Siemens AG 2009
Energy Sector
Comprehensive
Comprehensive solutions
solutions
50 Hz
- SCC5-4000F 1S
- SCC5-4000F 1S
(SST5-5000)
- SCC5-4000F 2x1
60 Hz
- SCC6-5000F 2x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant30
Operating costs
Plant performance
Financials
Electricity price
Fuel price
Power output
Efficiency
Investment volume
Payment schedule
Personnel costs
Consumables
Availability
Load regime
Insurance
Maintenance
Interest rate
Taxes
- SCC6-5000F 1x1
Flex-Plant10
Fast start-up
development
Proven and reliable
50 Hz
60 Hz
Our goal is to optimize key factors that are within our sphere of influence Standardization addresses all of these
Slide 2
Energy Sector
Siemens AG 2009
50 Hz
- SCC5-4000F 1S
- SCC5-4000F 1S
(SST5-5000)
- SCC5-4000F 2x1
HRSG type,
e.g. BENSON
or Drum
60 Hz
- SCC6-5000F 2x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant10
Customerspecific options
(examples)
Base
design
Fast start-up
development
Proven and reliable
50 Hz
60 Hz
Service
packages
Back-up
fuel
Water
treatment
systems
Cooling
variants
Site-specific
options
(examples)
Grid
connection
References 50 Hz
References 60 Hz
Slide 3
Energy Sector
Siemens AG 2009
Comprehensive
Comprehensive solutions
solutions
50 Hz
- SCC5-4000F 1S
- SCC5-4000F 1S
(SST5-5000)
- SCC5-4000F 2x1
60 Hz
- SCC6-5000F 2x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant10
Fast start-up
development
Proven and reliable
50 Hz
60 Hz
Slide 4
Energy Sector
Siemens AG 2009
Comprehensive
Comprehensive solutions
solutions
50 Hz
- SCC5-4000F 1S
- SCC5-4000F 1S
(SST5-5000)
- SCC5-4000F 2x1
60 Hz
- SCC6-5000F 2x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant10
Fast start-up
development
Slide 5
Energy Sector
Siemens AG 2009
50 Hz
- SCC5-4000F 1S
- SCC5-4000F 1S
(SST5-5000)
- SCC5-4000F 2x1
SGT-PAC
60 Hz
- SCC6-5000F 2x1
Flex-Plant30
SST-PAC w/o
condenser
Steam turbine
incl. auxiliaries
w/o piping
Generator incl.
auxiliaries
SSS Clutch
ST electrical and
I&C
Options
- SCC6-5000F 1x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant10
Fast start-up
development
Proven and reliable
50 Hz
60 Hz
System integration /
Optimized operability
Replication of standardized
components
SCC Turnkey
SCC Power Block
Additional fuel supply systems
and cooling systems
Water treatment
Raw water system
Waste water system
Tanks
Additional
- buildings/structures
- cranes/hoists
- fire protection/fighting
- plant
piping/valves
electrical plant
Erection/Commissioning
Further options
Energy Sector
Siemens AG 2009
Performance/Delivery
SCC
Thermal Equipment
SGT-PAC
SCC Turnkey
Cycle optimization /
Performance wrap
System integration /
Optimized operability
Buildings/structures
Cranes and HVAC (Turbine hall)
Plant Cooling systems
Water treatment
Raw water system
Waste water system
Tanks
Plant piping/valves
Electrical equipment
Plant control system
Additional fire protection/fighting
Erection/Commissioning
Further Options
Energy Sector
Siemens AG 2009
Comprehensive
Comprehensive solutions
solutions
50 Hz
- SCC5-4000F 1S
Single Shaft
- SCC5-4000F 1S
(SST5-5000)
50 Hz:
SCC5-1000F 1S
SCC5-4000F 1S
- SCC5-4000F 2x1
60 Hz
- SCC6-5000F 2x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant10
Fast start-up
development
Proven and reliable
50 Hz
60 Hz
Steam Power Plants
