PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2


J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM


PT.HANJUNG INDONESIA

PACK NO.

DRAWING NO.

Status as
Date
Rev
MARKING NO.

PACKAGE
No.

TYPE

DESCRIPTION

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

CBM (m3)

H210-550-FPGC1

H210-550-FPGC1

RIL/PTH-J3-0003

SKID

ROOD MILL STRUCTURE

7.05

7.19

1086

1401

8425

12.82

H210-550-FPGC5

H210-550-FPGC5

RIL/PTH-J3-0007

SKID

ROOD MILL STRUCTURE

7.30

7.44

1316

1401

8425

15.53

11

H210-550-FPGC9

H210-550-FPGC9

RIL/PTH-J3-0011

SKID

ROOD MILL STRUCTURE

6.33

6.47

869

1403

6176

7.53

12

H210-550-FPGC10

H210-550-FPGC10

RIL/PTH-J3-0012

SKID

ROOD MILL STRUCTURE

7.22

7.37

586

1486

8425

7.34

16

H210-550-FPGC14

H210-550-FPGC14

RIL/PTH-J3-0016

SKID

ROOD MILL STRUCTURE

6.40

6.54

810

1413

6176

7.07

23

H210-550-FPGC20

H210-550-FPGC20

RIL/PTH-J3-0023

SKID

ROOD MILL STRUCTURE

7.48

7.62

1164

1486

8425

14.57

32

H210-550-FPGC29

H210-550-FPGC29

RIL/PTH-J3-0032

SKID

ROOD MILL STRUCTURE

6.45

6.58

824

1239

6176

6.31

36

H210-550-FPGC33

H210-550-FPGC33

RIL/PTH-J3-0036

SKID

ROOD MILL STRUCTURE

11.13

11.31

676

1439

11726

11.41

41

H210-550-FPGC40

H210-550-FPGC40

RIL/PTH-J3-0041

SKID

ROOD MILL STRUCTURE

7.33

7.47

1312

1486

8425

16.43

46

H210-550-FPGC45

H210-550-FPGC45

RIL/PTH-J3-0046

SKID

ROOD MILL STRUCTURE

9.93

10.18

1136

1937

10300

22.66

50

H210-550-FPGC49

H210-550-FPGC49

RIL/PTH-J3-0050

SKID

ROOD MILL STRUCTURE

11.15

11.32

1099

1239

11955

16.28

53

H210-550-FPGC52

H210-550-FPGC52

RIL/PTH-J3-0053

SKID

ROOD MILL STRUCTURE

7.14

7.29

696

1507

7140

7.49

59

H210-550-FPGC58

H210-550-FPGC58

RIL/PTH-J3-0059

SKID

ROOD MILL STRUCTURE

7.14

7.27

696

1407

7140

6.99

61

H210-550-FPGC60

H210-550-FPGC60

RIL/PTH-J3-0061

SKID

ROOD MILL STRUCTURE

6.45

6.59

859

1404

6244

7.53

65

H210-550-FPGC64

H210-550-FPGC64

RIL/PTH-J3-0065

SKID

ROOD MILL STRUCTURE

9.37

9.54

695

1241

10300

8.88

67

H210-550-FPGC66

H210-550-FPGC66

RIL/PTH-J3-0067

SKID

ROOD MILL STRUCTURE

7.47

7.61

1311

1402

8425

15.49

73

H210-550-FPGC72

H210-550-FPGC72

RIL/PTH-J3-0073

SKID

ROOD MILL STRUCTURE

7.47

7.62

1308

1482

8425

16.33

74

H210-550-FPGC73

H210-550-FPGC73

RIL/PTH-J3-0074

SKID

ROOD MILL STRUCTURE

5.40

5.49

661

1407

4960

4.61

79

H210-550-FPGC78

H210-550-FPGC78

RIL/PTH-J3-0079

SKID

ROOD MILL STRUCTURE

9.40

9.58

881

1406

10500

13.01

84

H210-550-FPGC83

H210-550-FPGC83

RIL/PTH-J3-0084

SKID

ROOD MILL STRUCTURE

6.93

7.07

695

1406

6840

6.68

91

H210-550-FPGC91

H210-550-FPGC91

RIL/PTH-J3-0091

SKID

ROOD MILL STRUCTURE

6.86

7.00

731

1397

8425

8.60

95

H210-550-FPGC95

H210-550-FPGC95

RIL/PTH-J3-0095

SKID

ROOD MILL STRUCTURE

7.14

7.27

696

1242

7140

6.17

97

H210-550-FPGC97

H210-550-FPGC97

RIL/PTH-J3-0097

SKID

ROOD MILL STRUCTURE

4.72

4.81

661

1406

4060

3.77

101

H220-550-FPGC2

H220-550-FPGC2

RIL/PTH-J3-0101

SKID

ROOD MILL STRUCTURE

6.99

7.23

1192

1450

8437

14.58

H220-550-FPGC16

H220-550-FPGC16

RIL/PTH-J3-0102

SKID

ROD MILL STRUCTURE

5.67

5.74

1540

995

5000

7.66

H220-550-FPGC28

H220-550-FPGC28

RIL/PTH-J3-0103

SKID

ROD MILL STRUCTURE

5.67

5.74

1540

995

5000

7.66

H361-013-VB5

H361-013-VB5

SUB PIPE RACK ACR 001

1.10

1.28

649

505

2130

2.79

H361-013-VB6

H361-013-VB6

SUB PIPE RACK ACR 001

1.18

1.36

649

506

2397

3.15

H361-013-VB7

H361-013-VB7

SUB PIPE RACK ACR 001

1.18

1.36

653

508

2456

3.26

285

H361-013-B50

H361-013-B50

SUB PIPE RACK ACR 001

2.38

2.38

410

406

5673

289

H361-013-B56

H361-013-B56

SUB PIPE RACK ACR 001

0.34

0.34

410

406

5607

BUNDLE

BUNDLE

Page 1 of 137

BARGE/ CONTAINER

: 2nd Shipment
: Mar. 11 2015
:D
REMARK

04/16/2015 09:39:59

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2


J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM


PT.HANJUNG INDONESIA

PACK NO.

DRAWING NO.

Status as
Date
Rev
MARKING NO.

PACKAGE
No.

TYPE

DESCRIPTION

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

CBM (m3)

2.71

3.30

670

1050

5720

32.19

2.99

A. H210-550 ROOD MILL STRUCTURE


1

H210-550-FPGB1

H210-550-FPGB1

RIL/PTH-J3-0001

SKID

ROOD MILL STRUCTURE

2.36

2.42

700

780

5470

H210-550-FPGB2

H210-550-FPGB2

RIL/PTH-J3-0002

SKID

ROOD MILL STRUCTURE

2.36

2.42

759

846

5470

3.51

H210-550-FPGC2

H210-550-FPGC2

RIL/PTH-J3-0004

SKID

ROOD MILL STRUCTURE

10.13

10.36

1134

1815

10370

21.34

H210-550-FPGC3

H210-550-FPGC3

RIL/PTH-J3-0005

SKID

ROOD MILL STRUCTURE

11.45

11.64

1106

1406

11955

18.59

H210-550-FPGC4

H210-550-FPGC4

RIL/PTH-J3-0006

SKID

ROOD MILL STRUCTURE

3.88

3.97

958

1439

2571

3.54

H210-550-FPGC6

H210-550-FPGC6

RIL/PTH-J3-0008

SKID

ROOD MILL STRUCTURE

9.68

10.05

881

3117

10300

28.28
14.79

H210-550-FPGC7

H210-550-FPGC7

RIL/PTH-J3-0009

SKID

ROOD MILL STRUCTURE

10.92

11.10

968

1402

10900

10

H210-550-FPGC8

H210-550-FPGC8

RIL/PTH-J3-0010

SKID

ROOD MILL STRUCTURE

9.57

9.75

708

1402

9800

9.73

13

H210-550-FPGC11

H210-550-FPGC11

RIL/PTH-J3-0013

SKID

ROOD MILL STRUCTURE

10.18

10.55

696

3117

10300

22.35

14

H210-550-FPGC12

H210-550-FPGC12

RIL/PTH-J3-0014

SKID

ROOD MILL STRUCTURE

10.25

10.44

1131

1406

10400

16.54

15

H210-550-FPGC13

H210-550-FPGC13

RIL/PTH-J3-0015

SKID

ROOD MILL STRUCTURE

9.99

10.17

511

1406

10300

7.40

17

H210-550-FPGC15

H210-550-FPGC15

RIL/PTH-J3-0017

SKID

ROOD MILL STRUCTURE

7.42

7.56

885

1401

8425

10.45

18

H210-550-FPGC16

H210-550-FPGC16

RIL/PTH-J3-0018

SKID

ROOD MILL STRUCTURE

10.19

10.43

693

1931

10300

13.78

19

H210-550-FPGC16

H210-550-FPGC16

RIL/PTH-J3-0019

SKID

ROOD MILL STRUCTURE

10.19

10.43

693

1931

10300

13.78

20

H210-550-FPGC17

H210-550-FPGC17

RIL/PTH-J3-0020

SKID

ROOD MILL STRUCTURE

10.05

10.21

610

1241

10400

7.87

21

H210-550-FPGC18

H210-550-FPGC18

RIL/PTH-J3-0021

SKID

ROOD MILL STRUCTURE

9.76

9.93

706

1259

10300

9.16

22

H210-550-FPGC19

H210-550-FPGC19

RIL/PTH-J3-0022

SKID

ROOD MILL STRUCTURE

6.40

6.54

861

1405

6176

7.47

24

H210-550-FPGC21

H210-550-FPGC21

RIL/PTH-J3-0024

SKID

ROOD MILL STRUCTURE

10.18

10.55

696

3117

10300

22.35

25

H210-550-FPGC22

H210-550-FPGC22

RIL/PTH-J3-0025

SKID

ROOD MILL STRUCTURE

7.41

7.54

1129

1239

6525

9.13

26

H210-550-FPGC23

H210-550-FPGC23

RIL/PTH-J3-0026

SKID

ROOD MILL STRUCTURE

7.07

7.19

661

1242

6800

5.58

27

H210-550-FPGC24

H210-550-FPGC24

RIL/PTH-J3-0027

SKID

ROOD MILL STRUCTURE

7.78

7.92

696

1407

7375

7.22

28

H210-550-FPGC25

H210-550-FPGC25

RIL/PTH-J3-0028

SKID

ROOD MILL STRUCTURE

6.27

6.39

875

1240

6176

6.70

29

H210-550-FPGC26

H210-550-FPGC26

RIL/PTH-J3-0029

SKID

ROOD MILL STRUCTURE

7.56

7.69

1164

1401

8425

13.74

30

H210-550-FPGC27

H210-550-FPGC27

RIL/PTH-J3-0030

SKID

ROOD MILL STRUCTURE

11.58

11.76

1128

1402

11700

18.50

31

H210-550-FPGC28

H210-550-FPGC28

RIL/PTH-J3-0031

SKID

ROOD MILL STRUCTURE

9.06

9.20

808

1402

9000

10.20

33

H210-550-FPGC30

H210-550-FPGC30

RIL/PTH-J3-0033

SKID

ROOD MILL STRUCTURE

7.34

7.48

1311

1401

8425

15.47

34

H210-550-FPGC31

H210-550-FPGC31

RIL/PTH-J3-0034

SKID

ROOD MILL STRUCTURE

10.18

10.55

696

3117

10300

22.35

35

H210-550-FPGC32

H210-550-FPGC32

RIL/PTH-J3-0035

SKID

ROOD MILL STRUCTURE

10.85

11.03

821

1408

11900

13.76

37

H210-550-FPGC35

H210-550-FPGC35

RIL/PTH-J3-0037

SKID

ROOD MILL STRUCTURE

7.30

7.44

737

1401

8425

8.70

38

H210-550-FPGC36

H210-550-FPGC36

RIL/PTH-J3-0038

SKID

ROOD MILL STRUCTURE

10.19

10.55

695

3117

10300

22.31

39

H210-550-FPGC37

H210-550-FPGC37

RIL/PTH-J3-0039

SKID

ROOD MILL STRUCTURE

11.22

11.40

968

1402

11900

16.15

40

H210-550-FPGC38

H210-550-FPGC38

RIL/PTH-J3-0040

SKID

ROOD MILL STRUCTURE

11.16

11.35

711

1438

11726

11.99

42

H210-550-FPGC41

H210-550-FPGC41

RIL/PTH-J3-0042

SKID

ROOD MILL STRUCTURE

9.68

10.04

881

3110

10300

28.22

43

H210-550-FPGC42

H210-550-FPGC42

RIL/PTH-J3-0043

SKID

ROOD MILL STRUCTURE

11.45

11.64

1022

1408

11900

17.12

44

H210-550-FPGC43

H210-550-FPGC43

RIL/PTH-J3-0044

SKID

ROOD MILL STRUCTURE

11.13

11.32

904

1442

11726

15.29

45

H210-550-FPGC44

H210-550-FPGC44

RIL/PTH-J3-0045

SKID

ROOD MILL STRUCTURE

7.15

7.30

1141

1486

8425

14.28

47

H210-550-FPGC46

H210-550-FPGC46

RIL/PTH-J3-0047

SKID

ROOD MILL STRUCTURE

8.30

8.44

1101

1406

7250

11.22

48

H210-550-FPGC47

H210-550-FPGC47

RIL/PTH-J3-0048

SKID

ROOD MILL STRUCTURE

6.83

6.98

1141

1486

8425

14.28

49

H210-550-FPGC48

H210-550-FPGC48

RIL/PTH-J3-0049

SKID

ROOD MILL STRUCTURE

9.50

9.69

1132

1432

10380

16.83

51

H210-550-FPGC50

H210-550-FPGC50

RIL/PTH-J3-0051

SKID

ROOD MILL STRUCTURE

3.96

4.05

949

1395

2629

3.48

52

H210-550-FPGC51

H210-550-FPGC51

RIL/PTH-J3-0052

SKID

ROOD MILL STRUCTURE

7.35

7.49

1312

1401

8425

15.49

Page 2 of 137

BARGE/ CONTAINER

: 2nd Shipment
: Mar. 11 2015
:D
REMARK

04/16/2015 09:39:59

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2


J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM


PT.HANJUNG INDONESIA

PACK NO.

DRAWING NO.

Status as
Date
Rev
MARKING NO.

PACKAGE
No.

TYPE

DESCRIPTION

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

CBM (m3)

54

H210-550-FPGC53

H210-550-FPGC53

RIL/PTH-J3-0054

SKID

ROOD MILL STRUCTURE

9.86

10.03

1006

1241

9700

12.11

55

H210-550-FPGC54

H210-550-FPGC54

RIL/PTH-J3-0055

SKID

ROOD MILL STRUCTURE

9.81

9.97

720

1241

9950

8.89

56

H210-550-FPGC55

H210-550-FPGC55

RIL/PTH-J3-0056

SKID

ROOD MILL STRUCTURE

6.53

6.66

849

1407

6256

7.47

57

H210-550-FPGC56

H210-550-FPGC56

RIL/PTH-J3-0057

SKID

ROOD MILL STRUCTURE

7.20

7.34

586

1486

8425

7.34

58

H210-550-FPGC57

H210-550-FPGC57

RIL/PTH-J3-0058

SKID

ROOD MILL STRUCTURE

5.01

5.10

511

1406

4210

3.02

60

H210-550-FPGC59

H210-550-FPGC59

RIL/PTH-J3-0060

SKID

ROOD MILL STRUCTURE

9.13

9.31

695

1406

9200

8.99

62

H210-550-FPGC61

H210-550-FPGC61

RIL/PTH-J3-0062

SKID

ROOD MILL STRUCTURE

7.15

7.29

878

1482

8425

10.96

63

H210-550-FPGC62

H210-550-FPGC62

RIL/PTH-J3-0063

SKID

ROOD MILL STRUCTURE

9.43

9.63

881

1506

10500

13.93

64

H210-550-FPGC63

H210-550-FPGC63

RIL/PTH-J3-0064

SKID

ROOD MILL STRUCTURE

9.75

9.93

1127

1402

10200

16.12

66

H210-550-FPGC65

H210-550-FPGC65

RIL/PTH-J3-0066

SKID

ROOD MILL STRUCTURE

6.33

6.47

909

1426

6244

8.09

68

H210-550-FPGC67

H210-550-FPGC67

RIL/PTH-J3-0068

SKID

ROOD MILL STRUCTURE

9.61

9.79

1131

1406

9700

15.42

69

H210-550-FPGC68

H210-550-FPGC68

RIL/PTH-J3-0069

SKID

ROOD MILL STRUCTURE

10.16

10.42

1131

2056

10000

23.25

70

H210-550-FPGC69

H210-550-FPGC69

RIL/PTH-J3-0070

SKID

ROOD MILL STRUCTURE

6.97

7.11

660

1407

6660

6.18

71

H210-550-FPGC70

H210-550-FPGC70

RIL/PTH-J3-0071

SKID

ROOD MILL STRUCTURE

7.73

7.87

694

1404

7500

7.31

72

H210-550-FPGC71

H210-550-FPGC71

RIL/PTH-J3-0072

SKID

ROOD MILL STRUCTURE

6.37

6.51

876

1430

6244

7.82

75

H210-550-FPGC74

H210-550-FPGC74

RIL/PTH-J3-0075

SKID

ROOD MILL STRUCTURE

7.14

7.27

696

1407

7140

6.99

76

H210-550-FPGC75

H210-550-FPGC75

RIL/PTH-J3-0076

SKID

ROOD MILL STRUCTURE

9.20

9.37

811

1241

9250

9.31

77

H210-550-FPGC76

H210-550-FPGC76

RIL/PTH-J3-0077

SKID

ROOD MILL STRUCTURE

6.52

6.66

862

1396

6244

7.51

78

H210-550-FPGC77

H210-550-FPGC77

RIL/PTH-J3-0078

SKID

ROOD MILL STRUCTURE

7.15

7.29

1311

1486

8425

16.41

80

H210-550-FPGC79

H210-550-FPGC79

RIL/PTH-J3-0080

SKID

ROOD MILL STRUCTURE

9.39

9.57

971

1406

10000

13.65

81

H210-550-FPGC80

H210-550-FPGC80

RIL/PTH-J3-0081

SKID

ROOD MILL STRUCTURE

9.66

9.84

843

1402

10500

12.41

82

H210-550-FPGC81

H210-550-FPGC81

RIL/PTH-J3-0082

SKID

ROOD MILL STRUCTURE

3.94

4.03

876

1422

2994

3.73

83

H210-550-FPGC82

H210-550-FPGC82

RIL/PTH-J3-0083

SKID

ROOD MILL STRUCTURE

7.30

7.44

738

1486

8425

9.24

85

H210-550-FPGC84

H210-550-FPGC84

RIL/PTH-J3-0085

SKID

ROOD MILL STRUCTURE

7.14

7.28

688

1407

7140

6.91

86

H210-550-FPGC85

H210-550-FPGC85

RIL/PTH-J3-0086

SKID

ROOD MILL STRUCTURE

9.50

9.68

661

1406

10100

9.39

87

H210-550-FPGC86

H210-550-FPGC86

RIL/PTH-J3-0087

SKID

ROOD MILL STRUCTURE

4.11

4.20

709

1419

2994

3.01

88

H210-550-FPGC87

H210-550-FPGC87

RIL/PTH-J3-0088

SKID

ROOD MILL STRUCTURE

7.46

7.60

1308

1482

8425

16.33

89

H210-550-FPGC88

H210-550-FPGC88

RIL/PTH-J3-0089

SKID

ROOD MILL STRUCTURE

9.92

10.11

1131

1406

9700

15.42

90

H210-550-FPGC90

H210-550-FPGC90

RIL/PTH-J3-0090

SKID

ROOD MILL STRUCTURE

11.57

11.76

674

1403

11794

11.15

92

H210-550-FPGC92

H210-550-FPGC92

RIL/PTH-J3-0092

SKID

ROOD MILL STRUCTURE

9.41

9.57

965

1241

10385

12.44

93

H210-550-FPGC93

H210-550-FPGC93

RIL/PTH-J3-0093

SKID

ROOD MILL STRUCTURE

8.24

8.36

658

1237

7165

5.83

94

H210-550-FPGC94

H210-550-FPGC94

RIL/PTH-J3-0094

SKID

ROOD MILL STRUCTURE

5.50

5.58

659

1239

4910

4.01

96

H210-550-FPGC96

H210-550-FPGC96

RIL/PTH-J3-0096

SKID

ROOD MILL STRUCTURE

9.61

9.79

1131

1406

9700

15.42

98

H210-550-FPGC98

H210-550-FPGC98

RIL/PTH-J3-0098

SKID

ROOD MILL STRUCTURE

9.80

9.97

968

1237

9680

11.59

99

H210-550-FPGC99

H210-550-FPGC99

RIL/PTH-J3-0099

SKID

ROOD MILL STRUCTURE

5.74

5.84

701

1597

5380

76

634.55

647.59

SUB TOTAL A. H210-550 ROOD MILL STRUCTURE

6.02
905.65

B. H220-550 ROOD MILL STRUCTURE


100

H220-550-FPGC1

H220-550-FPGC1

RIL/PTH-J3-0100

SKID

ROOD MILL STRUCTURE

4.59

4.69

1316

1351

6036

10.73

102

H220-550-FPGC3

H220-550-FPGC3

RIL/PTH-J3-0102

SKID

ROOD MILL STRUCTURE

5.59

5.75

1440

1495

5000

10.76

103

H220-550-FPGC4

H220-550-FPGC4

RIL/PTH-J3-0103

SKID

ROOD MILL STRUCTURE

11.87

12.20

1400

1540

12000

25.87

104

H220-550-FPGC5

H220-550-FPGC5

RIL/PTH-J3-0104

SKID

ROOD MILL STRUCTURE

11.48

11.77

1540

1250

10500

20.21

105

H220-550-FPGC6

H220-550-FPGC6

RIL/PTH-J3-0105

SKID

ROOD MILL STRUCTURE

7.16

7.41

1547

1608

8437

20.99

106

H220-550-FPGC7

H220-550-FPGC7

RIL/PTH-J3-0106

SKID

ROOD MILL STRUCTURE

5.44

5.59

1540

1180

5000

9.09

107

H220-550-FPGC8

H220-550-FPGC8

RIL/PTH-J3-0107

SKID

ROOD MILL STRUCTURE

11.97

12.27

2259

1271

12000

34.45

Page 3 of 137

BARGE/ CONTAINER

: 2nd Shipment
: Mar. 11 2015
:D
REMARK

04/16/2015 09:39:59

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2


J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM


PT.HANJUNG INDONESIA

PACK NO.

DRAWING NO.

Status as
Date
Rev
MARKING NO.

PACKAGE
No.

TYPE

DESCRIPTION

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

CBM (m3)

108

H220-550-FPGC9

H220-550-FPGC9

RIL/PTH-J3-0108

SKID

ROOD MILL STRUCTURE

10.08

10.35

1524

961

10500

15.38

109

H220-550-FPGC10

H220-550-FPGC10

RIL/PTH-J3-0109

SKID

ROOD MILL STRUCTURE

6.32

6.57

1125

1540

6036

10.46

110

H220-550-FPGC11

H220-550-FPGC11

RIL/PTH-J3-0110

SKID

ROOD MILL STRUCTURE

7.12

7.31

1550

885

8437

11.57

111

H220-550-FPGC12

H220-550-FPGC12

RIL/PTH-J3-0111

SKID

ROOD MILL STRUCTURE

11.33

11.60

1540

995

5000

15.32

12

92.96

7.23

SUB TOTAL B. H220-550 ROOD MILL STRUCTURE

184.84

C. H360-013 SUB PIPE RACK ACR 001


112

H360-013-VB19

H360-013-VB19

SUB PIPE RACK ACR 001

0.05

0.05

300

300

1526

0.27

113

H360-013-VB20

H360-013-VB20

SUB PIPE RACK ACR 001

0.03

0.03

300

300

1151

0.21

114

H360-013-VB21

H360-013-VB21

SUB PIPE RACK ACR 001

0.05

0.05

300

300

862

0.31

115

H360-013-VB22

H360-013-VB22

SUB PIPE RACK ACR 001

0.01

0.01

300

300

898

0.08

116

H360-013-VB23

H360-013-VB23

SUB PIPE RACK ACR 001

0.01

0.01

300

300

760

0.07

10

0.16

0.52

361

375

1526

2.07

RIL/PTH-J3-0112

BUNDLE

117

H360-013-HB1

H360-013-HB1

SUB PIPE RACK ACR 001

0.01

0.01

290

290

1334

0.11

118

H360-013-HB2

H360-013-HB2

SUB PIPE RACK ACR 001

0.02

0.02

290

290

1450

0.12

119

H360-013-HB3

H360-013-HB3

SUB PIPE RACK ACR 001

0.02

0.02

290

290

1484

0.12

120

H360-013-HB4

H360-013-HB4

SUB PIPE RACK ACR 001

0.02

0.02

290

290

1536

0.13

121

H360-013-HB5

H360-013-HB5

SUB PIPE RACK ACR 001

16

0.34

0.34

290

290

1987

2.67

122

H360-013-HB6

H360-013-HB6

SUB PIPE RACK ACR 001

0.02

0.02

290

290

1698

0.14

123

H360-013-VB16

H360-013-VB16

SUB PIPE RACK ACR 001

0.01

0.01

290

290

870

0.07

124

H360-013-VB17

H360-013-VB17

SUB PIPE RACK ACR 001

0.04

0.04

290

290

1652

0.28

125

H360-013-VB18

H360-013-VB18

SUB PIPE RACK ACR 001

0.02

0.02

290

290

1455

0.12

25

0.49

1.63

461

545

1987

12.48

RIL/PTH-J3-0113

BUNDLE

126

H360-013-CT6

H360-013-CT6

SUB PIPE RACK ACR 001

0.01

0.01

250

300

1150

0.09

127

H360-013-CT7

H360-013-CT7

SUB PIPE RACK ACR 001

0.01

0.01

300

531

1150

0.18

128

H360-013-CT8

H360-013-CT8

SUB PIPE RACK ACR 001

0.01

0.01

300

548

1150

0.19

129

H360-013-CT9

H360-013-CT9

SUB PIPE RACK ACR 001

0.07

0.07

300

509

1150

0.88

130

H360-013-CT10

H360-013-CT10

SUB PIPE RACK ACR 001

0.01

0.01

300

529

1150

0.18

131

H360-013-CT11

H360-013-CT11

SUB PIPE RACK ACR 001

0.04

0.04

300

651

1150

0.45

132

H360-013-CT12

H360-013-CT12

SUB PIPE RACK ACR 001

0.01

0.01

300

509

935

0.14

133

H360-013-CT13

H360-013-CT13

SUB PIPE RACK ACR 001

0.01

0.01

250

300

1045

0.08

13

0.19

1.42

1270

871

1150

16.54

RIL/PTH-J3-0114

BUNDLE

134

H360-013-B67

H360-013-B67

SUB PIPE RACK ACR 001

0.03

0.03

350

275

1461

0.14

135

H360-013-B68

H360-013-B68

SUB PIPE RACK ACR 001

0.03

0.03

350

275

1461

0.14

136

H360-013-B69

H360-013-B69

SUB PIPE RACK ACR 001

0.03

0.03

350

275

1461

0.14

137

H360-013-B70

H360-013-B70

SUB PIPE RACK ACR 001

0.03

0.03

350

275

1461

0.14

138

H360-013-B71

H360-013-B71

SUB PIPE RACK ACR 001

0.16

0.16

350

275

1461

0.84

139

H360-013-B72

H360-013-B72

SUB PIPE RACK ACR 001

0.05

0.05

350

275

1461

0.28

140

H360-013-B73

H360-013-B73

SUB PIPE RACK ACR 001

0.03

0.03

350

275

1461

0.14

141

H360-013-B74

H360-013-B74

SUB PIPE RACK ACR 001

0.03

0.03

350

275

1461

0.14

142

H360-013-B75

H360-013-B75

SUB PIPE RACK ACR 001

0.03

0.03

350

275

1461

0.14

143

H360-013-B76

H360-013-B76

SUB PIPE RACK ACR 001

0.03

0.03

350

275

1461

0.14

RIL/PTH-J3-0115

BUNDLE

Page 4 of 137

BARGE/ CONTAINER

: 2nd Shipment
: Mar. 11 2015
:D
REMARK

04/16/2015 09:39:59

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2


J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM


PT.HANJUNG INDONESIA

Status as
Date
Rev
RIL/PTH-J3-0115

PACK NO.

DRAWING NO.

MARKING NO.

PACKAGE
No.

BUNDLE

TYPE

DESCRIPTION

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

CBM (m3)

144

H360-013-B77

H360-013-B77

SUB PIPE RACK ACR 001

0.03

0.03

350

275

1461

0.14

145

H360-013-B78

H360-013-B78

SUB PIPE RACK ACR 001

0.06

0.06

1051

275

2334

0.67

146

H360-013-B79

H360-013-B79

SUB PIPE RACK ACR 001

0.05

0.05

350

275

2962

0.29

147

H360-013-B88

H360-013-B88

SUB PIPE RACK ACR 001

0.02

0.02

350

349

1211

0.15

20

0.58

2.72

461

1020

2962

27.86

0.14

0.14

400

275

1461

0.64

0.14

0.26

400

275

1461

0.64

SUB PIPE RACK ACR 001

0.04

0.04

890

350

388

0.36

SUB PIPE RACK ACR 001

0.07

0.07

837

408

388

0.66

0.11

0.53

1110

658

388

2.27

SUB PIPE RACK ACR 001

0.04

0.04

403

333

1461

0.20

SUB PIPE RACK ACR 001

0.07

0.07

403

333

1461

0.39

SUB PIPE RACK ACR 001

0.12

0.12

404

410

4657

0.77

0.23

0.38

436

378

4657

3.07

148

H360-013-B82

H360-013-B82

149

H360-013-CT1

H360-013-CT1

150

H360-013-CT2

H360-013-CT2

151

H360-013-B19

H360-013-B19

152

H360-013-B80

H360-013-B80

153

H360-013-B81

H360-013-B81

RIL/PTH-J3-0116

RIL/PTH-J3-0117

RIL/PTH-J3-0118

BUNDLE

BUNDLE

BUNDLE

SUB PIPE RACK ACR 001

154

H360-013-B7

H360-013-B7

SUB PIPE RACK ACR 001

0.21

0.21

457

383

5673

0.99

155

H360-013-B8

H360-013-B8

SUB PIPE RACK ACR 001

0.04

0.04

456

347

1142

0.18

156

H360-013-B9

H360-013-B9

SUB PIPE RACK ACR 001

0.22

0.22

456

346

5942

0.94

157

H360-013-B10

H360-013-B10

SUB PIPE RACK ACR 001

0.06

0.06

705

440

1102

0.34

158

H360-013-B11

H360-013-B11

SUB PIPE RACK ACR 001

0.06

0.06

620

440

1102

0.30

0.59

0.78

874

399

5942

10.36

0.16

0.16

856

352

4827

1.45

0.16

0.20

856

352

4827

1.45

0.58

0.58

1722

578

5944

5.92

0.58

0.63

1722

578

5944

5.92

0.58

0.58

1718

578

5944

5.90

0.58

0.63

1718

578

5944

5.90

0.12

0.12

380

1031

1684

0.66

0.12

0.19

380

1031

1684

0.66

0.11

0.11

399

336

2904

0.39

0.11

0.15

399

336

2904

0.39

11

1.91

1.91

358

478

5673

10.68

11

1.91

2.58

971

833

5673

50.47

0.87

0.87

357

352

4827

3.64

159

160

161

162

163

164

165

H360-013-B4

H360-013-B5

H360-013-B6

H360-013-CT4

H360-013-B1

H360-013-B2

H360-013-B3

H360-013-B4

H360-013-B5

H360-013-B6

H360-013-CT4

H360-013-B1

H360-013-B2

H360-013-B3

RIL/PTH-J3-0119

RIL/PTH-J3-0120

RIL/PTH-J3-0121

RIL/PTH-J3-0122

RIL/PTH-J3-0123

RIL/PTH-J3-0124

RIL/PTH-J3-0125

RIL/PTH-J3-0126

BUNDLE

BUNDLE

BUNDLE

BUNDLE

SKID

SKID

BUNDLE

BUNDLE

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001


Page 5 of 137

BARGE/ CONTAINER

: 2nd Shipment
: Mar. 11 2015
:D
REMARK

04/16/2015 09:39:59

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2


J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM


PT.HANJUNG INDONESIA

PACK NO.

166

167

168

169

170

171

DRAWING NO.

H360-013-VB1

H360-013-B55

H360-013-CT3

H360-013-CT5

H360-013-CT14

H360-013-FR1

Status as
Date
Rev
MARKING NO.

H360-013-VB1

H360-013-B55

H360-013-CT3

H360-013-CT5

H360-013-CT14

H360-013-FR1

PACKAGE
No.

