You are on page 1of 51

PWHT

BY

T BALAMURUGAN
SENIOR WELDING INSPECTOR
WHAT IS HEAT TREATMENT?
• Heat Treatment is the controlled
heating and cooling of metals to
alter their physical and mechanical
properties, without changing the
product shape

• PWHT is the one of Heat treatment


done after the welding/ machining
to improve the mechanical property
and material structure. In steel
fabrication PWHT is commonly
known as stress relieving.
PWHT
POST WELD HEAT TREATMENT
WHAT IS PWHT?
REFERS TO THE PROCESS OF
REHEATING A WELD TO BELOW
THE LOWER TRANSFORMATION
TEMPERATURE AT A
CONTROLLED RATE, HOLDING
FOR A SPECIFIC TIME AND
COOLING AT A CONTROLLED
RATE.
Applications
WHY THE NEED FOR PWHT?
• Residual Stress
• Effects of Mechanical
Properties
• Effect on Creep Properties
• Other benefits
WHY THE NEED FOR PWHT?
• Residual Stress
 The development of residual stresses approaching or even
exceeding the yield stress is possible when welding thick
sections.
 Petrochemical, Chemical, Oil and Gas, etc. the existence
of residual stress of this magnitude is completely
unacceptable
 the stress developed due to thermal expansion of
pipework can take on a far greater significance than
residual stress due to welding.
WHY THE NEED FOR PWHT
• Effect on Mechanical Properties
As a series of very general statements, the following are
the consequences of post weld heat treatment compared
with the as-welded condition:
 Yield strength is decreased slightly, the effect falling off
fairly rapidly with time.
 The tensile strength is decreased.
 The ductility is increased.
 Hardness levels are reduced.
 Toughness is slightly reduced at short times but the
effect can be significant over longer times.
WHY THE NEED FOR PWHT
• Effect on Creep Properties

For creep resisting material, post weld


heat treatment is required in order to fully
develop the creep strength. This is
specially true for thicker components such
as headers.
WHY THE NEED FOR PWHT
• Other benefits
Improving the diffusion of hydrogen out of
weld metal
Softening the heat affected zone and thus
improving toughness (although not weld metal
toughness)
Improving dimensional stability during
machining.
WHY THE NEED FOR PWHT
• Other benefits…contd
Improving ductility.
Improving the resistance to stress
corrosion cracking.
Reducing the effects of cold work.
WHEN TO POST WELD HEAT
TREAT

• SERVICE CONDITION
(Eg. Caustic)
• MATERIAL GRADE AND
THICKNESS
• WHERE HARDNESS LIMITS ARE
SPECIFIED.
HOW TO PERFORM POST WELD
HEAT TREATMENT
• FIXED FURNACE
• TEMPORARY FURNACE
• INTERNAL FIRING
• LOCAL HEATING
• PARTIAL HEAT TREATMENT
FIXED FURNACE

• Fixed furnaces tend to be large and


expensive to operate.
• Gas Fired.
• Oil Fired.
• Electrical resistance heating elements.
FIXED FURNACE
FIXED FURNACE
FIXED FURNACE
TEMPORARY FURNACE

• These are custom-built around a


vessel, rather than transport a vessel to
a fixed furnace. The idea is to minimise
the air space between the vessel and
furnace walls, and they allow for faster
heating and cooling
TEMPORARY FURNACE
..contd
• Heating can be through resistant heating
mats placed on a concrete floor or via gas
burners placed at each end.
• In the case of gas burners, care must be
taken to avoid direct flame impingement
on the vessel.
TEMPORARY FURNACE
TEMPORARY FURNACE
TEMPORARY FURNACE
TEMPORARY FURNACE
TEMPORARY FURNACE
TEMPORARY FURNACE
TEMPORARY FURNACE
TEMPORARY FURNACE
TEMPORARY FURNACE
TEMPORARY FURNACE
INTERNAL FIRING
• Vessels of suitable dimensions and arrangement of
openings can be post weld heat treated by gas firing
through nozzles or manways.
• Manways are large enough to accommodate the gas
burners, but care needs to be exercised with the
diameter and position of nozzles and expert opinion
should be sought.
INTERNAL FIRING
.. Contd
• Care must also be taken to place deflector plates inside
the vessel and opposite the burner entry points to avoid
direct flame impingement on the shell.
• It is not advisable to post weld heat treat vessels that
contain internals in this manner.
• The outside of the vessel must be completely encased in
insulating material, and again, at least a 12 point
temperature recorder is advisable.
INTERNAL FIRING
INTERNAL FIRING
INTERNAL FIRING
INTERNAL FIRING
LOCAL HEATING

• Circumferential weld seams can be post weld heat


treated by heating a band around the weld.
• Although not specifically stated, such heating is
essentially limited to resistance or induction heating,
mainly because of the controls required on heated band
width, width of insulation and temperature measurement
requirements.
LOCAL HEATING
LOCAL HEATING
LOCAL HEATING
PARTIAL HEAT
TREATMENT
• There are occasions, for example with very long vessels,
when the entire vessel will not fit into a fixed furnace.
• This has been catered for in most Standards, and it is
permissible to post weld heat treat section of the vessel
first, then turn the vessel around and heat treat the
remaining section.
• As with local heating, there are restrictions in this case
as well over the degree of overlap and the longitudinal
temperature gradient.
ITEMS TO CONCERN
• AREA TO BE HEATED
• HEATING AND COOLING RATE
• HOLDING TEMPERATURE AND
DURATION
• TEMPERATURE MEASUREMENT AND
DISTRIBUTION
• EQUIPMENT CALIBRATION AND
CONDITION
HEATING / COOLING
RATE
• The PWHT heating and cooling rates above 316°C shall
not exceed 222°C/hr divided by the weld thickness in
inches, but in no case shall it be more than 222°C/hr.
• At least compliant with the necessary code
requirements.
• Related to component thickness to offer protection
against thermally induced stresses (thermal shocks).
• With thicker and more complex structures, consider
lower rates than required by the code to ensure
acceptable temperature profiles and gradients with a
view to keeping these thermally induced stresses to an
absolute minimum.
HEATING RATE
SOAKING PERIOD
COOLING RATE
THERMO COUPLES
• To transmit the surface temperature to the recorder.
• If localized PWHT is used, the following minimum
number of equally spaced recording thermocouples
(T/C) shall be used:
a) Pipe diameter of 305 mm or less: 1 T/C.
b) Pipe diameter above 305 mm up to and including 610
mm: 2 T/C.
c) Pipe diameter above 610 mm: 4 T/C.
d) Additional thermocouples are required if multiple heat
control zones are used, in which a control zone is not
monitored by any of the primary T/Cs.
THERMO COUPLES
• Type K (Chromel-Alumel) or Type J (iron-
Constantan) thermocouples are permitted.
THERMO COUPLES
• Thermocouples shall be attached to the
component by capacitive discharge welding
only. Other methods of attachment are not
permitted.
• The thermocouples shall not be in direct contact
with electrical heating elements or subjected to
flame impingement by gas or oil burners.
THERMO COUPLES
THERMO COUPLES
New innovations improve results…
Introducing, Tomorrow’s heat treating technology … Today!

Internet Based Quality Management Model