Combined Cycle Power Plants

back

Siemens AG 2009
Energy Sector

Combined Cycle Power Plants


Combined Cycle
Power Plants

Key factors for competitiveness

Comprehensive
Comprehensive solutions
solutions
50 Hz
- SCC5-4000F 1S
- SCC5-4000F 1S
(SST5-5000)
- SCC5-4000F 2x1
60 Hz
- SCC6-5000F 2x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant30

Operating costs

Plant performance

Financials

Electricity price
Fuel price

Power output
Efficiency

Investment volume
Payment schedule

Personnel costs
Consumables

Availability
Load regime

Project lead time


Debt / equity ratio

Insurance
Maintenance

Interest rate
Taxes

- SCC6-5000F 1x1
Flex-Plant10
Fast start-up
development
Proven and reliable
50 Hz
60 Hz

Our goal is to optimize key factors that are within our sphere of influence Standardization addresses all of these

Steam Power Plants


References 50 Hz
References 60 Hz

Slide 2

Energy Sector

Siemens AG 2009

Combined Cycle Power Plants


Combined Cycle
Power Plants
Comprehensive
Comprehensive solutions
solutions

The reference power plant Solving your power puzzle with


proven modular base design and options to meet your needs

50 Hz
- SCC5-4000F 1S
- SCC5-4000F 1S
(SST5-5000)

Modular base design

- SCC5-4000F 2x1

HRSG type,
e.g. BENSON
or Drum

60 Hz
- SCC6-5000F 2x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant10

Steam Power Plants

Customerspecific options
(examples)

Base
design

Fast start-up
development
Proven and reliable
50 Hz
60 Hz

Service
packages

Back-up
fuel

Water
treatment
systems

Cooling
variants

Site-specific
options
(examples)

The Siemens reference power plant


concept is an innovative synthesis of
standardization and flexibility. The
combination of a pre-engineered
design with modular add-ons provides
the ideal basis for a successful project.
This approach helps to keep life-cycle
costs low while providing the flexibility
to meet individual plant needs.

Grid
connection

References 50 Hz
References 60 Hz

Slide 3

Energy Sector

Siemens AG 2009

Combined Cycle Power Plants


Combined Cycle
Power Plants

Advantages of reference power plant

Comprehensive
Comprehensive solutions
solutions
50 Hz
- SCC5-4000F 1S

Advantages of an integrated reference power plant program

- SCC5-4000F 1S
(SST5-5000)

Lead time reduction

- SCC5-4000F 2x1
60 Hz
- SCC6-5000F 2x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant10
Fast start-up
development
Proven and reliable
50 Hz
60 Hz

Availability and plant efficiency increase


High operational flexibility
Optimized operations and service effort
Detailed information to support project conceptual /
permitting phase
Standardized components

Steam Power Plants


References 50 Hz
References 60 Hz

Slide 4

Energy Sector

Siemens AG 2009

Combined Cycle Power Plants


Combined Cycle
Power Plants

Lead time reduction

Comprehensive
Comprehensive solutions
solutions
50 Hz
- SCC5-4000F 1S

Reference power plant designs facilitate implementation due to:

- SCC5-4000F 1S
(SST5-5000)

Pre-configured modular components

- SCC5-4000F 2x1
60 Hz
- SCC6-5000F 2x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant10
Fast start-up
development

Schedule-driven project planning and


management
The use of experienced proven suppliers
and equipment
Highly trained personnel

Proven and reliable


50 Hz
60 Hz
Steam Power Plants
References 50 Hz
References 60 Hz

Slide 5

Energy Sector

Siemens AG 2009

Combined Cycle Power Plants


Combined Cycle
Power Plants
Comprehensive
Comprehensive solutions
solutions

Reference power plant program scope


optimization Single Shaft

50 Hz
- SCC5-4000F 1S
- SCC5-4000F 1S
(SST5-5000)

SCC Power Train

- SCC5-4000F 2x1

SGT-PAC

60 Hz
- SCC6-5000F 2x1
Flex-Plant30

SST-PAC w/o
condenser
Steam turbine
incl. auxiliaries
w/o piping
Generator incl.
auxiliaries
SSS Clutch
ST electrical and
I&C
Options

- SCC6-5000F 1x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant10
Fast start-up
development
Proven and reliable
50 Hz
60 Hz