RIL/PTH-J3-0127

RIL/PTH-J3-0128

RIL/PTH-J3-0129

RIL/PTH-J3-0130

RIL/PTH-J3-0131

RIL/PTH-J3-0132

TYPE

BUNDLE

SKID

BUNDLE

SKID

SKID

SKID

DESCRIPTION

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

CBM (m3)

0.87

1.13

397

503

4827

5.78

0.17

0.17

358

353

1389

0.70

0.17

0.32

397

413

1389

0.91

0.21

0.21

358

876

5673

1.78

0.21

0.27

358

876

5673

1.78

0.20

0.20

900

380

1442

1.48

0.20

0.35

900

649

1442

2.53

0.13

0.13

380

1420

1684

0.91

0.13

0.23

380

1420

1684

0.91

0.12

0.12

826

380

1684

0.53

0.12

0.16

826

380

1684

0.53

0.38

0.38

777

1242

4790

4.62

0.38

0.46

777

1242

4790

4.62

172

H360-013-B12

H360-013-B12

SUB PIPE RACK ACR 001

0.17

0.17

623

406

1236

0.63

173

H360-013-B13

H360-013-B13

SUB PIPE RACK ACR 001

0.08

0.08

605

406

1236

0.30

174

H360-013-B17

H360-013-B17

SUB PIPE RACK ACR 001

0.07

0.07

623

406

1086

0.27

175

H360-013-B20

H360-013-B20

SUB PIPE RACK ACR 001

0.34

0.34

410

406

5673

0.94

176

H360-013-B21

H360-013-B21

SUB PIPE RACK ACR 001

0.34

0.34

410

406

5640

0.94

177

H360-013-B23

H360-013-B23

SUB PIPE RACK ACR 001

0.08

0.08

522

416

1142

0.25

178

H360-013-B25

H360-013-B25

SUB PIPE RACK ACR 001

0.08

0.08

630

405

1142

0.29

179

H360-013-B27

H360-013-B27

SUB PIPE RACK ACR 001

0.09

0.09

410

406

1181

0.20

180

H360-013-B37

H360-013-B37

SUB PIPE RACK ACR 001

0.06

0.06

410

407

731

0.12

10

1.31

1.79

750

587

5673

24.98

RIL/PTH-J3-0133

BUNDLE

181

H360-013-B29

H360-013-B29

SUB PIPE RACK ACR 001

0.33

0.33

610

465

4617

1.31

182

H360-013-B33

H360-013-B33

SUB PIPE RACK ACR 001

0.33

0.33

609

464

4594

1.30

183

H360-013-B38

H360-013-B38

SUB PIPE RACK ACR 001

0.36

0.36

410

406

2912

0.97

184

H360-013-B41

H360-013-B41

SUB PIPE RACK ACR 001

0.15

0.15

410

416

1201

0.41

185

H360-013-B50

H360-013-B50

SUB PIPE RACK ACR 001

2.38

2.38

410

406

5673

6.61

186

H360-013-B51

H360-013-B51

SUB PIPE RACK ACR 001

0.34

0.34

410

406

5640

0.94

187

H360-013-B52

H360-013-B52

SUB PIPE RACK ACR 001

0.34

0.34

410

406

5607

0.93

188

H360-013-B53

H360-013-B53

SUB PIPE RACK ACR 001

0.34

0.34

410

406

5607

0.93

189

H360-013-B56

H360-013-B56

SUB PIPE RACK ACR 001

0.34

0.34

410

406

5607

0.93

190

H360-013-B84

H360-013-B84

SUB PIPE RACK ACR 001

0.33

0.33

609

464

4593

1.30

191

H360-013-SC1

H360-013-SC1

SUB PIPE RACK ACR 001

0.32

0.32

440

440

2530

0.98

20

5.55

6.91

1142

966

5673

125.17

RIL/PTH-J3-0134

BUNDLE

Page 6 of 137

BARGE/ CONTAINER

: 2nd Shipment
: Mar. 11 2015
:D
REMARK

04/16/2015 09:39:59

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2


J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM


PT.HANJUNG INDONESIA

PACK NO.

192

193

194

195

196

197

198

199

200

201

202

203

204

205

206

DRAWING NO.

H360-013-B14

H360-013-B15

H360-013-B16

H360-013-B18

H360-013-B22

H360-013-B24

H360-013-B26

H360-013-B28

H360-013-B30

H360-013-B31

H360-013-B32

H360-013-B34

H360-013-B35

H360-013-B36

H360-013-B39

Status as
Date
Rev
MARKING NO.

H360-013-B14

H360-013-B15

H360-013-B16

H360-013-B18

H360-013-B22

H360-013-B24

H360-013-B26

H360-013-B28

H360-013-B30

H360-013-B31

H360-013-B32

H360-013-B34

H360-013-B35

H360-013-B36

H360-013-B39

PACKAGE
No.
RIL/PTH-J3-0135

RIL/PTH-J3-0136

RIL/PTH-J3-0137

RIL/PTH-J3-0138

RIL/PTH-J3-0139

RIL/PTH-J3-0140

RIL/PTH-J3-0141

RIL/PTH-J3-0142

RIL/PTH-J3-0143

RIL/PTH-J3-0144

RIL/PTH-J3-0145

RIL/PTH-J3-0146

RIL/PTH-J3-0147

RIL/PTH-J3-0148

RIL/PTH-J3-0149

TYPE

SKID

SKID

SKID

SKID

SKID

SKID

SKID

BUNDLE

SKID

BUNDLE

SKID

SKID

SKID

SKID

SKID

DESCRIPTION

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

Page 7 of 137

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

CBM (m3)

0.85

0.85

1821

520

5942

5.63

0.85

0.89

1821

520

5942

5.63

0.63

0.63

1233

520

5942

3.81

0.63

0.67

1233

520

5942

3.81

0.78

0.78

1615

519

5944

4.98

0.78

0.83

1615

519

5944

4.98

0.37

0.37

410

642

5673

1.49

0.37

0.42

410

642

5673

1.49

0.36

0.36

609

666

4594

1.86

0.36

0.41

609

666

4594

1.86

0.73

0.73

1584

406

5607

3.61

0.73

0.77

1584

406

5607

3.61

0.09

0.09

633

662

1181

0.49

0.09

0.15

633

662

1181

0.49

0.69

0.69

793

864

4617

6.33

0.69

0.82

793

864

4617

6.33

0.36

0.36

846

958

4594

3.72

0.36

0.43

846

958

4594

3.72

0.70

0.70

610

868

4617

4.89

0.70

0.82

610

868

4617

4.89

0.37

0.37

610

745

4617

2.10

0.37

0.42

610

745

4617

2.10

0.73

0.73

1165

344

5607

2.25

0.73

0.76

1165

344

5607

2.25

0.87

0.87

1284

401

5942

3.06

0.87

0.91

1284

401

5942

3.06

0.06

0.06

659

406

731

0.20

0.06

0.10

659

406

731

0.20

0.37

0.37

410

657

5951

1.60

0.37

0.42

410

657

5951

1.60

BARGE/ CONTAINER

: 2nd Shipment
: Mar. 11 2015
:D
REMARK

04/16/2015 09:40:00

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2


J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM


PT.HANJUNG INDONESIA

PACK NO.

207

208

209

210

211

DRAWING NO.

H360-013-B40

H360-013-B42

H360-013-B43

H360-013-B44

H360-013-B45

Status as
Date
Rev
MARKING NO.

H360-013-B40

H360-013-B42

H360-013-B43

H360-013-B44

H360-013-B45

PACKAGE
No.

RIL/PTH-J3-0150

RIL/PTH-J3-0151

RIL/PTH-J3-0152

RIL/PTH-J3-0153

RIL/PTH-J3-0154

TYPE

SKID

SKID

BUNDLE

SKID

SKID

DESCRIPTION

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB TOTAL C. H360-013 SUB PIPE RACK ACR 001

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

CBM (m3)

0.37

0.37

410

660

5951

1.61

0.37

0.43

410

660

5951

1.61

0.32

0.32

410

867

4961

1.76

0.32

0.38

410

867

4961

1.76

0.95

0.95

344

660

4961

3.38

0.95

1.11

344

660

4961

3.38

0.32

0.32

410

868

4961

1.77

0.32

0.39

410

868

4961

1.77

0.34

0.34

410

868

4961

1.77

0.34

0.40

410

868

4961

1.77

176

25.15

35.77

363.58

D. H361-013 SUB PIPE RACK ACR 001


212

H361-013-VB19

H361-013-VB19

SUB PIPE RACK ACR 001

0.05

0.05

300

300

1526

0.27

213

H361-013-VB20

H361-013-VB20

SUB PIPE RACK ACR 001

0.03

0.03

300

300

1151

0.21

214

H361-013-VB21

H361-013-VB21

SUB PIPE RACK ACR 001

0.05

0.05

300

300

862

0.31

215

H361-013-VB22

H361-013-VB22

SUB PIPE RACK ACR 001

0.01

0.01

300

300

898

0.08

216

H361-013-VB23

H361-013-VB23

SUB PIPE RACK ACR 001

0.01

0.01

300

300

760

0.07

10

0.16

0.52

361

375

1526

2.07

RIL/PTH-J3-0155

BUNDLE

217

H361-013-HB1

H361-013-HB1

SUB PIPE RACK ACR 001

0.01

0.01

290

290

1334

0.11

218

H361-013-HB2

H361-013-HB2

SUB PIPE RACK ACR 001

0.02

0.02

290

290

1450

0.12

219

H361-013-HB3

H361-013-HB3

SUB PIPE RACK ACR 001

0.02

0.02

290

290

1484

0.12

220

H361-013-HB4

H361-013-HB4

SUB PIPE RACK ACR 001

0.02

0.02

290

290

1536

0.13

221

H361-013-HB5

H361-013-HB5

SUB PIPE RACK ACR 001

16

0.34

0.34

290

290

1987

2.67

222

H361-013-HB6

H361-013-HB6

SUB PIPE RACK ACR 001

0.02

0.02

290

290

1698

0.14

223

H361-013-VB16

H361-013-VB16

SUB PIPE RACK ACR 001

0.01

0.01

290

290

870

0.07

224

H361-013-VB17

H361-013-VB17

SUB PIPE RACK ACR 001

0.04

0.04

290

290

1652

0.28

225

H361-013-VB18

H361-013-VB18

SUB PIPE RACK ACR 001

0.02

0.02

290

290

1455

0.12

25

0.49

1.63

461

545

1987

12.48

RIL/PTH-J3-0156

BUNDLE

226

H361-013-CT6

H361-013-CT6

SUB PIPE RACK ACR 001

0.01

0.01

250

300

1150

0.09

227

H361-013-CT7

H361-013-CT7

SUB PIPE RACK ACR 001

0.01

0.01

300

531

1150

0.18

228

H361-013-CT8

H361-013-CT8

SUB PIPE RACK ACR 001

0.01

0.01

300

548

1150

0.19

229

H361-013-CT9

H361-013-CT9

SUB PIPE RACK ACR 001

0.07

0.07

300

509

1150

0.88

230

H361-013-CT10

H361-013-CT10

SUB PIPE RACK ACR 001

0.01

0.01

300

529

1150

0.18

231

H361-013-CT11

H361-013-CT11

SUB PIPE RACK ACR 001

0.04

0.04

300

651

1150

0.45

232

H361-013-CT12

H361-013-CT12

SUB PIPE RACK ACR 001

0.01

0.01

300

509

935

0.14

233

H361-013-CT13

H361-013-CT13

SUB PIPE RACK ACR 001

0.01

0.01

250

300

1045

0.08

RIL/PTH-J3-0157

BUNDLE

Page 8 of 137

BARGE/ CONTAINER

: 2nd Shipment
: Mar. 11 2015
:D
REMARK

04/16/2015 09:40:00

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2


J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM


PT.HANJUNG INDONESIA

PACK NO.

DRAWING NO.

Status as
Date
Rev
MARKING NO.

PACKAGE
No.

TYPE

DESCRIPTION

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

CBM (m3)

13

0.19

1.42

1270

871

1150

16.54

234

H361-013-B67

H361-013-B67

SUB PIPE RACK ACR 001

0.03

0.03

350

275

1461

0.14

235

H361-013-B68

H361-013-B68

SUB PIPE RACK ACR 001

0.03

0.03

350

275

1461

0.14

236

H361-013-B69

H361-013-B69

SUB PIPE RACK ACR 001

0.03

0.03

350

275

1461

0.14

237

H361-013-B70

H361-013-B70

SUB PIPE RACK ACR 001

0.03

0.03

350

275

1461

0.14

238

H361-013-B71

H361-013-B71

SUB PIPE RACK ACR 001

0.16

0.16

350

275

1461

0.84

239

H361-013-B72

H361-013-B72

SUB PIPE RACK ACR 001

0.05

0.05

350

275

1461

0.28

240

H361-013-B73

H361-013-B73

SUB PIPE RACK ACR 001

0.03

0.03

350

275

1461

0.14

241

H361-013-B74

H361-013-B74

SUB PIPE RACK ACR 001

0.03

0.03

350

275

1461

0.14

242

H361-013-B75

H361-013-B75

SUB PIPE RACK ACR 001

0.03

0.03

350

275

1461

0.14

243

H361-013-B76

H361-013-B76

SUB PIPE RACK ACR 001

0.03

0.03

350

275

1461

0.14

244

H361-013-B77

H361-013-B77

SUB PIPE RACK ACR 001

0.03

0.03

350

275

1461

0.14

245

H361-013-B78

H361-013-B78

SUB PIPE RACK ACR 001

0.06

0.06

1051

275

2334

0.67

246

H361-013-B79

H361-013-B79

SUB PIPE RACK ACR 001

0.05

0.05

350

275

2962

0.29

247

H361-013-B88

H361-013-B88

SUB PIPE RACK ACR 001

0.02

0.02

350

349

1211

0.15

20

0.58

2.72

461

1020

2962

27.86

0.14

0.14

400

275

1461

0.64

0.14

0.26

400

275

1461

0.64

SUB PIPE RACK ACR 001

0.04

0.04

890

350

388

0.36

SUB PIPE RACK ACR 001

0.07

0.07

837

408

388

0.66

0.11

0.53

1110

658

388

2.27

SUB PIPE RACK ACR 001

0.04

0.04

403

333

1461

0.20

SUB PIPE RACK ACR 001

0.07

0.07

403

333

1461

0.39

SUB PIPE RACK ACR 001

0.12

0.12

404

410

4657

0.77

0.23

0.38

436

378

4657

3.07

248

H361-013-B82

H361-013-B82

249

H361-013-CT1

H361-013-CT1

250

H361-013-CT2

H361-013-CT2

251

H361-013-B19

H361-013-B19

252

H361-013-B80

H361-013-B80

253

H361-013-B81

H361-013-B81

RIL/PTH-J3-0158

RIL/PTH-J3-0159

RIL/PTH-J3-0160

RIL/PTH-J3-0161

BUNDLE

BUNDLE

BUNDLE

BUNDLE

SUB PIPE RACK ACR 001

254

H361-013-B7

H361-013-B7

SUB PIPE RACK ACR 001

0.21

0.21

457

383

5673

0.99

255

H361-013-B8

H361-013-B8

SUB PIPE RACK ACR 001

0.04

0.04

456

347

1142

0.18

256

H361-013-B9

H361-013-B9

SUB PIPE RACK ACR 001

0.22

0.22

456

346

5942

0.94

257

H361-013-B10

H361-013-B10

SUB PIPE RACK ACR 001

0.06

0.06

705

440

1102

0.34

258

H361-013-B11

H361-013-B11

SUB PIPE RACK ACR 001

0.06

0.06

620

440

1102

0.30

0.59

0.78

874

399

5942

10.36

0.16

0.16

856

352

4827

1.45

0.16

0.20

856

352

4827

1.45

0.58

0.58

1722

578

5944

5.92

0.58

0.63

1722

578

5944

5.92

0.58

0.58

1718

578

5944

5.90

259

260

261

H361-013-B4

H361-013-B5

H361-013-B6

H361-013-B4

H361-013-B5

H361-013-B6

RIL/PTH-J3-0162

RIL/PTH-J3-0163

RIL/PTH-J3-0164

RIL/PTH-J3-0165

BUNDLE

SKID

SKID

SKID

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001


Page 9 of 137

BARGE/ CONTAINER

: 2nd Shipment
: Mar. 11 2015
:D
REMARK

04/16/2015 09:40:00

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2


J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM


PT.HANJUNG INDONESIA

PACK NO.

262

263

264

265

266

267

268

269

270

271

DRAWING NO.

H361-013-CT4

H361-013-B1

H361-013-B2

H361-013-B3

H361-013-VB1

H361-013-B55

H361-013-CT3

H361-013-CT5

H361-013-CT14

H361-013-FR1

Status as
Date
Rev
MARKING NO.

H361-013-CT4

H361-013-B1

H361-013-B2

H361-013-B3

H361-013-VB1

H361-013-B55

H361-013-CT3

H361-013-CT5

H361-013-CT14

H361-013-FR1

PACKAGE

TYPE

No.

RIL/PTH-J3-0166

SKID

RIL/PTH-J3-0167

SKID

RIL/PTH-J3-0168

BUNDLE

RIL/PTH-J3-0169

BUNDLE

RIL/PTH-J3-0170

BUNDLE

RIL/PTH-J3-0171

SKID

RIL/PTH-J3-0172

BUNDLE

RIL/PTH-J3-0173

SKID

RIL/PTH-J3-0174

SKID

RIL/PTH-J3-0175

SKID

DESCRIPTION

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

CBM (m3)

0.58

0.63

1718

578

5944

5.90

0.12

0.12

380

1031

1684

0.66

0.12

0.19

380

1031

1684

0.66

0.11

0.11

399

336

2904

0.39

0.11

0.15

399

336

2904

0.39

11

1.91

1.91

358

478

5673

10.68

11

1.91

2.58

971

833

5673

50.47

0.87

0.87

357

352

4827

3.64

0.87

1.13

397

503

4827

5.78

0.17

0.17

358

353

1389

0.70

0.17

0.32

397

413

1389

0.91

0.21

0.21

358

876

5673

1.78

0.21

0.27

358

876

5673

1.78

0.20

0.20

900

380

1442

1.48

0.20

0.35

900

649

1442

2.53

0.13

0.13

380

1420

1684

0.91

0.13

0.23

380

1420

1684

0.91

0.12

0.12

826

380

1684

0.53

0.12

0.16

826

380

1684

0.53

0.38

0.38

777

1242

4790

4.62

0.38

0.46

777

1242

4790

4.62

272

H361-013-B12

H361-013-B12

SUB PIPE RACK ACR 001

0.17

0.17

623

406

1236

0.63

273

H361-013-B13

H361-013-B13

SUB PIPE RACK ACR 001

0.08

0.08

605

406

1236

0.30

274

H361-013-B17

H361-013-B17

SUB PIPE RACK ACR 001

0.07

0.07

623

406

1086

0.27

275

H361-013-B20

H361-013-B20

SUB PIPE RACK ACR 001

0.34

0.34

410

406

5673

0.94

276

H361-013-B21

H361-013-B21

SUB PIPE RACK ACR 001

0.34

0.34

410

406

5640

0.94

277

H361-013-B23

H361-013-B23

SUB PIPE RACK ACR 001

0.08

0.08

522

416

1142

0.25

278

H361-013-B25

H361-013-B25

SUB PIPE RACK ACR 001

0.08

0.08

630

405

1142

0.29

279

H361-013-B27

H361-013-B27

SUB PIPE RACK ACR 001

0.09

0.09

410

406

1181

0.20

280

H361-013-B37

H361-013-B37

SUB PIPE RACK ACR 001

0.06

0.06

410

407

731

0.12

10

1.31

1.79

750

587

5673

24.98

0.33

0.33

610

465

4617

1.31

281

H361-013-B29

H361-013-B29

RIL/PTH-J3-0176

RIL/PTH-J3-0177

BUNDLE

BUNDLE

SUB PIPE RACK ACR 001


Page 10 of 137

BARGE/ CONTAINER

: 2nd Shipment
: Mar. 11 2015
:D
REMARK

04/16/2015 09:40:00

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2


J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM


PT.HANJUNG INDONESIA

PACK NO.

DRAWING NO.

Status as
Date
Rev
MARKING NO.

PACKAGE
No.

TYPE

DESCRIPTION

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

CBM (m3)

282

H361-013-B33

H361-013-B33

SUB PIPE RACK ACR 001

0.33

0.33

609

464

4594

1.30

283

H361-013-B38

H361-013-B38

SUB PIPE RACK ACR 001

0.36

0.36

410

406

2912

0.97

284

H361-013-B41

H361-013-B41

SUB PIPE RACK ACR 001

0.15

0.15

410

416

1201

0.41

286

H361-013-B51

H361-013-B51

SUB PIPE RACK ACR 001

0.34

0.34

410

406

5640

0.94

287

H361-013-B52

H361-013-B52

SUB PIPE RACK ACR 001

0.34

0.34

410

406

5607

0.93

288

H361-013-B53

H361-013-B53

SUB PIPE RACK ACR 001

0.34

0.34

410

406

5607

0.93

290

H361-013-B84

H361-013-B84

SUB PIPE RACK ACR 001

0.33

0.33

609

464

4593

1.30

291

H361-013-SC1

H361-013-SC1

SUB PIPE RACK ACR 001

0.32

0.32

440

440

2530

0.98

12

2.83

3.65

1142

966

5640

74.66

0.85

0.85

1821

520

5942

5.63

0.85

0.89

1821

520

5942

5.63

0.63

0.63

1233

520

5942

3.81

0.63

0.67

1233

520

5942

3.81

0.78

0.78

1615

519

5944

4.98

0.78

0.83

1615

519

5944

4.98

0.37

0.37

410

642

5673

1.49

0.37

0.42

410

642

5673

1.49

0.36

0.36

609

666

4594

1.86

0.36

0.41

609

666

4594

1.86

0.73

0.73

1584

406

5607

3.61

0.73

0.77

1584

406

5607

3.61

0.09

0.09

633

662

1181

0.49

0.09

0.15

633

662

1181

0.49

0.69

0.69

793

864

4617

6.33

0.69

0.82

793

864

4617

6.33

0.36

0.36

846

958

4594

3.72

0.36

0.43

846

958

4594

3.72

0.70

0.70

610

868

4617

4.89

0.70

0.82

610

868

4617

4.89

0.37

0.37

610

745

4617

2.10

0.37

0.42

610

745

4617

2.10

0.73

0.73

1165

344

5607

2.25

292

293

294

295

296

297

298

299

300

301

302

303

H361-013-B14

H361-013-B15

H361-013-B16

H361-013-B18

H361-013-B22

H361-013-B24

H361-013-B26

H361-013-B28

H361-013-B30

H361-013-B31

H361-013-B32

H361-013-B34

H361-013-B14

H361-013-B15

H361-013-B16

H361-013-B18

H361-013-B22

H361-013-B24

H361-013-B26

H361-013-B28

H361-013-B30

H361-013-B31

H361-013-B32

H361-013-B34

RIL/PTH-J3-0178

RIL/PTH-J3-0179

RIL/PTH-J3-0180

RIL/PTH-J3-0181

RIL/PTH-J3-0182

RIL/PTH-J3-0183

RIL/PTH-J3-0184

RIL/PTH-J3-0185

RIL/PTH-J3-0186

RIL/PTH-J3-0187

RIL/PTH-J3-0188

RIL/PTH-J3-0189

SKID

SKID

SKID

SKID

SKID

SKID

SKID

BUNDLE

SKID

BUNDLE

SKID

SKID

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001


Page 11 of 137

BARGE/ CONTAINER

: 2nd Shipment
: Mar. 11 2015
:D
REMARK

04/16/2015 09:40:00

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2


J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM


PT.HANJUNG INDONESIA

PACK NO.

304

305

306

307

308

309

310

311

Status as
Date
Rev

DRAWING NO.

H361-013-B35

H361-013-B36

H361-013-B39

H361-013-B40

H361-013-B42

H361-013-B43

H361-013-B44

H361-013-B45

MARKING NO.

H361-013-B35

H361-013-B36

H361-013-B39

H361-013-B40

H361-013-B42

H361-013-B43

H361-013-B44

H361-013-B45

PACKAGE
No.

RIL/PTH-J3-0190

RIL/PTH-J3-0191

RIL/PTH-J3-0192

RIL/PTH-J3-0193

RIL/PTH-J3-0194

RIL/PTH-J3-0195

RIL/PTH-J3-0196

RIL/PTH-J3-0197

TYPE

SKID

SKID

SKID

SKID

SKID

BUNDLE

SKID

SKID

DESCRIPTION

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB TOTAL D. H361-013 SUB PIPE RACK ACR 001

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

CBM (m3)

0.73

0.76

1165

344

5607

2.25

0.87

0.87

1284

401

5942

3.06

0.87

0.91

1284

401

5942

3.06

0.06

0.06

659

406

731

0.20

0.06

0.10

659

406

731

0.20

0.37

0.37

410

657

5951

1.60

0.37

0.42

410

657

5951

1.60

0.37

0.37

410

660

5951

1.61

0.37

0.43

410

660

5951

1.61

0.32

0.32

410

867

4961

1.76

0.32

0.38

410

867

4961

1.76

0.95

0.95

344

660

4961

3.38

0.95

1.11

344

660

4961

3.38

0.32

0.32

410

868

4961

1.77

0.32

0.39

410

868

4961

1.77

0.34

0.34

410

868

4961

1.77

0.34

0.40

410

868

4961

168

22.44

32.51

1.77
313.08

D. H360-009 SULPHUR RECOVERY UNIT APR 002


312

H360-009-1HB1

H360-009-1HB1

SULPHUR RECOVERY UNIT APR 002

10

0.68

0.68

200

330

2897

1.91

313

H360-009-1HB2

H360-009-1HB2

SULPHUR RECOVERY UNIT APR 002

0.14

0.14

200

330

3039

0.40

314

H360-009-1HB3

H360-009-1HB3

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

200

330

2797

0.18

315

H360-009-1HB4

H360-009-1HB4

SULPHUR RECOVERY UNIT APR 002

0.15

0.15

200

330

3258

0.43

316

H360-009-1HB6

H360-009-1HB6

SULPHUR RECOVERY UNIT APR 002

0.20

0.20

200

330

2866

0.57

317

H360-009-1HB7

H360-009-1HB7

SULPHUR RECOVERY UNIT APR 002

0.17

0.17

200

330

3671

0.48

318

H360-009-1HB8

H360-009-1HB8

SULPHUR RECOVERY UNIT APR 002

0.27

0.27

200

330

2889

0.76

319

H360-009-1HB10

H360-009-1HB10

SULPHUR RECOVERY UNIT APR 002

0.09

0.09

200

330

3863

0.25

320

H360-009-1HB11

H360-009-1HB11

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

200

330

2891

0.19

321

H360-009-1HB12

H360-009-1HB12

SULPHUR RECOVERY UNIT APR 002

0.09

0.09

200

330

3828

0.25

322

H360-009-1HB13

H360-009-1HB13

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

200

330

3053

0.20

323

H360-009-1HB14

H360-009-1HB14

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

200

330

2977

0.20

324

H360-009-1HB15

H360-009-1HB15

SULPHUR RECOVERY UNIT APR 002

0.23

0.23

200

330

3203

0.63

325

H360-009-1VB1

H360-009-1VB1

SULPHUR RECOVERY UNIT APR 002

0.06

0.06

200

330

1201

0.16

326

H360-009-1VB2

H360-009-1VB2

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

330

777

0.05

327

H360-009-1VB3

H360-009-1VB3

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

200

330

1899

0.13

328

H360-009-1VB4

H360-009-1VB4

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

200

330

1594

0.11

RIL/PTH-J3-0198

BUNDLE

Page 12 of 137

BARGE/ CONTAINER

: 2nd Shipment
: Mar. 11 2015
:D
REMARK

04/16/2015 09:40:00

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2


J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM


PT.HANJUNG INDONESIA

PACK NO.

DRAWING NO.

RIL/PTH-J3-0198

MARKING NO.

PACKAGE
No.

Status as
Date
Rev

BUNDLE

TYPE

DESCRIPTION

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

CBM (m3)

329

H360-009-1VB5

H360-009-1VB5

SULPHUR RECOVERY UNIT APR 002

0.08

0.08

200

330

3348

0.22

330

H360-009-1VB6

H360-009-1VB6

SULPHUR RECOVERY UNIT APR 002

0.08

0.08

200

330

1625

0.21

331

H360-009-1VB7

H360-009-1VB7

SULPHUR RECOVERY UNIT APR 002

0.19

0.19

200

330

3940

0.52

332

H360-009-1VB8

H360-009-1VB8

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

200

330

1498

0.20

333

H360-009-1VB9

H360-009-1VB9

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

200

330

1392

0.09

334

H360-009-1VB10

H360-009-1VB10

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

200

330

1481

0.10

335

H360-009-1VB11

H360-009-1VB11

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

200

330

1389

0.09

336

H360-009-1VB26

H360-009-1VB26

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

200

330

1388

0.09

48

3.00

5.36

698

610

3940

80.52

SULPHUR RECOVERY UNIT APR 002

0.06

0.06

200

275

1396

0.38

SULPHUR RECOVERY UNIT APR 002

0.01

0.01

200

275

1230

0.07

SULPHUR RECOVERY UNIT APR 002

0.01

0.01

200

275

1366

0.08

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

200

275

2409

0.26

0.13

0.43

326

319

2409

2.25

337

H360-009-1HB16

H360-009-1HB16

338

H360-009-1HB17

H360-009-1HB17

339

H360-009-1VB12

H360-009-1VB12

340

H360-009-1VB25

H360-009-1VB25

RIL/PTH-J3-0199

BUNDLE

341

H360-009-1HB5

H360-009-1HB5

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1934

0.11

342

H360-009-1HB18

H360-009-1HB18

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

200

290

1589

0.18

343

H360-009-1HB19

H360-009-1HB19

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1616

0.09

344

H360-009-1HB20

H360-009-1HB20

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

753

0.09

345

H360-009-1HB21

H360-009-1HB21

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

200

290

2383

0.14

346

H360-009-1HB22

H360-009-1HB22

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

2017

0.12

347

H360-009-1HB23

H360-009-1HB23

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1804

0.10

348

H360-009-1HB24

H360-009-1HB24

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

200

290

2513

0.15

349

H360-009-1HB25

H360-009-1HB25

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

200

290

1967

0.23

350

H360-009-1HB26

H360-009-1HB26

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

200

290

1603

0.19

351

H360-009-1HB27

H360-009-1HB27

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

200

290

1893

0.22

352

H360-009-1HB28

H360-009-1HB28

SULPHUR RECOVERY UNIT APR 002

0.10

0.10

200

290

1914

0.56

353

H360-009-1HB29

H360-009-1HB29

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

200

290

1916

0.22

354

H360-009-1HB30

H360-009-1HB30

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1819

0.11

355

H360-009-1HB31

H360-009-1HB31

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

200

290

1959

0.23

356

H360-009-1HB32

H360-009-1HB32

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1560

0.09

357

H360-009-1HB33

H360-009-1HB33

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1895

0.11

358

H360-009-1HB34

H360-009-1HB34

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1582

0.09

359

H360-009-1HB35

H360-009-1HB35

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1622

0.09

360

H360-009-1HB36

H360-009-1HB36

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1578

0.09

361

H360-009-1HB37

H360-009-1HB37

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

200

290

1542

0.18

362

H360-009-1HB38

H360-009-1HB38

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1735

0.10

363

H360-009-1HB39

H360-009-1HB39

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1690

0.10

364

H360-009-1HB40

H360-009-1HB40

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1758

0.10

365

H360-009-1HB41

H360-009-1HB41

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1455

0.08

366

H360-009-1HB42

H360-009-1HB42

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

2208

0.13

367

H360-009-1HB43

H360-009-1HB43

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1865

0.11

368

H360-009-1HB44

H360-009-1HB44

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1960

0.11

Page 13 of 137

BARGE/ CONTAINER

: 2nd Shipment
: Mar. 11 2015
:D
REMARK

04/16/2015 09:40:00

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2


J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM


PT.HANJUNG INDONESIA

PACK NO.

DRAWING NO.

Status as
Date
Rev
MARKING NO.

PACKAGE
No.

TYPE

DESCRIPTION

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

CBM (m3)

369

H360-009-1HB45

H360-009-1HB45

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1756

0.10

370

H360-009-1HB46

H360-009-1HB46

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1576

0.09

371

H360-009-1HB47

H360-009-1HB47

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1503

0.09

372

H360-009-1HB48

H360-009-1HB48

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1872

0.11

373

H360-009-1HB49

H360-009-1HB49

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1591

0.09

374

H360-009-1HB50

H360-009-1HB50

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1439

0.08

375

H360-009-1HB51

H360-009-1HB51

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

200

290

1816

0.21

376

H360-009-1HB52

H360-009-1HB52

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1626

0.09

377

H360-009-1HB53

H360-009-1HB53

SULPHUR RECOVERY UNIT APR 002

0.06

0.06

200

290

2864

0.33

378

H360-009-1HB54

H360-009-1HB54

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1787

0.10

379

H360-009-1HB55

H360-009-1HB55

SULPHUR RECOVERY UNIT APR 002

0.01

0.01

200

290

1235

0.07

380

H360-009-1HB56

H360-009-1HB56

SULPHUR RECOVERY UNIT APR 002

0.01

0.01

200

290

1260

0.07

381

H360-009-1HB57

H360-009-1HB57

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1953

0.11

382

H360-009-1HB58

H360-009-1HB58

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1476

0.09

383

H360-009-1HB59

H360-009-1HB59

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1783

0.10

384

H360-009-1HB60

H360-009-1HB60

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1416

0.08

385

H360-009-1HB61

H360-009-1HB61

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1387

0.08

386

H360-009-1HB62

H360-009-1HB62

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1938

0.11

387

H360-009-1HB63

H360-009-1HB63

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1803

0.10

388

H360-009-1HB64

H360-009-1HB64

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1749

0.10

389

H360-009-1HB65

H360-009-1HB65

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

200

290

1227

0.14

390

H360-009-1HB66

H360-009-1HB66

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

200

290

1979

0.23

391

H360-009-1HB67

H360-009-1HB67

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1763

0.10

392

H360-009-1HB68

H360-009-1HB68

SULPHUR RECOVERY UNIT APR 002

0.01

0.01

200

290

1351

0.08

393

H360-009-1HB69

H360-009-1HB69

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1921

0.11

394

H360-009-1HB70

H360-009-1HB70

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

200

290

3445

0.20

395

H360-009-1HB71

H360-009-1HB71

SULPHUR RECOVERY UNIT APR 002

0.01

0.01

200

290

1378

0.08

396

H360-009-1HB72

H360-009-1HB72

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

2005

0.12

397

H360-009-1HB73

H360-009-1HB73

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1954

0.11

398

H360-009-1HB74

H360-009-1HB74

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1638

0.10

399

H360-009-1HB75

H360-009-1HB75

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1946

0.11

400

H360-009-1HB76

H360-009-1HB76

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1463

0.08

401

H360-009-1HB77

H360-009-1HB77

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1809

0.10

402

H360-009-1HB78

H360-009-1HB78

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1517

0.09

403

H360-009-1HB79

H360-009-1HB79

SULPHUR RECOVERY UNIT APR 002

0.01

0.01

200

290

1366

0.08

404

H360-009-1HB80

H360-009-1HB80

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1437

0.08

405

H360-009-1HB81

H360-009-1HB81

SULPHUR RECOVERY UNIT APR 002

0.01

0.01

200

290

1085

0.06

406

H360-009-1VB23

H360-009-1VB23

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

200

290

3480

0.20

407

H360-009-1VB24

H360-009-1VB24

SULPHUR RECOVERY UNIT APR 002

0.01

0.01

200

290

580

0.03

83

1.58

7.79

585

624

3480

105.44

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

300

250

1084

0.16

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

300

250

1099

0.16

0.04

0.16

330

229

1099

0.33

408

H360-009-1B123

H360-009-1B123

409

H360-009-1B124

H360-009-1B124

RIL/PTH-J3-0200

RIL/PTH-J3-0201

BUNDLE

BUNDLE

Page 14 of 137

BARGE/ CONTAINER

: 2nd Shipment
: Mar. 11 2015
:D
REMARK

04/16/2015 09:40:00

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2


J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM


PT.HANJUNG INDONESIA

PACK NO.

DRAWING NO.

Status as
Date
Rev
MARKING NO.

410

H360-009-1B254

H360-009-1B254

411

H360-009-1B255

H360-009-1B255

PACKAGE
No.

