Professional Documents
Culture Documents
AKEA
SBA
8(a)
Certified
Inc.
ABOUTUS
How to Reach Us
KEA,Inc.isaminority,verifiedservice
disabledveteranownedsmallbusiness
(SDVOSB)foundedin2003byU.S.veteran
andprofessionalengineerAnthonyJ.Kwan.
ThenameAKEAistheacronymforAnthonyKwan
EngineeringAssociates.
25105W.NewberryRd.
Newberry,FL32669
(352)4746124Telephone
(352)4746324Fax
www.akeainc.com
AKEAisamultidisciplinefirmproviding
comprehensiveengineering,design/build,and
environmentalservicestobothpublicandprivate
sectors.OnJuly17,2009,AKEAwascertifiedasa
participantintheSmallBusinessAdministrations8(a)
BusinessDevelopmentProgram.Ourmissionisto
provideourclientsprofessionalservicesutilizing
innovativetechnologiesandprovenmanagement
systems.Ourvisionistoberecognizedasthe
8(a)/SDVOSBofchoice.
Our Location
AKEA,Inc.islocatedinthetownofNewberryinNorth
CentralFlorida,afewmilesfromGainesville,homeof
theUniversityofFlorida,andwithinafewhoursdrive
fromJacksonville,Tampa,theSpaceCoast,and
Atlanta.
Ourservicesinclude:
Design/Build&ComprehensiveDesign
EnvironmentalStudies
Remediation&WasteDisposal
Ourcorevaluesare:
Duty,Honor,Country
Professionalism,Loyalty,HardWork
HonoringOurCommitments
Open,Honest,RespectfulCommunication
SBA8(a)Certified
OURSERVICES
Design/Build &
Comprehensive Design
Environmental
Studies
Remediation &
Waste Disposal
Design/Build
InnovativeInvestigative
Technologies,Geophysical
Surveys,andDirectMeasurement
CivilSiteEngineeringandDesign
StructuralEngineeringandDesign
MechanicalandElectricalDesign
Marine/WaterfrontEngineering
andDesign
Roadway,Pavement,and
IntersectionDesign
FacilityDesign,NewConstruction,
andRenovation
EnvironmentalImpactAnalysis
Processes/Preparationof
NationalEnvironmentalPolicyAct
(NEPA)Documents,i.e.,
EnvironmentalImpactStatement
(EIS)andRecordofDecision(ROD)
EnvironmentalManagement
SystemsComplianceAuditing
ConstructionManagement
Hazardous/UniversalMaterialand
WasteManagementPlanning
AntiTerroristForceProtection
(ATFP)EngineeringandDesign
HydrogeologyandGroundWater
Assessments
SurfaceWaterManagementand
Protection
IntegratedSolidWaste
Characterization,Management,
andRecycling
CostAnalysis
Permitting
GroundWaterModeling
EnvironmentalConservation
WetlandsStudiesand
Investigation
Multimedia(Air,Water,and
Waste)PermitApplication
Packages
ResourceConservationand
RecoveryAct(RCRA)Facility
AssessmentsandCorrective
Actions
ComprehensiveEnvironmental
Response,Compensation,and
LiabilityAct(CERCLA)
Investigations
EngineeringEvaluation/Cost
Analysis(EECA)
RiskAssessment
RemovalandInstallationof
AbovegroundStorageTanks(ASTs)
andUndergroundStorageTanks
(USTs)
IndustrialandHazardousWaste
Management
RemediationofContaminated
Sites
WasteTransportation,Disposal
and/orRecycling
FacilityDecommissioning,
Remediation,Demolition,and
Reclamation
ResourceConservationand
RecoveryAct(RCRA)/Superfund
AmendmentsandReauthorization
Act(SARA)RemedialAction
Activities(SoilandGroundWater)
ContaminatedSiteAssessments
PollutantFateandTransport
SpillPrevention,Control,and
Countermeasure(SPCC)Plansand
Programs
SBA8(a)Certified
LICENSES&CAPABILITIES
LICENSES
NAICS Codes
BoardofProfessionalEngineersLic.No.26693
236220
CommercialandInstitutionalBuilding
Construction(primary)
GeneralContractorCGC062515
236210
IndustrialBuildingConstruction
PlumbingContractorCFC1425873
237110
WaterandSewerLineandRelated
StructuresConstruction
237120
OilandGasPipelineandRelated
StructuresConstruction
ArchitectCorporationAA26002266
PollutantStorageSystemsContractorPCC1256801
RoofingContractorCCC1329363
GeologyBusinessGB517
API653AbovegroundStorageTankInspector#24744
API570PipingInspector#26289
STAFF EXPERTISE
Ourhighlyexperiencedemployeeshaveprovided
professionalservicestoawiderangeofclientsand
takeprideintheiroutstandinghistoryofrepeat
business.AKEAscoreseniorstaffaveragesmorethan
30yearsofprofessionalexperienceandhasworked
togetherasateamformorethan20years.
Ourstaffsexpertiseincludesbutisnotlimitedtothe
followingareas:
Design/Build
CivilEngineering
Mechanical,Electrical,Plumbing(MEP)
StructuralEngineering
ConstructionManagement
EnvironmentalEngineering
AntiTerroristForceProtection(ATFP)
EnergyAudits
237310
Highway,Street,andBridgeConstruction
237990
OtherHeavyandCivilEngineering
Construction
238110
PouredConcreteFoundationand
StructureContractors
238160
RoofingContractors
238210
ElectricalContractorsandOtherWiring
InstallationContractors
238330
FlooringContractors
238910
SitePreparationContractors
337127
InstitutionalFurnitureManufacturing
541310
ArchitecturalServices
541320
LandscapeArchitecturalServices
541330
EngineeringServices
541340
DraftingServices
541410
InteriorDesignServices
541620
EnvironmentalConsultingServices
541690
OtherScientificandTechnicalConsulting
Services
QUALITY COUNTS
541990
AllOtherProfessional,Scientific,and
TechnicalServices
TheAKEAqualityassurance/qualitycontrol(QA/QC)
programisintegratedintoeveryprojectthroughthe
managementteam.AKEApromiseseachclienta
partneringapproach,withsufficientresourcesand
expertisetomorethansatisfytheclientsneeds,and
constantcommunicationthroughoutallphasesofthe
project.AllAKEApersonnelarecommittedto
completingallprojectsontimeandwithinbudget,and
toensuringthatallclientsaresatisfiedbeyondtheir
expectations.Emphasisonqualityinallaspectsof
workhasresultedinAKEAwinningrepeatbusiness
fromadiversepublicandprivatesectorclientbase.
561730
LandscapingServices
562111
SolidWasteCollection
562112
HazardousWasteCollection
562910
RemediationServices
811310
CommercialandIndustrialMachineryand
Equipment(exceptAutomotiveand
Electronic)RepairandMaintenance
SBA8(a)Certified
KEYPERSONNEL
Mr.Kwansprofessionalexperienceincludesmore
than30yearsofmanagingcivilandengineering
projectsintheareasofregulatorycompliance,
environmentalsiteassessment,transactionaland
operationalauditing,hazardouswastemanagement,
andcivilengineeringconstruction.Hehasbeen
responsiblefornumerouscomplianceprojectsthat
haveincludedconductingstormwaterassessmentsof
installationindustrialactivitiessubjecttoregulation
undertheCleanWaterAct,conductingPollution
PreventionOpportunityAssessments(P2OAs),
developingandimplementingPollutionPrevention
(P2)plans,conductingEmergencyPlanning
CommunityRighttoKnowActchemicalinventories,
andconductingDefenseEnvironmentalRestoration
Program(nowMilitaryMunitionsResponseProgram)
inventorysitesurveysandevaluationsofformer
DepartmentofDefensesites.