SCC Power Island


SCC Power Train
HRSG
Condenser incl. air removal
system
Boiler feed pumps
Condensate pumps
Critical valves
Fuel pre-heater with filter,
metering station etc.
Power Island controls
Options

Power Train equipment


performance / delivery

System integration /
Optimized operability

SCC Power Block


SCC Power Island
Detailed design of Turbine building,
foundation and structures
HVAC inside Power Block area
Cranes inside turbine building
Water/ Steam cycle
Cooling water system with wet
cooling tower and circulating water
pumps
Service- and closed cooling water
system
Electrical equipment
Power Block controls
Fire Fighting inside Power Block
Options

Replication of standardized
components

SCC Turnkey
SCC Power Block
Additional fuel supply systems
and cooling systems
Water treatment
Raw water system
Waste water system
Tanks
Additional
- buildings/structures
- cranes/hoists
- fire protection/fighting
- plant
piping/valves
electrical plant
Erection/Commissioning
Further options

Total EPC plant wrap

Steam Power Plants


References 50 Hz
References 60 Hz

Modularization with options for flexibility


standardization to reduce risk and project schedule
Slide 6

Energy Sector

Siemens AG 2009

Combined Cycle Power Plants


Combined Cycle
Power Plants
Comprehensive
Comprehensive solutions
solutions
50 Hz
- SCC5-4000F 1S
- SCC5-4000F 1S
(SST5-5000)
- SCC5-4000F 2x1
60 Hz
- SCC6-5000F 2x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant10
Fast start-up
development
Proven and reliable
50 Hz
60 Hz

Reference power plant program scope


optimization Multi Shaft
SCC
SGT PAC
Gas turbines for fuel gas
incl. auxiliaries
Air intake / exhaust
system
Fuel gas system
- skids
- connecting pipes
Gas turbine generators
incl. auxiliaries
Fire protection GT
GT electrical and I&C
Options

Performance/Delivery

SCC
Thermal Equipment
SGT-PAC

SCC Power Island

SCC Turnkey

SCC Thermal Equipment

SST-PAC w/o condenser


Steam turbine incl.
auxiliaries w/o piping
Generator incl.
auxiliaries
ST electrical and I&C
HRSG
Options

Condenser incl. air removal


system
Boiler feed pumps
Condensate pumps
Critical valves
Fuel pre-heater with filter,
metering station etc.
Power Island controls
Options

Cycle optimization /
Performance wrap

System integration /
Optimized operability

SCC Power Island

Buildings/structures
Cranes and HVAC (Turbine hall)
Plant Cooling systems
Water treatment
Raw water system
Waste water system
Tanks
Plant piping/valves
Electrical equipment
Plant control system
Additional fire protection/fighting
Erection/Commissioning
Further Options

Total EPC plant wrap

Steam Power Plants


References 50 Hz
References 60 Hz

Modularization with options for flexibility


Standardization to enhance implementation of project schedule
Slide 7

Energy Sector

Siemens AG 2009

Combined Cycle Power Plants


Combined Cycle
Power Plants

Reference power plants Combined cycle plant portfolio

Comprehensive
Comprehensive solutions
solutions
50 Hz
- SCC5-4000F 1S

Single Shaft

- SCC5-4000F 1S
(SST5-5000)

50 Hz:

SCC5-1000F 1S
SCC5-4000F 1S

- SCC5-4000F 2x1
60 Hz
- SCC6-5000F 2x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant10
Fast start-up
development
Proven and reliable
50 Hz
60 Hz
Steam Power Plants
References 50 Hz

Multi Shaft
50 Hz:
60 Hz:

SCC5-4000F 2x1
SCC6-5000F 1x1 Flex-Plant10
SCC6-5000F 1x1 Flex-Plant30
SCC6-5000F 2x1 Flex-Plant30

References 60 Hz

Slide 8

Energy Sector

Siemens AG 2009

Combined Cycle Power Plants


Combined Cycle
Power Plants

SCC5-4000F 1S (SST5-3000) for warm climate conditions

Comprehensive
Comprehensive solutions
solutions
50 Hz
- SCC5-4000F 1S
- SCC5-4000F 1S
(SST5-5000)
- SCC5-4000F 2x1
60 Hz
- SCC6-5000F 2x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant10
Fast start-up
development
Proven and reliable
50 Hz
60 Hz
Steam Power Plants
References 50 Hz
References 60 Hz