RIL/PTH-J3-0202

TYPE

BUNDLE

DESCRIPTION

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

CBM (m3)

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

350

275

876

0.08

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

350

275

969

0.09

0.03

0.09

386

254

969

0.19

412

H360-009-1B166

H360-009-1B166

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1464

0.16

413

H360-009-1B168

H360-009-1B168

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1563

0.17

414

H360-009-1B171

H360-009-1B171

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1463

0.16

415

H360-009-1B172

H360-009-1B172

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1463

0.16

416

H360-009-1B173

H360-009-1B173

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1463

0.16

417

H360-009-1B175

H360-009-1B175

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1463

0.16

418

H360-009-1B179

H360-009-1B179

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1164

0.13

419

H360-009-1B180

H360-009-1B180

SULPHUR RECOVERY UNIT APR 002

0.05

0.05

400

275

1464

0.16

420

H360-009-1B181

H360-009-1B181

SULPHUR RECOVERY UNIT APR 002

0.05

0.05

400

275

1464

0.16

421

H360-009-1B182

H360-009-1B182

SULPHUR RECOVERY UNIT APR 002

0.05

0.05

400

275

1464

0.16

422

H360-009-1B187

H360-009-1B187

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1461

0.16

423

H360-009-1B189

H360-009-1B189

SULPHUR RECOVERY UNIT APR 002

0.67

0.67

400

275

2961

2.61

424

H360-009-1B191

H360-009-1B191

SULPHUR RECOVERY UNIT APR 002

0.67

0.67

400

275

2961

2.61

425

H360-009-1B192

H360-009-1B192

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1411

0.16

426

H360-009-1B196

H360-009-1B196

SULPHUR RECOVERY UNIT APR 002

0.10

0.10

400

275

2860

0.31

427

H360-009-1B197

H360-009-1B197

SULPHUR RECOVERY UNIT APR 002

0.10

0.10

400

275

2860

0.31

428

H360-009-1B199

H360-009-1B199

SULPHUR RECOVERY UNIT APR 002

0.08

0.08

400

275

2960

0.33

429

H360-009-1B200

H360-009-1B200

SULPHUR RECOVERY UNIT APR 002

0.08

0.08

400

275

2860

0.31

430

H360-009-1B204

H360-009-1B204

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1463

0.16

431

H360-009-1B206

H360-009-1B206

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1363

0.15

432

H360-009-1B208

H360-009-1B208

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1463

0.16

433

H360-009-1B209

H360-009-1B209

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1463

0.16

36

2.39

4.76

950

920

2961

93.16

RIL/PTH-J3-0203

BUNDLE

434

H360-009-1B167

H360-009-1B167

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

400

275

1563

0.34

435

H360-009-1B169

H360-009-1B169

SULPHUR RECOVERY UNIT APR 002

10

0.34

0.34

400

275

1464

1.61

436

H360-009-1B170

H360-009-1B170

SULPHUR RECOVERY UNIT APR 002

0.17

0.17

400

275

1463

0.80

437

H360-009-1B174

H360-009-1B174

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1463

0.16

438

H360-009-1B176

H360-009-1B176

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

400

275

1463

0.32

439

H360-009-1B177

H360-009-1B177

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

400

275

2964

0.33

440

H360-009-1B178

H360-009-1B178

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1164

0.13

441

H360-009-1B183

H360-009-1B183

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

400

275

874

0.10

442

H360-009-1B184

H360-009-1B184

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1240

0.14

443

H360-009-1B185

H360-009-1B185

SULPHUR RECOVERY UNIT APR 002

0.21

0.21

400

275

1461

0.96

444

H360-009-1B186

H360-009-1B186

SULPHUR RECOVERY UNIT APR 002

0.21

0.21

400

275

1461

0.96

445

H360-009-1B188

H360-009-1B188

SULPHUR RECOVERY UNIT APR 002

0.28

0.28

400

275

2961

1.30

446

H360-009-1B190

H360-009-1B190

SULPHUR RECOVERY UNIT APR 002

0.35

0.35

400

275

2961

1.63

447

H360-009-1B193

H360-009-1B193

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1476

0.16

448

H360-009-1B194

H360-009-1B194

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1476

0.16

RIL/PTH-J3-0204

BUNDLE

Page 15 of 137

BARGE/ CONTAINER

: 2nd Shipment
: Mar. 11 2015
:D
REMARK

04/16/2015 09:40:00

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2


J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM


PT.HANJUNG INDONESIA

PACK NO.

DRAWING NO.

Status as
Date
Rev
MARKING NO.

449

H360-009-1B195

H360-009-1B195

450

H360-009-1B198

H360-009-1B198

451

H360-009-1B201

452

PACKAGE
No.

TYPE

DESCRIPTION

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

CBM (m3)

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

400

275

836

0.09

SULPHUR RECOVERY UNIT APR 002

0.14

0.14

400

275

2960

0.65

H360-009-1B201

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

400

275

857

0.09

H360-009-1B202

H360-009-1B202

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1459

0.16

453

H360-009-1B203

H360-009-1B203

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1463

0.16

454

H360-009-1B205

H360-009-1B205

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1363

0.15

455

H360-009-1B207

H360-009-1B207

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

400

275

1463

0.32

456

H360-009-1B210

H360-009-1B210

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1178

0.13

457

H360-009-1B211

H360-009-1B211

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1463

0.16

458

H360-009-1B212

H360-009-1B212

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1463

0.16

459

H360-009-1B213

H360-009-1B213

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

400

275

860

0.09

460

H360-009-1B214

H360-009-1B214

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1260

0.14

461

H360-009-1B215

H360-009-1B215

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

400

275

964

0.32

462

H360-009-1B216

H360-009-1B216

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1164

0.13

463

H360-009-1B217

H360-009-1B217

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1494

0.16

464

H360-009-1B218

H360-009-1B218

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1164

0.13

465

H360-009-1B219

H360-009-1B219

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

400

275

2954

0.32

68

2.67

11.36

1087

1278

2964

279.99

0.05

0.05

352

289

312

0.13

0.05

0.18

352

289

312

0.13

466

H360-009-1CT27

H360-009-1CT27

RIL/PTH-J3-0204

RIL/PTH-J3-0205

BUNDLE

BUNDLE

SULPHUR RECOVERY UNIT APR 002

467

H360-009-1B115

H360-009-1B115

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

679

374

1163

0.30

468

H360-009-1B116

H360-009-1B116

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

679

374

1163

0.30

469

H360-009-1B118

H360-009-1B118

SULPHUR RECOVERY UNIT APR 002

0.14

0.14

403

364

5585

0.82

470

H360-009-1B119

H360-009-1B119

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

599

343

1547

0.32

471

H360-009-1B120

H360-009-1B120

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

601

344

1547

0.32

472

H360-009-1B121

H360-009-1B121

SULPHUR RECOVERY UNIT APR 002

0.08

0.08

403

333

1596

0.43

473

H360-009-1B128

H360-009-1B128

SULPHUR RECOVERY UNIT APR 002

0.08

0.08

403

333

2959

0.40

474

H360-009-1B133

H360-009-1B133

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

403

333

1413

0.19

475

H360-009-1B134

H360-009-1B134

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

403

333

1463

0.20

476

H360-009-1B135

H360-009-1B135

SULPHUR RECOVERY UNIT APR 002

0.14

0.14

403

333

5462

0.73

477

H360-009-1B136

H360-009-1B136

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

403

333

712

0.10

478

H360-009-1B138

H360-009-1B138

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

403

333

1746

0.23

479

H360-009-1B139

H360-009-1B139

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

403

333

1746

0.23

480

H360-009-1B140

H360-009-1B140

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

403

333

1461

0.20

481

H360-009-1B141

H360-009-1B141

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

403

333

2961

0.40

482

H360-009-1B142

H360-009-1B142

SULPHUR RECOVERY UNIT APR 002

0.08

0.08

403

333

2961

0.40

483

H360-009-1B143

H360-009-1B143

SULPHUR RECOVERY UNIT APR 002

0.08

0.08

403

333

2961

0.40

484

H360-009-1B145

H360-009-1B145

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

403

333

2961

0.40

485

H360-009-1B146

H360-009-1B146

SULPHUR RECOVERY UNIT APR 002

0.09

0.09

403

333

2961

0.40

486

H360-009-1B147

H360-009-1B147

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

403

333

1176

0.16

487

H360-009-1B151

H360-009-1B151

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

403

333

2960

0.40

488

H360-009-1B154

H360-009-1B154

SULPHUR RECOVERY UNIT APR 002

0.15

0.15

403

333

5464

0.73

RIL/PTH-J3-0206

BUNDLE

Page 16 of 137

BARGE/ CONTAINER

: 2nd Shipment
: Mar. 11 2015
:D
REMARK

04/16/2015 09:40:00

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2


J3 PROJECT
RIL/PTH-J3-0206

BUNDLE

JAMNAGAR GASIFICATION PROGRAM


PT.HANJUNG INDONESIA

PACK NO.

DRAWING NO.

Status as
Date
Rev
MARKING NO.

PACKAGE
No.

TYPE

DESCRIPTION

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

CBM (m3)

489

H360-009-1B157

H360-009-1B157

SULPHUR RECOVERY UNIT APR 002

0.15

0.15

403

333

5964

0.80

490

H360-009-1B158

H360-009-1B158

SULPHUR RECOVERY UNIT APR 002

0.15

0.15

403

333

5964

0.80

491

H360-009-1B161

H360-009-1B161

SULPHUR RECOVERY UNIT APR 002

0.05

0.05

403

333

1764

0.24

492

H360-009-1B163

H360-009-1B163

SULPHUR RECOVERY UNIT APR 002

0.05

0.05

403

333

1514

0.20

493

H360-009-1B164

H360-009-1B164

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

403

333

1463

0.39

494

H360-009-1B165

H360-009-1B165

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

403

333

763

0.10

495

H360-009-1FR10

H360-009-1FR10

SULPHUR RECOVERY UNIT APR 002

0.08

0.08

403

333

1355

0.18

496

H360-009-1SC2

H360-009-1SC2

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

403

333

508

0.07

497

H360-009-1SC3

H360-009-1SC3

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

403

333

508

0.07

33

2.09

6.41

1372

1314

5964

354.81

498

H360-009-1CT28

H360-009-1CT28

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

403

333

1988

0.27

499

H360-009-1CT29

H360-009-1CT29

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

403

333

778

0.21

500

H360-009-1CT30

H360-009-1CT30

SULPHUR RECOVERY UNIT APR 002

0.08

0.08

403

333

548

0.22

501

H360-009-1CT31

H360-009-1CT31

SULPHUR RECOVERY UNIT APR 002

0.05

0.05

403

333

548

0.15

502

H360-009-1CT32

H360-009-1CT32

SULPHUR RECOVERY UNIT APR 002

0.05

0.05

403

333

1188

0.16

0.32

1.60

1180

1457

1988

30.76

0.05

0.05

680

375

1463

0.37

0.05

0.09

680

375

1463

0.37

0.11

0.11

682

591

3093

1.25

0.11

0.16

682

591

3093

1.25

0.05

0.05

403

333

1463

0.20

0.05

0.08

403

333

1463

0.20

0.08

0.08

403

333

2899

0.39

0.08

0.12

403

333

2899

0.39

0.08

0.08

403

333

2963

0.40

0.08

0.12

403

333

2963

0.40

0.05

0.05

403

333

1459

0.20

0.05

0.09

403

333

1459

0.20

0.10

0.10

403

333

2964

0.40

0.10

0.13

403

333

2964

0.40

0.09

0.09

403

333

2964

0.40

0.09

0.13

403

333

2964

0.40

0.09

0.09

403

333

2964

0.40

0.09

0.12

403

333

2964

0.40

503

504

505

506

507

508

509

510

511

H360-009-1B114

H360-009-1B117

H360-009-1B122

H360-009-1B125

H360-009-1B126

H360-009-1B127

H360-009-1B129

H360-009-1B130

H360-009-1B131

H360-009-1B114

H360-009-1B117

H360-009-1B122

H360-009-1B125

H360-009-1B126

H360-009-1B127

H360-009-1B129

H360-009-1B130

H360-009-1B131

RIL/PTH-J3-0207

RIL/PTH-J3-0208

RIL/PTH-J3-0209

RIL/PTH-J3-0210

RIL/PTH-J3-0211

RIL/PTH-J3-0212

RIL/PTH-J3-0213

RIL/PTH-J3-0214

RIL/PTH-J3-0215

RIL/PTH-J3-0216

BUNDLE

SKID

SKID

SKID

SKID

SKID

SKID

SKID

SKID

SKID

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

Page 17 of 137

BARGE/ CONTAINER

: 2nd Shipment
: Mar. 11 2015
:D
REMARK

04/16/2015 09:40:00

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2


J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM


PT.HANJUNG INDONESIA

PACK NO.

512

513

514

515

516

517

518

519

520

521

522

523

524

525

526

DRAWING NO.

H360-009-1B132

H360-009-1B137

H360-009-1B144

H360-009-1B148

H360-009-1B149

H360-009-1B150

H360-009-1B152

H360-009-1B153

H360-009-1B155

H360-009-1B156

H360-009-1B159

H360-009-1B160

H360-009-1B162

H360-009-1B259

H360-009-1FR6

Status as
Date
Rev
MARKING NO.

H360-009-1B132

H360-009-1B137

H360-009-1B144

H360-009-1B148

H360-009-1B149

H360-009-1B150

H360-009-1B152

H360-009-1B153

H360-009-1B155

H360-009-1B156

H360-009-1B159

H360-009-1B160

H360-009-1B162

H360-009-1B259

H360-009-1FR6

PACKAGE
No.

RIL/PTH-J3-0217

RIL/PTH-J3-0218

RIL/PTH-J3-0219

RIL/PTH-J3-0220

RIL/PTH-J3-0221

RIL/PTH-J3-0222

RIL/PTH-J3-0223

RIL/PTH-J3-0224

RIL/PTH-J3-0225

RIL/PTH-J3-0226

RIL/PTH-J3-0227

RIL/PTH-J3-0228

RIL/PTH-J3-0229

RIL/PTH-J3-0230

RIL/PTH-J3-0231

TYPE

SKID

SKID

SKID

SKID

SKID

BUNDLE

SKID

SKID

SKID

SKID

SKID

SKID

SKID

SKID

SKID

DESCRIPTION

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002


Page 18 of 137

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

CBM (m3)

0.09

0.09

403

333

2964

0.40

0.09

0.12

403

333

2964

0.40

0.05

0.05

403

333

1459

0.20

0.05

0.09

403

333

1459

0.20

0.04

0.04

403

333

1411

0.19

0.04

0.08

403

333

1411

0.19

0.10

0.10

403

333

2860

0.38

0.10

0.13

403

333

2860

0.38

0.09

0.09

403

333

2860

0.38

0.09

0.13

403

333

2860

0.38

0.10

0.10

403

333

1461

0.39

0.10

0.17

403

333

1461

0.39

0.06

0.06

403

333

1348

0.18

0.06

0.09

403

333

1348

0.18

0.12

0.12

403

333

3093

0.42

0.12

0.15

403

333

3093

0.42

0.15

0.15

403

333

5464

0.73

0.15

0.19

403

333

5464

0.73

0.17

0.17

403

333

5964

0.80

0.17

0.20

403

333

5964

0.80

0.07

0.07

403

333

2364

0.32

0.07

0.11

403

333

2364

0.32

0.08

0.08

403

333

2364

0.32

0.08

0.11

403

333

2364

0.32

0.23

0.23

403

333

7882

1.06

0.23

0.27

403

333

7882

1.06

0.09

0.09

403

333

3062

0.41

0.09

0.13

403

333

3062

0.41

0.35

0.35

403

333

1744

0.23

BARGE/ CONTAINER

: 2nd Shipment
: Mar. 11 2015
:D
REMARK

04/16/2015 09:40:00

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2


J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM


PT.HANJUNG INDONESIA

PACK NO.

527

528

529

DRAWING NO.

H360-009-1FR7

H360-009-1FR8

H360-009-1FR9

Status as
Date
Rev
MARKING NO.

H360-009-1FR7

H360-009-1FR8

H360-009-1FR9

PACKAGE
No.

RIL/PTH-J3-0232

RIL/PTH-J3-0233

RIL/PTH-J3-0234

TYPE

SKID

SKID

SKID

DESCRIPTION

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

CBM (m3)

0.35

0.39

403

333

1744

0.23

0.19

0.19

403

333

647

0.09

0.19

0.22

403

333

647

0.09

0.18

0.18

403

333

647

0.09

0.18

0.21

403

333

647

0.09

0.16

0.16

403

333

1850

0.25

0.16

0.19

403

333

1850

0.25

530

H360-009-1B40

H360-009-1B40

SULPHUR RECOVERY UNIT APR 002

0.10

0.10

456

346

2834

0.45

531

H360-009-1B42

H360-009-1B42

SULPHUR RECOVERY UNIT APR 002

0.76

0.76

456

346

3963

3.13

532

H360-009-1B43

H360-009-1B43

SULPHUR RECOVERY UNIT APR 002

0.60

0.60

456

346

3963

2.50

533

H360-009-1B44

H360-009-1B44

SULPHUR RECOVERY UNIT APR 002

0.15

0.15

456

347

3963

0.63

534

H360-009-1B45

H360-009-1B45

SULPHUR RECOVERY UNIT APR 002

0.23

0.23

455

356

5963

0.97

535

H360-009-1B49

H360-009-1B49

SULPHUR RECOVERY UNIT APR 002

0.12

0.12

456

346

2963

0.47

536

H360-009-1B50

H360-009-1B50

SULPHUR RECOVERY UNIT APR 002

0.16

0.16

456

347

3963

0.63

537

H360-009-1B52

H360-009-1B52

SULPHUR RECOVERY UNIT APR 002

0.15

0.15

456

346

3962

0.63

538

H360-009-1B56

H360-009-1B56

SULPHUR RECOVERY UNIT APR 002

1.04

1.04

456

347

5585

4.42

539

H360-009-1B57

H360-009-1B57

SULPHUR RECOVERY UNIT APR 002

0.05

0.05

276

456

1463

0.18

21

3.37

6.03

1218

1262

5963

192.48

RIL/PTH-J3-0235

BUNDLE

540

H360-009-1B41

H360-009-1B41

SULPHUR RECOVERY UNIT APR 002

0.12

0.12

725

347

2834

0.71

541

H360-009-1B58

H360-009-1B58

SULPHUR RECOVERY UNIT APR 002

0.11

0.11

957

406

1463

0.57

542

H360-009-1B59

H360-009-1B59

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

456

565

1463

0.38

543

H360-009-1B60

H360-009-1B60

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

456

565

1463

0.38

544

H360-009-1B72

H360-009-1B72

SULPHUR RECOVERY UNIT APR 002

0.09

0.09

1057

347

1160

0.43

545

H360-009-1B78

H360-009-1B78

SULPHUR RECOVERY UNIT APR 002

0.10

0.10

1121

346

1460

0.57

546

H360-009-1B81

H360-009-1B81

SULPHUR RECOVERY UNIT APR 002

0.21

0.21

640

346

5461

1.21

547

H360-009-1B85

H360-009-1B85

SULPHUR RECOVERY UNIT APR 002

0.11

0.11

1056

347

1659

0.61

548

H360-009-1B90

H360-009-1B90

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

734

471

1394

0.48

549

H360-009-1B69

H360-009-1B69

SULPHUR RECOVERY UNIT APR 002

0.08

0.08

456

565

1949

0.50

550

H360-009-1B74

H360-009-1B74

SULPHUR RECOVERY UNIT APR 002

0.11

0.11

456

347

2963

0.47

551

H360-009-1B73

H360-009-1B73

SULPHUR RECOVERY UNIT APR 002

0.55

0.55

347

456

2963

2.34

552

H360-009-1B75

H360-009-1B75

SULPHUR RECOVERY UNIT APR 002

0.11

0.11

456

371

2963

0.50

553

H360-009-1B76

H360-009-1B76

SULPHUR RECOVERY UNIT APR 002

0.15

0.15

456

347

3962

0.63

554

H360-009-1B77

H360-009-1B77

SULPHUR RECOVERY UNIT APR 002

0.15

0.15

456

347

3962

0.63

555

H360-009-1B82

H360-009-1B82

SULPHUR RECOVERY UNIT APR 002

0.21

0.21

457

357

5461

0.89

556

H360-009-1B84

H360-009-1B84

SULPHUR RECOVERY UNIT APR 002

0.12

0.12

346

456

1659

0.52

557

H360-009-1SC4

H360-009-1SC4

SULPHUR RECOVERY UNIT APR 002

0.11

0.11

454

346

1332

0.42

24

2.56

7.11

1121

2042

5461

300.02

0.14

0.14

456

566

1464

0.76

558

H360-009-1B46

H360-009-1B46

RIL/PTH-J3-0236

RIL/PTH-J3-0237

BUNDLE

BUNDLE

SULPHUR RECOVERY UNIT APR 002


Page 19 of 137

BARGE/ CONTAINER

: 2nd Shipment
: Mar. 11 2015
:D
REMARK

04/16/2015 09:40:00

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2


J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM


PT.HANJUNG INDONESIA

PACK NO.

559

560

561

562

563

564

565

566

567

568

569

570

571

572

DRAWING NO.

H360-009-1B47

H360-009-1B48

H360-009-1B51

H360-009-1B53

H360-009-1B54

H360-009-1B55

H360-009-1B61

H360-009-1B62

H360-009-1B63

H360-009-1B64

H360-009-1B65

H360-009-1B66

H360-009-1B67

H360-009-1B68

Status as
Date
Rev
MARKING NO.

H360-009-1B47

H360-009-1B48

H360-009-1B51

H360-009-1B53

H360-009-1B54

H360-009-1B55

H360-009-1B61

H360-009-1B62

H360-009-1B63

H360-009-1B64

H360-009-1B65

H360-009-1B66

H360-009-1B67

H360-009-1B68

PACKAGE
No.

RIL/PTH-J3-0238

RIL/PTH-J3-0239

RIL/PTH-J3-0240

RIL/PTH-J3-0241

RIL/PTH-J3-0242

RIL/PTH-J3-0243

RIL/PTH-J3-0244

RIL/PTH-J3-0245

RIL/PTH-J3-0246

RIL/PTH-J3-0247

RIL/PTH-J3-0248

RIL/PTH-J3-0249

RIL/PTH-J3-0250

RIL/PTH-J3-0251

TYPE

SKID

SKID

SKID

SKID

SKID

BUNDLE

SKID

SKID

SKID

BUNDLE

SKID

SKID

SKID

SKID

DESCRIPTION

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

Page 20 of 137

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

CBM (m3)

0.14

0.24

456

566

1464

0.76

0.22

0.22

456

787

5460

1.96

0.22

0.28

456

787

5460

1.96

0.23

0.23

455

885

5460

2.20

0.23

0.29

455

885

5460

2.20

0.25

0.25

455

845

5462

2.10

0.25

0.31

455

845

5462

2.10

0.18

0.18

455

696

3962

1.25

0.18

0.23

455

696

3962

1.25

0.18

0.18

456

699

3963

1.26

0.18

0.23

456

699

3963

1.26

1.19

1.19

634

456

5585

8.07

1.19

1.39

634

456

5585

8.07

0.28

0.28

851

1010

5462

4.69

0.28

0.35

851

1010

5462

4.69

0.23

0.23

850

822

5462

3.82

0.23

0.29

850

822

5462

3.82

0.23

0.23

850

612

5462

2.84

0.23

0.28

850

612

5462

2.84

1.07

1.07

641

346

5462

6.06

1.07

1.25

641

346

5462

6.06

0.22

0.22

456

817

5462

2.03

0.22

0.28

456

817

5462

2.03

0.23

0.23

455

814

5462

2.02

0.23

0.29

455

814

5462

2.02

0.22

0.22

456

574

5462

1.43

0.22

0.27

456

574

5462

1.43

0.23

0.23

456

847

5462

2.11

0.23

0.29

456

847

5462

2.11

BARGE/ CONTAINER

: 2nd Shipment
: Mar. 11 2015
:D
REMARK

04/16/2015 09:40:00

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2


J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM


PT.HANJUNG INDONESIA

PACK NO.

573

Status as
Date
Rev

DRAWING NO.

H360-009-1B70

MARKING NO.

H360-009-1B70

PACKAGE
No.
RIL/PTH-J3-0252

TYPE

BUNDLE

DESCRIPTION

SULPHUR RECOVERY UNIT APR 002

SUB TOTAL D. H360-009 SULPHUR RECOVERY UNIT APR 002

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

CBM (m3)

0.67

0.67

456

849

5462

6.34

0.67

0.86

456

849

5462

6.34

396

27.02

62.40

1499.88

E. H361-009 SULPHUR RECOVERY UNIT APR 002


574

H361-009-1HB1

H361-009-1HB1

SULPHUR RECOVERY UNIT APR 002

10

0.68

0.68

200

330

2897

1.91

575

H361-009-1HB2

H361-009-1HB2

SULPHUR RECOVERY UNIT APR 002

0.14

0.14

200

330

3039

0.40

576

H361-009-1HB3

H361-009-1HB3

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

200

330

2797

0.18

577

H361-009-1HB4

H361-009-1HB4

SULPHUR RECOVERY UNIT APR 002

0.15

0.15

200

330

3258

0.43

578

H361-009-1HB6

H361-009-1HB6

SULPHUR RECOVERY UNIT APR 002

0.20

0.20

200

330

2866

0.57

579

H361-009-1HB7

H361-009-1HB7

SULPHUR RECOVERY UNIT APR 002

0.17

0.17

200

330

3671

0.48

580

H361-009-1HB8

H361-009-1HB8

SULPHUR RECOVERY UNIT APR 002

0.27

0.27

200

330

2889

0.76

581

H361-009-1HB10

H361-009-1HB10

SULPHUR RECOVERY UNIT APR 002

0.09

0.09

200

330

3863

0.25

582

H361-009-1HB11

H361-009-1HB11

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

200

330

2891

0.19

583

H361-009-1HB12

H361-009-1HB12

SULPHUR RECOVERY UNIT APR 002

0.09

0.09

200

330

3828

0.25

584

H361-009-1HB13

H361-009-1HB13

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

200

330

3053

0.20

585

H361-009-1HB14

H361-009-1HB14

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

200

330

2977

0.20

586

H361-009-1HB15

H361-009-1HB15

SULPHUR RECOVERY UNIT APR 002

0.23

0.23

200

330

3203

0.63

587

H361-009-1VB1

H361-009-1VB1

SULPHUR RECOVERY UNIT APR 002

0.06

0.06

200

330

1201

0.16

588

H361-009-1VB2

H361-009-1VB2

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

330

777

0.05

589

H361-009-1VB3

H361-009-1VB3

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

200

330

1899

0.13

590

H361-009-1VB4

H361-009-1VB4

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

200

330

1594

0.11

591

H361-009-1VB5

H361-009-1VB5

SULPHUR RECOVERY UNIT APR 002

0.08

0.08

200

330

3348

0.22

592

H361-009-1VB6

H361-009-1VB6

SULPHUR RECOVERY UNIT APR 002

0.08

0.08

200

330

1625

0.21

593

H361-009-1VB7

H361-009-1VB7

SULPHUR RECOVERY UNIT APR 002

0.19

0.19

200

330

3940

0.52

594

H361-009-1VB8

H361-009-1VB8

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

200

330

1498

0.20

595

H361-009-1VB9

H361-009-1VB9

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

200

330

1392

0.09

596

H361-009-1VB10

H361-009-1VB10

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

200

330

1481

0.10

597

H361-009-1VB11

H361-009-1VB11

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

200

330

1389

0.09

598

H361-009-1VB26

H361-009-1VB26

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

200

330

1388

0.09

48

3.00

5.36

698

610

3940

80.52

RIL/PTH-J3-0253

BUNDLE

599

H361-009-1HB16

H361-009-1HB16

SULPHUR RECOVERY UNIT APR 002

0.06

0.06

200

275

1396

0.38

600

H361-009-1HB17

H361-009-1HB17

SULPHUR RECOVERY UNIT APR 002

0.01

0.01

200

275

1230

0.07

601

H361-009-1VB12

H361-009-1VB12

SULPHUR RECOVERY UNIT APR 002

0.01

0.01

200

275

1366

0.08

602

H361-009-1VB25

H361-009-1VB25

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

200

275

2409

0.26

0.13

0.43

326

319

2409

2.25

RIL/PTH-J3-0254

BUNDLE

603

H361-009-1HB5

H361-009-1HB5

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1934

0.11

604

H361-009-1HB18

H361-009-1HB18

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

200

290

1589

0.18

605

H361-009-1HB19

H361-009-1HB19

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1616

0.09

606

H361-009-1HB20

H361-009-1HB20

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

753

0.09

607

H361-009-1HB21

H361-009-1HB21

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

200

290

2383

0.14

608

H361-009-1HB22

H361-009-1HB22

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

2017

0.12

Page 21 of 137

BARGE/ CONTAINER

: 2nd Shipment
: Mar. 11 2015
:D
REMARK

04/16/2015 09:40:00

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2


J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM


PT.HANJUNG INDONESIA

PACK NO.

DRAWING NO.

Status as
Date
Rev
MARKING NO.

PACKAGE
No.

TYPE

DESCRIPTION

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

CBM (m3)

609

H361-009-1HB23

H361-009-1HB23

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1804

0.10

610

H361-009-1HB24

H361-009-1HB24

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

200

290

2513

0.15

611

H361-009-1HB25

H361-009-1HB25

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

200

290

1967

0.23

612

H361-009-1HB26

H361-009-1HB26

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

200

290

1603

0.19

613

H361-009-1HB27

H361-009-1HB27

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

200

290

1893

0.22

614

H361-009-1HB28

H361-009-1HB28

SULPHUR RECOVERY UNIT APR 002

0.10

0.10

200

290

1914

0.56

615

H361-009-1HB29

H361-009-1HB29

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

200

290

1916

0.22

616

H361-009-1HB30

H361-009-1HB30

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1819

0.11

617

H361-009-1HB31

H361-009-1HB31

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

200

290

1959

0.23

618

H361-009-1HB32

H361-009-1HB32

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1560

0.09

619

H361-009-1HB33

H361-009-1HB33

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1895

0.11

620

H361-009-1HB34

H361-009-1HB34

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1582

0.09

621

H361-009-1HB35

H361-009-1HB35

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1622

0.09

622

H361-009-1HB36

H361-009-1HB36

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1578

0.09

623

H361-009-1HB37

H361-009-1HB37

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

200

290

1542

0.18

624

H361-009-1HB38

H361-009-1HB38

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1735

0.10

625

H361-009-1HB39

H361-009-1HB39

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1690

0.10

626

H361-009-1HB40

H361-009-1HB40

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1758

0.10

627

H361-009-1HB41

H361-009-1HB41

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1455

0.08

628

H361-009-1HB42

H361-009-1HB42

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

2208

0.13

629

H361-009-1HB43

H361-009-1HB43

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1865

0.11

630

H361-009-1HB44

H361-009-1HB44

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1960

0.11

631

H361-009-1HB45

H361-009-1HB45

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1756

0.10

632

H361-009-1HB46

H361-009-1HB46

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1576

0.09

633

H361-009-1HB47

H361-009-1HB47

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1503

0.09

634

H361-009-1HB48

H361-009-1HB48

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1872

0.11

635

H361-009-1HB49

H361-009-1HB49

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1591

0.09

636

H361-009-1HB50

H361-009-1HB50

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1439

0.08

637

H361-009-1HB51

H361-009-1HB51

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

200

290

1816

0.21

638

H361-009-1HB52

H361-009-1HB52

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1626

0.09

639

H361-009-1HB53

H361-009-1HB53

SULPHUR RECOVERY UNIT APR 002

0.06

0.06

200

290

2864

0.33

640

H361-009-1HB54

H361-009-1HB54

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1787

0.10

641

H361-009-1HB55

H361-009-1HB55

SULPHUR RECOVERY UNIT APR 002

0.01

0.01

200

290

1235

0.07

642

H361-009-1HB56

H361-009-1HB56

SULPHUR RECOVERY UNIT APR 002

0.01

0.01

200

290

1260

0.07

643

H361-009-1HB57

H361-009-1HB57

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1953

0.11

644

H361-009-1HB58

H361-009-1HB58

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1476

0.09

645

H361-009-1HB59

H361-009-1HB59

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1783

0.10

646

H361-009-1HB60

H361-009-1HB60

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1416

0.08

647

H361-009-1HB61

H361-009-1HB61

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1387

0.08

648

H361-009-1HB62

H361-009-1HB62

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1938

0.11

649

H361-009-1HB63

H361-009-1HB63

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1803

0.10

650

H361-009-1HB64

H361-009-1HB64

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1749

0.10

651

H361-009-1HB65

H361-009-1HB65

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

200

290

1227

0.14

652

H361-009-1HB66

H361-009-1HB66

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

200

290

1979

0.23

RIL/PTH-J3-0255

BUNDLE

Page 22 of 137

BARGE/ CONTAINER

: 2nd Shipment
: Mar. 11 2015
:D
REMARK

04/16/2015 09:40:00

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2


J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM


PT.HANJUNG INDONESIA

PACK NO.

DRAWING NO.

Status as
Date
Rev
MARKING NO.

PACKAGE
No.

