Universidad Nacional Toribio Rodriguez de Mendoza - Amazonas

DETALLE DE FINANCIAMIENTO Y COSTOS INDIRECTOS


FORMATO E10
PROYECTO:
MEJORAMIENTO DEL SERVICIO DE TECNOLOGIAS DE INFORMACION Y COMUNICACIN EN LA UNTRM
META: MEJORAMIENTO DEL SERVICIO DE TECNOLOGIAS DE INFORMACION Y COMUNICACIN EN LA UNTRM

FECHA: Octubre del 2014

OBRA POR CONTRATA


A COSTO DIRECTO (CD)
2.6.23.2.3 MATERIALES
2.6.23.2.3 MANO DE OBRA
2.6.23.2.3 EQUIPO Y MAQUINARIA
IMPACTO AMBIENTAL

2,410,621.64
1,457,830.71
647,650.94
283,949.99
21,190.00

B GASTOS GENERALES DE OBRA


GASTOS VARIABLES
2.6.23.2.3 INGENIERO RESIDENTE
2.6.23.2.3 INGENIERO ASISTENTE DE OBRA
2.6.23.2.3 INGENIERO ELECTRICISTA
2.6.23.2.3 INGENIERO DE SISTEMAS
2.6.23.2.3 ADMINISTRADOR - CONTADOR
2.6.23.2.3 MAESTRO DE OBRA
2.6.23.2.3 MOVILIDAD Y VIATICOS
2.6.23.2.3 ALMACENERO
2.6.23.2.3 GUARDIAN
2.6.23.2.3 OFICINA, ENERGIA, TELEFONO

2.6.23.2.3
2.6.23.2.3
2.6.23.2.3
2.6.23.2.3
2.6.23.2.3
2.6.23.2.3
2.6.23.2.3
2.6.23.2.3
2.6.23.2.3

MESES

GASTOS FIJOS
CARTEL DE OBRA
CARTAS FIANZAS
PRUEBAS DE CALIDAD Y ENSAYO DE LABORATORIO
ARTICULOS DE LIMPIEZA Y OTROS
COPIA DE DOCUMENTOS Y PLANOS
GASTOS GENERALES NOTARIALES
POLIZAS DE SEGURO
MATERIALES DE ESCRITORIO
IMPLEMENTOS DE SEGURIDAD Y SALUD

C GASTOS DE SUPERVISION
2.6.23.2.3 INGENIERO SUPERVISOR
2.6.23.2.3 INGENIERO ASISTENTE DE SUPERVISION
2.6.23.2.3 UTILES DE ESCRITORIO
2.6.23.2.3 MOVILIDAD
2.6.23.2.3 OTROS SERVICIOS DE TERCEROS
2.6.23.2.3 COPIA DE DOCUMENTOS Y PLANOS
2.6.23.2.4 OFICINA, ENERGIA, TELEFONO
D GASTOS ADMINISTRATIVOS DE LA UNTRM
2.6.23.2.3 UTILES DE ESCRITORIO
2.6.23.2.3 MOVILIDAD Y VIATICOS
2.6.23.2.3 COMBUSTIBLE
2.6.23.2.3 SERVICIOS DE LIQUIDADOR
2.6.23.2.3 COPIA DE DOCUMENTOS
2.6.23.2.3 GASTOS GENERALES Y NOTARIALES
2.6.23.2.3 OTROS SERVICIOS DE TERCEROS (Publicidad y difusin)
2.6.23.2.3 MONITOREO
2.6.23.2.3 PLACA RECORDATORIA
E ESTUDIOS DEFINITIVOS A NIVEL DE EJECUCION
2.6.23.2.3 ESTUDIOS DEFINITIVOS A NIVEL DE EXPEDIENTE TECNICO
COSTO TOTAL

COEF

4.50
0.00
1.00
2.00
4.00
4.00
0.00
4.00
4.00
4.00

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

7,000.00
5,000.00
7,000.00
7,000.00
2,000.00
3,500.00
600.00
1,500.00
1,500.00
500.00

105,400.00
88,500.00
31,500.00
0.00
7,000.00
14,000.00
8,000.00
14,000.00
0.00
6,000.00
6,000.00
2,000.00

1.00
1.00
1.00
4.00
1.00
1.00
1.00
1.00
1.00

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

1,500.00
2,000.00
2,000.00
100.00
500.00
1,000.00
1,000.00
500.00
8,000.00

16,900.00
1,500.00
2,000.00
2,000.00
400.00
500.00
1,000.00
1,000.00
500.00
8,000.00

MONTO
8,000.00
6,000.00
200.00
100.00
500.00
500.00
500.00

1.57 %

1.00
1.00
1.00
1.00
1.00
1.00
1.00

37,900.00
36,000.00
0.00
900.00
0.00
0.00
500.00
500.00

MONTO
500.00
0.00
0.00
0.00
500.00
3,000.00
500.00
4,000.00
800.00
MONTO
253,877.00

1.01 %

24,300.00
2,000.00
0.00
0.00
0.00
2,000.00
3,000.00
500.00
16,000.00
800.00
253,877.00
253,877.00
2,832,098.64

MESES
4.50
0.00
4.50
0.00
0.00
1.00
1.00

COEF

MESES
4.00
0.00
0.00
1.00
4.00
1.00
1.00
4.00
1.00
MESES
1.00

COEF

MONTO

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
COEF
1.00

4.37 %

10.53 %

DETALLE DE FINANCIAMIENTO
UNTRM
DESEMBOLSO ADMINISTRA

DESCRIPCION

COSTO DIRECTO
GASTOS GENERALES DE OBRA (4.37%)
UTILIDAD DEL CONTRATISTA (7.00%)
SUBTOTAL DEL CONTRATISTA (SIN IGV)
IGV (18.00%)
SUBTOTAL DEL CONTRATISTA (CON IGV)
COSTO DE OBRA
GASTOS DE SUPERVISION (1.57%)
SUBTOTAL SUPERVISION (SIN IGV)
IGV SUPERVISION (18.00%)
GASTOS TOTAL DE SUPERVISION (CON IGV)
GASTOS ADMINISTRATIVOS DE LA UNTRM (1.01%)
ESTUDIOS DEFINITIVOS A NIVEL DE EXPDIENTE TECNICO (10.52%)
TOTAL

OTRA ENTIDAD
APORTE

2,410,621.64

24,300.00
253,877.00
2,410,621.64

278,177.00

TOTAL

2,410,621.64
105,400.00
168,743.51
2,684,765.15
483,257.73
3,168,022.88
3,168,022.88
37,900.00
37,900.00
6,822.00
44,722.00
24,300.00
253,877.00
0.00

3,490,921.88