Slide 9

Major components
Gas turbine:
SGT5-4000F
Steam turbine: SST5-3000
Generator:
SGen5-2000H

Performance (net)
Power:
Efficiency:

ISO
416 MW
58.2%

Design data
Ambient conditions:
15C (59F), 1013 mbar,
60% humidity
Condenser pressure:
50 mbar (1.5 HgA)

Design features
HRSG:
Steam parameters:
Cold end:
Fuel system:
Pump redundancies:
Condensate:
Feedwater:

3P-RH, horizontal type


HP 125 bar/565C, IP 30 bar/565C, LP 5 bar/235C
1810 psi/1050F, 435 psi/1022F, 72.5 psi/455F
Cooling tower, induced draft, 8 cells
(ACC and once-through cooling options)
Natural gas with preheating/fuel oil backup (option)
2x 100%
2x 100%

Circulating water:
2x 50%
Closed cooling water: 2x 100%
Service cooling water: 1x 100%

Energy Sector

Siemens AG 2009

Combined Cycle Power Plants


Combined Cycle
Power Plants

SCC5-4000F 1S (SST5-5000) for cold climate conditions

Comprehensive
Comprehensive solutions
solutions
50 Hz
- SCC5-4000F 1S

Major components

Performance (net)

- SCC5-4000F 1S
(SST5-5000)

Gas turbine:
SGT5-4000F
Steam turbine: SST5-5000

Design
ISO
Power:
427 MW 416 MW
Efficiency: 58.7 %
58.2%

- SCC5-4000F 2x1
60 Hz
- SCC6-5000F 2x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant10
Fast start-up
development
Proven and reliable
50 Hz
60 Hz
Steam Power Plants
References 50 Hz
References 60 Hz

Slide 10

Generator:

SGen5-2000H

Design data
Ambient conditions:
10C (50F), 1013 mbar,
77% humidity
Condenser pressure:
25 mbar (0.7 HgA)

Design features
HRSG:
Steam parameters:
Cold end:
Fuel system:
Pump redundancies:
Condensate:
Feedwater:

3P-RH, horizontal arrangement


HP 125 bar/565C, IP 30 bar/565C, LP 5 bar/235C
1810 psi/1050F, 435 psi/1050F, 72.5 psi/455F
Once-through cooling
Natural gas with preheating/fuel oil backup (option)
2x 100% or 1x 100% Circulating water:
2x 100% or 1x 100% Closed cooling water:
Service cooling water:

2x 50%
2x 100%
1x 100%

Energy Sector

Siemens AG 2009

Combined Cycle Power Plants


Combined Cycle
Power Plants

SCC5-4000F 2x1

Comprehensive
Comprehensive solutions
solutions
50 Hz
- SCC5-4000F 1S
- SCC5-4000F 1S
(SST5-5000)
- SCC5-4000F 2x1

Performance (net)

Major components
Gas turbine:
SGT5-4000F
Steam turbine: SST5-5000
Generator:
SGen5-1000A

Power:
Efficiency:

ISO
832 MW
58.2%

60 Hz
- SCC6-5000F 2x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant10
Fast start-up
development
Proven and reliable
50 Hz
60 Hz
Steam Power Plants
References 50 Hz
References 60 Hz

Slide 11

Design data
Ambient conditions:
32C (90F), 1013 mbar,
80% humidity
Condenser pressure:
100 mbar (3.0 HgA)

Design features
HRSG:
Steam parameters:
Cold end:
Fuel system:
Pump redundancies:
Condensate:
Feedwater:

3P-RH, horizontal arrangement


HP 125 bar/565C, IP 30 bar/565C, LP 5 bar/235C
1810 psi/1050F, 435 psi/1050F, 72.5 psi/455F
Cooling tower, induced draft
(ACC and once-through cooling options)
Natural gas with preheating/fuel oil backup (option)
3x 50% or 2x 50%Circulating water:
2x 50%
3x 50% or 2x 50%
Closed cooling water: 2x 100%
Service cooling water:1x 100%

Energy Sector

Siemens AG 2009

Combined Cycle Power Plants


Combined Cycle
Power Plants

SCC6-5000F 2x1 Flex-Plant30

Comprehensive
Comprehensive solutions
solutions
50 Hz
- SCC5-4000F 1S
- SCC5-4000F 1S
(SST5-5000)
- SCC5-4000F 2x1
60 Hz
- SCC6-5000F 2x1
Flex-Plant30
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant10
Fast start-up
development
Proven and reliable
50 Hz
60 Hz
Steam Power Plants
References 50 Hz

