL 01 AL 31
OCTUBRE
2013

DEL 01 AL 06
NOVIEMBRE
2013

500.00

500.00

500.00

500.00

500.00

500.00

500.00

300.00

2,640.00

1,980.00

ESTRUCTURAS
01

OBRAS PROVISIONALES

01.01

CARTEL PARA LA OBRA DE 7.20X3.60M

01.02

CONSTRUCCION DE CASETA PARA ALMACEN Y OFICINA DE RESIDENCIA

01.03

INSTALACION PROVISIONAL PARA DEPOSITO DE AGUA

01.04

21,165.72
u

1.00

1,570.29

1,570.29

1,570.29

glb

1.00

7,500.00

7,500.00

7,500.00

1.00

949.52

949.52

AGUA PARA LA CONSTRUCCION

mes

8.00

500.00

4,000.00

200.00

01.05

SERVICIOS HIGIENICOS EN OBRA

glb

1.00

545.91

545.91

545.91

01.06

MOVILIZACION Y DESMOVILIZACION DE EQUIPO

glb

1.00

6,600.00

02

OBRAS PRELIMINARES

02.01

DESMONTAJES DE COBERTURA DE ETERNIT Y ESTRUCTURA DE TECHO

02.02

DESMONTAJE DE TIJERALES

02.03
02.04

6,600.00

949.52

1,980.00

43,618.05
m2

839.59

6.49

5,448.94

14.00

64.89

908.46

3,269.36
908.46

DESMONTAJE DE PUERTA DE FIERRO

m2

40.30

9.87

397.76

258.54

DESMONTAJE DE PUERTAS DE MADERA

m2

6.30

7.40

46.62

46.62

02.05

DESMONTAJE DE VENTANAS Y SOBREVENTANAS DE FIERRO

m2

98.24

9.87

969.63

775.70

02.06

DESMONTAJE DE APARATOS SANITARIOS

7.00

29.61

207.27

207.27

02.07

DESMONTAJE DE SISTEMA ELECTRICO

glb

1.00

1,500.00

1,500.00

1,200.00

02.08

REMOCION DE ARBOLES

20.00

83.77

1,675.40

670.16

02.09

DEMOLICION DE MUROS DE LADRILLO KK - SOGA MANUAL

m2

367.63

5.54

2,036.67

407.33

02.10

DEMOLICION DE MUROS DE LADRILLO K.K. - CABEZA, MANUAL

m2

68.74

6.24

428.94

428.94

02.11

DEMOLICION DE SOBRECIMIENTOS DE CONCRETO

m3

6.74

134.32

905.32

02.12

DEMOLICION DE CIMIENTOS

m3

61.69

130.09

8,025.25

02.13

DEMOLICION DE COLUMNAS DE CONCRETO

m3

10.20

201.47

2,054.99

02.14

DEMOLICION DE VIGAS DE CONCRETO

m3

5.60

183.15

02.15

DEMOLICION DE PISO DE CEMENTO PULIDO, e=0.05m

m2

636.73

4.00

02.16

DEMOLICION DE FALSO PISO, e = 0.10 m

m2

41.03

6.65

272.85

02.17

DEMOLICION DE VEREDAS DE CONCRETO A PULSO

m2

68.36

6.65

454.59

02.18

DEMOLICION DE URINARIO CORRIDO

m3

0.09

39.91

3.59

3.59

02.19

DEMOLICION DE BEBEDERO DE CONCRETO

m3

0.48

49.89

23.95

23.95

02.20

ELIMINACION DE MATERIAL EXCEDENTE DE DEMOLICIONES, Dp=5 KM

m3

274.13

13.95

3,824.11

02.21

LIMPIEZA DE TERRENO MANUAL

m2

3,031.17

0.83

2,515.87

2,515.87

02.22

TRAZO Y REPLANTEO EN EDIFICACION

m2

3,031.17

1.15

3,485.85

497.98

02.23

TRAZO Y REPLANTEO EN CERCO PERIMETRICO

727.99

1.16

844.47

02.24

ENTIBADO PARA EXCAVACION MASIVA

m2

289.68

13.86

4,014.96

2,179.58

139.22

193.93

300.00
1,005.24
1,629.34

905.32
2,407.58
513.75

1,541.25

1,025.64

615.38

410.26

2,546.92

1,018.77

5,617.68

1,528.15

272.85
454.59

3,824.11

497.98

497.98

497.98

497.98

497.98
844.47

4,014.96

497.98

Item

Descripcin

Und. Metrado Precio S/.

Parcial S/.

1 MES

2 MES

3 MES

4 MES

5 MES

6 MES

7 MES

8 MES

9 MES

DEL 12 AL
31 MARZO
2013

DEL 01 AL
30 ABRIL
2013

DEL 01 AL
31 MAYO
2013

DEL 01 AL
30 JUNIO
2013

DEL 01 AL
31 JULIO
2013

DEL 01 AL 31
AGOSTO
2013

DEL 01 AL 30
SETIEMBRE
2013

DEL 01 AL 31
OCTUBRE
2013

DEL 01 AL 06
NOVIEMBRE
2013

2,471.02

4,942.04

4,942.04

03

MOVIMIENTO DE TIERRAS

03.01

CORTE DE TERRENO NATURAL PARA NIVELACION

m3

2,501.03

4.94

374,975.08
12,355.09

03.02

CORTE DE TERRENO NATURAL, e= 0.05m

m2

363.90

1.25

454.88

03.03

CORTE DE TERRENO NATURAL, e = 0.10m

m2

130.38

2.49

324.65

03.04

CORTE DE TERRENO NATURAL, e = 0.20m

m2

638.88

4.99

3,188.01

03.05

CORTE DE TERRENO NATURAL, e = 0.30m

m2

141.19

7.98

1,126.70

03.06

CORTE DE TERRENO NATURAL, e= 0.65m

m2

15.19

19.96

303.19

303.19

03.07

CORTE DE TERRENO NATURAL, e= 0.75m

m2

15.19

19.96

303.19

303.19

03.08

CORTE DE TERRENO NATURAL, e = 0.84m

m2

200.38

19.96

3,999.58

03.09

CORTE DE TERRENO NATURAL, e = 1.31m

m2

22.00

33.26

731.72

03.10

EXCAVACION DE ZANJAS PARA ZAPATAS

m3

266.89

24.95

6,658.91

03.11

EXCAVACION DE ZANJAS PARA CIMIENTOS CORRIDOS

m3

531.75

24.95

13,267.16

03.12

EXCAVACION DE ZANJAS PARA VIGAS DE CIMENTACION

m3

16.85

24.95

420.41

03.13

EXCAVACION DE MURO DE CONTENCION

m3

777.34

24.95

19,394.63

5,818.39

03.14

EXCAVACION PARA CISTERNA

m3

43.13

24.95

1,076.09

1,076.09

03.15

EXCAVACION MASIVA PARA MEJORAMIENTO DE TERRENO

m3

2,533.72

6.20

15,709.06

03.16

CORTE DE TERRENO NATURAL PARA VEREDAS, e = 0.10 m

m2

67.13

2.49

167.15

03.17

CORTE DE TERRENO NATURAL PARA CIRCULACIN, e = 0.20m

m2

444.38

4.99

2,217.46

2,217.46

03.18

CORTE DE TERRENO NATURAL PARA CIRCULACIN, e = 0.25m

m2

227.84

6.24

1,421.72

1,421.72

03.19

CORTE DE TERRENO NATURAL PARA LOSA DEPORTIVA, e = 0.20m

m2

613.30

4.99

3,060.37

3,060.37

03.20

EXCAVACION PARA CUNETA PLUVIAL

m3

64.68

33.26

2,151.26

2,151.26

03.21

EXCAVACION PARA SARDINEL, e = 0.20m

59.31

1.42

84.22

84.22

03.22

EXCAVACION PARA SARDINEL, e = 0.24m

112.10

1.42

159.18

159.18

03.23

EXCAVACION PARA SARDINEL, e = 0.30m

86.44

1.53

132.25

132.25

03.24

EXCAVACION PARA SARDINEL ARMADO

m3

22.32

22.18

495.06

03.25

RELLENO CON MATERIAL DE PRESTAMO (AFIRMADO)

m3

23.49

58.37

1,371.11

03.26

RELLENO CON MATERIAL PROPIO (AFIRMADO)

m3

161.74

15.97

2,582.99

03.27

RELLENO CON MATERIAL PROPIO (SP)

m3

575.42

15.97

9,189.46

03.28

RELLENO PARA MEJORAMIENTO DE TERRENO (OVER SIDE)

m3

445.69

63.10

28,123.04

03.29

RELLENO PARA MEJORAMIENTO DE TERRENO (AFIRMADO)

m3

1,741.36

53.30

92,814.49

92,814.49

03.30

RELLENO PARA MEJORAMIENTO DE TERRENO (HORMIGON)

m3

211.34

53.82

11,374.32

11,374.32

03.31

RELLENO CON HORMIGON

m3

154.93

73.10

11,325.38

03.32

BASE DE FALSO PISO CON HORMIGON, e = 0.05 m

m2

286.13

9.22

2,638.12

03.33

BASE DE FALSO PISO CON HORMIGON, e = 0.10 m

m2

114.26

18.43

2,105.81

03.34

CAPA DE GRAVA DE 3/4", e=0.10m

m2

50.99

12.69

647.06

03.35

CAPA DE HORMIGON, e=0.20m

m3

98.86

65.04

6,429.85

6,429.85

03.36

CAPA DE AFIRMADO, e=0.20m

m3

98.86

64.42

6,368.56

6,368.56

03.37

ELIMINACION DE MATERIAL EXCEDENTE (AFIRMADO)

m3

374.14

13.18

4,931.17

03.38

ELIMINACION DE MATERIAL EXCEDENTE (SP)

m3

8,032.76

13.18

105,871.78

04

OBRAS DE CONCRETO SIMPLE

335,223.80

454.88
324.65
3,188.01
1,126.70

3,999.58
731.72
4,661.24
663.36

1,997.67

2,653.43

2,653.43

7,296.94

420.41
11,636.78

1,939.46

15,709.06
167.15

495.06
1,371.11
1,162.35

1,420.64
6,432.62

28,123.04

11,325.38
1,319.06

1,319.06
2,105.81
647.06

4,931.17
42,348.71

63,523.07

2,756.84

Item

Descripcin

Und. Metrado Precio S/.

Parcial S/.

1 MES

2 MES

3 MES

4 MES

5 MES

6 MES

7 MES

8 MES

9 MES

DEL 12 AL
31 MARZO
2013

DEL 01 AL
30 ABRIL
2013

DEL 01 AL
31 MAYO
2013

DEL 01 AL
30 JUNIO
2013

DEL 01 AL
31 JULIO
2013

DEL 01 AL 31
AGOSTO
2013

DEL 01 AL 30
SETIEMBRE
2013

DEL 01 AL 31
OCTUBRE
2013

DEL 01 AL 06
NOVIEMBRE
2013

04.01

SOLADOS

04.01.01

SOLADO PARA ZAPATAS, h=0.10m Mezcla 1:10

m2

204.71

23.04

11,684.97
4,716.52

04.01.02

SOLADO PARA MURO DE CONTENCION, h = 0.10m, Mezcla 1:10

m2

302.45

23.04

6,968.45

04.02

CIMIENTO CORRIDO DE CONCRETO CICLOPEO 1:10 + 30% P.M. 6"

m3

285.87

162.03

46,319.52

04.03

SOBRECIMIENTO

04.03.01

CONCRETO CICLOPEO 1:8 + 25% P.M. 3" PARA SOBRECIMIENTOS

m3

6.33

234.82

1,486.41

04.03.02

ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS

m2

42.67

35.28

1,505.40

1,505.40

04.04

FALSO PISO, MEZCLA 1:8, e = 4"

m2

1,398.59

33.10

46,293.33

20,832.00

04.05

VEREDAS DE CONCRETO

04.05.01

VEREDA, e=4" CONCRETO f'c=140 Kg/cm2, una ua.

m2

367.92

44.42

16,343.01

04.05.02

JUNTAS DE DILATACION CADA TRES METROS, e = 1"

113.88

2.13

242.56

04.06

RAMPAS DE CONCRETO

04.06.01

BASE DE AFIRMADO PARA RAMPAS, e=10 cm.

m2

84.93

10.33

877.33

04.06.02

RAMPA, e=4" CONCRETO f'c=140 Kg/cm2

m2

307.88

44.42

13,676.03

04.07

CUNETA PLUVIAL DE CONCRETO

04.07.01

CUNETA DE CONCRETO f'c=140 Kg/cm2

336.68

43.17

14,534.48

14,534.48

04.07.02

ENCOFRADO Y DESENCOFRADO EN CUNETA PLUVIAL DE CONCRETO

m2

571.62

29.29

16,742.75

16,742.75

04.08

CIMENTACION DE ESCALERA, CONCRETO f'c=175 Kg/cm2

m3

11.51

273.38

3,146.60

3,146.60

04.09

CIRCULACION

04.09.01

SUB BASE DE AFIRMADO PARA CIRCULACIN, e = 0.10 m

m2

955.29

10.90

10,412.66

04.09.02

BASE DE HORMIGON PARA CIRCULACIN, e=10 cm.

m2

955.29

10.96

10,469.98

10,469.98

04.09.03

CIRCULACIN, e=4" CONCRETO f'c=140 Kg/cm2, una ua.

m2

534.26

44.42

23,731.83

23,731.83

04.09.04

JUNTA ASFALTICA EN CIRCULACION CADA TRES METROS, e=1"

945.82

2.13

2,014.60

2,014.60

04.10

LOSA DEPORTIVA

04.10.01

BASE DE HORMIGON PARA LOSA DEPORTIVA, e=0.15 m.

m2

613.30

14.73

9,033.91

04.10.02

LOSA DEPORTIVA, e=0.15m. CONCRETO f'c=175 Kg/cm2, una ua.

m2

613.30

59.65

36,583.35

04.10.03

JUNTA ASFALTICA EN LOSA DEPORTIVA CADA CINCO METROS, e=1"

190.00

2.13

404.70

04.11

PATIO

04.11.01

BASE DE HORMIGON PARA PATIO, e=0.15m.

m2

780.07

13.59

10,601.15

04.11.02

PATIO, e=0.15m. CONCRETO f'c=175 Kg/cm2

m2

780.07

59.65

46,531.18

46,531.18

04.11.03

JUNTA ASFALTICA EN PATIO CADA TRES METROS, e=1"

469.61

2.13

1,000.27

1,000.27

04.12

SARDINEL

04.12.01

SARDINEL DE h=0.50m., CONCRETO f'c=140 Kg/cm2

94.80

24.13

2,287.52

04.12.02

SARDINEL DE h=0.30m., CONCRETO f'c=140 Kg/cm2

155.61

19.02

2,959.70

739.93

04.12.03

ENCOFRADO Y DESENCOFRADO PARA SARDINEL

m2

165.42

28.96

4,790.56

4,790.56

04.13

CALZADURAS EN EDIFICACION

glb

1.00

05

OBRAS DE CONCRETO ARMADO

05.01

ZAPATAS

CONCRETO PARA ZAPATAS f'c=210 kg/cm2

m3

115.08

05.01.02

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60

kg

2,708.59

3,301.56

1,414.96
6,968.45

9,263.90

13,895.86

23,159.76

2,991.81
1,486.41

25,461.33

16,585.57
16,343.01
242.56

14,553.36
877.33
13,676.03

31,277.23

46,629.07
10,412.66

46,021.96
9,033.91
36,583.35
404.70

58,132.60
10,601.15

10,037.78

1,550.00

1,550.00

2,287.52

1,550.00

869,851.11
43,995.62
305.34

35,138.53

24,596.97

10,541.56

3.27

8,857.09

7,528.53

1,328.56

2,219.78

Item

Descripcin

Und. Metrado Precio S/.

Parcial S/.

1 MES

2 MES

3 MES

4 MES

5 MES

6 MES

7 MES

8 MES

9 MES

DEL 12 AL
31 MARZO
2013

DEL 01 AL
30 ABRIL
2013

DEL 01 AL
31 MAYO
2013

DEL 01 AL
30 JUNIO
2013

DEL 01 AL
31 JULIO
2013

DEL 01 AL 31
AGOSTO
2013

DEL 01 AL 30
SETIEMBRE
2013

DEL 01 AL 31
OCTUBRE
2013

DEL 01 AL 06
NOVIEMBRE
2013

05.02

SOBRECIMIENTO ARMADO

05.02.01

CONCRETO PARA SOBRECIMIENTO ARMADO f'c=175 kg/cm2

m3

61.46

307.30

56,131.54
18,886.66

11,332.00

7,554.66

05.02.02

ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS

m2

531.76

35.28

18,760.49

11,256.29

7,504.20

05.02.03

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60

kg

5,652.72

3.27

18,484.39

11,090.63

7,393.76

05.03

SARDINEL ARMADO

05.03.01

SARDINEL DE CONCRETO f'c=175 Kg/cm2

m3

44.90

307.30

13,797.77

13,797.77

05.03.02

ENCOFRADO Y DESENCOFRADO PARA SARDINEL

m2

379.99

28.96

11,004.51

11,004.51

05.03.03

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60

kg

1,724.99

3.27

5,640.72

5,640.72

05.04

VIGAS DE CIMENTACION

05.04.01

CONCRETO PARA VIGA DE CIMENTACION f'c=210 kg/cm2

m3

14.34

326.79

4,686.17

05.04.02

ENCOFRADO Y DESENCOFRADO PARA VIGAS DE CIMENTACION

m2

114.74

50.33

5,774.86

05.04.03

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60

kg

1,603.26

3.27

5,242.66

05.05

MUROS DE CONTENCION

05.05.01

CONCRETO PARA MURO DE CONTENCION f'c=175 kg/cm2

m3

260.45

316.92

82,541.81

05.05.02

ENCOFRADO Y DESENCOFRADO PARA MUROS DE CONTENCION

m2

1,209.82

41.76

50,522.08

2,526.10

30,313.25

17,682.73

05.05.03

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60

kg

15,236.78

3.27

49,824.27

7,473.64

34,876.99

7,473.64

05.06

GRADERIAS

05.06.01

GRADERIAS, CONCRETO f'c=175 Kg/cm2

m3

9.70

340.50

3,302.85

3,302.85

05.06.02

ENCOFRADO Y DESENCOFRADO EN GRADERIAS

m2

38.25

54.89

2,099.54

2,099.54

05.06.03

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60

kg

1,121.79

3.27

3,668.25

3,668.25

05.07

COLUMNAS

05.07.01

CONCRETO PARA COLUMNAS, f'c = 210 kg/cm2

m3

113.54

380.12

43,158.82

17,263.53

15,105.59

10,789.71

05.07.02

ENCOFRADO Y DESENCOFRADO EN COLUMNAS

m2

1,240.18

40.28

49,954.45

19,981.78

22,479.50

7,493.17

05.07.03

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60

kg

16,440.90

3.27

53,761.74

30,443.00

15,703.69
4,686.17
5,774.86
3,669.86

1,572.80

182,888.16
82,541.81

9,070.64

146,875.01

5.08 COLUMNAS DE CONFINAMIENTO

17,920.58

35,841.16

25,944.52

05.08.01

CONCRETO PARA COLUMNAS DE CONFINAMIENTO f'c=175 kg/cm2

m3

22.34

300.12

6,704.68

2,681.87

4,022.81

05.08.02

ENCOFRADO Y DESENCOFRADO EN COLUMNAS DE CONFINAMIENTO

m2

321.78

31.79

10,229.39

4,091.76

6,137.63

05.08.03

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60

kg

2,755.49

3.27

9,010.45

3,604.18

5,406.27

05.09

COLUMNAS DE CERCO PERIMETRICO

05.09.01

CONCRETO PARA COLUMNAS, f'c=175 kg/cm2

m3

13.72

300.12

4,117.65

4,117.65

05.09.02

ENCOFRADO Y DESENCOFRADO EN COLUMNAS

m2

143.37

40.28

5,774.94

5,774.94

05.09.03

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60

kg

1,221.25

3.27

05.10

VIGAS

05.10.01

CONCRETO PARA VIGAS, f'c = 210 kg/cm2

m3

129.76

325.93

42,292.68

21,146.34

21,146.34

05.10.02

ENCOFRADO Y DESENCOFRADO EN VIGAS

m2

1,026.18

35.55

36,480.70

18,240.35

18,240.35

05.10.03

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60

kg

16,447.19

3.27

53,782.31

24,202.04

10,756.46

05.11

VIGAS DE CONFINAMIENTO

05.11.01

CONCRETO PARA VIGAS DE CONFINAMIENTO f'c=175 kg/cm2

m3

7.23

300.12

2,169.87

2,169.87

05.11.02

ENCOFRADO Y DESENCOFRADO EN VIGAS DE CONFINAMIENTO

m2

75.20

31.79

2,390.61

2,390.61

05.11.03

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60

kg

654.77

3.27

2,141.10

2,141.10

13,886.08

3,993.49

3,993.49

132,555.69

18,823.81

6,701.58

Item

Descripcin

Und. Metrado Precio S/.

Parcial S/.

1 MES

2 MES

3 MES

4 MES

5 MES

6 MES

7 MES

8 MES

9 MES

DEL 12 AL
31 MARZO
2013

DEL 01 AL
30 ABRIL
2013

DEL 01 AL
31 MAYO
2013

DEL 01 AL
30 JUNIO
2013

DEL 01 AL
31 JULIO
2013

DEL 01 AL 31
AGOSTO
2013

DEL 01 AL 30
SETIEMBRE
2013

DEL 01 AL 31
OCTUBRE
2013

DEL 01 AL 06
NOVIEMBRE
2013

05.12

VIGAS DE CERCO PERIMETRICO

05.12.01

CONCRETO EN VIGAS f'c=175 kg/cm2

m3

3.96

300.12

4,222.90
1,188.48

1,188.48

05.12.02

ENCOFRADO Y DESENCOFRADO EN VIGAS

m2

39.64

35.55

1,409.20

1,409.20

05.12.03

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60

kg

497.01

3.27

05.13

LOSA ALIGERADA

05.13.01

CONCRETO PARA LOSA ALIGERADA, f'c = 210 kg/cm2

m3

122.34

309.69

37,887.47

17,049.36

20,838.11

05.13.02

ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA

m2

1,397.04

39.24

54,819.85

24,668.93

30,150.92

05.13.03

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60

kg

7,341.65

3.27

24,007.20

10,803.24

13,203.96

05.13.04

LADRILLO PARA TECHO 15 x 30 x 30 cm

11,638.00

2.19

25,487.22

11,469.25

14,017.97

05.14

LOSA MACIZA

05.14.01

CONCRETO PARA LOSA MACIZA, f'c = 210 kg/cm2

m3

10.46

314.63

3,291.03

05.14.02

ENCOFRADO Y DESENCOFRADO EN LOSA MACIZA

m2

58.40

46.79

2,732.54

2,049.41

05.14.03

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60

kg

730.84

3.27

2,389.85

2,389.85

05.15

ESCALERAS

05.15.01

CONCRETO PARA ESCALERA, f'c = 210 kg/cm2

m3

42.76

360.03

15,394.88

15,394.88

05.15.02

ENCOFRADO Y DESENCOFRADO EN ESCALERAS

m2

227.51

57.30

13,036.32

13,036.32

05.15.03

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60

kg

2,444.54

3.27

7,993.65

7,993.65

05.16

CISTERNA

05.16.01

CONCRETO PARA CISTERNA, f'c = 210 kg/cm2

m3

12.08

346.37

4,184.15

4,184.15

05.16.02

ENCOFRADO Y DESENCOFRADO EN CISTERNA

m2

39.78

40.41

1,607.51

1,607.51

05.16.03

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60

kg

1,064.84

3.27

3,482.03

3,482.03

05.17

TANQUE ELEVADO

05.17.01

CONCRETO PARA TANQUE ELEVADO, f'c = 210 kg/cm2

m3

4.45

398.29

1,772.39

1,772.39

05.17.02

ENCOFRADO Y DESENCOFRADO EN TANQUE ELEVADO

m2

29.09

56.92

1,655.80

1,655.80

05.17.03

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60

kg

517.06

3.27

1,690.79

1,690.79

06

ESTRUCTURAS METALICAS

06.01

ESTRUCTURA METALICA EN BLOQUES EXISTENTES

06.01.01

CORREAS 50mm x 70mm x 1.5mm

475.20

68.51

32,555.95

06.01.02

TIJERAL DE METAL 01 + ANCLAJES

15.00

2,741.87

41,128.05

41,128.05

06.01.03

TIJERAL DE METAL 02 + ANCLAJES

7.00

2,705.30

18,937.10

18,937.10

06.01.04

TIJERAL DE METAL 03 + ANCLAJES

10.00

2,718.50

27,185.00

27,185.00

06.01.05

ARRIOSTRES DE METAL

298.92

31.00

9,266.52

9,266.52

06.02

ESTRUCTURA METALICA EN PATIO 01

06.02.01

TIJERAL PARABOLICO + ANCLAJES

8.00

2,840.39

22,723.12

22,723.12

06.02.02

VIGUETA METALICA

261.45

55.12

14,411.12

14,411.12

06.02.03

TEMPLADORE DE F LISO 3/8"

328.44

19.99

6,565.52

6,565.52

06.02.04

TEMPLADORE DE F LISO 1/2"

145.60

21.08

3,069.25

3,069.25

06.02.05

SUMINISTRO Y COLOCACION DE VIGAS DE RIGIDEZ

149.40

106.16

15,860.30

06.03

ESTRUCTURA METALICA EN TRIBUNA DE LOSA DEPORTIVA

06.03.01

TIJERAL SUSPENDIDO + ANCLAJES

1,625.22

812.61

812.61

142,201.74

8,413.42
3,291.03
683.14

36,424.85

9,273.69

5,118.98

231,021.06
129,072.62
32,555.95

62,629.31

15,860.30

29,127.36
u

10.00

1,405.94

14,059.40

14,059.40

Item

Descripcin

Und. Metrado Precio S/.