References 50 Hz
Multi Shaft
50 Hz:
60 Hz:
SCC5-4000F 2x1
SCC6-5000F 1x1 Flex-Plant10
SCC6-5000F 1x1 Flex-Plant30
SCC6-5000F 2x1 Flex-Plant30
References 60 Hz
Slide 8
Energy Sector
Siemens AG 2009
Comprehensive
Comprehensive solutions
solutions
50 Hz
- SCC5-4000F 1S
- SCC5-4000F 1S
(SST5-5000)
- SCC5-4000F 2x1
60 Hz
- SCC6-5000F 2x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant10
Fast start-up
development
Proven and reliable
50 Hz
60 Hz
Steam Power Plants
References 50 Hz
References 60 Hz
Slide 9
Major components
Gas turbine:
SGT5-4000F
Steam turbine: SST5-3000
Generator:
SGen5-2000H
Performance (net)
Power:
Efficiency:
ISO
416 MW
58.2%
Design data
Ambient conditions:
15C (59F), 1013 mbar,
60% humidity
Condenser pressure:
50 mbar (1.5 HgA)
Design features
HRSG:
Steam parameters:
Cold end:
Fuel system:
Pump redundancies:
Condensate:
Feedwater:
Circulating water:
2x 50%
Closed cooling water: 2x 100%
Service cooling water: 1x 100%
Energy Sector
Siemens AG 2009
Comprehensive
Comprehensive solutions
solutions
50 Hz
- SCC5-4000F 1S
Major components
Performance (net)
- SCC5-4000F 1S
(SST5-5000)
Gas turbine:
SGT5-4000F
Steam turbine: SST5-5000
Design
ISO
Power:
427 MW 416 MW
Efficiency: 58.7 %
58.2%
- SCC5-4000F 2x1
60 Hz
- SCC6-5000F 2x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant10
Fast start-up
development
Proven and reliable
50 Hz
60 Hz
Steam Power Plants
References 50 Hz
References 60 Hz
Slide 10
Generator:
SGen5-2000H
Design data
Ambient conditions:
10C (50F), 1013 mbar,
77% humidity
Condenser pressure:
25 mbar (0.7 HgA)
Design features
HRSG:
Steam parameters:
Cold end:
Fuel system:
Pump redundancies:
Condensate:
Feedwater:
2x 50%
2x 100%
1x 100%
Energy Sector
Siemens AG 2009
SCC5-4000F 2x1
Comprehensive
Comprehensive solutions
solutions
50 Hz
- SCC5-4000F 1S
- SCC5-4000F 1S
(SST5-5000)
- SCC5-4000F 2x1
Performance (net)
Major components
Gas turbine:
SGT5-4000F
Steam turbine: SST5-5000
Generator:
SGen5-1000A
Power:
Efficiency:
ISO
832 MW
58.2%
60 Hz
- SCC6-5000F 2x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant10
Fast start-up
development
Proven and reliable
50 Hz
60 Hz
Steam Power Plants
References 50 Hz
References 60 Hz
Slide 11
Design data
Ambient conditions:
32C (90F), 1013 mbar,
80% humidity
Condenser pressure:
100 mbar (3.0 HgA)
Design features
HRSG:
Steam parameters:
Cold end:
Fuel system:
Pump redundancies:
Condensate:
Feedwater:
Energy Sector
Siemens AG 2009
Comprehensive
Comprehensive solutions
solutions
50 Hz
- SCC5-4000F 1S
- SCC5-4000F 1S
(SST5-5000)
- SCC5-4000F 2x1
60 Hz
- SCC6-5000F 2x1
Flex-Plant30
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant10
Fast start-up
development
Proven and reliable
50 Hz
60 Hz
Steam Power Plants
References 50 Hz
Gas turbine:
SGT6-5000F
Steam turbine: SST-5000
Generator:
SGen6-1000A
Power:
Efficiency:
ISO
590 MW
57.2%
Design data
Ambient conditions:
59 F (15C), 1013 mbar,
60% humidity
Condenser pressure:
1.5 HgA (50 mbar)
Design features
HRSG:
Steam parameters:
Cold end:
Fuel system:
Pump redundancies:
Condensate:
Feedwater:
References 60 Hz
Condenser:
Slide 12
Performance (net)
Major components
Energy Sector
Siemens AG 2009
Comprehensive
Comprehensive solutions
solutions
50 Hz
- SCC5-4000F 1S
- SCC5-4000F 1S
(SST5-5000)
