COMPUTOS METRICOS

Ampliacion Escuela Mi Jardin V

PARTIDA

OBRAS PRELIMINARES
01

E-124-S/N-000
Largo = 37,00
Ancho = 10,00

02

E-136.010.000

03

E-212-100-000

LIMPIEZA Y CONFORMACION DEL TERRENO


A = (37,00 X10,00) =
TOTAL=

370.00 M2

CARGA A MANO DE MATERIAL PROVENIENTE DE LAS DEMOLICIONES Y PREPARACION DEL SITIO


L= 37.00mts
A= 10.00mts
E= 0.10mts
TOTAL=
37.00 M3
EXCAVACION EN PRESTAMO INCLUYENDO CARGA, EN CALQUIER TIPO DE MATERIAL
CON EMPLEO DE TRACTOR Y EXCAVADOR
V= (37,00X10,00X0,2) =
TOTAL=
74.00 M3

ESTRUCTURA
04

E-311-110-150
ZAPATA=
RIOSTRA=

EXCAVACION EN TIERRA A MANO PARA ASIENTO DE FUNDACIONES, ZANJAS U OTROS


(0,80X080X1.30) x26 UNID
21.63 M3
(0,20X0,30) X [(34,55X2)+(5,6x12)
8.18 M3
TOTAL=
29.81 M3

05

E-311-310-000

EXCAVACION EN TIERRA CON USO DE EQUIPO DE RETROEXCAVADOR PARA ASIENTOS DE FUNDACIONES, ZANJAS U OTROS.
37x10x0.6=
222 M3

06 E-313.310.000
SEGUN EXCAVACION
=>

CARGA CON EQUIPO PESADO DE MATERIAL PROVENIENTE DE LAS EXCAVACIONES PARA


ASIENTO DE FUNDACIONES, ZANJAS U OTROS
251.81
251.81 M3

07

E-317-000-000

COMPACTACION DE RELLENO CON APISONADORES DE PERCUSION CORRESPONDIENTE


A LOS ASIENTOS DE FUNDACIONES, ZANJAS U OTROS
L= 37.00mts
A= 10.00mts
V= (37,00X10,00X0,2) =
E= 0.2mts
TOTAL=
74.00 M3

08

E-319-100-S/N

CONSTRUCCION DE BASE DE PIEDRA CORRESPONDIENTE A OBRAS PREPARATIVAS


L= 37.00mts
A= 10.00mts
V= (37,00X10,00X0,05) =
E= 0.05mts
TOTAL=
18.50 M3

09

E-323-000-120
CONCRETO DE fc 200 Kgf/CM2 A LOS 28 DAS ACABADO CORRIENTE EN BASES Y ESCALONES
VOL = (0.80*0.80*0.30) * 26 zapatas =
TOTAL=
4.99 M3

10

E-324-000-120

11

E-325-000-120

12

E-328-000-120

13

E-334-000-120

CONCRETO DE fc 200 Kgf/CM2 A LOS 28 DAS ACABADO CORRIENTE PARA LA


CONSTRUCCION DE PEDESTALES
VOL= (0.40mx0.40mx0.75m)x26zap=
TOTAL=
3.12 M3

CONCRETO DE fc 200 Kgf/CM2 A LOS 28 DAS ACABADO CORRIENTE PARA LA CONSTRUCCION


DE VIGAS DE RIOSTRA, TIRANTESY FUNDACIONES DE PARED
VOL = [(34,5x2unid) + (5,95X12unid)] X (0,20 X 0,20) =
TOTAL=
5.62 M3
CONCRETO DE fc 200 Kgf/CM2 A LOS 28 DAS ACABADO CORRIENTE PARA LA
CONSTRUCCION DE BASE DE PAVIMENTO
L=34.55m
A=5.95m
E=0.10m
(34,55 X 5.95) X 0,10 =
TOTAL=
20.56 M3

CONCRETO DE FC= 200 KG/CM2 A LOS 28 DIAS ACABADO CORRIENTE PARA CONSTRUCCION
DE MACHONES, VIGA DE CORONA, DINTELES, ARIOSTRAMIENTO DE PAREDES
V AMARRE= [(0,15 X 0,15) X 5,95] X 6=
TOTAL=
0.80 M3

14

E-337-S/N-118

15

E-341-010-110

16

E-342-010-114

CONCRETO DE FC = 180 KG/CM2, A LOS 28 DIAS ACABADO CORRIENTE, PARA LA CONSTRUCCION DE MESONES Y ESTANTES DE COCINA
(0,55 X 1,40 X 0,10)X2
0.15 M3

ENCOFRADO DE MADERA TIPO RECTO ACABADO CORRIENTE EN CABEZALES DE PILOTES


BASES Y ESCALONES,PEDESTALES,VIGAS DE RIOSTRA, TIRANTES, FUNDACIONES DE PARED,
LOSAS DE FUNDACION, VIGAS DE FUNDACION Y BASES DE PAVIMENTO
BASE DE PAVIMENTO= [(34,55 X 2)+(5.95 X 2)] X 0.10=
8.10 M2
PEDESTAL= (0.75mx0.40m)x4x26=
31.20 M2
TOTAL=
39.30 M2

17

ENCOFRADO DE MADERA TIPO RECTO ACABADO CORRIENTE EN MACHONES,VIGAS DE


CORONA, DINTELES Y VIGAS DE RIOSTRA
V AMARRE= 5,95X0,15X2X6=
TOTAL=
10.71 M2
E-342-S/N
ENCOFRADO TIPO RECTO, ACABADO CORRIENTE PARA MESONES Y ESTANTES
((0,10 X 0,55) + (0,10 X 1,4)) x 2
0.39 M2
((1,4 X 0,55))x2
1.54 M2
TOTAL=
1.93 M2

18

E-351-110-210
ESTRIBOS DE
LONGITUD=
RIOSTRA=

19

E-351-120-210

20

21

S/T/P/C DE ACERO DE REFUERZO FY = 4200 KG/CM2 UTILIZANDO CABILLA DE


IGUAL O MENOR DEL No 3 PARA INFRAESTRUCTURA.
1.00m
{[(34.55 X 2) + (5,95 X12)] / 0,15} X 1.00 =
Peso= 936.66 mtsx0,559 Kg/mts.
523.59 KG
PEDESTAL= (0.75mx26)/0.15mx1.60mx0.559kg/ml=
116.27 KG
TOTAL=
639.86 KG
S/T/P/C DE ACERO DE REFUERZO FY = 4200 KG/CM2 UTILIZANDO CABILLA
No 4 A No 7 PARA INFRAESTRUCTURA.
ZAPATA= 26 ZAP X (11.5) ml X 0.994 Kg/mts =
RIOSTRA= 4 cab 1/2" x 140,05ML x 0,99 4kg
PEDESTAL= 4pzasx(1.25mx24)x0.994kg/ml=
TOTAL=

E-351-200-250
Base de pavim

S/T/P/C DE MALLA SOLDADA DE ACERO PARA INFRAESTRUCTURA


L= 34,55 M
A= 5,95 M
(34,55 X 5,95)X 1,98 Kg/m2

E-352-110-210

VIGAS DE AMARRE=
ESTRIBOS=
MESON DE CONCRETO
(PARRILLA DE 3/8")

297.21
556.84
119.28
973.32

KG
KG
KG
KG

407.03 KG

S/T/P/C DE ACERO DE REFUERZO FY = 4200 KG/CM2 UTILIZANDO CABILLA DE


IGUAL O MENOR DEL No 3 PARA SUPERESTRUCTURA.
35,70mlx4cab3/8"x0,559=
79.83
((35,70 mts / 0,20) x 0,60 mts) x 0,559 Kg/m
59.87
1,40 /0,15 = 9,33 => 10 cabillas
0,55 /0,15 = 3,67 => 4 cabillas
(10 cab. X 0,50) x 0,559 kg/cm2
2.80
(4 cab. X 1,40) x 0,559 kg/cm2
3.13
TOTAL
145.62

KG
KG

KG
KG
KG

22

E-361-121-100

SUMINISTRO DE PLANCHAS LISAS DE ACERO NACIONAL, PARA LA FABRICACION DE


ESTRUCTURAS DE ACERO. NO INCLUYE EL TRANSPORTE.
((.4mx.5m)/2x54.95Kg/M2)X2
10.99 KG
.64mx.06mx54.95Kg/M2
2.11 KG
TOTAL 26Cartelasx13.10Kg
13.10 KG
TOTAL=
340.60 KG

23

E-361-210-100

FABRICACION DE ESTRUCTURAS METALICAS CON PLANCHA LISA DE ACERO NACIONAL


TOTAL 26 Cartelasx13.10Kg

24

E-361-511-100

340.60 KG

MONTAJE DE PLANCHAS LISAS DE ACERO NACIONAL EN ESTRUCTURAS METALICAS.


TOTAL 26 Cartelasx13.10Kg

25

E-362-110-000
CONDUVEN
100X100

340.60 KG

SUMINISTRO, TRANSPORTE Y COLOCACION EN ESTRUCTURAS METALICA DE


COLUMNAS SIMPLES
28 X 3,10 m X 8,34 Kg/ mL =

TOTAL =

723.91 KG

26

E-362-120-000
VIGAS IPN 10=
V DE AMARRE 80x40=
VIGAS IPN 14=

27

E-362-130-000

TUBO 100X40
Peso = 4.68 KG/ML

28

E-362-S/C-1

SUMINISTRO, COFECCION Y COLOCACION EN ESTRUCTURAS METALICA DE VIGAS SIMPLES


(10x3,20 +0,50x20)X8.32
349.44 Kg.
(34,55X2)X3,98KG
275.02 Kg.
(13*9,55+13*3.56)*14.4KG/ML
2,454.19 Kg.
TOTAL =
3,078.65 Kg.
SUMINISTRO, COFECCION Y COLOCACION EN ESTRUCTURAS METALICA EN
CORREAS SIMPLES
(8unidX4.68kgX36.55mlx2lados)+(4unidx28.45mlx2ladosx4.68kg) =
TOTAL =

3,802.03 KG

S/C/C ANCLAJE METALICO PARA COLUMNAS FORMADO POR LAMINAS DE HIERRO


DE 20 X 25 CAL=1/4" Y CABILLA DE 5/8"
26 FUNDACIONES = 2(1,50 X 1,40) X 3
26 PZA

OBRAS DE ARQUITECTURA
29

E-411-041-010

CONSTRUCCION DE PAREDES DE BLOQUES DE CONCRETO ACABADO CORRIENTE


E= 10 CM,NO INCLUYE MACHONES, DINTELES Y BROCALES.
(1,50 X 1,40) X 3
6.30 M2

30

E-411-041-012

CONSTRUCCION DE PAREDES DE BLOQUES DE CONCRETO ACABADO CORRIENTE


E= 12CM,NO INCLUYE MACHONES, DINTELES Y BROCALES.
((0,55X0,90)X2)X2
TOTAL =
1.98 M2

31

E-411-041-015

CONSTRUCCION DE PAREDES DE BLOQUES DE CONCRETO ACABADO CORRIENTE, E= 15CMS. NO INCLUYE MACHONES, DINTELES Y BROCALES
34,55x2,10-(0,90x2.10+(1,20x2,10x3))=
63.11
34,55x2,10
72.56
5,90x3,10+5,90x0,60/2
20.06
(5,90 x 3,10+5,90x0,60/2)-(0,70X 2,10X4 + 0.70 X 1,00+0,50 X 1,00)
14.45
(5,90x3,10+5,90x0,60/2)X4+2,65X3,70
90.05
3,90X3,70+7,00X3,50
38.93
TOTAL=
299.15

FACHADA POSTERIOR
PRINCIPAL=
FACHADA
=
ACHADA LAT DERECHA=
CHADA LAT IZQUIERDA=
PARDES INTERNAS=
PAREDES INT. BAOS=

32

E-412-102-003

FACHADA PRINCIPAL int=


CHADA POSTERIOR int=
HADA LAT DERECHA int=
DA LAT IZQUIERDA int=
PAREDES INTERNA
PAREDES INT. BAOS=

33

E-412-105-117

CONSTRUCCION DE REVESTIMENTO INTERIOR EN PAREDES CON MORTERO A BASE


DE CAL ACABADO LISO INCLUYE FRISO BASE
63,11m2-area ceramica bao=7,29m2
55.82 M2
72,56m2-area ceramica bao=7,29m2
65.27 M2
20.06 M2
14,45m2-area ceramica bao=5,58m2
8.87 M2
90,05m2x2-area ceramica bao=10,62
169.48 M2
38,93m2x2-(area revestida con ceramica=39,24m2)
38.62 M2
358.11 M2
CONST.DE REVESTIMIENTO INTERIOR EN PAREDES CON PORCELANA BLANCA
ACABADO NATURAL INCLUYE FRISO BASE
2.1(5.75+.15x4+.30x3+1.2x4+.8x4+.15x3+2.95+4.05+2.3++2.05+.8+
1.95+4.05-(.8x.1+1.4x.1+.1x2.1+1.14x2x2.1+.1x.8x2+1.4x.1)

34

E-412-202-003

TOTAL=
E-412-S/N.1

65.57

CONSTRUCCION DE REVESTIMIENTO EXTERIOR EN PAREDES CON


MORTERO A BASE DE CAL, ACABADO LISO.INCLUYE FRISO BASE.