Mr.Kwansareasofspecializationincludemulti
disciplinaryprojectmanagement;civiland
environmentalengineering;federalcontract
management;wastemanagement;P2plansandstorm
waterP2plans;spillpreventioncontroland
countermeasuresplans;environmentalassessments
andpermitting;andfederalregulations,including
ResourceConservationandRecoveryAct(RCRA);
ComprehensiveEnvironmentalResponse,
Compensation,andLiabilityAct(CERCLA)(commonly
knownasSuperfund);ToxicSubstancesControlAct
(TSCA);CleanWaterAct(CWA);andSuperfund
AmendmentsandReauthorizationAct(SARA).
SBA8(a)Certified
KEYPERSONNEL
RandallHensley,seniorelectrical
engineeratAKEA,hasmorethan
30yearsofelectricaldesign
experience,beginningasan
engineerintrainingatOdell
AssociatesinCharlotte,NC.He
wasformerlyaleadelectrical
engineerwithAffiliated
Engineers,aTop50designfirmspecializinginresearch
laboratoriesandhealthcarefacilities,andhespent
eightyearsasaconsultantinprivatepractice.His
diverseexperienceencompassesdesignfornewand
renovationwork,includingeducational,industrial,
commercial,government,religious,andhealthcare
facilities.Heisexperiencedinallphasesofproject
planning,fromconceptdesigndevelopmentto
constructiondocumentationtoconstruction
administrationthroughfinalprojectcloseout.
StephenSteffehasmorethan30
yearsofmechanicalengineering
experience.Hisdutieshave
includedHVAC,plumbing,andfire
protectiondesignforvarious
typesofprojectswithpackaged
watercooledheatpumps,central
heating,andcoolingplantswith
bothreciprocatingandcentrifugalchillercoolingand
hotwaterandsteamboilerheatingsystems.Hehas
designedheatrecoverysystemsforhighschool
facilitiesutilizingdomestichotwaterandenergy
recoverywheels,andmoistureremovalsystemsfor
swimmingpoolsutilizingbothventilationand
desiccantdryers.Hehasalsoprovidedconstruction
administrationservicesformorethan20yearsfor
bothnewandretrofitsystems,includingcoliseums,
arenas,ammunition/industrial/militaryfacilities,
universities,highschools,andmedicalfacilities.
AreasofSpecialization
Powerdistribution
Lightingdesign
Communicationsystemsdesign
Firealarmdetection
LightningprotectionforULmasterlabel
AreasofSpecialization
Heating,ventilation,andairconditioning
(HVAC)design
Interiorandexteriorplumbing
Wet/drysystemfireprotection
Constructionandenvironmentaloversight
CAEPIPEpipestressanalysis
High/medium/lowpressuresteamsystems
Airandwatercooledchilledwatersystems
Directdigitalcontrolsystems
TraneTraceenergyanalysis
Energyaudits
Education,Licenses,Registrations,Certifications
BS,ElectricalEngineering,Universityof
Florida
ProfessionalEngineer:FL,GA,NC,OH
Education,Licenses,Registrations,Certifications
BS,MechanicalEngineering,Kennedy
WesternUniversity(WY)
ProfessionalEngineer:AK,FL,GA,KY
LEEDAccreditedProfessional
SBA8(a)Certified
KEYPERSONNEL
JeffBergmannhasmorethan
28yearsofprofessional
responsibilityformanagingcivil
andstructuralengineering
projectsintheareasofstructural
andcivilengineeringdesignand
construction,andregulatory
compliance.Hehasextensive
experienceinstructuralandcivilengineeringdesign,
permitting,andconstruction.Hehasmanagedlarge
testingandevaluationprojectsforSandiaandLos
AlamosNationalLaboratoriesandWhiteSandsMissile
Range,aswellaslargelanddevelopmentprojectsfor
privateandgovernmentclients,andlargestructural
andcivilinfrastructureconstructionprojects.Hehas
heldDepartmentofEnergy(DOE)andDepartmentof
Defense(DOD)Qlevelsecurityclearances.
SeanHolwayisacivilengineer
witheightyearsofexperiencein
constructionanddesignproject
management,costestimating,
residentialandcommercial
development,stormwaterdesign
andpermitting,utilitiesdesign
andpermitting,NPDESstorm
waterpermitting,roadwaydesignandpermitting,
civil/sitedesign,andregulatorycomplianceand
environmentalsiteassessments.Hehasmanaged
variousprojectsfromconceptthroughconstruction
andhasexperienceinhydrologic,hydraulic,andwater
qualityanalyses.Hiscomputerexperienceincludes
stormwaterandutilitiesmodelingsoftwaresuchas
ICPR,ASAD,StormCAD,WaterCAD,PONDS,HECRAS,
andGeopakDrainage,aswellasplansproduction
softwaresuchasAutoCADandMicroStationwith
Geopak.
AreasofSpecialization
Structuralanalysisanddesign
Structuralforensicanalysis
Finiteelementanalysis
Prestressed/posttensionedconcretedesign
Civilengineeringandsitedevelopment
Roadwaydesignandconstruction
Waterdistributiondesignandconstruction
Wastewatercollectiondesignand
construction
Environmentalpermittingandregulatory
compliance
NPDESstormwaterpermitting
Surfacewatermanagementdesignand
construction
AreasofSpecialization
Constructionprojectmanagement
Designprojectmanagement
Design/buildteamintegration
Costestimating
Residentialandcommercialdevelopment
Utilitiesdesignandpermitting
Stormwaterdesignandpermitting
NPDESstormwaterpermitting
Roadwaydesignandpermitting,including
FloridaDepartmentofTransportation(FDOT)
Civilengineeringdesign/sitedevelopment
Constructionandenvironmentaloversight
Regulatorycompliance/environmentalsite
assessments
Waterresources/hydrologicstudies
Education,Licenses,Registrations,Certifications
BS,CivilEngineering,UniversityofNew
Mexico
ProfessionalEngineer:AZ,FL,ID,NM
SBA8(a)Certified
Education,Licenses,Registrations,Certifications
BS,CivilEngineering,UniversityofCentral
Florida
ProfessionalEngineer:FL
KEYPERSONNEL
Theresa A. Hensley
TerryeHensleyhasmorethan25
yearsofexperiencesupporting
andmanagingvariousaspectsof
constructionandmanufacturing
organizations.Herexperienceand
trainingincludesmaintainingand
reportingcompanyfinancials,
overseeingcompanyoperations,
preparingprojectschedules,editinggovernment
writtenspecificationsusingSpecsIntact,identifying
anddocumentingbothcostbenefitandquality
processimprovements;certificationinlean
manufacturing,withemphasisonprocess
standardizationtoincreasethroughputandimprove
quality;conductingprocessfailuremodesandeffects
analyses(FMEAs)toidentifyrootcausesofprocessing
errorsandassistinredesignofprocessesaffectedby
productredesignorregulatorychanges;collecting
manufacturingrequirementsinthedesignofa
productiondatabase;andmanagingprojectsincluding
buildingconstruction,updatingtraining
documentation,andleadinganewlydeveloped
producttomarket.
ChadFralickhasfiveyearsof
experienceinelectrical
engineering.Hisexperience
includespower,lighting,lightning
protection,dataraceway,andfire
alarmdesignforhospitals,office
spaces,churches,hotels,
apartments,schools,restaurants,
stateparks,parkinggarages,andmilitaryfacilities.He
alsoperformselectricalstudieswhichincludeshort
circuit,voltagedrop,arcflashhazard,andelectrical
loadanalyses.Hisprojectinvolvementhasincluded
siteinvestigations,projectmeetings,design,design
narratives,drafting,calculations,specifications,cost
estimates,andshopdrawingreview.