Parcial S/.

1 MES

2 MES

3 MES

4 MES

5 MES

6 MES

7 MES

8 MES

9 MES

DEL 12 AL
31 MARZO
2013

DEL 01 AL
30 ABRIL
2013

DEL 01 AL
31 MAYO
2013

DEL 01 AL
30 JUNIO
2013

DEL 01 AL
31 JULIO
2013

DEL 01 AL 31
AGOSTO
2013

DEL 01 AL 30
SETIEMBRE
2013

DEL 01 AL 31
OCTUBRE
2013

DEL 01 AL 06
NOVIEMBRE
2013

06.03.02

CORREAS 100mmx100mm, e=4mm

92.81

81.51

7,564.94

7,564.94

06.03.03

CORREAS 50mmx100m, e=4mm

98.31

76.32

7,503.02

7,503.02

06.04

ESTRUCTURA METALICA EN ESCENARIO

06.04.01

TIJERAL PARABOLICO + ANCLAJES

2.00

1,907.62

3,815.24

3,815.24

06.04.02

VIGUETA METALICA

87.50

55.12

4,823.00

4,823.00

06.04.03

TEMPLADORE DE F LISO 3/8"

45.32

19.99

905.95

905.95

06.04.04

TEMPLADORE DE F LISO 1/2"

30.72

21.08

647.58

647.58

07

SISTEMA DE EVACUACION DE LLUVIAS

07.01

CANALETA GALVANIZADA 6" PARA TECHO

78.60

19.08

1,499.69

07.02

CANALETA PLUVIAL TIPO CALAMINN, e=4mm.

87.40

11.16

975.38

10,191.77

2,475.07
1,499.69
975.38

ARQUITECTURA
01

MUROS Y TABIQUES DE ALBAILERIA

01.01

MUROS DE LADRILLO KK MAQUINADO ASENTADO DE SOGA

m2

1,009.81

39.21

82,683.57
39,594.65

01.02

MUROS DE LADRILLO KK MAQUINADO ASENTADO DE CABEZA

m2

558.74

73.27

40,938.88

16,375.55

18,422.50

6,140.83

01.03

ALAMBRE N 8, REFUERZO HORIZONTAL EN MUROS

kg

565.80

3.80

2,150.04

967.52

967.52

215.00

02

REVOQUES Y ENLUCIDOS

02.01

TARRAJEO EN INTERIORES, e = 1.5 cm, Mezcla 1:5

m2

1,469.73

16.98

24,956.02

12,478.01

12,478.01

02.02

TARRAJEO EN EXTERIORES, e = 1.5 cm, Mezcla 1:5

m2

1,730.27

19.86

34,363.16

17,181.58

17,181.58

02.03

TARRAJEO PRIMARIO RAYADO, e = 1.5 c m

m2

252.15

16.23

4,092.39

02.04

TARRAJEO DE COLUMNAS, e = 1.5 cm, Mezcla 1:5

m2

1,079.64

23.70

25,587.47

02.05

TARRAJEO DE VIGAS, e = 1.5 cm, Mezcla 1:5

m2

1,019.15

23.70

24,153.86

02.06

TARRAJEO DE CIELO RASO, e = 1.5 cm, Mezcla = 1:5

m2

1,460.03

24.04

35,099.12

02.07

TARRAJEO DE MUROS DE CONTENCIN, e = 1.5 c m, Mezcla 1:5

m2

409.08

20.48

8,377.96

02.08

TARRAJEO PULIDO EN GRADERIAS

m2

162.78

24.36

3,965.32

02.09

TARRAJEO CON IMPERMEABILIZANTE

m2

62.08

22.41

1,391.21

02.10

VESTIDURA EN FONDO DE ESCALERAS CON MEZCLA C:A, 1:5

m2

106.61

31.94

3,405.12

02.11

VESTIDURA DE DERRAMES

1,347.04

9.36

12,608.29

02.12

BRUAS

361.53

6.26

2,263.18

03

PISOS Y PAVIMENTOS

03.01

CONTRAPISO DE 40 mm

m2

1,263.98

19.54

24,698.17

03.02

PISO DE CEMENTO PULIDO, e = 2" , BRUADO

m2

1,190.80

16.81

20,017.35

20,017.35

03.03

PISO DE CERAMICA DE 0.40 X 0.40m - ALTO TRANSITO

m2

1,165.52

46.94

54,709.51

54,709.51

03.04

PISO DE CERAMICA DE 0.30 X 0.30m - ALTO TRANSITO

m2

139.49

42.82

5,972.96

5,972.96

03.05

PISOS DE ADOQUIN DE CONCRETO

03.05.01

SUB BASE DE HORMIGON PARA ADOQUIN, e= 20cm

m2

420.79

15.64

6,581.16

6,581.16

03.05.02

BASE DE AFIRMADO PARA ADOQUIN, e= 18cm

m2

420.79

14.23

5,987.84

5,987.84

03.05.03

BASE DE AFIRMADO PARA ADOQUIN, e= 10cm

m2

168.08

9.30

1,563.14

1,563.14

03.05.04

CAMA DE ARENA PARA ADOQUIN, e= 4cm

m2

588.87

6.55

3,857.10

3,857.10

03.05.05

ADOQUIN DE CONCRETO, e= 0.06m

m2

226.72

47.50

10,769.20

10,769.20

03.05.06

ADOQUIN DE CONCRETO, e= 0.08m

m2

420.70

56.40

23,727.48

23,727.48

15,837.86

15,837.86

7,918.93

180,263.10

4,092.39

2,415.39

17,911.23

7,676.24

8,453.85

8,453.85

4,830.77

8,774.78

17,549.56

8,774.78

8,377.96
3,965.32
1,391.21
3,405.12
3,782.49

3,152.07

3,152.07

2,521.66

1,131.59

1,131.59

157,883.91
12,349.09

12,349.09

52,485.92

Item

Descripcin

Und. Metrado Precio S/.

Parcial S/.

1 MES

2 MES

3 MES

4 MES

5 MES

6 MES

7 MES

8 MES

9 MES

DEL 12 AL
31 MARZO
2013

DEL 01 AL
30 ABRIL
2013

DEL 01 AL
31 MAYO
2013

DEL 01 AL
30 JUNIO
2013

DEL 01 AL
31 JULIO
2013

DEL 01 AL 31
AGOSTO
2013

DEL 01 AL 30
SETIEMBRE
2013

DEL 01 AL 31
OCTUBRE
2013

DEL 01 AL 06
NOVIEMBRE
2013

04

CONTRAZOCALOS

04.01

CONTRAZOCALO DE CERAMICA EN INTERIOR, 0.087 x 0.40

636.54

27.93

23,030.84
17,778.56

17,778.56

04.02

CONTRAZOCALO CEMENTO PULIDO EN INTERIOR, h=0.10m, e=1.5cm C:A, 1:5

367.72

6.93

2,548.30

2,548.30

04.03

CONTRAZOCALO CEMENTO PULIDO EN EXTERIOR, h=0.20m, e=1.5cm C:A, 1:5

305.19

8.86

2,703.98

2,703.98

05

ZOCALOS

05.01

ZOCALO DE CERAMICA 0.20x0.30 M. COLOR

06

ENCHAPADOS

06.01

ENCHAPADO DE ESTRUCTURA DE APOYO DE OVALINES

m2

10.15

58.29

591.64

06.02

ENCHAPADO CON CERAMICA EN MESADA DE CONCRETO

m2

22.01

63.11

1,389.05

06.03

ENCHAPADO DE BANCAS DE CONCRETO

m2

6.27

58.29

365.48

365.48

06.04

ENCHAPADO DE BEBEDERO

m2

9.18

58.29

535.10

535.10

07

REVESTIMIENTO DE GRADAS Y ESCALERAS

07.01

REVESTIMIENTO DE ESCALERA CON CEMENTO PULIDO PASO Y CONTRAPASO

66.83

25.61

1,711.52

07.02

REVESTIMIENTO DE DESCANSO CON CEMENTO PULIDO Y BRUADO

m2

24.56

23.46

576.18

08

COBERTURAS

08.01

CUBIERTA DE MORTERO 1:3 CON IMPERMIABILIZANTE EN POLVO

m2

916.97

24.19

22,181.50

08.02

COBERTURA CON LADRILLO PASTELERO

m2

41.92

41.11

1,723.33

08.03

COBERTURA DE PLANCHA ONDULADA

m2

632.16

20.01

12,649.52

08.04

COBERTURA CON CALAMINN CU-6

m2

758.96

51.39

39,002.95

08.05

COBERTURA PLANCHA ONDULADA EN TRIBUNAS

m2

109.45

22.42

2,453.87

08.06

CANALETA A MEDIA CAA DE MORTERO EN TECHOS e=0.05 m.

456.59

15.05

6,871.68

08.07

GRGOLAS DE CONCRETO

58.00

107.87

6,256.46

09

CARPINTERIA DE MADERA

09.01

PUERTAS DE MADERA

09.01.01

PUERTA APANELADA MAD. CEDRO P-01 (1.50 x 2.10 m) CON FRESQUILLA DE 0.65m - 02

5.00

824.92

4,124.60

4,124.60

09.01.02

PUERTA APANELADA MAD. CEDRO P-02 (0.90 x 2.10 m) CON FRESQUILLA DE 0.75m - 01

2.00

681.95

1,363.90

1,363.90

09.01.03

PUERTA APANELADA MAD. CEDRO P-03 (0.90 x 2.10 m) SIN FRESQUILLA - 01 HOJA

11.00

618.88

6,807.68

09.01.04

PUERTA APANELADA MAD. CEDRO P-04 (0.60 x 1.50 m) SIN FRESQUILLA - 01 HOJA

29.00

380.17

11,024.93

09.01.05

PUERTA APANELADA MAD. CEDRO P-05 (1.10 x 2.10 m) CON FRESQUILLA DE 0.65m - 01

8.00

694.16

5,553.28

5,553.28

09.01.06

PUERTA APANELADA MAD. CEDRO P-06 (0.90 x 2.10 m) CON FRESQUILLA DE 0.80m - 01

2.00

682.27

1,364.54

1,364.54

09.01.07

PUERTA APANELADA MAD. CEDRO P-07 (0.90 x 2.10 m) CON FRESQUILLA DE 0.50m - 01

2.00

665.54

1,331.08

1,331.08

09.01.08

PUERTA APANELADA MAD. CEDRO P-08 (0.80 x 2.10 m) CON FRESQUILLA DE 0.60m - 01

2.00

594.09

1,188.18

1,188.18

09.01.09

PUERTA APANELADA MAD. CEDRO P-09 (1.00 x 2.10 m) CON FRESQUILLA DE 0.70m - 01

2.00

681.57

1,363.14

1,363.14

09.01.10

PUERTA APANELADA MAD. CEDRO P-10 (0.90 x 2.30 m) SIN FRESQUILLA - 01 HOJA

4.00

645.36

2,581.44

2,581.44

09.01.11

PUERTA APANELADA MAD. CEDRO P-11 (0.70 x 2.10 m) CON FRESQUILLA DE 0.40m - 01

1.00

602.37

602.37

602.37

09.01.12

PUERTA APANELADA MAD. CEDRO P-12 (1.10 x 2.10 m) CON FRESQUILLA DE 0.90m - 01

1.00

699.38

699.38

699.38

09.01.13

PUERTA APANELADA MAD. CEDRO P-13 (1.00 x 2.10 m) CON FRESQUILLA DE 0.70m - 01

1.00

695.64

695.64

695.64

09.01.14

PUERTA APANELADA MAD. CEDRO P-14 (0.90 x 2.10 m) CON FRESQUILLA DE 0.90m - 01

1.00

693.67

693.67

693.67

09.01.15

PUERTA APANELADA MAD. CEDRO P-15 (0.70 x 2.10 m) CON FRESQUILLA DE 0.70m - 01

1.00

640.55

640.55

09.01.16

PUERTA APANELADA MAD. CEDRO P-16 (1.00 x 2.10 m) CON FRESQUILLA DE 0.50m - 01

7.00

665.05

4,655.35

15,443.34
m2

308.62

50.04

15,443.34

15,443.34

2,881.27
591.64
1,389.05

2,287.70
1,711.52
576.18

91,139.31
22,181.50
1,723.33
12,649.52
39,002.95
2,453.87
6,871.68
6,256.46

54,684.47
52,509.36

6,807.68
2,756.23

8,268.70

640.55
4,655.35

Item

Descripcin

Und. Metrado Precio S/.

Parcial S/.

1 MES

2 MES

3 MES

4 MES

5 MES

6 MES

7 MES

8 MES

9 MES

DEL 12 AL
31 MARZO
2013

DEL 01 AL
30 ABRIL
2013

DEL 01 AL
31 MAYO
2013

DEL 01 AL
30 JUNIO
2013

DEL 01 AL
31 JULIO
2013

DEL 01 AL 31
AGOSTO
2013

DEL 01 AL 30
SETIEMBRE
2013

DEL 01 AL 31
OCTUBRE
2013

DEL 01 AL 06
NOVIEMBRE
2013

09.01.17

PUERTA APANELADA MAD. CEDRO P-17 (0.90 x 2.10 m) CON FRESQUILLA DE 0.40mVARIA u

1.00

654.51

654.51

09.01.18

PUERTA APANELADA MAD. CEDRO P-18 (0.84 x 2.10 m) CON FRESQUILLA DE 0.40m - 01

1.00

642.15

642.15

654.51

09.01.19

PUERTA APANELADA MAD. CEDRO P-19 (1.00 x 2.10 m) CON FRESQUILLA DE 0.70m - 01

2.00

695.64

1,391.28

1,391.28

09.01.20

PUERTA CONTRAPLACADA P-20 (0.90 x 2.00 m) SIN FRESQUILLA - 01 HOJA

6.00

511.03

3,066.18

3,066.18

09.01.21

PUERTA APANELADA MAD. CEDRO P-21 (1.00 x 2.10 m) CON FRESQUILLA DE 0.60m - 01

2.00

686.01

1,372.02

09.01.22

PUERTA APANELADA MAD. CEDRO P-22 (1.05 x 2.10 m) CON FRESQUILLA DE 0.60m - 01

1.00

693.49

693.49

09.02

TABIQUE DE MELAMINE e= 15mm

10.00

51.67

516.70

09.03

TICERO DE MADERA TORNILLO L=4.8 m, BARNIZADO

13.00

127.57

1,658.41

10

CARPINTERIA METALICA

10.01

PUERTAS DE METAL

10.01.01

PORTN METALICO P-01 (3.00x3.00) - 02 HOJAS

1.00

1,683.07

1,683.07

10.01.02

PUERTA METALICA P-02 (1.00x3.00) - 01 HOJAS

1.00

852.66

852.66

10.01.03

PORTN METALICO P-03 (4.00x3.50) - 02 HOJAS

1.00

2,514.03

2,514.03

10.01.04

PUERTA DE FIERRO P-M1 (0.80 x2.10m) CON FRESQUILLA DE 0.50m

1.00

508.47

508.47

10.02

VENTANA DE METAL

10.02.01

VENTANA DE FIERRO V-CM (0.80 x 1.00m)

10.03

PROTECTOR METALICO

10.03.01

PROTECTOR METALICO EN GUARDIANIA DE 0.70X0.80m

1.00

482.29

482.29

10.03.02

REJA METALICA EN FACHADA DE 2.77x1.35m

2.00

1,455.36

2,910.72

2,910.72

10.03.03

REJA METALICA EN FACHADA DE 2.80x1.35m

2.00

1,457.70

2,915.40

2,915.40

10.03.04

CERCO METALICO CON TUBO DE FIERRO Y MALLA COCADA

m2

48.00

262.93

12,620.64

12,620.64

10.04

AGARRADERA PARA IMPEDIDOS FISICOS

3.42

36.74

125.65

10.05

REJILLA PARA CUNETA PLUVIAL

336.68

108.19

36,425.41

10.06

CANTONERAS CON PERFILES DE PLANCHA ESTRIADA

80.00

16.00

1,280.00

10.07

PASAMANOS DE METAL

10.07.01

PASAMANOS DE METAL TIPO I

43.60

48.10

2,097.16

2,097.16

10.08

BARANDA METALICA DE TUBO, SEGN DISEO

308.36

81.30

25,069.67

25,069.67

10.09

ESCALERA DE GATO

1.00

779.01

779.01

779.01

10.10

TAPA DE FIERRO FUNDIDO DE 0.60x0.60

2.00

116.01

232.02

232.02

11

VIDRIOS, CRISTALES Y SIMILARES

11.01

VENTANAS CON MARCO DE ALUMINIO EN VIDRIO DOBLE LAMINADO

12

PINTURA

12.01

PINTURA LATEX 2 MANOS EN MUROS

m2

3,962.66

7.98

31,622.03

6,324.41

9,486.61

15,811.02

12.02

PINTURA LATEX 2 MANOS EN COLUMNAS

m2

1,183.76

8.30

9,825.21

1,965.04

2,947.56

4,912.61

12.03

PINTURA ESMALTE 2 MANOS EN CONTRAZOCALO H=0.10m

367.72

1.61

592.03

592.03

12.04

PINTURA ESMALTE 2 MANOS EN CONTRAZOCALO H=0.20m

305.19

2.06

628.69

628.69

12.05

PINTURA ESMALTE 2 MANOS EN CONTRAZOCALO H=0.30m

97.35

2.66

258.95

258.95

12.06

PINTURA LATEX 2 MANOS EN VIGAS.

m2

1,019.15

7.98

8,132.82

12.07

PINTURA LATEX 2 MANOS EN CIELO RASO

m2

1,460.03

7.87

11,490.44

12.08

PINTURA LATEX 2 MANOS EN MUROS DE CONTENCIN

m2

446.56

7.98

3,563.55

642.15

1,372.02
693.49
516.70
1,658.41

90,919.92
5,558.23
1,683.07
852.66
2,514.03
508.47

423.72
u

1.00

423.72

423.72

423.72

18,929.05
482.29

125.65
36,425.41
1,280.00

2,097.16

27,992.37
m2

313.64

89.25

27,992.37

13,996.19

70,770.14

1,626.56

3,253.13

3,253.13

6,894.26

4,596.18
3,563.55

13,996.19

Item

Descripcin

Und. Metrado Precio S/.

Parcial S/.

1.00

390.55

390.55

m2

261.71

16.30

4,265.87

1 MES

2 MES

3 MES

4 MES

5 MES

6 MES

7 MES

8 MES

9 MES

DEL 12 AL
31 MARZO
2013

DEL 01 AL
30 ABRIL
2013

DEL 01 AL
31 MAYO
2013

DEL 01 AL
30 JUNIO
2013

DEL 01 AL
31 JULIO
2013

DEL 01 AL 31
AGOSTO
2013

DEL 01 AL 30
SETIEMBRE
2013

DEL 01 AL 31
OCTUBRE
2013

DEL 01 AL 06
NOVIEMBRE
2013

12.09

PINTURA PARA DEMARCACION DE LOSA DEPORTIVA

12.10

BARNIZ PARA PUERTAS

390.55

13

VARIOS

13.01

JUNTA DE DILATACION 1"(ESPUMA PLASTIFICANTE + JEBE MICROPOROSO)

590.58

14.63

8,640.19

13.02

TAPAJUNTA METALICA EN TECHOS DE BLOQUES

19.20

42.59

817.73

817.73

13.03

ESTRUCTURA DE APOYO PARA OVALINES

m2

8.00

123.66

989.28

989.28

13.04

COLOCACION DE PIZARRAS ACRILICAS DE 1.20 x 2.44 m

2.00

172.39

344.78

13.05

PIZARRA DE CEMENTO 4.8m x 1.2m SIN TIZERO

13.00

45.05

585.65

13.06

ESPEJO BISELADO EMPOTRADO(2.60x0.70)

2.00

141.06

282.12

282.12

13.07

ESPEJO BISELADO EMPOTRADO(0.50x0.80)

6.00

73.26

439.56

439.56

13.08

ESPEJO BISELADO EMPOTRADO(0.45x0.80)

4.00

73.26

293.04

293.04

13.09

ESPEJO BISELADO EMPOTRADO(2.50x0.70)

2.00

141.06

282.12

282.12

13.10

TUBOS DE VOLEY, INC. RED Y DADOS DE CONCRETO

jgo

1.00

332.07

332.07

13.11

ARCO Y TABLERO FULBITO Y BASKET (MADERA Y METAL)

jgo

1.00

2,214.98

2,214.98

13.12

ASTA DE BANDERA

pza

2.00

950.53

1,901.06

13.13

TABIQUERIA PREBAFRICADA DE DRYWALL

m2

10.65

54.55

580.96

13.14

PINTADO DE TEXTO EN PORTADA

13.15

CERRAMIENTO PLANCHA DE FIBROCEMENTO DE e=8mm

13.16

MESADA DE LABORATORIO

13.16.01

4,265.87

42,908.80
8,640.19

344.78
263.54

322.11

332.07
2,214.98
1,901.06
580.96

38.77

51.36

1,991.23

m2

192.42

37.09

7,136.86

1,991.23

CONCRETO PARA MESADA f'c=175 kg/cm2

m3

2.06

273.38

563.16

13.16.02

ENCOFRADO Y DESENCOFRADO EN MESADA

m2

33.81

51.61

1,744.93

13.16.03

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60

kg

129.52

3.27

423.53

13.17

SEMBRADO DE GRASS

m2

287.44

27.96

8,036.82

13.18

SEMBRADO DE PLANTONES

88.00

9.27

815.76

13.19

BANCAS DE CONCRETO

13.19.01

BANCAS DE CONCRETO f'c= 175 Kg/cm2

m3

2.65

272.46

722.02

13.19.02

ENCOFRADO Y DESENCOFRADO EN BANCAS

m2

50.01

25.78

1,289.26

13.19.03

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60

kg

169.09

3.27

552.92

13.19.04

TARRAJEO PULIDO DE BANCAS

m2

64.40

24.36

1,568.78

13.20

BEBEDERO DE CONCRETO

13.20.01

BEBEDERO DE CONCRETO f'c= 175 Kg/cm2

m3

0.47

272.46

128.06

128.06

13.20.02

ENCOFRADO Y DESENCOFRADO EN BEBEDERO

m2

4.59

25.78

118.33

118.33

13.20.03

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60

kg

34.74

3.27

113.60

113.60

01

INSTALACIONES SANITARIAS

01.01

TRABAJOS PRELIMINARES

01.01.01

TRAZO DE NIVELES Y REPLANTEO

01.02

RED DE DESAGUE

01.02.01

SALIDA DE PVC SAL PARA DESAGE DE 4"

pto

24.00

56.74

1,361.76

408.53

953.23

01.02.02

SALIDA DE PVC SAL PARA DESAGE DE 2"

pto

50.00

56.89

2,844.50

853.35

1,991.15

01.02.03

SALIDA DE PVC SAL PARA VENTILACIN DE 2"

pto

20.00

52.65

1,053.00

315.90

737.10

7,136.86

2,731.62
563.16
1,744.93
423.53
8,036.82
815.76

4,132.98
722.02
1,289.26
552.92
1,568.78

359.99

61,758.48
393.70
m

351.52

1.12

393.70

19.69

374.02

26,671.85

Item

Descripcin

Und. Metrado Precio S/.

