You are on page 1of 5

=

HERR.=
G.G=
SUBTOTAL=
DESCRIPCION DEL ELEMENTO
MANO DE OBRA
ACERO LISO
ACERO CORRUGADO
AGREGADO FINO
AGREGADO GRUESO
APARATOS SANITARIOS CON GRIFERIA
CEMENTO PORTLAND I
DLAR
HORMIGON
IGPC
MADERA TERCIADA
MADERA NAC. ENCOFRADO
MAQUINARIA NACIONAL
MAQUINARIA IMPORTADA
HERRAMIENTA MANUAL
=

145145.420
7257.270
13976.340
166379.030
CODIGO
47
2
3
4
5
10
21
30
38
39
45
43
48
49
37

MONTO
60,056.710
2,345.680
22,353.200
1,426.840
2,581.810
245.820
18,574.710
567.030
6,218.240
215.370
218.810
7,955.870
9,209.860
10,121.650
24,287.430
166379.030

% INCIDENCIA
0.361
0.014
0.134
0.009
0.016
0.001
0.112
0.003
0.037
0.001
0.001
0.048
0.055
0.061
0.146

AGRUPAMIENTO

02 + 30
-

04+05
-

45+37
48
1.000
0

% INCID. FINAL
0.361
0
0.152
0
0
0.112
0
0.061
0.02
0
0
0.203
0.116
0
1.025

ELEMENTOS
MANO DE OBRA
ACERO CORRUGADO
MAQ. NACIONAL
MAQ. IMPORTADA
CEMENTO PORTLAND
HORMIGON
GASTOS GENERALES Y UTIL.

K=0.361(Jo/Jr)+0.152

SIMBOLO
J
A

COEF. INCID.
0.361
0.152

MM
C

0.285
0.112

% DE INCID (F)
100.0%
100.0%
19.3%
80.7%
100.0%

H
GG

0.07
0.02

100.0%
100.0%

FORMULA POLINOMICA

0.361(Jo/Jr)+0.152(Ao/Ar)+0.285(Mmo/MMr)+0.112(Co/Cr)+0.07(Ho/Hr)+0.02(Ggo/GGr)