AreasofSpecialization
Powerdistributiondesignandcalculations
Lightingdesign
Lightningprotection
SKMPowerTools
AutoCAD2010andProENGINEER
MicrosoftExcel
HTML
AreasofSpecialization
QuickBooksfinancials
SureTrakscheduling
SpecsIntactspecificationwriting
Businessandmanufacturingprocess
improvementdocumentation
Projectmanagement:construction,business,
manufacturing
Developmentofstandardoperating
procedures/policiesandprocedures
Datacollectionandreporting
Developmentofperformancemeasurements
Leanmanufacturing
Facilitiesplanning
Education,Licenses,Registrations,Certifications
BS,MS,ElectricalEngineering,Universityof
Florida
ProfessionalEngineer:FL
U.S.ArmyCorpsofEngineersConstruction
QualityManagementforContractors
Education,Licenses,Registrations,Certifications
BS,Mathematics,UniversityofFlorida
MS,IndustrialandSystemsEngineering,
UniversityofFlorida
CertifiedinLeanManufacturing
SpecsIntactSpecialist
SBA8(a)Certified
KEYPERSONNEL
ThomasGyllstromisaregistered
architectwith38yearsof
experienceindesigningand
managingcomplexprojects
involvingbothnewconstruction
andrenovationstohealthcare,
laboratories,highereducation,
andinstitutionalprojectsfor
private,public/institutional,andgovernmentclients.
Hisextensiveexperiencewiththeseclientsand
buildingtypeshashonedhisskillsinlisteningand
understandingtheclientsneedsandissues,
marshalingtheappropriatelevelofexpertiseto
addressthoseneedsandissues,developingasolution
throughconsensusbuildingwiththeclientandteam
ofexperts,managingtheimplementationeffort,and
servingtheclientbeyondtheprojectcompletion.Heis
aLEEDaccreditedprofessionalandhasbothLEED
registeredbuildingsandawardsforsustainabledesign.
TheAmericanInstituteofArchitectshasawardedboth
stateandlocalchapterbuildingdesignawardsforhis
designleadershipefforts.
PaigePooleisanarchitectwith
morethan40yearsofexperience
inresidentialandcommercial
design.Hehasmanagedvarious
projectsfromconceptthrough
construction,andhisdesign
experienceincludesdoctors
offices,ambulatorysurgical
facilities,multistorybankandofficebuildings,church
facilities,multifamilyhousingandcondominiums,and
educationalfacilityrenovations.Hisclientshave
includedtheUniversityofFlorida,SantaFe
CommunityCollege,EglinAirForceBase,andNaval
SupportActivityPanamaCity.Hiscomputer
experienceincludesAutoCAD2010andMicroStation.
AreasofSpecialization
Planningandbuildingdesigns
Residentialandcommercialdesign
Utilitiesdesignandpermitting
Constructionandenvironmentaloversight
Regulatorycompliance/environmentalsite
assessments
AreasofSpecialization
Healthcareplanninganddesign
Laboratoryplanninganddesign
Highereducationalplanninganddesign
Sustainabledesign
MultipleAHJs(AuthorityHavingJurisdiction)
coordination/management
Buildingenvelopecommissioning
Education,Licenses,Registrations,Certifications
BachelorofArchitecture,UniversityofFlorida
RegisteredArchitect:FL
Education,Licenses,Registrations,Certifications
BachelorofArchitecture,UniversityofIllinois
MA,BusinessAdministration,Universityof
Illinois
RegisteredArchitect:FL,WI,AR
LEEDAccreditedProfessional
NCARBcertified
SBA8(a)Certified
KEYPERSONNEL
MichaelTootleisaseniorcivil
engineerwith20yearsof
experienceinstormwaterdesign
andNationalPollutantDischarge
EliminationSystem(NPDES)storm
waterpermitting,roadwaydesign,
civilandsitedesign,erosionand
sedimentcontrol,regulatory
complianceandenvironmentalassessments,
hazardousmaterials,hazardouswaste,pollution
prevention,constructionmanagement,andTitleII
constructionoversight.Heisanaccredited
professionalinLeadershipinEnergyand
EnvironmentalDesign(LEED)greenbuildingprinciples,
andhehasexperienceinhydrologic,hydraulic,and
waterqualityanalyses.Hiscomputerexperience
includessoftwaremodeling,consultingandinstruction
inhydraulicsandhydrologyapplications.
StephenDenahanhasmorethan
40yearsofexperienceasa
geologist.Hisdutieshave
includedprogramandproject
management,contamination
assessment,geophysical
techniques,hazardouswaste
management,engineering
geology,andsinkholeassessment.Hehasmanaged
largeinterdisciplinaryhazardouswasteprojectsand
hehasextensiveexperienceintheuseofgeophysical
andchemicalscreeningtechniquesincontamination
assessmenttasks.
AreasofSpecialization
NationalEnvironmentalPolicyAct(NEPA)
Environmentalimpactassessmentsand
conservation
Hydrogeologyandgroundwaterassessments
Integratedsolidwastecharacterization,
management,andrecycling
Groundwatermodeling
Wetlandsstudiesandinvestigation
Multimedia(air,water,waste)permit
applications
RCRAFacilityAssessmentsandCERCLA
investigations
Contaminatedsiteassessments
Humanandecologicalriskassessment
Preparationoftechnicalplans(work,field
sampling,qualitycontrol,laboratoryquality
assurance,healthandsafety,investigation
derivedwaste)
Environmentalsampling:soil,groundwater
(includinglowflowsampling),sediment,
surfacewater
AreasofSpecialization
Stormwaterdesignandpermitting
NPDESstormwaterpermitting
Roadwaydesign
Civilengineeringdesignandsitedevelopment
Erosion,sediment,andpollutioncontrol
design
Regulatorycomplianceandenvironmental
assessments
Hazardousmaterials,hazardouswaste,
pollutionprevention
Waterresources,hydrologicstudies
Constructionmanagement
Constructionandenvironmentaloversight
Education,Licenses,Registrations,Certifications
BS,MS,CivilEngineering,UniversityofFlorida
ProfessionalEngineer:FL
LEEDAccreditedProfessional
U.S.ArmyCorpsofEngineersConstruction
QualityManagementforContractors
SBA8(a)Certified
Education,Licenses,Registrations,Certifications
BS,Geology,UniversityofFlorida
ProfessionalGeologist:FL,IN
REPRESENTATIVECLIENTS
TheAKEAteam,throughcompanyandemployeepersonalexperience,hasprovidedservicestothefollowing
clients(partiallist):
AirForceCenterforEngineering
andtheEnvironment(AFCEE)
U.S.AirForce
ApexEnvironmental
ColumbusAFB,MS
ComputerScienceCorporation
DefenseLogisticsAgency(DLA)
EglinAFB,FL
EarthTech
FederalLawEnforcement
TrainingCenter(FLETC)
MacDillAFB,FL
FloridaPowerCorporation
FloridaDepartmentof
Transportation(FDOT)
MoodyAFB,GA
GeneralElectric
PatrickAFB,FL
GeneralPhysics
FloridaGovernmentAgencies
RobinsAFB,GA
HeeryInternational
AlachuaCounty
U.S.Army
InstituteofFoodandAgricultural
Science
BrevardCounty
ArmyEnvironmentalCenter
HillsboroughCounty
FortBragg,NC
MACTEC,Inc.(nowAMEC)
MarionCounty
FortGordon,GA
MiamiDadeCounty
FortJackson,SC
NorthFloridaRegionalMedical
Center
OrangeCounty
FortMcPherson,GA
PascoCounty
FortStewart,GA
PinellasCounty
U.S.ArmyCorpsofEngineers
Charleston,SC
SouthwestFloridaWater
ManagementDistrict
Huntsville,AL
St.JohnsRiverWater
ManagementDistrict
FloridaSchoolDistricts
AlachuaCounty
BradfordCounty
ClayCounty
PutnamCounty
Savannah,GA
Atlanta,GA
Gainesville,FL
NavalFacilitiesEngineering
CommandSoutheast(NAVFACSE)
LakeCity,FL
NavalSubmarineBase,Kings
Bay,GA
Miami,FL
Tampa,FL
WestPalmBeach,FL
U.S.Fish&WildlifeService
U.S.PostalService
CampSantiago,PR
U.S.SecretService
SBA8(a)Certified
UniversityofFlorida
WestonSolutions
NationalParkService
MCLBAlbany,GA
ShandsHealthCare
Mobile,AL
U.S.DepartmentofVeterans
Affairs(VAMedicalCenters)
NSMayport,FL
SantaFeCommunityCollege
WesternWasteIndustriesand
WasteManagement
U.S.DepartmentofAgriculture
NASJacksonville,FL
SAIC
Jacksonville,FL
U.S.CoastGuard
SuwanneeCounty
PittsburghPaintandGlass
TASKORDERCONTRACTS
Issuedby:Dept.ofVeteransAffairs,Decatur,GA
Maximumdollaramount:$3million
Duration:Maximum4years
ThiscontractawardedtoAKEAcallsforprofessional
architectengineerservicesforvariousVAprojects.