TYPE

DESCRIPTION

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

CBM (m3)

653

H361-009-1HB67

H361-009-1HB67

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1763

0.10

654

H361-009-1HB68

H361-009-1HB68

SULPHUR RECOVERY UNIT APR 002

0.01

0.01

200

290

1351

0.08

655

H361-009-1HB69

H361-009-1HB69

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1921

0.11

656

H361-009-1HB70

H361-009-1HB70

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

200

290

3445

0.20

657

H361-009-1HB71

H361-009-1HB71

SULPHUR RECOVERY UNIT APR 002

0.01

0.01

200

290

1378

0.08

658

H361-009-1HB72

H361-009-1HB72

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

2005

0.12

659

H361-009-1HB73

H361-009-1HB73

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1954

0.11

660

H361-009-1HB74

H361-009-1HB74

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1638

0.10

661

H361-009-1HB75

H361-009-1HB75

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1946

0.11

662

H361-009-1HB76

H361-009-1HB76

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1463

0.08

663

H361-009-1HB77

H361-009-1HB77

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1809

0.10

664

H361-009-1HB78

H361-009-1HB78

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1517

0.09

665

H361-009-1HB79

H361-009-1HB79

SULPHUR RECOVERY UNIT APR 002

0.01

0.01

200

290

1366

0.08

666

H361-009-1HB80

H361-009-1HB80

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1437

0.08

667

H361-009-1HB81

H361-009-1HB81

SULPHUR RECOVERY UNIT APR 002

0.01

0.01

200

290

1085

0.06

668

H361-009-1VB23

H361-009-1VB23

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

200

290

3480

0.20

669

H361-009-1VB24

H361-009-1VB24

SULPHUR RECOVERY UNIT APR 002

0.01

0.01

200

290

580

0.03

83

1.58

7.79

585

624

3480

105.44

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

300

250

1084

0.16

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

300

250

1099

0.16

0.04

0.16

330

229

1099

0.33

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

350

275

876

0.08

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

350

275

969

0.09

0.03

0.09

386

254

969

0.19

670

H361-009-1B123

H361-009-1B123

671

H361-009-1B124

H361-009-1B124

672

H361-009-1B254

H361-009-1B254

673

H361-009-1B255

H361-009-1B255

RIL/PTH-J3-0256

RIL/PTH-J3-0257

BUNDLE

BUNDLE

674

H361-009-1B166

H361-009-1B166

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1464

0.16

675

H361-009-1B168

H361-009-1B168

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1563

0.17

676

H361-009-1B171

H361-009-1B171

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1463

0.16

677

H361-009-1B172

H361-009-1B172

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1463

0.16

678

H361-009-1B173

H361-009-1B173

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1463

0.16

679

H361-009-1B175

H361-009-1B175

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1463

0.16

680

H361-009-1B179

H361-009-1B179

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1164

0.13

681

H361-009-1B180

H361-009-1B180

SULPHUR RECOVERY UNIT APR 002

0.05

0.05

400

275

1464

0.16

682

H361-009-1B181

H361-009-1B181

SULPHUR RECOVERY UNIT APR 002

0.05

0.05

400

275

1464

0.16

683

H361-009-1B182

H361-009-1B182

SULPHUR RECOVERY UNIT APR 002

0.05

0.05

400

275

1464

0.16

684

H361-009-1B187

H361-009-1B187

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1461

0.16

685

H361-009-1B189

H361-009-1B189

SULPHUR RECOVERY UNIT APR 002

0.67

0.67

400

275

2961

2.61

686

H361-009-1B191

H361-009-1B191

SULPHUR RECOVERY UNIT APR 002

0.67

0.67

400

275

2961

2.61

687

H361-009-1B192

H361-009-1B192

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1411

0.16

688

H361-009-1B196

H361-009-1B196

SULPHUR RECOVERY UNIT APR 002

0.10

0.10

400

275

2860

0.31

689

H361-009-1B197

H361-009-1B197

SULPHUR RECOVERY UNIT APR 002

0.10

0.10

400

275

2860

0.31

690

H361-009-1B199

H361-009-1B199

SULPHUR RECOVERY UNIT APR 002

0.08

0.08

400

275

2960

0.33

RIL/PTH-J3-0258

BUNDLE

Page 23 of 137

BARGE/ CONTAINER

: 2nd Shipment
: Mar. 11 2015
:D
REMARK

04/16/2015 09:40:00

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2


J3 PROJECT
RIL/PTH-J3-0258

JAMNAGAR GASIFICATION PROGRAM


PT.HANJUNG INDONESIA

PACK NO.

DRAWING NO.

MARKING NO.

PACKAGE
No.

BUNDLE

TYPE

Status as
Date
Rev
DESCRIPTION

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

CBM (m3)

691

H361-009-1B200

H361-009-1B200

SULPHUR RECOVERY UNIT APR 002

0.08

0.08

400

275

2860

0.31

692

H361-009-1B204

H361-009-1B204

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1463

0.16

693

H361-009-1B206

H361-009-1B206

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1363

0.15

694

H361-009-1B208

H361-009-1B208

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1463

0.16

695

H361-009-1B209

H361-009-1B209

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1463

0.16

36

2.39

4.76

950

920

2961

93.16

696

H361-009-1B167

H361-009-1B167

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

400

275

1563

0.34

697

H361-009-1B169

H361-009-1B169

SULPHUR RECOVERY UNIT APR 002

10

0.34

0.34

400

275

1464

1.61

698

H361-009-1B170

H361-009-1B170

SULPHUR RECOVERY UNIT APR 002

0.17

0.17

400

275

1463

0.80

699

H361-009-1B174

H361-009-1B174

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1463

0.16

700

H361-009-1B176

H361-009-1B176

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

400

275

1463

0.32

701

H361-009-1B177

H361-009-1B177

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

400

275

2964

0.33

702

H361-009-1B178

H361-009-1B178

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1164

0.13

703

H361-009-1B183

H361-009-1B183

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

400

275

874

0.10

704

H361-009-1B184

H361-009-1B184

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1240

0.14

705

H361-009-1B185

H361-009-1B185

SULPHUR RECOVERY UNIT APR 002

0.21

0.21

400

275

1461

0.96

706

H361-009-1B186

H361-009-1B186

SULPHUR RECOVERY UNIT APR 002

0.21

0.21

400

275

1461

0.96

707

H361-009-1B188

H361-009-1B188

SULPHUR RECOVERY UNIT APR 002

0.28

0.28

400

275

2961

1.30

708

H361-009-1B190

H361-009-1B190

SULPHUR RECOVERY UNIT APR 002

0.35

0.35

400

275

2961

1.63

709

H361-009-1B193

H361-009-1B193

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1476

0.16

710

H361-009-1B194

H361-009-1B194

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1476

0.16

711

H361-009-1B195

H361-009-1B195

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

400

275

836

0.09

712

H361-009-1B198

H361-009-1B198

SULPHUR RECOVERY UNIT APR 002

0.14

0.14

400

275

2960

0.65

713

H361-009-1B201

H361-009-1B201

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

400

275

857

0.09

714

H361-009-1B202

H361-009-1B202

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1459

0.16

715

H361-009-1B203

H361-009-1B203

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1463

0.16

716

H361-009-1B205

H361-009-1B205

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1363

0.15

717

H361-009-1B207

H361-009-1B207

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

400

275

1463

0.32

718

H361-009-1B210

H361-009-1B210

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1178

0.13

719

H361-009-1B211

H361-009-1B211

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1463

0.16

720

H361-009-1B212

H361-009-1B212

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1463

0.16

721

H361-009-1B213

H361-009-1B213

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

400

275

860

0.09

722

H361-009-1B214

H361-009-1B214

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1260

0.14

723

H361-009-1B215

H361-009-1B215

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

400

275

964

0.32

724

H361-009-1B216

H361-009-1B216

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1164

0.13

725

H361-009-1B217

H361-009-1B217

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1494

0.16

726

H361-009-1B218

H361-009-1B218

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1164

0.13

727

H361-009-1B219

H361-009-1B219

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

400

275

2954

0.32

68

2.67

11.36

1087

1278

2964

279.99

0.05

0.05

352

289

312

0.13

0.05

0.18

352

289

312

0.13

728

H361-009-1CT27

H361-009-1CT27

RIL/PTH-J3-0259

RIL/PTH-J3-0260

BUNDLE

BUNDLE

SULPHUR RECOVERY UNIT APR 002

Page 24 of 137

BARGE/ CONTAINER

: 2nd Shipment
: Mar. 11 2015
:D
REMARK

04/16/2015 09:40:00

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2


J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM


PT.HANJUNG INDONESIA

PACK NO.

DRAWING NO.

Status as
Date
Rev
MARKING NO.

PACKAGE
No.

TYPE

DESCRIPTION

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

CBM (m3)

729

H361-009-1B115

H361-009-1B115

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

679

374

1163

0.30

730

H361-009-1B116

H361-009-1B116

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

679

374

1163

0.30

731

H361-009-1B118

H361-009-1B118

SULPHUR RECOVERY UNIT APR 002

0.14

0.14

403

364

5585

0.82

732

H361-009-1B119

H361-009-1B119

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

599

343

1547

0.32

733

H361-009-1B120

H361-009-1B120

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

601

344

1547

0.32

734

H361-009-1B121

H361-009-1B121

SULPHUR RECOVERY UNIT APR 002

0.08

0.08

403

333

1596

0.43

735

H361-009-1B128

H361-009-1B128

SULPHUR RECOVERY UNIT APR 002

0.08

0.08

403

333

2959

0.40

736

H361-009-1B133

H361-009-1B133

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

403

333

1413

0.19

737

H361-009-1B134

H361-009-1B134

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

403

333

1463

0.20

738

H361-009-1B135

H361-009-1B135

SULPHUR RECOVERY UNIT APR 002

0.14

0.14

403

333

5462

0.73

739

H361-009-1B136

H361-009-1B136

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

403

333

712

0.10

740

H361-009-1B138

H361-009-1B138

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

403

333

1746

0.23

741

H361-009-1B139

H361-009-1B139

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

403

333

1746

0.23

742

H361-009-1B140

H361-009-1B140

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

403

333

1461

0.20

743

H361-009-1B141

H361-009-1B141

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

403

333

2961

0.40

744

H361-009-1B142

H361-009-1B142

SULPHUR RECOVERY UNIT APR 002

0.08

0.08

403

333

2961

0.40

745

H361-009-1B143

H361-009-1B143

SULPHUR RECOVERY UNIT APR 002

0.08

0.08

403

333

2961

0.40

746

H361-009-1B145

H361-009-1B145

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

403

333

2961

0.40

747

H361-009-1B146

H361-009-1B146

SULPHUR RECOVERY UNIT APR 002

0.09

0.09

403

333

2961

0.40

748

H361-009-1B147

H361-009-1B147

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

403

333

1176

0.16

749

H361-009-1B151

H361-009-1B151

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

403

333

2960

0.40

750

H361-009-1B154

H361-009-1B154

SULPHUR RECOVERY UNIT APR 002

0.15

0.15

403

333

5464

0.73

751

H361-009-1B157

H361-009-1B157

SULPHUR RECOVERY UNIT APR 002

0.15

0.15

403

333

5964

0.80

752

H361-009-1B158

H361-009-1B158

SULPHUR RECOVERY UNIT APR 002

0.15

0.15

403

333

5964

0.80

753

H361-009-1B161

H361-009-1B161

SULPHUR RECOVERY UNIT APR 002

0.05

0.05

403

333

1764

0.24

754

H361-009-1B163

H361-009-1B163

SULPHUR RECOVERY UNIT APR 002

0.05

0.05

403

333

1514

0.20

755

H361-009-1B164

H361-009-1B164

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

403

333

1463

0.39

756

H361-009-1B165

H361-009-1B165

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

403

333

763

0.10

757

H361-009-1FR10

H361-009-1FR10

SULPHUR RECOVERY UNIT APR 002

0.08

0.08

403

333

1355

0.18

758

H361-009-1SC2

H361-009-1SC2

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

403

333

508

0.07

759

H361-009-1SC3

H361-009-1SC3

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

403

333

508

0.07

33

2.09

6.41

1372

1314

5964

354.81

RIL/PTH-J3-0261

BUNDLE

760

H361-009-1CT28

H361-009-1CT28

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

403

333

1988

0.27

761

H361-009-1CT29

H361-009-1CT29

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

403

333

778

0.21

762

H361-009-1CT30

H361-009-1CT30

SULPHUR RECOVERY UNIT APR 002

0.08

0.08

403

333

548

0.22

763

H361-009-1CT31

H361-009-1CT31

SULPHUR RECOVERY UNIT APR 002

0.05

0.05

403

333

548

0.15

764

H361-009-1CT32

H361-009-1CT32

SULPHUR RECOVERY UNIT APR 002

0.05

0.05

403

333

1188

0.16

0.32

1.60

1180

1457

1988

30.76

0.05

0.05

680

375

1463

0.37

0.05

0.09

680

375

1463

0.37

0.11

0.11

682

591

3093

1.25

765

766

H361-009-1B114

H361-009-1B117

H361-009-1B114

H361-009-1B117

RIL/PTH-J3-0262

RIL/PTH-J3-0263

RIL/PTH-J3-0264

BUNDLE

SKID

SKID

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002


Page 25 of 137

BARGE/ CONTAINER

: 2nd Shipment
: Mar. 11 2015
:D
REMARK

04/16/2015 09:40:00

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2


J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM


PT.HANJUNG INDONESIA

PACK NO.

767

768

769

770

771

772

773

774

775

776

777

778

779

780

DRAWING NO.

H361-009-1B122

H361-009-1B125

H361-009-1B126

H361-009-1B127

H361-009-1B129

H361-009-1B130

H361-009-1B131

H361-009-1B132

H361-009-1B137

H361-009-1B144

H361-009-1B148

H361-009-1B149

H361-009-1B150

H361-009-1B152

Status as
Date
Rev
MARKING NO.

H361-009-1B122

H361-009-1B125

H361-009-1B126

H361-009-1B127

H361-009-1B129

H361-009-1B130

H361-009-1B131

H361-009-1B132

H361-009-1B137

H361-009-1B144

H361-009-1B148

H361-009-1B149

H361-009-1B150

H361-009-1B152

PACKAGE
No.

RIL/PTH-J3-0265

RIL/PTH-J3-0266

RIL/PTH-J3-0267

RIL/PTH-J3-0268

RIL/PTH-J3-0269

RIL/PTH-J3-0270

RIL/PTH-J3-0271

RIL/PTH-J3-0272

RIL/PTH-J3-0273

RIL/PTH-J3-0274

RIL/PTH-J3-0275

RIL/PTH-J3-0276

RIL/PTH-J3-0277

RIL/PTH-J3-0278

TYPE

SKID

SKID

SKID

SKID

SKID

SKID

SKID

SKID

SKID

SKID

SKID

SKID

BUNDLE

SKID

DESCRIPTION

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

Page 26 of 137

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

CBM (m3)

0.11

0.16

682

591

3093

1.25

0.05

0.05

403

333

1463

0.20

0.05

0.08

403

333

1463

0.20

0.08

0.08

403

333

2899

0.39

0.08

0.12

403

333

2899

0.39

0.08

0.08

403

333

2963

0.40

0.08

0.12

403

333

2963

0.40

0.05

0.05

403

333

1459

0.20

0.05

0.09

403

333

1459

0.20

0.10

0.10

403

333

2964

0.40

0.10

0.13

403

333

2964

0.40

0.09

0.09

403

333

2964

0.40

0.09

0.13

403

333

2964

0.40

0.09

0.09

403

333

2964

0.40

0.09

0.12

403

333

2964

0.40

0.09

0.09

403

333

2964

0.40

0.09

0.12

403

333

2964

0.40

0.05

0.05

403

333

1459

0.20

0.05

0.09

403

333

1459

0.20

0.04

0.04

403

333

1411

0.19

0.04

0.08

403

333

1411

0.19

0.10

0.10

403

333

2860

0.38

0.10

0.13

403

333

2860

0.38

0.09

0.09

403

333

2860

0.38

0.09

0.13

403

333

2860

0.38

0.10

0.10

403

333

1461

0.39

0.10

0.17

403

333

1461

0.39

0.06

0.06

403

333

1348

0.18

0.06

0.09

403

333

1348

0.18

BARGE/ CONTAINER

: 2nd Shipment
: Mar. 11 2015
:D
REMARK

04/16/2015 09:40:00

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2


J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM


PT.HANJUNG INDONESIA

PACK NO.

781

782

783

784

785

786

787

788

789

790

791

DRAWING NO.

H361-009-1B153

H361-009-1B155

H361-009-1B156

H361-009-1B159

H361-009-1B160

H361-009-1B162

H361-009-1B259

H361-009-1FR6

H361-009-1FR7

H361-009-1FR8

H361-009-1FR9

Status as
Date
Rev
MARKING NO.

H361-009-1B153

H361-009-1B155

H361-009-1B156

H361-009-1B159

H361-009-1B160

H361-009-1B162

H361-009-1B259

H361-009-1FR6

H361-009-1FR7

H361-009-1FR8

H361-009-1FR9

PACKAGE
No.
RIL/PTH-J3-0279

RIL/PTH-J3-0280

RIL/PTH-J3-0281

RIL/PTH-J3-0282

RIL/PTH-J3-0283

RIL/PTH-J3-0284

RIL/PTH-J3-0285

RIL/PTH-J3-0286

RIL/PTH-J3-0287

RIL/PTH-J3-0288

RIL/PTH-J3-0289

TYPE

SKID

SKID

SKID

SKID

SKID

SKID

SKID

SKID

SKID

SKID

SKID

DESCRIPTION

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

CBM (m3)

0.12

0.12

403

333

3093

0.42

0.12

0.15

403

333

3093

0.42

0.15

0.15

403

333

5464

0.73

0.15

0.19

403

333

5464

0.73

0.17

0.17

403

333

5964

0.80

0.17

0.20

403

333

5964

0.80

0.07

0.07

403

333

2364

0.32

0.07

0.11

403

333

2364

0.32

0.08

0.08

403

333

2364

0.32

0.08

0.11

403

333

2364

0.32

0.23

0.23

403

333

7882

1.06

0.23

0.27

403

333

7882

1.06

0.09

0.09

403

333

3062

0.41

0.09

0.13

403

333

3062

0.41

0.35

0.35

403

333

1744

0.23

0.35

0.39

403

333

1744

0.23

0.19

0.19

403

333

647

0.09

0.19

0.22

403

333

647

0.09

0.18

0.18

403

333

647

0.09

0.18

0.21

403

333

647

0.09

0.16

0.16

403

333

1850

0.25

0.16

0.19

403

333

1850

0.25

792

H361-009-1B40

H361-009-1B40

SULPHUR RECOVERY UNIT APR 002

0.10

0.10

456

346

2834

0.45

793

H361-009-1B42

H361-009-1B42

SULPHUR RECOVERY UNIT APR 002

0.76

0.76

456

346

3963

3.13

794

H361-009-1B43

H361-009-1B43

SULPHUR RECOVERY UNIT APR 002

0.60

0.60

456

346

3963

2.50

795

H361-009-1B44

H361-009-1B44

SULPHUR RECOVERY UNIT APR 002

0.15

0.15

456

347

3963

0.63

796

H361-009-1B45

H361-009-1B45

SULPHUR RECOVERY UNIT APR 002

0.23

0.23

455

356

5963

0.97

797

H361-009-1B49

H361-009-1B49

SULPHUR RECOVERY UNIT APR 002

0.12

0.12

456

346

2963

0.47

798

H361-009-1B50

H361-009-1B50

SULPHUR RECOVERY UNIT APR 002

0.16

0.16

456

347

3963

0.63

799

H361-009-1B52

H361-009-1B52

SULPHUR RECOVERY UNIT APR 002

0.15

0.15

456

346

3962

0.63

800

H361-009-1B56

H361-009-1B56

SULPHUR RECOVERY UNIT APR 002

1.04

1.04

456

347

5585

4.42

801

H361-009-1B57

H361-009-1B57

SULPHUR RECOVERY UNIT APR 002

0.05

0.05

276

456

1463

0.18

21

3.37

6.03

1218

1262

5963

192.48

RIL/PTH-J3-0290

BUNDLE

Page 27 of 137

BARGE/ CONTAINER

: 2nd Shipment
: Mar. 11 2015
:D
REMARK

04/16/2015 09:40:00

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2


J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM


PT.HANJUNG INDONESIA

PACK NO.

DRAWING NO.

Status as
Date
Rev
MARKING NO.

PACKAGE
No.

TYPE

DESCRIPTION

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

CBM (m3)

802

H361-009-1B41

H361-009-1B41

SULPHUR RECOVERY UNIT APR 002

0.12

0.12

725

347

2834

0.71

803

H361-009-1B58

H361-009-1B58

SULPHUR RECOVERY UNIT APR 002

0.11

0.11

957

406

1463

0.57

804

H361-009-1B59

H361-009-1B59

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

456

565

1463

0.38

805

H361-009-1B60

H361-009-1B60

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

456

565

1463

0.38

806

H361-009-1B72

H361-009-1B72

SULPHUR RECOVERY UNIT APR 002

0.09

0.09

1057

347

1160

0.43

807

H361-009-1B78

H361-009-1B78

SULPHUR RECOVERY UNIT APR 002

0.10

0.10

1121

346

1460

0.57

808

H361-009-1B81

H361-009-1B81

SULPHUR RECOVERY UNIT APR 002

0.21

0.21

640

346

5461

1.21

809

H361-009-1B85

H361-009-1B85

SULPHUR RECOVERY UNIT APR 002

0.11

0.11

1056

347

1659

0.61

810

H361-009-1B90

H361-009-1B90

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

734

471

1394

0.48

811

H361-009-1B69

H361-009-1B69

SULPHUR RECOVERY UNIT APR 002

0.08

0.08

456

565

1949

0.50

812

H361-009-1B74

H361-009-1B74

SULPHUR RECOVERY UNIT APR 002

0.11

0.11

456

347

2963

0.47

813

H361-009-1B73

H361-009-1B73

SULPHUR RECOVERY UNIT APR 002

0.55

0.55

347

456

2963

2.34

814

H361-009-1B75

H361-009-1B75

SULPHUR RECOVERY UNIT APR 002

0.11

0.11

456

371

2963

0.50

815

H361-009-1B76

H361-009-1B76

SULPHUR RECOVERY UNIT APR 002

0.15

0.15

456

347

3962

0.63

816

H361-009-1B77

H361-009-1B77

SULPHUR RECOVERY UNIT APR 002

0.15

0.15

456

347

3962

0.63

817

H361-009-1B82

H361-009-1B82

SULPHUR RECOVERY UNIT APR 002

0.21

0.21

457

357

5461

0.89

818

H361-009-1B84

H361-009-1B84

SULPHUR RECOVERY UNIT APR 002

0.12

0.12

346

456

1659

0.52

819

H361-009-1SC4

H361-009-1SC4

SULPHUR RECOVERY UNIT APR 002

0.11

0.11

454

346

1332

0.42

24

2.56

7.11

1121

2042

5461

300.02

0.14

0.14

456

566

1464

0.76

0.14

0.24

456

566

1464

0.76

0.22

0.22

456

787

5460

1.96

0.22

0.28

456

787

5460

1.96

0.23

0.23

455

885

5460

2.20

0.23

0.29

455

885

5460

2.20

0.25

0.25

455

845

5462

2.10

0.25

0.31

455

845

5462

2.10

0.18

0.18

455

696

3962

1.25

0.18

0.23

455

696

3962

1.25

0.18

0.18

456

699

3963

1.26

0.18

0.23

456

699

3963

1.26

1.19

1.19

634

456

5585

8.07

1.19

1.39

634

456

5585

8.07

0.28

0.28

851

1010

5462

4.69

0.28

0.35

851

1010

5462

4.69

820

821

822

823

824

825

826

827

H361-009-1B46

H361-009-1B47

H361-009-1B48

H361-009-1B51

H361-009-1B53

H361-009-1B54

H361-009-1B55

H361-009-1B61

H361-009-1B46

H361-009-1B47

H361-009-1B48

H361-009-1B51

H361-009-1B53

H361-009-1B54

H361-009-1B55

H361-009-1B61

RIL/PTH-J3-0291

RIL/PTH-J3-0292

RIL/PTH-J3-0293

RIL/PTH-J3-0294

RIL/PTH-J3-0295

RIL/PTH-J3-0296

RIL/PTH-J3-0297

RIL/PTH-J3-0298

RIL/PTH-J3-0299

BUNDLE

BUNDLE

SKID

SKID

SKID

SKID

SKID

BUNDLE

SKID

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

Page 28 of 137

BARGE/ CONTAINER

: 2nd Shipment
: Mar. 11 2015
:D
REMARK

04/16/2015 09:40:00

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2


J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM


PT.HANJUNG INDONESIA

PACK NO.

828

829

830

831

832

833

834

835

DRAWING NO.

H361-009-1B62

H361-009-1B63

H361-009-1B64

H361-009-1B65

H361-009-1B66

H361-009-1B67

H361-009-1B68

H361-009-1B70

Status as
Date
Rev
MARKING NO.

H361-009-1B62

H361-009-1B63

H361-009-1B64

H361-009-1B65

H361-009-1B66

H361-009-1B67

H361-009-1B68

H361-009-1B70

PACKAGE
No.

RIL/PTH-J3-0300

RIL/PTH-J3-0301

RIL/PTH-J3-0302

RIL/PTH-J3-0303

RIL/PTH-J3-0304

RIL/PTH-J3-0305

RIL/PTH-J3-0306

RIL/PTH-J3-0307

TYPE

SKID

SKID

BUNDLE

SKID

SKID

SKID

SKID

BUNDLE

DESCRIPTION

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SUB TOTAL E. H361-009 SULPHUR RECOVERY UNIT APR 002


GRAND TOTAL

Page 29 of 137

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

CBM (m3)

0.23

0.23

850

822

5462

3.82

0.23

0.29

850

822

5462

3.82

0.23

0.23

850

612

5462

2.84

0.23

0.28

850

612

5462

2.84

1.07

1.07

641

346

5462

6.06

1.07

1.25

641

346

5462

6.06

0.22

0.22

456

817

5462

2.03

0.22

0.28

456

817

5462

2.03

0.23

0.23

455

814

5462

2.02

0.23

0.29

455

814

5462

2.02

0.22

0.22

456

574

5462

1.43

0.22

0.27

456

574

5462

1.43

0.23

0.23

456

847

5462

2.11

0.23

0.29

456

847

5462

2.11

0.67

0.67

456

849

5462

6.34

0.67

0.86

456

849

5462

6.34

396

27.02

62.40

1499.88

1224

829.15

847.90

4766.90

BARGE/ CONTAINER

: 2nd Shipment
: Mar. 11 2015
:D
REMARK

04/16/2015 09:40:00

DETAIL APCKING LIST 2nd SHIPMENT


JAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number

: 1J/3HM/7558812

Item Code

: 4500190308

Description

: Fabrication Steel Structures

Quantity

: 308 Pckgs

Quantity of Weight

: 1,012.12 TONS

Quantity of Cubic Meters

: 1,713.09 CBM

Shipped from

: Hanjung Private Jetty, Lampung INDONESIA

Shipped to

: Kandla, INDIA

Date of Shipment to India : 22-March-2015

PACK NO.

DRAWING NO.

MARKING NO.

PACKAGE
No.

TYPE

DESCRIPTION

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

CBM (m3)

A. H210-550 ROOD MILL STRUCTURE


1

H210-550-FPGB1

H210-550-FPGB1

RIL/PTH-J3-0001

SKID

ROOD MILL STRUCTURE

2.36

2.42

700

780

5470

H210-550-FPGB2

H210-550-FPGB2

RIL/PTH-J3-0002

SKID

ROOD MILL STRUCTURE

2.36

2.42

759

846

5470

3.51

H210-550-FPGC1

H210-550-FPGC1

RIL/PTH-J3-0003

SKID

ROOD MILL STRUCTURE

7.05

7.19

1086

1401

8425

12.82

H210-550-FPGC2

H210-550-FPGC2

RIL/PTH-J3-0004

SKID

ROOD MILL STRUCTURE

10.13

10.36

1134

1815

10370

21.34

H210-550-FPGC3

H210-550-FPGC3

RIL/PTH-J3-0005

SKID

ROOD MILL STRUCTURE

11.45

11.64

1106

1406

11955

18.59

H210-550-FPGC4

H210-550-FPGC4

RIL/PTH-J3-0006

SKID

ROOD MILL STRUCTURE

3.88

3.97

958

1439

2571

3.54

H210-550-FPGC5

H210-550-FPGC5

RIL/PTH-J3-0007

SKID

ROOD MILL STRUCTURE

7.30

7.44

1316

1401

8425

15.53

H210-550-FPGC6

H210-550-FPGC6

RIL/PTH-J3-0008

SKID

ROOD MILL STRUCTURE

9.68

10.05

881

3117

10300

28.28

H210-550-FPGC7

H210-550-FPGC7

RIL/PTH-J3-0009

SKID

ROOD MILL STRUCTURE

10.92

11.10

968

1402

10900

14.79

10

H210-550-FPGC8

H210-550-FPGC8

RIL/PTH-J3-0010

SKID

ROOD MILL STRUCTURE

9.57

9.75

708

1402

9800

9.73

11

H210-550-FPGC9

H210-550-FPGC9

RIL/PTH-J3-0011

SKID

ROOD MILL STRUCTURE

6.33

6.47

869

1403

6176

7.53

12

H210-550-FPGC10

H210-550-FPGC10

RIL/PTH-J3-0012

SKID

ROOD MILL STRUCTURE

7.22

7.37

586

1486

8425

7.34

13

H210-550-FPGC11

H210-550-FPGC11

RIL/PTH-J3-0013

SKID

ROOD MILL STRUCTURE

10.18

10.55

696

3117

10300

22.35

14

H210-550-FPGC12

H210-550-FPGC12

RIL/PTH-J3-0014

SKID

ROOD MILL STRUCTURE

10.25

10.44

1131

1406

10400

16.54

15

H210-550-FPGC13

H210-550-FPGC13

RIL/PTH-J3-0015

SKID

ROOD MILL STRUCTURE

9.99

10.17

511

1406

10300

7.40

Page 30 of 137

2.99

BARGE/ CONTAINER

04/16/2015 09:40:00

DETAIL APCKING LIST 2nd SHIPMENT


JAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number

: 1J/3HM/7558812

Item Code

: 4500190308

Description

: Fabrication Steel Structures

Quantity

: 308 Pckgs

Quantity of Weight

: 1,012.12 TONS

Quantity of Cubic Meters

: 1,713.09 CBM

Shipped from

: Hanjung Private Jetty, Lampung INDONESIA

Shipped to

: Kandla, INDIA

Date of Shipment to India : 22-March-2015

PACK NO.

DRAWING NO.

MARKING NO.

PACKAGE
No.

TYPE

DESCRIPTION

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

CBM (m3)

16

H210-550-FPGC14

H210-550-FPGC14

RIL/PTH-J3-0016

SKID

ROOD MILL STRUCTURE

6.40

6.54

810

1413

6176

7.07

17

H210-550-FPGC15

H210-550-FPGC15

RIL/PTH-J3-0017

SKID

ROOD MILL STRUCTURE

7.42

7.56

885

1401

8425

10.45

18

H210-550-FPGC16

H210-550-FPGC16

RIL/PTH-J3-0018

SKID

ROOD MILL STRUCTURE

10.19

10.43

693

1931

10300

13.78

19

H210-550-FPGC16

H210-550-FPGC16

RIL/PTH-J3-0019

SKID

ROOD MILL STRUCTURE

10.19

10.43

693

1931

10300

13.78

20

H210-550-FPGC17

H210-550-FPGC17

RIL/PTH-J3-0020

SKID

ROOD MILL STRUCTURE

10.05

10.21

610

1241

10400

7.87

21

H210-550-FPGC18

H210-550-FPGC18

RIL/PTH-J3-0021

SKID

ROOD MILL STRUCTURE

9.76

9.93

706

1259

10300

9.16

22

H210-550-FPGC19

H210-550-FPGC19

RIL/PTH-J3-0022

SKID

ROOD MILL STRUCTURE

6.40

6.54

861

1405

6176

7.47

23

H210-550-FPGC20

H210-550-FPGC20

RIL/PTH-J3-0023

SKID

ROOD MILL STRUCTURE

7.48

7.62

1164

1486

8425

14.57

24

H210-550-FPGC21

H210-550-FPGC21

RIL/PTH-J3-0024

SKID

ROOD MILL STRUCTURE

10.18

10.55

696

3117

10300

22.35

25

H210-550-FPGC22

H210-550-FPGC22

RIL/PTH-J3-0025

SKID

ROOD MILL STRUCTURE

7.41

7.54

1129

1239

6525

9.13

26

H210-550-FPGC23

H210-550-FPGC23

RIL/PTH-J3-0026

SKID

ROOD MILL STRUCTURE

7.07

7.19

661

1242

6800

5.58

27

H210-550-FPGC24

H210-550-FPGC24

RIL/PTH-J3-0027

SKID

ROOD MILL STRUCTURE

7.78

7.92

696

1407

7375

7.22

28

H210-550-FPGC25

H210-550-FPGC25

RIL/PTH-J3-0028

SKID

ROOD MILL STRUCTURE

6.27

6.39

875

1240

6176

6.70

29

H210-550-FPGC26

H210-550-FPGC26

RIL/PTH-J3-0029

SKID

ROOD MILL STRUCTURE

7.56

7.69

1164

1401

8425

13.74

30

H210-550-FPGC27

H210-550-FPGC27

RIL/PTH-J3-0030

SKID

ROOD MILL STRUCTURE

11.58

11.76

1128

1402

11700

18.50

31

H210-550-FPGC28

H210-550-FPGC28

RIL/PTH-J3-0031

SKID

ROOD MILL STRUCTURE

9.06

9.20

808

1402

9000

10.20

32

H210-550-FPGC29

H210-550-FPGC29

RIL/PTH-J3-0032

SKID

ROOD MILL STRUCTURE

6.45

6.58

824

1239

6176

6.31

33

H210-550-FPGC30

H210-550-FPGC30

RIL/PTH-J3-0033

SKID

ROOD MILL STRUCTURE

7.34

7.48

1311

1401

8425

15.47

34

H210-550-FPGC31

H210-550-FPGC31

RIL/PTH-J3-0034

SKID

ROOD MILL STRUCTURE

10.18

10.55

696

3117

10300

22.35

35

H210-550-FPGC32

H210-550-FPGC32

RIL/PTH-J3-0035

SKID

ROOD MILL STRUCTURE

10.85

11.03

821

1408

11900

13.76

36

H210-550-FPGC33

H210-550-FPGC33

RIL/PTH-J3-0036

SKID

ROOD MILL STRUCTURE

11.13

11.31

676

1439

11726

11.41

37

H210-550-FPGC35

H210-550-FPGC35

RIL/PTH-J3-0037

SKID

ROOD MILL STRUCTURE

7.30

7.44

737

1401

8425

8.70

38

H210-550-FPGC36

H210-550-FPGC36

RIL/PTH-J3-0038

SKID

ROOD MILL STRUCTURE

10.19

10.55

695

3117

10300

22.31

39

H210-550-FPGC37

H210-550-FPGC37

RIL/PTH-J3-0039

SKID

ROOD MILL STRUCTURE

11.22

11.40

968

1402

11900

16.15

40

H210-550-FPGC38

H210-550-FPGC38

RIL/PTH-J3-0040

SKID

ROOD MILL STRUCTURE

11.16

11.35

711

1438

11726

11.99

41

H210-550-FPGC40

H210-550-FPGC40

RIL/PTH-J3-0041

SKID

ROOD MILL STRUCTURE

7.33

7.47

1312

1486

8425

16.43

42

H210-550-FPGC41

H210-550-FPGC41

RIL/PTH-J3-0042

SKID

ROOD MILL STRUCTURE

9.68

10.04

881

3110

10300

28.22

43

H210-550-FPGC42

H210-550-FPGC42

RIL/PTH-J3-0043

SKID

ROOD MILL STRUCTURE

11.45

11.64

1022

1408

11900

17.12

44

H210-550-FPGC43

H210-550-FPGC43

RIL/PTH-J3-0044

SKID

ROOD MILL STRUCTURE

11.13

11.32

904

1442

11726

15.29

45

H210-550-FPGC44

H210-550-FPGC44

RIL/PTH-J3-0045

SKID

ROOD MILL STRUCTURE

7.15

7.30

1141

1486

8425

14.28

46

H210-550-FPGC45

H210-550-FPGC45

RIL/PTH-J3-0046

SKID

ROOD MILL STRUCTURE

9.93

10.18

1136

1937

10300

22.66

47

H210-550-FPGC46

H210-550-FPGC46

RIL/PTH-J3-0047

SKID

ROOD MILL STRUCTURE

8.30

8.44

1101

1406

7250

11.22

48

H210-550-FPGC47

H210-550-FPGC47

RIL/PTH-J3-0048

SKID

ROOD MILL STRUCTURE

6.83

6.98

1141

1486

8425

14.28

49

H210-550-FPGC48

H210-550-FPGC48

RIL/PTH-J3-0049

SKID

ROOD MILL STRUCTURE

9.50

9.69

1132

1432

10380

16.83

50

H210-550-FPGC49

H210-550-FPGC49

RIL/PTH-J3-0050

SKID

ROOD MILL STRUCTURE

11.15

11.32

1099

1239

11955

16.28

Page 31 of 137

BARGE/ CONTAINER

04/16/2015 09:40:00

DETAIL APCKING LIST 2nd SHIPMENT


JAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number

: 1J/3HM/7558812

Item Code

: 4500190308

Description

: Fabrication Steel Structures

Quantity

: 308 Pckgs

Quantity of Weight

: 1,012.12 TONS

Quantity of Cubic Meters

: 1,713.09 CBM

Shipped from

: Hanjung Private Jetty, Lampung INDONESIA

Shipped to

: Kandla, INDIA

Date of Shipment to India : 22-March-2015

PACK NO.