- SCC5-4000F 2x1
60 Hz
- SCC6-5000F 2x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant30
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant10
Fast start-up
development
Proven and reliable
50 Hz
60 Hz
Steam Power Plants
References 50 Hz
References 60 Hz
Slide 13
Major components
Gas turbine:
SGT6-5000F
Steam turbine: SST-900
Generator:
SGen6-1000A
Performance (net)
Power:
Efficiency:
ISO
295 MW
57%
Design data
Ambient conditions:
85 F (29C), 1013 mbar,
60% humidity
Condenser pressure:
30.5 HgA (1.034 bar)
Design features
HRSG:
3P-RH, horizontal arrangement
Steam parameters: HP 1850 psi/1050F, IP 380 psi/1050F, LP 55 psi/540F
128 bar/565C, 26 bar/565C, 3.8 bar/282C
Cold end:
Cooling tower, induced draft
Fuel system:
Natural gas / fuel oil backup
(option)
Pump redundancies:
Condensate:
1x 100% or 2x 100% Circulating water:
2x 50%
Feedwater:
1x 100% or 2x 100% Closed cooling water: 2x 100%
Service cooling water: 2x 100%
Condenser:
Wet surface/2-pass/nondivided water box
Energy Sector
Siemens AG 2009
Comprehensive
Comprehensive solutions
solutions
50 Hz
- SCC5-4000F 1S
- SCC5-4000F 1S
(SST5-5000)
- SCC5-4000F 2x1
60 Hz
- SCC6-5000F 2x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant10
Flex-Plant10
Fast start-up
development
Proven and reliable
50 Hz
60 Hz
Steam Power Plants
References 50 Hz
References 60 Hz
Slide 14
Performance (net)
Major components
Gas turbine:
SGT6-5000F
Steam turbine: SST-800
Generator:
SGen6-1000A
Power:
Efficiency:
85F
250 MW
48%
Design data
Ambient conditions:
1013 mbar,
60% humidity
Condenser pressure:
30.5 HgA (1.034 bar)
Design features
HRSG:
Steam parameters:
Cold end:
Fuel system:
Pump redundancies:
Condensate:
Feedwater:
SCR:
Energy Sector
Siemens AG 2009
Comprehensive solutions
50 Hz
- SCC5-4000F 1S
- SCC5-4000F 1S
(SST5-5000)
- SCC5-4000F 2x1
60 Hz
- SCC6-5000F 2x1
Flex-Plant30
Operating benefits
Fast start-up
start-up
development
development
Market environment
Fuel savings
Capacity payments
Uncertain Markets
Higher efficiency
Seasonal electricity
demand
Flexible operation
Spinning reserve
credits
Developing wind
energy
Additional earnings
through new products
in liberalized markets
Less emissions
- SCC6-5000F 1x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant10
Ancillary services
References 60 Hz
Slide 15
Energy Sector
Siemens AG 2009
Comprehensive solutions
50 Hz
- SCC5-4000F 1S
- SCC5-4000F 1S
(SST5-5000)
Challenges:
HRSG pressure ramp rate capability
Steam turbine ramp rate capability
Piping warm up time
Steam Chemistry
Steam turbine back pressure limitations
- SCC5-4000F 2x1
60 Hz
- SCC6-5000F 2x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant10
Fast start-up
start-up
development
development
Proven and reliable
50 Hz
60 Hz
Steam Power Plants
References 50 Hz
References 60 Hz
Findings:
Plants designed for exclusive base load
operation had excessive start times due
to equipment restrictions
100
90
Solutions:
Develop integrated plant technology to
increase operating flexibility and fast-start
capability
80
70
60
50
40
30
20
10
Slide 16
Energy Sector
Siemens AG 2009
Comprehensive solutions
50 Hz
- SCC5-4000F 1S
- SCC5-4000F 1S
(SST5-5000)
BENSON once
through in HP section
ST stress
controller
High-capacity
Desuperheater
- SCC5-4000F 2x1
60 Hz