Parcial S/.

1 MES

2 MES

3 MES

4 MES

5 MES

6 MES

7 MES

8 MES

9 MES

DEL 12 AL
31 MARZO
2013

DEL 01 AL
30 ABRIL
2013

DEL 01 AL
31 MAYO
2013

DEL 01 AL
30 JUNIO
2013

DEL 01 AL
31 JULIO
2013

DEL 01 AL 31
AGOSTO
2013

DEL 01 AL 30
SETIEMBRE
2013

DEL 01 AL 31
OCTUBRE
2013

DEL 01 AL 06
NOVIEMBRE
2013

01.02.04

TUBERIA Y ACCESORIOS DE REBOSE Y LIMPIEZA DE TANQUE ELEVADO

glb

1.00

938.44

938.44

01.02.05

EXCAVACION DE ZANJAS, TUBERIA 2" - 4", H PROMED. 0.90m

353.75

10.67

3,774.51

938.44
1,887.26

1,887.26

01.02.06

RELLENO Y COMPACTACION DE ZANJAS

m3

84.25

21.91

1,845.92

922.96

922.96

01.02.07

SUMINISTRO E INSTALACION DE TUBERIAS DE DESAGE DE 4"

269.15

10.95

2,947.19

884.16

2,063.03

01.02.08

SUMINISTRO E INSTALACION DE TUBERIAS DESAGE 2"

126.17

9.26

1,168.33

350.50

817.83

01.02.09

PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE

348.14

2.19

762.43

228.73

533.70

01.02.10

SUMIN. E INSTALACION SUMIDEROS DE BRONCE DE 2"

21.00

11.05

232.05

232.05

01.02.11

SUMIN. E INSTALACION REGISTROS ROSCADOS DE BRONCE DE 4"

10.00

17.42

174.20

174.20

01.02.12

SUMIN. E INSTALACION REGISTROS ROSCADOS DE BRONCE DE 2"

10.00

14.45

144.50

01.02.13

CODO PVC SAL DE 4" x 45

1.00

18.29

18.29

01.02.14

CODO PVC SAL DE 2" x 45

11.00

13.63

149.93

29.99

119.94

01.02.15

YEE PVC SAL DE 2"

49.00

15.75

771.75

115.76

655.99

01.02.16

YEE PVC SAL DE 4"

26.00

20.83

541.58

162.47

379.11

01.02.17

YEE PVC SAL DE 4" A 2"

14.00

20.83

291.62

58.32

233.30

01.02.18

CODO PVC SAL DE 4" x 2"

21.00

18.29

384.09

115.23

268.86

01.02.19

REDUCCION PVC SAL DE 4" A 2"

2.00

14.56

29.12

01.02.20

CAJA CIEGA DE CONCRETO 30 x 40 cm

2.00

176.97

353.94

01.02.21

CAJA DE REGISTRO DE DESAGE 30 x 60 cm

24.00

178.26

4,278.24

01.02.22

CAJA DE REGISTRO DE DESAGE 60 x 60 cm

6.00

179.77

1,078.62

1,078.62

01.02.23

CONEXIN A RED PUBLICA DE DESAGUE

1.00

1,527.84

1,527.84

1,527.84

01.03

SISTEMA DE AGUA

01.03.01

SALIDA DE AGUA FRIA CON TUBERIA DE PVC - SAP 1/2"

pto

64.00

54.68

3,499.52

01.03.02

EXCAVACION DE ZANJAS PARA TUBERIA 0.40 x 0.50

390.00

6.24

2,433.60

01.03.03

RELLENO Y COMPACTACION DE ZANJAS

m3

80.62

21.91

1,766.38

01.03.04

RED DE DISTRIBUCION TUBERIA DE 1/2" PVC - SAP

94.40

7.11

671.18

134.24

536.94

01.03.05

RED DE DISTRIBUCION TUBERIA DE 3/4" PVC - SAP

41.40

7.55

312.57

62.51

250.06

01.03.06

RED DE DISTRIBUCION TUBERIA DE 1" PVC - SAP

180.55

9.56

1,726.06

01.03.07

RED DE DISTRIBUCION TUBERIA DE 1 1/2" PVC - SAP

105.60

9.91

1,046.50

01.03.08

PRUEBA HIDRAULICA Y DESINDECCION

380.15

4.45

1,691.67

507.50

1,184.17

01.03.09

ACCESORIOS EN RED DE DISTRIBUCION DE AGUA

glb

1.00

1,823.53

1,823.53

547.06

1,276.47

01.03.10

VALVULA COMPUERTA DE 1/2" CON NICHO DE MADERA

19.00

75.55

1,435.45

287.09

1,148.36

01.03.11

VALVULA COMPUERTA DE 3/4"

1.00

62.07

62.07

12.41

49.66

01.03.12

VALVULA COMPUERTA DE 1"

3.00

68.84

206.52

206.52

01.03.13

VALVULA COMPUERTA 1 1/2"

2.00

86.63

173.26

173.26

01.03.14

VALVULA CHECK FG DE 1"

2.00

96.15

192.30

01.03.15

ACCESORIOS Y TUBERIA DE AGUA EN CISTERNA Y TANQUE ELEVADO

glb

1.00

451.01

451.01

451.01

01.03.16

CONEXIN DOMICILIARIA 1" A RED DE AGUA EXTERIOR

1.00

647.73

647.73

647.73

01.04

APARATOS SANITARIOS

01.04.01

INODORO TANQUE BAJO BLANCO, INC PAPELERA

24.00

175.97

4,223.28

01.04.02

LAVATORIOS DE LOSA BLANCA

11.00

67.12

738.32

144.50
18.29

29.12
353.94
4,278.24

18,139.35
349.95

3,149.57
1,216.80

1,216.80
1,766.38

1,726.06
1,046.50

192.30

14,698.56
4,223.28
738.32

Item

Descripcin

Und. Metrado Precio S/.

Parcial S/.

1 MES

2 MES

3 MES

4 MES

5 MES

6 MES

7 MES

8 MES

9 MES

DEL 12 AL
31 MARZO
2013

DEL 01 AL
30 ABRIL
2013

DEL 01 AL
31 MAYO
2013

DEL 01 AL
30 JUNIO
2013

DEL 01 AL
31 JULIO
2013

DEL 01 AL 31
AGOSTO
2013

DEL 01 AL 30
SETIEMBRE
2013

DEL 01 AL 31
OCTUBRE
2013

DEL 01 AL 06
NOVIEMBRE
2013

01.04.03

LAVATORIO OVALIN (47.5 X 42.0 CM.) O SIMILAR

14.00

145.39

2,035.46

2,035.46

01.04.04

LAVATORIOS DE ACERO INOXIDABLE

9.00

240.14

2,161.26

2,161.26

01.04.05

SUM. E INST. DUCHA CROMADA 1 LLAVE INC. ACC Y JABONER

5.00

86.52

432.60

432.60

01.04.06

URINARIO DE LOSA BCO TIPO PICO INC ACC

8.00

79.15

633.20

633.20

01.04.07

GRIFO DE 1/2" TIPO CUELLO DE CISNE

9.00

84.00

756.00

01.04.08

COLOCACION DE APARATOS SANITARIOS

66.00

56.34

3,718.44

01.05

SISTEMA DE EVACUACION DE LLUVIAS

01.05.01

MONTANTE PARA BAJADA DE AGUA DE LLUVIA PVC SAL 4" EN EDIFICACIONES

pto

2.00

126.38

252.76

01.05.02

MONTANTE PARA BAJADA DE AGUA DE LLUVIA DE TUBERIA PVC SAL 4" EN PATIO DE

pto

8.00

189.46

1,515.68

01.05.03

DADO DE PROTECCION PARA MONTANTE DE EVACUACION PLUVIAL 4"

m3

0.36

240.51

86.58

01

INSTALACIONES ELECTRICAS

01.01

MOVIMIENTO DE TIERRAS

01.01.01

EXCAVACION DE ZANJAS DE 1.25 x 0.84

233.70

1.96

458.05

458.05

01.01.02

EXCAVACION DE ZANJAS DE 0.70 x 0.50

392.20

1.96

768.71

461.23

01.01.03

REFINE DE ZANJA

233.70

1.38

322.51

01.01.04

REFINE DE ZANJA INCLUYE CAMA DE ARENA

392.20

3.28

1,286.42

1,286.42

01.01.05

RELLENO Y COMPACTADO DE ZANJA DE 1.25 x 0.84

233.70

8.42

1,967.75

1,967.75

01.01.06

RELLENO Y COMPACTADO MANUAL DE ZANJAS DE 0.70 x 0.50

392.20

7.58

2,972.88

2,972.88

01.02

CONDUCTORES DE ALIMENTACION

01.02.01

CABLE N2XOH-1Kv, 3 -1 x 35 mm2

01.02.02

CABLE N2XOH-1Kv, 1 x 16 mm2

01.02.03

CABLE N2XOH-1Kv, 3 -1 x 10 mm2

01.02.04

CABLE N2XOH-1Kv, 2 -1 x 10 mm2

01.02.05

CABLE N2XOH-1Kv, 2 -1 x 6 mm2

01.02.06

756.00
3,718.44

1,855.02
252.76
1,515.68
86.58

200,061.95
7,776.32

307.48
322.51

61,831.68
10.40

28.22

293.49

293.49

10.40

13.52

140.61

200.70

27.91

5,601.54

5,601.54

654.65

18.80

12,307.42

12,307.42

1,052.13

11.36

11,952.20

11,952.20

CABLE N2XOH-1Kv, 2 -1 x 4 mm2

79.10

14.12

1,116.89

1,116.89

01.02.07

CABLE N2XOH-1Kv, 1 x 6 mm2

858.55

5.77

4,953.83

4,953.83

01.02.08

CABLE N2XOH-1Kv, 1 x 4 mm2

209.70

6.97

1,461.61

1,461.61

01.02.09

CABLE N2XOH-1Kv, 1 x 2.5 mm2

133.20

5.97

795.20

795.20

01.02.10

CABLE NLT-1Kv, 2 - 1 x 2.5 mm2

18.00

9.29

167.22

167.22

01.02.11

CABLE NH-80-1Kv, 2 - 1 x 6 mm2

18.00

9.29

167.22

01.02.12

SUMINISTRO E INSTALACION DE DUCTO PVC SAP DE 50 MM DIAM

10.70

6.22

66.55

01.02.13

SUMINISTRO E INSTALACION DE DUCTO PVC SAP DE 35 MM DIAM

187.35

5.07

949.86

01.02.14

SUMINISTRO E INSTALACION DE DUCTO PVC SAP DE 25 MM DIAM

476.80

3.91

1,864.29

01.02.15

SUMINISTRO E INSTALACION DE DUCTO PVC SAP DE 20 MM DIAM

71.20

3.57

254.18

01.02.16

SUMINISTRO E INSTALACION DE DUCTO DE CONCRETO DE CUATRO VIAS

285.75

65.36

18,676.62

18,676.62

01.02.17

SUMINISTRO E INSTALACION DE DUCTO DE CONCRETO DE DOS VIAS

23.70

44.85

1,062.95

1,062.95

01.03

CABLES Y CONDUCTORES SISTEMA ELECTRICO

01.03.01

SUMINISTRO E INSTALACION DE CONDUCTOR TIPO NH-80 6 mm2 UNIPOLAR

78.80

3.24

255.31

01.03.02

SUMINISTRO E INSTALACION DE CONDUCTOR TIPO NH-80 4.0 mm2 UNIPOLAR

1,472.00

2.88

4,239.36

4,239.36

01.03.03

SUMINISTRO E INSTALACION DE CONDUCTOR TIPO NH-80 2.5 mm2 UNIPOLAR

4,094.00

2.24

9,170.56

9,170.56

140.61

167.22
66.55
949.86
1,864.29
254.18

13,665.23
255.31

Item

Descripcin

Und. Metrado Precio S/.

Parcial S/.

1 MES

2 MES

3 MES

4 MES

5 MES

6 MES

7 MES

8 MES

9 MES

DEL 12 AL
31 MARZO
2013

DEL 01 AL
30 ABRIL
2013

DEL 01 AL
31 MAYO
2013

DEL 01 AL
30 JUNIO
2013

DEL 01 AL
31 JULIO
2013

DEL 01 AL 31
AGOSTO
2013

DEL 01 AL 30
SETIEMBRE
2013

DEL 01 AL 31
OCTUBRE
2013

DEL 01 AL 06
NOVIEMBRE
2013

01.04

TUBERIAS E INTERRUPTORES ELECTRICOS

01.04.01

PICADO Y RESANE DE MUROS Y PAREDES

74.00

5.84

20,483.90
432.16

01.04.02

SUMINISTRO E INSTALACION DE DUCTO PVC SAP DE 20 MM DIAM

2,397.00

3.57

8,557.29

01.04.03

SUMINISTRO E INSTALACION DE TOMACORRIENTES DOBLES C/T

155.00

24.78

3,840.90

3,840.90

01.04.04

SUMINISTRO E INSTALACION DE TOMACORRIENTES DOBLES C/T PARA PISO

155.00

35.14

5,446.70

5,446.70

01.04.05

SUMINISTRO E INSTALACION DE INTERRUPTOR SIMPLE UNIPOLAR

42.00

23.24

976.08

976.08

01.04.06

SUMINISTRO E INSTALACION DE INTERRUPTOR DOBLE UNIPOLAR

33.00

22.74

750.42

750.42

01.04.07

SUMINISTRO E INSTALACION DE INTERRUPTOR TRIPLE UNIPOLAR

1.00

40.67

40.67

40.67

01.04.08

SUMINISTRO E INSTALACION DE INTERRUPTOR DE CONMUTACION SIMPLE

4.00

43.08

172.32

172.32

01.04.09

SUMINISTRO E INSTALACION DE INTERRUPTOR DE CONMUTACION DOBLE

6.00

44.56

267.36

267.36

01.05

ARTEFACTOS DE ILUMINACION - LUMINARIAS

01.05.01

ARTEFACTO FLUORESCENTE 2 x 36 w

86.00

115.89

9,966.54

01.05.02

ARTEFACTO FLUORESCENTE 3 x 36 w

6.00

142.53

855.18

01.05.03

LAMPARA AHORRADORA DE ENERGIA 18 w

127.00

44.57

5,660.39

5,660.39

01.05.04

FAROLA TIPO HONGO MODELO PFH 1 x 70 w, INC SUMINISTRO E IZAJE DE POSTE DE

26.00

966.14

25,119.64

25,119.64

01.05.05

REFLECTOR MODELO ZORUS CON LAMPARA DE 400 W, INC SUMINISTRO E IZAJE DE

4.00

1,788.26

7,153.04

7,153.04

01.05.06

REFLECTOR CON LAMPARA DE 70 W VAP DE SODIO EN PATIO DE FORMACION

8.00

383.66

3,069.28

3,069.28

01.05.07

VENTILADORES DE TECHO

7.00

300.74

2,105.18

2,105.18

01.05.08

CONTROLADOR DE VENTILADOR

7.00

109.63

767.41

767.41

01.05.09

TIMBRE PULSADOR

2.00

119.20

238.40

238.40

01.06

VOZ Y DATA

01.06.01

EQUIPO UPS SEGN ESPECIFICACIONES

2.00

2,234.62

4,469.24

01.06.02

SUMINISTRO E INSTALACION DE CABLE UTP CAT 5E BELDEN

396.00

2.13

843.48

01.06.03

SUMINISTRO E INSTALACION DE TOMAS DE TELEFONO

1.00

31.16

31.16

31.16

01.06.04

SWITCH PRINCIPAL DE RED DE 8 PUERTOS

2.00

136.42

272.84

272.84

01.06.05

SWITCH SECUNDARIOS DE RED DE 12 PUERTOS

4.00

164.62

658.48

01.06.06

SUMINISTRO E INSTALACION DE TOMA DE DATA

pto

44.00

53.54

2,355.76

01.06.07

ACOMETIDA EXTERIOR PARA TELEFONO E INTERNET

1.00

150.00

01.07

EQUIPOS DE MANIOBRA Y PROTECCION

01.07.01

TABLEROS ELECTRICOS

432.16
1,711.46

6,845.83

54,935.06
9,966.54
855.18

8,780.96

150.00

4,469.24
843.48

658.48
2,355.76
150.00

18,292.52
9,679.56

01.07.01.01 TABLERO GENERAL 380 V, TRIFASICO (TG)

1.00

715.61

715.61

715.61

01.07.01.02 TABLERO TD-01 220 V, MONOFASICO

1.00

715.61

715.61

715.61

01.07.01.03 TABLERO TD-02 220 V , MONOFASICO

1.00

715.61

715.61

715.61

01.07.01.04 TABLERO TD-03 220 V, MONOFASICO

1.00

715.61

715.61

715.61

01.07.01.05 TABLERO TD-04 380 V, TRIFASICO

1.00

855.61

855.61

855.61

01.07.01.06 TABLERO TD-05 220 V, MONOFASICO

1.00

715.61

715.61

715.61

01.07.01.07 TABLERO TD-06 220 V, MONOFASICO

1.00

715.61

715.61

715.61

01.07.01.08 TABLERO TD-07 220 V, MONOFASICO

1.00

715.61

715.61

715.61

01.07.01.09 TABLERO TD-08 220 V, MONOFASICO

1.00

715.61

715.61

715.61

01.07.01.10 TABLERO TD-09 380 V, TRIFASICO

1.00

952.24

952.24

952.24

Item

Descripcin

Und. Metrado Precio S/.

Parcial S/.

1 MES

2 MES

3 MES

4 MES

5 MES

6 MES

7 MES

8 MES

9 MES

DEL 12 AL
31 MARZO
2013

DEL 01 AL
30 ABRIL
2013

DEL 01 AL
31 MAYO
2013

DEL 01 AL
30 JUNIO
2013

DEL 01 AL
31 JULIO
2013

DEL 01 AL 31
AGOSTO
2013

DEL 01 AL 30
SETIEMBRE
2013

DEL 01 AL 31
OCTUBRE
2013

DEL 01 AL 06
NOVIEMBRE
2013

01.07.01.11 TABLERO TD-10 220 V, MONOFASICO

1.00

715.61

715.61

715.61

01.07.01.12 TABLERO TD-11 220 V, MONOFASICO

1.00

715.61

715.61

715.61

01.07.01.13 SUBTABLERO STD-BB 220 V, MONOFASICO

1.00

715.61

715.61

715.61

01.07.02.01 SUMINISTRO E INSTALACION DE INTERRUPTOR TERMOMAGNETICO DE 3 x 100 A, CAJ

1.00

268.45

268.45

268.45

01.07.02.02 SUMINISTRO E INSTALACION DE INTERRUPTOR TERMOMAGNETICO DE 3 x 40 A, CAJA

2.00

208.90

417.80

417.80

01.07.02.03 SUMINISTRO E INSTALACION DE INTERRUPTOR TERMOMAGNETICO DE 3 x 30 A, CAJA

1.00

208.90

208.90

208.90

01.07.02.04 SUMINISTRO E INSTALACION DE INTERRUPTOR TERMOMAGNETICO DE 2 x 40 A, CAJA

1.00

98.96

98.96

98.96

01.07.02.05 SUMINISTRO E INSTALACION DE INTERRUPTOR TERMOMAGNETICO DE 2 x 30 A, CAJA

5.00

78.96

394.80

394.80

01.07.02.06 SUMINISTRO E INSTALACION DE INTERRUPTOR TERMOMAGNETICO DE 2 x 25 A, CAJA

3.00

160.37

481.11

481.11

01.07.02

01.07.03

INTERRUPTORES TERMOMAGNETICOS DE CAJA MOLDEADA

1,870.02

INTERRUPTORES TERMOMAGNETICOS DEL TIPO ATORNILLABLES

4,187.36

01.07.03.01 SUMINISTRO E INSTALACION DE INTERRUPTOR TERMOMAGNETICO ATORNILLABLE DE 3 u

1.00

182.76

182.76

182.76

01.07.03.02 SUMINISTRO E INSTALACION DE INTERRUPTOR TERMOMAGNETICO ATORNILLABLE DE 3 u

1.00

182.76

182.76

182.76

01.07.03.03 SUMINISTRO E INSTALACION DE INTERRUPTOR TERMOMAGNETICO ATORNILLABLE DE 3 u

3.00

162.76

488.28

488.28

01.07.03.04 SUMINISTRO E INSTALACION DE INTERRUPTOR TERMOMAGNETICO ATORNILLABLE DE 2 u

6.00

98.96

593.76

593.76

01.07.03.05 SUMINISTRO E INSTALACION DE INTERRUPTOR TERMOMAGNETICO ATORNILLABLE DE 2 u

7.00

63.96

447.72

01.07.03.06 SUMINISTRO E INSTALACION DE INTERRUPTOR TERMOMAGNETICO ATORNILLABLE DE 2 u

20.00

58.96

1,179.20

1,179.20

01.07.03.07 SUMINISTRO E INSTALACION DE INTERRUPTOR TERMOMAGNETICO ATORNILLABLE DE 2 u

24.00

46.37

1,112.88

1,112.88

01.07.04

INTERRUPTORES DIFERENCIALES

01.07.04.01 SUMINISTRO E INSTALACION DE INTERRUPTOR DIFERENCIAL DE 2 x 20 A


01.07.05

2,287.12
u

22.00

103.96

2.00

134.23

INTERRUPTORES HORARIOS

01.07.05.01 SUMINISTRO E INSTALACION DE INTERRUPTOR HORARIO

447.72

2,287.12

2,287.12

268.46
268.46

268.46

01.08

PUESTA A TIERRA

01.08.01

EXCAVACION DE AGUJERO PARA PUESTA A TIERRA

6.00

53.09

318.54

01.08.02

INSTALACION DEL POZO DE CONEXIN A TIERRA TIPO P1

1.00

733.19

733.19

01.08.03

INSTALACION DEL POZO DE CONEXIN A TIERRA TIPO P2

6.00

561.11

3,366.66

01.08.04

RELLENO COMPACTACION DE LA PUESTA A TIERRA

7.00

53.88

01.09

ELECTROBOMBA Y ACCESORIOS

01.09.01

ELECTROBOMBA ALTO RENDIMIENTO 0.75 HP

2.00

743.50

1,487.00

1,487.00

01.09.02

TABLERO DE PROTECCION, OPERACIN Y MANDO

1.00

1,178.69

1,178.69

1,178.69

01.10

ACOMETIDA ELECTRICA INCLUIDO MEDIDOR DE ENERGIA ACTIVA

01.10.01

ACOMETIDA EXTERIOR DE ENOSA

01.11

PRUEBAS Y PUESTA DE SERVICIO

01.11.01

PRUEBA Y PUESTA DE SERVICIO DE LAS INSTALACIONES ELECTRICAS DE BAJA TENSI glb

01.12

OTROS

01.12.01

EXCAVACION DE ZANJAS PARA CAJA DE PASE

16.00

48.44

775.04

01.12.02

CAJAS DE PASO DE CONCRETO ARMADO PARA CABLEADO ELECTRICO

16.00

260.00

4,160.00

COSTO DIRECTO

4,795.55
318.54
733.19
3,366.66

377.16

377.16

2,665.69

900.00
glb

1.00

900.00

900.00

900.00

1,000.00
1.00

1,000.00

1,000.00

1,000.00

4,935.04
775.04
4,160.00

2,983,039.06

114,745.92

294,246.84

279,082.59

278,944.29

398,681.14

688,440.80

591,082.04

322,274.49

15,540.97

GASTOS GENERALES (10%)

298,303.91

11,474.59

29,424.68

27,908.26

27,894.43

39,868.11

68,844.08

59,108.20

32,227.45

1,554.10

UTILIDAD (10%)

298,303.91

11,474.59

29,424.68

27,908.26

27,894.43

39,868.11

68,844.08

59,108.20

32,227.45

1,554.10

Item

Descripcin

Und. Metrado Precio S/.