Servicesincludebutarenotlimitedtocomplete
designandconstructiondocumentswhicharebased
oncompleteandthoroughsiteinvestigation,
verificationofasbuiltdrawings,analysisofutility
systems,necessarydetaileddrawings,contract
specifications,reproductionofallnecessary
documents,accurateestimatesandcalculation,and
constructionperiodservices.Tasksincludebutarenot
limitedtoarchitectural,mechanical,plumbing,
electrical,civil,andstructural.Requireddesign
submissionsmayincludebutarenotlimitedto
conceptual,25%,50%,75%,100%,andfinal.Task
orderstodatehaveincludedthefollowingdesign
projects.
FuelUndergroundStorageTank(UST)
Remediation
InstallStackEconomizerHeat
WaterStorageFacility
EncloseResearchAtrium
Expand/ReplaceDirectDigitalControls
SBA8(a)Certified
TASKORDERCONTRACTS
Issuedby:23ContractingSquadronFA4830
Maximumdollaramount:$3.5million
Duration:Maximum5years
ThisBasicOrderingAgreement(BOA)wasawardedto
AKEAfordesignbuildmiscellaneousconstruction
projectsforMoodyAirForceBase,GA.Individualtask
ordersmaybeplacedagainstthisagreementforupto
5years,withamaximum$3.5milliondollarvaluefor
alltaskorders.TheagreementcallsforAKEAto
providematerials,supplies,parts(includingsystem
components),labor,supervision,management,
equipment,transportation,andotheritemsand
servicesnecessarytoperformdesign,construction,
repair,andalterationofrealpropertyatMoodyAir
ForceBase.TaskorderstodateunderthisBOAhave
includedthefollowingprojects.
DesignandInstallSolarPhotovoltaicPanels
onBuilding105
DesignandConstructSolarThermalHot
WaterSysteminBuilding571
DesignandInstallLowFlowShowerheadsand
Faucets
Issuedby:NAVFACSE,PWDKingsBay
Maximumdollaramount:$4million
Duration:Maximum36months
AKEAwasrecentlyawardedthis$4millionIDIQ
contracttoprovidefacilitiesandpublicworksrelated
construction,environmentalstudies,repair,alteration,
andmaintenance,includingplanningandengineering,
primarilyforKingsBayNavalSubmarineBase,GA.The
contractcallsforallprojectmanagement,planning,
estimating,labor,transportation,materials,
equipment,tools,supervision,incidentaldesign,and
allothercostsnecessarytofulfilltherequirementsof
eachcontracttaskorder.Preparationofcontractor
proposalsandtaskorderperformanceshallrequire
managingandcoordinatingnumerousprojectsand
subcontractorssimultaneously.Taskorderstodate
haveincludedthefollowingprojects.
ReplaceFamilyHousingTransformers
ReplaceSwitchgearatBuilding3038
SBA8(a)Certified
REPRESENTATIVEPROJECTS
POL Facility
Design and
Construction of
Petroleum, Oil,
Lubricants (POL)
Facility, Naval
Station Mayport, FL
ThisAKEAproject,underaNAVFACSEcontract,called
fortheinstallationofanaircraft(helicopter)hotpit
directfuelingsystem(designbyU.S.Navy).Operating
helicoptersstationedatNSMayportwerebeing
refueledontheparkingapronatHangar1552using
tacticalrefuelertrucks.Theaircraftdirectfueling
systemreplacedtheuseofthetrucksforhelicopter
refueling.Thedirectfuelingsystemisbasedona
pressurized,recirculatingfuelingsystem,includingfuel
returnpipingfromthesingleaircraftdirectfueling
station(pantograph)locationtothetwoexistingJP5
operatingstoragetanks.Thetwoexisting15,000
gallonJP5abovegroundstoragetanks(ASTs)were
modifiedtosupportthenewaircraftdirectfueling
system.
AKEAwascontracted
byNAVFACSEtodesign
andconstructanew
1,600squarefootPOL
operations,sampling,
andtestingfacilityto
accommodateNSMayportsAviationFuelsDivision.
(Thecontractalsocalledforconstructionofanew
aircraftrefuelingsystem.)Exteriormaterialsand
finishesforthePOLfacilitywerematchedtobe
visuallycomplementaryandarchitecturallycompatible
withtheadjacentAirTrafficControlTower,Building
2215.ThedesignofthisprojectmeetsallATFP
standardsandEPAct2005criteria,andwascertified
LEEDSilver.Theprojectalsoincludeddemolitionof
Building18(theexistingPOLlaboratory),once
constructionofthenewfacilitywascomplete.
Installationofthesingleaircraftdirectfuelingstation
includedrefuelingcontrolvalves,fuelingstation
meter,fuelingstationventuri,swiveljoints,fueling
hose,pressuregauges,fittings,andpantograph
sectionstoencompassacompletesystem.Fueling
pumpsandfilter/separatorswereprovidedand
installedneartheexistingfuelstoragetanks.All
undergroundfuellinesarepremanufactureddual
wallcontainmentpipelines,withacontinuousleak
detectioncableinstalled.Undergroundfuellineswere
installedundertheaircraftparkingaproninan
undergroundcasementpipe.Allundergroundpiping
wasinstalledbyhorizontaldirectionaldrilling(HDD)
methodswithoutdisturbanceoftheactiveaircraft
apron.
SBA8(a)Certified
U.S.Navywaspresented
withLEEDSilverAward.
REPRESENTATIVEPROJECTS
Blast Booth 5
SBA8(a)Certified
REPRESENTATIVEPROJECTS
SBA8(a)Certified
REPRESENTATIVEPROJECTS
AKEAassubcontractorprovidedthedesignservices
forthisdesign/buildrenovationtotwobuildingsat
NASJRBFortWorth.Therenovationsincludedadding
3,000squarefeetofofficespace,HVACandelectrical
upgrades,securityupgrades,additionalrestroom
facilities,replacementofexteriorwindows,and
generalinteriorfinishupgrades.Inaddition,acrane
wasreplacedinthehangar.AKEApersonnelprovided
engineeringservicesnecessarytoproducefinalplans
andspecifications.Adesignanalysisreportwas
developedthatincludedalldesigncharts,tables,
drawings,andphotographs.
AKEAassubcontractorprovidedthedesignservices
forthisdesign/buildrenovationtoahangaratNASJRB
FortWorth.Therenovationsincludeda12x16foot
flightjacketstoragemezzanine,HVACandelectrical
upgrades,replacingtheexistingaircompressor
locatedinthemechanicalroomatthenorthendof
thebuilding,additionalrestroomfacilities,
replacementofexteriorwindows,andgeneralinterior
finishupgrades.Inaddition,theexistingalcoveentry
onthewestsideofTower2wasenclosedtocreatea
quarterdeckapproximately20feetwideby30feet
long,includinganextensionoftheexistingcorridor.