FACHADA PRINCIPAL=
FACHADA POSTERIOR=
ACHADA LAT DERECHA=
CHADA LAT IZQUIERDA=

35

M2
M2
M2
M2
M2
M2
M2

63.11
72.56
20.06
14.45
170.17

M2
M2
M2
M2
M2

CONSTRUCCION DE PIZARRON CON MORTERO DE CEMENTO EN LA PARED, ACABADO LISO


INCLUYE MALLA, FONDO ANTIALCALINO Y PINTURA DE PIZARRON
A=(3X1,50) = 4,5 M2x3unid

13.5 M2

36

E-412-S/N-2

CONSTRUCCION DE REVESTIMIENTO INTERIOR EN MESONES DE CONCRETO


CON PORCELANA BLANCA, ACABADO NATURAL
((0,55X0,90)X6
(0,55 X 1,40 )X2
2,80+0,90x4)x0,10
TOTAL=

2.97
0.15
0.64
3.76

M2
M2
M2
M2

37

E-413-218-007

RECUBRIMIENTO EXTERIOR EN TECHOS CON TEJAS CRIOLLAS INCLUYE MORTERO DE CEMENTO


27,45x3,44x2+27,45x1,52x2+9,10x4,48x2=
353.84 M2

38

E-413-218-S/N

39

E-414-011-450

S/T/C DE GOTERO EN LAMINA GALVANIZADA PARA ALEROS DE MACHIHEMBRADO. ANCHO 10CMS


36,55x2+27,45x2=
128 M
CONST. DE REVESTIMIENTO DE PISO CON MORTERO DE CEMENTO
ACABADO LISO CON JUNTAS.INCLUYE MORTERO BASE
(34,55x5,9)
203.85 M2

40

E-421-403-401

CAPA IMPERMEABILIZANTE EN TECHOS DE MADERA CON MEMBRANA ASFALTICA (MANTO)


DE ESPESOR 4 MM REFORZADA CON VELO DE POLIESTER
27,45x3,44x2+27,45x1,52x2+9,10x4,48x2=
TOTAL=
353.84 M2

41

E-437-011-311

S/T/C DE PUERTAS BATIENTES DE LAMINAS SENCILLAS DE HIERRO


(1,50 X 0,80 X 5)

6.00 M2

S/T/C DE PUERTAS BATIENTES DE LAMINAS ENTAMBORADAS DE HIERRO


(2,10X0,70)x4=
(0,90x2,1)x2=
TOTAL=

5.88 M2
3.78 M2
9.66 M2

42

E-437-011-411

43

E-437-011-451

S/T/C DE PUERTAS BATIENTES DE LAMINAS ENTAMBORADAS DE HIERRO Y VISOR


INCLUYE VIDRIO
(2,10X1,20)x3=
7.56 M2

44

E-437-047-S/N

S/T/C DE REJAS DE PERFILES DE HIERRO 1" x 1" Y MARCOS DE 3" X 1"


(1,00x3,05x9)+(1,40x3,05x9)+(1,00x2,90x4)+1,20x1,00+27,45x0,30x2
TOTAL=

95.15 M2

S/T/C DE MARCOS DE CHAPA DOBLADA DE HIERRO EN PAREDES DE


15 CM DE ESPESOR
(2,1x2)x9+(0,7x4+1,2x3+0,9x2)=
TOTAL=

46.00 M

45

46

47

48

E-437-071-015

E-447-090-304

S/T/C DE REVESTIMIENTO DE MADERA MACHIHEMBRADA EN ESTRUCTURAS (TECHOS).


27,45x3,44x2+27,45x1,52x2+9,10x4,48x2=
TOTAL=
353.84 M2
E-461-000-101
ESMALTE EN COLUMNAS METALICAS
AREA A SER PINT 0.40m x 3,10m x 28 columnas
TOTAL=
34.72 M2
E-461-000-201

ESMALTE EN VIGAS METALICAS DE ALMA LLENA

AREA A SER PINTADA (IPN


14) 0.502perimetro

A =( 9.80 x 14 pzas+3.56x14) x 0.502 =


VIGAS DE AMARRE
(80*40)
(3,05 x 22 pzas+4,05x2) x [(0,08 + 0,04) x 2]
AREA A SER PINTADA (IPN
(0,50x20+3.20x10)x0.37perimetro
10)

49

E-461-000-S/N

M2
M2
M2
M2

ESMALTE EN CORREAS METALICAS


((8unidX35.55mlx2lados)+(4unidx28.45mlx2lados))X.10X.04X2 =

50 E-461-000-500
FACHADA PRINCIPAL=
FACHADA POSTERIOR=
FACHADA LAT DEREC=
FACHADA L

93.89
18.05
15.54
127.48

ESMALTE EN PAREDES INC. FONDO ANTIALCALINO


23,55x1,20-((1,2x1,2x3)+(0,9x1,2))
34,55x1,2
5,90x1,2
5,9x1,2-(0,7x1,2x4)

222.99 M2

36.06
41.46
7.08
3.72
88.32

M2
M2
M2
M2
M2

51

E-461-000-701
ESMALTE EN PUERTAS METALICAS
PUERTAS FACHADA PRINCIPAL=
(2,10x0,90)x2+(2,1x1,2)x6=
PUERTAS FACHADA LAT IZQ=
(2,1x0,70x4)x2
PUERTA PARED INT=
(0,9x2,10)x2=
PUERTAS LAMINA SENCILLA BAOS=
1,40x0,70x5x2

18.9
11.76
3.78
24.50
58.94

TOTAL=
52

E-461-000-801

ESMALTE EN MARCOS METALICOS


(2,1x2)x9+(0,7x4+1,2x3+0,9x2)=

53

54

E-461-001-101

E-462-S/N

M2
M2
M2
M2
M2

46 M

ESMALTE EN BARANDAS Y REJAS METALICAS


((1,00x3,05x9)+(1,40x3,05x9)+(1,00x2,90x4)+1,20x1,00+27,45x0,30x2)x2caras
TOTAL=

190.30 M2

TOTAL=

353.84 M2

BARNIZ EN TECHO MACHIEMBRADO. INCLUYE FONDO SELLADOR

27,45x3,44x2+27,45x1,52x2+9,10x4,48x2=

55 E-463-100-503
FACHADA PRINCIPAL int=
CHADA POSTERIOR int=
HADA LAT DERECHA int=
DA LAT IZQUIERDA int=
PAREDES INTERNA
PAREDES INT. BAOS=

CAUCHO INTERIOR EN PAREDES.INCLUYENDO FONDO ANTIALCALINO


63,11m2-area ceramica bao=7,29m2
72,56m2-area ceramica bao=7,29m2
14,45m2-area ceramica bao=5,58m2
90,05m2x2-area ceramica bao=10,62
38,93m2x2-(area revestida con ceramica=39,24m2)
TOTAL=

56 E-463-200-503
FACHADA PRINCIPAL=
FACHADA POSTERIOR=
ACHADA LAT DERECHA=
CHADA LAT IZQUIERDA=

57

E-473-632-253

CAUCHO EXTERIOR EN PAREDES. INCLUYENDO FONDO ANTIALCALINO


63,11m2-area pintura esmalte(36,06)
72,56m2-area pintura esmalte(41,46)
20,26m2-area pintura esmalte(7,08)
14,45m2-area pintura esmalte(3,72)
TOTAL=

55.82
65.27
20.06
8.87
169.48
38.62
358.12

M2
M2
M2
M2
M2
M2
M2

27.05
31.10
13.18
10.73
82.06

M2
M2
M2
M2
M2

CERRADURA DE EMBUTIR, ACABADO DE ACERO NIQUELADO CILINDRO


MOVIL CERROJO SIMPLE, PESTILLO SIMPLE. AMBOS LADOS CON LLAVE (35mm)
9 PZA

58

E-614-S/N-1

S/T/C DE CANAL DE SECCION CUADRADA EN LAMINA GALVANIZADA CAL= 24


36,55 x 2
73.1 M

59

E-614-S/N-102

S/T/C DE BAJANTE DE D= 4" EN LAMINA GALVANIZADA CAL= 22.INCLUYE ELEMENTOS DE FIJ.


L=(3,10) x4 bajantes
12.40 M

INSTALACIONES ELECTRICAS Y ACOMETIDA


60

E-311.110.150

EXCAVACION EN TIERRA A MANO PARA ASIENTO DE FUNDACIONES, COMPRENDIDAS


ENTRE 0.00 Y 1.50 M
2.70 M3

61

E-317.000.S/C

RELLENO COMPACTADO CON EL USO DE LA TIERRA PROVENIENTE DE LAS EXCAVACIONES.


0.77 M3

62

E-512.211.013

I.E. TUBERIA DE HIERRO GALVANIZADO, SIN ROSCA, TIPO EMT, EMBUTIDA. DIAMETRO 1/2" (13 MM).
234.00 M

63

E-512.212.013

I.E. TUBERIA DE HIERRO GALVANIZADO, SIN ROSCA, TIPO EMT, SUPERFICIAL. DIAMETRO 1/2" (13 MM).
225.00 M

64

E-521.222.023

I.E CABLE DE COBRE, TRENSADO, REVESTIDO, T.W., CALIBRE 12 AWG (2,32 mm).
930.00 M

65

E-521.224.037

I.E CABLE DE COBRE, TRENSADO, REVESTIDO, TTU, CALIBRE 8 AWG (3,7mm).


45.00 M

66

E-521.224.047

I.E CABLE DE COBRE, TRENSADO, REVESTIDO, TTU, CALIBRE 6 AWG (4,67mm).


90.00 M

67

E-531-110-510

I.E.CAJETINES METALICOS SALIDA 1/2" PROFUNDIDAD 1 1/2", RECTANGULAR 2" X 4"


45.00 PZA

68

E-531-210-010

I.E.CAJETINES METALICOS SALIDA 1/2"-3/4" PROFUNDIDAD 1 1/2", OCTOGONAL 4"


35.00 PZA

69

E-531-311-010

I.E.CAJETINES METALICOS SALIDA 3/4"PLG, PROFUNDIDAD 1 1/2", CUADRADO 4x4 PLG


(10X10 cms.)
6.00 PZA

70

E-541.211.110

I.E. INTERRUPTOR (SWITCHES) COMBINABLES SIMPLES CON TAPA DE PLASTICO,


PUENTE Y TORNILLOS, 10 A.
2.00 PZA

71

E-541.121.110

I.E. INTERRUPTOR (SWITCHES) COMBINABLES DOBLE CON TAPA DE PLASTICO, PUENTE


Y TORNILLOS, 10 A.
4.00 PZA

72

E-542-211-120

I.E. SUMINISTRO Y COLOCACION DE TOMACORRIENTES CON INTERRUPTOR, CON TAPA PLASTICA


PUENTE Y TORNILLOS, SENCILLOS, UNA FASE, 20 A A.
2.00 PZA

73

E-542.221.120

I.E. SUMINISTRO Y COLOCACION DE TOMACORRIENTES CON TAPA PLASTICA, PUENTE Y TORNILLOS. .


