Advantages of using Reliable Steels Cut 'n' Bent bars
• Consistent Quality and Accuracy: Through precise cutting and bending with the help of Automatic Rebar Processing Plant.
• Lower material costs : By ordering
• precise quantity required
• Less wastage : Pre-cut bars eliminate wastage caused by on-side cutting of standard length bars
• Lower warehousing cost: Cut 'n' Bent bars can be ordered using a (JIT) ‘just in time’ method of inventory.
• Reduced space requirement on-site : Through elimination of on-site bar cutting and bending
• Quicker construction : Manual cutting & bending of bars is unprofessional and slow
Advantages of using Reliable Steels Cut 'n' Bent bars
• Consistent Quality and Accuracy: Through precise cutting and bending with the help of Automatic Rebar Processing Plant.
• Lower material costs : By ordering
• precise quantity required
• Less wastage : Pre-cut bars eliminate wastage caused by on-side cutting of standard length bars
• Lower warehousing cost: Cut 'n' Bent bars can be ordered using a (JIT) ‘just in time’ method of inventory.
• Reduced space requirement on-site : Through elimination of on-site bar cutting and bending
• Quicker construction : Manual cutting & bending of bars is unprofessional and slow
Advantages of using Reliable Steels Cut 'n' Bent bars
• Consistent Quality and Accuracy: Through precise cutting and bending with the help of Automatic Rebar Processing Plant.
• Lower material costs : By ordering
• precise quantity required
• Less wastage : Pre-cut bars eliminate wastage caused by on-side cutting of standard length bars
• Lower warehousing cost: Cut 'n' Bent bars can be ordered using a (JIT) ‘just in time’ method of inventory.
• Reduced space requirement on-site : Through elimination of on-site bar cutting and bending
• Quicker construction : Manual cutting & bending of bars is unprofessional and slow
(OFFICE OF THE ENGINEER-IN-CHIEF (CIVIL)
‘ODISHA, BHUBANESWAR,
Gey
(Ne, GTIM-(Mise}2/09 26e9F mm 05-614
Fam
‘Sn $ Meher,
Engineer-m-Chie (Civil) Odishet
1 ‘
Thecll Superintending Ergincers/Executive Engineers
under (RB) Wieg (except al SEs/EEs ofthis office).
‘Sub: Test remit of Reinforcement TIT Bars of Relicle Sponge Pvt Ld
Sie,
(With reference to the subject cited cbove, tis to send herenith the test result of,
Reinfercement TMT Steel Sars (Physical) submitted by the Reliable Sponge Prt. Lta.
Cempary for your reference end necessery action at your end .
In this connection it may be nated thet, the compary hada technical presentotin of
‘their preductafethis office ov 11.3.2014,
Encl: Test resull-IN,
Heron, HBAS yy
Copy forwarded to Sri . General Manager, Dua. Complex Pengosh Read
Rourkula-768004, Dist. Sundargarh fer infermation and necessery action,
i
FNSINEER-IN-cHreR(caVL)ODESHAOFFICE OF THE CHIEF ENGINEER
Research Development & Quality Promotion (R&B)
Bhubaneswar
‘TEST RESULT OF REINFORCEMENT STEEL BARS
308 No: $1-79/8-37/150834/ 13
BeQUIGI TIONING OFFICE: Gree Merger, eile Synge Ld ert, Dit.
Sandergarh (Ose)
LETTER Na enseo5i4
WOR REFERENCE: Testing of Reliable Stee! TAT bers.
Date recep of specimens 15.0516
ree trare spr ts 0, 15.1786.) 7
Ber] Rint tec |Parenge | Teale] Val ead
Me [ne |Gonerer [3 area logtin | Stengh | stress | Stel as | Rebed et
aftarsaryer [inn | ivan? | Nant | per
| (Esse
a 5 is [3
3s) wo Fe | Seaton
0 _| uo te
Tass | ira] tenor | 28922 | Feb | Sead
rs | o_ | eszat_| 54370 |
inner [ iso] e571 | 85730 | Fest | Satan |
tise | we | apes | sarzs_ | oe |
wwase | eno” [eats _| S440 | Feo0d | Stacey |
15799 | 210 | e465 "| s4548_| oe |
svar | a00 | e258 | tans | Fe-3005| Staley |
soass|_z20__| 8074 | 54066 | do a
Tweet cewsngis [> TB Fe sere | WB ere]
rsieezoku) ag fas |asare |
rere |tontere [ao | |
ti |e | ote re | }
teres [ater |sooare |
titers [am 509 |
| 000 |e frFes | 0 a
iaree | «| oate
‘WS forFe | 985 forFe | 5500 |
| 200/550 | clarke | |
\ 10 fer Fe-b00 | 600fee Fes | 600 |
itt a]
Remarks 1) Above Five sets of steel bors ore sotifing the regarement as per
1.51786-2008 with respect to Tease Strength, Vild Strength and Percentge of
Ehongction The grade of stel indicated in CoB. ~
2) Chemical enlysis os per 15:1786 maybe supplemented cong with it.