DRAWING NO.

MARKING NO.

PACKAGE
No.

TYPE

DESCRIPTION

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

CBM (m3)

51

H210-550-FPGC50

H210-550-FPGC50

RIL/PTH-J3-0051

SKID

ROOD MILL STRUCTURE

3.96

4.05

949

1395

2629

3.48

52

H210-550-FPGC51

H210-550-FPGC51

RIL/PTH-J3-0052

SKID

ROOD MILL STRUCTURE

7.35

7.49

1312

1401

8425

15.49

53

H210-550-FPGC52

H210-550-FPGC52

RIL/PTH-J3-0053

SKID

ROOD MILL STRUCTURE

7.14

7.29

696

1507

7140

7.49

54

H210-550-FPGC53

H210-550-FPGC53

RIL/PTH-J3-0054

SKID

ROOD MILL STRUCTURE

9.86

10.03

1006

1241

9700

12.11

55

H210-550-FPGC54

H210-550-FPGC54

RIL/PTH-J3-0055

SKID

ROOD MILL STRUCTURE

9.81

9.97

720

1241

9950

8.89

56

H210-550-FPGC55

H210-550-FPGC55

RIL/PTH-J3-0056

SKID

ROOD MILL STRUCTURE

6.53

6.66

849

1407

6256

7.47

57

H210-550-FPGC56

H210-550-FPGC56

RIL/PTH-J3-0057

SKID

ROOD MILL STRUCTURE

7.20

7.34

586

1486

8425

7.34

58

H210-550-FPGC57

H210-550-FPGC57

RIL/PTH-J3-0058

SKID

ROOD MILL STRUCTURE

5.01

5.10

511

1406

4210

3.02

59

H210-550-FPGC58

H210-550-FPGC58

RIL/PTH-J3-0059

SKID

ROOD MILL STRUCTURE

7.14

7.27

696

1407

7140

6.99

60

H210-550-FPGC59

H210-550-FPGC59

RIL/PTH-J3-0060

SKID

ROOD MILL STRUCTURE

9.13

9.31

695

1406

9200

8.99

61

H210-550-FPGC60

H210-550-FPGC60

RIL/PTH-J3-0061

SKID

ROOD MILL STRUCTURE

6.45

6.59

859

1404

6244

7.53

62

H210-550-FPGC61

H210-550-FPGC61

RIL/PTH-J3-0062

SKID

ROOD MILL STRUCTURE

7.15

7.29

878

1482

8425

10.96

63

H210-550-FPGC62

H210-550-FPGC62

RIL/PTH-J3-0063

SKID

ROOD MILL STRUCTURE

9.43

9.63

881

1506

10500

13.93

64

H210-550-FPGC63

H210-550-FPGC63

RIL/PTH-J3-0064

SKID

ROOD MILL STRUCTURE

9.75

9.93

1127

1402

10200

16.12

65

H210-550-FPGC64

H210-550-FPGC64

RIL/PTH-J3-0065

SKID

ROOD MILL STRUCTURE

9.37

9.54

695

1241

10300

8.88

66

H210-550-FPGC65

H210-550-FPGC65

RIL/PTH-J3-0066

SKID

ROOD MILL STRUCTURE

6.33

6.47

909

1426

6244

8.09

67

H210-550-FPGC66

H210-550-FPGC66

RIL/PTH-J3-0067

SKID

ROOD MILL STRUCTURE

7.47

7.61

1311

1402

8425

15.49

68

H210-550-FPGC67

H210-550-FPGC67

RIL/PTH-J3-0068

SKID

ROOD MILL STRUCTURE

9.61

9.79

1131

1406

9700

15.42

69

H210-550-FPGC68

H210-550-FPGC68

RIL/PTH-J3-0069

SKID

ROOD MILL STRUCTURE

10.16

10.42

1131

2056

10000

23.25

70

H210-550-FPGC69

H210-550-FPGC69

RIL/PTH-J3-0070

SKID

ROOD MILL STRUCTURE

6.97

7.11

660

1407

6660

6.18

71

H210-550-FPGC70

H210-550-FPGC70

RIL/PTH-J3-0071

SKID

ROOD MILL STRUCTURE

7.73

7.87

694

1404

7500

7.31

72

H210-550-FPGC71

H210-550-FPGC71

RIL/PTH-J3-0072

SKID

ROOD MILL STRUCTURE

6.37

6.51

876

1430

6244

7.82

73

H210-550-FPGC72

H210-550-FPGC72

RIL/PTH-J3-0073

SKID

ROOD MILL STRUCTURE

7.47

7.62

1308

1482

8425

16.33

74

H210-550-FPGC73

H210-550-FPGC73

RIL/PTH-J3-0074

SKID

ROOD MILL STRUCTURE

5.40

5.49

661

1407

4960

4.61

75

H210-550-FPGC74

H210-550-FPGC74

RIL/PTH-J3-0075

SKID

ROOD MILL STRUCTURE

7.14

7.27

696

1407

7140

6.99

76

H210-550-FPGC75

H210-550-FPGC75

RIL/PTH-J3-0076

SKID

ROOD MILL STRUCTURE

9.20

9.37

811

1241

9250

9.31

77

H210-550-FPGC76

H210-550-FPGC76

RIL/PTH-J3-0077

SKID

ROOD MILL STRUCTURE

6.52

6.66

862

1396

6244

7.51

78

H210-550-FPGC77

H210-550-FPGC77

RIL/PTH-J3-0078

SKID

ROOD MILL STRUCTURE

7.15

7.29

1311

1486

8425

16.41

79

H210-550-FPGC78

H210-550-FPGC78

RIL/PTH-J3-0079

SKID

ROOD MILL STRUCTURE

9.40

9.58

881

1406

10500

13.01

80

H210-550-FPGC79

H210-550-FPGC79

RIL/PTH-J3-0080

SKID

ROOD MILL STRUCTURE

9.39

9.57

971

1406

10000

13.65

81

H210-550-FPGC80

H210-550-FPGC80

RIL/PTH-J3-0081

SKID

ROOD MILL STRUCTURE

9.66

9.84

843

1402

10500

12.41

82

H210-550-FPGC81

H210-550-FPGC81

RIL/PTH-J3-0082

SKID

ROOD MILL STRUCTURE

3.94

4.03

876

1422

2994

3.73

83

H210-550-FPGC82

H210-550-FPGC82

RIL/PTH-J3-0083

SKID

ROOD MILL STRUCTURE

7.30

7.44

738

1486

8425

9.24

84

H210-550-FPGC83

H210-550-FPGC83

RIL/PTH-J3-0084

SKID

ROOD MILL STRUCTURE

6.93

7.07

695

1406

6840

6.68

85

H210-550-FPGC84

H210-550-FPGC84

RIL/PTH-J3-0085

SKID

ROOD MILL STRUCTURE

7.14

7.28

688

1407

7140

6.91

Page 32 of 137

BARGE/ CONTAINER

04/16/2015 09:40:00

DETAIL APCKING LIST 2nd SHIPMENT


JAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number

: 1J/3HM/7558812

Item Code

: 4500190308

Description

: Fabrication Steel Structures

Quantity

: 308 Pckgs

Quantity of Weight

: 1,012.12 TONS

Quantity of Cubic Meters

: 1,713.09 CBM

Shipped from

: Hanjung Private Jetty, Lampung INDONESIA

Shipped to

: Kandla, INDIA

Date of Shipment to India : 22-March-2015

PACK NO.

DRAWING NO.

MARKING NO.

PACKAGE
No.

TYPE

DESCRIPTION

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

CBM (m3)

86

H210-550-FPGC85

H210-550-FPGC85

RIL/PTH-J3-0086

SKID

ROOD MILL STRUCTURE

9.50

9.68

661

1406

10100

87

H210-550-FPGC86

H210-550-FPGC86

RIL/PTH-J3-0087

SKID

ROOD MILL STRUCTURE

4.11

4.20

709

1419

2994

3.01

88

H210-550-FPGC87

H210-550-FPGC87

RIL/PTH-J3-0088

SKID

ROOD MILL STRUCTURE

7.46

7.60

1308

1482

8425

16.33

89

H210-550-FPGC88

H210-550-FPGC88

RIL/PTH-J3-0089

SKID

ROOD MILL STRUCTURE

9.92

10.11

1131

1406

9700

15.42

90

H210-550-FPGC90

H210-550-FPGC90

RIL/PTH-J3-0090

SKID

ROOD MILL STRUCTURE

11.57

11.76

674

1403

11794

11.15

91

H210-550-FPGC91

H210-550-FPGC91

RIL/PTH-J3-0091

SKID

ROOD MILL STRUCTURE

6.86

7.00

731

1397

8425

8.60

92

H210-550-FPGC92

H210-550-FPGC92

RIL/PTH-J3-0092

SKID

ROOD MILL STRUCTURE

9.41

9.57

965

1241

10385

12.44

93

H210-550-FPGC93

H210-550-FPGC93

RIL/PTH-J3-0093

SKID

ROOD MILL STRUCTURE

8.24

8.36

658

1237

7165

5.83

94

H210-550-FPGC94

H210-550-FPGC94

RIL/PTH-J3-0094

SKID

ROOD MILL STRUCTURE

5.50

5.58

659

1239

4910

4.01

95

H210-550-FPGC95

H210-550-FPGC95

RIL/PTH-J3-0095

SKID

ROOD MILL STRUCTURE

7.14

7.27

696

1242

7140

6.17

96

H210-550-FPGC96

H210-550-FPGC96

RIL/PTH-J3-0096

SKID

ROOD MILL STRUCTURE

9.61

9.79

1131

1406

9700

15.42

97

H210-550-FPGC97

H210-550-FPGC97

RIL/PTH-J3-0097

SKID

ROOD MILL STRUCTURE

4.72

4.81

661

1406

4060

3.77

98

H210-550-FPGC98

H210-550-FPGC98

RIL/PTH-J3-0098

SKID

ROOD MILL STRUCTURE

9.80

9.97

968

1237

9680

11.59

99

H210-550-FPGC99

H210-550-FPGC99

RIL/PTH-J3-0099

SKID

ROOD MILL STRUCTURE

701

1597

5380

SUB TOTAL A. H210-550 ROOD MILL STRUCTURE

5.74

5.84

99

807.81

824.20

9.39

6.02
1149.16

B. H220-550 ROOD MILL STRUCTURE


100

H220-550-FPGC1

H220-550-FPGC1

RIL/PTH-J3-0100

SKID

ROOD MILL STRUCTURE

4.59

4.69

1316

1351

6036

10.73

101

H220-550-FPGC2

H220-550-FPGC2

RIL/PTH-J3-0101

SKID

ROOD MILL STRUCTURE

6.99

6.99

1192

1450

8437

14.58

102

H220-550-FPGC3

H220-550-FPGC3

RIL/PTH-J3-0102

SKID

ROOD MILL STRUCTURE

5.59

5.75

1440

1495

5000

10.76

103

H220-550-FPGC4

H220-550-FPGC4

RIL/PTH-J3-0103

SKID

ROOD MILL STRUCTURE

11.87

12.20

1400

1540

12000

25.87

104

H220-550-FPGC5

H220-550-FPGC5

RIL/PTH-J3-0104

SKID

ROOD MILL STRUCTURE

11.48

11.78

1540

1250

10500

20.21

105

H220-550-FPGC6

H220-550-FPGC6

RIL/PTH-J3-0105

SKID

ROOD MILL STRUCTURE

7.16

7.42

1547

1608

8437

20.99

106

H220-550-FPGC7

H220-550-FPGC7

RIL/PTH-J3-0106

SKID

ROOD MILL STRUCTURE

5.44

5.59

1540

1180

5000

9.09

107

H220-550-FPGC8

H220-550-FPGC8

RIL/PTH-J3-0107

SKID

ROOD MILL STRUCTURE

11.97

12.27

2259

1271

12000

34.45

108

H220-550-FPGC9

H220-550-FPGC9

RIL/PTH-J3-0108

SKID

ROOD MILL STRUCTURE

10.08

10.35

1524

961

10500

15.38

109

H220-550-FPGC10

H220-550-FPGC10

RIL/PTH-J3-0109

SKID

ROOD MILL STRUCTURE

6.32

6.57

1125

1540

6036

10.46

110

H220-550-FPGC11

H220-550-FPGC11

RIL/PTH-J3-0110

SKID

ROOD MILL STRUCTURE

7.12

7.32

1550

885

8437

11.57

111

H220-550-FPGC12

H220-550-FPGC12

RIL/PTH-J3-0111

SKID

ROOD MILL STRUCTURE

5.67

5.80

1540

995

5000

7.66

112

H220-550-FPGC12

H220-550-FPGC12

RIL/PTH-J3-0112

SKID

ROOD MILL STRUCTURE

5.67

5.80

1540

995

5000

SUB TOTAL B. H220-550 ROOD MILL STRUCTURE

13

99.95

102.56

C. H360-013 SUB PIPE RACK ACR 001


113

H360-013-VB19

H360-013-VB19

SUB PIPE RACK ACR 001

0.05

0.05

300

300

1526

114

H360-013-VB20

H360-013-VB20

SUB PIPE RACK ACR 001

0.03

0.03

300

300

1151

115

H360-013-VB21

H360-013-VB21

SUB PIPE RACK ACR 001

0.05

0.05

300

300

862

116

H360-013-VB22

H360-013-VB22

SUB PIPE RACK ACR 001

0.01

0.01

300

300

898

RIL/PTH-J3-0113

BUNDLE

Page 33 of 137

7.66
199.42

BARGE/ CONTAINER

04/16/2015 09:40:00

DETAIL APCKING LIST 2nd SHIPMENT


JAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number

: 1J/3HM/7558812

Item Code

: 4500190308

Description

: Fabrication Steel Structures

Quantity

: 308 Pckgs

Quantity of Weight

: 1,012.12 TONS

Quantity of Cubic Meters

: 1,713.09 CBM

Shipped from

: Hanjung Private Jetty, Lampung INDONESIA

Shipped to

: Kandla, INDIA

Date of Shipment to India : 22-March-2015

PACK NO.

117

DRAWING NO.

H360-013-VB23

MARKING NO.

PACKAGE
RIL/PTH-J3-0113
No.

TYPE

BUNDLE

H360-013-VB23

DESCRIPTION

SUB PIPE RACK ACR 001

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

0.01

0.01

300

300

760

10

0.16

0.19

361

375

1526

118

H360-013-HB1

H360-013-HB1

SUB PIPE RACK ACR 001

0.01

0.01

290

290

1334

119

H360-013-HB2

H360-013-HB2

SUB PIPE RACK ACR 001

0.02

0.02

290

290

1450

120

H360-013-HB3

H360-013-HB3

SUB PIPE RACK ACR 001

0.02

0.02

290

290

1484

121

H360-013-HB4

H360-013-HB4

SUB PIPE RACK ACR 001

0.02

0.02

290

290

1536

122

H360-013-HB5

H360-013-HB5

SUB PIPE RACK ACR 001

16

0.34

0.34

290

290

1987

123

H360-013-HB6

H360-013-HB6

SUB PIPE RACK ACR 001

0.02

0.02

290

290

1698

124

H360-013-VB16

H360-013-VB16

SUB PIPE RACK ACR 001

0.01

0.01

290

290

870

125

H360-013-VB17

H360-013-VB17

SUB PIPE RACK ACR 001

0.04

0.04

290

290

1652

126

H360-013-VB18

H360-013-VB18

SUB PIPE RACK ACR 001

RIL/PTH-J3-0114

BUNDLE

0.02

0.02

290

290

1455

25

0.49

0.53

461

545

1987

127

H360-013-CT6

H360-013-CT6

SUB PIPE RACK ACR 001

0.01

0.01

250

300

1150

128

H360-013-CT7

H360-013-CT7

SUB PIPE RACK ACR 001

0.01

0.01

300

531

1150

129

H360-013-CT8

H360-013-CT8

SUB PIPE RACK ACR 001

0.01

0.01

300

548

1150

130

H360-013-CT9

H360-013-CT9

SUB PIPE RACK ACR 001

0.07

0.07

300

509

1150

131

H360-013-CT10

H360-013-CT10

SUB PIPE RACK ACR 001

0.01

0.01

300

529

1150

132

H360-013-CT11

H360-013-CT11

SUB PIPE RACK ACR 001

0.04

0.04

300

651

1150

133

H360-013-CT12

H360-013-CT12

SUB PIPE RACK ACR 001

0.01

0.01

300

509

935

134

H360-013-CT13

H360-013-CT13

SUB PIPE RACK ACR 001

0.01

0.01

250

300

1045

13

0.19

0.28

1270

871

1150

RIL/PTH-J3-0115

BUNDLE

135

H360-013-B67

H360-013-B67

SUB PIPE RACK ACR 001

0.03

0.03

350

275

1461

136

H360-013-B68

H360-013-B68

SUB PIPE RACK ACR 001

0.03

0.03

350

275

1461

137

H360-013-B69

H360-013-B69

SUB PIPE RACK ACR 001

0.03

0.03

350

275

1461

138

H360-013-B70

H360-013-B70

SUB PIPE RACK ACR 001

0.03

0.03

350

275

1461

139

H360-013-B71

H360-013-B71

SUB PIPE RACK ACR 001

0.16

0.16

350

275

1461

140

H360-013-B72

H360-013-B72

SUB PIPE RACK ACR 001

0.05

0.05

350

275

1461

141

H360-013-B73

H360-013-B73

SUB PIPE RACK ACR 001

0.03

0.03

350

275

1461

142

H360-013-B74

H360-013-B74

SUB PIPE RACK ACR 001

0.03

0.03

350

275

1461

143

H360-013-B75

H360-013-B75

SUB PIPE RACK ACR 001

0.03

0.03

350

275

1461

144

H360-013-B76

H360-013-B76

SUB PIPE RACK ACR 001

0.03

0.03

350

275

1461

145

H360-013-B77

H360-013-B77

SUB PIPE RACK ACR 001

0.03

0.03

350

275

1461

RIL/PTH-J3-0116

BUNDLE

Page 34 of 137

CBM (m3)

0.21

0.50

1.27

BARGE/ CONTAINER

04/16/2015 09:40:00

DETAIL APCKING LIST 2nd SHIPMENT


JAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number

: 1J/3HM/7558812

Item Code

: 4500190308

Description

: Fabrication Steel Structures

Quantity

: 308 Pckgs

Quantity of Weight

: 1,012.12 TONS

Quantity of Cubic Meters

: 1,713.09 CBM

Shipped from

: Hanjung Private Jetty, Lampung INDONESIA

Shipped to

: Kandla, INDIA

Date of Shipment to India : 22-March-2015


RIL/PTH-J3-0116

PACK NO.

DRAWING NO.

MARKING NO.

PACKAGE
No.

BUNDLE

TYPE

DESCRIPTION

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

146

H360-013-B78

H360-013-B78

SUB PIPE RACK ACR 001

0.06

0.06

1051

275

2334

147

H360-013-B79

H360-013-B79

SUB PIPE RACK ACR 001

0.05

0.05

350

275

2962

148

H360-013-B88

H360-013-B88

SUB PIPE RACK ACR 001

0.02

0.02

350

349

1211

20

0.58

0.69

461

1020

2962

0.14

0.14

400

275

1461

0.14

0.17

400

275

1461

SUB PIPE RACK ACR 001

0.04

0.04

890

350

388

SUB PIPE RACK ACR 001

0.07

0.07

837

408

388

0.11

0.17

1110

658

388

SUB PIPE RACK ACR 001

0.04

0.04

403

333

1461

SUB PIPE RACK ACR 001

0.07

0.07

403

333

1461

SUB PIPE RACK ACR 001

0.12

0.12

404

410

4657

0.23

0.27

436

378

4657
5673

149

H360-013-B82

H360-013-B82

150

H360-013-CT1

H360-013-CT1

151

H360-013-CT2

H360-013-CT2

152

H360-013-B19

H360-013-B19

153

H360-013-B80

H360-013-B80

154

H360-013-B81

H360-013-B81

RIL/PTH-J3-0117

RIL/PTH-J3-0118

RIL/PTH-J3-0119

BUNDLE

BUNDLE

BUNDLE

SUB PIPE RACK ACR 001

155

H360-013-B7

H360-013-B7

SUB PIPE RACK ACR 001

0.21

0.21

457

383

156

H360-013-B8

H360-013-B8

SUB PIPE RACK ACR 001

0.04

0.04

456

347

1142

157

H360-013-B9

H360-013-B9

SUB PIPE RACK ACR 001

0.22

0.22

456

346

5942

158

H360-013-B10

H360-013-B10

SUB PIPE RACK ACR 001

0.06

0.06

705

440

1102

159

H360-013-B11

H360-013-B11

SUB PIPE RACK ACR 001

0.06

0.06

620

440

1102

0.59

0.63

874

399

5942

0.16

0.16

856

352

4827

0.16

0.20

856

352

4827

0.58

0.58

1722

578

5944

0.58

0.63

1722

578

5944

0.58

0.58

1718

578

5944

0.58

0.63

1718

578

5944

0.12

0.12

380

1031

1684

0.12

0.19

380

1031

1684

160

161

162

163

H360-013-B4

H360-013-B5

H360-013-B6

H360-013-CT4

H360-013-B4

H360-013-B5

H360-013-B6

H360-013-CT4

RIL/PTH-J3-0120

RIL/PTH-J3-0121

RIL/PTH-J3-0122

RIL/PTH-J3-0123

RIL/PTH-J3-0124

BUNDLE

BUNDLE

BUNDLE

BUNDLE

SKID

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

Page 35 of 137

CBM (m3)

1.39

0.16

0.28

0.77

2.07

1.45

5.92

5.90

0.66

BARGE/ CONTAINER

04/16/2015 09:40:00

DETAIL APCKING LIST 2nd SHIPMENT


JAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number

: 1J/3HM/7558812

Item Code

: 4500190308

Description

: Fabrication Steel Structures

Quantity

: 308 Pckgs

Quantity of Weight

: 1,012.12 TONS

Quantity of Cubic Meters

: 1,713.09 CBM

Shipped from

: Hanjung Private Jetty, Lampung INDONESIA

Shipped to

: Kandla, INDIA

Date of Shipment to India : 22-March-2015

PACK NO.

164

165

166

167

168

169

170

171

172

DRAWING NO.

H360-013-B1

H360-013-B2

H360-013-B3

H360-013-VB1

H360-013-B55

H360-013-CT3

H360-013-CT5

H360-013-CT14

H360-013-FR1

MARKING NO.

H360-013-B1

H360-013-B2

H360-013-B3

H360-013-VB1

H360-013-B55

H360-013-CT3

H360-013-CT5

H360-013-CT14

H360-013-FR1

PACKAGE
No.

RIL/PTH-J3-0125

RIL/PTH-J3-0126

RIL/PTH-J3-0127

RIL/PTH-J3-0128

RIL/PTH-J3-0129

RIL/PTH-J3-0130

RIL/PTH-J3-0131

RIL/PTH-J3-0132

RIL/PTH-J3-0133

TYPE

SKID

BUNDLE

BUNDLE

BUNDLE

SKID

BUNDLE

SKID

SKID

SKID

DESCRIPTION

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

0.11

0.11

399

336

2904

0.11

0.15

399

336

2904

11

1.91

1.91

358

478

5673

11

1.91

1.97

971

833

5673

0.87

0.87

357

352

4827

0.87

0.91

397

503

4827

0.17

0.17

358

353

1389

0.17

0.21

397

413

1389

0.21

0.21

358

876

5673

0.21

0.27

358

876

5673

0.20

0.20

900

380

1442

0.20

0.25

900

649

1442

0.13

0.13

380

1420

1684

0.13

0.23

380

1420

1684

0.12

0.12

826

380

1684

0.12

0.16

826

380

1684

0.38

0.38

777

1242

4790

0.38

0.46

777

1242

4790

173

H360-013-B12

H360-013-B12

SUB PIPE RACK ACR 001

0.17

0.17

623

406

1236

174

H360-013-B13

H360-013-B13

SUB PIPE RACK ACR 001

0.08

0.08

605

406

1236

175

H360-013-B17

H360-013-B17

SUB PIPE RACK ACR 001

0.07

0.07

623

406

1086

176

H360-013-B20

H360-013-B20

SUB PIPE RACK ACR 001

0.34

0.34

410

406

5673

177

H360-013-B21

H360-013-B21

SUB PIPE RACK ACR 001

0.34

0.34

410

406

5640

178

H360-013-B23

H360-013-B23

SUB PIPE RACK ACR 001

0.08

0.08

522

416

1142

179

H360-013-B25

H360-013-B25

SUB PIPE RACK ACR 001

0.08

0.08

630

405

1142

RIL/PTH-J3-0134

BUNDLE

Page 36 of 137

CBM (m3)

0.39

4.59

0.96

0.23

1.78

0.84

0.91

0.53

4.62

BARGE/ CONTAINER

04/16/2015 09:40:00

DETAIL APCKING LIST 2nd SHIPMENT


JAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number

: 1J/3HM/7558812

Item Code

: 4500190308

Description

: Fabrication Steel Structures

Quantity

: 308 Pckgs

Quantity of Weight

: 1,012.12 TONS

Quantity of Cubic Meters

: 1,713.09 CBM

Shipped from

: Hanjung Private Jetty, Lampung INDONESIA

Shipped to

: Kandla, INDIA

Date of Shipment to India : 22-March-2015

PACK NO.

DRAWING NO.

MARKING NO.

RIL/PTH-J3-0134
PACKAGE

No.

BUNDLE

TYPE

DESCRIPTION

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

180

H360-013-B27

H360-013-B27

SUB PIPE RACK ACR 001

0.09

0.09

410

406

181

H360-013-B37

H360-013-B37

SUB PIPE RACK ACR 001

0.06

0.06

410

407

731

10

1.31

1.36

750

587

5673

1181

182

H360-013-B29

H360-013-B29

SUB PIPE RACK ACR 001

0.33

0.33

610

465

4617

183

H360-013-B33

H360-013-B33

SUB PIPE RACK ACR 001

0.33

0.33

609

464

4594

184

H360-013-B38

H360-013-B38

SUB PIPE RACK ACR 001

0.36

0.36

410

406

2912

185

H360-013-B41

H360-013-B41

SUB PIPE RACK ACR 001

0.15

0.15

410

416

1201

186

H360-013-B50

H360-013-B50

SUB PIPE RACK ACR 001

2.38

2.38

410

406

5673

187

H360-013-B51

H360-013-B51

SUB PIPE RACK ACR 001

0.34

0.34

410

406

5640

188

H360-013-B52

H360-013-B52

SUB PIPE RACK ACR 001

0.34

0.34

410

406

5607

189

H360-013-B53

H360-013-B53

SUB PIPE RACK ACR 001

0.34

0.34

410

406

5607

190

H360-013-B56

H360-013-B56

SUB PIPE RACK ACR 001

0.34

0.34

410

406

5607

191

H360-013-B84

H360-013-B84

SUB PIPE RACK ACR 001

0.33

0.33

609

464

4593

192

H360-013-SC1

H360-013-SC1

SUB PIPE RACK ACR 001

0.32

0.32

440

440

2530

20

5.55

5.61

1142

966

5673

0.85

0.85

1821

520

5942

0.85

0.89

1821

520

5942

0.63

0.63

1233

520

5942

0.63

0.67

1233

520

5942

0.78

0.78

1615

519

5944

0.78

0.83

1615

519

5944

0.37

0.37

410

642

5673

0.37

0.42

410

642

5673

0.36

0.36

609

666

4594

0.36

0.41

609

666

4594

0.73

0.73

1584

406

5607

0.73

0.77

1584

406

5607

193

194

195

196

197

198

H360-013-B14

H360-013-B15

H360-013-B16

H360-013-B18

H360-013-B22

H360-013-B24

H360-013-B14

H360-013-B15

H360-013-B16

H360-013-B18

H360-013-B22

H360-013-B24

RIL/PTH-J3-0135

RIL/PTH-J3-0136

RIL/PTH-J3-0137

RIL/PTH-J3-0138

RIL/PTH-J3-0139

RIL/PTH-J3-0140

RIL/PTH-J3-0141

BUNDLE

SKID

SKID

SKID

SKID

SKID

SKID

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

Page 37 of 137

CBM (m3)

2.50

6.26

5.63

3.81

4.98

1.49

1.86

3.61

BARGE/ CONTAINER

04/16/2015 09:40:00

DETAIL APCKING LIST 2nd SHIPMENT


JAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number

: 1J/3HM/7558812

Item Code

: 4500190308

Description

: Fabrication Steel Structures

Quantity

: 308 Pckgs

Quantity of Weight

: 1,012.12 TONS

Quantity of Cubic Meters

: 1,713.09 CBM

Shipped from

: Hanjung Private Jetty, Lampung INDONESIA

Shipped to

: Kandla, INDIA

Date of Shipment to India : 22-March-2015

PACK NO.

199

200

201

202

203

204

205

206

207

208

209

210

DRAWING NO.

H360-013-B26

H360-013-B28

H360-013-B30

H360-013-B31

H360-013-B32

H360-013-B34

H360-013-B35

H360-013-B36

H360-013-B39

H360-013-B40

H360-013-B42

H360-013-B43

MARKING NO.

H360-013-B26

H360-013-B28

H360-013-B30

H360-013-B31

H360-013-B32

H360-013-B34

H360-013-B35

H360-013-B36

H360-013-B39

H360-013-B40

H360-013-B42

H360-013-B43

PACKAGE
No.
RIL/PTH-J3-0142

RIL/PTH-J3-0143

RIL/PTH-J3-0144

RIL/PTH-J3-0145

RIL/PTH-J3-0146

RIL/PTH-J3-0147

RIL/PTH-J3-0148

RIL/PTH-J3-0149

RIL/PTH-J3-0150

RIL/PTH-J3-0151

RIL/PTH-J3-0152

RIL/PTH-J3-0153

TYPE

SKID

BUNDLE

SKID

BUNDLE

SKID

SKID

SKID

SKID

SKID

SKID

SKID

BUNDLE

DESCRIPTION

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

Page 38 of 137

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

0.09

0.09

633

662

1181

0.09

0.15

633

662

1181

0.69

0.69

793

864

4617

0.69

0.76

793

864

4617

0.36

0.36

846

958

4594

0.36

0.43

846

958

4594

0.70

0.70

610

868

4617

0.70

0.76

610

868

4617

0.37

0.37

610

745

4617

0.37

0.42

610

745

4617

0.73

0.73

1165

344

5607

0.73

0.76

1165

344

5607

0.87

0.87

1284

401

5942

0.87

0.91

1284

401

5942

0.06

0.06

659

406

731

0.06

0.10

659

406

731

0.37

0.37

410

657

5951

0.37

0.42

410

657

5951

0.37

0.37

410

660

5951

0.37

0.43

410

660

5951

0.32

0.32

410

867

4961

0.32

0.38

410

867

4961

0.95

0.95

344

660

4961

0.95

1.00

344

660

4961

CBM (m3)

0.49

3.16

3.72

2.44

2.10

2.25

3.06

0.20

1.60

1.61

1.76

1.13

BARGE/ CONTAINER

04/16/2015 09:40:00

DETAIL APCKING LIST 2nd SHIPMENT


JAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number

: 1J/3HM/7558812

Item Code

: 4500190308

Description

: Fabrication Steel Structures

Quantity

: 308 Pckgs

Quantity of Weight

: 1,012.12 TONS

Quantity of Cubic Meters

: 1,713.09 CBM

Shipped from

: Hanjung Private Jetty, Lampung INDONESIA

Shipped to

: Kandla, INDIA

Date of Shipment to India : 22-March-2015

PACK NO.

211

212

DRAWING NO.

H360-013-B44

H360-013-B45

MARKING NO.

H360-013-B44

H360-013-B45

PACKAGE
No.