COMBINABLES DOBLES, UNA FASE 20A
26.00 PZA

74

E-551.120.812

I.E. TABLERO METALICO CONVERTIBLE, EMBUTIDO, CON PUERTA, 2 FASE + NEUTRO, 8 CIRCUITOS,
BARRAS DE 125 A, NO INCLUYE BREAKER.
1.00 PZA

75

E-561.110.020

I.E. INTERRUPTOR TERMOMAGNETICO (BREAKERS) CON ENCHUFE, 1 POLO, 120/240 V.,


10 KA ICC, CAP. 20 A.
9.00 PZA

76

E-561.210.060

I.E. INTERRUPTOR TERMOMAGNETICO (BREAKER) CON ENCHUFE, 2 POLO, 120/240 V., 10 KA ICC, CAP. 60 A.
1.00 PZA

77

E-581-S/N.1

I.E. SUMINISTRO TRANSPORTE E INSTALACION DE LUMINARIA INCANDESCENTE TIPO


APLIQUE. INCLUYE BOMBILLOS DE 100 W.
8.00 PZA

78

E-581-S/N.2

I.E. SUMINISTRO TRANSPORTE E INSTALACION DE LAMPARA CIRCULAR FLUORESCENTE


32 WATT. INCLUYE UN TUBO Y ELEMENTOS DE FIJACION
7.00 PZA

79

E-581.S/N.7

I.E. SUMINISTRO TRANSPORTE E INSTALACION DE VENTILADORES DE TECHO, DE TRES ASPAS,


CON MECANISMO REGULADOR DE VELOCIDAD.
8.00 PZA

80

E-581-S/N.10

I.E. SUMINISTRO TRANSPORTE E INSTALACION DE LAMPARA FLUORESCENTE SUPERFICIAL DE


4 X 40 W, INCLUYE CUATRO TUBOS FLUORESCENTES Y ELEMENTOS DE FIJACION.
19.00 PZA

81

E-581-S/N.9

I.E. SUMINISTRO TRANSPORTE E INSTALACION DE LAMPARA FLUORESCENTE SUPERFICIAL DE


2 X 40 W, INCLUYE DOS TUBOS FLUORESCENTES Y ELEMENTOS DE FIJACION.
1.00 PZA

82

E-802.306.010

CONCRETO VACIADO PARA LA PROTECCION DE TUBERIAS EMPLEADAS PARA LA CONSTRUCCION DE


BANCADAS DE ELECTRICIDAD, Fc=100 Kg/Cm2
1.8m3-((3.1415x.0254x.0254x2)x30)

83

E-802.S/C.013.1

1.68 M3

TANQUILLA PARA B.T. (T1) (30x40x80 cms). INCLUYE TAPA DE CONCRETO, CON MARCO Y CONTRAMARCO .
METALICO.
2.00 PZA

84

E-802.S/C.051

SUMINISTRO Y COLOCACION DE TUBO DE PVC 2" PARA BANCADA EN B.T. NO INCLUYE EXCAVACION NI .
CONCRETO
60.00 M

85

RAB00550

S/C DE BAJANTE DE H.G (CONDUIT)DE 6 MTS.x 2"


1.00 UND

INSTALACIONES SANITARIAS
86

E-611-111-019

TUBERIA AGUA CLARAS DE H.G D = 3/4 PLG (19mm), ISO II, 150 PSI AMBIENTE EXTERIOR
AL RECINTO SANITARIO INCLUYE CONEXIN
30 M

87

E-612-081-102

88

E-613-071-051

I.S. TUBERIA DE AGUAS RESIDUALES P.V.C. D = 4" (102mm) E = 3.2 mm EMBUTIDA O


ENETERRADA.INCLUYE CONEXIONES
30 M
TUBERIA PARA VENTILACION DE P.V.C D=2" LIVIANO. E=1.8MM EMBUTIDA O ENTERRADA. INCLUYE
CONEXIONES
20 M

89

E-621-211-013

PUNTOS DE AGUAS CLARAS, DE H.G. ISO II , 150 PSI D= 1/2 "(13mm)AMBIENTE INTERIOR AL
RECINTO SANITARIO
10 PUNTO

90

E-622-041-051

PUNTOS DE AGUAS RESIDUALES DE P.V.C. D= 2" (51 mm.)E=1,8mm EMBUTIDO O ENTERRADO


INCLUYE CONEXIONES
9 PUNTO

91

E-622-051-102

PUNTOS DE AGUAS RESIDUALES DE P.V.C. D= 4" (102 mm.)E=3.2mm EMBUTIDO O ENTERRADO


INCLUYE CONEXIONES
4 PUNTO

92

E-631-010-019

SUMINISTRO DE LLAVE DE PASO TIPO COMPUERTA DE BRONCE D= 3/4"(19 mm)150 PSI


1 PZA

93

E-661-310-112

LAVAMANOS PARA EMPOTRAR DE UNA (1) LLAVE BLANCO O COLOR CLARO DE ANCHO MENOR
DE 54 CM OVALADO (INCLUYE GRIFERIA Y LLAVE DE ARRESTRO)
4 PZA

94

E-662-111-111

W.C. DE ASIENTO TANQUE BAJO, DESCARGA AL PISO BLANCO O COLOR CLARO


LINEA ECONOMICA CONVENCIONAL
6 PZA

95

E-663-112-110

URINARIO CON SIFON CROMADO ALIMENTADO CON LLAVE, DESCARGA A LA PARED, BLANCO
O COLOR CLARO LINEA ECONOMICA (INCLUYE GRIFERIA Y ELEMENTOS DE FIJACION)
3 PZA

96

E-666-311-051

S/T E INSTALACION DE CENTRO PISO CIRCULAR STANDAR PARA TUBO DE DESCARGA


DE 2" DE DIAMETRO (51mm)
3 PZA

97

E-667.300.001

BATEA PREFABRICADA DE CONCRETO

1 UND

OBRAS DE SERVICIO
98

E-802-120-250

99

E-802-211-000

S/T/P/C DE MALLA SOLDADA DE ACERO DE REFUERZO PARA EL CONCRETO ARMADO


CORRESPONDIENTE A OBRAS DE SERVICIO.
3 Tanquilla de 60 cm=>5.4m2x1.98kg/m2=
10.69 KG

ENCOFRADO DE MADERA TIPO RECTO, ACABADO CORRIENTE, EN CONCRETOS CORRESPONDIENTES A OBRAS DE SERVICIO.
ACERAS= (34,55x2+9.5x2)x0,10
8.81 M2
Tanquilla= 0.60x0.60x4x3=

4.32 M2
TOTAL=

100 E-802-302-018

13.13 M2

CONCRETO DE RCC 180KG/CM2, A LOS 28 DIAS, PARA LA CONSTRUCCION DE ACERAS Y


CUNETAS CORRESPONDIENTES A LAS OBRAS DE SERVICIO
ACERAS= (34,55x3.6x0,10)+(6.05x2,00x0,10)=
TOTAL=
13.65 M3

101 E-802-305-000

CONCRETO PARA LA CONSTRUCCION DE TANQUILLAS CORRESPONDIENTES A OBRAS


DE SERVICIO
V=(0,60X0,60X0,15X4)+(0,60X0,60X0,10)x3=
TOTAL=
0.75 M3

102 E-806-118-210

CONSTRUCCION DE CERCAS Y PORTONES DE MALLA CICLON CALIBRE N10 CON 6 HILOS DE


ALAMBRE DE PUA Y CORONAMIENTO ESPECIAL INCLINADO DOBLE H=1,80M
(50,00x2)+(25,00x2)
150 M

TRANSPORTE
103 E-903-142-005

TRANSPORTE URBANO EN CAMIONES DE CUALQUIER MATERIAL PROVENIENTE


DE LA PREPARACION DEL SITIO MEDIDO EN ESTADO SUELTO A DISTANCIAS
COMPRENDIDAS ENTRE 4 Y 5 Kmts.

Excavacion para la R3 =29.81M3


Excavacion en septico =13,07m3
Excavacin para tanque elevado =0,51m3
Total =(29.81+13,07+0,51)m3 x 5 Kmts.
104 E-903-141-015

216.95 M3xKM

TRANSPORTE URBANO EN CAMIONES DE TIERRA, AGREGADOS Y ESCOMBROS MEDIDO EN


ESTADO SUELTO, A DISTANCIAS ENTRE 14 KM. Y HASTA 15 KM. INCLUSIVE.

Excavacion en prestamo=
Agregados concreto =34,62m3*1,35=
piedra picada para base =
Friso=528,28m2*0,02m*(5/6)=
Pega para bloque=1m*0,15*0,02*5*301,13m2*(5/6)

SEPTICO Y TANQUE

Agregados concreto =4,73m3*1,35=


Pega para bloque=1m*0,15*0,02*5*12.46m2*(5/6)

Total =(373.81m3+6.54m3) x 15 Kmts


105 E-905-040-050

M3
M3
M3
M3
M3
M3

6.39
0.16
6.54
5705.25

M3
M3
M3
M3xKM

290.81
66.29
5.67
362.77
37.84
0.23
38.07
400.84

sacos
sacos
sacos
SACOS
sacos
sacos
SACOS
SACOS

TRANSPORTE EN CAMIONES DE CEMENTO A DISTANCIAS HASTA 50 KM

Cemento en concreto =34,62m3*8,4sacos=


Friso=528,28m2*0,02m*(1/6)*1600/42,5=
Pega para bloque=1m*0,15*0,02*5*301,13m2*(1/6)*1600/42,5=
SEPTICO Y TANQUE

296
46.74
18.5
8.80
3.76
373.81

Cemento en concreto =4,73m3*8sacos=


Pega para bloque=1m*0,15*0,02*5*12.46m2*(1/6)*1600/42,5=
TOTAL= 362.77+38.07

SEPTICO Y SUMIDERO
106 E-311-110-150
SEPTICO=
SUMIDERO=
TANQUILLA

EXCAVACION EN TIERRA A MANO PARA ASIENTO DE FUNDACIONES, COMPRENDIDAS ENTRE 0.00 Y 1.50
2,40X1,90X1,50
6.84 M3
M.
3,14X(1,15X1,15)X1,5
6.23 M3
0,60x0,60x0,60=
0.22 M3
TOTAL =
13.07 M3

107 E-802-112-210

S/T/P/C DE ACERO DE REFUERZO FY = 4200 KG/CM2 UTILIZANDO CABILLA


No 4 A No 7 PARA INFRAESTRUCTURA.
EN SEPTICO Y SUMIDERO
TAPA DEL SEPTICO
(17cabillas x 1,5ML) X 0,99 kg/m
(10cabillas x 2,5)x 0,99 kg/m
SUB TOTAL
LOSA DE PISO DEL SEPTICO
(17cabillasx1,5ml)x0,994kg/cm2
(10cabillasx2,5ml)x0,994kg/cm2
SUB TOTAL
PAREDES DEL SEPTICO
(27cabillasx1,6ml)x0,994kg/cm2

25.35 KG
24.85 KG
50.20 KG
25.35 KG
24.85 KG
50.20 KG
42.94 KG

SUB TOTAL

42.94 KG

SUB TOTAL

36.88 KG
23.51 KG
60.39 KG

TAPA DEL SUMIDERO


(14cabillasx2,,65mlx0,994kg/cm2
(11cabillasx2,,15mlx0,994kg/cm2
SUMIDERO
ANILLOS= PERIMETRICO 7,22 mL.
Peso = (( 7.22 X 3 ) X 4) X 0.99 4 Kg/m
SUB TOTAL
TOTAL=
108 E-812-211-000

86.12 KG
86.12 KG
289.84 KG

ENCOFRADO DE MADERA TIPO RECTO ACABADO CORRIENTE EN CONCRETOS,


CORRESPONDIENTE A OBRAS DE SERVICIO.
TAPA SEPTICO=(2,70X2,20) =5,94 M2
5.94
SEPTICO=(1,6x1,5)x2+(1,6x1,2)x2+(2,5x1,6)x2+(2,2x1,6)x2=
23.68
TAPA SUMIDERO = (2,60X2,60)=6,76 M2
6.76
ANILLOS = P X a = 7,22 x 0,20 = 1,44 m2
1.44
TOTAL=
37.82

M2
M2
M2
M2
M2

109 E-812-S/N-015

CONSTRUCCION DE PARED DE BLOQUES DE CONCRETO , ACABADO CORRIENTE, E=15 CMS.


PARA SUMIDERO
EN SUMIDERO A= ( 2XTTX(1,15)2X1,50) = 12,46 mts2
12.46 M2

110

CONCRETO Rcc= 200Kg/Cm2 EN SEPTICO Y SUMIDERO


(2,70 X 2,20) X 0,10=
(2,5x1,6x0,15)+(1,2x1,6x0,15)+(2,5x1,5x0,20)=
(2,60 X 2,60) X 0,10 =
3 X( (0,20 X 0,20) X 7,22) =

E-812-S/N-120
TAPA SEPTICO=
SEPTICO=
T. SUMIDERO
CONCRETO ANILLOS=

TOTAL =

0.59
1.64
0.68
0.87
3.77

M3
M3
M3
M3
M3

TANQUE ELEVADO
111

E-311-110-150

EXCAVACION EN TIERRA A MANO PARA ASIENTO DE FUNDACIONES, COMPRENDIDAS ENTRE 0.00 Y 1.50
M.
0,80X0,80X0,80
0.51 M3

112

E-323-000-120

CONCRETO Rcc 200 KG/CM2, ACABADO CORRIENTE PARA LA CONSTRUCCION DE BASES Y


ESCALONES
V=0,80Mx0,80Mx0,30M=
0.19 M3

113

E-324-000-120

CONCRETO Rcc 200 KG/CM2, ACABADO CORRIENTE, PARA LA CONSTRUCION DE PEDES.