AKEApersonnelprovidedengineeringservices
necessarytoproducefinalplansandspecifications.A
designanalysisreportwasdevelopedthatincludedall
designcharts,tables,drawings,andphotographs.
SBA8(a)Certified
REPRESENTATIVEPROJECTS
SBA8(a)Certified
REPRESENTATIVEPROJECTS
Expand ICU
Thiscurrentprojectrequirescompletedesign
documentation(plansandspecifications)for
renovationoftwoexistingpatientwards,2Aand2B,
intoanewintensivecareunitlocatedonthesecond
floorofmainhospitalBuilding1.Initialrequirements
includedprovisionsfor30beds,anddirectionto
encloseapproximately2,300squarefeetofopenair
patiointousableICUfloorspace.Basedonongoing
designmeetingswiththeVAstaffincluding
administration,engineering,andnursingthenew
designwillprovidefor18patientrooms,including2
isolationrooms,andforapproximately25percentof
thepatioareatobeenclosedtoaccommodateanew
waitingroomandaportionofthestafflounge.The
projectdesignincorporatesallarchitecturaland
engineeringdisciplinesneededtoensureacomplete
andfunctionalICU,inaccordancewithVA
constructionstandards,specifications,anddesign
guides,andcurrentcodesandstandardsincludingbut
notlimitedtoNFPA,JCAHO,andOSHA.
SBA8(a)Certified
REPRESENTATIVEPROJECTS
documents,permitting,andconstruction
administration.Foreachproject,AKEAprovideda
projectneedsanalysisaswellassiteselectionanalysis
todevelopthebestuseandthebestlocationbefore
theconceptwasdevelopedandpresented.The
evaluationalsoincludedfunctionaldesignissues,
constructioncost,andpermittingconstraints.
Thefirstparkinggarage(5levels,637spaces,219,207
squarefeet)wasrecentlyopenedforuse.AKEAhas
alsocompletedthedesignforthesecondparking
garage(5levels,478spaces,175,270squarefeet).The
designofthefirstandsecondgaragesincludesa
provisiontoconnectthestandalonegaragesina
futurephase.Designisunderwayonthethirdparking
garage(7levels,1,000spaces,350,000squarefeet).
Thesehighlyvisibleprojectspresenteduniquedesign
challengesincludinganaugercastpilefoundation,
uninterruptedhospitaloperations,andheightand
operationalrestrictionsduetoanadjacentactive
heliportservinganearbyhospital.AKEApresented
alternativedesignsolutionstomeetthespecificneeds
oftheclient.Workingcloselywiththeclienttoreview
andapprovealternativeshasresultedinsignificant
projectsavingstodate.
Uponcompletionofthesethreecontracts,atotalof
2,115parkingspaceswillbeavailableinanarea
greaterthan744,000squarefeet.
Thedesignfeeforthethreeparkinggarageprojectsis
$1.6million,andtheconstructionfeeisestimatedat
$21.5million.
Tasksforallthreeprojectsincludesiteselectionand
alternativesanalysis,schematicdesign,design
development,preparationofconstruction
SBA8(a)Certified
REPRESENTATIVEPROJECTS
Inthefallof2011,constructionwascompletedatthe
MalcomRandallVAMedicalCenterinGainesvilleofa
newbedtowerthatreplaced238bedsinmultibed
wardswithsinglepatientrooms(designedbyFlad
Associates).Oncethepatientbedsweremovedtothe
newtower,approximately65,000departmentalgross
squarefeet(dgsf)ofspacebecomeavailable.In
anticipationoftheavailablespace,theAKEA/Flad
teamwascontractedtoprepareamasterspaceplan,
notonlyfortheGainesvilleMedicalCenterbutforthe
LakeCityfacilityaswell.Itwasdeterminedthatthe
Gainesvillefacilityhadanadditionaldeficitofalmost
500,000squarefeetduetoprogram/functional
deficiencies,VAcriteriadeficiencies,and2015growth
projectionsforthevariousservices.AKEA/Fladwas
taskedtocompleteaplanthatbackfillsthevacant
spaceandaccommodatestheneededspacein
renovatedornewspace.LakeCityisamuchsmaller
facilitythanGainesvillebuthassimilarcriteria
deficienciesthatmustbecorrectedinthemasterplan.
AKEAperformedelectricalsystemstudiesofexisting
campusfacilitiesattheOrlandoVAMedicalCenter.
Thestudieswerebasedonthemostcurrentdata
obtainedfromfieldinvestigationsandinformation
derivedfromasbuiltdrawingsandfromstaff
familiarityandknowledgeofthefacilityelectrical
systems,inadditiontopersonalinspectionofthe
distributionsystembyAKEAelectricalengineering
staff.Thefacilitiesstudiesencompassedatotalof
nearly480,000squarefeetoverseveralbuildings,
includingthe214,925squarefootmainhospital
building,the62,523squarefootCommunityLiving
Center,andthe148,500squarefootLakemont
Campus,whichservesastheadministration
headquarters.AKEAprovidedafinalreportforeach
facilitythatincludedupdatedonelinediagrams,short
circuitanalysis,arcflashhazardanalysis,voltagedrop
calculations,timecurrentcoordinationstudyand
drawings,andalistofobservedNECviolations.The
reportincludedrecommendedimprovementsand
associatedcoststocorrectdeficiencies.AKEA
additionallyprovidedlabelsindicatingarcflashhazard
categoriesandappropriatepersonalprotective
equipment(PPE)foreachelectricaldevicestudied.
TheAKEAteamprovidedprojectmanagementservices
includingschedulinganddocumentingallmeetings,
coordinatingreportproduction,andadheringto
projectscheduleandbudget;collectingdatafromVA
providedreportsand/orfromobservationincluding
butnotlimitedtospacerequirements,staffing,and
waittimes,patientflow,adjacentservices,andleased
spacedata;andhighlevelinvestigationofexisting
buildingconditions,basedonexistingdata.Two
separatestudieswereconductedsequentiallybutin
parallel(oneforeachcampus)andasinglereportwas
presentedforboth.Thefinalreportfocusedonafive
yearvisionyetincorporatinganyknownprojects
beyondthefiveyears.
SBA8(a)Certified
REPRESENTATIVEPROJECTS
AKEAwasretainedbytheVAtoconductawater
towerfeasibilitystudyattheAtlantaVAMedical
Center.Thestudywasmandatedbytherequirement
thatthewaterstoragefacilitybecapableofsustaining
thewatersupplyattheAtlantaVAMCforaperiodof
96hoursperTheJointCommission,formerlyknownas
theJointCommissionforAccreditationofHealth
Organization.Threealternativeswereoriginally
generatedforeachoffourlocations:anelevated
watertankalternative,anabovegroundconcrete
storagetankalternative,andaconcretebelowground
storagetankalternative.
AKEAwascontractedtodesignanunderground
storagetank(UST)withcapacityof750,000+gallons,
withaccompanyingpumpstationandpiping,
disinfection,andelectricalsystem(including
temporarypowersupply),alongwithinstrumentation
andcontrols,fortheAtlantaVAMedicalCenter.A
feasibilitystudywaspreviouslyconductedbyAKEA
underadifferentcontracttoevaluatepotential
locationsanddesignalternatives.Thelocation
identifiedfromthefeasibilitystudywasnolonger
validbecauseofotherongoingprojectsatthemedical
center.FinalsitelocationfortheUSTutilizedoneof
thesteeperareasonthemedicalcentergrounds.The
tankisspecifiedtobeATFPblasthardenedresistant,
anditutilizesastandalonepumphouse.Thewater
distributionsystemwasalsomodified.Constructionof
thiswaterstoragefacilityisslatedfor2012.