RIL/PTH-J3-0154

RIL/PTH-J3-0155

TYPE

SKID

SKID

DESCRIPTION

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB TOTAL C. H360-013 SUB PIPE RACK ACR 001

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

0.32

0.32

410

868

4961

0.32

0.39

410

868

4961

0.34

0.34

410

868

4961

0.34

0.40

410

868

4961

176

25.15

27.45

CBM (m3)

1.77

1.77
92.64

D. H361-013 SUB PIPE RACK ACR 001


213

H361-013-VB19

H361-013-VB19

SUB PIPE RACK ACR 001

0.05

0.05

300

300

1526

214

H361-013-VB20

H361-013-VB20

SUB PIPE RACK ACR 001

0.03

0.03

300

300

1151

215

H361-013-VB21

H361-013-VB21

SUB PIPE RACK ACR 001

0.05

0.05

300

300

862

216

H361-013-VB22

H361-013-VB22

SUB PIPE RACK ACR 001

0.01

0.01

300

300

898

217

H361-013-VB23

H361-013-VB23

SUB PIPE RACK ACR 001

0.01

0.01

300

300

760

10

0.16

0.19

361

375

1526

RIL/PTH-J3-0156

BUNDLE

218

H361-013-HB1

H361-013-HB1

SUB PIPE RACK ACR 001

0.01

0.01

290

290

1334

219

H361-013-HB2

H361-013-HB2

SUB PIPE RACK ACR 001

0.02

0.02

290

290

1450

220

H361-013-HB3

H361-013-HB3

SUB PIPE RACK ACR 001

0.02

0.02

290

290

1484

221

H361-013-HB4

H361-013-HB4

SUB PIPE RACK ACR 001

0.02

0.02

290

290

1536

222

H361-013-HB5

H361-013-HB5

SUB PIPE RACK ACR 001

16

0.34

0.34

290

290

1987

223

H361-013-HB6

H361-013-HB6

SUB PIPE RACK ACR 001

0.02

0.02

290

290

1698

224

H361-013-VB16

H361-013-VB16

SUB PIPE RACK ACR 001

0.01

0.01

290

290

870

225

H361-013-VB17

H361-013-VB17

SUB PIPE RACK ACR 001

0.04

0.04

290

290

1652

226

H361-013-VB18

H361-013-VB18

SUB PIPE RACK ACR 001

RIL/PTH-J3-0157

BUNDLE

0.02

0.02

290

290

1455

25

0.49

0.53

461

545

1987

227

H361-013-CT6

H361-013-CT6

SUB PIPE RACK ACR 001

0.01

0.01

250

300

1150

228

H361-013-CT7

H361-013-CT7

SUB PIPE RACK ACR 001

0.01

0.01

300

531

1150

229

H361-013-CT8

H361-013-CT8

SUB PIPE RACK ACR 001

0.01

0.01

300

548

1150

230

H361-013-CT9

H361-013-CT9

SUB PIPE RACK ACR 001

0.07

0.07

300

509

1150

231

H361-013-CT10

H361-013-CT10

SUB PIPE RACK ACR 001

0.01

0.01

300

529

1150

232

H361-013-CT11

H361-013-CT11

SUB PIPE RACK ACR 001

0.04

0.04

300

651

1150

233

H361-013-CT12

H361-013-CT12

SUB PIPE RACK ACR 001

0.01

0.01

300

509

935

234

H361-013-CT13

H361-013-CT13

SUB PIPE RACK ACR 001

0.01

0.01

250

300

1045

RIL/PTH-J3-0158

BUNDLE

Page 39 of 137

0.21

0.50

BARGE/ CONTAINER

04/16/2015 09:40:00

DETAIL APCKING LIST 2nd SHIPMENT


JAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number

: 1J/3HM/7558812

Item Code

: 4500190308

Description

: Fabrication Steel Structures

Quantity

: 308 Pckgs

Quantity of Weight

: 1,012.12 TONS

Quantity of Cubic Meters

: 1,713.09 CBM

Shipped from

: Hanjung Private Jetty, Lampung INDONESIA

Shipped to

: Kandla, INDIA

Date of Shipment to India : 22-March-2015

PACK NO.

DRAWING NO.

MARKING NO.

PACKAGE
No.

TYPE

DESCRIPTION

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

13

0.19

0.28

1270

871

1150

235

H361-013-B67

H361-013-B67

SUB PIPE RACK ACR 001

0.03

0.03

350

275

1461

236

H361-013-B68

H361-013-B68

SUB PIPE RACK ACR 001

0.03

0.03

350

275

1461

237

H361-013-B69

H361-013-B69

SUB PIPE RACK ACR 001

0.03

0.03

350

275

1461

238

H361-013-B70

H361-013-B70

SUB PIPE RACK ACR 001

0.03

0.03

350

275

1461

239

H361-013-B71

H361-013-B71

SUB PIPE RACK ACR 001

0.16

0.16

350

275

1461

240

H361-013-B72

H361-013-B72

SUB PIPE RACK ACR 001

0.05

0.05

350

275

1461

241

H361-013-B73

H361-013-B73

SUB PIPE RACK ACR 001

0.03

0.03

350

275

1461

242

H361-013-B74

H361-013-B74

SUB PIPE RACK ACR 001

0.03

0.03

350

275

1461

243

H361-013-B75

H361-013-B75

SUB PIPE RACK ACR 001

0.03

0.03

350

275

1461

244

H361-013-B76

H361-013-B76

SUB PIPE RACK ACR 001

0.03

0.03

350

275

1461

245

H361-013-B77

H361-013-B77

SUB PIPE RACK ACR 001

0.03

0.03

350

275

1461

246

H361-013-B78

H361-013-B78

SUB PIPE RACK ACR 001

0.06

0.06

1051

275

2334

247

H361-013-B79

H361-013-B79

SUB PIPE RACK ACR 001

0.05

0.05

350

275

2962

248

H361-013-B88

H361-013-B88

SUB PIPE RACK ACR 001

0.02

0.02

350

349

1211

20

0.58

0.69

461

1020

2962

0.14

0.14

400

275

1461

0.14

0.17

400

275

1461

SUB PIPE RACK ACR 001

0.04

0.04

890

350

388

SUB PIPE RACK ACR 001

0.07

0.07

837

408

388

0.11

0.17

1110

658

388

SUB PIPE RACK ACR 001

0.04

0.04

403

333

1461

SUB PIPE RACK ACR 001

0.07

0.07

403

333

1461

SUB PIPE RACK ACR 001

0.12

0.12

404

410

4657

0.23

0.27

436

378

4657
5673

249

H361-013-B82

H361-013-B82

250

H361-013-CT1

H361-013-CT1

251

H361-013-CT2

H361-013-CT2

252

H361-013-B19

H361-013-B19

253

H361-013-B80

H361-013-B80

254

H361-013-B81

H361-013-B81

RIL/PTH-J3-0159

RIL/PTH-J3-0160

RIL/PTH-J3-0161

RIL/PTH-J3-0162

BUNDLE

BUNDLE

BUNDLE

BUNDLE

SUB PIPE RACK ACR 001

255

H361-013-B7

H361-013-B7

SUB PIPE RACK ACR 001

0.21

0.21

457

383

256

H361-013-B8

H361-013-B8

SUB PIPE RACK ACR 001

0.04

0.04

456

347

1142

257

H361-013-B9

H361-013-B9

SUB PIPE RACK ACR 001

0.22

0.22

456

346

5942

258

H361-013-B10

H361-013-B10

SUB PIPE RACK ACR 001

0.06

0.06

705

440

1102

259

H361-013-B11

H361-013-B11

SUB PIPE RACK ACR 001

0.06

0.06

620

440

1102

RIL/PTH-J3-0163

BUNDLE

Page 40 of 137

CBM (m3)

1.27

1.39

0.16

0.28

0.77

BARGE/ CONTAINER

04/16/2015 09:40:00

DETAIL APCKING LIST 2nd SHIPMENT


JAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number

: 1J/3HM/7558812

Item Code

: 4500190308

Description

: Fabrication Steel Structures

Quantity

: 308 Pckgs

Quantity of Weight

: 1,012.12 TONS

Quantity of Cubic Meters

: 1,713.09 CBM

Shipped from

: Hanjung Private Jetty, Lampung INDONESIA

Shipped to

: Kandla, INDIA

Date of Shipment to India : 22-March-2015

PACK NO.

260

261

262

263

264

265

266

267

268

269

270

DRAWING NO.

H361-013-B4

H361-013-B5

H361-013-B6

H361-013-CT4

H361-013-B1

H361-013-B2

H361-013-B3

H361-013-VB1

H361-013-B55

H361-013-CT3

H361-013-CT5

MARKING NO.

H361-013-B4

H361-013-B5

H361-013-B6

H361-013-CT4

H361-013-B1

H361-013-B2

H361-013-B3

H361-013-VB1

H361-013-B55

H361-013-CT3

H361-013-CT5

PACKAGE
No.

RIL/PTH-J3-0164

RIL/PTH-J3-0165

RIL/PTH-J3-0166

RIL/PTH-J3-0167

RIL/PTH-J3-0168

RIL/PTH-J3-0169

RIL/PTH-J3-0170

RIL/PTH-J3-0171

RIL/PTH-J3-0172

RIL/PTH-J3-0173

RIL/PTH-J3-0174

TYPE

SKID

SKID

SKID

SKID

SKID

BUNDLE

BUNDLE

BUNDLE

SKID

BUNDLE

SKID

DESCRIPTION

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

Page 41 of 137

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

0.59

0.63

874

399

5942

0.16

0.16

856

352

4827

0.16

0.20

856

352

4827

0.58

0.58

1722

578

5944

0.58

0.63

1722

578

5944

0.58

0.58

1718

578

5944

0.58

0.63

1718

578

5944

0.12

0.12

380

1031

1684

0.12

0.19

380

1031

1684

0.11

0.11

399

336

2904

0.11

0.15

399

336

2904

11

1.91

1.91

358

478

5673

11

1.91

1.97

971

833

5673

0.87

0.87

357

352

4827

0.87

0.91

397

503

4827

0.17

0.17

358

353

1389

0.17

0.21

397

413

1389

0.21

0.21

358

876

5673

0.21

0.27

358

876

5673

0.20

0.20

900

380

1442

0.20

0.25

900

649

1442

0.13

0.13

380

1420

1684

0.13

0.23

380

1420

1684

CBM (m3)

2.07

1.45

5.92

5.90

0.66

0.39

4.59

0.96

0.23

1.78

0.84

0.91

BARGE/ CONTAINER

04/16/2015 09:40:01

DETAIL APCKING LIST 2nd SHIPMENT


JAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number

: 1J/3HM/7558812

Item Code

: 4500190308

Description

: Fabrication Steel Structures

Quantity

: 308 Pckgs

Quantity of Weight

: 1,012.12 TONS

Quantity of Cubic Meters

: 1,713.09 CBM

Shipped from

: Hanjung Private Jetty, Lampung INDONESIA

Shipped to

: Kandla, INDIA

Date of Shipment to India : 22-March-2015

PACK NO.

271

272

DRAWING NO.

H361-013-CT14

H361-013-FR1

MARKING NO.

H361-013-CT14

H361-013-FR1

PACKAGE
No.
RIL/PTH-J3-0175

RIL/PTH-J3-0176

TYPE

SKID

SKID

DESCRIPTION

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

0.12

0.12

826

380

1684

0.12

0.16

826

380

1684

0.38

0.38

777

1242

4790

0.38

0.46

777

1242

4790

273

H361-013-B12

H361-013-B12

SUB PIPE RACK ACR 001

0.17

0.17

623

406

1236

274

H361-013-B13

H361-013-B13

SUB PIPE RACK ACR 001

0.08

0.08

605

406

1236

275

H361-013-B17

H361-013-B17

SUB PIPE RACK ACR 001

0.07

0.07

623

406

1086

276

H361-013-B20

H361-013-B20

SUB PIPE RACK ACR 001

0.34

0.34

410

406

5673

277

H361-013-B21

H361-013-B21

SUB PIPE RACK ACR 001

0.34

0.34

410

406

5640

278

H361-013-B23

H361-013-B23

SUB PIPE RACK ACR 001

0.08

0.08

522

416

1142

279

H361-013-B25

H361-013-B25

SUB PIPE RACK ACR 001

0.08

0.08

630

405

1142

280

H361-013-B27

H361-013-B27

SUB PIPE RACK ACR 001

0.09

0.09

410

406

1181

281

H361-013-B37

H361-013-B37

SUB PIPE RACK ACR 001

0.06

0.06

410

407

731

10

1.31

1.36

750

587

5673

RIL/PTH-J3-0177

BUNDLE

282

H361-013-B29

H361-013-B29

SUB PIPE RACK ACR 001

0.33

0.33

610

465

4617

283

H361-013-B33

H361-013-B33

SUB PIPE RACK ACR 001

0.33

0.33

609

464

4594

284

H361-013-B38

H361-013-B38

SUB PIPE RACK ACR 001

0.36

0.36

410

406

2912

285

H361-013-B41

H361-013-B41

SUB PIPE RACK ACR 001

0.15

0.15

410

416

1201

286

H361-013-B50

H361-013-B50

SUB PIPE RACK ACR 001

2.38

2.38

410

406

5673

287

H361-013-B51

H361-013-B51

SUB PIPE RACK ACR 001

0.34

0.34

410

406

5640

288

H361-013-B52

H361-013-B52

SUB PIPE RACK ACR 001

0.34

0.34

410

406

5607

289

H361-013-B53

H361-013-B53

SUB PIPE RACK ACR 001

0.34

0.34

410

406

5607

290

H361-013-B56

H361-013-B56

SUB PIPE RACK ACR 001

0.34

0.34

410

406

5607

291

H361-013-B84

H361-013-B84

SUB PIPE RACK ACR 001

0.33

0.33

609

464

4593

292

H361-013-SC1

H361-013-SC1

SUB PIPE RACK ACR 001

0.32

0.32

440

440

2530

20

5.55

5.61

1142

966

5673

0.85

0.85

1821

520

5942

0.85

0.89

1821

520

5942

0.63

0.63

1233

520

5942

0.63

0.67

1233

520

5942

293

294

H361-013-B14

H361-013-B15

H361-013-B14

H361-013-B15

RIL/PTH-J3-0178

RIL/PTH-J3-0179

RIL/PTH-J3-0180

BUNDLE

SKID

SKID

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

Page 42 of 137

CBM (m3)

0.53

4.62

2.50

6.26

5.63

3.81

BARGE/ CONTAINER

04/16/2015 09:40:01

DETAIL APCKING LIST 2nd SHIPMENT


JAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number

: 1J/3HM/7558812

Item Code

: 4500190308

Description

: Fabrication Steel Structures

Quantity

: 308 Pckgs

Quantity of Weight

: 1,012.12 TONS

Quantity of Cubic Meters

: 1,713.09 CBM

Shipped from

: Hanjung Private Jetty, Lampung INDONESIA

Shipped to

: Kandla, INDIA

Date of Shipment to India : 22-March-2015

PACK NO.

295

296

297

298

299

300

301

302

303

304

305

306

DRAWING NO.

H361-013-B16

H361-013-B18

H361-013-B22

H361-013-B24

H361-013-B26

H361-013-B28

H361-013-B30

H361-013-B31

H361-013-B32

H361-013-B34

H361-013-B35

H361-013-B36

MARKING NO.

H361-013-B16

H361-013-B18

H361-013-B22

H361-013-B24

H361-013-B26

H361-013-B28

H361-013-B30

H361-013-B31

H361-013-B32

H361-013-B34

H361-013-B35

H361-013-B36

PACKAGE
No.

RIL/PTH-J3-0181

RIL/PTH-J3-0182

RIL/PTH-J3-0183

RIL/PTH-J3-0184

RIL/PTH-J3-0185

RIL/PTH-J3-0186

RIL/PTH-J3-0187

RIL/PTH-J3-0188

RIL/PTH-J3-0189

RIL/PTH-J3-0190

RIL/PTH-J3-0191

RIL/PTH-J3-0192

TYPE

SKID

SKID

SKID

SKID

SKID

BUNDLE

SKID

BUNDLE

SKID

SKID

SKID

SKID

DESCRIPTION

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001


Page 43 of 137

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

CBM (m3)

0.78

0.78

1615

519

5944

0.78

0.83

1615

519

5944

0.37

0.37

410

642

5673

0.37

0.42

410

642

5673

0.36

0.36

609

666

4594

0.36

0.41

609

666

4594

1.86

0.73

0.73

1584

406

5607

3.61

0.73

0.77

1584

406

5607

3.61

0.09

0.09

633

662

1181

0.09

0.15

633

662

1181

0.69

0.69

793

864

4617

0.69

0.76

793

864

4617

0.36

0.36

846

958

4594

0.36

0.43

846

958

4594

0.70

0.70

610

868

4617

0.70

0.76

610

868

4617

2.44

0.37

0.37

610

745

4617

2.10

0.37

0.42

610

745

4617

2.10

0.73

0.73

1165

344

5607

0.73

0.76

1165

344

5607

0.87

0.87

1284

401

5942

0.87

0.91

1284

401

5942

0.06

0.06

659

406

731

4.98

1.49

0.49

3.16

3.72

2.25

3.06

BARGE/ CONTAINER

04/16/2015 09:40:01

DETAIL APCKING LIST 2nd SHIPMENT


JAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number

: 1J/3HM/7558812

Item Code

: 4500190308

Description

: Fabrication Steel Structures

Quantity

: 308 Pckgs

Quantity of Weight

: 1,012.12 TONS

Quantity of Cubic Meters

: 1,713.09 CBM

Shipped from

: Hanjung Private Jetty, Lampung INDONESIA

Shipped to

: Kandla, INDIA

Date of Shipment to India : 22-March-2015

PACK NO.

307

308

309

310

311

312

DRAWING NO.

H361-013-B39

H361-013-B40

H361-013-B42

H361-013-B43

H361-013-B44

H361-013-B45

MARKING NO.

H361-013-B39

H361-013-B40

H361-013-B42

H361-013-B43

H361-013-B44

H361-013-B45

PACKAGE
No.

RIL/PTH-J3-0193

RIL/PTH-J3-0194

RIL/PTH-J3-0195

RIL/PTH-J3-0196

RIL/PTH-J3-0197

RIL/PTH-J3-0198

TYPE

SKID

SKID

SKID

BUNDLE

SKID

SKID

DESCRIPTION

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB PIPE RACK ACR 001

SUB TOTAL D. H361-013 SUB PIPE RACK ACR 001

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

0.06

0.10

659

406

731

0.37

0.37

410

657

5951

0.37

0.42

410

657

5951

0.37

0.37

410

660

5951

0.37

0.43

410

660

5951

0.32

0.32

410

867

4961

0.32

0.38

410

867

4961

0.95

0.95

344

660

4961

0.95

1.00

344

660

4961

0.32

0.32

410

868

4961

0.32

0.39

410

868

4961

0.34

0.34

410

868

4961

0.34

0.40

410

868

4961

176

25.15

27.45

313

H360-009-1HB1

H360-009-1HB1

SULPHUR RECOVERY UNIT APR 002

10

0.68

0.68

200

330

2897

314

H360-009-1HB2

H360-009-1HB2

SULPHUR RECOVERY UNIT APR 002

0.14

0.14

200

330

3039

315

H360-009-1HB3

H360-009-1HB3

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

200

330

2797

316

H360-009-1HB4

H360-009-1HB4

SULPHUR RECOVERY UNIT APR 002

0.15

0.15

200

330

3258

317

H360-009-1HB6

H360-009-1HB6

SULPHUR RECOVERY UNIT APR 002

0.20

0.20

200

330

2866

318

H360-009-1HB7

H360-009-1HB7

SULPHUR RECOVERY UNIT APR 002

0.17

0.17

200

330

3671

319

H360-009-1HB8

H360-009-1HB8

SULPHUR RECOVERY UNIT APR 002

0.27

0.27

200

330

2889

320

H360-009-1HB10

H360-009-1HB10

SULPHUR RECOVERY UNIT APR 002

0.09

0.09

200

330

3863

321

H360-009-1HB11

H360-009-1HB11

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

200

330

2891

322

H360-009-1HB12

H360-009-1HB12

SULPHUR RECOVERY UNIT APR 002

0.09

0.09

200

330

3828

323

H360-009-1HB13

H360-009-1HB13

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

200

330

3053

324

H360-009-1HB14

H360-009-1HB14

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

200

330

2977

325

H360-009-1HB15

H360-009-1HB15

SULPHUR RECOVERY UNIT APR 002

0.23

0.23

200

330

3203

326

H360-009-1VB1

H360-009-1VB1

SULPHUR RECOVERY UNIT APR 002

0.06

0.06

200

330

1201

BUNDLE

Page 44 of 137

0.20

1.60

1.61

1.76

1.13

1.77

1.77
92.64

D. H360-009 SULPHUR RECOVERY UNIT APR 002

RIL/PTH-J3-0199

CBM (m3)

BARGE/ CONTAINER

04/16/2015 09:40:01

DETAIL APCKING LIST 2nd SHIPMENT


JAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number

: 1J/3HM/7558812

Item Code

: 4500190308

Description

: Fabrication Steel Structures

Quantity

: 308 Pckgs

Quantity of Weight

: 1,012.12 TONS

Quantity of Cubic Meters

: 1,713.09 CBM

Shipped from

: Hanjung Private Jetty, Lampung INDONESIA

Shipped to

: Kandla, INDIA

Date of Shipment to India : 22-March-2015

PACK NO.

DRAWING NO.

MARKING NO.

PACKAGE
RIL/PTH-J3-0199
No.

TYPE

BUNDLE

DESCRIPTION

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

327

H360-009-1VB2

H360-009-1VB2

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

330

777

328

H360-009-1VB3

H360-009-1VB3

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

200

330

1899

329

H360-009-1VB4

H360-009-1VB4

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

200

330

1594

330

H360-009-1VB5

H360-009-1VB5

SULPHUR RECOVERY UNIT APR 002

0.08

0.08

200

330

3348

331

H360-009-1VB6

H360-009-1VB6

SULPHUR RECOVERY UNIT APR 002

0.08

0.08

200

330

1625

332

H360-009-1VB7

H360-009-1VB7

SULPHUR RECOVERY UNIT APR 002

0.19

0.19

200

330

3940

333

H360-009-1VB8

H360-009-1VB8

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

200

330

1498

334

H360-009-1VB9

H360-009-1VB9

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

200

330

1392

335

H360-009-1VB10

H360-009-1VB10

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

200

330

1481

336

H360-009-1VB11

H360-009-1VB11

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

200

330

1389

337

H360-009-1VB26

H360-009-1VB26

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

200

330

1388

48

3.00

3.05

698

610

3940

SULPHUR RECOVERY UNIT APR 002

0.06

0.06

200

275

1396

SULPHUR RECOVERY UNIT APR 002

0.01

0.01

200

275

1230

SULPHUR RECOVERY UNIT APR 002

0.01

0.01

200

275

1366

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

200

275

2409

0.13

0.16

326

319

2409

338

H360-009-1HB16

H360-009-1HB16

339

H360-009-1HB17

H360-009-1HB17

340

H360-009-1VB12

H360-009-1VB12

341

H360-009-1VB25

H360-009-1VB25

RIL/PTH-J3-0200

BUNDLE

342

H360-009-1HB5

H360-009-1HB5

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1934

343

H360-009-1HB18

H360-009-1HB18

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

200

290

1589

344

H360-009-1HB19

H360-009-1HB19

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1616

345

H360-009-1HB20

H360-009-1HB20

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

753

346

H360-009-1HB21

H360-009-1HB21

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

200

290

2383

347

H360-009-1HB22

H360-009-1HB22

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

2017

348

H360-009-1HB23

H360-009-1HB23

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1804

349

H360-009-1HB24

H360-009-1HB24

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

200

290

2513

350

H360-009-1HB25

H360-009-1HB25

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

200

290

1967

351

H360-009-1HB26

H360-009-1HB26

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

200

290

1603

352

H360-009-1HB27

H360-009-1HB27

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

200

290

1893

353

H360-009-1HB28

H360-009-1HB28

SULPHUR RECOVERY UNIT APR 002

0.10

0.10

200

290

1914

354

H360-009-1HB29

H360-009-1HB29

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

200

290

1916

355

H360-009-1HB30

H360-009-1HB30

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1819

356

H360-009-1HB31

H360-009-1HB31

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

200

290

1959

357

H360-009-1HB32

H360-009-1HB32

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1560

Page 45 of 137

CBM (m3)

1.68

0.25

BARGE/ CONTAINER

04/16/2015 09:40:01

DETAIL APCKING LIST 2nd SHIPMENT


JAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number

: 1J/3HM/7558812

Item Code

: 4500190308

Description

: Fabrication Steel Structures

Quantity

: 308 Pckgs

Quantity of Weight

: 1,012.12 TONS

Quantity of Cubic Meters

: 1,713.09 CBM

Shipped from

: Hanjung Private Jetty, Lampung INDONESIA

Shipped to

: Kandla, INDIA

Date of Shipment to India : 22-March-2015

PACK NO.

DRAWING NO.

MARKING NO.

PACKAGE
No.

TYPE

DESCRIPTION

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

358

H360-009-1HB33

H360-009-1HB33

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1895

359

H360-009-1HB34

H360-009-1HB34

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1582

360

H360-009-1HB35

H360-009-1HB35

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1622

361

H360-009-1HB36

H360-009-1HB36

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1578

362

H360-009-1HB37

H360-009-1HB37

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

200

290

1542

363

H360-009-1HB38

H360-009-1HB38

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1735

364

H360-009-1HB39

H360-009-1HB39

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1690

365

H360-009-1HB40

H360-009-1HB40

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1758

366

H360-009-1HB41

H360-009-1HB41

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1455

367

H360-009-1HB42

H360-009-1HB42

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

2208

368

H360-009-1HB43

H360-009-1HB43

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1865

369

H360-009-1HB44

H360-009-1HB44

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1960

370

H360-009-1HB45

H360-009-1HB45

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1756

371

H360-009-1HB46

H360-009-1HB46

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1576

372

H360-009-1HB47

H360-009-1HB47

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1503

373

H360-009-1HB48

H360-009-1HB48

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1872

374

H360-009-1HB49

H360-009-1HB49

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1591

375

H360-009-1HB50

H360-009-1HB50

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1439

376

H360-009-1HB51

H360-009-1HB51

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

200

290

1816

377

H360-009-1HB52

H360-009-1HB52

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1626

378

H360-009-1HB53

H360-009-1HB53

SULPHUR RECOVERY UNIT APR 002

0.06

0.06

200

290

2864

379

H360-009-1HB54

H360-009-1HB54

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1787

380

H360-009-1HB55

H360-009-1HB55

SULPHUR RECOVERY UNIT APR 002

0.01

0.01

200

290

1235

381

H360-009-1HB56

H360-009-1HB56

SULPHUR RECOVERY UNIT APR 002

0.01

0.01

200

290

1260

382

H360-009-1HB57

H360-009-1HB57

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1953

383

H360-009-1HB58

H360-009-1HB58

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1476

384

H360-009-1HB59

H360-009-1HB59

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1783

385

H360-009-1HB60

H360-009-1HB60

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1416

386

H360-009-1HB61

H360-009-1HB61

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1387

387

H360-009-1HB62

H360-009-1HB62

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1938

388

H360-009-1HB63

H360-009-1HB63

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1803

389

H360-009-1HB64

H360-009-1HB64

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1749

390

H360-009-1HB65

H360-009-1HB65

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

200

290

1227

391

H360-009-1HB66

H360-009-1HB66

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

200

290

1979

392

H360-009-1HB67

H360-009-1HB67

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1763

RIL/PTH-J3-0201

BUNDLE

Page 46 of 137

CBM (m3)

BARGE/ CONTAINER

04/16/2015 09:40:01
RIL/PTH-J3-0201

BUNDLE

Purchase Order Number

: 1J/3HM/7558812

Item Code

: 4500190308

Description

: Fabrication Steel Structures

Quantity

: 308 Pckgs

Quantity of Weight

: 1,012.12 TONS

Quantity of Cubic Meters

: 1,713.09 CBM

Shipped from

: Hanjung Private Jetty, Lampung INDONESIA

Shipped to

: Kandla, INDIA

DETAIL APCKING LIST 2nd SHIPMENT


JAMNAGAR 3 (J3) GASIFICATION PROJECT

Date of Shipment to India : 22-March-2015

PACK NO.

DRAWING NO.

MARKING NO.

PACKAGE
No.

TYPE

DESCRIPTION

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

393

H360-009-1HB68

H360-009-1HB68

SULPHUR RECOVERY UNIT APR 002

0.01

0.01

200

290

1351

394

H360-009-1HB69

H360-009-1HB69

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1921

395

H360-009-1HB70

H360-009-1HB70

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

200

290

3445

396

H360-009-1HB71

H360-009-1HB71

SULPHUR RECOVERY UNIT APR 002

0.01

0.01

200

290

1378

397

H360-009-1HB72

H360-009-1HB72

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

2005

398

H360-009-1HB73

H360-009-1HB73

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1954

399

H360-009-1HB74

H360-009-1HB74

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1638

400

H360-009-1HB75

H360-009-1HB75

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1946

401

H360-009-1HB76

H360-009-1HB76

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1463

402

H360-009-1HB77

H360-009-1HB77

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1809

403

H360-009-1HB78

H360-009-1HB78

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1517

404

H360-009-1HB79

H360-009-1HB79

SULPHUR RECOVERY UNIT APR 002

0.01

0.01

200

290

1366

405

H360-009-1HB80

H360-009-1HB80

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1437

406

H360-009-1HB81

H360-009-1HB81

SULPHUR RECOVERY UNIT APR 002

0.01

0.01

200

290

1085

407

H360-009-1VB23

H360-009-1VB23

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

200

290

3480

408

H360-009-1VB24

H360-009-1VB24

SULPHUR RECOVERY UNIT APR 002

0.01

0.01

200

290

580

83

1.58

1.66

585

624

3480

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

300

250

1084

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

300

250

1099

0.04

0.07

330

229

1099

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

350

275

876

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

350

275

969

0.03

0.06

386

254

969

409

H360-009-1B123

H360-009-1B123

410

H360-009-1B124

H360-009-1B124

411

H360-009-1B254

H360-009-1B254

412

H360-009-1B255

H360-009-1B255

RIL/PTH-J3-0202

RIL/PTH-J3-0203

BUNDLE

BUNDLE

413

H360-009-1B166

H360-009-1B166

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1464

414

H360-009-1B168

H360-009-1B168

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1563

415

H360-009-1B171

H360-009-1B171

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1463

416

H360-009-1B172

H360-009-1B172

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1463

417

H360-009-1B173

H360-009-1B173

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1463

418

H360-009-1B175

H360-009-1B175

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1463

419

H360-009-1B179

H360-009-1B179

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1164

420

H360-009-1B180

H360-009-1B180

SULPHUR RECOVERY UNIT APR 002

0.05

0.05

400

275

1464

421

H360-009-1B181

H360-009-1B181

SULPHUR RECOVERY UNIT APR 002

0.05

0.05

400

275

1464

Page 47 of 137

RIL/PTH-J3-0204

BUNDLE

CBM (m3)

1.27

0.08

0.10

BARGE/ CONTAINER

04/16/2015 09:40:01

DETAIL APCKING LIST 2nd SHIPMENT


JAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number

: 1J/3HM/7558812

Item Code

: 4500190308

Description

: Fabrication Steel Structures

Quantity

: 308 Pckgs

Quantity of Weight

: 1,012.12 TONS

Quantity of Cubic Meters

: 1,713.09 CBM

Shipped from

: Hanjung Private Jetty, Lampung INDONESIA

Shipped to

: Kandla, INDIA

Date of Shipment to India : 22-March-2015

PACK NO.

DRAWING NO.

MARKING NO.

PACKAGE
No.

TYPE

DESCRIPTION

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

422

H360-009-1B182

H360-009-1B182

SULPHUR RECOVERY UNIT APR 002

0.05

0.05

400

275

1464

423

H360-009-1B187

H360-009-1B187

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1461

424

H360-009-1B189

H360-009-1B189

SULPHUR RECOVERY UNIT APR 002

0.67

0.67

400

275

2961

425

H360-009-1B191

H360-009-1B191

SULPHUR RECOVERY UNIT APR 002

0.67

0.67

400

275

2961

426

H360-009-1B192

H360-009-1B192

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1411

427

H360-009-1B196

H360-009-1B196

SULPHUR RECOVERY UNIT APR 002

0.10

0.10

400

275

2860

428

H360-009-1B197

H360-009-1B197

SULPHUR RECOVERY UNIT APR 002

0.10

0.10

400

275

2860

429

H360-009-1B199

H360-009-1B199

SULPHUR RECOVERY UNIT APR 002

0.08

0.08

400

275

2960

430

H360-009-1B200

H360-009-1B200

SULPHUR RECOVERY UNIT APR 002

0.08

0.08

400

275

2860

431

H360-009-1B204

H360-009-1B204

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1463

432

H360-009-1B206

H360-009-1B206

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1363

433

H360-009-1B208

H360-009-1B208

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1463

434

H360-009-1B209

H360-009-1B209

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1463

36

2.39

2.45

950

920

2961

RIL/PTH-J3-0204

BUNDLE

435

H360-009-1B167

H360-009-1B167

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

400

275

1563

436

H360-009-1B169

H360-009-1B169

SULPHUR RECOVERY UNIT APR 002

10

0.34

0.34

400

275

1464

437

H360-009-1B170

H360-009-1B170

SULPHUR RECOVERY UNIT APR 002

0.17

0.17

400

275

1463

438

H360-009-1B174

H360-009-1B174

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1463

439

H360-009-1B176

H360-009-1B176

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

400

275

1463

440

H360-009-1B177

H360-009-1B177

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

400

275

2964

441

H360-009-1B178

H360-009-1B178

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1164

442

H360-009-1B183

H360-009-1B183

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

400

275

874

443

H360-009-1B184

H360-009-1B184

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1240

444

H360-009-1B185

H360-009-1B185

SULPHUR RECOVERY UNIT APR 002

0.21

0.21

400

275

1461

445

H360-009-1B186

H360-009-1B186

SULPHUR RECOVERY UNIT APR 002

0.21

0.21

400

275

1461

446

H360-009-1B188

H360-009-1B188

SULPHUR RECOVERY UNIT APR 002

0.28

0.28

400

275

2961

447

H360-009-1B190

H360-009-1B190

SULPHUR RECOVERY UNIT APR 002

0.35

0.35

400

275

2961

448

H360-009-1B193

H360-009-1B193

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1476

449

H360-009-1B194

H360-009-1B194

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1476

450

H360-009-1B195

H360-009-1B195

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

400

275

836

451

H360-009-1B198

H360-009-1B198

SULPHUR RECOVERY UNIT APR 002

0.14

0.14

400

275

2960

452

H360-009-1B201

H360-009-1B201

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

400

275

857

453

H360-009-1B202

H360-009-1B202

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1459

454

H360-009-1B203

H360-009-1B203

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1463

RIL/PTH-J3-0205

BUNDLE

Page 48 of 137

CBM (m3)

2.59

BARGE/ CONTAINER

04/16/2015 09:40:01

DETAIL APCKING LIST 2nd SHIPMENT


JAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number

: 1J/3HM/7558812

Item Code

: 4500190308

Description

: Fabrication Steel Structures

Quantity

: 308 Pckgs

Quantity of Weight

: 1,012.12 TONS

Quantity of Cubic Meters

: 1,713.09 CBM

Shipped from

: Hanjung Private Jetty, Lampung INDONESIA

Shipped to

: Kandla, INDIA

Date of Shipment to India : 22-March-2015


RIL/PTH-J3-0205

PACK NO.

DRAWING NO.

MARKING NO.

PACKAGE
No.