2 MES

3 MES

4 MES

5 MES

6 MES

7 MES

8 MES

9 MES

DEL 12 AL
31 MARZO
2013

DEL 01 AL
30 ABRIL
2013

DEL 01 AL
31 MAYO
2013

DEL 01 AL
30 JUNIO
2013

DEL 01 AL
31 JULIO
2013

DEL 01 AL 31
AGOSTO
2013

DEL 01 AL 30
SETIEMBRE
2013

DEL 01 AL 31
OCTUBRE
2013

DEL 01 AL 06
NOVIEMBRE
2013

18,649.16

SUB TOTAL

3,579,646.88

137,695.10

353,096.21

334,899.11

334,733.15

478,417.36

826,128.96

709,298.45

386,729.39

I.G.V. (18%)

644,336.44

24,785.12

63,557.32

60,281.84

60,251.97

86,115.13

148,703.21

127,673.72

69,611.29

3,356.85

4,223,983.32

162,480.22

416,653.52

395,180.95

394,985.11

564,532.49

974,832.18

836,972.17

456,340.68

22,006.01

3.85%

9.86%

9.36%

9.35%

13.36%

23.08%

19.81%

10.80%

0.52%

1 MES
DEL 12
AL 31
MARZO
2013

2 MES
DEL 01 AL
30 ABRIL
2013

3 MES
DEL 01
AL 31
MAYO
2013

4 MES
DEL 01 AL
30 JUNIO
2013

5 MES
DEL 01
AL 31
JULIO
2013

PRESUPUESTO TOTAL

Item

Parcial S/.

1 MES

Descripcin

Und.

Metrado

01.00

AMBIENTES PEDAGOGICOS

01.01

AULAS COMUNES

01.01.01

adquisicin de carpetas unipersonales de estructura de metlica y tablero de madera revestido pza

400.00

01.01.02

Rehabilitacin de carpetas unipersonales de estructura metlica y tablero de madera(2 aulas=4 pza

01.01.03

adquisicin mobiliario de madera para docentes ( 1pupitre + 1 silla)

01.02

LABORATORIOS, TALLERES Y BIBLIOTECA

01.02.01

Laboratorio de Qumica, Biologa y Fsica

mod.

Precio S/.

Parcial S/.

6 MES
7 MES
8 MES
DEL 01 AL
DEL 01 AL
DEL 01 AL 30
31
31
SETIEMBRE
AGOSTO
OCTUBRE
2013
2013
2013

9 MES
DEL 01 AL 06
NOVIEMBRE
2013

93.22

37,288.14

27,966.10

9,322.03

80.00

55.08

4,406.78

3,305.08

1,101.69

12.00

474.58

5,694.92

4,271.19

1,423.73

01.02.01.01 adquisicin de estantes metlicos de angulos ranurados

pza

4.00

330.51

1,322.03

991.53

330.51

01.02.01.02 Adquisicin de mobiliario para alumnos (taburete de estruc. Metlica y asiento de madera)

pza

40.00

279.66

11,186.44

8,389.83

2,796.61

01.02.01.03 Adquisicin mobiliario de madera, para docente ( 1pupitre + 1 silla)

mod

1.00

474.58

474.58

355.93

118.64

01.02.01.04 Adquisicin de armario metlico

pza

1.00

508.47

508.47

381.36

127.12

01.02.01.05 Equipo de laboratorio de qumica ( 2 telescopios, 2 balanzas, tubo de ensayo, mechero de gas, glob

1.00

1,525.42

1,525.42

1,144.07

381.36

01.02.01.06 Equipo para gas (baln, manguera, vlvulas )

glob.

1.00

567.80

567.80

425.85

141.95

01.02.02.01 Adquisicin de caballetes de madera, para sesiones de Arte

pza

25.00

101.69

2,542.37

1,906.78

635.59

01.02.02.02 adquisicin de mobiliario de madera para docentes ( 1pupitre + 1 silla)

mod

1.00

474.58

474.58

01.02.02.03 Adquisicin de sillas de madera

pza

40.00

76.27

3,050.85

01.02.02.04 adquisicin de estantes metlicos de angulos ranurados

pza

3.00

330.51

01.02.02.05 Adquisicin de armario metlico

pza

2.00

01.02.03.01 Adquisicin de computadora personal

unid

01.02.03.02 adquisicin de mdulos(mueble+silla) de estructura metlica para computadora


01.02.03.03 adquisicin de impresora multifuncional

01.02.02

Sala de Usos Mltiples

355.93

118.64

2,288.14

762.71

991.53

743.64

247.88

508.47

1,016.95

762.71

254.24

41.00

1,211.86

49,686.44

37,264.83

12,421.61

mod

41.00

398.31

16,330.51

12,247.88

4,082.63

unid

1.00

135.59

135.59

101.69

33.90

01.02.03.04 Adquisicin de mesa chica de madera para impresora multifuncional

pza

1.00

211.86

211.86

158.90

52.97

01.02.03.05 adquisicin de equipo para aire acondicionado

unid

2.00

5,074.45

10,148.90

7,611.68

2,537.23

01.02.03.06 adquisicin de armario metlico

pza

1.00

508.47

508.47

01.02.03.07 Software Windows

unid

45.00

355.93

01.02.03.08 Software Antivirus

Glob

1.00

1,525.42

01.02.03

Sala de Computo

381.36

127.12

16,016.95

12,012.71

4,004.24

1,525.42

1,144.07

381.36

Item

01.02.04

Descripcin

Und. Metrado Precio S/.

Parcial S/.

1 MES

2 MES

3 MES

4 MES

5 MES

6 MES

7 MES

8 MES

9 MES

DEL 12 AL
31 MARZO
2013

DEL 01 AL
30 ABRIL
2013

DEL 01 AL
31 MAYO
2013

DEL 01 AL
30 JUNIO
2013

DEL 01 AL
31 JULIO
2013

DEL 01 AL 31
AGOSTO
2013

DEL 01 AL 30
SETIEMBRE
2013

DEL 01 AL 31
OCTUBRE
2013

DEL 01 AL 06
NOVIEMBRE
2013

302.97

Sala de Video

01.02.04.01 Adquisicin de computadora personal

unid

1.00

1,211.86

1,211.86

908.90

01.02.04.02 adquisicin de mdulos(mueble+silla) de estructura metlica para computadora

mod

1.00

398.31

398.31

298.73

99.58

01.02.04.03 adquisicin de proyector multimedia

pza

1.00

1,627.12

1,627.12

1,220.34

406.78

01.02.04.04 adquisicin de ECRAN

pza

1.00

135.59

135.59

101.69

33.90

01.02.04.05 adquisicin de equipo de sonido

unid

1.00

677.12

677.12

507.84

169.28

01.02.04.06 adquisicin de silla de estructura metlica

pza

40.00

76.27

3,050.85

2,288.14

762.71

01.02.04.07 adquisicin de armario metlico

pza

1.00

508.47

508.47

381.36

127.12

01.02.05.01 Adquisicin de mobiliario de madera para lectura (1mesa grande + 6 sillas)

mod

6.00

1,033.90

6,203.39

4,652.54

1,550.85

01.02.05.02 adquisicin de estantes metlicos de angulos ranurados

pza

6.00

330.51

1,983.05

1,487.29

495.76

01.02.05.03 adquisicin de armario metlico

pza

1.00

508.47

508.47

381.36

127.12

01.02.05.04 adquisicin de escritorio metlico para auxiliar de biblioteca

pza

1.00

398.31

398.31

298.73

99.58

01.02.05.05 Adquisicin de silla de estructura metlica para escritorio

pza

1.00

76.27

76.27

57.20

19.07

01.02.05.06 Adquisicin de silla de estructura de metlica adicionales para biblioteca

pza

3.00

76.27

228.81

171.61

57.20

01.02.05

BIBLIOTECA

02.00

AMBIENTES COMPLEMENTARIOS

02.01

OBE, TOPICO Y PSICOLOGA , APAFA

02.01.01

adquisicin de escritorio metlico para OBE

pza

1.00

398.31

398.31

298.73

99.58

02.01.02

Adquisicin de silla de estructura metlica para escritorio OBE

pza

3.00

76.27

228.81

171.61

57.20

02.01.03

Adquisicin de camilla para tpico

pza

1.00

491.53

491.53

368.64

122.88

02.01.04

Adquisicin de mesa bipersonal de madera para tpico y psicologa

pza

2.00

406.78

813.56

610.17

203.39

02.01.05

Adquisicin de silla de estructura metlica para tpico y psicologa

pza

6.00

76.27

457.63

343.22

114.41

02.01.06

Adquisicin de botiqun de madera para tpico

pza

1.00

50.85

50.85

38.14

12.71

02.01.07

kit de reactivos de primeros auxilios (botiqun)

kit

1.00

42.37

42.37

31.78

10.59

02.01.08

Adquisicin de mueble fijo para lavadero en tpico

pza

1.00

203.39

203.39

152.54

50.85

02.01.09

Adquisicin de armario metlico para psicologa

pza

1.00

508.47

508.47

381.36

127.12

02.01.10

Adquisicin de biombo metlico de 2 cuerpos para tpico

pza

1.00

194.92

194.92

146.19

48.73

02.01.11

Adquisicin de escalinata metlica de 2 peldaos para tpico

pza

1.00

118.64

118.64

88.98

29.66

02.01.12

Adquisicin de vitrina de estructura metlica

pza

1.00

550.85

550.85

413.14

137.71

02.01.13

Adquisicin de mesa bipersonal de madera para APAFA

pza

1.00

406.78

406.78

305.08

101.69

02.01.14

Adquisicin de silla de estructura metlica para PAFA

pza

2.00

76.27

152.54

114.41

38.14

02.02

SALA DE PROFESORES

02.02.01

Adquisicin de mobiliario (1mesa grande + 10 sillas) de madera

mod

2.00

1,338.98

2,677.97

2,008.47

669.49

02.02.02

adquisicin de estantes de ngulo ranurados para sala de profesores

pza

1.00

330.51

330.51

247.88

82.63

02.02.03

adquisicin de armario metlico para sala de profesores

pza

1.00

508.47

508.47

381.36

127.12

03.00

AMBIENTES ADMINISTRATIVOS

Item

Descripcin

03.01

adquisicin de escritorio metlico para Direccin, Sub direccin y secretara

03.02
03.03

Und. Metrado Precio S/.

2 MES

3 MES

4 MES

5 MES

6 MES

7 MES

8 MES

9 MES

DEL 12 AL
31 MARZO
2013

DEL 01 AL
30 ABRIL
2013

DEL 01 AL
31 MAYO
2013

DEL 01 AL
30 JUNIO
2013

DEL 01 AL
31 JULIO
2013

DEL 01 AL 31
AGOSTO
2013

DEL 01 AL 30
SETIEMBRE
2013

DEL 01 AL 31
OCTUBRE
2013

DEL 01 AL 06
NOVIEMBRE
2013

1,194.92

896.19

298.73

Parcial S/.

pza

3.00

Adquisicin de sillas de estructura metlica

pza

10.00

76.27

762.71

572.03

190.68

adquisicin de equipo de cmputo para secretaria

unid

1.00

1,211.86

1,211.86

908.90

302.97

03.04

Adq. de mdulos(mueble+silla) de estructura metlica para computadora de secretaria

mod

1.00

398.31

398.31

298.73

99.58

03.05

adquisicin de impresora multifuncional

pza

1.00

135.59

135.59

101.69

33.90

03.06

Adq. estantes de ngulo ranurados para direccin , sub direccin y secretaria

pza

3.00

330.51

991.53

743.64

247.88

03.07

adquisicin de armario metlico para direccin , sub direccin y secretaria

pza

3.00

508.47

1,525.42

1,144.07

381.36

03.08

Adq. estantes de ngulo ranurados para deposito administrativo

pza

3.00

330.51

991.53

743.64

247.88

04.00

AMBIENTES DE SERVICIOS

04.01

adquisicin de estante metlico de ngulo ranurados para deposito

pza

3.00

330.51

991.53

743.64

247.88

04.02

Adquisicin de mesa grande de estructura de madera para maestranza

pza

1.00

576.27

576.27

432.20

144.07

04.03

adquisicin de estante metlico de ngulo ranurados para maestranza limpieza

unid

2.00

330.51

661.02

495.76

165.25

04.04

adquisicin de mesa bi personal de madera para caseta de guardiana

pza

1.00

406.78

406.78

305.08

101.69

04.05

adquisicin de silla de estructura metlica para caseta de guardiana

pza

1.00

76.27

76.27

57.20

19.07

COSTO DIRECTO

398.31

1 MES

200,681.95

150,511.46

50,170.49

3,000.00

2,250.00

750.00

SUB TOTAL

203,681.95

152,761.46

50,920.49

IGV (18.00%)

36,662.75

27,497.06

9,165.69

240,344.70

180,258.53

60,086.18

GASTOS GENERALES (1.494903%)

TOTAL PRESUPUESTO

PROYECTADO DEL MONTO TOTAL (S/. 4'464,328.01)

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

75.00%

25.00%

3.64%

9.33%

8.85%

8.85%

12.65%

21.84%

18.75%

14.26%

1.84%

CRONOGRAMA DE AVANCE DE OBRA


Presupuesto 0303013 AMPLIACION Y MEJORAMIENTO DE LA INFRAESTRUCTURA DE LA INSTITUCION EDUCATIVA LOS ALGARROBOS DEL AA.HH. LOS ALGARROBOS - DISTRITO DE PIURA
Cliente

GOBIERNO REGIONAL PIURA

Contratista

CONSORCIO PIURA

Lugar

PIURA - PIURA - PIURA


1 MES

Descripcin

Item

Precio S/.

2 MES

3 MES

4 MES

5 MES

6 MES

7 MES

8 MES

9 MES

DEL 12 AL
31 MARZO
2013

DEL 01 AL
30 ABRIL
2013

DEL 01 AL
31 MAYO
2013

DEL 01 AL
30 JUNIO
2013

DEL 01 AL
31 JULIO
2013

DEL 01 AL
31 AGOSTO
2013

DEL 01 AL
30
SETIEMBRE
2013

1,570.29

1,570.29

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

7,500.00

7,500.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

949.52

0.00

0.00

0.00

0.00

0.00

0.00

0.00

200.00

500.00

500.00

500.00

500.00

500.00

500.00

500.00

300.00

Und.

Metrado

Parcial S/.

1.00

1,570.29

glb

1.00

7,500.00

1.00

949.52

949.52

500.00

4,000.00

DEL 01 AL
DEL 01 AL 06
31 OCTUBRE NOVIEMBRE
2013
2013

ESTRUCTURAS
01

OBRAS PROVISIONALES

01.01

CARTEL PARA LA OBRA DE 7.20X3.60M

21,165.72

01.02

CONSTRUCCION DE CASETA PARA ALMACEN Y OFICINA DE RESIDENCIA

01.03

INSTALACION PROVISIONAL PARA DEPOSITO DE AGUA

01.04

AGUA PARA LA CONSTRUCCION

mes

8.00

01.05

SERVICIOS HIGIENICOS EN OBRA

glb

1.00

545.91

545.91

545.91

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

01.06

MOVILIZACION Y DESMOVILIZACION DE EQUIPO

glb

1.00

6,600.00

6,600.00

1,980.00

2,640.00

1,980.00

0.00

0.00

0.00

0.00

0.00

0.00

02

OBRAS PRELIMINARES

43,618.05

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

02.01

DESMONTAJES DE COBERTURA DE ETERNIT Y ESTRUCTURA DE TECHO

3,269.36

0.00

0.00

0.00

2,179.58

0.00

0.00

0.00

0.00

02.02

DESMONTAJE DE TIJERALES

02.03

m2

839.59

6.49

5,448.94

14.00

64.89

908.46

908.46

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

DESMONTAJE DE PUERTA DE FIERRO

m2

40.30

9.87

397.76

258.54

0.00

0.00

0.00

139.22

0.00

0.00

0.00

0.00

02.04

DESMONTAJE DE PUERTAS DE MADERA

m2

6.30

7.40

46.62

46.62

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

02.05

DESMONTAJE DE VENTANAS Y SOBREVENTANAS DE FIERRO

m2

98.24

9.87

969.63

775.70

0.00

0.00

0.00

193.93

0.00

0.00

0.00

0.00

02.06

DESMONTAJE DE APARATOS SANITARIOS

7.00

29.61

207.27

207.27

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

02.07

DESMONTAJE DE SISTEMA ELECTRICO

glb

1.00

1,500.00

1,500.00

1,200.00

0.00

0.00

0.00

300.00

0.00

0.00

0.00

0.00

02.08

REMOCION DE ARBOLES

20.00

83.77

1,675.40

670.16

1,005.24

0.00

0.00

0.00

0.00

0.00

0.00

0.00

02.09

DEMOLICION DE MUROS DE LADRILLO KK - SOGA MANUAL

m2

367.63

5.54

2,036.67

407.33

0.00

0.00

0.00

1,629.34

0.00

0.00

0.00

0.00

02.10

DEMOLICION DE MUROS DE LADRILLO K.K. - CABEZA, MANUAL

m2

68.74

6.24

428.94

428.94

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

02.11

DEMOLICION DE SOBRECIMIENTOS DE CONCRETO

m3

6.74

134.32

905.32

0.00

0.00

0.00

0.00

905.32

0.00

0.00

0.00

0.00

02.12

DEMOLICION DE CIMIENTOS

m3

61.69

130.09

8,025.25

0.00

0.00

0.00

0.00

2,407.58

5,617.68

0.00

0.00

0.00

02.13

DEMOLICION DE COLUMNAS DE CONCRETO

m3

10.20

201.47

2,054.99

513.75

0.00

0.00

0.00

1,541.25

0.00

0.00

0.00

0.00

02.14

DEMOLICION DE VIGAS DE CONCRETO

m3

5.60

183.15

1,025.64

615.38

0.00

0.00

0.00

410.26

0.00

0.00

0.00

0.00

02.15

DEMOLICION DE PISO DE CEMENTO PULIDO, e=0.05m

m2

636.73

4.00

2,546.92

1,018.77

0.00

0.00

0.00

0.00

1,528.15

0.00

0.00

0.00

02.16

DEMOLICION DE FALSO PISO, e = 0.10 m

m2

41.03

6.65

272.85

272.85

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

02.17

DEMOLICION DE VEREDAS DE CONCRETO A PULSO

m2

68.36

6.65

454.59

0.00

0.00

0.00

0.00

454.59

0.00

0.00

0.00

0.00

02.18

DEMOLICION DE URINARIO CORRIDO

m3

0.09

39.91

3.59

3.59

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

02.19

DEMOLICION DE BEBEDERO DE CONCRETO

m3

0.48

49.89

23.95

23.95

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

02.20

ELIMINACION DE MATERIAL EXCEDENTE DE DEMOLICIONES, Dp=5 KM

m3

274.13

13.95

3,824.11

0.00

0.00

0.00

0.00

0.00

3,824.11

0.00

0.00

0.00

02.21

LIMPIEZA DE TERRENO MANUAL

m2

3,031.17

0.83

2,515.87

2,515.87

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

02.22

TRAZO Y REPLANTEO EN EDIFICACION

m2

3,031.17

1.15

3,485.85

497.98

497.98

497.98

497.98

497.98

497.98

497.98

0.00

0.00

02.23

TRAZO Y REPLANTEO EN CERCO PERIMETRICO

727.99

1.16

844.47

0.00

0.00

0.00

0.00

0.00

844.47

0.00

0.00

0.00

02.24

ENTIBADO PARA EXCAVACION MASIVA

m2

289.68

13.86

4,014.96

0.00

4,014.96

0.00

0.00

0.00

0.00

0.00

0.00

0.00

03

MOVIMIENTO DE TIERRAS

374,975.08

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

03.01

CORTE DE TERRENO NATURAL PARA NIVELACION

m3

2,501.03

4.94

12,355.09

2,471.02

4,942.04

4,942.04

0.00

0.00

0.00

0.00

0.00

0.00

03.02

CORTE DE TERRENO NATURAL, e= 0.05m

m2

363.90

1.25

454.88

0.00

0.00

454.88

0.00

0.00

0.00

0.00

0.00

0.00

03.03

CORTE DE TERRENO NATURAL, e = 0.10m

m2

130.38

2.49

324.65

0.00

0.00

0.00

0.00

0.00

0.00

324.65

0.00

0.00

03.04

CORTE DE TERRENO NATURAL, e = 0.20m

m2

638.88

4.99

3,188.01

0.00

0.00

0.00

0.00

0.00

0.00

3,188.01

0.00

0.00

03.05

CORTE DE TERRENO NATURAL, e = 0.30m

m2

141.19

7.98

1,126.70

0.00

0.00

0.00

0.00

0.00

0.00

1,126.70

0.00

0.00

03.06

CORTE DE TERRENO NATURAL, e= 0.65m

m2

15.19

19.96

303.19

0.00

303.19

0.00

0.00

0.00

0.00

0.00

0.00

0.00

03.07

CORTE DE TERRENO NATURAL, e= 0.75m

m2

15.19

19.96

303.19

0.00

303.19

0.00

0.00

0.00

0.00

0.00

0.00

0.00

03.08

CORTE DE TERRENO NATURAL, e = 0.84m

m2

200.38

19.96

3,999.58

0.00

0.00

0.00

0.00

0.00

3,999.58

0.00

0.00

0.00

03.09

CORTE DE TERRENO NATURAL, e = 1.31m

m2

22.00

33.26

731.72

0.00

0.00

0.00

0.00

0.00

731.72

0.00

0.00

0.00

03.10

EXCAVACION DE ZANJAS PARA ZAPATAS

m3

266.89

24.95

6,658.91

0.00

4,661.24

0.00

0.00

1,997.67

0.00

0.00

0.00

0.00

03.11

EXCAVACION DE ZANJAS PARA CIMIENTOS CORRIDOS

m3

531.75

24.95

13,267.16

663.36

2,653.43

0.00

2,653.43

0.00

7,296.94

0.00

0.00

0.00

03.12

EXCAVACION DE ZANJAS PARA VIGAS DE CIMENTACION

m3

16.85

24.95

420.41

0.00

420.41

0.00

0.00

0.00

0.00

0.00

0.00

0.00

03.13

EXCAVACION DE MURO DE CONTENCION

m3

777.34

24.95

19,394.63

0.00

0.00

0.00

5,818.39

11,636.78

1,939.46

0.00

0.00

0.00

03.14

EXCAVACION PARA CISTERNA

m3

43.13

24.95

1,076.09

0.00

0.00

0.00

1,076.09

0.00

0.00

0.00

0.00

0.00

03.15

EXCAVACION MASIVA PARA MEJORAMIENTO DE TERRENO

m3

2,533.72

6.20

15,709.06

15,709.06

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

03.16

CORTE DE TERRENO NATURAL PARA VEREDAS, e = 0.10 m

m2

67.13

2.49

167.15

0.00

0.00

0.00

0.00

0.00

167.15

0.00

0.00

0.00

03.17

CORTE DE TERRENO NATURAL PARA CIRCULACIN, e = 0.20m

m2

444.38

4.99

2,217.46

0.00

0.00

0.00

0.00

0.00

2,217.46

0.00

0.00

0.00

03.18

CORTE DE TERRENO NATURAL PARA CIRCULACIN, e = 0.25m

m2

227.84

6.24

1,421.72

0.00

0.00

0.00

0.00

0.00

1,421.72

0.00

0.00

0.00

03.19

CORTE DE TERRENO NATURAL PARA LOSA DEPORTIVA, e = 0.20m

m2

613.30

4.99

3,060.37

0.00

0.00

0.00

0.00

0.00

3,060.37

0.00

0.00

0.00

03.20

EXCAVACION PARA CUNETA PLUVIAL

m3

64.68

33.26

2,151.26

0.00

0.00

0.00

0.00

0.00

2,151.26

0.00

0.00

0.00

03.21

EXCAVACION PARA SARDINEL, e = 0.20m

59.31

1.42

84.22

0.00

0.00

0.00

0.00

0.00

84.22

0.00

0.00

0.00

03.22

EXCAVACION PARA SARDINEL, e = 0.24m

112.10

1.42

159.18

0.00

0.00

0.00

0.00

0.00

159.18

0.00

0.00

0.00

03.23

EXCAVACION PARA SARDINEL, e = 0.30m

86.44

1.53

132.25

0.00

0.00

0.00

0.00

0.00

132.25

0.00

0.00

0.00

03.24

EXCAVACION PARA SARDINEL ARMADO

m3

22.32

22.18

495.06

0.00

0.00

0.00

0.00

0.00

495.06

0.00

0.00

0.00

03.25

RELLENO CON MATERIAL DE PRESTAMO (AFIRMADO)