V=0,30Mx0,30Mx0,50M=
0.05 M3

114

E-328-000-120

CONCRETO Rcc 200 KG/CM2 A LOS 28 DIAS, ACABADO CORRIENTE, PARA LA


CONSTRUCCION DE PAVIMENTO
V=1,5Mx1,5Mx0,10M=

0.23 M3

CONCRETO Rcc 200 KG/CM2 A LOS 28 DIAS, ACABADO CORRIENTE, PARA LA


CONSTRUCCION DE COLUMNAS RECTANGULARES
V=0,30Mx0,30Mx3M=

0.27 M3

115

E-331-100-120

116

E-333-310-120

LOSA MACIZA, e=10 CM, CON CONCRETO Rcc=200 KG/CM2 A LOS 28 DIAS ACABADO
CORRIENTE
V=1,5Mx1,50M=
2.25 M2

117

E-341-010-110

ENCOFRADO DE MADERA TIPO RECTO ACABADO CORRIENTE EN CABEZALES


DE PILOTES,BASES Y ESCALONES, PEDESTALES,V.R, TIRANTES,FUND.PARED,
Y BASES DE PAVIMENTO.
LOSA DE PAVIMENTO=(1,5x0,10)x4=0,6M2
PEDESTALES =(0,3x1,50)x4=1,8M2
TOTAL=
2.40 M2

118

E-342-010-113

ENCOFRADO DE MADERA, TIPO RECTO, ACABADO CORRIENTE, EN LOSAS, INCLUYENDO


MACIZADO
(1,50x1,50)+(1,50x0,10)x4=2,85M2
TOTAL=
2.85 M2

119

E-351-110-210

S/T/P/C DE ACERO DE REFUERZO FY = 4200 KG/CM2 UTILIZANDO CABILLA DE


IGUAL O MENOR DEL No 3 PARA INFRAESTRUCTURA.
PEDESTAL=[(0,80 / 0,15) X 1.20 ] X 0,56 Kg/m
3.58 KG

120 E-351-120-210

121 E-351-200-250

122 E-352-110-210

N DE ESTRIBOS=
ESTRIBOS=
ESTRIBO I=
AMARRE=
AMARRE=
ESTRIBO II=
123 E-352-120-210

S/T/P/C DE ACERO DE REFUERZO FY = 4200 KG/CM2 UTILIZANDO CABILLA


No 4 A No 7 PARA INFRAESTRUCTURA.
EN LA COLUMNA DEL TANQUE
[(8pzas X 1,00) + (16 pzas X 0,80)] X 0,99 kg/m
TOTAL =
S/T Y COLOCACION DE MALLA DE ACERO PARA INFRAESTRUCTURA
(1,50x1,50)x1,33KG/M2x2=5,99KG
TOTAL=

20.59 KG
20.59 KG

5.99 KG

S/T/P/C DE ACERO DE REFUERZO FY = 4200 KG/CM2 UTILIZANDO CABILLA DE


IGUAL O MENOR DEL No 3 PARA SUPERESTRUCTURA.
COLUMNA DEL TANQUE: 3 / (O.15) = 20
3,00 / 0,15 =>
20
1.20mL x 20 x 0.56 Kg/m
13.44 Kg
5 X 5.60 X 3 X 0.56 Kg/m
47,04 KG
0.78 DE LONG X 20 X 0.56 Kg/mL = 8.74 kG
TOTAL=
69.22 KG
S/T/P/C DE ACERO DE REFUERZO FY = 4200 KG/CM2 UTILIZANDO CABILLA
No 4 A No 7 PARA SUPERESTRUCTURA.
(8x4,5x0,99)+(30x1,5x0,99)
TOTAL=

80.19 KG

124 E-391-564-020

S/T/C DE LAMINAS DE ACERO ASFALTO Y ALUMINIO PARA CUBIERTAS DE TECHO, PERFIL


ONDULADO, ACABADO RELIEVE GOFRADO, ESPESOR=2 MM (ACEROLIT)
(1,12x1,00)=1,12M2
TOTAL=
1.12 M2

125 E-437-047-S/C

S/T/C DE REJAS DE PERFILES DE HIERRO 1" x 1" Y MARCOS DE 3" X 1"


(0,80+1,00)/2x1,00x2+(0,80x1,00)+(1,00x1,00)+(1,02x1,00)=4,62M2
TOTAL=

126 E-461-001-101

ESMALTE EN BARANDAS Y REJAS METALICAS


4,62x2=9,24
TOTAL=

127 E-611-111-019

4.62 M2

9.24 M2

TUBERIA AGUAS CLARAS, DE HIERRO GALVANIZADO, DIAMETRO 3/4 PLG ( 19 MM), ISO II,
150 PSI AMBIENTE EXTERIOR AL RECINTO SANITARIO, INCLUYE CONEXIONES
30.00 M

128 E-802-220-000

ENCOFRADO METALICO PARA CONCRETO CORRESPONDIENTE OBRAS DE SERVICIO


A=(3Mx0,30m)x4=3,60M2
3.60 M2

129 E-807-S/N

SUMINISTRO Y COLOCACION DE TANQUE ELEVADO SINTETICO CON CAPACIDAD DE 1500 LTS.


INCLUYE ESCALERA DE HIERRO.
1.00 UND

130 E-807-S/N-1

PERFORACION DE POZO A MANO PARA LA EXTRACCION DE AGUA, INCLUYE ENCAMISADO


CON TUBO PVC DE 3" ,TUBO H.G 1", PARA SUCCION, VALVULA CHECK DE 1"
1 UND

MODULO DE ACCESO
CONSTRUCCION DE PORTON METALICO
REMOCION DE MANTO Y TEJA ASFALTICA
REEMPLAZO DE MACHIHEMBRADO DETERIORADO
IMPERMEABILIZACION CON MANTO ASFALTICO Y ACABADO EN TEJA ASFALTICA
REPARACION DE FRISO EN FILTRACIONES
PINTURA EN CAUCHO PAREDES INTERNAS
PINTURA EN ACEITE PAREDES INTERNAS
PINTURA DE CAUCHO EN EXTERIORES
PINTURA EN ACEITE EXTERIOR
APLICACIN DE BARNIZ EN PUERTA DE MADERA
REEMPLAZO DE PIEZAS SANITARIAS

2.10X0.90X4X2
SANITARIOS
LAVAMANOS

REEMPLAZO DE CENTRO PISO


DUCHA PARA BAO
CONSTRUCCION DE BROCAL DE DUCHA
REEMPLAZO DE TUBOS FLUORESCENTES X BOMBILLOS AHORRADORES
COLOCACION DE TAPAS EN TOMACORRIENTES E INTERRUPTORES
INSTALACION DE BREAKEKRS EN EL TABLERO ELECTRICO EXISTENTE
MANTENIMIENTO DE AIRE ACONDICIONADO 18.000 BTU
MODULO 1
REMOCION DE MANTO Y TEJA ASFALTICA
REEMPLAZO DE MACHIHEMBRADO DETERIORADO
IMPERMEABILIZACION CON MANTO ASFALTICO Y ACABADO EN TEJA ASFALTICA
REPARACION DE FRISO EN FILTRACIONES
PINTURA EN CAUCHO PAREDES INTERNAS
PINTURA EN ACEITE PAREDES INTERNAS
PINTURA DE CAUCHO EN EXTERIORES
PINTURA EN ACEITE EXTERIOR
APLICACIN DE BARNIZ EN PUERTA DE MADERA
SUSITUCION DE CARAMICAS EN PAREDES
REEMPLAZO DE PIEZAS SANITARIAS
REEMPLAZO DE CENTRO PISO Y GRIFERIA (FREGADERO Y DUCHA)

REEMPLAZO DE TUBOS FLUORESCENTES X BOMBILLOS AHORRADORES


COLOCACION DE TAPAS EN TOMACORRIENTES E INTERRUPTORES
INSTALACION DE TABLERO ELECTRICO
INSTALACION DE 18 AIRES ACONDICIONADOS DE 18.000 BTU

2.10X0.90X25X2
SANITARIOS
LAVAMANOS
CENTRO PISO
FREGADERO
DUCHA

18.00
M2
71.12
M2
28.45
M2
142.23
M2
21.65
M2
65.02
M2
60.73
M2
42.08
M2
42.08
M2
15.12
M2
1.00
UND
1.00
UND
2.00
PZA
1.00
UND
0.14
M3
4.00
UND
10.00
UND
0.00
1.00 UND

591.10
236.44
1,182.20
86.42
376.55
355.81
97.05
97.05
94.50
8.00
8.00
8.00
1.00
2.00

UND
UND
UND
UND
UND

1.00
18.00

UND
UND

UNES
REMOCION DE MANTO Y TEJA ASFALTICA
REEMPLAZO DE MACHIHEMBRADO DETERIORADO
IMPERMEABILIZACION CON MANTO ASFALTICO Y ACABADO EN TEJA ASFALTICA
REPARACION DE FRISO EN FILTRACIONES
PINTURA EN CAUCHO PAREDES INTERNAS
PINTURA EN ACEITE PAREDES INTERNAS
PINTURA DE CAUCHO EN EXTERIORES
PINTURA EN ACEITE EXTERIOR
APLICACIN DE BARNIZ EN PUERTA DE MADERA
SUSITUCION DE CARAMICAS EN (PISOS Y PAREDES)
REEMPLAZO DE PIEZAS SANITARIAS

2.10X0.90X9X2
2X1.44X2
6.08X2.1X2
SANITARIOS
LAVAMANOS

REEMPLAZO DE CENTRO PISOS


REEMPLAZO DE TUBOS FLUORESCENTES X BOMBILLOS AHORRADORES
COLOCACION DE TAPAS EN TOMACORRIENTES E INTERRUPTORES
INSTALACION DE TABLERO ELECTRICO
MANTENIMIENTO DE AIRE ACONDICIONADO 18.000 BTU
DORMITORIOS 2, 3, 4
REMOCION DE MANTO Y TEJA ASFALTICA
REEMPLAZO DE MACHIHEMBRADO DETERIORADO
IMPERMEABILIZACION CON MANTO ASFALTICO Y ACABADO EN TEJA ASFALTICA
REPARACION DE FRISO EN FILTRACIONES
PINTURA EN CAUCHO PAREDES INTERNAS
PINTURA EN ACEITE PAREDES INTERNAS
PINTURA DE CAUCHO EN EXTERIORES
PINTURA EN ACEITE EXTERIOR
APLICACIN DE BARNIZ EN PUERTA DE MADERA
SUSITUCION DE CARAMICAS EN (PISOS Y PAREDES)
REEMPLAZO DE PIEZAS SANITARIAS
REEMPLAZO DE CENTRO PISOS
GRIFERIA DE DUCHA
REEMPLAZO DE TUBOS FLUORESCENTES X BOMBILLOS AHORRADORES
COLOCACION DE TAPAS EN TOMACORRIENTES E INTERRUPTORES
INSTALACION DE TABLERO ELECTRICO
MANTENIMIENTO DE AIRE ACONDICIONADO 18.000 BTU

2.10X0.90X12X2
2.2X1.60X6
6.0X2.1X6
SANITARIOS
LAVAMANOS

281.52
112.61
563.04
33.26
142.60
126.29
77.84
77.84
34.02
5.76
25.54
4.00
4.00

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
UND
UND

2.00
7.00

UND
UND

159.84
63.94
319.68
21.07
79.09
65.94
96.60
96.60
45.36
21.12
75.60
2.00
2.00
6.00
6.00
0.00
0.00
0.00
6.00

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
UND
UND
UND
UND

UND

PISOS
PAREDES

PISOS
PAREDES

MODULOS 5, 6, 7
REMOCION DE MANTO Y TEJA ASFALTICA
REEMPLAZO DE MACHIHEMBRADO DETERIORADO
IMPERMEABILIZACION CON MANTO ASFALTICO Y ACABADO EN TEJA ASFALTICA
REPARACION DE FRISO EN FILTRACIONES
PINTURA EN CAUCHO PAREDES INTERNAS
PINTURA EN ACEITE PAREDES INTERNAS
PINTURA DE CAUCHO EN EXTERIORES
PINTURA EN ACEITE EXTERIOR
APLICACIN DE BARNIZ EN PUERTA DE MADERA
ADECUACION DE PIEZAS SANITARIAS

REEMPLAZO DE TUBOS FLUORESCENTES X BOMBILLOS AHORRADORES


INSTALACION DE TABLEROS
INSTALACION DE AIRES ACONDICIONADOS DE 18.000 BTU

2.10X0.90X12X2
LAVAMANOS
W.C.
URINARIOS
REGADERAS

1,074.80
429.92
2,149.60
0.00
1,130.31
995.76
397.44
397.44
45.36
6.00
6.00
6.00
8.00

M2
M2
M2
M2
M2
M2
M2
M2
M2
UND
UND
UND
UND

4.00

UND

663.26
2,178.38
871.35
4,356.75
162.39
1,793.57
1,604.54
711.01
711.01
234.36
15.00
15.00
16.00
17.00
26.88 CERAMICA PISO
101.14 CERAMICA PAREDES