BUNDLE

TYPE

DESCRIPTION

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

455

H360-009-1B205

H360-009-1B205

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1363

456

H360-009-1B207

H360-009-1B207

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

400

275

1463

457

H360-009-1B210

H360-009-1B210

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1178

458

H360-009-1B211

H360-009-1B211

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1463

459

H360-009-1B212

H360-009-1B212

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1463

460

H360-009-1B213

H360-009-1B213

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

400

275

860

461

H360-009-1B214

H360-009-1B214

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1260

462

H360-009-1B215

H360-009-1B215

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

400

275

964

463

H360-009-1B216

H360-009-1B216

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1164

464

H360-009-1B217

H360-009-1B217

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1494

465

H360-009-1B218

H360-009-1B218

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1164

466

H360-009-1B219

H360-009-1B219

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

400

275

2954

68

2.67

2.79

1087

1278

2964

0.05

0.05

352

289

312

0.05

0.08

352

289

312
1163

467

H360-009-1CT27

H360-009-1CT27

RIL/PTH-J3-0206

BUNDLE

SULPHUR RECOVERY UNIT APR 002

468

H360-009-1B115

H360-009-1B115

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

679

374

469

H360-009-1B116

H360-009-1B116

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

679

374

1163

470

H360-009-1B118

H360-009-1B118

SULPHUR RECOVERY UNIT APR 002

0.14

0.14

403

364

5585

471

H360-009-1B119

H360-009-1B119

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

599

343

1547

472

H360-009-1B120

H360-009-1B120

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

601

344

1547

473

H360-009-1B121

H360-009-1B121

SULPHUR RECOVERY UNIT APR 002

0.08

0.08

403

333

1596

474

H360-009-1B128

H360-009-1B128

SULPHUR RECOVERY UNIT APR 002

0.08

0.08

403

333

2959

475

H360-009-1B133

H360-009-1B133

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

403

333

1413

476

H360-009-1B134

H360-009-1B134

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

403

333

1463

477

H360-009-1B135

H360-009-1B135

SULPHUR RECOVERY UNIT APR 002

0.14

0.14

403

333

5462

478

H360-009-1B136

H360-009-1B136

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

403

333

712

479

H360-009-1B138

H360-009-1B138

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

403

333

1746

480

H360-009-1B139

H360-009-1B139

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

403

333

1746

481

H360-009-1B140

H360-009-1B140

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

403

333

1461

482

H360-009-1B141

H360-009-1B141

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

403

333

2961

483

H360-009-1B142

H360-009-1B142

SULPHUR RECOVERY UNIT APR 002

0.08

0.08

403

333

2961

484

H360-009-1B143

H360-009-1B143

SULPHUR RECOVERY UNIT APR 002

0.08

0.08

403

333

2961

485

H360-009-1B145

H360-009-1B145

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

403

333

2961

RIL/PTH-J3-0207

BUNDLE

Page 49 of 137

CBM (m3)

4.12

0.03

BARGE/ CONTAINER

04/16/2015 09:40:01

DETAIL APCKING LIST 2nd SHIPMENT


JAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number

: 1J/3HM/7558812

Item Code

: 4500190308

Description

: Fabrication Steel Structures

Quantity

: 308 Pckgs

Quantity of Weight

: 1,012.12 TONS

Quantity of Cubic Meters

: 1,713.09 CBM

Shipped from

: Hanjung Private Jetty, Lampung INDONESIA

Shipped to

: Kandla, INDIA

Date of Shipment to India : 22-March-2015

PACK NO.

DRAWING NO.

MARKING NO.

RIL/PTH-J3-0207
PACKAGE

No.

BUNDLE

TYPE

DESCRIPTION

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

486

H360-009-1B146

H360-009-1B146

SULPHUR RECOVERY UNIT APR 002

0.09

0.09

403

333

487

H360-009-1B147

H360-009-1B147

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

403

333

1176

488

H360-009-1B151

H360-009-1B151

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

403

333

2960

489

H360-009-1B154

H360-009-1B154

SULPHUR RECOVERY UNIT APR 002

0.15

0.15

403

333

5464

490

H360-009-1B157

H360-009-1B157

SULPHUR RECOVERY UNIT APR 002

0.15

0.15

403

333

5964

491

H360-009-1B158

H360-009-1B158

SULPHUR RECOVERY UNIT APR 002

0.15

0.15

403

333

5964

492

H360-009-1B161

H360-009-1B161

SULPHUR RECOVERY UNIT APR 002

0.05

0.05

403

333

1764

493

H360-009-1B163

H360-009-1B163

SULPHUR RECOVERY UNIT APR 002

0.05

0.05

403

333

1514

494

H360-009-1B164

H360-009-1B164

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

403

333

1463

495

H360-009-1B165

H360-009-1B165

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

403

333

763

496

H360-009-1FR10

H360-009-1FR10

SULPHUR RECOVERY UNIT APR 002

0.08

0.08

403

333

1355

497

H360-009-1SC2

H360-009-1SC2

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

403

333

508

498

H360-009-1SC3

H360-009-1SC3

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

403

333

508

33

2.09

2.22

1372

1314

5964

2961

499

H360-009-1CT28

H360-009-1CT28

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

403

333

1988

500

H360-009-1CT29

H360-009-1CT29

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

403

333

778

501

H360-009-1CT30

H360-009-1CT30

SULPHUR RECOVERY UNIT APR 002

0.08

0.08

403

333

548

502

H360-009-1CT31

H360-009-1CT31

SULPHUR RECOVERY UNIT APR 002

0.05

0.05

403

333

548

503

H360-009-1CT32

H360-009-1CT32

SULPHUR RECOVERY UNIT APR 002

0.05

0.05

403

333

1188

0.32

0.46

1180

1457

1988

0.05

0.05

680

375

1463

0.05

0.09

680

375

1463

0.11

0.11

682

591

3093

0.11

0.16

682

591

3093

0.05

0.05

403

333

1463

0.05

0.08

403

333

1463

0.08

0.08

403

333

2899

0.08

0.12

403

333

2899

0.08

0.08

403

333

2963

504

505

506

507

508

H360-009-1B114

H360-009-1B117

H360-009-1B122

H360-009-1B125

H360-009-1B126

H360-009-1B114

H360-009-1B117

H360-009-1B122

H360-009-1B125

H360-009-1B126

RIL/PTH-J3-0208

RIL/PTH-J3-0209

RIL/PTH-J3-0210

RIL/PTH-J3-0211

RIL/PTH-J3-0212

RIL/PTH-J3-0213

BUNDLE

SKID

SKID

SKID

SKID

SKID

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002


Page 50 of 137

CBM (m3)

10.75

3.42

0.37

1.25

0.20

0.39

BARGE/ CONTAINER

04/16/2015 09:40:01

DETAIL APCKING LIST 2nd SHIPMENT


JAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number

: 1J/3HM/7558812

Item Code

: 4500190308

Description

: Fabrication Steel Structures

Quantity

: 308 Pckgs

Quantity of Weight

: 1,012.12 TONS

Quantity of Cubic Meters

: 1,713.09 CBM

Shipped from

: Hanjung Private Jetty, Lampung INDONESIA

Shipped to

: Kandla, INDIA

Date of Shipment to India : 22-March-2015

PACK NO.

509

510

511

512

513

514

515

516

517

518

519

DRAWING NO.

H360-009-1B127

H360-009-1B129

H360-009-1B130

H360-009-1B131

H360-009-1B132

H360-009-1B137

H360-009-1B144

H360-009-1B148

H360-009-1B149

H360-009-1B150

H360-009-1B152

MARKING NO.

H360-009-1B127

H360-009-1B129

H360-009-1B130

H360-009-1B131

H360-009-1B132

H360-009-1B137

H360-009-1B144

H360-009-1B148

H360-009-1B149

H360-009-1B150

H360-009-1B152

PACKAGE
No.

RIL/PTH-J3-0214

RIL/PTH-J3-0215

RIL/PTH-J3-0216

RIL/PTH-J3-0217

RIL/PTH-J3-0218

RIL/PTH-J3-0219

RIL/PTH-J3-0220

RIL/PTH-J3-0221

RIL/PTH-J3-0222

RIL/PTH-J3-0223

RIL/PTH-J3-0224

TYPE

SKID

SKID

SKID

SKID

SKID

SKID

SKID

SKID

SKID

BUNDLE

SKID

DESCRIPTION

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

Page 51 of 137

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

0.08

0.12

403

333

2963

0.05

0.05

403

333

1459

0.05

0.09

403

333

1459

0.10

0.10

403

333

2964

0.10

0.13

403

333

2964

0.09

0.09

403

333

2964

0.09

0.13

403

333

2964

0.09

0.09

403

333

2964

0.09

0.12

403

333

2964

0.09

0.09

403

333

2964

0.09

0.12

403

333

2964

0.05

0.05

403

333

1459

0.05

0.09

403

333

1459

0.04

0.04

403

333

1411

0.04

0.08

403

333

1411

0.10

0.10

403

333

2860

0.10

0.13

403

333

2860

0.09

0.09

403

333

2860

0.09

0.13

403

333

2860

0.10

0.10

403

333

1461

0.10

0.13

403

333

1461

0.06

0.06

403

333

1348

0.06

0.09

403

333

1348

CBM (m3)

0.40

0.20

0.40

0.40

0.40

0.40

0.20

0.19

0.38

0.38

0.20

0.18

BARGE/ CONTAINER

04/16/2015 09:40:01

DETAIL APCKING LIST 2nd SHIPMENT


JAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number

: 1J/3HM/7558812

Item Code

: 4500190308

Description

: Fabrication Steel Structures

Quantity

: 308 Pckgs

Quantity of Weight

: 1,012.12 TONS

Quantity of Cubic Meters

: 1,713.09 CBM

Shipped from

: Hanjung Private Jetty, Lampung INDONESIA

Shipped to

: Kandla, INDIA

Date of Shipment to India : 22-March-2015

PACK NO.

520

521

522

523

524

525

526

527

528

529

530

DRAWING NO.

H360-009-1B153

H360-009-1B155

H360-009-1B156

H360-009-1B159

H360-009-1B160

H360-009-1B162

H360-009-1B259

H360-009-1FR6

H360-009-1FR7

H360-009-1FR8

H360-009-1FR9

MARKING NO.

H360-009-1B153

H360-009-1B155

H360-009-1B156

H360-009-1B159

H360-009-1B160

H360-009-1B162

H360-009-1B259

H360-009-1FR6

H360-009-1FR7

H360-009-1FR8

H360-009-1FR9

PACKAGE
No.
RIL/PTH-J3-0225

RIL/PTH-J3-0226

RIL/PTH-J3-0227

RIL/PTH-J3-0228

RIL/PTH-J3-0229

RIL/PTH-J3-0230

RIL/PTH-J3-0231

RIL/PTH-J3-0232

RIL/PTH-J3-0233

RIL/PTH-J3-0234

RIL/PTH-J3-0235

TYPE

SKID

SKID

SKID

SKID

SKID

SKID

SKID

SKID

SKID

SKID

SKID

DESCRIPTION

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

0.12

0.12

403

333

3093

0.12

0.15

403

333

3093

0.15

0.15

403

333

5464

0.15

0.19

403

333

5464

0.17

0.17

403

333

5964

0.17

0.20

403

333

5964

0.07

0.07

403

333

2364

0.07

0.11

403

333

2364

0.08

0.08

403

333

2364

0.08

0.11

403

333

2364

0.23

0.23

403

333

7882

0.23

0.27

403

333

7882

0.09

0.09

403

333

3062

0.09

0.13

403

333

3062

0.35

0.35

403

333

1744

0.35

0.39

403

333

1744

0.19

0.19

403

333

647

0.19

0.22

403

333

647

0.18

0.18

403

333

647

0.18

0.21

403

333

647

0.16

0.16

403

333

1850

0.16

0.19

403

333

1850

531

H360-009-1B40

H360-009-1B40

SULPHUR RECOVERY UNIT APR 002

0.10

0.10

456

346

2834

532

H360-009-1B42

H360-009-1B42

SULPHUR RECOVERY UNIT APR 002

0.76

0.76

456

346

3963

Page 52 of 137

RIL/PTH-J3-0236

BUNDLE

CBM (m3)

0.42

0.73

0.80

0.32

0.32

1.06

0.41

0.23

0.09

0.09

0.25

BARGE/ CONTAINER

04/16/2015 09:40:01

DETAIL APCKING LIST 2nd SHIPMENT


JAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number

: 1J/3HM/7558812

Item Code

: 4500190308

Description

: Fabrication Steel Structures

Quantity

: 308 Pckgs

Quantity of Weight

: 1,012.12 TONS

Quantity of Cubic Meters

: 1,713.09 CBM

Shipped from

: Hanjung Private Jetty, Lampung INDONESIA

Shipped to

: Kandla, INDIA

Date of Shipment to India : 22-March-2015

PACK NO.

DRAWING NO.

MARKING NO.

PACKAGE
No.

TYPE

DESCRIPTION

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

533

H360-009-1B43

H360-009-1B43

SULPHUR RECOVERY UNIT APR 002

0.60

0.60

456

346

3963

534

H360-009-1B44

H360-009-1B44

SULPHUR RECOVERY UNIT APR 002

0.15

0.15

456

347

3963

535

H360-009-1B45

H360-009-1B45

SULPHUR RECOVERY UNIT APR 002

0.23

0.23

455

356

5963

536

H360-009-1B49

H360-009-1B49

SULPHUR RECOVERY UNIT APR 002

0.12

0.12

456

346

2963

537

H360-009-1B50

H360-009-1B50

SULPHUR RECOVERY UNIT APR 002

0.16

0.16

456

347

3963

538

H360-009-1B52

H360-009-1B52

SULPHUR RECOVERY UNIT APR 002

0.15

0.15

456

346

3962

539

H360-009-1B56

H360-009-1B56

SULPHUR RECOVERY UNIT APR 002

1.04

1.04

456

347

5585

540

H360-009-1B57

H360-009-1B57

SULPHUR RECOVERY UNIT APR 002

0.05

0.05

276

456

1463

21

3.37

3.50

1218

1262

5963

RIL/PTH-J3-0236

BUNDLE

541

H360-009-1B41

H360-009-1B41

SULPHUR RECOVERY UNIT APR 002

0.12

0.12

725

347

2834

542

H360-009-1B58

H360-009-1B58

SULPHUR RECOVERY UNIT APR 002

0.11

0.11

957

406

1463

543

H360-009-1B59

H360-009-1B59

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

456

565

1463

544

H360-009-1B60

H360-009-1B60

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

456

565

1463

545

H360-009-1B72

H360-009-1B72

SULPHUR RECOVERY UNIT APR 002

0.09

0.09

1057

347

1160

546

H360-009-1B78

H360-009-1B78

SULPHUR RECOVERY UNIT APR 002

0.10

0.10

1121

346

1460

547

H360-009-1B81

H360-009-1B81

SULPHUR RECOVERY UNIT APR 002

0.21

0.21

640

346

5461

548

H360-009-1B85

H360-009-1B85

SULPHUR RECOVERY UNIT APR 002

0.11

0.11

1056

347

1659

549

H360-009-1B90

H360-009-1B90

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

734

471

1394

550

H360-009-1B69

H360-009-1B69

SULPHUR RECOVERY UNIT APR 002

0.08

0.08

456

565

1949

551

H360-009-1B74

H360-009-1B74

SULPHUR RECOVERY UNIT APR 002

0.11

0.11

456

347

2963

552

H360-009-1B73

H360-009-1B73

SULPHUR RECOVERY UNIT APR 002

0.55

0.55

347

456

2963

553

H360-009-1B75

H360-009-1B75

SULPHUR RECOVERY UNIT APR 002

0.11

0.11

456

371

2963

554

H360-009-1B76

H360-009-1B76

SULPHUR RECOVERY UNIT APR 002

0.15

0.15

456

347

3962

555

H360-009-1B77

H360-009-1B77

SULPHUR RECOVERY UNIT APR 002

0.15

0.15

456

347

3962

556

H360-009-1B82

H360-009-1B82

SULPHUR RECOVERY UNIT APR 002

0.21

0.21

457

357

5461

557

H360-009-1B84

H360-009-1B84

SULPHUR RECOVERY UNIT APR 002

0.12

0.12

346

456

1659

558

H360-009-1SC4

H360-009-1SC4

SULPHUR RECOVERY UNIT APR 002

0.11

0.11

454

346

1332

24

2.56

2.75

1121

2042

5461

0.14

0.14

456

566

1464

0.14

0.19

456

566

1464

0.22

0.22

456

787

5460

0.22

0.28

456

787

5460

559

560

H360-009-1B46

H360-009-1B47

H360-009-1B46

H360-009-1B47

RIL/PTH-J3-0237

RIL/PTH-J3-0238

RIL/PTH-J3-0239

BUNDLE

BUNDLE

SKID

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

Page 53 of 137

CBM (m3)

9.17

12.50

0.38

1.96

BARGE/ CONTAINER

04/16/2015 09:40:01

DETAIL APCKING LIST 2nd SHIPMENT


JAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number

: 1J/3HM/7558812

Item Code

: 4500190308

Description

: Fabrication Steel Structures

Quantity

: 308 Pckgs

Quantity of Weight

: 1,012.12 TONS

Quantity of Cubic Meters

: 1,713.09 CBM

Shipped from

: Hanjung Private Jetty, Lampung INDONESIA

Shipped to

: Kandla, INDIA

Date of Shipment to India : 22-March-2015

PACK NO.

561

562

563

564

565

566

567

568

569

570

571

572

DRAWING NO.

H360-009-1B48

H360-009-1B51

H360-009-1B53

H360-009-1B54

H360-009-1B55

H360-009-1B61

H360-009-1B62

H360-009-1B63

H360-009-1B64

H360-009-1B65

H360-009-1B66

H360-009-1B67

MARKING NO.

H360-009-1B48

H360-009-1B51

H360-009-1B53

H360-009-1B54

H360-009-1B55

H360-009-1B61

H360-009-1B62

H360-009-1B63

H360-009-1B64

H360-009-1B65

H360-009-1B66

H360-009-1B67

PACKAGE
No.

RIL/PTH-J3-0240

RIL/PTH-J3-0241

RIL/PTH-J3-0242

RIL/PTH-J3-0243

RIL/PTH-J3-0244

RIL/PTH-J3-0245

RIL/PTH-J3-0246

RIL/PTH-J3-0247

RIL/PTH-J3-0248

RIL/PTH-J3-0249

RIL/PTH-J3-0250

RIL/PTH-J3-0251

TYPE

SKID

SKID

SKID

SKID

BUNDLE

SKID

SKID

SKID

BUNDLE

SKID

SKID

SKID

DESCRIPTION

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002


Page 54 of 137

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

0.23

0.23

455

885

5460

0.23

0.29

455

885

5460

0.25

0.25

455

845

5462

0.25

0.31

455

845

5462

0.18

0.18

455

696

3962

0.18

0.23

455

696

3962

0.18

0.18

456

699

3963

0.18

0.23

456

699

3963

1.19

1.19

634

456

5585

1.19

1.23

634

456

5585

0.28

0.28

851

1010

5462

0.28

0.35

851

1010

5462

0.23

0.23

850

822

5462

0.23

0.29

850

822

5462

0.23

0.23

850

612

5462

0.23

0.28

850

612

5462

1.07

1.07

641

346

5462

1.07

1.11

641

346

5462

0.22

0.22

456

817

5462

0.22

0.28

456

817

5462

0.23

0.23

455

814

5462

0.23

0.29

455

814

5462

0.22

0.22

456

574

5462

CBM (m3)

2.20

2.10

1.25

1.26

1.61

4.69

3.82

2.84

1.21

2.03

2.02

BARGE/ CONTAINER

04/16/2015 09:40:01

DETAIL APCKING LIST 2nd SHIPMENT


JAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number

: 1J/3HM/7558812

Item Code

: 4500190308

Description

: Fabrication Steel Structures

Quantity

: 308 Pckgs

Quantity of Weight

: 1,012.12 TONS

Quantity of Cubic Meters

: 1,713.09 CBM

Shipped from

: Hanjung Private Jetty, Lampung INDONESIA

Shipped to

: Kandla, INDIA

Date of Shipment to India : 22-March-2015

PACK NO.

573

574

DRAWING NO.

H360-009-1B68

H360-009-1B70

MARKING NO.

H360-009-1B68

H360-009-1B70

PACKAGE
No.

RIL/PTH-J3-0252

RIL/PTH-J3-0253

TYPE

SKID

BUNDLE

DESCRIPTION

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SUB TOTAL D. H360-009 SULPHUR RECOVERY UNIT APR 002

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

0.22

0.27

456

574

5462

0.23

0.23

456

847

5462

0.23

0.29

456

847

5462

0.67

0.67

456

849

5462

0.67

0.74

456

849

5462

396

27.02

29.88

575

H361-009-1HB1

H361-009-1HB1

SULPHUR RECOVERY UNIT APR 002

10

0.68

0.68

200

330

2897

576

H361-009-1HB2

H361-009-1HB2

SULPHUR RECOVERY UNIT APR 002

0.14

0.14

200

330

3039

577

H361-009-1HB3

H361-009-1HB3

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

200

330

2797

578

H361-009-1HB4

H361-009-1HB4

SULPHUR RECOVERY UNIT APR 002

0.15

0.15

200

330

3258

579

H361-009-1HB6

H361-009-1HB6

SULPHUR RECOVERY UNIT APR 002

0.20

0.20

200

330

2866

580

H361-009-1HB7

H361-009-1HB7

SULPHUR RECOVERY UNIT APR 002

0.17

0.17

200

330

3671

581

H361-009-1HB8

H361-009-1HB8

SULPHUR RECOVERY UNIT APR 002

0.27

0.27

200

330

2889

582

H361-009-1HB10

H361-009-1HB10

SULPHUR RECOVERY UNIT APR 002

0.09

0.09

200

330

3863

583

H361-009-1HB11

H361-009-1HB11

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

200

330

2891

584

H361-009-1HB12

H361-009-1HB12

SULPHUR RECOVERY UNIT APR 002

0.09

0.09

200

330

3828

585

H361-009-1HB13

H361-009-1HB13

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

200

330

3053

586

H361-009-1HB14

H361-009-1HB14

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

200

330

2977

587

H361-009-1HB15

H361-009-1HB15

SULPHUR RECOVERY UNIT APR 002

0.23

0.23

200

330

3203

588

H361-009-1VB1

H361-009-1VB1

SULPHUR RECOVERY UNIT APR 002

0.06

0.06

200

330

1201

589

H361-009-1VB2

H361-009-1VB2

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

330

777

590

H361-009-1VB3

H361-009-1VB3

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

200

330

1899

591

H361-009-1VB4

H361-009-1VB4

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

200

330

1594

592

H361-009-1VB5

H361-009-1VB5

SULPHUR RECOVERY UNIT APR 002

0.08

0.08

200

330

3348

593

H361-009-1VB6

H361-009-1VB6

SULPHUR RECOVERY UNIT APR 002

0.08

0.08

200

330

1625

594

H361-009-1VB7

H361-009-1VB7

SULPHUR RECOVERY UNIT APR 002

0.19

0.19

200

330

3940

595

H361-009-1VB8

H361-009-1VB8

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

200

330

1498

596

H361-009-1VB9

H361-009-1VB9

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

200

330

1392

597

H361-009-1VB10

H361-009-1VB10

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

200

330

1481

598

H361-009-1VB11

H361-009-1VB11

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

200

330

1389

599

H361-009-1VB26

H361-009-1VB26

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

200

330

1388

BUNDLE

Page 55 of 137

1.43

2.11

2.11
89.62

E. H361-009 SULPHUR RECOVERY UNIT APR 002

RIL/PTH-J3-0254

CBM (m3)

BARGE/ CONTAINER

04/16/2015 09:40:01

DETAIL APCKING LIST 2nd SHIPMENT


JAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number

: 1J/3HM/7558812

Item Code

: 4500190308

Description

: Fabrication Steel Structures

Quantity

: 308 Pckgs

Quantity of Weight

: 1,012.12 TONS

Quantity of Cubic Meters

: 1,713.09 CBM

Shipped from

: Hanjung Private Jetty, Lampung INDONESIA

Shipped to

: Kandla, INDIA

Date of Shipment to India : 22-March-2015

PACK NO.

DRAWING NO.

MARKING NO.

PACKAGE
No.

TYPE

DESCRIPTION

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

48

3.00

3.05

698

610

3940

600

H361-009-1HB16

H361-009-1HB16

SULPHUR RECOVERY UNIT APR 002

0.06

0.06

200

275

1396

601

H361-009-1HB17

H361-009-1HB17

SULPHUR RECOVERY UNIT APR 002

0.01

0.01

200

275

1230

602

H361-009-1VB12

H361-009-1VB12

SULPHUR RECOVERY UNIT APR 002

0.01

0.01

200

275

1366

603

H361-009-1VB25

H361-009-1VB25

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

200

275

2409

0.13

0.16

326

319

2409

RIL/PTH-J3-0255

BUNDLE

604

H361-009-1HB5

H361-009-1HB5

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1934

605

H361-009-1HB18

H361-009-1HB18

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

200

290

1589

606

H361-009-1HB19

H361-009-1HB19

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1616

607

H361-009-1HB20

H361-009-1HB20

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

753

608

H361-009-1HB21

H361-009-1HB21

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

200

290

2383

609

H361-009-1HB22

H361-009-1HB22

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

2017

610

H361-009-1HB23

H361-009-1HB23

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1804

611

H361-009-1HB24

H361-009-1HB24

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

200

290

2513

612

H361-009-1HB25

H361-009-1HB25

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

200

290

1967

613

H361-009-1HB26

H361-009-1HB26

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

200

290

1603

614

H361-009-1HB27

H361-009-1HB27

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

200

290

1893

615

H361-009-1HB28

H361-009-1HB28

SULPHUR RECOVERY UNIT APR 002

0.10

0.10

200

290

1914

616

H361-009-1HB29

H361-009-1HB29

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

200

290

1916

617

H361-009-1HB30

H361-009-1HB30

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1819

618

H361-009-1HB31

H361-009-1HB31

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

200

290

1959

619

H361-009-1HB32

H361-009-1HB32

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1560

620

H361-009-1HB33

H361-009-1HB33

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1895

621

H361-009-1HB34

H361-009-1HB34

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1582

622

H361-009-1HB35

H361-009-1HB35

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1622

623

H361-009-1HB36

H361-009-1HB36

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1578

624

H361-009-1HB37

H361-009-1HB37

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

200

290

1542

625

H361-009-1HB38

H361-009-1HB38

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1735

626

H361-009-1HB39

H361-009-1HB39

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1690

627

H361-009-1HB40

H361-009-1HB40

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1758

628

H361-009-1HB41

H361-009-1HB41

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1455

629

H361-009-1HB42

H361-009-1HB42

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

2208

630

H361-009-1HB43

H361-009-1HB43

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1865

Page 56 of 137

CBM (m3)

1.68

0.25

BARGE/ CONTAINER

04/16/2015 09:40:01

DETAIL APCKING LIST 2nd SHIPMENT


JAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number

: 1J/3HM/7558812

Item Code

: 4500190308

Description

: Fabrication Steel Structures

Quantity

: 308 Pckgs

Quantity of Weight

: 1,012.12 TONS

Quantity of Cubic Meters

: 1,713.09 CBM

Shipped from

: Hanjung Private Jetty, Lampung INDONESIA

Shipped to

: Kandla, INDIA

Date of Shipment to India : 22-March-2015

PACK NO.

DRAWING NO.

MARKING NO.

PACKAGE
No.

TYPE

DESCRIPTION

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

631

H361-009-1HB44

H361-009-1HB44

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1960

632

H361-009-1HB45

H361-009-1HB45

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1756

633

H361-009-1HB46

H361-009-1HB46

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1576

634

H361-009-1HB47

H361-009-1HB47

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1503

635

H361-009-1HB48

H361-009-1HB48

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1872

636

H361-009-1HB49

H361-009-1HB49

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1591

637

H361-009-1HB50

H361-009-1HB50

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1439

638

H361-009-1HB51

H361-009-1HB51

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

200

290

1816

639

H361-009-1HB52

H361-009-1HB52

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1626

640

H361-009-1HB53

H361-009-1HB53

SULPHUR RECOVERY UNIT APR 002

0.06

0.06

200

290

2864

641

H361-009-1HB54

H361-009-1HB54

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1787

642

H361-009-1HB55

H361-009-1HB55

SULPHUR RECOVERY UNIT APR 002

0.01

0.01

200

290

1235

643

H361-009-1HB56

H361-009-1HB56

SULPHUR RECOVERY UNIT APR 002

0.01

0.01

200

290

1260

644

H361-009-1HB57

H361-009-1HB57

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1953

645

H361-009-1HB58

H361-009-1HB58

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1476

646

H361-009-1HB59

H361-009-1HB59

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1783

647

H361-009-1HB60

H361-009-1HB60

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1416

648

H361-009-1HB61

H361-009-1HB61

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1387

649

H361-009-1HB62

H361-009-1HB62

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1938

650

H361-009-1HB63

H361-009-1HB63

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1803

651

H361-009-1HB64

H361-009-1HB64

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1749

652

H361-009-1HB65

H361-009-1HB65

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

200

290

1227

653

H361-009-1HB66

H361-009-1HB66

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

200

290

1979

654

H361-009-1HB67

H361-009-1HB67

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1763

655

H361-009-1HB68

H361-009-1HB68

SULPHUR RECOVERY UNIT APR 002

0.01

0.01

200

290

1351

656

H361-009-1HB69

H361-009-1HB69

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1921

657

H361-009-1HB70

H361-009-1HB70

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

200

290

3445

658

H361-009-1HB71

H361-009-1HB71

SULPHUR RECOVERY UNIT APR 002

0.01

0.01

200

290

1378

659

H361-009-1HB72

H361-009-1HB72

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

2005

660

H361-009-1HB73

H361-009-1HB73

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1954

661

H361-009-1HB74

H361-009-1HB74

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1638

662

H361-009-1HB75

H361-009-1HB75

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1946

663

H361-009-1HB76

H361-009-1HB76

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1463

664

H361-009-1HB77

H361-009-1HB77

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1809

665

H361-009-1HB78

H361-009-1HB78

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1517

RIL/PTH-J3-0256

BUNDLE

Page 57 of 137

CBM (m3)

BARGE/ CONTAINER

04/16/2015 09:40:01

DETAIL APCKING LIST 2nd SHIPMENT


JAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number

: 1J/3HM/7558812

Item Code

: 4500190308

Description

: Fabrication Steel Structures

Quantity

: 308 Pckgs

Quantity of Weight

: 1,012.12 TONS

Quantity of Cubic Meters

: 1,713.09 CBM

Shipped from

: Hanjung Private Jetty, Lampung INDONESIA

Shipped to

: Kandla, INDIA

Date of Shipment to India : 22-March-2015

PACK NO.

DRAWING NO.

MARKING NO.

PACKAGE
No.

TYPE

DESCRIPTION

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

666

H361-009-1HB79

H361-009-1HB79

SULPHUR RECOVERY UNIT APR 002

0.01

0.01

200

290

1366

667

H361-009-1HB80

H361-009-1HB80

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

200

290

1437

668

H361-009-1HB81

H361-009-1HB81

SULPHUR RECOVERY UNIT APR 002

0.01

0.01

200

290

1085

669

H361-009-1VB23

H361-009-1VB23

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

200

290

3480

670

H361-009-1VB24

H361-009-1VB24

SULPHUR RECOVERY UNIT APR 002

0.01

0.01

200

290

580

83

1.58

1.66

585

624

3480

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

300

250

1084

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

300

250

1099

0.04

0.07

330

229

1099

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

350

275

876

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

350

275

969

0.03

0.06

386

254

969

671

H361-009-1B123

H361-009-1B123

672

H361-009-1B124

H361-009-1B124

673

H361-009-1B254

H361-009-1B254

674

H361-009-1B255

H361-009-1B255

RIL/PTH-J3-0257

RIL/PTH-J3-0258

BUNDLE

BUNDLE

675

H361-009-1B166

H361-009-1B166

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1464

676

H361-009-1B168

H361-009-1B168

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1563

677

H361-009-1B171

H361-009-1B171

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1463

678

H361-009-1B172

H361-009-1B172

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1463

679

H361-009-1B173

H361-009-1B173

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1463

680

H361-009-1B175

H361-009-1B175

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1463

681

H361-009-1B179

H361-009-1B179

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1164

682

H361-009-1B180

H361-009-1B180

SULPHUR RECOVERY UNIT APR 002

0.05

0.05

400

275

1464

683

H361-009-1B181

H361-009-1B181

SULPHUR RECOVERY UNIT APR 002

0.05

0.05

400

275

1464

684

H361-009-1B182

H361-009-1B182

SULPHUR RECOVERY UNIT APR 002

0.05

0.05

400

275

1464

685

H361-009-1B187

H361-009-1B187

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1461

686

H361-009-1B189

H361-009-1B189

SULPHUR RECOVERY UNIT APR 002

0.67

0.67

400

275

2961

687

H361-009-1B191

H361-009-1B191

SULPHUR RECOVERY UNIT APR 002

0.67

0.67

400

275

2961

688

H361-009-1B192

H361-009-1B192

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1411

689

H361-009-1B196

H361-009-1B196

SULPHUR RECOVERY UNIT APR 002

0.10

0.10

400

275

2860

690

H361-009-1B197

H361-009-1B197

SULPHUR RECOVERY UNIT APR 002

0.10

0.10

400

275

2860

691

H361-009-1B199

H361-009-1B199

SULPHUR RECOVERY UNIT APR 002

0.08

0.08

400

275

2960

692

H361-009-1B200

H361-009-1B200

SULPHUR RECOVERY UNIT APR 002

0.08

0.08

400

275

2860

693

H361-009-1B204

H361-009-1B204

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1463

694

H361-009-1B206

H361-009-1B206

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1363

RIL/PTH-J3-0259

BUNDLE

Page 58 of 137

CBM (m3)

1.27

0.08

0.10

BARGE/ CONTAINER

04/16/2015 09:40:01

DETAIL APCKING LIST 2nd SHIPMENT


JAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number

: 1J/3HM/7558812

Item Code

: 4500190308

Description

: Fabrication Steel Structures

Quantity

: 308 Pckgs

Quantity of Weight

: 1,012.12 TONS

Quantity of Cubic Meters

: 1,713.09 CBM

Shipped from

: Hanjung Private Jetty, Lampung INDONESIA

Shipped to

: Kandla, INDIA

RIL/PTH-J3-0259

BUNDLE

Date of Shipment to India : 22-March-2015

PACK NO.

DRAWING NO.

MARKING NO.

PACKAGE
No.