m3

23.49

58.37

1,371.11

0.00

0.00

0.00

0.00

0.00

1,371.11

0.00

0.00

0.00

03.26

RELLENO CON MATERIAL PROPIO (AFIRMADO)

m3

161.74

15.97

2,582.99

0.00

0.00

1,162.35

0.00

0.00

1,420.64

0.00

0.00

0.00

03.27

RELLENO CON MATERIAL PROPIO (SP)

m3

575.42

15.97

9,189.46

0.00

0.00

0.00

0.00

0.00

0.00

6,432.62

2,756.84

0.00

03.28

RELLENO PARA MEJORAMIENTO DE TERRENO (OVER SIDE)

m3

445.69

63.10

28,123.04

28,123.04

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

03.29

RELLENO PARA MEJORAMIENTO DE TERRENO (AFIRMADO)

m3

1,741.36

53.30

92,814.49

0.00

92,814.49

0.00

0.00

0.00

0.00

0.00

0.00

0.00

03.30

RELLENO PARA MEJORAMIENTO DE TERRENO (HORMIGON)

m3

211.34

53.82

11,374.32

0.00

11,374.32

0.00

0.00

0.00

0.00

0.00

0.00

0.00

03.31

RELLENO CON HORMIGON

m3

154.93

73.10

11,325.38

0.00

0.00

0.00

0.00

0.00

11,325.38

0.00

0.00

0.00

03.32

BASE DE FALSO PISO CON HORMIGON, e = 0.05 m

m2

286.13

9.22

2,638.12

0.00

1,319.06

1,319.06

0.00

0.00

0.00

0.00

0.00

0.00

03.33

BASE DE FALSO PISO CON HORMIGON, e = 0.10 m

m2

114.26

18.43

2,105.81

0.00

0.00

2,105.81

0.00

0.00

0.00

0.00

0.00

0.00

03.34

CAPA DE GRAVA DE 3/4", e=0.10m

m2

50.99

12.69

647.06

0.00

0.00

0.00

0.00

0.00

647.06

0.00

0.00

0.00

03.35

CAPA DE HORMIGON, e=0.20m

m3

98.86

65.04

6,429.85

0.00

0.00

0.00

0.00

0.00

0.00

6,429.85

0.00

0.00

03.36

CAPA DE AFIRMADO, e=0.20m

m3

98.86

64.42

6,368.56

0.00

0.00

0.00

0.00

0.00

0.00

6,368.56

0.00

0.00

03.37

ELIMINACION DE MATERIAL EXCEDENTE (AFIRMADO)

m3

374.14

13.18

4,931.17

0.00

0.00

0.00

0.00

0.00

0.00

4,931.17

0.00

0.00

03.38

ELIMINACION DE MATERIAL EXCEDENTE (SP)

m3

8,032.76

13.18

105,871.78

42,348.71

0.00

0.00

0.00

0.00

63,523.07

0.00

0.00

0.00

04

OBRAS DE CONCRETO SIMPLE

335,223.80

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

04.01

SOLADOS

11,684.97

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

04.01.01

SOLADO PARA ZAPATAS, h=0.10m Mezcla 1:10

m2

204.71

23.04

4,716.52

0.00

3,301.56

0.00

0.00

1,414.96

0.00

0.00

0.00

0.00

04.01.02

SOLADO PARA MURO DE CONTENCION, h = 0.10m, Mezcla 1:10

m2

302.45

23.04

6,968.45

0.00

0.00

0.00

0.00

0.00

0.00

6,968.45

0.00

0.00

04.02

CIMIENTO CORRIDO DE CONCRETO CICLOPEO 1:10 + 30% P.M. 6"

m3

285.87

162.03

46,319.52

0.00

9,263.90

0.00

13,895.86

0.00

23,159.76

0.00

0.00

0.00

04.03

SOBRECIMIENTO

2,991.81

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

04.03.01

CONCRETO CICLOPEO 1:8 + 25% P.M. 3" PARA SOBRECIMIENTOS

m3

6.33

234.82

1,486.41

0.00

0.00

1,486.41

0.00

0.00

0.00

0.00

0.00

0.00

04.03.02

ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS

m2

42.67

35.28

1,505.40

0.00

0.00

1,505.40

0.00

0.00

0.00

0.00

0.00

0.00

04.04

FALSO PISO, MEZCLA 1:8, e = 4"

m2

1,398.59

33.10

46,293.33

0.00

0.00

20,832.00

25,461.33

0.00

0.00

0.00

0.00

0.00

04.05

VEREDAS DE CONCRETO

16,585.57

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

04.05.01

VEREDA, e=4" CONCRETO f'c=140 Kg/cm2, una ua.

m2

367.92

44.42

16,343.01

0.00

0.00

0.00

0.00

0.00

16,343.01

0.00

0.00

0.00

04.05.02

JUNTAS DE DILATACION CADA TRES METROS, e = 1"

113.88

2.13

242.56

0.00

0.00

0.00

0.00

0.00

242.56

0.00

0.00

0.00

04.06

RAMPAS DE CONCRETO

14,553.36

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

04.06.01

BASE DE AFIRMADO PARA RAMPAS, e=10 cm.

m2

84.93

10.33

877.33

0.00

0.00

0.00

0.00

0.00

877.33

0.00

0.00

0.00

04.06.02

RAMPA, e=4" CONCRETO f'c=140 Kg/cm2

m2

307.88

44.42

13,676.03

0.00

0.00

0.00

0.00

0.00

13,676.03

0.00

0.00

0.00

04.07

CUNETA PLUVIAL DE CONCRETO

31,277.23

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

04.07.01

CUNETA DE CONCRETO f'c=140 Kg/cm2

336.68

43.17

14,534.48

0.00

0.00

0.00

0.00

0.00

14,534.48

0.00

0.00

0.00

04.07.02

ENCOFRADO Y DESENCOFRADO EN CUNETA PLUVIAL DE CONCRETO

m2

571.62

29.29

16,742.75

0.00

0.00

0.00

0.00

0.00

16,742.75

0.00

0.00

0.00

04.08

CIMENTACION DE ESCALERA, CONCRETO f'c=175 Kg/cm2

m3

11.51

273.38

3,146.60

0.00

0.00

0.00

0.00

0.00

3,146.60

0.00

0.00

0.00

04.09

CIRCULACION

46,629.07

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

04.09.01

SUB BASE DE AFIRMADO PARA CIRCULACIN, e = 0.10 m

m2

955.29

10.90

10,412.66

0.00

0.00

0.00

0.00

0.00

10,412.66

0.00

0.00

0.00

04.09.02

BASE DE HORMIGON PARA CIRCULACIN, e=10 cm.

m2

955.29

10.96

10,469.98

0.00

0.00

0.00

0.00

0.00

0.00

10,469.98

0.00

0.00

04.09.03

CIRCULACIN, e=4" CONCRETO f'c=140 Kg/cm2, una ua.

m2

534.26

44.42

23,731.83

0.00

0.00

0.00

0.00

0.00

0.00

23,731.83

0.00

0.00

04.09.04

JUNTA ASFALTICA EN CIRCULACION CADA TRES METROS, e=1"

945.82

2.13

2,014.60

0.00

0.00

0.00

0.00

0.00

0.00

2,014.60

0.00

0.00

04.10

LOSA DEPORTIVA

46,021.96

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

04.10.01

BASE DE HORMIGON PARA LOSA DEPORTIVA, e=0.15 m.

m2

613.30

14.73

9,033.91

0.00

0.00

0.00

0.00

0.00

9,033.91

0.00

0.00

0.00

04.10.02

LOSA DEPORTIVA, e=0.15m. CONCRETO f'c=175 Kg/cm2, una ua.

m2

613.30

59.65

36,583.35

0.00

0.00

0.00

0.00

0.00

0.00

36,583.35

0.00

0.00

04.10.03

JUNTA ASFALTICA EN LOSA DEPORTIVA CADA CINCO METROS, e=1"

190.00

2.13

404.70

0.00

0.00

0.00

0.00

0.00

0.00

404.70

0.00

0.00

04.11

PATIO

58,132.60

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

04.11.01

BASE DE HORMIGON PARA PATIO, e=0.15m.

m2

780.07

13.59

10,601.15

0.00

0.00

0.00

0.00

0.00

10,601.15

0.00

0.00

0.00

04.11.02

PATIO, e=0.15m. CONCRETO f'c=175 Kg/cm2

m2

780.07

59.65

46,531.18

0.00

0.00

0.00

0.00

0.00

0.00

46,531.18

0.00

0.00

04.11.03

JUNTA ASFALTICA EN PATIO CADA TRES METROS, e=1"

469.61

2.13

1,000.27

0.00

0.00

0.00

0.00

0.00

0.00

1,000.27

0.00

0.00

04.12

SARDINEL

10,037.78

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

04.12.01

SARDINEL DE h=0.50m., CONCRETO f'c=140 Kg/cm2

94.80

24.13

2,287.52

0.00

0.00

0.00

0.00

0.00

2,287.52

0.00

0.00

0.00

04.12.02

SARDINEL DE h=0.30m., CONCRETO f'c=140 Kg/cm2

155.61

19.02

2,959.70

0.00

0.00

0.00

0.00

0.00

739.93

2,219.78

0.00

0.00

04.12.03

ENCOFRADO Y DESENCOFRADO PARA SARDINEL

m2

165.42

28.96

4,790.56

0.00

0.00

0.00

0.00

0.00

4,790.56

0.00

0.00

0.00

04.13

CALZADURAS EN EDIFICACION

glb

1.00

1,550.00

1,550.00

0.00

1,550.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

05

OBRAS DE CONCRETO ARMADO

869,851.11

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

05.01

ZAPATAS

43,995.62

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

CONCRETO PARA ZAPATAS f'c=210 kg/cm2

m3

115.08

305.34

35,138.53

0.00

24,596.97

0.00

0.00

0.00

10,541.56

0.00

0.00

0.00

05.01.02

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60

kg

2,708.59

3.27

8,857.09

0.00

7,528.53

0.00

0.00

0.00

1,328.56

0.00

0.00

0.00

05.02

SOBRECIMIENTO ARMADO

56,131.54

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

05.02.01

CONCRETO PARA SOBRECIMIENTO ARMADO f'c=175 kg/cm2

m3

61.46

307.30

18,886.66

0.00

0.00

11,332.00

0.00

0.00

7,554.66

0.00

0.00

0.00

05.02.02

ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS

m2

531.76

35.28

18,760.49

0.00

0.00

11,256.29

0.00

0.00

7,504.20

0.00

0.00

0.00

05.02.03

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60

kg

5,652.72

3.27

18,484.39

0.00

0.00

11,090.63

0.00

0.00

7,393.76

0.00

0.00

0.00

05.03

SARDINEL ARMADO

30,443.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

05.03.01

SARDINEL DE CONCRETO f'c=175 Kg/cm2

m3

44.90

307.30

13,797.77

0.00

0.00

0.00

0.00

0.00

13,797.77

0.00

0.00

0.00

05.03.02

ENCOFRADO Y DESENCOFRADO PARA SARDINEL

m2

379.99

28.96

11,004.51

0.00

0.00

0.00

0.00

0.00

11,004.51

0.00

0.00

0.00

05.03.03

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60

kg

1,724.99

3.27

5,640.72

0.00

0.00

0.00

0.00

0.00

5,640.72

0.00

0.00

0.00

05.04

VIGAS DE CIMENTACION

15,703.69

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

05.04.01

CONCRETO PARA VIGA DE CIMENTACION f'c=210 kg/cm2

m3

14.34

326.79

4,686.17

0.00

0.00

4,686.17

0.00

0.00

0.00

0.00

0.00

0.00

05.04.02

ENCOFRADO Y DESENCOFRADO PARA VIGAS DE CIMENTACION

m2

114.74

50.33

5,774.86

0.00

0.00

5,774.86

0.00

0.00

0.00

0.00

0.00

0.00

05.04.03

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60

kg

1,603.26

3.27

5,242.66

0.00

3,669.86

1,572.80

0.00

0.00

0.00

0.00

0.00

0.00

05.05

MUROS DE CONTENCION

182,888.16

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

05.05.01

CONCRETO PARA MURO DE CONTENCION f'c=175 kg/cm2

m3

260.45

316.92

82,541.81

0.00

0.00

0.00

0.00

0.00

0.00

82,541.81

0.00

0.00

05.05.02

ENCOFRADO Y DESENCOFRADO PARA MUROS DE CONTENCION

m2

1,209.82

41.76

50,522.08

0.00

0.00

0.00

0.00

2,526.10

30,313.25

17,682.73

0.00

0.00

05.05.03

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60

kg

15,236.78

3.27

49,824.27

0.00

0.00

0.00

0.00

7,473.64

34,876.99

7,473.64

0.00

0.00

05.06

GRADERIAS

9,070.64

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

05.06.01

GRADERIAS, CONCRETO f'c=175 Kg/cm2

m3

9.70

340.50

3,302.85

0.00

0.00

0.00

0.00

0.00

0.00

3,302.85

0.00

0.00

05.06.02

ENCOFRADO Y DESENCOFRADO EN GRADERIAS

m2

38.25

54.89

2,099.54

0.00

0.00

0.00

0.00

0.00

0.00

2,099.54

0.00

0.00

05.06.03

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60

kg

1,121.79

3.27

3,668.25

0.00

0.00

0.00

0.00

0.00

0.00

3,668.25

0.00

0.00

05.07

COLUMNAS

146,875.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

05.07.01

CONCRETO PARA COLUMNAS, f'c = 210 kg/cm2

m3

113.54

380.12

43,158.82

0.00

0.00

17,263.53

15,105.59

10,789.71

0.00

0.00

0.00

0.00

05.07.02

ENCOFRADO Y DESENCOFRADO EN COLUMNAS

m2

1,240.18

40.28

49,954.45

0.00

0.00

19,981.78

22,479.50

7,493.17

0.00

0.00

0.00

0.00

05.07.03

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60

kg

16,440.90

3.27

53,761.74

0.00

17,920.58

35,841.16

0.00

0.00

0.00

0.00

0.00

0.00

25,944.52

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.08 COLUMNAS DE CONFINAMIENTO


05.08.01

CONCRETO PARA COLUMNAS DE CONFINAMIENTO f'c=175 kg/cm2

m3

22.34

300.12

6,704.68

0.00

0.00

0.00

0.00

2,681.87

4,022.81

0.00

0.00

0.00

05.08.02

ENCOFRADO Y DESENCOFRADO EN COLUMNAS DE CONFINAMIENTO

m2

321.78

31.79

10,229.39

0.00

0.00

0.00

0.00

4,091.76

6,137.63

0.00

0.00

0.00

05.08.03

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60

kg

2,755.49

3.27

9,010.45

0.00

0.00

0.00

0.00

3,604.18

5,406.27

0.00

0.00

0.00

05.09

COLUMNAS DE CERCO PERIMETRICO

13,886.08

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

05.09.01

CONCRETO PARA COLUMNAS, f'c=175 kg/cm2

m3

13.72

300.12

4,117.65

0.00

0.00

0.00

0.00

4,117.65

0.00

0.00

0.00

0.00

05.09.02

ENCOFRADO Y DESENCOFRADO EN COLUMNAS

m2

143.37

40.28

5,774.94

0.00

0.00

0.00

0.00

5,774.94

0.00

0.00

0.00

0.00

05.09.03

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60

kg

1,221.25

3.27

3,993.49

0.00

0.00

3,993.49

0.00

0.00

0.00

0.00

0.00

0.00

05.10

VIGAS

132,555.69

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

05.10.01

CONCRETO PARA VIGAS, f'c = 210 kg/cm2

m3

129.76

325.93

42,292.68

0.00

0.00

0.00

0.00

21,146.34

21,146.34

0.00

0.00

0.00

05.10.02

ENCOFRADO Y DESENCOFRADO EN VIGAS

m2

1,026.18

35.55

36,480.70

0.00

0.00

0.00

0.00

18,240.35

18,240.35

0.00

0.00

0.00

05.10.03

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60

kg

16,447.19

3.27

53,782.31

0.00

0.00

0.00

18,823.81

24,202.04

10,756.46

0.00

0.00

0.00

05.11

VIGAS DE CONFINAMIENTO

6,701.58

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

05.11.01

CONCRETO PARA VIGAS DE CONFINAMIENTO f'c=175 kg/cm2

m3

7.23

300.12

2,169.87

0.00

0.00

0.00

0.00

0.00

2,169.87

0.00

0.00

0.00

05.11.02

ENCOFRADO Y DESENCOFRADO EN VIGAS DE CONFINAMIENTO

m2

75.20

31.79

2,390.61

0.00

0.00

0.00

0.00

0.00

2,390.61

0.00

0.00

0.00

05.11.03

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60

kg

654.77

3.27

2,141.10

0.00

0.00

0.00

0.00

0.00

2,141.10

0.00

0.00

0.00

05.12

VIGAS DE CERCO PERIMETRICO

4,222.90

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

05.12.01

CONCRETO EN VIGAS f'c=175 kg/cm2

m3

3.96

300.12

1,188.48

0.00

0.00

0.00

0.00

0.00

1,188.48

0.00

0.00

0.00

05.12.02

ENCOFRADO Y DESENCOFRADO EN VIGAS

m2

39.64

35.55

1,409.20

0.00

0.00

0.00

0.00

0.00

1,409.20

0.00

0.00

0.00

05.12.03

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60

kg

497.01

3.27

1,625.22

0.00

0.00

0.00

0.00

812.61

812.61

0.00

0.00

0.00

05.13

LOSA ALIGERADA

142,201.74

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

05.13.01

CONCRETO PARA LOSA ALIGERADA, f'c = 210 kg/cm2

m3

122.34

309.69

37,887.47

0.00

0.00

0.00

17,049.36

20,838.11

0.00

0.00

0.00

0.00

05.13.02

ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA

m2

1,397.04

39.24

54,819.85

0.00

0.00

0.00

24,668.93

30,150.92

0.00

0.00

0.00

0.00

05.13.03

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60

kg

7,341.65

3.27

24,007.20

0.00

0.00

0.00

10,803.24

13,203.96

0.00

0.00

0.00

0.00

05.13.04

LADRILLO PARA TECHO 15 x 30 x 30 cm

11,638.00

2.19

25,487.22

0.00

0.00

0.00

11,469.25

14,017.97

0.00

0.00

0.00

0.00

05.14

LOSA MACIZA

8,413.42

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

05.14.01

CONCRETO PARA LOSA MACIZA, f'c = 210 kg/cm2

m3

10.46

314.63

3,291.03

0.00

0.00

0.00

0.00

0.00

0.00

3,291.03

0.00

0.00

05.14.02

ENCOFRADO Y DESENCOFRADO EN LOSA MACIZA

m2

58.40

46.79

2,732.54

0.00

0.00

0.00

0.00

0.00

2,049.41

683.14

0.00

0.00

05.14.03

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60

kg

730.84

3.27

2,389.85

0.00

0.00

0.00

0.00

0.00

2,389.85

0.00

0.00

0.00

05.15

ESCALERAS

36,424.85

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

05.15.01

CONCRETO PARA ESCALERA, f'c = 210 kg/cm2

m3

42.76

360.03

15,394.88

0.00

0.00

0.00

0.00

0.00

15,394.88

0.00

0.00

0.00

05.15.02

ENCOFRADO Y DESENCOFRADO EN ESCALERAS

m2

227.51

57.30

13,036.32

0.00

0.00

0.00

0.00

0.00

13,036.32

0.00

0.00

0.00

05.15.03

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60

kg

2,444.54

3.27

7,993.65

0.00

0.00

0.00

0.00

0.00

7,993.65

0.00

0.00

0.00

05.16

CISTERNA

9,273.69

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

05.16.01

CONCRETO PARA CISTERNA, f'c = 210 kg/cm2

m3

12.08

346.37

4,184.15

0.00

0.00

0.00

4,184.15

0.00

0.00

0.00

0.00

0.00

05.16.02

ENCOFRADO Y DESENCOFRADO EN CISTERNA

m2

39.78

40.41

1,607.51

0.00

0.00

0.00

1,607.51

0.00

0.00

0.00

0.00

0.00

05.16.03

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60

kg

1,064.84

3.27

3,482.03

0.00

0.00

0.00

3,482.03

0.00

0.00

0.00

0.00

0.00

05.17

TANQUE ELEVADO

5,118.98

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

05.17.01

CONCRETO PARA TANQUE ELEVADO, f'c = 210 kg/cm2

1,772.39

0.00

0.00

0.00

1,772.39

0.00

0.00

0.00

0.00

0.00

m3

4.45

398.29

05.17.02

ENCOFRADO Y DESENCOFRADO EN TANQUE ELEVADO

m2

29.09

56.92

1,655.80

0.00

0.00

0.00

1,655.80

0.00

0.00

0.00

0.00

0.00

05.17.03

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60

kg

517.06

3.27

1,690.79

0.00

0.00

0.00

1,690.79

0.00

0.00

0.00

0.00

0.00

06

ESTRUCTURAS METALICAS

231,021.06

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

06.01

ESTRUCTURA METALICA EN BLOQUES EXISTENTES

129,072.62

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

06.01.01

CORREAS 50mm x 70mm x 1.5mm

475.20

68.51

32,555.95

0.00

0.00

32,555.95

0.00

0.00

0.00

0.00

0.00

0.00

06.01.02

TIJERAL DE METAL 01 + ANCLAJES

15.00

2,741.87

41,128.05

0.00

41,128.05

0.00

0.00

0.00

0.00

0.00

0.00

0.00

06.01.03

TIJERAL DE METAL 02 + ANCLAJES

7.00

2,705.30

18,937.10

0.00

18,937.10

0.00

0.00

0.00

0.00

0.00

0.00

0.00

06.01.04

TIJERAL DE METAL 03 + ANCLAJES

10.00

2,718.50

27,185.00

0.00

27,185.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

06.01.05

ARRIOSTRES DE METAL

298.92

31.00

9,266.52

0.00

9,266.52

0.00

0.00

0.00

0.00

0.00

0.00

0.00

06.02

ESTRUCTURA METALICA EN PATIO 01

62,629.31

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

06.02.01

TIJERAL PARABOLICO + ANCLAJES

8.00

2,840.39

22,723.12

0.00

0.00

0.00

0.00

0.00

22,723.12

0.00

0.00

0.00

06.02.02

VIGUETA METALICA

261.45

55.12

14,411.12

0.00

0.00

0.00

0.00

0.00

14,411.12

0.00

0.00

0.00

06.02.03

TEMPLADORE DE F LISO 3/8"

328.44

19.99

6,565.52

0.00

0.00

0.00

0.00

0.00

0.00

6,565.52

0.00

0.00

06.02.04

TEMPLADORE DE F LISO 1/2"

145.60

21.08

3,069.25

0.00

0.00

0.00

0.00

0.00

0.00

3,069.25

0.00

0.00

06.02.05

SUMINISTRO Y COLOCACION DE VIGAS DE RIGIDEZ

149.40

106.16

15,860.30

0.00

0.00

0.00

0.00

0.00

15,860.30

0.00

0.00

0.00

06.03

ESTRUCTURA METALICA EN TRIBUNA DE LOSA DEPORTIVA

29,127.36

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

06.03.01

TIJERAL SUSPENDIDO + ANCLAJES

10.00

1,405.94

14,059.40

0.00

0.00

0.00

0.00

0.00

0.00

14,059.40

0.00

0.00

06.03.02

CORREAS 100mmx100mm, e=4mm

92.81

81.51

7,564.94

0.00

0.00

0.00

0.00

0.00

0.00

7,564.94

0.00

0.00

06.03.03

CORREAS 50mmx100m, e=4mm

98.31

76.32

7,503.02

0.00

0.00

0.00

0.00

0.00

0.00

7,503.02

0.00

0.00

06.04

ESTRUCTURA METALICA EN ESCENARIO

10,191.77

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

06.04.01

TIJERAL PARABOLICO + ANCLAJES

2.00

1,907.62

3,815.24

0.00

0.00

0.00

0.00

0.00

3,815.24

0.00

0.00

0.00

06.04.02

VIGUETA METALICA

87.50

55.12

4,823.00

0.00

0.00

0.00

0.00

0.00

4,823.00

0.00

0.00

0.00

06.04.03

TEMPLADORE DE F LISO 3/8"

45.32

19.99

905.95

0.00

0.00

0.00

0.00

0.00

905.95

0.00

0.00

0.00

06.04.04

TEMPLADORE DE F LISO 1/2"

30.72

21.08

647.58

0.00

0.00

0.00

0.00

0.00

647.58

0.00

0.00

0.00

07

SISTEMA DE EVACUACION DE LLUVIAS

2,475.07

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

07.01

CANALETA GALVANIZADA 6" PARA TECHO

78.60

19.08

1,499.69

0.00

1,499.69

0.00

0.00

0.00

0.00

0.00

0.00

0.00

07.02

CANALETA PLUVIAL TIPO CALAMINN, e=4mm.