MODULO DE ACCESO (INFORMACION, DORMITORIOS, ARCHIVOS Y REGISTRO)


REMOCION DE MANTO Y TEJA ASFALTICA EXISTENTE
10.16
5.20

5.07
3.77

51.51
19.60
71.12

REEMPLAZO DE MACHIHEMBRADO DETERIORADO


71.12
28.45

15%

IMPERMEABILIZACION CON MANTO ASFALTICO Y ACABADO EN TEJA ASFALTICA


MANTO ASFALTICO
TEJA ASFALTICA

71.12
71.12
142.23

REPARACION DE FRISO EN FILTRACIONES


MODULO DE INFORMACION
PARED 1
PARED 2
PARED 3
PARED 4

2.6
2.60
3.57
3.57

2.80
2.80
2.80
2.80

M2
7.28
7.28
10.00
10.00

%
15%
15%
15%
15%

M2
1.09
1.09
1.50
1.50
5.18

PARED 1
PARED 2
PARED 3
PARED 4
PARED 5
PARED 6

2.60
1.89
3.47
0.78
1.30
6.13

2.80
2.80
2.80
2.80
2.80
0.70

7.28
5.29
9.72
2.18
3.64
4.29

15%
15%
15%
15%
15%
80%

1.09
0.79
1.46
0.33
0.55
3.43
7.65

PARED 1
PARED 2
PARED 3
PARED 4

3.47
3.47
2.38
1.38

2.80
2.80
2.80
2.80

9.72
9.72
6.66
3.86

15%
15%
15%
15%

1.46
1.46
1.00
0.58
4.49

PARED 1
PARED 2
PARED 3
PARED 4

3.47
3.47
2.18
1.18

2.80
2.80
2.80
2.80

9.72
9.72
6.10
3.30

15%
15%
15%
15%

1.46
1.46
0.92
0.50
4.33

DORMITORIO

BAO DORMITORIO

DEPOSITO

ARCHIVOS Y REGISTROS

21.65

PINTURA EN CAUCHO PAREDES INTERNAS


MODULO DE INFORMACION
PARED 1
PARED 2
PARED 3
PARED 4

2.60
2.60
3.57
3.57

1.40
1.40
1.40
1.40

3.64
3.64
5.00
5.00
17.28

PARED 1
PARED 2
PARED 3
PARED 4
PARED 5
PARED 6

2.60
1.89
3.47
0.78
1.30
6.13

1.40
1.40
1.40
1.40
1.40
0.70

3.64
2.65
4.86
1.09
1.82
4.29
18.35

DEPOSITO

PARED 1
PARED 2
PARED 3
PARED 4

3.47
3.47
2.38
1.38

1.40
1.40
1.40
1.40

4.86
4.86
3.33
1.93
14.98

ARCHIVOS Y REGISTROS

PARED 1
PARED 2
PARED 3
PARED 4

3.47
3.47
2.18
1.18

1.40
1.40
1.40
1.40

4.86
4.86
3.05
1.65
14.42
TOTAL

DORMITORIO

BAO DORMITORIO

PINTURA EN ACEITE PAREDES INTERNAS


MODULO DE INFORMACION
PARED 1
PARED 2
PARED 3
PARED 4

2.60
2.60
3.57
3.57

1.40
1.40
1.40
1.40

PARED 1
PARED 2
PARED 3
PARED 4
PARED 5

2.60
1.89
3.47
0.78
1.30

1.40
1.40
1.40
1.40
1.40

PARED 1
PARED 2
PARED 3
PARED 4

3.47
3.47
2.38
1.38

1.40
1.40
1.40
1.40

PARED 1
PARED 2
PARED 3
PARED 4

3.47
3.47
2.18
1.18

1.40
1.40
1.40
1.40

DORMITORIO

DEPOSITO

ARCHIVOS Y REGISTROS

3.64
3.64
5.00
5.00
17.28
3.64
2.65
4.86
1.09
1.82
14.06
4.86
4.86
3.33
1.93
14.98
4.86
4.86
3.05
1.65

65.02

14.42
TOTAL

60.73

PINTURA DE CAUCHO EN EXTERIORES


FACHADA POSTERIOR
FACHADA LATERAL IZQUIERDA
FACHADA PRINCIPAL 1
FACHADA PRINCIPAL 2
FACHADA LATERAL DERECHA 1
FACHADA LATERAL DERECHA 2

8.96
7.64
2.80
3.02
3.77
3.87

1.40
1.40
1.40
1.40
1.40
1.40

12.54
10.70
3.92
4.23
5.28
5.42
42.08

8.96
7.64
2.80
3.02
3.77
3.87

1.40
1.40
1.40
1.40
1.40
1.40

12.54
10.70
3.92
4.23
5.28
5.42
42.08

2.10
2.10
2.10
2.10
2.10

0.94
0.94
0.94
0.94
0.94

3.95
3.95
3.95
3.95
3.95
19.74

PINTURA EN ACEITE EXTERIOR


FACHADA POSTERIOR
FACHADA LATERAL IZQUIERDA
FACHADA PRINCIPAL 1
FACHADA PRINCIPAL 2
FACHADA LATERAL DERECHA 1
FACHADA LATERAL DERECHA 2

BARNIZ EN PUERTA DE MADERA


MODULO DE INFORMACION
DORMITORIO
BAO DORMITORIO
DEPOSITO
ARCHIVOS Y REGISTROS

PINTURA EN ACEITE Y VENTANAS METALICAS

REEMPLAZO DE PIEZAS SANITARIAS


BAO DORMITORIO

1.00
1.00

REEMPLAZO DE CENTRO PISO


BAO DORMITORIO

2.00

REEMPLAZO DE TUBERIA DE AGUAS BLANCAS

12.00

REEMPLAZO DE TUBOS FLURESCENTE CIRCULARES 26 W

LAVAMANOS (PEDESTAL)
W.C.

ML
5.00

COLOCACION DE TAPAS EN TOMACOORRIENTES E INTERRUPTORES


INSTALACION DE BREAKER

40 W

MANTEMIMIENTO DE AIRE 18 MIL BTU

1.00

UND
5.00

UND
4 UND

UND

MODULO No 1
REMOCION DE MANTO Y TEJA ASFALTICA EXISTENTE
29.61
4.60

19.59
2.40

580.06
11.04
591.10

REEMPLAZO DE MACHIHEMBRADO DETERIORADO


591.10
236.44

8%

IMPERMEABILIZACION CON MANTO ASFALTICO Y ACABADO EN TEJA ASFALTICA


MANTO ASFALTICO
TEJA ASFALTICA

591.10
591.10
1,182.20

REPARACION DE FRISO EN AREAS DE AIRE ACONDICIONADO Y FILTRACIONES


MODULO DEL DIRECTOR
PARED 1
PARED 2
PARED 3
PARED 4
PARED 5
PARED 6
PARED 7
PARED 8

7.5
4.17
2.40
3.50
3.27
1.12
1.12
0.50

2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80

M2
21.00
11.68
6.72
9.80
9.16
3.14
3.14
1.40

%
8%
8%
8%
8%
8%
8%
8%
8%

M2
1.68
0.93
0.54
0.78
0.73
0.25
0.25
0.11
5.28

PARED 1
PARED 2
PARED 3
PARED 4
PARED 5
PARED 6
PARED 7
PARED 8

0.50
0.68
0.77
0.63
2.61
2.91
3.29
6.66

2.80
2.80
2.80
2.80
2.80
2.80
2.80
0.70

1.40
1.90
2.16
1.76
7.31
8.15
9.21
4.66

8%
8%
8%
8%
8%
8%
8%
80%

0.11
0.15
0.17
0.14
0.58
0.65
0.74
3.73
6.28

JEFA DE AYUDANTIA

PARED 1
PARED 2
PARED 3
PARED 4

3.09
3.30
3.30
2.19

2.80
2.80
2.80
2.80

8.65
9.24
9.24
6.13

8%
8%
8%
8%

KITCHENETTE

PARED 1
PARED 2
PARED 3

3.30
3.30
1.12

2.80
2.80
2.80

9.24
9.24
3.14

8%
8%
8%

0.69
0.74
0.74
0.49
2.66
0.74
0.74
0.25
1.73

DORMITORIO

BAO DORMITORIO

RECEPCION

PARED 1
PARED 2
PARED 3
PARED 4
PARED 5
PARED 6
PARED 7
PARED 8
PARED 9
PARED 10

0.50
0.34
0.54
1.20
2.12
1.02
2.08
2.29
6.06
3.69

2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80

1.40
0.95
1.51
3.36
5.94
2.86
5.82
6.41
16.97
10.33

8%
8%
8%
8%
8%
8%
8%
8%
8%
8%

BAO RECEPCION

PARED 1
PARED 2
PARED 3
PARED 4

0.54
1.60
1.44
1.60

0.70
0.70
0.70
0.70

0.38
1.12
1.01
1.12

8%
8%
8%
8%

INFORMATICA

PARED 1
PARED 2
PARED 3
PARED 4

1.92
2.80
3.07
2.80

2.80
2.80
2.80
2.80

5.38
7.84
8.60
7.84

8%
8%
8%
8%

TOTAL
PINTURA EN CAUCHO PAREDES INTERNAS
MODULO DEL DIRECTOR
M2
10.50
5.84
3.36
4.90
4.58
1.57
1.57
0.70
33.01

PARED 1
PARED 2
PARED 3
PARED 4
PARED 5
PARED 6
PARED 7
PARED 8

7.5
4.17
2.40
3.50
3.27
1.12
1.12
0.50

1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40

PARED 1
PARED 2
PARED 3
PARED 4
PARED 5
PARED 6
PARED 7
PARED 8

0.50
0.68
0.77
0.63
2.61
2.91
3.29
6.66

1.40
1.40
1.40
1.40
1.40
1.40
1.40
0.70

0.70
0.95
1.08
0.88
3.65
4.07
4.61
4.66
20.61

PARED 1
PARED 2
PARED 3
PARED 4

3.09
3.30
3.30
2.19

1.40
1.40
1.40
1.40

4.33
4.62
4.62
3.07

DORMITORIO

BAO DORMITORIO

JEFA DE AYUDANTIA

0.11
0.08
0.12
0.27
0.47
0.23
0.47
0.51
1.36
0.83
4.44
0.03
0.09
0.08
0.09
0.29
0.43
0.63
0.69
0.63
2.37
23.06