Gas turbine:
SGT6-5000F
Steam turbine: SST-5000
Generator:
SGen6-1000A

Power:
Efficiency:

ISO
590 MW
57.2%

Design data
Ambient conditions:
59 F (15C), 1013 mbar,
60% humidity
Condenser pressure:
1.5 HgA (50 mbar)

Design features
HRSG:
Steam parameters:
Cold end:
Fuel system:
Pump redundancies:
Condensate:
Feedwater:

References 60 Hz

Condenser:

Slide 12

Performance (net)

Major components

3P-RH, horizontal arrangement


HP 1850 psi/1050F, IP 380 psi/1050F, LP 55 psi/540F
128 bar/565C, 26 bar/565C, 3.8 bar/282C
Cooling tower, induced draft
Natural gas with preheating/fuel oil backup (option)
3x 50% or 2x 50%Circulating water:
2x 50%
3x 50% or 2x 50%
Closed cooling water: 2x 100%
Service cooling water:2x 100%
Wet surface/2-pass/nondivided water box

Energy Sector

Siemens AG 2009

Combined Cycle Power Plants


Combined Cycle
Power Plants

SCC6-5000F 1x1 Flex-Plant30

Comprehensive
Comprehensive solutions
solutions
50 Hz
- SCC5-4000F 1S
- SCC5-4000F 1S
(SST5-5000)
- SCC5-4000F 2x1
60 Hz
- SCC6-5000F 2x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant30
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant10
Fast start-up
development
Proven and reliable
50 Hz
60 Hz
Steam Power Plants
References 50 Hz
References 60 Hz

Slide 13

Major components
Gas turbine:
SGT6-5000F
Steam turbine: SST-900
Generator:
SGen6-1000A

Performance (net)
Power:
Efficiency:

ISO
295 MW
57%

Design data
Ambient conditions:
85 F (29C), 1013 mbar,
60% humidity
Condenser pressure:
30.5 HgA (1.034 bar)

Design features
HRSG:
3P-RH, horizontal arrangement
Steam parameters: HP 1850 psi/1050F, IP 380 psi/1050F, LP 55 psi/540F
128 bar/565C, 26 bar/565C, 3.8 bar/282C
Cold end:
Cooling tower, induced draft
Fuel system:
Natural gas / fuel oil backup
(option)
Pump redundancies:
Condensate:
1x 100% or 2x 100% Circulating water:
2x 50%
Feedwater:
1x 100% or 2x 100% Closed cooling water: 2x 100%
Service cooling water: 2x 100%
Condenser:
Wet surface/2-pass/nondivided water box

Energy Sector

Siemens AG 2009

Combined Cycle Power Plants


Combined Cycle
Power Plants

SCC6-5000F 1x1 Flex-Plant10

Comprehensive
Comprehensive solutions
solutions
50 Hz
- SCC5-4000F 1S
- SCC5-4000F 1S
(SST5-5000)
- SCC5-4000F 2x1
60 Hz
- SCC6-5000F 2x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant10
Flex-Plant10
Fast start-up
development
Proven and reliable
50 Hz
60 Hz
Steam Power Plants
References 50 Hz
References 60 Hz

Slide 14

Performance (net)

Major components
Gas turbine:
SGT6-5000F
Steam turbine: SST-800
Generator:
SGen6-1000A

Power:
Efficiency:

85F
250 MW
48%

Design data
Ambient conditions:
1013 mbar,
60% humidity
Condenser pressure:
30.5 HgA (1.034 bar)

Design features
HRSG:
Steam parameters:
Cold end:
Fuel system:
Pump redundancies:
Condensate:
Feedwater:
SCR:

1P, non-reheat, horizontal arrangement


1450 psi / 930F (100 bar / 500C)
Fin-fan condenser
Natural gas / fuel oil backup
(option)
1x 100% or 2x 100%
1x 100% or 2x 100%
Conventional SCR