Theproposedlayoutfortheselectedalternative
includeda750,000gallonconcretestoragetankwith
an84footoutsidediameter,approximately20feet
belowgrade.Thetopofthetankisdesignedfor
normalvehicleloads(H20)andtheareaoccupiedby
thetankcouldbeutilizedforvehicleparking,since
parkingisatapremiumatthesite.Thechosen
alternativealsoincludedanewdualpumpbelow
gradeconcretevaultpumpstation,witheachpump
capacityat250gallonsperminuteat200foottotal
dynamichead.
SBA8(a)Certified
REPRESENTATIVEPROJECTS
Thescopeofworkforthisfeasibilitystudyincluded
reviewingVAfurnishedasbuiltdrawings,schematics
anddesigndocuments,equipmentlayouts,andother
programmaterials,andevaluatingthefeasibilityand
approximatecivilandstructuralcosttoreplace
existingcoolingtowersattheAtlantaVAMedical
Centerwithtowerstobeplacedatopanursinghome
adjacenttothemedicalcenter.Incompletingthe
analysis,AKEAassumedthattheexistingstructural
frameworkwouldbeutilized,existingcolumnswould
beuncoveredandextended,andanewstructural
steelframeworkwouldbeconstructedtosupportthe
newcoolingtowers.Ascreenwallwouldbe
constructedaroundthecoolingtowers,butthespace
abovethetowerswouldbeleftopen.AKEA
determinedthattheexistingstructurewascapableof
withstandingtheanticipatedadditionalvertical(dead
andlive)loadswithoutmodification.Theapplication
oflateral(windandearthquake/seismic)loads
necessitatedincreasingthecapacityofsomeofthe
existingstructuralmembers.Theeffortassociated
withthisinstallationwouldbesignificant,withcranes
neededtoliftthetowerstotheroof,screenwalls
extendedapproximately35feetabovetheexisting
rooflevel,andstructuralsteelframingrequiredto
facilitatetheaddition.
SBA8(a)Certified
REPRESENTATIVEPROJECTS
Design/Build
Renovation of
8th Floor,
Section B, for
Specialty Care,
VA Medical
Center, West
Palm Beach, FL
Workonthisrecentprojectincludedrenovationof
SectionBoftheeighthfloor(approximately12,000
squarefeet)oftheWestPalmBeachVAMedical
Centertoprovideacompleteandfunctionalspaceto
serveasaneyeclinicandanear,nose,andthroat
(ENT)clinic.TheworkwascontractedthroughtheU.S.
CorpsofEngineersMobileDistrict,withAKEAthe
designsubcontractor.Aspartoftheproject,an
interiorspaceallocationstudywasconductedwith
closecoordinationwiththeclient.Afloorplanwas
thendevelopedwithinputfromtheclient.The
constructionbiddocumentsincludedmechanical,
electrical,plumbing,structural,fireprotection,and
signal/systemsdetails,andalldesignelements
pertinentforfullyfunctionalclinics.
Trailer Replacement
Design Trailer T-1 Replacement, Malcom
Randall VA Medical Center, Gainesville, FL
AKEAprovidedthedesignforreplacingatemporary
trailerwithapermanentstructuretohousethe
facilitysHumanResourcesManagementService.The
trailerhadbeeninstalledinthe1970sandwasusedby
thehumanresourcesdepartmenttoprovidecritical
administrativeservicesatthefacility.Theexisting
trailerwas5,080squarefeetinsize,andthespace
availabletolocateanewbuildingwasrestrictedto
7,000squarefeet.Afterconsideringseveral
alternatives,AKEAdevelopedaninnovativedesign
comprisedoftwoseparatebuildingstotakethebest
advantageoftheavailablespace.Thetwobuildings
combinedprovide7,000squarefeetofspace.The
projectincludedsitesurvey,utilityconnections,soil
study,codecompliance,andhurricanerequirements,
inadditiontodesignofthebuildings.
SBA8(a)Certified
REPRESENTATIVEPROJECTS
Energy
Efficiency
Improvement
Thedesignincludedthreeenergyreductionaspects:
(1)throughminimizingexcesscombustionair
quantities,(2)throughboilerfeedwaterheating
energyrequirementsutilizingfluegastemperature
reductions,and(3)throughtheboilerblowdown
makeupwaterheatexchanger.Theseenergy
reductioncalculationsutilizedtheASHRAE2009
combustionandfueltosteamenergycalculations
methods.Basedupontheseenergysavingsestimates
andbyutilizingtheactualAtlantaVAMCfuelcosts
alongwiththeconstructioncostestimates,AKEA
performedalifecyclecostanalysisanddeterminedan
estimatedsimplepaybackperiodforthiscapital
expenditure.
AKEAdevelopedthedesignofthreeboilerfluestack
economizers,onecommonblowdownheatrecovery
system,andallnewcontrolsforthethreeboilers,heat
recoverysystem,andeconomizerswiththreenew
forceddraftfanvariablefrequencydrives.
Aninitialenergyauditandenergyevaluationwas
performedtodetermineanestimatedbaselineand
costsavingstobeutilizedinthelifecyclecostanalysis.
Thesecalculationsincludedcombustionandfuelto
steamefficienciesandfuelinputanalysisofthe
existingboilersbyperformingastacktestandinput
fuelfiringrateanalysisfortherequired30%energy
reduction.Additionalenergysavingsweredetermined
byananalysisofthesystemwatermakeupquantity
andcostwithenergyreductionutilizingaboiler
blowdown/makeuptubeandbundleheatexchanger.
Thisenergysavingsanalysisdeterminedthelowest
acceptablefluegastemperatureandthemaximum
combustionairquantitythroughtheentirerangeof
theboileroperationtodeterminethemostefficient
andcosteffectiveeconomizerandoxygencontrol
systemsfortheactualdesign.
SBA8(a)Certified
Theinitialcostestimatewasperformedbasedupon
thedesignsystemsselectedbyAKEAandapprovedby
theVA.Thesecostestimatesalongwiththeenergy
costssavings,costofmoney,escalationrates,and
maintenancecostswereutilizedtoperformthelife
cyclecostanalysis.
REPRESENTATIVEPROJECTS
Energy
Efficiency
Improvement
Solar Panels
Thiscurrentprojectincludesdesignandconstruction
of50KWsolarvoltaicpanels.Theconverterwastied
intothefacilityselectricgrid,andsupplied
approximately25%ofthefacilitiesdailyelectrical
requirements.
Projectincludesthedesignandconstructionofa500
gallondrainbacksolarthermalhotwatersysteminthe
dininghallfacility.Thesystemwasdesignedtooffset
heatingenergyfromtheconventionalsystem.
AKEAdesignedanew5,000squarefootofficeand
commercialbuildingfollowingtheLEEDGreen
BuildingRatingSystem.Thedesignincorporatedthe
necessaryelectrical,mechanical,andstructural
componentstoprovideforacompleteandfunctional
area,andwasinaccordancewithallapplicable
requirementsoftheNationalFireProtection
Association(NFPA),EPA,OSHA,NationalPlumbing
Code,NationalElectricalCode,AmericanSocietyof
Heating,Refrigerating,andAirConditioningEngineers
(ASHRAE),andNationalSafetyCode,inadditionto
local,state,andfederalregulations.Asitesurveywas
conductedtoanalyzefoundationconditionsand
existingutilitysystems,andasitedevelopmentplan
waspreparedandpresentedtotheNewberry
PlanningCommission.Themostnoticeableelements
ofthefacilitysenvironmentalefficiencyarethe
xeriscapelandscaping(lowmaintenancelandscaping
withnativeplantsthatdonotrequireextrairrigation)
andthesensorsintheroomsthatactivateand
deactivatethelightswhenpeopleenterandleavethe
space.
Energy Audits
Department of Natural Resources
ThepastpersonalexperienceofAKEApersonnel
includesperformingauditsforseveralfacilities,which
includedschoolsandhousingauthoritycomplexes,
withenergyconservationmeasurerecommendations,
energysavingsanalyses,costestimates,andlifecycle
costanalyseswithsimplepayback.
