Wet and saturate the concrete with water and allow the surface to partly dry so
that it is damp.
4.
5.
Once the primer becomes tacky, apply SpECbuild SG 15 mixed with correct
amount of water with a gloved hand to ensure thorough compaction and finish
with steel trowel.
6.
Wire brush and remove all loose material and prepare the surface to receive the
waterproofing.
8.
Wet the concrete and allow the surface to partly dry so that it is damp.
9.
10.
11.
12.
Carry out water testing by ponding the relevant area with water for 3 days (water
shall be supplied by the client / main contractor at the point of working)
13.
The client / main contractor shall lay cement sand protective screed (tile
bedding) on the waterproofing soon after water test is complete.