Energy Sector

Siemens AG 2009

Combined Cycle Power Plants


Combined Cycle
Power Plants

Economic benefits for fast start-up plants

Comprehensive solutions
50 Hz
- SCC5-4000F 1S
- SCC5-4000F 1S
(SST5-5000)
- SCC5-4000F 2x1
60 Hz
- SCC6-5000F 2x1
Flex-Plant30

Operating benefits

Fast start-up
start-up
development
development

Market environment

Fuel savings

Capacity payments

Uncertain Markets

Higher efficiency

KWh price for


ancillary Energy

Seasonal electricity
demand

Flexible operation

Spinning reserve
credits

Developing wind
energy

Lower start-up costs

Additional earnings
through new products
in liberalized markets

Higher profit through


usage of high price
markets

Less emissions

- SCC6-5000F 1x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant10

Ancillary services

Proven and reliable


50 Hz
60 Hz
Steam Power Plants
References 50 Hz

Fast start-up capability enhances your plant profitability

References 60 Hz

Slide 15

Energy Sector

Siemens AG 2009

Combined Cycle Power Plants


Combined Cycle
Power Plants

Reference power plants with fast-start technology

Comprehensive solutions
50 Hz
- SCC5-4000F 1S

Plant start-up time reduction development

- SCC5-4000F 1S
(SST5-5000)

Challenges:
HRSG pressure ramp rate capability
Steam turbine ramp rate capability
Piping warm up time
Steam Chemistry
Steam turbine back pressure limitations

- SCC5-4000F 2x1
60 Hz
- SCC6-5000F 2x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant10
Fast start-up
start-up
development
development
Proven and reliable
50 Hz
60 Hz
Steam Power Plants
References 50 Hz
References 60 Hz

Findings:
Plants designed for exclusive base load
operation had excessive start times due
to equipment restrictions

100
90

Solutions:
Develop integrated plant technology to
increase operating flexibility and fast-start
capability

80
70
60
50
40
30
20
10

Slide 16

Energy Sector

Siemens AG 2009

Combined Cycle Power Plants


Combined Cycle
Power Plants

Integrated plant technology for fast-start capabilities

Comprehensive solutions
50 Hz
- SCC5-4000F 1S
- SCC5-4000F 1S
(SST5-5000)

BENSON once
through in HP section

ST stress
controller

High-capacity
Desuperheater

- SCC5-4000F 2x1
60 Hz
- SCC6-5000F 2x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant10

Funnel
Damper

Optimize GT
load ramp

Fast start-up
start-up
development
development
Proven and reliable
50 Hz
60 Hz
Steam Power Plants

Auxiliary Boiler

Automated
drains and vents

References 50 Hz
References 60 Hz

Condensate
polishing
plant

An integration of proven technologies

Slide 17

Energy Sector

Siemens AG 2009

Combined Cycle Power Plants


Combined Cycle
Power Plants

SCC6-5000F 1x1 Flex-Plant10

Comprehensive solutions
50 Hz
- SCC5-4000F 1S

Benefits Include:

- SCC5-4000F 1S
(SST5-5000)

- SCC5-4000F 2x1
60 Hz
- SCC6-5000F 2x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant10
Fast start-up
start-up
development
development
Proven and reliable
50 Hz
60 Hz

Integration of proven technology and components


Application of the high reliability of the SGT6-5000F
Combined cycle performance for peaking application
Fast ramp of the gas turbine (150MW in 10 Minutes)
Improved start-up efficiency
Very low start-up emissions
Very low water consumption

Steam Power Plants


References 50 Hz
References 60 Hz

Slide 18

Energy Sector

Siemens AG 2009

Combined Cycle Power Plants


Combined Cycle
Power Plants

Ribatejo EDP, Portugal

Comprehensive solutions
50 Hz
- SCC5-4000F 1S
- SCC5-4000F 1S
(SST5-5000)

Commercial operation in spring 2004

- SCC5-4000F 2x1
60 Hz
- SCC6-5000F 2x1
Flex-Plant30

Net output 1,180 MW

- SCC6-5000F 1x1
Flex-Plant30

3x Single Shaft CC 1S.V94.3A

- SCC6-5000F 1x1
Flex-Plant10
Fast start-up
development
Proven and
Proven
andreliable
reliable
50 Hz
60 Hz
Steam Power Plants
References 50 Hz
References 60 Hz