16.63
KITCHENETTE

PARED 1
PARED 2
PARED 3

3.30
3.30
1.12

1.40
1.40
1.40

4.62
4.62
1.57
10.81

RECEPCION

PARED 1
PARED 2
PARED 3
PARED 4
PARED 5
PARED 6
PARED 7
PARED 8
PARED 9
PARED 10

0.50
0.34
0.54
1.20
2.12
1.02
2.08
2.29
6.06
3.69

1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40

0.70
0.48
0.76
1.68
2.97
1.43
2.91
3.21
8.48
5.17
27.78

BAO RECEPCION

PARED 1
PARED 2
PARED 3
PARED 4

0.54
1.60
1.44
1.60

0.70
0.70
0.70
0.70

0.38
1.12
1.01
1.12
3.63

INFORMATICA

PARED 1
PARED 2
PARED 3
PARED 4

1.92
2.80
3.07
2.80

1.40
1.40
1.40
1.40

2.69
3.92
4.30
3.92
14.83

TOTAL

127.29

PINTURA EN ACEITE PAREDES INTERNAS


MODULO DEL DIRECTOR
PARED 1
PARED 2
PARED 3
PARED 4
PARED 5
PARED 6
PARED 7
PARED 8

7.5
4.17
2.40
3.50
3.27
1.12
1.12
0.50

1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40

10.50
5.84
3.36
4.90
4.58
1.57
1.57
0.70
33.01

PARED 1
PARED 2
PARED 3
PARED 4
PARED 5
PARED 6

0.50
0.68
0.77
0.63
2.61
2.91

1.40
1.40
1.40
1.40
1.40
1.40

0.70
0.95
1.08
0.88
3.65
4.07

DORMITORIO

PARED 7

3.29

1.40

4.61
15.95

JEFA DE AYUDANTIA

PARED 1
PARED 2
PARED 3
PARED 4

3.09
3.30
3.30
2.19

1.40
1.40
1.40
1.40

4.33
4.62
4.62
3.07
16.63

KITCHENETTE

PARED 1
PARED 2
PARED 3

3.30
3.30
1.12

1.40
1.40
1.40

4.62
4.62
1.57
10.81

RECEPCION

PARED 1
PARED 2
PARED 3
PARED 4
PARED 5
PARED 6
PARED 7
PARED 8
PARED 9
PARED 10

0.50
0.34
0.54
1.20
2.12
1.02
2.08
2.29
6.06
3.69

1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40

0.70
0.48
0.76
1.68
2.97
1.43
2.91
3.21
8.48
5.17
27.78

INFORMATICA

PARED 1
PARED 2
PARED 3
PARED 4

1.92
2.80
3.07
2.80

1.40
1.40
1.40
1.40

2.69
3.92
4.30
3.92
14.83
TOTAL

PINTURA DE CAUCHO EN EXTERIORES


FACHADA LATERAL IZQUIERDA
FACHADA PRINCIPAL 1
FACHADA PRINCIPAL 2
FACHADA LATERAL DERECHA

9.55
9.65
14.16
9.55

1.60
1.60
1.60
1.60
TOTAL

15.28
15.44
22.66
15.28
68.66

9.55
9.65
14.16
9.55

1.40
1.40
1.40
1.40
TOTAL

13.37
13.51
19.82
13.37
60.07

PINTURA EN ACEITE EXTERIOR


FACHADA POSTERIOR
FACHADA LATERAL IZQUIERDA
FACHADA PRINCIPAL 1
FACHADA PRINCIPAL 2

119.00

REPARACION DE FRISO EN AREAS DE AIRE ACONDICIONADO Y FILTRACIONES


MODULO SUB.DIRECTOR
PARED 1
PARED 2
PARED 3
PARED 4

5.00
3.55
3.85
4.55

2.80
2.80
2.80
2.80

M2
14.00
9.94
10.78
12.74

PARED 1
PARED 2
PARED 3
PARED 4
PARED 5
PARED 6
PARED 7
PARED 8
PARED 9
PARED 10
PARED 11

4.05
3.90
0.20
1.07
0.55
1.00
0.55
0.20
3.55
0.75
5.55

2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80
0.70

11.34
10.92
0.56
3.00
1.54
2.80
1.54
0.56
9.94
2.10
3.89

8%
8%
8%
8%
8%
8%
8%
8%
8%
8%
80%

0.91
0.87
0.04
0.24
0.12
0.22
0.12
0.04
0.80
0.17
3.11
6.65

SALA DE REUNIONES

PARED 1
PARED 2
PARED 3
PARED 4
PARED 5
PARED 6
PARED 7
PARED 8
PARED 9
PARED 10
PARED 11

3.39
1.55
3.88
6.35
2.10
0.55
1.55
0.65
0.65
0.60
0.19

2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80

9.49
4.34
10.86
17.78
5.88
1.54
4.34
1.82
1.82
1.68
0.53

8%
8%
8%
8%
8%
8%
8%
8%
8%
8%
8%

0.76
0.35
0.87
1.42
0.47
0.12
0.35
0.15
0.15
0.13
0.04
4.81

DORMITORIO

PARED 1
PARED 2
PARED 3
PARED 4
PARED 5

3.85
4.40
3.85
2.36
1.10

2.80
2.80
2.80
2.80
2.80

10.78
12.32
10.78
6.61
3.08

8%
8%
8%
8%
8%

0.86
0.99
0.86
0.53
0.25
3.49

BAO DORMITORIO

PARED 1
PARED 2
PARED 3
PARED 4

1.90
2.30
1.90
1.10

2.80
2.80
2.80
2.80

5.32
6.44
5.32
3.08

30%
30%
30%
30%

1.60
1.93
1.60
0.92
6.05

RECEPCION

BAO RECEPCION

%
8%
8%
8%
8%

M2
1.12
0.80
0.86
1.02
3.80

TOTAL

PINTURA EN CAUCHO PAREDES INTERNAS


MODULO SUB.DIRECTOR
M2
7.00
4.97
5.39
6.37
23.73

PARED 1
PARED 2
PARED 3
PARED 4

5.00
3.55
3.85
4.55

1.40
1.40
1.40
1.40

PARED 1
PARED 2
PARED 3
PARED 4
PARED 5
PARED 6
PARED 7
PARED 8
PARED 9
PARED 10
PARED 11

4.05
3.90
0.20
1.07
0.55
1.00
0.55
0.20
3.55
0.75
5.55

1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
0.70

5.67
5.46
0.28
1.50
0.77
1.40
0.77
0.28
4.97
1.05
3.89
26.03

SALA DE REUNIONES

PARED 1
PARED 2
PARED 3
PARED 4
PARED 5
PARED 6
PARED 7
PARED 8
PARED 9
PARED 10
PARED 11

3.39
1.55
3.88
6.35
2.10
0.55
1.55
0.65
0.65
0.60
0.19

1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40

4.75
2.17
5.43
8.89
2.94
0.77
2.17
0.91
0.91
0.84
0.27
30.04

DORMITORIO

PARED 1
PARED 2
PARED 3
PARED 4
PARED 5

3.85
4.40
3.85
2.36
1.10

1.40
1.40
1.40
1.40
1.40

5.39
6.16
5.39
3.30
1.54
21.78

BAO DORMITORIO

PARED 1
PARED 2
PARED 3
PARED 4

1.90
2.30
1.90
1.10

1.40
1.40
1.40
1.40

2.66
3.22
2.66
1.54
10.08

RECEPCION

BAO RECEPCION

24.79

TOTAL

111.67

PINTURA EN ACEITE PAREDES INTERNAS


MODULO SUB.DIRECTOR
M2
7.00
4.97
5.39
6.37
23.73

PARED 1
PARED 2
PARED 3
PARED 4

5.00
3.55
3.85
4.55

1.40
1.40
1.40
1.40

RECEPCION

PARED 1
PARED 2
PARED 3
PARED 4
PARED 5
PARED 6
PARED 7
PARED 8
PARED 9
PARED 10

4.05
3.90
0.20
1.07
0.55
1.00
0.55
0.20
3.55
0.75

1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40

5.67
5.46
0.28
1.50
0.77
1.40
0.77
0.28
4.97
1.05
22.15

SALA DE REUNIONES

PARED 1
PARED 2
PARED 3
PARED 4
PARED 5
PARED 6
PARED 7
PARED 8
PARED 9
PARED 10
PARED 11

3.39
1.55
3.88
6.35
2.10
0.55
1.55
0.65
0.65
0.60
0.19

1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40

4.75
2.17
5.43
8.89
2.94
0.77
2.17
0.91
0.91
0.84
0.27
30.04

DORMITORIO

PARED 1
PARED 2
PARED 3
PARED 4
PARED 5

3.85
4.40
3.85
2.36
1.10

1.40
1.40
1.40
1.40
1.40

5.39
6.16
5.39
3.30
1.54
21.78

BAO DORMITORIO

PARED 1
PARED 2
PARED 3
PARED 4

1.90
2.30
1.90
1.10

1.40
1.40
1.40
1.40

2.66
3.22
2.66
1.54
10.08

TOTAL

107.79

PASILLO CENTRAL ENTRE (DIRECCION/SUB.DIRECCION)


REPARACION DE FRISO EN AREAS DE AIRE ACONDICIONADO Y FILTRACIONES
PASILLO CENTRAL
PARED 1
PARED 2
PARED 3
PARED 4
PARED 5
PARED 6
PARED 7
PARED 8
PARED 9

M2
1.48
6.61
5.82
11.62
11.62
4.34
4.82
9.18
11.48

0.53
2.36
2.08
4.15
4.15
1.55
1.72
3.28
4.10

2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80

PINTURA EN CAUCHO PAREDES INTERNAS


PARED 1
0.53
PARED 2
2.36
PARED 3
2.08
PARED 4
4.15
PARED 5
4.15
PARED 6
1.55
PARED 7
1.72
PARED 8
3.28
PARED 9
4.10

1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40

0.74
3.30
2.91
5.81
5.81
2.17
2.41
4.59
5.74
33.49

PINTURA EN ACEITE PAREDES INTERNAS


PARED 1
PARED 2
PARED 3
PARED 4
PARED 5
PARED 6
PARED 7
PARED 8
PARED 9

1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40

0.74
3.30
2.91
5.81
5.81
2.17
2.41
4.59
5.74
33.49

0.53
2.36
2.08
4.15
4.15
1.55
1.72
3.28
4.10

%
8%
8%
8%
8%
8%
8%
8%
8%
8%

M2
0.12
0.53
0.47
0.93
0.93
0.35
0.39
0.73
0.92
5.36

DIRECCION DE R.R.H.H
REPARACION DE FRISO EN AREAS DE AIRE ACONDICIONADO Y FILTRACIONES
M2
PARED 1
3.90
2.80
10.92
PARED 2
1.10
2.80
3.08
PARED 3
0.20
2.80
0.56
PARED 4
0.94
2.80
2.63
PARED 5
2.32
2.80
6.50
PARED 6
3.16
2.80
8.85
PARED 7
5.80
2.80
16.24
PARED 8
0.24
2.80
0.67
PARED 9
1.86
2.80
5.21
PARED 10
1.56
2.80
4.37
BAO RRHH PARED 11
6.12
0.70
4.28
PARED 12
2.50
2.80
7.00
PARED 13
2.32
2.80
6.50
PARED 14
3.52
2.80
9.86
PARED 15
2.12
2.80
5.94
PARED 16
2.50
2.80
7.00
PARED 17
2.50
2.80
7.00
PARED 18
1.86
2.80
5.21
PARED 19
0.20
2.80
0.56
PARED 20
1.56
2.80
4.37
PARED 21
0.20
2.80
0.56
PARED 22
0.94
2.80
2.63
PARED 23
2.32
2.80
6.50
PARED 24
3.52
2.80
9.86
PARED 25
2.12
2.80
5.94
PARED 26
2.50
2.80
7.00

O.C.A.P.

BAO OCAP

SALA SITUACIONAL

%
8%
8%
8%
8%
8%
8%
8%
8%
8%
8%
8%
8%
8%
8%
8%
8%
8%
8%
8%
8%
8%
8%
8%
8%
8%
8%

M2
0.87
0.25
0.04
0.21
0.52
0.71
1.30
0.05
0.42
0.35
0.34
0.56
0.52
0.79
0.47
0.56
0.56
0.42
0.04
0.35
0.04
0.21
0.52
0.79
0.47
0.56
11.94

PARED 1
PARED 2
PARED 3
PARED 4
PARED 5
PARED 6
PARED 7

1.10
3.90
5.80
3.16
2.32
0.20
6.12

2.80
2.80
2.80
2.80
2.80
2.80
0.70

3.08
10.92
16.24
8.85
6.50
0.56
4.28

8%
8%
8%
8%
8%
8%
8%

0.25
0.87
1.30
0.71
0.52
0.04
0.34
4.03

PARED 1
PARED 2
PARED 3
PARED 4

5.80
3.16
3.90
2.32

2.8
2.8
2.8
2.8

16.24
8.85
10.92
6.50

8%
8%
8%
8%

1.30
0.71
0.87
0.52

PARED 5
PARED 6

1.10
0.94

2.8
2.8

3.08
2.63

8%
8%

DIREC. OPERACIONES

PARED 1
PARED 2
PARED 3
PARED 4

2.12
2.50
2.32
3.52

2.8
2.8
2.8
2.8

5.94
7.00
6.50
9.86

8%
8%
8%
8%

ADM. Y SERVICIOS

PARED 1
PARED 2
PARED 3
PARED 4

2.32
2.32
3.52
2.50

2.8
2.8
2.8
2.8

6.50
6.50
9.86
7.00

8%
8%
8%
8%

PASILLO

PARED 1
PARED 2
PARED 3
PARED 4
PARED 5
PARED 6
PARED 7
PARED 8
PARED 9
PARED 10
PARED 11
PARED 12
PARED 13
PARED 14

0.20
1.86
1.56
0.20
0.20
0.20
1.56
1.86
0.20
1.00
2.50
2.50
0.20
0.20

2.8
2.8
2.8
2.8
2.8
2.8
2.8
2.8
2.8
2.8
2.8
2.8
2.8
2.8

0.56
5.21
4.37
0.56
0.56
0.56
4.37
5.21
0.56
2.80
7.00
7.00
0.56
0.56

8%
8%
8%
8%
8%
8%
8%
8%
8%
8%
8%
8%
8%
8%

SALON AMPLIO

PARED 1
PARED 2
PARED 3
PARED 4
PARED 5
PARED 6

2.32
3.16
5.80
3.90
1.10
0.20

2.8
2.8
2.8
2.8
2.8
2.8

6.50
8.85
16.24
10.92
3.08
0.56

8%
8%
8%
8%
8%
8%

BAO SALON AMPLIO

PARED 1

6.32

0.7

4.42

40%

1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
0.70
1.40

M2
5.46
1.54
0.28
1.32
3.25
4.42
8.12
0.34
2.60
2.18
4.28
3.50

0.25
0.21
3.86
0.47
0.56
0.52
0.79
2.34
0.52
0.52
0.79
0.56
2.39
0.04
0.42
0.35
0.04
0.04
0.04
0.35
0.42
0.04
0.22
0.56
0.56
0.04
0.04
3.19
0.52
0.71
1.30
0.87
0.25
0.04
3.69
1.77
1.77
33.21

PINTURA EN CAUCHO PAREDES INTERNAS


PARED 1
3.90
PARED 2
1.10
PARED 3
0.20
PARED 4
0.94
PARED 5
2.32
PARED 6
3.16
PARED 7
5.80
PARED 8
0.24
PARED 9
1.86
PARED 10
1.56
BAO RRHH PARED 11
6.12
PARED 12
2.50

O.C.A.P.