- SCC6-5000F 2x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant10
Funnel
Damper
Optimize GT
load ramp
Fast start-up
start-up
development
development
Proven and reliable
50 Hz
60 Hz
Steam Power Plants
Auxiliary Boiler
Automated
drains and vents
References 50 Hz
References 60 Hz
Condensate
polishing
plant
Slide 17
Energy Sector
Siemens AG 2009
Comprehensive solutions
50 Hz
- SCC5-4000F 1S
Benefits Include:
- SCC5-4000F 1S
(SST5-5000)
- SCC5-4000F 2x1
60 Hz
- SCC6-5000F 2x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant10
Fast start-up
start-up
development
development
Proven and reliable
50 Hz
60 Hz
Slide 18
Energy Sector
Siemens AG 2009
Comprehensive solutions
50 Hz
- SCC5-4000F 1S
- SCC5-4000F 1S
(SST5-5000)
- SCC5-4000F 2x1
60 Hz
- SCC6-5000F 2x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant10
Fast start-up
development
Proven and
Proven
andreliable
reliable
50 Hz
60 Hz
Steam Power Plants
References 50 Hz
References 60 Hz
Slide 19
Energy Sector
Siemens AG 2009
Comprehensive solutions
50 Hz
- SCC5-4000F 1S
- SCC5-4000F 1S
(SST5-5000)
- SCC5-4000F 2x1
60 Hz
- SCC6-5000F 2x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant10
Fast start-up
development
Proven and
Proven
andreliable
reliable
50 Hz
60 Hz
Steam Power Plants
References 50 Hz
References 60 Hz
Slide 20
Energy Sector
Siemens AG 2009
Comprehensive solutions
50 Hz
- SCC5-4000F 1S
- SCC5-4000F 1S
(SST5-5000)
- SCC5-4000F 2x1
60 Hz
- SCC6-5000F 2x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant30
Commercial operation in
summer 2004
Net output 1,500 MW
Multi Shaft CC 5.V94.3A + 2 steam turbines
with sea water desalination
- SCC6-5000F 1x1
Flex-Plant10
Fast start-up
development
Proven and
Proven
andreliable
reliable
50 Hz
60 Hz
Steam Power Plants
References 50 Hz
References 60 Hz
Energy Sector
Video
Siemens AG 2009
Comprehensive solutions
50 Hz
- SCC5-4000F 1S
- SCC5-4000F 1S
(SST5-5000)
- SCC5-4000F 2x1
60 Hz
- SCC6-5000F 2x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant10
Fast start-up
development
Proven and
Proven
andreliable
reliable
50 Hz
60 Hz
Steam Power Plants
References 50 Hz
References 60 Hz
Energy Sector
Siemens AG 2009
Merida, Mexico
Comprehensive solutions
50 Hz
- SCC5-4000F 1S
- SCC5-4000F 1S
(SST5-5000)
- SCC5-4000F 2x1
60 Hz
- SCC6-5000F 2x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant10
Fast start-up
development
Proven and
Proven
andreliable
reliable
50 Hz
60 Hz
Steam Power Plants
References 50 Hz
References 60 Hz
Slide 23
Energy Sector
Siemens AG 2009
Ironwood, Pennsylvania
Comprehensive solutions
50 Hz
- SCC5-4000F 1S
- SCC5-4000F 1S
(SST5-5000)
- SCC5-4000F 2x1
60 Hz
- SCC6-5000F 2x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant10
Fast start-up
development
Proven and
Proven
andreliable
reliable
50 Hz
60 Hz
Steam Power Plants
References 50 Hz
References 60 Hz
Slide 24
Energy Sector
Siemens AG 2009
Lakeside, Utah
Comprehensive solutions
50 Hz
- SCC5-4000F 1S
- SCC5-4000F 1S
(SST5-5000)
- SCC5-4000F 2x1
60 Hz
- SCC6-5000F 2x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant30
- SCC6-5000F 1x1
Flex-Plant10
Fast start-up
development
Proven
Provenand
andreliable
reliable
50 Hz
60
60 Hz
Hz
Steam Power Plants
References 50 Hz
References 60 Hz
Slide 25
Energy Sector
Siemens AG 2009