Slide 19

Energy Sector

Siemens AG 2009

Combined Cycle Power Plants


Combined Cycle
Power Plants

Panglima Power Sdn, Malaysia

Comprehensive solutions
50 Hz
- SCC5-4000F 1S
- SCC5-4000F 1S
(SST5-5000)

Commercial operation in spring 2004

- SCC5-4000F 2x1

Net output 720 MW

60 Hz
- SCC6-5000F 2x1
Flex-Plant30

Multi Shaft CC 2.V94.3A

- SCC6-5000F 1x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant10
Fast start-up
development
Proven and
Proven
andreliable
reliable
50 Hz
60 Hz
Steam Power Plants
References 50 Hz
References 60 Hz

Slide 20

Energy Sector

Siemens AG 2009

Combined Cycle Power Plants


Combined Cycle
Power Plants

Shuweihat, Abu Dhabi, United Arab Emirates

Comprehensive solutions
50 Hz
- SCC5-4000F 1S
- SCC5-4000F 1S
(SST5-5000)
- SCC5-4000F 2x1
60 Hz
- SCC6-5000F 2x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant30

Commercial operation in
summer 2004
Net output 1,500 MW
Multi Shaft CC 5.V94.3A + 2 steam turbines
with sea water desalination

- SCC6-5000F 1x1
Flex-Plant10
Fast start-up
development
Proven and
Proven
andreliable
reliable
50 Hz
60 Hz
Steam Power Plants
References 50 Hz
References 60 Hz

For more information click here


Slide 21

Energy Sector

Video

Siemens AG 2009

Combined Cycle Power Plants


Combined Cycle
Power Plants

Santa Rita 1-4, San Lorenzo 1-2, Philippines

Comprehensive solutions
50 Hz
- SCC5-4000F 1S
- SCC5-4000F 1S
(SST5-5000)

Commercial operation in 2000 and 2002

- SCC5-4000F 2x1

Net output 1,500 MW

60 Hz
- SCC6-5000F 2x1
Flex-Plant30

6x Single Shaft CC 1S.V84.3A

- SCC6-5000F 1x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant10
Fast start-up
development
Proven and
Proven
andreliable
reliable
50 Hz
60 Hz
Steam Power Plants
References 50 Hz
References 60 Hz

The most fuel flexible plant worldwide.


Fuels: Natural Gas, Distillate, Naphtha, Condensate, Mixtures
Slide 22

Energy Sector

Siemens AG 2009

Combined Cycle Power Plants


Combined Cycle
Power Plants

Merida, Mexico

Comprehensive solutions
50 Hz
- SCC5-4000F 1S
- SCC5-4000F 1S
(SST5-5000)

Commercial operation in 2000

- SCC5-4000F 2x1

Net output 480 MW

60 Hz
- SCC6-5000F 2x1
Flex-Plant30

Multi Shaft CC 2.W501F

- SCC6-5000F 1x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant10
Fast start-up
development
Proven and
Proven
andreliable
reliable
50 Hz
60 Hz
Steam Power Plants
References 50 Hz
References 60 Hz

Slide 23

Energy Sector

Siemens AG 2009

Combined Cycle Power Plants


Combined Cycle
Power Plants

Ironwood, Pennsylvania

Comprehensive solutions
50 Hz
- SCC5-4000F 1S
- SCC5-4000F 1S
(SST5-5000)

Commercial operation in 2001

- SCC5-4000F 2x1

Net output 700 MW

60 Hz
- SCC6-5000F 2x1
Flex-Plant30

Multi Shaft CC 2.W501G

- SCC6-5000F 1x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant10
Fast start-up
development
Proven and
Proven
andreliable
reliable
50 Hz
60 Hz
Steam Power Plants
References 50 Hz
References 60 Hz

Slide 24

Energy Sector

Siemens AG 2009

Combined Cycle Power Plants


Combined Cycle
Power Plants

Lakeside, Utah

Comprehensive solutions
50 Hz
- SCC5-4000F 1S
- SCC5-4000F 1S
(SST5-5000)

Commercial operation in 2007

- SCC5-4000F 2x1

Net output 560 MW

60 Hz
- SCC6-5000F 2x1
Flex-Plant30

Multi Shaft CC 2.SCC6-5000F

- SCC6-5000F 1x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant10
Fast start-up
development
Proven
Provenand
andreliable
reliable
50 Hz
60
60 Hz
Hz
Steam Power Plants
References 50 Hz
References 60 Hz

Slide 25