BAO OCAP

PARED 13
PARED 14
PARED 15
PARED 16
PARED 17
PARED 18
PARED 19
PARED 20
PARED 21
PARED 22
PARED 23
PARED 24
PARED 25
PARED 26

2.32
3.52
2.12
2.50
2.50
1.86
0.20
1.56
0.20
0.94
2.32
3.52
2.12
2.50

1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40

3.25
4.93
2.97
3.50
3.50
2.60
0.28
2.18
0.28
1.32
3.25
4.93
2.97
3.50
76.75

PARED 1
PARED 2
PARED 3
PARED 4
PARED 5
PARED 6
PARED 7

1.10
3.90
5.80
3.16
2.32
0.20
6.12

1.40
1.40
1.40
1.40
1.40
1.40
0.70

1.54
5.46
8.12
4.42
3.25
0.28
4.28
27.36

TOTAL

104.10

1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40

5.46
1.54
0.28
1.32
3.25
4.42
8.12
0.34
2.60
2.18
3.50
3.25
4.93
2.97
3.50
3.50
2.60
0.28
2.18
0.28
1.32
3.25
4.93
2.97
3.50

PINTURA EN ACEITE PAREDES INTERNAS


PARED 1
PARED 2
PARED 3
PARED 4
PARED 5
PARED 6
PARED 7
PARED 8
PARED 9
PARED 10
PARED 12
PARED 13
PARED 14
PARED 15
PARED 16
PARED 17
PARED 18
PARED 19
PARED 20
PARED 21
PARED 22
PARED 23
PARED 24
PARED 25
PARED 26

3.90
1.10
0.20
0.94
2.32
3.16
5.80
0.24
1.86
1.56
2.50
2.32
3.52
2.12
2.50
2.50
1.86
0.20
1.56
0.20
0.94
2.32
3.52
2.12
2.50

72.46
O.C.A.P.

PARED 1
PARED 2
PARED 3
PARED 4
PARED 5
PARED 6

1.10
3.90
5.80
3.16
2.32
0.20

PINTURA EN CAUCHO PAREDES EXTERNAS


9.55
PARED 1
9.65
PARED 2
14.16
PARED 3
9.55
PARED 4
3.11
PARED 5
19.25
PARED 6
4.05
PARED 7

PINTURA EN ACEITE PAREDES EXTERNAS


PARED 1
PARED 2
PARED 3
PARED 4
PARED 5
PARED 6
PARED 7

9.55
9.65
14.16
9.55
3.11
19.25
4.05

1.40
1.40
1.40
1.40
1.40
1.40

1.54
5.46
8.12
4.42
3.25
0.28
23.07

TOTAL

95.54

1.40
1.40
1.40
1.40
1.40
1.40
1.40
TOTAL

13.37
13.51
19.82
13.37
4.35
26.95
5.67
97.05

1.40
1.40
1.40
1.40
1.40
1.40
1.40
TOTAL

13.37
13.51
19.82
13.37
4.35
26.95
5.67
97.05

BARNIZ EN PUERTA DE MADERA


MODULO DE INFORMACION
DORMITORIO
BAO DORMITORIO
DEPOSITO
ARCHIVOS Y REGISTROS

2.10
2.10
2.10
2.10
2.10

0.94
0.94
0.94
0.94
0.94

3.95
3.95
3.95
3.95
3.95
19.74

PINTURA EN ACEITE Y VENTANAS METALICAS

REEMPLAZO DE PIEZAS SANITARIAS


BAO DORMITORIO

REEMPLAZO DE CENTRO PISO

1.00
1.00

LAVAMANOS (PEDESTAL)
W.C.

BAO DORMITORIO
REEMPLAZO DE TUBERIA DE AGUAS BLANCAS

2.00
12.00

REEMPLAZO DE TUBOS FLURESCENTE CIRCULARES 26 W

ML
5.00

COLOCACION DE TAPAS EN TOMACOORRIENTES E INTERRUPTORES


INSTALACION DE BREAKER

40 W

MANTEMIMIENTO DE AIRE 18 MIL BTU

1.00

UND
5.00

UND
4 UND

UND

MODULO UNES
REMOCION DE MANTO Y TEJA ASFALTICA EXISTENTE
18.40

15.30

281.52
281.52

REEMPLAZO DE MACHIHEMBRADO DETERIORADO


281.52
112.61

8%

IMPERMEABILIZACION CON MANTO ASFALTICO Y ACABADO EN TEJA ASFALTICA


MANTO ASFALTICO
TEJA ASFALTICA

281.52
281.52
563.04

REPARACION DE FRISO EN AREAS DE AIRE ACONDICIONADO Y FILTRACIONES


AREA "A"
PARED 1
PARED 2
PARED 3
PARED 4
PARED 5
PARED 6
PARED 7
PARED 8
PARED 9
PARED 10
PARED 11
PARED 12
PARED 13
PARED 14

5.6
2.60
1.25
2.54
2.80
2.80
2.70
0.70
0.70
2.70
2.60
2.70
0.70
0.70

2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80

M2
15.68
7.28
3.50
7.11
7.84
7.84
7.56
1.96
1.96
7.56
7.28
7.56
1.96
1.96

%
8%
8%
8%
8%
8%
8%
8%
8%
8%
8%
8%
8%
8%
8%

M2
1.25
0.58
0.28
0.57
0.63
0.63
0.60
0.16
0.16
0.60
0.58
0.60
0.16
0.16
6.96

BAO 1 AREA "A"


BAO 2 AREA "A"

PARED 8
PARED 9

6.20
6.20

0.70
0.70

4.34
4.34

80%
80%

3.47
3.47
6.94

AREA "B"

PARED 1
PARED 2
PARED 3
PARED 4
PARED 5
PARED 6
PARED 7
PARED 8
PARED 9

1.80
2.30
1.00
2.70
2.80
0.20
2.70
2.60
1.64

2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80

5.04
6.44
2.80
7.56
7.84
0.56
7.56
7.28
4.59

8%
8%
8%
8%
8%
8%
8%
8%
8%

0.40
0.52
0.22
0.60
0.63
0.04
0.60
0.58
0.37

PARED 10
PARED 11
PARED 12
PARED 13
PARED 14
PARED 15
PARED 16
PARED 17

1.64
2.60
2.70
2.80
2.80
2.70
2.60
1.64

2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80

4.59
7.28
7.56
7.84
7.84
7.56
7.28
4.59

8%
8%
8%
8%
8%
8%
8%
8%

0.37
0.58
0.60
0.63
0.63
0.60
0.58
0.37
8.34

AREA "C"

PARED 1
PARED 2
PARED 3
PARED 4
PARED 5
PARED 6
PARED 7

2.80
0.20
5.70
2.40
2.40
5.60
2.80

2.80
2.80
2.80
2.80
2.80
2.80
2.80

7.84
0.56
15.96
6.72
6.72
15.68
7.84

8%
8%
8%
8%
8%
8%
8%

0.63
0.04
1.28
0.54
0.54
1.25
0.63
4.91

BAO 1 AREA "C"


BAO 2 AREA "C"

PARED 8
PARED 9

5.45
5.45

0.70
0.70

3.82
3.82

80%
80%

3.05
3.05
6.10

TOTAL
PINTURA EN CAUCHO PAREDES INTERNAS
AREA "A"
M2
7.84
3.64
1.75
3.56
3.92
3.92
3.78
0.98
0.98
3.78
3.64
3.78
0.98
0.98
43.53

PARED 1
PARED 2
PARED 3
PARED 4
PARED 5
PARED 6
PARED 7
PARED 8
PARED 9
PARED 10
PARED 11
PARED 12
PARED 13
PARED 14

5.6
2.60
1.25
2.54
2.80
2.80
2.70
0.70
0.70
2.70
2.60
2.70
0.70
0.70

1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40

BAO 1 AREA "A"


BAO 2 AREA "A"

PARED 8
PARED 9

6.20
6.20

0.70
0.70

4.34
4.34
8.68

AREA "B"

PARED 1
PARED 2
PARED 3
PARED 4

1.80
2.30
1.00
2.70

1.40
1.40
1.40
1.40

2.52
3.22
1.40
3.78

33.26

PARED 5
PARED 6
PARED 7
PARED 8
PARED 9
PARED 10
PARED 11
PARED 12
PARED 13
PARED 14
PARED 15
PARED 16
PARED 17

2.80
0.20
2.70
2.60
1.64
1.64
2.60
2.70
2.80
2.80
2.70
2.60
1.64

1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40

3.92
0.28
3.78
3.64
2.30
2.30
3.64
3.78
3.92
3.92
3.78
3.64
2.30
52.11

AREA "C"

PARED 1
PARED 2
PARED 3
PARED 4
PARED 5
PARED 6
PARED 7

2.80
0.20
5.70
2.40
2.40
5.60
2.80

1.40
1.40
1.40
1.40
1.40
1.40
1.40

3.92
0.28
7.98
3.36
3.36
7.84
3.92
30.66

BAO 1 AREA "C"


BAO 2 AREA "C"

PARED 8
PARED 9

5.45
5.45

0.70
0.70

3.82
3.82
7.63

TOTAL

142.60

PINTURA EN ACEITE PAREDES INTERNAS


AREA "A"

AREA "B"

PARED 1
PARED 2
PARED 3
PARED 4
PARED 5
PARED 6
PARED 7
PARED 8
PARED 9
PARED 10
PARED 11
PARED 12
PARED 13
PARED 14

5.6
2.60
1.25
2.54
2.80
2.80
2.70
0.70
0.70
2.70
2.60
2.70
0.70
0.70

1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40

7.84
3.64
1.75
3.56
3.92
3.92
3.78
0.98
0.98
3.78
3.64
3.78
0.98
0.98
43.53

PARED 1
PARED 2
PARED 3

1.80
2.30
1.00

1.40
1.40
1.40

2.52
3.22
1.40

AREA "C"

PARED 4
PARED 5
PARED 6
PARED 7
PARED 8
PARED 9
PARED 10
PARED 11
PARED 12
PARED 13
PARED 14
PARED 15
PARED 16
PARED 17

2.70
2.80
0.20
2.70
2.60
1.64
1.64
2.60
2.70
2.80
2.80
2.70
2.60
1.64

1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40

3.78
3.92
0.28
3.78
3.64
2.30
2.30
3.64
3.78
3.92
3.92
3.78
3.64
2.30
52.11

PARED 1
PARED 2
PARED 3
PARED 4
PARED 5
PARED 6
PARED 7

2.80
0.20
5.70
2.40
2.40
5.60
2.80

1.40
1.40
1.40
1.40
1.40
1.40
1.40

3.92
0.28
7.98
3.36
3.36
7.84
3.92
30.66

TOTAL

126.29

3
1.20
2.00
1.20
3.00
6.00
1.00
2.10
1.00
6.00
3.00
3.00
3.00
3.00
3.00
14.10

1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40

4.20
1.68
2.80
1.68
4.20
8.40
1.40
2.94
1.40
8.40
4.20
4.20
4.20
4.20
4.20
19.74
77.84

3
1.20
2.00
1.20
3.00

1.40
1.40
1.40
1.40
1.40

4.20
1.68
2.80
1.68
4.20

PINTURA EN CAUCHO PAREDES EXTERNAS


PARED 1
PARED 2
PARED 3
PARED 4
PARED 5
PARED 6
PARED 7
PARED 8
PARED 9
PARED 10
PARED 11
PARED 12
PARED 13
PARED 14
PARED 15
PARED 16

PINTURA EN ACEITE PAREDES EXTERNAS


PARED 1
PARED 2
PARED 3
PARED 4
PARED 5

PARED 6
PARED 7
PARED 8
PARED 9
PARED 10
PARED 11
PARED 12
PARED 13
PARED 14
PARED 15
PARED 16

6.00
1.00
2.10
1.00
6.00
3.00
3.00
3.00
3.00
3.00
14.10

1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40

8.40
1.40
2.94
1.40
8.40
4.20
4.20
4.20
4.20
4.20
19.74
77.84

2.10
2.10
2.10
2.10
2.10

0.94
0.94
0.94
0.94
0.94

3.95
3.95
3.95
3.95
3.95
19.74

BARNIZ EN PUERTA DE MADERA


MODULO DE INFORMACION
DORMITORIO
BAO DORMITORIO
DEPOSITO
ARCHIVOS Y REGISTROS

PINTURA EN ACEITE Y VENTANAS METALICAS

REEMPLAZO DE PIEZAS SANITARIAS


BAO DORMITORIO

1.00
1.00

REEMPLAZO DE CENTRO PISO


BAO DORMITORIO

2.00

REEMPLAZO DE TUBERIA DE AGUAS BLANCAS

12.00

REEMPLAZO DE TUBOS FLURESCENTE CIRCULARES 26 W

LAVAMANOS (PEDESTAL)
W.C.