87.40

11.16

975.38

0.00

0.00

0.00

0.00

0.00

975.38

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

82,683.57

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

ARQUITECTURA
01

MUROS Y TABIQUES DE ALBAILERIA

01.01

MUROS DE LADRILLO KK MAQUINADO ASENTADO DE SOGA

m2

1,009.81

39.21

39,594.65

0.00

0.00

0.00

15,837.86

15,837.86

7,918.93

0.00

0.00

0.00

01.02

MUROS DE LADRILLO KK MAQUINADO ASENTADO DE CABEZA

m2

558.74

73.27

40,938.88

0.00

0.00

16,375.55

18,422.50

0.00

6,140.83

0.00

0.00

0.00

01.03

ALAMBRE N 8, REFUERZO HORIZONTAL EN MUROS

kg

565.80

3.80

2,150.04

0.00

0.00

967.52

967.52

0.00

215.00

0.00

0.00

0.00

02

REVOQUES Y ENLUCIDOS

180,263.10

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

02.01

TARRAJEO EN INTERIORES, e = 1.5 cm, Mezcla 1:5

m2

1,469.73

16.98

24,956.02

0.00

0.00

0.00

0.00

0.00

12,478.01

12,478.01

0.00

0.00

02.02

TARRAJEO EN EXTERIORES, e = 1.5 cm, Mezcla 1:5

m2

1,730.27

19.86

34,363.16

0.00

0.00

0.00

0.00

0.00

17,181.58

17,181.58

0.00

0.00

02.03

TARRAJEO PRIMARIO RAYADO, e = 1.5 c m

m2

252.15

16.23

4,092.39

0.00

0.00

0.00

0.00

0.00

0.00

4,092.39

0.00

0.00

02.04

TARRAJEO DE COLUMNAS, e = 1.5 cm, Mezcla 1:5

m2

1,079.64

23.70

25,587.47

0.00

0.00

0.00

0.00

0.00

17,911.23

7,676.24

0.00

0.00

02.05

TARRAJEO DE VIGAS, e = 1.5 cm, Mezcla 1:5

m2

1,019.15

23.70

24,153.86

0.00

0.00

2,415.39

0.00

8,453.85

8,453.85

4,830.77

0.00

0.00

02.06

TARRAJEO DE CIELO RASO, e = 1.5 cm, Mezcla = 1:5

m2

1,460.03

24.04

35,099.12

0.00

0.00

0.00

0.00

8,774.78

17,549.56

8,774.78

0.00

0.00

02.07

TARRAJEO DE MUROS DE CONTENCIN, e = 1.5 c m, Mezcla 1:5

m2

409.08

20.48

8,377.96

0.00

0.00

0.00

0.00

0.00

8,377.96

0.00

0.00

0.00

02.08

TARRAJEO PULIDO EN GRADERIAS

m2

162.78

24.36

3,965.32

0.00

0.00

0.00

0.00

0.00

0.00

3,965.32

0.00

0.00

02.09

TARRAJEO CON IMPERMEABILIZANTE

m2

62.08

22.41

1,391.21

0.00

0.00

0.00

1,391.21

0.00

0.00

0.00

0.00

0.00

02.10

VESTIDURA EN FONDO DE ESCALERAS CON MEZCLA C:A, 1:5

m2

106.61

31.94

3,405.12

0.00

0.00

0.00

0.00

0.00

0.00

3,405.12

0.00

0.00

02.11

VESTIDURA DE DERRAMES

1,347.04

9.36

12,608.29

0.00

0.00

3,782.49

0.00

3,152.07

3,152.07

2,521.66

0.00

0.00

02.12

BRUAS

361.53

6.26

2,263.18

0.00

0.00

0.00

0.00

0.00

1,131.59

1,131.59

0.00

0.00

03

PISOS Y PAVIMENTOS

157,883.91

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

03.01

CONTRAPISO DE 40 mm

m2

1,263.98

19.54

24,698.17

0.00

0.00

12,349.09

0.00

12,349.09

0.00

0.00

0.00

0.00

03.02

PISO DE CEMENTO PULIDO, e = 2" , BRUADO

m2

1,190.80

16.81

20,017.35

0.00

0.00

0.00

0.00

20,017.35

0.00

0.00

0.00

0.00

03.03

PISO DE CERAMICA DE 0.40 X 0.40m - ALTO TRANSITO

m2

1,165.52

46.94

54,709.51

0.00

0.00

0.00

0.00

54,709.51

0.00

0.00

0.00

0.00

03.04

PISO DE CERAMICA DE 0.30 X 0.30m - ALTO TRANSITO

m2

139.49

42.82

5,972.96

0.00

0.00

0.00

0.00

5,972.96

0.00

0.00

0.00

0.00

03.05

PISOS DE ADOQUIN DE CONCRETO

52,485.92

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

03.05.01

SUB BASE DE HORMIGON PARA ADOQUIN, e= 20cm

m2

420.79

15.64

6,581.16

0.00

0.00

0.00

0.00

0.00

0.00

6,581.16

0.00

0.00

03.05.02

BASE DE AFIRMADO PARA ADOQUIN, e= 18cm

m2

420.79

14.23

5,987.84

0.00

0.00

0.00

0.00

0.00

0.00

5,987.84

0.00

0.00

03.05.03

BASE DE AFIRMADO PARA ADOQUIN, e= 10cm

m2

168.08

9.30

1,563.14

0.00

0.00

0.00

0.00

0.00

0.00

1,563.14

0.00

0.00

03.05.04

CAMA DE ARENA PARA ADOQUIN, e= 4cm

m2

588.87

6.55

3,857.10

0.00

0.00

0.00

0.00

0.00

0.00

3,857.10

0.00

0.00

03.05.05

ADOQUIN DE CONCRETO, e= 0.06m

m2

226.72

47.50

10,769.20

0.00

0.00

0.00

0.00

0.00

0.00

10,769.20

0.00

0.00

03.05.06

ADOQUIN DE CONCRETO, e= 0.08m

m2

420.70

56.40

23,727.48

0.00

0.00

0.00

0.00

0.00

0.00

23,727.48

0.00

0.00

04

CONTRAZOCALOS

23,030.84

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

04.01

CONTRAZOCALO DE CERAMICA EN INTERIOR, 0.087 x 0.40

636.54

27.93

17,778.56

0.00

0.00

0.00

0.00

0.00

0.00

17,778.56

0.00

0.00

04.02

CONTRAZOCALO CEMENTO PULIDO EN INTERIOR, h=0.10m, e=1.5cm C:A, 1:5

367.72

6.93

2,548.30

0.00

0.00

0.00

0.00

0.00

0.00

2,548.30

0.00

0.00

04.03

CONTRAZOCALO CEMENTO PULIDO EN EXTERIOR, h=0.20m, e=1.5cm C:A, 1:5

305.19

8.86

2,703.98

0.00

0.00

0.00

0.00

0.00

0.00

2,703.98

0.00

0.00

05

ZOCALOS

15,443.34

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

05.01

ZOCALO DE CERAMICA 0.20x0.30 M. COLOR

06

ENCHAPADOS

m2

15,443.34

0.00

0.00

0.00

0.00

0.00

0.00

15,443.34

0.00

0.00

2,881.27

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

06.01

ENCHAPADO DE ESTRUCTURA DE APOYO DE OVALINES

m2

10.15

0.00

58.29

591.64

0.00

0.00

0.00

0.00

0.00

0.00

591.64

0.00

06.02

ENCHAPADO CON CERAMICA EN MESADA DE CONCRETO

m2

0.00

22.01

63.11

1,389.05

0.00

0.00

0.00

0.00

0.00

0.00

1,389.05

0.00

06.03

ENCHAPADO DE BANCAS DE CONCRETO

0.00

m2

6.27

58.29

365.48

0.00

0.00

0.00

0.00

0.00

0.00

365.48

0.00

06.04

ENCHAPADO DE BEBEDERO

0.00

m2

9.18

58.29

535.10

0.00

0.00

0.00

0.00

0.00

0.00

535.10

0.00

07

REVESTIMIENTO DE GRADAS Y ESCALERAS

0.00

2,287.70

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

07.01

REVESTIMIENTO DE ESCALERA CON CEMENTO PULIDO PASO Y CONTRAPASO

66.83

0.00

25.61

1,711.52

0.00

0.00

0.00

0.00

0.00

0.00

1,711.52

0.00

07.02

REVESTIMIENTO DE DESCANSO CON CEMENTO PULIDO Y BRUADO

m2

24.56

0.00

23.46

576.18

0.00

0.00

0.00

0.00

0.00

0.00

576.18

0.00

08

COBERTURAS

0.00

91,139.31

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

08.01

CUBIERTA DE MORTERO 1:3 CON IMPERMIABILIZANTE EN POLVO

m2

916.97

0.00

24.19

22,181.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00

22,181.50

08.02

COBERTURA CON LADRILLO PASTELERO

m2

0.00

41.92

41.11

1,723.33

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1,723.33

08.03

COBERTURA DE PLANCHA ONDULADA

0.00

m2

632.16

20.01

12,649.52

0.00

0.00

12,649.52

0.00

0.00

0.00

0.00

0.00

08.04

0.00

COBERTURA CON CALAMINN CU-6

m2

758.96

51.39

39,002.95

0.00

0.00

0.00

0.00

0.00

0.00

39,002.95

0.00

0.00

08.05

COBERTURA PLANCHA ONDULADA EN TRIBUNAS

m2

109.45

22.42

2,453.87

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2,453.87

0.00

08.06

CANALETA A MEDIA CAA DE MORTERO EN TECHOS e=0.05 m.

456.59

15.05

6,871.68

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6,871.68

0.00

08.07

GRGOLAS DE CONCRETO

58.00

107.87

6,256.46

0.00

0.00

0.00

0.00

6,256.46

0.00

0.00

0.00

0.00

09

CARPINTERIA DE MADERA

54,684.47

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

09.01

PUERTAS DE MADERA

52,509.36

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

09.01.01

PUERTA APANELADA MAD. CEDRO P-01 (1.50 x 2.10 m) CON FRESQUILLA DE 0.65m - 02

5.00

824.92

4,124.60

0.00

0.00

0.00

0.00

0.00

0.00

4,124.60

0.00

0.00

09.01.02

PUERTA APANELADA MAD. CEDRO P-02 (0.90 x 2.10 m) CON FRESQUILLA DE 0.75m - 01

2.00

681.95

1,363.90

0.00

0.00

0.00

0.00

0.00

0.00

1,363.90

0.00

0.00

09.01.03

PUERTA APANELADA MAD. CEDRO P-03 (0.90 x 2.10 m) SIN FRESQUILLA - 01 HOJA

11.00

618.88

6,807.68

0.00

0.00

0.00

0.00

0.00

0.00

6,807.68

0.00

0.00

09.01.04

PUERTA APANELADA MAD. CEDRO P-04 (0.60 x 1.50 m) SIN FRESQUILLA - 01 HOJA

29.00

380.17

11,024.93

0.00

0.00

2,756.23

0.00

0.00

0.00

0.00

8,268.70

0.00

09.01.05

PUERTA APANELADA MAD. CEDRO P-05 (1.10 x 2.10 m) CON FRESQUILLA DE 0.65m - 01

8.00

694.16

5,553.28

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5,553.28

0.00

09.01.06

PUERTA APANELADA MAD. CEDRO P-06 (0.90 x 2.10 m) CON FRESQUILLA DE 0.80m - 01

2.00

682.27

1,364.54

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1,364.54

0.00

09.01.07

PUERTA APANELADA MAD. CEDRO P-07 (0.90 x 2.10 m) CON FRESQUILLA DE 0.50m - 01

2.00

665.54

1,331.08

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1,331.08

0.00

09.01.08

PUERTA APANELADA MAD. CEDRO P-08 (0.80 x 2.10 m) CON FRESQUILLA DE 0.60m - 01

2.00

594.09

1,188.18

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1,188.18

0.00

09.01.09

PUERTA APANELADA MAD. CEDRO P-09 (1.00 x 2.10 m) CON FRESQUILLA DE 0.70m - 01

2.00

681.57

1,363.14

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1,363.14

0.00

09.01.10

PUERTA APANELADA MAD. CEDRO P-10 (0.90 x 2.30 m) SIN FRESQUILLA - 01 HOJA

4.00

645.36

2,581.44

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2,581.44

0.00

09.01.11

PUERTA APANELADA MAD. CEDRO P-11 (0.70 x 2.10 m) CON FRESQUILLA DE 0.40m - 01

1.00

602.37

602.37

0.00

0.00

0.00

0.00

0.00

0.00

0.00

602.37

0.00

09.01.12

PUERTA APANELADA MAD. CEDRO P-12 (1.10 x 2.10 m) CON FRESQUILLA DE 0.90m - 01

1.00

699.38

699.38

0.00

0.00

0.00

0.00

0.00

0.00

0.00

699.38

0.00

09.01.13

PUERTA APANELADA MAD. CEDRO P-13 (1.00 x 2.10 m) CON FRESQUILLA DE 0.70m - 01

1.00

695.64

695.64

0.00

0.00

0.00

0.00

0.00

0.00

0.00

695.64

0.00

09.01.14

PUERTA APANELADA MAD. CEDRO P-14 (0.90 x 2.10 m) CON FRESQUILLA DE 0.90m - 01

1.00

693.67

693.67

0.00

0.00

0.00

0.00

0.00

0.00

0.00

693.67

0.00

09.01.15

PUERTA APANELADA MAD. CEDRO P-15 (0.70 x 2.10 m) CON FRESQUILLA DE 0.70m - 01

1.00

640.55

640.55

0.00

0.00

0.00

0.00

0.00

0.00

0.00

640.55

0.00

09.01.16

PUERTA APANELADA MAD. CEDRO P-16 (1.00 x 2.10 m) CON FRESQUILLA DE 0.50m - 01

7.00

665.05

4,655.35

0.00

0.00

4,655.35

0.00

0.00

0.00

0.00

0.00

0.00

09.01.17

PUERTA APANELADA MAD. CEDRO P-17 (0.90 x 2.10 m) CON FRESQUILLA DE 0.40mVARIA

1.00

654.51

654.51

0.00

0.00

654.51

0.00

0.00

0.00

0.00

0.00

0.00

09.01.18

PUERTA APANELADA MAD. CEDRO P-18 (0.84 x 2.10 m) CON FRESQUILLA DE 0.40m - 01

1.00

642.15

642.15

0.00

0.00

642.15

0.00

0.00

0.00

0.00

0.00

0.00

09.01.19

PUERTA APANELADA MAD. CEDRO P-19 (1.00 x 2.10 m) CON FRESQUILLA DE 0.70m - 01

2.00

695.64

1,391.28

0.00

0.00

1,391.28

0.00

0.00

0.00

0.00

0.00

0.00

09.01.20

PUERTA CONTRAPLACADA P-20 (0.90 x 2.00 m) SIN FRESQUILLA - 01 HOJA

6.00

511.03

3,066.18

0.00

0.00

3,066.18

0.00

0.00

0.00

0.00

0.00

0.00

09.01.21

PUERTA APANELADA MAD. CEDRO P-21 (1.00 x 2.10 m) CON FRESQUILLA DE 0.60m - 01

2.00

686.01

1,372.02

0.00

0.00

0.00

1,372.02

0.00

0.00

0.00

0.00

0.00

09.01.22

PUERTA APANELADA MAD. CEDRO P-22 (1.05 x 2.10 m) CON FRESQUILLA DE 0.60m - 01

1.00

693.49

693.49

0.00

0.00

0.00

693.49

0.00

0.00

0.00

0.00

0.00

09.02

TABIQUE DE MELAMINE e= 15mm

10.00

51.67

516.70

0.00

0.00

0.00

516.70

0.00

0.00

0.00

0.00

0.00

09.03

TICERO DE MADERA TORNILLO L=4.8 m, BARNIZADO

13.00

127.57

1,658.41

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1,658.41

0.00

10

CARPINTERIA METALICA

90,919.92

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10.01

PUERTAS DE METAL

5,558.23

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10.01.01

PORTN METALICO P-01 (3.00x3.00) - 02 HOJAS

1.00

1,683.07

1,683.07

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1,683.07

0.00

10.01.02

PUERTA METALICA P-02 (1.00x3.00) - 01 HOJAS

1.00

852.66

852.66

0.00

0.00

0.00

0.00

0.00

0.00

0.00

852.66

0.00

10.01.03

PORTN METALICO P-03 (4.00x3.50) - 02 HOJAS

1.00

2,514.03

2,514.03

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2,514.03

0.00

10.01.04

PUERTA DE FIERRO P-M1 (0.80 x2.10m) CON FRESQUILLA DE 0.50m

1.00

508.47

508.47

0.00

0.00

0.00

0.00

0.00

0.00

0.00

508.47

0.00

10.02

VENTANA DE METAL

423.72

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10.02.01

VENTANA DE FIERRO V-CM (0.80 x 1.00m)

423.72

0.00

0.00

0.00

0.00

0.00

0.00

0.00

423.72

0.00

10.03

PROTECTOR METALICO

18,929.05

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10.03.01

PROTECTOR METALICO EN GUARDIANIA DE 0.70X0.80m

1.00

482.29

482.29

0.00

0.00

0.00

0.00

0.00

0.00

0.00

482.29

0.00

10.03.02

REJA METALICA EN FACHADA DE 2.77x1.35m

2.00

1,455.36

2,910.72

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2,910.72

0.00

10.03.03

REJA METALICA EN FACHADA DE 2.80x1.35m

2.00

1,457.70

2,915.40

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2,915.40

0.00

10.03.04

CERCO METALICO CON TUBO DE FIERRO Y MALLA COCADA

m2

48.00

262.93

12,620.64

0.00

0.00

0.00

0.00

0.00

0.00

0.00

12,620.64

0.00

10.04

AGARRADERA PARA IMPEDIDOS FISICOS

3.42

36.74

125.65

0.00

0.00

0.00

0.00

0.00

0.00

0.00

125.65

0.00

10.05

REJILLA PARA CUNETA PLUVIAL

336.68

108.19

36,425.41

0.00

0.00

0.00

0.00

0.00

0.00

0.00

36,425.41

0.00

10.06

CANTONERAS CON PERFILES DE PLANCHA ESTRIADA

80.00

16.00

1,280.00

0.00

0.00

0.00

0.00

0.00

1,280.00

0.00

0.00

0.00

10.07

PASAMANOS DE METAL

2,097.16

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10.07.01

PASAMANOS DE METAL TIPO I

43.60

48.10

2,097.16

0.00

0.00

0.00

2,097.16

0.00

0.00

0.00

0.00

0.00

10.08

BARANDA METALICA DE TUBO, SEGN DISEO

308.36

81.30

25,069.67

0.00

0.00

0.00

25,069.67

0.00

0.00

0.00

0.00

0.00

308.62

1.00

50.04

423.72

10.09

ESCALERA DE GATO

1.00

779.01

779.01

0.00

0.00

0.00

779.01

0.00

0.00

0.00

0.00

0.00

10.10

TAPA DE FIERRO FUNDIDO DE 0.60x0.60

2.00

116.01

232.02

0.00

0.00

0.00

232.02

0.00

0.00

0.00

0.00

0.00

11

VIDRIOS, CRISTALES Y SIMILARES

27,992.37

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.01

VENTANAS CON MARCO DE ALUMINIO EN VIDRIO DOBLE LAMINADO

27,992.37

0.00

0.00

0.00

0.00

0.00

0.00

0.00

13,996.19

13,996.19

12

PINTURA

12.01

m2

313.64

89.25

70,770.14

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

PINTURA LATEX 2 MANOS EN MUROS

m2

3,962.66

7.98

31,622.03

0.00

0.00

6,324.41

0.00

0.00

9,486.61

15,811.02

0.00

0.00

12.02

PINTURA LATEX 2 MANOS EN COLUMNAS

m2

1,183.76

8.30

9,825.21

0.00

0.00

1,965.04

0.00

0.00

2,947.56

4,912.61

0.00

0.00

12.03

PINTURA ESMALTE 2 MANOS EN CONTRAZOCALO H=0.10m

367.72

1.61

592.03

0.00

0.00

0.00

0.00

0.00

0.00

0.00

592.03

0.00

12.04

PINTURA ESMALTE 2 MANOS EN CONTRAZOCALO H=0.20m

305.19

2.06

628.69

0.00

0.00

0.00

0.00

0.00

0.00

0.00

628.69

0.00

12.05

PINTURA ESMALTE 2 MANOS EN CONTRAZOCALO H=0.30m

97.35

2.66

258.95

0.00

0.00

0.00

0.00

0.00

0.00

0.00

258.95

0.00

12.06

PINTURA LATEX 2 MANOS EN VIGAS.

m2

1,019.15

7.98

8,132.82

0.00

0.00

1,626.56

0.00

0.00

3,253.13

3,253.13

0.00

0.00

12.07

PINTURA LATEX 2 MANOS EN CIELO RASO

m2

1,460.03

7.87

11,490.44

0.00

0.00

0.00

0.00

0.00

6,894.26

4,596.18

0.00

0.00

12.08

PINTURA LATEX 2 MANOS EN MUROS DE CONTENCIN

m2

446.56

7.98

3,563.55

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3,563.55

0.00

12.09

PINTURA PARA DEMARCACION DE LOSA DEPORTIVA

1.00

390.55

390.55

0.00

0.00

0.00

0.00

0.00

0.00

390.55

0.00

0.00

12.10

BARNIZ PARA PUERTAS

m2

261.71

16.30

4,265.87

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4,265.87

0.00

13

VARIOS

42,908.80

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

13.01

JUNTA DE DILATACION 1"(ESPUMA PLASTIFICANTE + JEBE MICROPOROSO)

590.58

14.63

8,640.19

0.00

0.00

0.00

0.00

0.00

0.00

8,640.19

0.00

0.00

13.02

TAPAJUNTA METALICA EN TECHOS DE BLOQUES

19.20

42.59

817.73

0.00

0.00

0.00

0.00

0.00

0.00

817.73

0.00

0.00

13.03

ESTRUCTURA DE APOYO PARA OVALINES

m2

8.00

123.66

989.28

0.00

0.00

0.00

0.00

0.00

0.00

989.28

0.00

0.00

13.04

COLOCACION DE PIZARRAS ACRILICAS DE 1.20 x 2.44 m

2.00

172.39

344.78

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

344.78

13.05

PIZARRA DE CEMENTO 4.8m x 1.2m SIN TIZERO

13.00

45.05

585.65

0.00

0.00

263.54

0.00

0.00

0.00

322.11

0.00

0.00

13.06

ESPEJO BISELADO EMPOTRADO(2.60x0.70)

2.00

141.06

282.12

0.00

0.00

0.00

0.00

0.00

0.00

0.00

282.12

0.00

13.07

ESPEJO BISELADO EMPOTRADO(0.50x0.80)

6.00

73.26

439.56

0.00

0.00

0.00

0.00

0.00

0.00

0.00

439.56

0.00

13.08

ESPEJO BISELADO EMPOTRADO(0.45x0.80)

4.00

73.26

293.04

0.00

0.00

0.00

0.00

0.00

0.00

0.00

293.04

0.00

13.09

ESPEJO BISELADO EMPOTRADO(2.50x0.70)