SBA8(a)Certified
REPRESENTATIVEPROJECTS
Various
Clients &
Services
Building 556
Renovation
Recycling
Services
AKEAwascontractedbythe45thContracting
SquadronatPatrickAirForceBasetorenovateselect
sectionsoftheeastsideofBuilding556,anareathat
included14firstandsecondfloorsuitesandinterior
stairwell.Theworkincludedbutwasnotlimitedto
repairingwallsandfloors;replacingdoorsand
modifyingdooropenings;removingcarpetwithACM
mastic;installingnewcarpetandtile,baseboards,and
windowtreatments;modifyingwaterclosets,
rebuildingtoiletflushvalves,replacingvanitiesand
sinks,andmodifyingsinkventsanddrains;replacing
lightswitchesandreceptaclecoversandinstallingnew
lighting;andpatching,priming,andpainting14units
(approximately8,820squarefeet).Duringtheinitial
demolition,moldwasencountered,andAKEA
providedthemoldremediationforthe14units.
UnderthiscurrentcontractissuedbytheMissionand
InstallationContractingCommand(MICC),Fort
Stewart,onbehalfoftheDepartmentoftheArmy,
AKEAprovidesallnecessarypersonnel,management,
supervision,labor,administrativesupport,materials,
supplies,andequipmenttoperformallrecycling
requirementsatFortStewartandHunterArmyAirfield
(HAAF),inGeorgia.Theworkincludescollecting,
transporting,offloading,separating,processing,
baling/warehousing,andweighingallrecyclable
materialsasarawmaterialinamannerthat
constitutesrecyclingasdefinedinandincompliance
withtheResourceConservationandRecoveryAct
(RCRA).Allrecyclablematerialsaretransportedtothe
FortStewartProcessingStation,FortStewartRecycling
Center,orHAAFRecyclingCenter,andareproperly
segregated,stored,andpreparedforsaleinsucha
mannerthatwillbringthehighestmarketvalue
possible.
Thiscontractmeetstheprojectobjectivestodivertall
recyclablematerialsfromFortStewartssolidwaste
landfillandothersolidwastelandfills;tomeet
ExecutiveOrders13423and13514,requiringgreening
ofthegovernmentthroughwastepreventionand
recycling;tosavepreciousandexpensivesolidwaste
landfillspaceandextendthelifeexpectancyofthe
FortStewartlandfill;andtofullycapitalizeonthe
valueofrecyclablematerialsinFortStewart/HAAFs
solidwastestreambyredeemingrecyclablesthrough
localrecyclingmarkets,enablingtheseproductstobe
reutilizedintofutureproducts.Allrecyclingoperations
areperformedincompliancewithRCRA,andrecords
aremaintainedonallrecycledmaterials,andreports
andinformationareprovidedasrequiredtotheWaste
ManagementSectionoftheDirectorateofPublic
Works(DPW)EnvironmentalDivision.
SBA8(a)Certified
REPRESENTATIVEPROJECTS
Various
Clients &
Services
MICCFortStewartcontracted
AKEAtoprovidehazardous
wasteandmaterialssupport
services,includingtechnicaland
fieldassistance,insupportof
FortStewart,HunterArmy
Airfield(HAAF),andtheFort
StewartDirectorateofPublic
Works(DPW)Environmental
Division.TheEnvironmentalDivisionhasresponsibility
fortheenvironmentalprogrammanagementofthe
279,270acreFortStewartMilitaryReservationand
the5,370acreinstallationatHAAF,nearSavannah,
GA,andalsooperatesseveralsatellitefacilities.
Complexenvironmentalregulationssuchasthe
ComprehensiveEnvironmentalResponse,
CompensationandLiabilityAct(CERCLA),Resource
ConservationandRecoveryAct(RCRA),SafeDrinking
WaterAct(SDWA),CleanWaterAct(CWA),CleanAir
Act(CAA),ToxicSubstanceControlAct(TSCA),Solid
WasteDisposalAct,EmergencyPlanningand
CommunityRighttoKnowAct(EPCRA),Natural
HistoricPreservationAct,andtheNational
EnvironmentalPolicyAct(NEPA)placeanincreasing
burdenontheinstallationtomonitorthepotential
ramificationsoftheseregulationsonFortStewartand
HAAF.
AKEAoperatestheHAZMATsectionatFortStewart
outofBuilding1146,theHAZMATdropoffpointat
HAAFoutofBuilding1036,thehazardouswasteturn
insectionatFortStewartoutofBuilding1159,andthe
hazardouswastesectionatHAAFoutofBuilding726,
inadditiontooperatingtheRCRAinspectionsection
outofBuilding1112atFortStewart,reportingall
potentiallyunhealthyorhazardousconditions
encounteredintheperformanceofthiscontract.
AKEApersonnelarealsorequiredtoworkonsiteat
theDPWEnvironmentalDivisionandprovidesupport
totheDivisionssatelliteofficesthroughoutFort
StewartandHAAF.
SBA8(a)Certified
REPRESENTATIVEPROJECTS
SBA8(a)Certified
Various
Clients &
Services
REPRESENTATIVEPROJECTS
Various
Clients &
Services
Dock Replacement
AKEA(assubcontractor)personneldesignedanew
dockforthisproject,providingtheengineering
servicesnecessarytoconductplanningandprepareall
drawingsandreports.Thescopeoftheworkincluded
demolishingtheexistingdockandreplacingitwitha
newfloatingconcretestructure.Thenewdockwas
designedwithguildpilingstobeanintegralpartofthe
structure.Alightningprotectionsystemwasalso
designed.ThenewfloatingdockmetallAmericans
withDisabilitiesAct(ADA)accessibilityrequirements.
Atemporarydockandterminalplatformwasdesigned
foruseduringconstruction.Theprojectwas
completedwithinbudgetandaheadofschedule.
AKEAwascontractedbytheU.S.ArmyCorpsof
Engineers,Savannah,toclean,repair,prime,andpaint
20footISOcontainersforArmyStrategicLogistics
ActivityCharleston(ASLAC)inGooseCreek,SC.Ofthe
total412containers,200requiredrepairsinaddition
tocleaningandpainting.Containerstoberefurbished
hadbeeninspectedbytheuserandresultsrecorded
onaDepartmentoftheArmy(DA)Form2404.The
deficienciesnotedrequiredcorrectiveaction.All
containerswerecleaned,primed,andpainedin
accordancewithTM430139.TheAKEAteam
providedaverifiablequalityprocess,andquality
assurancepersonneltoensurethatcompleted
productsmetallrequiredstandardsandspecifications.
TheAKEAteamprovidedmaterialforsurface
preparation,staging/parkingandsecurearea,material
formaskingandpreparationofequipment,primerand
paint,andrepairmaterialandparts.
SBA8(a)Certified
REPRESENTATIVEPROJECTS
Various
Clients &
Services
OnApril11,2006,aU.S.Air
ForceF16Cjetfightercrashed
whiletakingoffforatraining
flightfromLukeAirForceBase,
AZ.Thebulkofthewreckage
cametorestontheground
approximately250feetnorthoftheinitialimpact
crater.Theaircraftwasreportedlycarryingafull
internalloadofJP8jetfuelaswellasanexternalfuel
tank.Theexternaltankrupturedandwasembedded
inthegroundattheinitialimpactpoint.Duringan
environmentalsitereconnaissanceconductedthree
daysafterthemishap,afuelsmellwasdetectedbut
noevidencewasfoundofasignificantfireatthe
impactsite;however,discreteareasofsoilswere
directlyimpactedbythefire,andbythecarbonfibers
andmetallicaircraftcomponentsitliberated,aswell
aspetroleumproductsthatwerenotfullyconsumed
inthefire.Theimpactedareasofsoilrequired
environmentalrestorationbyremoval,replacement,
anddisposalataproperlylicensedandpermitted
facility.Anestimated1,228tonsofsoilwererequired
toberemoved.AKEAassubcontractordevelopedthe
workplanandthesamplingplan,collectedand
analyzedrepresentativesoilsamples,andprepared
thesummaryreport.