ML
5.00

COLOCACION DE TAPAS EN TOMACOORRIENTES E INTERRUPTORES


INSTALACION DE BREAKER

40 W

MANTEMIMIENTO DE AIRE 18 MIL BTU

1.00

UND
5.00

UND
4 UND

UND

DORMMITORIOS 2,3,4
REMOCION DE MANTO Y TEJA ASFALTICA EXISTENTE
7.40

7.20

3.00

159.84
159.84

REEMPLAZO DE MACHIHEMBRADO DETERIORADO


159.84
63.94

8%

IMPERMEABILIZACION CON MANTO ASFALTICO Y ACABADO EN TEJA ASFALTICA


MANTO ASFALTICO
TEJA ASFALTICA

159.84
159.84
319.68

REPARACION DE FRISO EN AREAS DE AIRE ACONDICIONADO Y FILTRACIONES


MODULO 2, 3 Y 4

BAO 1 MODULO 2

PARED 1
PARED 2
PARED 3
PARED 4
PARED 5
PARED 6
PARED 7

2.40
0.24
0.66
3.40
2.00
0.80
6.20

2.80
2.80
2.80
2.80
2.80
2.80
2.80

M2
6.72
0.67
1.85
9.52
5.60
2.24
17.36

%
8%
8%
8%
8%
8%
8%
8%

M2
0.54
0.05
0.15
0.76
0.45
0.18
1.39
3.52

PARED 8

6.26

0.70

4.38

80%

3.51
3.51

3 MODULOS

TOTAL
3.00

7.02
21.07

PINTURA EN CAUCHO PAREDES INTERNAS

BAO 1 MODULO 2

PARED 1
PARED 2
PARED 3
PARED 4
PARED 5
PARED 6
PARED 7
PARED 8

2.40
0.24
0.66
3.40
2.00
0.80
6.20
6.26
3 MODULOS

1.40
1.40
1.40
1.40
1.40
1.40
1.40
0.70
TOTAL
3.00

M2
3.36
0.34
0.92
4.76
2.80
1.12
8.68
4.38
26.36
79.09

PINTURA EN ACEITE PAREDES INTERNAS


PARED 1
PARED 2
PARED 3
PARED 4
PARED 5
PARED 6
PARED 7

2.40
0.24
0.66
3.40
2.00
0.80
6.20

1.40
1.40
1.40
1.40
1.40
1.40
1.40
TOTAL
3.00

3.36
0.34
0.92
4.76
2.80
1.12
8.68
21.98
65.94

1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
TOTAL
3.00

2.80
8.40
2.80
0.56
3.08
0.56
2.80
8.40
2.80
32.20
96.60

3 MODULOS

1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
TOTAL
3.00

2.80
8.40
2.80
0.56
3.08
0.56
2.80
8.40
2.80
32.20
96.60

2.10
2.10
2.10
2.10
2.10

0.94
0.94
0.94
0.94
0.94

3.95
3.95
3.95
3.95
3.95
19.74

3 MODULOS

PINTURA EN CAUCHO PAREDES EXTERNAS


PARED 1
PARED 2
PARED 3
PARED 4
PARED 5
PARED 6
PARED 7
PARED 8
PARED 9

2.00
6.00
2.00
0.40
2.20
0.40
2.00
6.00
2.00
3 MODULOS

PINTURA EN ACEITE PAREDES EXTERNAS


PARED 1
PARED 2
PARED 3
PARED 4
PARED 5
PARED 6
PARED 7
PARED 8
PARED 9

2.00
6.00
2.00
0.40
2.20
0.40
2.00
6.00
2.00

BARNIZ EN PUERTA DE MADERA


MODULO DE INFORMACION
DORMITORIO
BAO DORMITORIO
DEPOSITO
ARCHIVOS Y REGISTROS

PINTURA EN ACEITE Y VENTANAS METALICAS

REEMPLAZO DE PIEZAS SANITARIAS


BAO DORMITORIO

1.00
1.00

REEMPLAZO DE CENTRO PISO


BAO DORMITORIO

2.00

REEMPLAZO DE TUBERIA DE AGUAS BLANCAS

12.00

REEMPLAZO DE TUBOS FLURESCENTE CIRCULARES 26 W

LAVAMANOS (PEDESTAL)
W.C.

ML
5.00

COLOCACION DE TAPAS EN TOMACOORRIENTES E INTERRUPTORES


INSTALACION DE BREAKER

40 W

MANTEMIMIENTO DE AIRE 18 MIL BTU

1.00

UND
5.00

UND
4 UND

UND

MODULO 5,6 Y 7
REMOCION DE MANTO Y TEJA ASFALTICA EXISTENTE
1,074.80
1,074.80
REEMPLAZO DE MACHIHEMBRADO DETERIORADO
1,074.80
429.92

8%

IMPERMEABILIZACION CON MANTO ASFALTICO Y ACABADO EN TEJA ASFALTICA


MANTO ASFALTICO
TEJA ASFALTICA

1,074.80
1,074.80
2,149.60

REPARACION DE FRISO EN AREAS DE AIRE ACONDICIONADO Y FILTRACIONES


MODULO 5,6 Y 7

BAO 1 MODULO 2

PARED 1
PARED 2
PARED 3
PARED 4
PARED 5
PARED 6
PARED 7

2.40
0.24
0.66
3.40
2.00
0.80
6.20

2.80
2.80
2.80
2.80
2.80
2.80
2.80

M2
6.72
0.67
1.85
9.52
5.60
2.24
17.36

%
8%
8%
8%
8%
8%
8%
8%

M2
0.54
0.05
0.15
0.76
0.45
0.18
1.39
3.52

PARED 8

6.26

0.70

4.38

80%

3.51
3.51

3 MODULOS

TOTAL
3.00

7.02
21.07

PINTURA EN CAUCHO PAREDES INTERNAS


PARED 1
PARED 2
PARED 3
PARED 4
PARED 5
PARED 6
PARED 7
PARED 8
PARED 9
PARED 10
PARED 11
PARED 12
PARED 13

5.80
2.80
4.20
4.00
2.20
2.00
5.60
4.00
4.00
4.00
6.06
2.00
2.66

2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00

M2
11.60
5.60
8.40
8.00
4.40
4.00
11.20
8.00
8.00
8.00
12.12
4.00
5.32

PARED 14
PARED 15
PARED 16
PARED 17
PARED 18
PARED 19
PARED 20
PARED 21
PARED 22
PARED 23
PARED 24
PARED 25
PARED 26
PARED 27
PARED 28
PARED 29
PARED 30
PARED 31
DUCHAS
DUCHAS
DUCHAS
PARED 32
PARED 33
PARED 34
PARED 35
PARED 36
PARED 37
PARED 38
PARED 39
PARED 40
PARED 41
PARED 42
PARED 43
PARED 44
PARED 45
PARED 46
PARED 47
PARED 48
PARED 49
PARED 50
PARED 51
PARED 52
PARED 53
PARED 54
PARED 55
PARED 56
PARED 57
W.C
W.C
URINARIO
PARED 58
URINARIO
PARED 59

0.20
0.20
0.20
0.20
0.50
0.56
0.50
1.96
1.40
8.46
4.20
2.40
3.50
1.80
2.00
1.80
2.80
0.80
3.60
3.60
6.00
1.00
2.80
1.80
2.00
1.80
8.46
1.40
1.96
0.56
0.56
4.20
2.40
2.20
4.00
5.60
4.00
2.20
2.00
4.00
6.06
4.00
2.66
4.20
2.80
5.80
2.70
6.00
2.70
2.00
1.00
2.00
1.00

2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
1.50
1.50
1.50
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
1.50
1.50
1.50
2.00
1.50
2.00

0.40
0.40
0.40
0.40
1.00
1.12
1.00
3.92
2.80
16.92
8.40
4.80
7.00
3.60
4.00
3.60
5.60
1.60
5.40
5.40
9.00
2.00
5.60
3.60
4.00
3.60
16.92
2.80
3.92
1.12
1.12
8.40
4.80
4.40
8.00
11.20
8.00
4.40
4.00
8.00
12.12
8.00
5.32
8.40
5.60
11.60
5.40
9.00
4.05
3.00
2.00
3.00
2.00

LAVAMANOS
LAVAMANOS

2.00
2.00
3 MODULOS

1.50
1.50
TOTAL
3.00

3.00
3.00
376.77
1,130.31

2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00

M2
11.60
5.60
8.40
8.00
4.40
4.00
11.20
8.00
8.00
8.00
12.12
4.00
5.32
0.40
0.40
0.40
0.40
1.00
1.12
1.00
3.92
2.80
16.92
8.40
4.80
7.00
3.60
4.00
3.60
5.60
1.60
2.00
5.60
3.60
4.00
3.60
16.92
2.80
3.92
1.12
1.12
8.40
4.80
4.40
8.00
11.20

PINTURA EN ACEITES PAREDES INTERNAS


PARED 1
PARED 2
PARED 3
PARED 4
PARED 5
PARED 6
PARED 7
PARED 8
PARED 9
PARED 10
PARED 11
PARED 12
PARED 13
PARED 14
PARED 15
PARED 16
PARED 17
PARED 18
PARED 19
PARED 20
PARED 21
PARED 22
PARED 23
PARED 24
PARED 25
PARED 26
PARED 27
PARED 28
PARED 29
PARED 30
PARED 31
PARED 32
PARED 33
PARED 34
PARED 35
PARED 36
PARED 37
PARED 38
PARED 39
PARED 40
PARED 41
PARED 42
PARED 43
PARED 44
PARED 45
PARED 46

5.80
2.80
4.20
4.00
2.20
2.00
5.60
4.00
4.00
4.00
6.06
2.00
2.66
0.20
0.20
0.20
0.20
0.50
0.56
0.50
1.96
1.40
8.46
4.20
2.40
3.50
1.80
2.00
1.80
2.80
0.80
1.00
2.80
1.80
2.00
1.80
8.46
1.40
1.96
0.56
0.56
4.20
2.40
2.20
4.00
5.60

PARED 47
PARED 48
PARED 49
PARED 50
PARED 51
PARED 52
PARED 53
PARED 54
PARED 55
PARED 56
PARED 57
PARED 58
PARED 59

4.00
2.20
2.00
4.00
6.06
4.00
2.66
4.20
2.80
5.80
2.70
1.00
1.00

2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
TOTAL
3.00

8.00
4.40
4.00
8.00
12.12
8.00
5.32
8.40
5.60
11.60
5.40
2.00
2.00
331.92
995.76

2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
TOTAL
3.00

30.52
12.00
12.00
5.72
12.00
5.72
12.00
30.52
12.00
132.48
397.44

3 MODULOS

2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
TOTAL
3.00

30.52
12.00
12.00
5.72
12.00
5.72
12.00
30.52
12.00
132.48
397.44

2.10
2.10
2.10
2.10
2.10

0.94
0.94
0.94
0.94
0.94

3.95
3.95
3.95
3.95
3.95
19.74

3 MODULOS
PINTURA EN CAUCHO PAREDES EXTERNAS
PARED 1
PARED 2
PARED 3
PARED 4
PARED 5
PARED 6
PARED 7
PARED 8
PARED 9

15.26
6.00
6.00
2.86
6.00
2.86
6.00
15.26
6.00
3 MODULOS

PINTURA EN ACEITE PAREDES EXTERNAS


PARED 1
PARED 2
PARED 3
PARED 4
PARED 5
PARED 6
PARED 7
PARED 8
PARED 9

15.26
6.00
6.00
2.86
6.00
2.86
6.00
15.26
6.00

BARNIZ EN PUERTA DE MADERA


MODULO DE INFORMACION
DORMITORIO
BAO DORMITORIO
DEPOSITO
ARCHIVOS Y REGISTROS

PINTURA EN ACEITE Y VENTANAS METALICAS

REEMPLAZO DE PIEZAS SANITARIAS


BAO DORMITORIO

1.00
1.00

REEMPLAZO DE CENTRO PISO


BAO DORMITORIO

2.00

REEMPLAZO DE TUBERIA DE AGUAS BLANCAS

12.00

REEMPLAZO DE TUBOS FLURESCENTE CIRCULARES 26 W

LAVAMANOS (PEDESTAL)
W.C.

ML
5.00

COLOCACION DE TAPAS EN TOMACOORRIENTES E INTERRUPTORES


INSTALACION DE BREAKER

40 W

MANTEMIMIENTO DE AIRE 18 MIL BTU

1.00

UND
5.00

UND
4 UND

UND