2.00

141.06

282.12

0.00

0.00

0.00

0.00

0.00

0.00

0.00

282.12

0.00

13.10

TUBOS DE VOLEY, INC. RED Y DADOS DE CONCRETO

jgo

1.00

332.07

332.07

0.00

0.00

0.00

0.00

0.00

0.00

0.00

332.07

0.00

13.11

ARCO Y TABLERO FULBITO Y BASKET (MADERA Y METAL)

jgo

1.00

2,214.98

2,214.98

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2,214.98

0.00

13.12

ASTA DE BANDERA

pza

2.00

950.53

1,901.06

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1,901.06

0.00

13.13

TABIQUERIA PREBAFRICADA DE DRYWALL

m2

10.65

54.55

580.96

0.00

0.00

0.00

0.00

0.00

0.00

580.96

0.00

0.00

13.14

PINTADO DE TEXTO EN PORTADA

38.77

51.36

1,991.23

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1,991.23

0.00

13.15

CERRAMIENTO PLANCHA DE FIBROCEMENTO DE e=8mm

m2

192.42

37.09

7,136.86

0.00

0.00

7,136.86

0.00

0.00

0.00

0.00

0.00

0.00

13.16

MESADA DE LABORATORIO

2,731.62

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

13.16.01

CONCRETO PARA MESADA f'c=175 kg/cm2

m3

2.06

273.38

563.16

0.00

0.00

0.00

0.00

0.00

563.16

0.00

0.00

0.00

13.16.02

ENCOFRADO Y DESENCOFRADO EN MESADA

m2

33.81

51.61

1,744.93

0.00

0.00

0.00

0.00

1,744.93

0.00

0.00

0.00

0.00

13.16.03

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60

kg

129.52

3.27

423.53

0.00

0.00

0.00

0.00

423.53

0.00

0.00

0.00

0.00

13.17

SEMBRADO DE GRASS

m2

287.44

27.96

8,036.82

0.00

0.00

0.00

0.00

0.00

0.00

0.00

8,036.82

0.00

13.18

SEMBRADO DE PLANTONES

88.00

9.27

815.76

0.00

0.00

0.00

0.00

0.00

0.00

0.00

815.76

0.00

13.19

BANCAS DE CONCRETO

4,132.98

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

13.19.01

BANCAS DE CONCRETO f'c= 175 Kg/cm2

m3

2.65

272.46

722.02

0.00

0.00

0.00

0.00

0.00

0.00

722.02

0.00

0.00

13.19.02

ENCOFRADO Y DESENCOFRADO EN BANCAS

m2

50.01

25.78

1,289.26

0.00

0.00

0.00

0.00

0.00

0.00

1,289.26

0.00

0.00

13.19.03

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60

kg

169.09

3.27

552.92

0.00

0.00

0.00

0.00

0.00

0.00

552.92

0.00

0.00

13.19.04

TARRAJEO PULIDO DE BANCAS

m2

64.40

24.36

1,568.78

0.00

0.00

0.00

0.00

0.00

0.00

1,568.78

0.00

0.00

13.20

BEBEDERO DE CONCRETO

359.99

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

13.20.01

BEBEDERO DE CONCRETO f'c= 175 Kg/cm2

m3

0.47

272.46

128.06

0.00

0.00

0.00

0.00

0.00

0.00

128.06

0.00

0.00

13.20.02

ENCOFRADO Y DESENCOFRADO EN BEBEDERO

m2

4.59

25.78

118.33

0.00

0.00

0.00

0.00

0.00

0.00

118.33

0.00

0.00

13.20.03

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60

kg

34.74

3.27

113.60

0.00

0.00

0.00

0.00

0.00

0.00

113.60

0.00

0.00

01

INSTALACIONES SANITARIAS

61,758.48

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

01.01

TRABAJOS PRELIMINARES

393.70

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

01.01.01

TRAZO DE NIVELES Y REPLANTEO

393.70

0.00

0.00

19.69

374.02

0.00

0.00

0.00

0.00

0.00

01.02

RED DE DESAGUE

26,671.85

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

01.02.01

SALIDA DE PVC SAL PARA DESAGE DE 4"

pto

24.00

56.74

1,361.76

0.00

0.00

408.53

953.23

0.00

0.00

0.00

0.00

0.00

01.02.02

SALIDA DE PVC SAL PARA DESAGE DE 2"

pto

50.00

56.89

2,844.50

0.00

0.00

853.35

1,991.15

0.00

0.00

0.00

0.00

0.00

01.02.03

SALIDA DE PVC SAL PARA VENTILACIN DE 2"

pto

20.00

52.65

1,053.00

0.00

0.00

315.90

737.10

0.00

0.00

0.00

0.00

0.00

01.02.04

TUBERIA Y ACCESORIOS DE REBOSE Y LIMPIEZA DE TANQUE ELEVADO

glb

1.00

938.44

938.44

0.00

0.00

0.00

938.44

0.00

0.00

0.00

0.00

0.00

01.02.05

EXCAVACION DE ZANJAS, TUBERIA 2" - 4", H PROMED. 0.90m

353.75

10.67

3,774.51

0.00

0.00

0.00

0.00

1,887.26

1,887.26

0.00

0.00

0.00

01.02.06

RELLENO Y COMPACTACION DE ZANJAS

m3

84.25

21.91

1,845.92

0.00

0.00

0.00

0.00

922.96

922.96

0.00

0.00

0.00

01.02.07

SUMINISTRO E INSTALACION DE TUBERIAS DE DESAGE DE 4"

269.15

10.95

2,947.19

0.00

0.00

884.16

2,063.03

0.00

0.00

0.00

0.00

0.00

01.02.08

SUMINISTRO E INSTALACION DE TUBERIAS DESAGE 2"

126.17

9.26

1,168.33

0.00

0.00

350.50

817.83

0.00

0.00

0.00

0.00

0.00

01.02.09

PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE

348.14

2.19

762.43

0.00

0.00

228.73

533.70

0.00

0.00

0.00

0.00

0.00

01.02.10

SUMIN. E INSTALACION SUMIDEROS DE BRONCE DE 2"

21.00

11.05

232.05

0.00

0.00

0.00

0.00

0.00

0.00

232.05

0.00

0.00

01.02.11

SUMIN. E INSTALACION REGISTROS ROSCADOS DE BRONCE DE 4"

10.00

17.42

174.20

0.00

0.00

0.00

0.00

0.00

0.00

174.20

0.00

0.00

01.02.12

SUMIN. E INSTALACION REGISTROS ROSCADOS DE BRONCE DE 2"

10.00

14.45

144.50

0.00

0.00

0.00

0.00

0.00

0.00

144.50

0.00

0.00

351.52

1.12

01.02.13

CODO PVC SAL DE 4" x 45

1.00

18.29

18.29

0.00

0.00

0.00

18.29

0.00

0.00

0.00

0.00

0.00

01.02.14

CODO PVC SAL DE 2" x 45

11.00

13.63

149.93

0.00

0.00

29.99

119.94

0.00

0.00

0.00

0.00

0.00

01.02.15

YEE PVC SAL DE 2"

49.00

15.75

771.75

0.00

0.00

115.76

655.99

0.00

0.00

0.00

0.00

0.00

01.02.16

YEE PVC SAL DE 4"

26.00

20.83

541.58

0.00

0.00

162.47

379.11

0.00

0.00

0.00

0.00

0.00

01.02.17

YEE PVC SAL DE 4" A 2"

14.00

20.83

291.62

0.00

0.00

58.32

233.30

0.00

0.00

0.00

0.00

0.00

01.02.18

CODO PVC SAL DE 4" x 2"

21.00

18.29

384.09

0.00

0.00

115.23

268.86

0.00

0.00

0.00

0.00

0.00

01.02.19

REDUCCION PVC SAL DE 4" A 2"

2.00

14.56

29.12

0.00

0.00

0.00

29.12

0.00

0.00

0.00

0.00

0.00

01.02.20

CAJA CIEGA DE CONCRETO 30 x 40 cm

2.00

176.97

353.94

0.00

0.00

0.00

0.00

353.94

0.00

0.00

0.00

0.00

01.02.21

CAJA DE REGISTRO DE DESAGE 30 x 60 cm

24.00

178.26

4,278.24

0.00

0.00

0.00

0.00

4,278.24

0.00

0.00

0.00

0.00

01.02.22

CAJA DE REGISTRO DE DESAGE 60 x 60 cm

6.00

179.77

1,078.62

0.00

0.00

0.00

0.00

0.00

1,078.62

0.00

0.00

0.00

01.02.23

CONEXIN A RED PUBLICA DE DESAGUE

1.00

1,527.84

1,527.84

0.00

0.00

0.00

0.00

0.00

1,527.84

0.00

0.00

0.00

01.03

SISTEMA DE AGUA

18,139.35

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

01.03.01

SALIDA DE AGUA FRIA CON TUBERIA DE PVC - SAP 1/2"

pto

64.00

54.68

3,499.52

0.00

0.00

349.95

3,149.57

0.00

0.00

0.00

0.00

0.00

01.03.02

EXCAVACION DE ZANJAS PARA TUBERIA 0.40 x 0.50

390.00

6.24

2,433.60

0.00

0.00

0.00

1,216.80

1,216.80

0.00

0.00

0.00

0.00

01.03.03

RELLENO Y COMPACTACION DE ZANJAS

m3

80.62

21.91

1,766.38

0.00

0.00

0.00

0.00

0.00

1,766.38

0.00

0.00

0.00

01.03.04

RED DE DISTRIBUCION TUBERIA DE 1/2" PVC - SAP

94.40

7.11

671.18

0.00

0.00

134.24

536.94

0.00

0.00

0.00

0.00

0.00

01.03.05

RED DE DISTRIBUCION TUBERIA DE 3/4" PVC - SAP

41.40

7.55

312.57

0.00

0.00

62.51

250.06

0.00

0.00

0.00

0.00

0.00

01.03.06

RED DE DISTRIBUCION TUBERIA DE 1" PVC - SAP

180.55

9.56

1,726.06

0.00

0.00

0.00

0.00

0.00

1,726.06

0.00

0.00

0.00

01.03.07

RED DE DISTRIBUCION TUBERIA DE 1 1/2" PVC - SAP

105.60

9.91

1,046.50

0.00

0.00

0.00

0.00

0.00

1,046.50

0.00

0.00

0.00

01.03.08

PRUEBA HIDRAULICA Y DESINDECCION

380.15

4.45

1,691.67

0.00

0.00

507.50

1,184.17

0.00

0.00

0.00

0.00

0.00

01.03.09

ACCESORIOS EN RED DE DISTRIBUCION DE AGUA

glb

1.00

1,823.53

1,823.53

0.00

0.00

547.06

1,276.47

0.00

0.00

0.00

0.00

0.00

01.03.10

VALVULA COMPUERTA DE 1/2" CON NICHO DE MADERA

19.00

75.55

1,435.45

0.00

0.00

287.09

1,148.36

0.00

0.00

0.00

0.00

0.00

01.03.11

VALVULA COMPUERTA DE 3/4"

1.00

62.07

62.07

0.00

0.00

12.41

49.66

0.00

0.00

0.00

0.00

0.00

01.03.12

VALVULA COMPUERTA DE 1"

3.00

68.84

206.52

0.00

0.00

0.00

0.00

0.00

206.52

0.00

0.00

0.00

01.03.13

VALVULA COMPUERTA 1 1/2"

2.00

86.63

173.26

0.00

0.00

0.00

0.00

0.00

173.26

0.00

0.00

0.00

01.03.14

VALVULA CHECK FG DE 1"

2.00

96.15

192.30

0.00

0.00

0.00

0.00

0.00

192.30

0.00

0.00

0.00

01.03.15

ACCESORIOS Y TUBERIA DE AGUA EN CISTERNA Y TANQUE ELEVADO

glb

1.00

451.01

451.01

0.00

0.00

0.00

451.01

0.00

0.00

0.00

0.00

0.00

01.03.16

CONEXIN DOMICILIARIA 1" A RED DE AGUA EXTERIOR

1.00

647.73

647.73

0.00

0.00

0.00

647.73

0.00

0.00

0.00

0.00

0.00

01.04

APARATOS SANITARIOS

14,698.56

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

01.04.01

INODORO TANQUE BAJO BLANCO, INC PAPELERA

24.00

175.97

4,223.28

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4,223.28

0.00

01.04.02

LAVATORIOS DE LOSA BLANCA

11.00

67.12

738.32

0.00

0.00

0.00

0.00

0.00

0.00

0.00

738.32

0.00

01.04.03

LAVATORIO OVALIN (47.5 X 42.0 CM.) O SIMILAR

14.00

145.39

2,035.46

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2,035.46

0.00

01.04.04

LAVATORIOS DE ACERO INOXIDABLE

9.00

240.14

2,161.26

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2,161.26

0.00

01.04.05

SUM. E INST. DUCHA CROMADA 1 LLAVE INC. ACC Y JABONER

5.00

86.52

432.60

0.00

0.00

0.00

0.00

0.00

0.00

0.00

432.60

0.00

01.04.06

URINARIO DE LOSA BCO TIPO PICO INC ACC

8.00

79.15

633.20

0.00

0.00

0.00

0.00

0.00

0.00

0.00

633.20

0.00

01.04.07

GRIFO DE 1/2" TIPO CUELLO DE CISNE

9.00

84.00

756.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

756.00

0.00

01.04.08

COLOCACION DE APARATOS SANITARIOS

66.00

56.34

3,718.44

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3,718.44

0.00

01.05

SISTEMA DE EVACUACION DE LLUVIAS

1,855.02

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

01.05.01

MONTANTE PARA BAJADA DE AGUA DE LLUVIA PVC SAL 4" EN EDIFICACIONES

pto

2.00

126.38

252.76

0.00

0.00

252.76

0.00

0.00

0.00

0.00

0.00

0.00

01.05.02

MONTANTE PARA BAJADA DE AGUA DE LLUVIA DE TUBERIA PVC SAL 4" EN PATIO DE F

pto

8.00

189.46

1,515.68

0.00

0.00

0.00

0.00

0.00

0.00

1,515.68

0.00

0.00

01.05.03

DADO DE PROTECCION PARA MONTANTE DE EVACUACION PLUVIAL 4"