AKEApreparedandsubmittedfinaldevelopmentplans
toAlachuaCountyforRiverCreekPreserve,a439acre
developmentwith99singlefamilyhomesites.Among
otherdeliverableswerestormwaterreport,andstorm
watermanagementdesigncalculations;aerial
photographs;trafficimpactstudy(byCausseauxand
Ellington,Inc.);naturalresourcesassessment(byPete
Wallace);CommonOpenAreaSpaceManagement
Plan;WildfireMitigationPlan(draft);covenantsand
restrictionsdocumentsforRiverCreekPreserve(draft);
articlesofincorporationandbylawsforfuture
homeownersassociationofRiverCreekPreserve
(draft);technicalreportsforFlexiPavepavingmaterial
andforproposedcommunitysewagetreatment
facility;geotechnicalsiteexplorationreport(bySDII);
andboundaryandwatershedsurveys.
SBA8(a)Certified
WhatOurClientsSayAboutUs
Congratulations.Your(AnthonyKwanandMichaelTootle)
entry,MultimediaComplianceGuideforFLETC,totheFlorida
TechnicalCommunicationsCompetitionhasreceivedthe
EXCELLENCEAWARD.YourentrywasjudgedstrictlyagainstSTC
criteriaratherthanagainstothercompetitionentries.
LoreEargle,Manager
FloridaTechnicalCommunicationCompetition
Yourpersonnel(AnthonyJ.KwanandMikeTootle)have
conductedenvironmentalcomplianceassessmentsatthirteen
militaryinstallations.AsprojectmanagerforSavannahDistrict,I
havefoundtheirpersonneltobenotonlyhighlycompetent
professionally,butenthusiastic,innovativeandcustomer
orientated.Theycommunicatewellwithmilitarypersonnel,and
havedemonstratedagreatdealofflexibilityincopingwith
changingrequirementsandconditionsarisingduringthe
assessments.
AlfredClowser,ProjectManager
U.S.ArmyCorpsofEngineers,SavannahDistrict
AcontinuingproblemintheECASprogramhasbeenthelong
turnaroundtimeforfinalizingthereports.UsingFt.Gordonasa
testcase,theDistrictECASTeamnotonlyconductedthe
assessment,butbyobtainingMAJCOM,installation,and
contractorcommitment,developedtheinitialdraftoftheECAR
onsite,reducingreviewtimeby45to90days.TheFt.Gordon
effortwashighlysuccessfuldueinlargeparttoateameffort
andawilldoattitudeofalltheplayers,andisbeing
promotedasamodelbytheArmyEnvironmentalCenter.
SavannahDistrictGoldStarAwardNominationPackage
U.S.ArmyCorpsofEngineers,SavannahDistrict
IfoundthattheTeamLeader(AnthonyJ.Kwan)waswellversed
withthepurposeoftheECASandwiththeprotocolas
assignedtomembersoftheTeam.Itisveryimportanttohavea
knowledgeableandcompetentTeamLeaderwhocanavoid
potentialproblemsduringsuchanassessment.
WayneHardcastle,EnvironmentalScientist
EnvironmentalComplianceAssessmentSystem(ECAS)Quality
AssuranceOnsiteAssessmentofContractorbyU.S.Army
EnvironmentalHygieneAgency(USAEHA)
Iwantedtothankyouforyourpersonalinvolvementonthis
extensiveassessment.Idontbelieveitispossibletohavea
projectsuchasthisgoanysmoother.Ilookforwardtoworking
withyouonotherprojectsinthefuture.
AlanT.Hunter,EnvironmentalEngineeringAssociate
FacilitiesManagementOffice,OfficeofAdjutantGeneral
SouthCarolinaNationalGuard
DearMr.Kwan,ThankyouforyoureffortsregardingtheFt.
BraggEmergencyPlanningCommunityRighttoKnowAct
(EPCRA)report.FtBraggsvariousmilitaryandcivilian
organizationsunanimouslyappreciatetheprofessionalattitude
exhibitedbytheteammembersduringthestudy.Wereceiveda
callfromtheAtlantaEnvironmentalProtectionAgencyoffice,
Mr.Steed,whowasveryimpressedwiththequalityand
quantityofinformationpresentedinthereport.
JamesR.Hougnon,Colonel
DirectorofPublicWorksandEnvironmental
Yourrepresentatives,Mr.AnthonyJ.KwanandTeam,continue
togiveusthebestservicepossible.Inthelasttwoweeksthey
haveprovidedtheCenterwithtwoauditsandworkedverywell
withtheCenterStaff.Theirtechnicalknowledge,familiarity
withsubjectmatterandabilitytoprovideasuperiorquality
projectareoutstanding.Theirlaborhasresultedincustomer
supportthatisrarelyseen.Theirattentiontodetailand
technicalknowhowhaveresultedindeliverablesthatare
consistentlyofhighquality.
WilliamColsen,ChiefSafetyandEnvironmentalManager
FederalLawEnforcementTrainingCenter(FLETC)
Thismemoistorecognizeyourcontractor(AnthonyJ.Kwan)for
excellentperformanceinpreparingthePollutionPrevention
PlanforFts.McPhersonandGillem,GA.ThePlansareeasily
comprehensibleandcomplete.OurP2Programhasjustbeen
reviewedbytheArmyAuditAgency(AAA).Theplanscontain
theproperlevelofdetailassoughtbytheAAA.TheAAAwas
impressedbythethoroughnessofthereport.
DavidA.Heins,ChiefofEnvironmentalDivision
DirectorateofPublicWorks
Iamwritingtoexpressmyapprovaloftheperformanceofthe
auditteamduringarecentenvironmentalauditconductedfor
theDLA.Thisprojectwastheassessmentofaprivatefirm
providingscrappingservicestotheDLA.Theauditrequiredthe
auditteamtointerviewcontractormanagementand
employees,stateregulatorsandgovernmentpersonnel,under
tenseanddifficultcircumstances.Theauditteam(AnthonyJ.
Kwan)approachedthissituationwithtactanddiscretion.This
levelofdiplomacy,combinedwithsuperiortechnicalskills,
broughttheaudittoasuccessfulconclusion.Pleaseextendour
appreciationforajobwelldone.
JanB.Reitman
StaffDirector,EnvironmentalandSafetyPolicy
SBA8(a)Certified
Iwishtocommendyoufortheexcellentenvironmentalservices
youhaverenderedinthepreparationoftheenvironmental
compliancestudiesforinstallationsandcustomersinthe
SavannahDistrict.PleaseexpressmyappreciationtoMr.
AnthonyJ.Kwanandallmembersofyourfirmwhocontributed
tothepreparationoftheenvironmentalcompliancestudiesand
reports.Weareverymuchawareoftheeffortrequiredto
producesuchhighqualityworkinatimelymanner.
JosephH.Hodges,P.E.
Chief,EngineeringDivision
SUMMARY
AKEA,Inc.
isasolid,growing,smallbusinesswithdiversecapabilitiesand
inhouseresources
iscertifiedasaparticipantintheU.S.SmallBusiness
Administrations8(a)BusinessDevelopmentProgram
isaverifiedservicedisabledveteranownedsmallbusiness
(SDVOSB)
providesafullrangeofdesign/build,construction,engineering,
environmental,andremediationservices
staffconsistsofhighlyqualified,experiencedindividuals
providesexperiencedandeffectiveprojectmanagement
honorsitscommitmenttoqualityservice
hasanexceptionalrecordindesign/build,design,remediation,
andengineeringservices
looksforwardtoprovidingyouwithprofessionalservicesand
addingyoutoourgrowinglistofclients
SBA8(a)Certified