3) The test result reletes to the above sanple received in this Laboratory. This
Lebortery isnot responsible fer the result of siilar other samples tested inthis
Lebocatery or any ether Labsratey,
pee OF LoS
Tech Asst esearg Deputy Director ResearchOFFICE OF THE ENGINEER-IN-CHIEF(CIVIL)ODISHA.
(651
No.GM-OMtise)-2709- 5 9.7 32"*"Dated.phadaneswarthe 7S FR agus, 2014
From
Shri S Meher,
Engincerin-Chief{Civil)Odisha
To
‘The Chief Engineer (DPI & Roads)/World Bank Projects/National Highways
Directorate of Designy’R.D. & Q.P./Chief Manager(Techiical) e-Procurement
Cell(Chief Architect, Odisha/Managing Director, .B. & C.C. Ltd /Chief Enginces,
‘OSH.B/Chief Engineer, Odisha State Police Housing Welfare Corporation/Chiet
Engineer, B.D.A/Chief Engineer, IDCO, Odishi/Chief Engineer, OPEPA/Chief
Engineer, Rural Works-I/iV/Odisho, Bhubaneswar/All SEs and E.Es under R&B Wing
(except all S.ES/E.Es of ths office),
Sub:= Test result of Reinforcement TMT Bars of Reliable Sponge Pvt. Led.
sir,
4a contnuation ofthis office eter No.26897 d.05,06.2014, on the above cited subject,
it ist enclose herewith the Test results of Reinforcement TMT Stccl burs submited by the Reliable
Sponge Pvt. Lid. technical presentation was conducted by the company on 1 3.2014 in this regard.
Basing on the test results Reliable TMT Steel bars may be recommended for use in the
‘departmental/construction jobs.
Youre ly.
Dek Ta ett
Fite
MemoNo. 39433 mated. 28
Copy forwarded to Sri RK. Dash, Soeral Manager, Dusi Complex, Panposh Road,
Rourkela-769004, Dist-Sundargarh for information and necessary action with reference to this offie
‘Memo No,26898, d.05,06,2014 :
aot
ENGINEER-IN-CHIEF(CIVILJODISHA.Prawengar - afta ae werd strat a
(har ter steifter argenr oft)
yee 751 010, sf, WA
CSIR - INSTITUTE OF MINERALS & MATERIALS TECHNOLOGY
(Coure of Slot & ing Rasoaren)
‘TSSLBEPORT ‘Bhubaneswar - 751013, Odisna, INDIA
ae! 2008 Soe
sale a »BRasmsrtass
{Ref eter No 750/24/BOA,0t:20052016)
[Name and address of the Client Chief Engineer-cum-Engineer member,
{0 Bhubaneswar
No.of Sampls/Detas O7Wo, Supplied TAT Bee of Reliable sel
Date reciig chosaone
cateot Completon - 1s0s204
Standard / Methoé of arays = O€S/ehenieal mas
Seni Yst ata
ped [Sle | Sampled | Samples | Sanses | Samples | pled | Madham
| Permisibe
(281 |(2Seum | 20mm | asmm | aamm | worm | (8 min
my |} Y Ola) Yowy | otay fay | Di) | ererage
spe
i Isa786 2008
forFeso0
[em [ee fear | me | aa [os | ae amo]
S [00s [oor jos |~o0s | oms | oma | 00s] 005s
[ous foar foot 00s | aes | aos | oon) ons
Sr [eae fase fear | ome | aio | aos | aos [ois
Remark: The aove Test Report only refers to the nature of samples supple.
: \w?
FI
‘ soate! 2g)
r Ban 4
NB. Thesample snot crann by theinstue laity any or cosy gengtenneton withthe
twinge jess algal amos eaves bye sue om ne cle. Teapot hols ee
inepeech pt
“Ta: 91 (0874) 2379212, 2879490, Fax: +01 (0874) 2567697 (ann) 2667948 (Pur] 2567160 (DH)
Wb ste: wnwirentresin|