m3

0.36

240.51

86.58

0.00

0.00

86.58

0.00

0.00

0.00

0.00

0.00

0.00

01

INSTALACIONES ELECTRICAS

200,061.95

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

01.01

MOVIMIENTO DE TIERRAS

7,776.32

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

01.01.01

EXCAVACION DE ZANJAS DE 1.25 x 0.84

233.70

1.96

458.05

0.00

0.00

0.00

0.00

458.05

0.00

0.00

0.00

0.00

01.01.02

EXCAVACION DE ZANJAS DE 0.70 x 0.50

392.20

1.96

768.71

0.00

0.00

0.00

0.00

461.23

307.48

0.00

0.00

0.00

01.01.03

REFINE DE ZANJA

233.70

1.38

322.51

0.00

0.00

0.00

0.00

0.00

322.51

0.00

0.00

0.00

01.01.04

REFINE DE ZANJA INCLUYE CAMA DE ARENA

392.20

3.28

1,286.42

0.00

0.00

0.00

0.00

1,286.42

0.00

0.00

0.00

0.00

01.01.05

RELLENO Y COMPACTADO DE ZANJA DE 1.25 x 0.84

233.70

8.42

1,967.75

0.00

0.00

0.00

0.00

1,967.75

0.00

0.00

0.00

0.00

01.01.06

RELLENO Y COMPACTADO MANUAL DE ZANJAS DE 0.70 x 0.50

392.20

7.58

2,972.88

0.00

0.00

0.00

0.00

2,972.88

0.00

0.00

0.00

0.00

01.02

CONDUCTORES DE ALIMENTACION

61,831.68

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

01.02.01

CABLE N2XOH-1Kv, 3 -1 x 35 mm2

10.40

28.22

293.49

0.00

0.00

0.00

0.00

0.00

0.00

0.00

293.49

0.00

01.02.02

CABLE N2XOH-1Kv, 1 x 16 mm2

10.40

13.52

140.61

0.00

0.00

0.00

0.00

0.00

0.00

0.00

140.61

0.00

01.02.03

CABLE N2XOH-1Kv, 3 -1 x 10 mm2

200.70

27.91

5,601.54

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5,601.54

0.00

01.02.04

CABLE N2XOH-1Kv, 2 -1 x 10 mm2

654.65

18.80

12,307.42

0.00

0.00

0.00

0.00

0.00

0.00

0.00

12,307.42

0.00

01.02.05

CABLE N2XOH-1Kv, 2 -1 x 6 mm2

1,052.13

11.36

11,952.20

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11,952.20

0.00

01.02.06

CABLE N2XOH-1Kv, 2 -1 x 4 mm2

79.10

14.12

1,116.89

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1,116.89

0.00

01.02.07

CABLE N2XOH-1Kv, 1 x 6 mm2

858.55

5.77

4,953.83

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4,953.83

0.00

01.02.08

CABLE N2XOH-1Kv, 1 x 4 mm2

209.70

6.97

1,461.61

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1,461.61

0.00

01.02.09

CABLE N2XOH-1Kv, 1 x 2.5 mm2

133.20

5.97

795.20

0.00

0.00

0.00

0.00

0.00

0.00

0.00

795.20

0.00

01.02.10

CABLE NLT-1Kv, 2 - 1 x 2.5 mm2

18.00

9.29

167.22

0.00

0.00

0.00

0.00

0.00

0.00

0.00

167.22

0.00

01.02.11

CABLE NH-80-1Kv, 2 - 1 x 6 mm2

18.00

9.29

167.22

0.00

0.00

0.00

0.00

0.00

0.00

0.00

167.22

0.00

01.02.12

SUMINISTRO E INSTALACION DE DUCTO PVC SAP DE 50 MM DIAM

10.70

6.22

66.55

0.00

0.00

0.00

0.00

66.55

0.00

0.00

0.00

0.00

01.02.13

SUMINISTRO E INSTALACION DE DUCTO PVC SAP DE 35 MM DIAM

187.35

5.07

949.86

0.00

0.00

0.00

0.00

949.86

0.00

0.00

0.00

0.00

01.02.14

SUMINISTRO E INSTALACION DE DUCTO PVC SAP DE 25 MM DIAM

476.80

3.91

1,864.29

0.00

0.00

0.00

0.00

1,864.29

0.00

0.00

0.00

0.00

01.02.15

SUMINISTRO E INSTALACION DE DUCTO PVC SAP DE 20 MM DIAM

71.20

3.57

254.18

0.00

0.00

0.00

0.00

254.18

0.00

0.00

0.00

0.00

01.02.16

SUMINISTRO E INSTALACION DE DUCTO DE CONCRETO DE CUATRO VIAS

285.75

65.36

18,676.62

0.00

0.00

0.00

0.00

18,676.62

0.00

0.00

0.00

0.00

01.02.17

SUMINISTRO E INSTALACION DE DUCTO DE CONCRETO DE DOS VIAS

23.70

44.85

1,062.95

0.00

0.00

0.00

0.00

1,062.95

0.00

0.00

0.00

0.00

01.03

CABLES Y CONDUCTORES SISTEMA ELECTRICO

13,665.23

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

01.03.01

SUMINISTRO E INSTALACION DE CONDUCTOR TIPO NH-80 6 mm2 UNIPOLAR

78.80

3.24

255.31

0.00

0.00

0.00

0.00

0.00

0.00

0.00

255.31

0.00

01.03.02

SUMINISTRO E INSTALACION DE CONDUCTOR TIPO NH-80 4.0 mm2 UNIPOLAR

1,472.00

2.88

4,239.36

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4,239.36

0.00

01.03.03

SUMINISTRO E INSTALACION DE CONDUCTOR TIPO NH-80 2.5 mm2 UNIPOLAR

4,094.00

2.24

9,170.56

0.00

0.00

0.00

0.00

0.00

0.00

0.00

9,170.56

0.00

01.04

TUBERIAS E INTERRUPTORES ELECTRICOS

20,483.90

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

01.04.01

PICADO Y RESANE DE MUROS Y PAREDES

74.00

5.84

432.16

0.00

0.00

432.16

0.00

0.00

0.00

0.00

0.00

0.00

01.04.02

SUMINISTRO E INSTALACION DE DUCTO PVC SAP DE 20 MM DIAM

2,397.00

3.57

8,557.29

0.00

0.00

1,711.46

6,845.83

0.00

0.00

0.00

0.00

0.00

01.04.03

SUMINISTRO E INSTALACION DE TOMACORRIENTES DOBLES C/T

155.00

24.78

3,840.90

0.00

0.00

0.00

0.00

0.00

0.00

3,840.90

0.00

0.00

01.04.04

SUMINISTRO E INSTALACION DE TOMACORRIENTES DOBLES C/T PARA PISO

155.00

35.14

5,446.70

0.00

0.00

0.00

0.00

0.00

0.00

5,446.70

0.00

0.00

01.04.05

SUMINISTRO E INSTALACION DE INTERRUPTOR SIMPLE UNIPOLAR

42.00

23.24

976.08

0.00

0.00

0.00

0.00

0.00

0.00

976.08

0.00

0.00

01.04.06

SUMINISTRO E INSTALACION DE INTERRUPTOR DOBLE UNIPOLAR

33.00

22.74

750.42

0.00

0.00

0.00

0.00

0.00

0.00

750.42

0.00

0.00

01.04.07

SUMINISTRO E INSTALACION DE INTERRUPTOR TRIPLE UNIPOLAR

1.00

40.67

40.67

0.00

0.00

0.00

0.00

0.00

0.00

40.67

0.00

0.00

01.04.08

SUMINISTRO E INSTALACION DE INTERRUPTOR DE CONMUTACION SIMPLE

4.00

43.08

172.32

0.00

0.00

0.00

0.00

0.00

0.00

172.32

0.00

0.00

01.04.09

SUMINISTRO E INSTALACION DE INTERRUPTOR DE CONMUTACION DOBLE

6.00

44.56

267.36

0.00

0.00

0.00

0.00

0.00

0.00

267.36

0.00

0.00

01.05

ARTEFACTOS DE ILUMINACION - LUMINARIAS

54,935.06

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

01.05.01

ARTEFACTO FLUORESCENTE 2 x 36 w

86.00

115.89

9,966.54

0.00

0.00

0.00

0.00

0.00

0.00

0.00

9,966.54

0.00

01.05.02

ARTEFACTO FLUORESCENTE 3 x 36 w

6.00

142.53

855.18

0.00

0.00

0.00

0.00

0.00

0.00

0.00

855.18

0.00

01.05.03

LAMPARA AHORRADORA DE ENERGIA 18 w

127.00

44.57

5,660.39

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5,660.39

0.00

01.05.04

FAROLA TIPO HONGO MODELO PFH 1 x 70 w, INC SUMINISTRO E IZAJE DE POSTE DE

26.00

966.14

25,119.64

0.00

0.00

0.00

0.00

0.00

0.00

0.00

25,119.64

0.00

01.05.05

REFLECTOR MODELO ZORUS CON LAMPARA DE 400 W, INC SUMINISTRO E IZAJE DE P

4.00

1,788.26

7,153.04

0.00

0.00

0.00

0.00

0.00

0.00

0.00

7,153.04

0.00

01.05.06

REFLECTOR CON LAMPARA DE 70 W VAP DE SODIO EN PATIO DE FORMACION

8.00

383.66

3,069.28

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3,069.28

0.00

01.05.07

VENTILADORES DE TECHO

7.00

300.74

2,105.18

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2,105.18

0.00

01.05.08

CONTROLADOR DE VENTILADOR

7.00

109.63

767.41

0.00

0.00

0.00

0.00

0.00

0.00

0.00

767.41

0.00

01.05.09

TIMBRE PULSADOR

2.00

119.20

238.40

0.00

0.00

0.00

0.00

0.00

0.00

0.00

238.40

0.00

01.06

VOZ Y DATA

8,780.96

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

01.06.01

EQUIPO UPS SEGN ESPECIFICACIONES

2.00

2,234.62

4,469.24

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4,469.24

0.00

01.06.02

SUMINISTRO E INSTALACION DE CABLE UTP CAT 5E BELDEN

396.00

2.13

843.48

0.00

0.00

0.00

0.00

0.00

0.00

0.00

843.48

0.00

01.06.03

SUMINISTRO E INSTALACION DE TOMAS DE TELEFONO

1.00

31.16

31.16

0.00

0.00

0.00

0.00

0.00

0.00

0.00

31.16

0.00

01.06.04

SWITCH PRINCIPAL DE RED DE 8 PUERTOS

2.00

136.42

272.84

0.00

0.00

0.00

0.00

0.00

0.00

0.00

272.84

0.00

01.06.05

SWITCH SECUNDARIOS DE RED DE 12 PUERTOS

4.00

164.62

658.48

0.00

0.00

0.00

0.00

0.00

0.00

0.00

658.48

0.00

01.06.06

SUMINISTRO E INSTALACION DE TOMA DE DATA

pto

44.00

53.54

2,355.76

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2,355.76

0.00

01.06.07

ACOMETIDA EXTERIOR PARA TELEFONO E INTERNET

1.00

150.00

150.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

150.00

0.00

01.07

EQUIPOS DE MANIOBRA Y PROTECCION

18,292.52

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

01.07.01

TABLEROS ELECTRICOS

9,679.56

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

01.07.01.01 TABLERO GENERAL 380 V, TRIFASICO (TG)

1.00

715.61

715.61

0.00

0.00

0.00

0.00

0.00

0.00

0.00

715.61

0.00

01.07.01.02 TABLERO TD-01 220 V, MONOFASICO

1.00

715.61

715.61

0.00

0.00

0.00

0.00

0.00

0.00

0.00

715.61

0.00

01.07.01.03 TABLERO TD-02 220 V , MONOFASICO

1.00

715.61

715.61

0.00

0.00

0.00

0.00

0.00

0.00

0.00

715.61

0.00

01.07.01.04 TABLERO TD-03 220 V, MONOFASICO

1.00

715.61

715.61

0.00

0.00

0.00

0.00

0.00

0.00

0.00

715.61

0.00

01.07.01.05 TABLERO TD-04 380 V, TRIFASICO

1.00

855.61

855.61

0.00

0.00

0.00

0.00

0.00

0.00

0.00

855.61

0.00

01.07.01.06 TABLERO TD-05 220 V, MONOFASICO

1.00

715.61

715.61

0.00

0.00

0.00

0.00

0.00

0.00

0.00

715.61

0.00

01.07.01.07 TABLERO TD-06 220 V, MONOFASICO

1.00

715.61

715.61

0.00

0.00

0.00

0.00

0.00

0.00

0.00

715.61

0.00

01.07.01.08 TABLERO TD-07 220 V, MONOFASICO

1.00

715.61

715.61

0.00

0.00

0.00

0.00

0.00

0.00

0.00

715.61

0.00

01.07.01.09 TABLERO TD-08 220 V, MONOFASICO

1.00

715.61

715.61

0.00

0.00

0.00

0.00

0.00

0.00

0.00

715.61

0.00

01.07.01.10 TABLERO TD-09 380 V, TRIFASICO

1.00

952.24

952.24

0.00

0.00

0.00

0.00

0.00

0.00

0.00

952.24

0.00

01.07.01.11 TABLERO TD-10 220 V, MONOFASICO

1.00

715.61

715.61

0.00

0.00

0.00

0.00

0.00

0.00

0.00

715.61

0.00

01.07.01.12 TABLERO TD-11 220 V, MONOFASICO

1.00

715.61

715.61

0.00

0.00

0.00

0.00

0.00

0.00

0.00

715.61

0.00

01.07.01.13 SUBTABLERO STD-BB 220 V, MONOFASICO

1.00

715.61

715.61

0.00

0.00

0.00

0.00

0.00

0.00

0.00

715.61

0.00

1,870.02

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

01.07.02

INTERRUPTORES TERMOMAGNETICOS DE CAJA MOLDEADA

01.07.02.01 SUMINISTRO E INSTALACION DE INTERRUPTOR TERMOMAGNETICO DE 3 x 100 A, CAJ

1.00

268.45

268.45

0.00

0.00

0.00

0.00

0.00

0.00

0.00

268.45

0.00

01.07.02.02 SUMINISTRO E INSTALACION DE INTERRUPTOR TERMOMAGNETICO DE 3 x 40 A, CAJA

2.00

208.90

417.80

0.00

0.00

0.00

0.00

0.00

0.00

0.00

417.80

0.00

01.07.02.03 SUMINISTRO E INSTALACION DE INTERRUPTOR TERMOMAGNETICO DE 3 x 30 A, CAJA

1.00

208.90

208.90

0.00

0.00

0.00

0.00

0.00

0.00

0.00

208.90

0.00

01.07.02.04 SUMINISTRO E INSTALACION DE INTERRUPTOR TERMOMAGNETICO DE 2 x 40 A, CAJA

1.00

98.96

98.96

0.00

0.00

0.00

0.00

0.00

0.00

0.00

98.96

0.00

01.07.02.05 SUMINISTRO E INSTALACION DE INTERRUPTOR TERMOMAGNETICO DE 2 x 30 A, CAJA

5.00

78.96

394.80

0.00

0.00

0.00

0.00

0.00

0.00

0.00

394.80

0.00

01.07.02.06 SUMINISTRO E INSTALACION DE INTERRUPTOR TERMOMAGNETICO DE 2 x 25 A, CAJA

3.00

160.37

481.11

0.00

0.00

0.00

0.00

0.00

0.00

0.00

481.11

0.00

4,187.36

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

01.07.03

INTERRUPTORES TERMOMAGNETICOS DEL TIPO ATORNILLABLES

01.07.03.01 SUMINISTRO E INSTALACION DE INTERRUPTOR TERMOMAGNETICO ATORNILLABLE DE 3 u

1.00

182.76

182.76

0.00

0.00

0.00

0.00

0.00

0.00

0.00

182.76

0.00

01.07.03.02 SUMINISTRO E INSTALACION DE INTERRUPTOR TERMOMAGNETICO ATORNILLABLE DE 3 u

1.00

182.76

182.76

0.00

0.00

0.00

0.00

0.00

0.00

0.00

182.76

0.00

01.07.03.03 SUMINISTRO E INSTALACION DE INTERRUPTOR TERMOMAGNETICO ATORNILLABLE DE 3 u

3.00

162.76

488.28

0.00

0.00

0.00

0.00

0.00

0.00

0.00

488.28

0.00

01.07.03.04 SUMINISTRO E INSTALACION DE INTERRUPTOR TERMOMAGNETICO ATORNILLABLE DE 2 u

6.00

98.96

593.76

0.00

0.00

0.00

0.00

0.00

0.00

0.00

593.76

0.00

01.07.03.05 SUMINISTRO E INSTALACION DE INTERRUPTOR TERMOMAGNETICO ATORNILLABLE DE 2 u

7.00

63.96

447.72

0.00

0.00

0.00

0.00

0.00

0.00

0.00

447.72

0.00

01.07.03.06 SUMINISTRO E INSTALACION DE INTERRUPTOR TERMOMAGNETICO ATORNILLABLE DE 2 u

20.00

58.96

1,179.20

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1,179.20

0.00

01.07.03.07 SUMINISTRO E INSTALACION DE INTERRUPTOR TERMOMAGNETICO ATORNILLABLE DE 2 u

24.00

46.37

1,112.88

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1,112.88

0.00

2,287.12

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2,287.12

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2,287.12

0.00

268.46

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

268.46

0.00

0.00

0.00

0.00

0.00

0.00

0.00

268.46

0.00

4,795.55

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

01.07.04

INTERRUPTORES DIFERENCIALES

01.07.04.01 SUMINISTRO E INSTALACION DE INTERRUPTOR DIFERENCIAL DE 2 x 20 A


01.07.05

22.00

103.96

INTERRUPTORES HORARIOS

01.07.05.01 SUMINISTRO E INSTALACION DE INTERRUPTOR HORARIO

2.00

134.23

01.08

PUESTA A TIERRA

01.08.01

EXCAVACION DE AGUJERO PARA PUESTA A TIERRA

6.00

53.09

318.54

0.00

0.00

0.00

0.00

0.00

0.00

0.00

318.54

0.00

01.08.02

INSTALACION DEL POZO DE CONEXIN A TIERRA TIPO P1

1.00

733.19

733.19

0.00

0.00

0.00

0.00

0.00

0.00

0.00

733.19

0.00

01.08.03

INSTALACION DEL POZO DE CONEXIN A TIERRA TIPO P2

6.00

561.11

3,366.66

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3,366.66

0.00

01.08.04

RELLENO COMPACTACION DE LA PUESTA A TIERRA

7.00

53.88

377.16

0.00

0.00

0.00

0.00

0.00

0.00

0.00

377.16

0.00

01.09

ELECTROBOMBA Y ACCESORIOS

2,665.69

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

01.09.01

ELECTROBOMBA ALTO RENDIMIENTO 0.75 HP

2.00

743.50

1,487.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1,487.00

0.00

01.09.02

TABLERO DE PROTECCION, OPERACIN Y MANDO

1.00

1,178.69

1,178.69

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1,178.69

0.00

01.10

ACOMETIDA ELECTRICA INCLUIDO MEDIDOR DE ENERGIA ACTIVA

900.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

01.10.01

ACOMETIDA EXTERIOR DE ENOSA

900.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

900.00

1,000.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1,000.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1,000.00

0.00

4,935.04

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

glb

1.00

900.00

01.11

PRUEBAS Y PUESTA DE SERVICIO

01.11.01

PRUEBA Y PUESTA DE SERVICIO DE LAS INSTALACIONES ELECTRICAS DE BAJA TENSIO glb

1.00

1,000.00

01.12

OTROS

01.12.01

EXCAVACION DE ZANJAS PARA CAJA DE PASE

16.00

48.44

775.04

0.00

0.00

0.00

0.00

775.04

0.00

0.00

0.00

01.12.02

CAJAS DE PASO DE CONCRETO ARMADO PARA CABLEADO ELECTRICO

16.00

260.00

4,160.00

0.00

0.00

0.00

0.00

4,160.00

0.00

0.00

0.00

0.00

2,983,039.06

114,745.92

294,246.84

279,082.59

278,944.29

398,681.14

688,440.80

591,082.04

322,274.49

15,540.97

GASTOS GENERALES (10%)

298,303.91

11,474.59

29,424.68

27,908.26

27,894.43

39,868.11

68,844.08

59,108.20

32,227.45

1,554.10

UTILIDAD (10%)

298,303.91

11,474.59

29,424.68

27,908.26

27,894.43

39,868.11

68,844.08

59,108.20

32,227.45

1,554.10

3,579,646.88

137,695.10

353,096.21

334,899.11

334,733.15

478,417.36

826,128.96

709,298.45

386,729.39

18,649.16

COSTO DIRECTO

SUB TOTAL
I.G.V. (18%)
PRESUPUESTO TOTAL

Item

Descripcin

Und.

Metrado

Precio S/.

644,336.44

24,785.12

63,557.32

60,281.84

60,251.97

86,115.13

148,703.21

127,673.72

69,611.29

3,356.85

4,223,983.32

162,480.22

416,653.52

395,180.95

394,985.11

564,532.49

974,832.18

836,972.17

456,340.68

22,006.01

3.85%

9.86%

9.36%

9.35%

13.36%

23.08%

19.81%

10.80%

0.52%

1 MES
DEL 12
AL 31
MARZO
2013

2 MES
DEL 01 AL
30 ABRIL
2013

3 MES
DEL 01
AL 31
MAYO
2013

4 MES
DEL 01 AL
30 JUNIO
2013

5 MES
DEL 01
AL 31
JULIO
2013

Parcial S/.

6 MES
7 MES
8 MES
9 MES
DEL 01 DEL 01 AL DEL 01 AL DEL 01 AL
AL 31
30
31
06
AGOSTO SETIEMBR OCTUBRE NOVIEMBR
2013
E 2013
2013
E 2013

01.00

AMBIENTES PEDAGOGICOS

01.01

AULAS COMUNES

01.01.01

adquisicin de carpetas unipersonales de estructura de metlica y tablero de madera revestido pza

400.00

93.22

37,288.14

0.00

0.00

0.00

0.00

0.00

0.00

0.00

27,966.10

9,322.03

01.01.02

Rehabilitacin de carpetas unipersonales de estructura metlica y tablero de madera(2 aulas=4 pza

80.00

55.08

4,406.78

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3,305.08

1,101.69

01.01.03

adquisicin mobiliario de madera para docentes ( 1pupitre + 1 silla)

12.00

474.58

5,694.92

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4,271.19

1,423.73

01.02

LABORATORIOS, TALLERES Y BIBLIOTECA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

01.02.01

Laboratorio de Qumica, Biologa y Fsica

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

mod.

01.02.01.01 adquisicin de estantes metlicos de angulos ranurados

pza

4.00

330.51

1,322.03

0.00

0.00

0.00

0.00

0.00

0.00

0.00

991.53

330.51

01.02.01.02 Adquisicin de mobiliario para alumnos (taburete de estruc. Metlica y asiento de madera)

pza

40.00

279.66

11,186.44

0.00

0.00

0.00

0.00

0.00

0.00

0.00

8,389.83

2,796.61

01.02.01.03 Adquisicin mobiliario de madera, para docente ( 1pupitre + 1 silla)

mod

1.00

474.58

474.58

0.00

0.00

0.00

0.00

0.00

0.00

0.00

355.93

118.64

01.02.01.04 Adquisicin de armario metlico

pza

1.00

508.47

508.47

0.00

0.00

0.00

0.00

0.00

0.00

0.00

381.36

127.12

01.02.01.05 Equipo de laboratorio de qumica ( 2 telescopios, 2 balanzas, tubo de ensayo, mechero de gas, glob

1.00

1,525.42

1,525.42

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1,144.07

381.36

01.02.01.06 Equipo para gas (baln, manguera, vlvulas )

1.00

567.80

567.80

0.00

0.00

0.00

0.00

0.00

0.00

0.00

425.85

141.95

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2,542.37

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1,906.78

635.59

01.02.02

glob.

Sala de Usos Mltiples

01.02.02.01 Adquisicin de caballetes de madera, para sesiones de Arte

pza

25.00

101.69

01.02.02.02 adquisicin de mobiliario de madera para docentes ( 1pupitre + 1 silla)


01.02.02.03 Adquisicin de sillas de madera

mod

1.00

474.58

474.58

0.00

0.00

0.00

0.00

0.00

0.00

0.00

355.93

118.64

pza

40.00

76.27

3,050.85

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2,288.14

762.71

01.02.02.04 adquisicin de estantes metlicos de angulos ranurados

pza

3.00

330.51

991.53

0.00

0.00

0.00

0.00

0.00

0.00

0.00

743.64

247.88

01.02.02.05 Adquisicin de armario metlico

pza

2.00

508.47

1,016.95

0.00

0.00

0.00

0.00

0.00

0.00

0.00

762.71

254.24

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

01.02.03

Sala de Computo

01.02.03.01 Adquisicin de computadora personal

unid

41.00

1,211.86

49,686.44

0.00

0.00

0.00

0.00

0.00

0.00

0.00

37,264.83

12,421.61

01.02.03.02 adquisicin de mdulos(mueble+silla) de estructura metlica para computadora

mod

41.00

398.31

16,330.51

0.00

0.00

0.00

0.00

0.00

0.00

0.00

12,247.88

4,082.63

01.02.03.03 adquisicin de impresora multifuncional

unid

1.00

135.59

135.59

0.00

0.00

0.00

0.00

0.00

0.00

0.00

101.69

33.90

01.02.03.04 Adquisicin de mesa chica de madera para impresora multifuncional

pza

1.00

211.86

211.86

0.00

0.00

0.00

0.00

0.00

0.00

0.00

158.90

52.97

01.02.03.05 adquisicin de equipo para aire acondicionado

unid

2.00

5,074.45

10,148.90

0.00

0.00

0.00

0.00

0.00

0.00

0.00

7,611.68

01.02.03.06 adquisicin de armario metlico

pza

1.00

508.47

508.47

0.00

0.00

0.00

0.00

0.00

0.00

0.00

381.36

127.12

01.02.03.07 Software Windows

unid

45.00

355.93

16,016.95

0.00

0.00

0.00

0.00

0.00

0.00

0.00

12,012.71

4,004.24

01.02.03.08 Software Antivirus

Glob

1.00

1,525.42

1,525.42

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1,144.07

381.36

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1,211.86

0.00

0.00

0.00

0.00

0.00

0.00

0.00

908.90

302.97

01.02.04

Sala de Video

01.02.04.01 Adquisicin de computadora personal

unid

1.00

01.02.04.02 adquisicin de mdulos(mueble+silla) de estructura metlica para computadora

mod

1.00

398.31

398.31

0.00

0.00

0.00

0.00

0.00

0.00

0.00

298.73

99.58

01.02.04.03 adquisicin de proyector multimedia

pza

1.00

1,627.12

1,627.12

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1,220.34

406.78

01.02.04.04 adquisicin de ECRAN

pza

1.00

135.59

135.59

0.00

0.00

0.00

0.00

0.00

0.00

0.00

101.69

33.90

01.02.04.05 adquisicin de equipo de sonido

unid

1.00

677.12

677.12

0.00

0.00

0.00

0.00

0.00

0.00

0.00

507.84

169.28

01.02.04.06 adquisicin de silla de estructura metlica

pza

40.00

76.27

3,050.85

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2,288.14

762.71

01.02.04.07 adquisicin de armario metlico

pza

1.00

508.47

508.47

0.00

0.00

0.00

0.00

0.00

0.00

0.00

381.36

127.12

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

01.02.05

1,211.86

2,537.23

BIBLIOTECA

01.02.05.01 Adquisicin de mobiliario de madera para lectura (1mesa grande + 6 sillas)

mod

6.00

1,033.90

6,203.39

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4,652.54

1,550.85

01.02.05.02 adquisicin de estantes metlicos de angulos ranurados

pza

6.00

330.51

1,983.05

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1,487.29

495.76

01.02.05.03 adquisicin de armario metlico

pza

1.00

508.47

508.47

0.00

0.00

0.00

0.00

0.00

0.00

0.00

381.36

127.12

01.02.05.04 adquisicin de escritorio metlico para auxiliar de biblioteca

pza

1.00

398.31

398.31

0.00

0.00

0.00

0.00

0.00

0.00

0.00

298.73

99.58

01.02.05.05 Adquisicin de silla de estructura metlica para escritorio

pza

1.00

76.27

76.27

0.00

0.00

0.00

0.00

0.00

0.00

0.00

57.20

19.07

01.02.05.06 Adquisicin de silla de estructura de metlica adicionales para biblioteca

pza

3.00

76.27

228.81

0.00

0.00

0.00

0.00

0.00

0.00

0.00

171.61

57.20
0.00

02.00

AMBIENTES COMPLEMENTARIOS

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

02.01

OBE, TOPICO Y PSICOLOGA , APAFA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

02.01.01

adquisicin de escritorio metlico para OBE

pza

1.00

99.58

02.01.02

Adquisicin de silla de estructura metlica para escritorio OBE

pza

02.01.03

Adquisicin de camilla para tpico

pza

02.01.04

Adquisicin de mesa bipersonal de madera para tpico y psicologa

02.01.05

Adquisicin de silla de estructura metlica para tpico y psicologa

02.01.06

398.31

398.31

0.00

0.00

0.00

0.00

0.00

0.00

0.00

298.73

3.00

76.27

228.81

0.00

0.00

0.00

0.00

0.00

0.00

0.00

171.61

57.20

1.00

491.53

491.53

0.00

0.00

0.00

0.00

0.00

0.00

0.00

368.64

122.88

pza

2.00

406.78

813.56

0.00

0.00

0.00

0.00

0.00

0.00

0.00

610.17

203.39

pza

6.00

76.27

457.63

0.00

0.00

0.00

0.00

0.00

0.00

0.00

343.22

114.41

Adquisicin de botiqun de madera para tpico

pza

1.00

50.85

50.85

0.00

0.00

0.00

0.00

0.00

0.00

0.00

38.14

12.71

02.01.07

kit de reactivos de primeros auxilios (botiqun)

kit

1.00

42.37

42.37

0.00

0.00

0.00

0.00

0.00

0.00

0.00

31.78

10.59

02.01.08

Adquisicin de mueble fijo para lavadero en tpico

pza

1.00

203.39

203.39

0.00

0.00

0.00

0.00

0.00

0.00

0.00

152.54

50.85

02.01.09

Adquisicin de armario metlico para psicologa

pza

1.00

508.47

508.47

0.00

0.00

0.00

0.00

0.00

0.00

0.00

381.36

127.12

02.01.10

Adquisicin de biombo metlico de 2 cuerpos para tpico

pza

1.00

194.92

194.92

0.00

0.00

0.00

0.00

0.00

0.00

0.00

146.19

48.73

02.01.11

Adquisicin de escalinata metlica de 2 peldaos para tpico

pza

1.00

118.64

118.64

0.00

0.00

0.00

0.00

0.00

0.00

0.00

88.98

29.66

02.01.12

Adquisicin de vitrina de estructura metlica

pza

1.00

550.85

550.85

0.00

0.00

0.00

0.00

0.00

0.00

0.00

413.14

137.71

02.01.13

Adquisicin de mesa bipersonal de madera para APAFA

pza

1.00

406.78

406.78

0.00

0.00

0.00

0.00

0.00

0.00

0.00

305.08

101.69

02.01.14

Adquisicin de silla de estructura metlica para PAFA

pza

2.00

76.27

152.54

0.00

0.00

0.00

0.00

0.00

0.00

0.00

114.41

38.14

02.02

SALA DE PROFESORES

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

02.02.01

Adquisicin de mobiliario (1mesa grande + 10 sillas) de madera

mod

2.00

1,338.98

2,677.97

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2,008.47

669.49

02.02.02

adquisicin de estantes de ngulo ranurados para sala de profesores

pza

1.00

330.51

330.51

0.00

0.00

0.00

0.00

0.00

0.00

0.00

247.88

82.63

02.02.03

adquisicin de armario metlico para sala de profesores

pza

1.00

508.47

508.47

0.00

0.00

0.00

0.00

0.00

0.00

0.00

381.36

127.12

03.00

AMBIENTES ADMINISTRATIVOS

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

03.01

adquisicin de escritorio metlico para Direccin, Sub direccin y secretara

pza

3.00

398.31

1,194.92

0.00

0.00

0.00

0.00

0.00

0.00

0.00

896.19

298.73

03.02

Adquisicin de sillas de estructura metlica

pza

10.00

76.27

762.71

0.00

0.00

0.00

0.00

0.00

0.00

0.00

572.03

190.68

03.03

adquisicin de equipo de cmputo para secretaria

unid

1.00

1,211.86

1,211.86

0.00

0.00

0.00

0.00

0.00

0.00

0.00

908.90

302.97

03.04

Adq. de mdulos(mueble+silla) de estructura metlica para computadora de secretaria

mod

1.00

398.31

398.31

0.00

0.00

0.00

0.00

0.00

0.00

0.00

298.73

99.58

03.05

adquisicin de impresora multifuncional

pza

1.00

135.59

135.59

0.00

0.00

0.00

0.00

0.00

0.00

0.00

101.69

33.90

03.06

Adq. estantes de ngulo ranurados para direccin , sub direccin y secretaria

pza

3.00

330.51

991.53

0.00

0.00

0.00

0.00

0.00

0.00

0.00

743.64

247.88

03.07

adquisicin de armario metlico para direccin , sub direccin y secretaria

pza

3.00

508.47

1,525.42

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1,144.07

381.36

03.08

Adq. estantes de ngulo ranurados para deposito administrativo

pza

3.00

330.51

991.53

0.00

0.00

0.00

0.00

0.00

0.00

0.00

743.64

247.88

04.00

AMBIENTES DE SERVICIOS

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

04.01

adquisicin de estante metlico de ngulo ranurados para deposito

pza

3.00

330.51

991.53

0.00

0.00

0.00

0.00

0.00

0.00

0.00

743.64

247.88

04.02

Adquisicin de mesa grande de estructura de madera para maestranza

pza

1.00

576.27

576.27

0.00

0.00

0.00

0.00

0.00

0.00

0.00

432.20

144.07

04.03

adquisicin de estante metlico de ngulo ranurados para maestranza limpieza

unid

2.00

330.51

661.02

0.00

0.00

0.00

0.00

0.00

0.00

0.00

495.76

165.25

04.04

adquisicin de mesa bi personal de madera para caseta de guardiana

pza

1.00

406.78

406.78

0.00

0.00

0.00

0.00

0.00

0.00

0.00

305.08

101.69

04.05

adquisicin de silla de estructura metlica para caseta de guardiana

pza

1.00

76.27

76.27

0.00

0.00

0.00

0.00

0.00

0.00

0.00

57.20

19.07

200,681.95

150,511.46

50,170.49

3,000.00

2,250.00

750.00

203,681.95

152,761.46

50,920.49

COSTO DIRECTO
GASTOS GENERALES (1.494903%)
SUB TOTAL

IGV (18.00%)
TOTAL PRESUPUESTO

PROYECTADO DEL MONTO TOTAL (S/. 4'464,328.01)

36,662.75

27,497.06

9,165.69

240,344.70

180,258.53

60,086.18

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

75.00%

25.00%

3.64%

9.33%

8.85%

8.85%

12.65%

21.84%

18.75%

14.26%

1.84%

You might also like