TYPE

DESCRIPTION

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

695

H361-009-1B208

H361-009-1B208

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1463

696

H361-009-1B209

H361-009-1B209

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1463

36

2.39

2.45

950

920

2961

697

H361-009-1B167

H361-009-1B167

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

400

275

1563

698

H361-009-1B169

H361-009-1B169

SULPHUR RECOVERY UNIT APR 002

10

0.34

0.34

400

275

1464

699

H361-009-1B170

H361-009-1B170

SULPHUR RECOVERY UNIT APR 002

0.17

0.17

400

275

1463

700

H361-009-1B174

H361-009-1B174

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1463

701

H361-009-1B176

H361-009-1B176

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

400

275

1463

702

H361-009-1B177

H361-009-1B177

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

400

275

2964

703

H361-009-1B178

H361-009-1B178

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1164

704

H361-009-1B183

H361-009-1B183

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

400

275

874

705

H361-009-1B184

H361-009-1B184

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1240

706

H361-009-1B185

H361-009-1B185

SULPHUR RECOVERY UNIT APR 002

0.21

0.21

400

275

1461

707

H361-009-1B186

H361-009-1B186

SULPHUR RECOVERY UNIT APR 002

0.21

0.21

400

275

1461

708

H361-009-1B188

H361-009-1B188

SULPHUR RECOVERY UNIT APR 002

0.28

0.28

400

275

2961

709

H361-009-1B190

H361-009-1B190

SULPHUR RECOVERY UNIT APR 002

0.35

0.35

400

275

2961

710

H361-009-1B193

H361-009-1B193

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1476

711

H361-009-1B194

H361-009-1B194

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1476

712

H361-009-1B195

H361-009-1B195

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

400

275

836

713

H361-009-1B198

H361-009-1B198

SULPHUR RECOVERY UNIT APR 002

0.14

0.14

400

275

2960

714

H361-009-1B201

H361-009-1B201

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

400

275

857

715

H361-009-1B202

H361-009-1B202

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1459

716

H361-009-1B203

H361-009-1B203

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1463

717

H361-009-1B205

H361-009-1B205

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1363

718

H361-009-1B207

H361-009-1B207

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

400

275

1463

719

H361-009-1B210

H361-009-1B210

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1178

720

H361-009-1B211

H361-009-1B211

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1463

721

H361-009-1B212

H361-009-1B212

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1463

722

H361-009-1B213

H361-009-1B213

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

400

275

860

723

H361-009-1B214

H361-009-1B214

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1260

724

H361-009-1B215

H361-009-1B215

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

400

275

964

725

H361-009-1B216

H361-009-1B216

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1164

726

H361-009-1B217

H361-009-1B217

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

400

275

1494

727

H361-009-1B218

H361-009-1B218

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

400

275

1164

RIL/PTH-J3-0260

BUNDLE

Page 59 of 137

CBM (m3)

2.59

BARGE/ CONTAINER

04/16/2015 09:40:01

DETAIL APCKING LIST 2nd SHIPMENT


JAMNAGAR 3 (J3) GASIFICATION PROJECT
RIL/PTH-J3-0260

BUNDLE

Purchase Order Number

: 1J/3HM/7558812

Item Code

: 4500190308

Description

: Fabrication Steel Structures

Quantity

: 308 Pckgs

Quantity of Weight

: 1,012.12 TONS

Quantity of Cubic Meters

: 1,713.09 CBM

Shipped from

: Hanjung Private Jetty, Lampung INDONESIA

Shipped to

: Kandla, INDIA

Date of Shipment to India : 22-March-2015

PACK NO.

728

729

DRAWING NO.

H361-009-1B219

H361-009-1CT27

MARKING NO.

PACKAGE
No.

TYPE

H361-009-1B219

H361-009-1CT27

DESCRIPTION

SULPHUR RECOVERY UNIT APR 002

RIL/PTH-J3-0261

BUNDLE

SULPHUR RECOVERY UNIT APR 002

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

0.07

0.07

400

275

2954

68

2.67

2.79

1087

1278

2964

0.05

0.05

352

289

312

0.05

0.08

352

289

312
1163

730

H361-009-1B115

H361-009-1B115

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

679

374

731

H361-009-1B116

H361-009-1B116

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

679

374

1163

732

H361-009-1B118

H361-009-1B118

SULPHUR RECOVERY UNIT APR 002

0.14

0.14

403

364

5585

733

H361-009-1B119

H361-009-1B119

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

599

343

1547

734

H361-009-1B120

H361-009-1B120

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

601

344

1547

735

H361-009-1B121

H361-009-1B121

SULPHUR RECOVERY UNIT APR 002

0.08

0.08

403

333

1596

736

H361-009-1B128

H361-009-1B128

SULPHUR RECOVERY UNIT APR 002

0.08

0.08

403

333

2959

737

H361-009-1B133

H361-009-1B133

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

403

333

1413

738

H361-009-1B134

H361-009-1B134

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

403

333

1463

739

H361-009-1B135

H361-009-1B135

SULPHUR RECOVERY UNIT APR 002

0.14

0.14

403

333

5462

740

H361-009-1B136

H361-009-1B136

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

403

333

712

741

H361-009-1B138

H361-009-1B138

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

403

333

1746

742

H361-009-1B139

H361-009-1B139

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

403

333

1746

743

H361-009-1B140

H361-009-1B140

SULPHUR RECOVERY UNIT APR 002

0.04

0.04

403

333

1461

744

H361-009-1B141

H361-009-1B141

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

403

333

2961

745

H361-009-1B142

H361-009-1B142

SULPHUR RECOVERY UNIT APR 002

0.08

0.08

403

333

2961

746

H361-009-1B143

H361-009-1B143

SULPHUR RECOVERY UNIT APR 002

0.08

0.08

403

333

2961

747

H361-009-1B145

H361-009-1B145

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

403

333

2961

748

H361-009-1B146

H361-009-1B146

SULPHUR RECOVERY UNIT APR 002

0.09

0.09

403

333

2961

749

H361-009-1B147

H361-009-1B147

SULPHUR RECOVERY UNIT APR 002

0.03

0.03

403

333

1176

750

H361-009-1B151

H361-009-1B151

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

403

333

2960

751

H361-009-1B154

H361-009-1B154

SULPHUR RECOVERY UNIT APR 002

0.15

0.15

403

333

5464

752

H361-009-1B157

H361-009-1B157

SULPHUR RECOVERY UNIT APR 002

0.15

0.15

403

333

5964

753

H361-009-1B158

H361-009-1B158

SULPHUR RECOVERY UNIT APR 002

0.15

0.15

403

333

5964

754

H361-009-1B161

H361-009-1B161

SULPHUR RECOVERY UNIT APR 002

0.05

0.05

403

333

1764

755

H361-009-1B163

H361-009-1B163

SULPHUR RECOVERY UNIT APR 002

0.05

0.05

403

333

1514

756

H361-009-1B164

H361-009-1B164

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

403

333

1463

757

H361-009-1B165

H361-009-1B165

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

403

333

763

758

H361-009-1FR10

H361-009-1FR10

SULPHUR RECOVERY UNIT APR 002

0.08

0.08

403

333

1355

RIL/PTH-J3-0262

BUNDLE

Page 60 of 137

CBM (m3)

4.12

0.03

BARGE/ CONTAINER

04/16/2015 09:40:01

DETAIL APCKING LIST 2nd SHIPMENT


JAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number

: 1J/3HM/7558812

Item Code

: 4500190308

Description

: Fabrication Steel Structures

Quantity

: 308 Pckgs

Quantity of Weight

: 1,012.12 TONS

Quantity of Cubic Meters

: 1,713.09 CBM

Shipped from

: Hanjung Private Jetty, Lampung INDONESIA

Shipped to

: Kandla, INDIA

RIL/PTH-J3-0262

BUNDLE

Date of Shipment to India : 22-March-2015

PACK NO.

DRAWING NO.

MARKING NO.

PACKAGE
No.

TYPE

DESCRIPTION

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

759

H361-009-1SC2

H361-009-1SC2

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

403

333

760

H361-009-1SC3

H361-009-1SC3

SULPHUR RECOVERY UNIT APR 002

0.02

0.02

403

333

508

33

2.09

2.22

1372

1314

5964

508

761

H361-009-1CT28

H361-009-1CT28

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

403

333

1988

762

H361-009-1CT29

H361-009-1CT29

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

403

333

778

763

H361-009-1CT30

H361-009-1CT30

SULPHUR RECOVERY UNIT APR 002

0.08

0.08

403

333

548

764

H361-009-1CT31

H361-009-1CT31

SULPHUR RECOVERY UNIT APR 002

0.05

0.05

403

333

548

765

H361-009-1CT32

H361-009-1CT32

SULPHUR RECOVERY UNIT APR 002

0.05

0.05

403

333

1188

0.32

0.46

1180

1457

1988

0.05

0.05

680

375

1463

0.05

0.09

680

375

1463

0.11

0.11

682

591

3093

0.11

0.16

682

591

3093

0.05

0.05

403

333

1463

0.05

0.08

403

333

1463

0.08

0.08

403

333

2899

0.08

0.12

403

333

2899

0.08

0.08

403

333

2963

0.08

0.12

403

333

2963

0.05

0.05

403

333

1459

0.05

0.09

403

333

1459

0.10

0.10

403

333

2964

0.10

0.13

403

333

2964

0.09

0.09

403

333

2964

0.09

0.13

403

333

2964

766

767

768

769

770

771

772

773

H361-009-1B114

H361-009-1B117

H361-009-1B122

H361-009-1B125

H361-009-1B126

H361-009-1B127

H361-009-1B129

H361-009-1B130

H361-009-1B114

H361-009-1B117

H361-009-1B122

H361-009-1B125

H361-009-1B126

H361-009-1B127

H361-009-1B129

H361-009-1B130

RIL/PTH-J3-0263

RIL/PTH-J3-0264

RIL/PTH-J3-0265

RIL/PTH-J3-0266

RIL/PTH-J3-0267

RIL/PTH-J3-0268

RIL/PTH-J3-0269

RIL/PTH-J3-0270

RIL/PTH-J3-0271

BUNDLE

SKID

SKID

SKID

SKID

SKID

SKID

SKID

SKID

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

Page 61 of 137

CBM (m3)

10.75

3.42

0.37

1.25

0.20

0.39

0.40

0.20

0.40

0.40

BARGE/ CONTAINER

04/16/2015 09:40:01

DETAIL APCKING LIST 2nd SHIPMENT


JAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number

: 1J/3HM/7558812

Item Code

: 4500190308

Description

: Fabrication Steel Structures

Quantity

: 308 Pckgs

Quantity of Weight

: 1,012.12 TONS

Quantity of Cubic Meters

: 1,713.09 CBM

Shipped from

: Hanjung Private Jetty, Lampung INDONESIA

Shipped to

: Kandla, INDIA

Date of Shipment to India : 22-March-2015

PACK NO.

774

775

776

777

778

779

780

781

782

783

784

785

DRAWING NO.

H361-009-1B131

H361-009-1B132

H361-009-1B137

H361-009-1B144

H361-009-1B148

H361-009-1B149

H361-009-1B150

H361-009-1B152

H361-009-1B153

H361-009-1B155

H361-009-1B156

H361-009-1B159

MARKING NO.

H361-009-1B131

H361-009-1B132

H361-009-1B137

H361-009-1B144

H361-009-1B148

H361-009-1B149

H361-009-1B150

H361-009-1B152

H361-009-1B153

H361-009-1B155

H361-009-1B156

H361-009-1B159

PACKAGE
No.
RIL/PTH-J3-0272

RIL/PTH-J3-0273

RIL/PTH-J3-0274

RIL/PTH-J3-0275

RIL/PTH-J3-0276

RIL/PTH-J3-0277

RIL/PTH-J3-0278

RIL/PTH-J3-0279

RIL/PTH-J3-0280

RIL/PTH-J3-0281

RIL/PTH-J3-0282

RIL/PTH-J3-0283

TYPE

SKID

SKID

SKID

SKID

SKID

SKID

BUNDLE

SKID

SKID

SKID

SKID

SKID

DESCRIPTION

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

Page 62 of 137

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

0.09

0.09

403

333

2964

0.09

0.12

403

333

2964

0.09

0.09

403

333

2964

0.09

0.12

403

333

2964

0.05

0.05

403

333

1459

0.05

0.09

403

333

1459

0.04

0.04

403

333

1411

0.04

0.08

403

333

1411

0.10

0.10

403

333

2860

0.10

0.13

403

333

2860

0.09

0.09

403

333

2860

0.09

0.13

403

333

2860

0.10

0.10

403

333

1461

0.10

0.13

403

333

1461

0.06

0.06

403

333

1348

0.06

0.09

403

333

1348

0.12

0.12

403

333

3093

0.12

0.15

403

333

3093

0.15

0.15

403

333

5464

0.15

0.19

403

333

5464

0.17

0.17

403

333

5964

0.17

0.20

403

333

5964

0.07

0.07

403

333

2364

0.07

0.11

403

333

2364

CBM (m3)

0.40

0.40

0.20

0.19

0.38

0.38

0.20

0.18

0.42

0.73

0.80

0.32

BARGE/ CONTAINER

04/16/2015 09:40:01

DETAIL APCKING LIST 2nd SHIPMENT


JAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number

: 1J/3HM/7558812

Item Code

: 4500190308

Description

: Fabrication Steel Structures

Quantity

: 308 Pckgs

Quantity of Weight

: 1,012.12 TONS

Quantity of Cubic Meters

: 1,713.09 CBM

Shipped from

: Hanjung Private Jetty, Lampung INDONESIA

Shipped to

: Kandla, INDIA

Date of Shipment to India : 22-March-2015

PACK NO.

786

787

788

789

790

791

792

DRAWING NO.

H361-009-1B160

H361-009-1B162

H361-009-1B259

H361-009-1FR6

H361-009-1FR7

H361-009-1FR8

H361-009-1FR9

MARKING NO.

H361-009-1B160

H361-009-1B162

H361-009-1B259

H361-009-1FR6

H361-009-1FR7

H361-009-1FR8

H361-009-1FR9

PACKAGE
No.

RIL/PTH-J3-0284

RIL/PTH-J3-0285

RIL/PTH-J3-0286

RIL/PTH-J3-0287

RIL/PTH-J3-0288

RIL/PTH-J3-0289

RIL/PTH-J3-0290

TYPE

SKID

SKID

SKID

SKID

SKID

SKID

SKID

DESCRIPTION

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

0.08

0.08

403

333

2364

0.08

0.11

403

333

2364

0.23

0.23

403

333

7882

0.23

0.27

403

333

7882

0.09

0.09

403

333

3062

0.09

0.13

403

333

3062

0.35

0.35

403

333

1744

0.35

0.39

403

333

1744

0.19

0.19

403

333

647

0.19

0.22

403

333

647

0.18

0.18

403

333

647

0.18

0.21

403

333

647

0.16

0.16

403

333

1850

0.16

0.19

403

333

1850

793

H361-009-1B40

H361-009-1B40

SULPHUR RECOVERY UNIT APR 002

0.10

0.10

456

346

2834

794

H361-009-1B42

H361-009-1B42

SULPHUR RECOVERY UNIT APR 002

0.76

0.76

456

346

3963

795

H361-009-1B43

H361-009-1B43

SULPHUR RECOVERY UNIT APR 002

0.60

0.60

456

346

3963

796

H361-009-1B44

H361-009-1B44

SULPHUR RECOVERY UNIT APR 002

0.15

0.15

456

347

3963

797

H361-009-1B45

H361-009-1B45

SULPHUR RECOVERY UNIT APR 002

0.23

0.23

455

356

5963

798

H361-009-1B49

H361-009-1B49

SULPHUR RECOVERY UNIT APR 002

0.12

0.12

456

346

2963

799

H361-009-1B50

H361-009-1B50

SULPHUR RECOVERY UNIT APR 002

0.16

0.16

456

347

3963

800

H361-009-1B52

H361-009-1B52

SULPHUR RECOVERY UNIT APR 002

0.15

0.15

456

346

3962

801

H361-009-1B56

H361-009-1B56

SULPHUR RECOVERY UNIT APR 002

1.04

1.04

456

347

5585

802

H361-009-1B57

H361-009-1B57

SULPHUR RECOVERY UNIT APR 002

0.05

0.05

276

456

1463

21

3.37

3.50

1218

1262

5963

0.12

0.12

725

347

2834

803

H361-009-1B41

H361-009-1B41

RIL/PTH-J3-0291

BUNDLE

SULPHUR RECOVERY UNIT APR 002


Page 63 of 137

CBM (m3)

0.32

1.06

0.41

0.23

0.09

0.09

0.25

9.17

BARGE/ CONTAINER

04/16/2015 09:40:01

DETAIL APCKING LIST 2nd SHIPMENT


JAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number

: 1J/3HM/7558812

Item Code

: 4500190308

Description

: Fabrication Steel Structures

Quantity

: 308 Pckgs

Quantity of Weight

: 1,012.12 TONS

Quantity of Cubic Meters

: 1,713.09 CBM

Shipped from

: Hanjung Private Jetty, Lampung INDONESIA

Shipped to

: Kandla, INDIA

Date of Shipment to India : 22-March-2015

PACK NO.

DRAWING NO.

MARKING NO.

PACKAGE
No.

TYPE

DESCRIPTION

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

804

H361-009-1B58

H361-009-1B58

SULPHUR RECOVERY UNIT APR 002

0.11

0.11

957

406

1463

805

H361-009-1B59

H361-009-1B59

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

456

565

1463

806

H361-009-1B60

H361-009-1B60

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

456

565

1463

807

H361-009-1B72

H361-009-1B72

SULPHUR RECOVERY UNIT APR 002

0.09

0.09

1057

347

1160

808

H361-009-1B78

H361-009-1B78

SULPHUR RECOVERY UNIT APR 002

0.10

0.10

1121

346

1460

809

H361-009-1B81

H361-009-1B81

SULPHUR RECOVERY UNIT APR 002

0.21

0.21

640

346

5461

810

H361-009-1B85

H361-009-1B85

SULPHUR RECOVERY UNIT APR 002

0.11

0.11

1056

347

1659

811

H361-009-1B90

H361-009-1B90

SULPHUR RECOVERY UNIT APR 002

0.07

0.07

734

471

1394

812

H361-009-1B69

H361-009-1B69

SULPHUR RECOVERY UNIT APR 002

0.08

0.08

456

565

1949

813

H361-009-1B74

H361-009-1B74

SULPHUR RECOVERY UNIT APR 002

0.11

0.11

456

347

2963

814

H361-009-1B73

H361-009-1B73

SULPHUR RECOVERY UNIT APR 002

0.55

0.55

347

456

2963

815

H361-009-1B75

H361-009-1B75

SULPHUR RECOVERY UNIT APR 002

0.11

0.11

456

371

2963

816

H361-009-1B76

H361-009-1B76

SULPHUR RECOVERY UNIT APR 002

0.15

0.15

456

347

3962

817

H361-009-1B77

H361-009-1B77

SULPHUR RECOVERY UNIT APR 002

0.15

0.15

456

347

3962

818

H361-009-1B82

H361-009-1B82

SULPHUR RECOVERY UNIT APR 002

0.21

0.21

457

357

5461

819

H361-009-1B84

H361-009-1B84

SULPHUR RECOVERY UNIT APR 002

0.12

0.12

346

456

1659

820

H361-009-1SC4

H361-009-1SC4

SULPHUR RECOVERY UNIT APR 002

0.11

0.11

454

346

1332

24

2.56

2.75

1121

2042

5461

0.14

0.14

456

566

1464

0.14

0.19

456

566

1464

0.22

0.22

456

787

5460

0.22

0.28

456

787

5460

0.23

0.23

455

885

5460

0.23

0.29

455

885

5460

0.25

0.25

455

845

5462

0.25

0.31

455

845

5462

0.18

0.18

455

696

3962

0.18

0.23

455

696

3962

0.18

0.18

456

699

3963

821

822

823

824

825

826

H361-009-1B46

H361-009-1B47

H361-009-1B48

H361-009-1B51

H361-009-1B53

H361-009-1B54

H361-009-1B46

H361-009-1B47

H361-009-1B48

H361-009-1B51

H361-009-1B53

H361-009-1B54

RIL/PTH-J3-0292

RIL/PTH-J3-0293

RIL/PTH-J3-0294

RIL/PTH-J3-0295

RIL/PTH-J3-0296

RIL/PTH-J3-0297

RIL/PTH-J3-0298

BUNDLE

BUNDLE

SKID

SKID

SKID

SKID

SKID

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002


Page 64 of 137

CBM (m3)

12.50

0.38

1.96

2.20

2.10

1.25

BARGE/ CONTAINER

04/16/2015 09:40:01

DETAIL APCKING LIST 2nd SHIPMENT


JAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number

: 1J/3HM/7558812

Item Code

: 4500190308

Description

: Fabrication Steel Structures

Quantity

: 308 Pckgs

Quantity of Weight

: 1,012.12 TONS

Quantity of Cubic Meters

: 1,713.09 CBM

Shipped from

: Hanjung Private Jetty, Lampung INDONESIA

Shipped to

: Kandla, INDIA

Date of Shipment to India : 22-March-2015

PACK NO.

827

828

829

830

831

832

833

834

835

836

DRAWING NO.

H361-009-1B55

H361-009-1B61

H361-009-1B62

H361-009-1B63

H361-009-1B64

H361-009-1B65

H361-009-1B66

H361-009-1B67

H361-009-1B68

H361-009-1B70

MARKING NO.

H361-009-1B55

H361-009-1B61

H361-009-1B62

H361-009-1B63

H361-009-1B64

H361-009-1B65

H361-009-1B66

H361-009-1B67

H361-009-1B68

H361-009-1B70

PACKAGE
No.

RIL/PTH-J3-0299

RIL/PTH-J3-0300

RIL/PTH-J3-0301

RIL/PTH-J3-0302

RIL/PTH-J3-0303

RIL/PTH-J3-0304

RIL/PTH-J3-0305

RIL/PTH-J3-0306

RIL/PTH-J3-0307

RIL/PTH-J3-0308

TYPE

BUNDLE

SKID

SKID

SKID

BUNDLE

SKID

SKID

SKID

SKID

BUNDLE

DESCRIPTION

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SULPHUR RECOVERY UNIT APR 002

SUB TOTAL E. H361-009 SULPHUR RECOVERY UNIT APR 002

QTY

Page 65 of 137

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

0.18

0.23

456

699

3963

1.19

1.19

634

456

5585

1.19

1.23

634

456

5585

0.28

0.28

851

1010

5462

0.28

0.35

851

1010

5462

0.23

0.23

850

822

5462

0.23

0.29

850

822

5462

0.23

0.23

850

612

5462

0.23

0.28

850

612

5462

1.07

1.07

641

346

5462

1.07

1.11

641

346

5462

0.22

0.22

456

817

5462

0.22

0.28

456

817

5462

0.23

0.23

455

814

5462

0.23

0.29

455

814

5462

0.22

0.22

456

574

5462

0.22

0.27

456

574

5462

0.23

0.23

456

847

5462

0.23

0.29

456

847

5462

0.67

0.67

456

849

5462

0.67

0.74

456

849

5462

396
GRAND TOTAL

WEIGHT (ton)
NETT.

1256

27.02
1012.12

29.88
1041.43

CBM (m3)

1.26

1.61

4.69

3.82

2.84

1.21

2.03

2.02

1.43

2.11

2.11
89.62
1713.09

BARGE/ CONTAINER

04/16/2015 09:40:01

L APCKING LIST 2nd SHIPMENT


AR 3 (J3) GASIFICATION PROJECT

17-Mar-15
Rev. 3
REMARK

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

Page 66 of 137

04/16/2015 09:40:01

L APCKING LIST 2nd SHIPMENT


AR 3 (J3) GASIFICATION PROJECT

17-Mar-15
Rev. 3
REMARK

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Page 67 of 137

04/16/2015 09:40:01

L APCKING LIST 2nd SHIPMENT


AR 3 (J3) GASIFICATION PROJECT

17-Mar-15
Rev. 3
REMARK

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Page 68 of 137

04/16/2015 09:40:01

L APCKING LIST 2nd SHIPMENT


AR 3 (J3) GASIFICATION PROJECT

17-Mar-15
Rev. 3
REMARK

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

Page 69 of 137

04/16/2015 09:40:01

L APCKING LIST 2nd SHIPMENT


AR 3 (J3) GASIFICATION PROJECT

17-Mar-15
Rev. 3
REMARK

###

###

###

Page 70 of 137

04/16/2015 09:40:01

L APCKING LIST 2nd SHIPMENT


AR 3 (J3) GASIFICATION PROJECT

17-Mar-15
Rev. 3
REMARK

###

###

###

###

###

###

###

###

###
Page 71 of 137

04/16/2015 09:40:01

L APCKING LIST 2nd SHIPMENT


AR 3 (J3) GASIFICATION PROJECT

17-Mar-15
Rev. 3
REMARK

###

###

###

###

###

###

###

###

###

Page 72 of 137

04/16/2015 09:40:01

L APCKING LIST 2nd SHIPMENT


AR 3 (J3) GASIFICATION PROJECT

17-Mar-15
Rev. 3
REMARK

###

###

###

###

###

###

###

###

Page 73 of 137

04/16/2015 09:40:01

L APCKING LIST 2nd SHIPMENT


AR 3 (J3) GASIFICATION PROJECT

17-Mar-15
Rev. 3
REMARK

###

###

###

###

###

###

###

###

###

###

###

###
Page 74 of 137

04/16/2015 09:40:01

L APCKING LIST 2nd SHIPMENT


AR 3 (J3) GASIFICATION PROJECT

17-Mar-15
Rev. 3
REMARK

###

###
###

###

###

Page 75 of 137

04/16/2015 09:40:01

L APCKING LIST 2nd SHIPMENT


AR 3 (J3) GASIFICATION PROJECT

17-Mar-15
Rev. 3
REMARK

###

###

###

###

###

Page 76 of 137

04/16/2015 09:40:01

L APCKING LIST 2nd SHIPMENT


AR 3 (J3) GASIFICATION PROJECT

17-Mar-15
Rev. 3
REMARK

###

###

###

###

###

###

###

###

###

###

###

###

Page 77 of 137

04/16/2015 09:40:01

L APCKING LIST 2nd SHIPMENT


AR 3 (J3) GASIFICATION PROJECT

17-Mar-15
Rev. 3
REMARK

###

###

###

###

###

###
Page 78 of 137

04/16/2015 09:40:01

L APCKING LIST 2nd SHIPMENT


AR 3 (J3) GASIFICATION PROJECT

17-Mar-15
Rev. 3
REMARK

###

###

###

###

###

###

###

###

###

###

###

Page 79 of 137

04/16/2015 09:40:01

L APCKING LIST 2nd SHIPMENT


AR 3 (J3) GASIFICATION PROJECT

17-Mar-15
Rev. 3
REMARK

###

###

###

###

###

###

###

Page 80 of 137

04/16/2015 09:40:01

L APCKING LIST 2nd SHIPMENT


AR 3 (J3) GASIFICATION PROJECT

17-Mar-15
Rev. 3
REMARK

###

###

Page 81 of 137

04/16/2015 09:40:01

L APCKING LIST 2nd SHIPMENT


AR 3 (J3) GASIFICATION PROJECT

17-Mar-15
Rev. 3
REMARK

Page 82 of 137

04/16/2015 09:40:01

L APCKING LIST 2nd SHIPMENT


AR 3 (J3) GASIFICATION PROJECT

17-Mar-15
Rev. 3
REMARK

###

###

###

Page 83 of 137

04/16/2015 09:40:01

L APCKING LIST 2nd SHIPMENT


AR 3 (J3) GASIFICATION PROJECT

17-Mar-15
Rev. 3
REMARK

###

Page 84 of 137

04/16/2015 09:40:01

L APCKING LIST 2nd SHIPMENT


AR 3 (J3) GASIFICATION PROJECT

17-Mar-15
Rev. 3
REMARK

###

###

Page 85 of 137

04/16/2015 09:40:01

L APCKING LIST 2nd SHIPMENT


AR 3 (J3) GASIFICATION PROJECT

17-Mar-15
Rev. 3
REMARK

###

###

###

###

###

###

Page 86 of 137

04/16/2015 09:40:01

L APCKING LIST 2nd SHIPMENT


AR 3 (J3) GASIFICATION PROJECT

17-Mar-15
Rev. 3
REMARK

###

###

###

###

###

###

###

###

###

###

###

###

Page 87 of 137

04/16/2015 09:40:01

L APCKING LIST 2nd SHIPMENT


AR 3 (J3) GASIFICATION PROJECT

17-Mar-15
Rev. 3
REMARK

###

###

###

###

###

###

###

###

###

###

###

Page 88 of 137

04/16/2015 09:40:01

L APCKING LIST 2nd SHIPMENT


AR 3 (J3) GASIFICATION PROJECT

17-Mar-15
Rev. 3
REMARK

###

###

###

###
Page 89 of 137

04/16/2015 09:40:01

L APCKING LIST 2nd SHIPMENT


AR 3 (J3) GASIFICATION PROJECT

17-Mar-15
Rev. 3
REMARK

###

###

###

###

###

###

###

###

###

###

###

Page 90 of 137

04/16/2015 09:40:02

L APCKING LIST 2nd SHIPMENT


AR 3 (J3) GASIFICATION PROJECT

17-Mar-15
Rev. 3
REMARK

###

###

###

Page 91 of 137

04/16/2015 09:40:02

L APCKING LIST 2nd SHIPMENT


AR 3 (J3) GASIFICATION PROJECT

17-Mar-15
Rev. 3
REMARK

###

###

Page 92 of 137

04/16/2015 09:40:02

L APCKING LIST 2nd SHIPMENT


AR 3 (J3) GASIFICATION PROJECT

17-Mar-15
Rev. 3
REMARK

Page 93 of 137

04/16/2015 09:40:02

L APCKING LIST 2nd SHIPMENT


AR 3 (J3) GASIFICATION PROJECT

17-Mar-15
Rev. 3
REMARK

###

###

###

Page 94 of 137

04/16/2015 09:40:02

L APCKING LIST 2nd SHIPMENT


AR 3 (J3) GASIFICATION PROJECT

17-Mar-15
Rev. 3
REMARK

###

Page 95 of 137

04/16/2015 09:40:02

L APCKING LIST 2nd SHIPMENT


AR 3 (J3) GASIFICATION PROJECT

17-Mar-15
Rev. 3
REMARK

###

###

Page 96 of 137

04/16/2015 09:40:02

L APCKING LIST 2nd SHIPMENT


AR 3 (J3) GASIFICATION PROJECT

17-Mar-15
Rev. 3
REMARK

###

###

###

###

###

###

###

###

###

###

Page 97 of 137

04/16/2015 09:40:02

L APCKING LIST 2nd SHIPMENT


AR 3 (J3) GASIFICATION PROJECT

17-Mar-15
Rev. 3
REMARK

###

###

###

###

###

###

###

###

###

###

###

###
Page 98 of 137

04/16/2015 09:40:02

L APCKING LIST 2nd SHIPMENT


AR 3 (J3) GASIFICATION PROJECT

17-Mar-15
Rev. 3
REMARK

###

###

###

###

###

###

###

###

Page 99 of 137

04/16/2015 09:40:02

L APCKING LIST 2nd SHIPMENT


AR 3 (J3) GASIFICATION PROJECT

17-Mar-15
Rev. 3
REMARK

###

###

###

###

###

###

Page 100 of 137

04/16/2015 09:40:02

L APCKING LIST 2nd SHIPMENT


AR 3 (J3) GASIFICATION PROJECT

17-Mar-15
Rev. 3
REMARK

###

###

###

###

###

###

###

###

###

###

###

Page 101 of 137

04/16/2015 09:40:02

SUMMARY PACKING LIST 2nd SHIPMENT


JAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number

: 1J/3HM/7558812

Item Code

: 4500190308

Description

: Fabrication Steel Structures

Quantity

: 308 Pckgs

Quantity of Weight

: 1012.12 TONS

Quantity of Cubic Meters

: 5075.49 CBM

Shipped from

: Hanjung Private Jetty, Lampung INDONESIA

Shipped to

: Kandla, INDIA

Date of Shipment to India

: 22-March-2015

PACK NO.

DRAWING NO.

MARKING NO.

PACKAGE
No.

TYPE

DESCRIPTION

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

CBM (m3)

A. H210-550 ROOD MILL STRUCTURE


1

H210-550-FPGB1

H210-550-FPGB1

RIL/PTH-J3-0001

SKID

ROOD MILL STRUCTURE

2.36

2.42

700

780

5470

H210-550-FPGB2

H210-550-FPGB2

RIL/PTH-J3-0002

SKID

ROOD MILL STRUCTURE

2.36

2.42

759

846

5470

3.51

H210-550-FPGC1

H210-550-FPGC1

RIL/PTH-J3-0003

SKID

ROOD MILL STRUCTURE

7.05

7.19

1086

1401

8425

12.82

H210-550-FPGC2

H210-550-FPGC2

RIL/PTH-J3-0004

SKID

ROOD MILL STRUCTURE

10.13

10.36

1134

1815

10370

21.34

H210-550-FPGC3

H210-550-FPGC3

RIL/PTH-J3-0005

SKID

ROOD MILL STRUCTURE

11.45

11.64

1106

1406

11955

18.59

H210-550-FPGC4

H210-550-FPGC4

RIL/PTH-J3-0006

SKID

ROOD MILL STRUCTURE

3.88

3.97

958

1439

2571

3.54

H210-550-FPGC5

H210-550-FPGC5

RIL/PTH-J3-0007

SKID

ROOD MILL STRUCTURE

7.30

7.44

1316

1401

8425

15.53

H210-550-FPGC6

H210-550-FPGC6

RIL/PTH-J3-0008

SKID

ROOD MILL STRUCTURE

9.68

10.05

881

3117

10300

28.28

H210-550-FPGC7

H210-550-FPGC7

RIL/PTH-J3-0009

SKID

ROOD MILL STRUCTURE

10.92

11.10

968

1402

10900

14.79

10

H210-550-FPGC8

H210-550-FPGC8

RIL/PTH-J3-0010

SKID

ROOD MILL STRUCTURE

9.57

9.75

708

1402

9800

9.73

11

H210-550-FPGC9

H210-550-FPGC9

RIL/PTH-J3-0011

SKID

ROOD MILL STRUCTURE

6.33

6.47

869

1403

6176

7.53

12

H210-550-FPGC10

H210-550-FPGC10

RIL/PTH-J3-0012

SKID

ROOD MILL STRUCTURE

7.22

7.37

586

1486

8425

7.34

13

H210-550-FPGC11

H210-550-FPGC11

RIL/PTH-J3-0013

SKID

ROOD MILL STRUCTURE

10.18

10.55

696

3117

10300

22.35

14

H210-550-FPGC12

H210-550-FPGC12

RIL/PTH-J3-0014

SKID

ROOD MILL STRUCTURE

10.25

10.44

1131

1406

10400

16.54

15

H210-550-FPGC13

H210-550-FPGC13

RIL/PTH-J3-0015

SKID

ROOD MILL STRUCTURE

9.99

10.17

511

1406

10300

7.40

Page 102 of 137

2.99

04/16/2015 09:40:02

SUMMARY PACKING LIST 2nd SHIPMENT


JAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number

: 1J/3HM/7558812

Item Code

: 4500190308

Description

: Fabrication Steel Structures

Quantity

: 308 Pckgs

Quantity of Weight

: 1012.12 TONS

Quantity of Cubic Meters

: 5075.49 CBM

Shipped from

: Hanjung Private Jetty, Lampung INDONESIA

Shipped to

: Kandla, INDIA

Date of Shipment to India

: 22-March-2015

PACK NO.

DRAWING NO.

MARKING NO.

PACKAGE
No.

TYPE

DESCRIPTION

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

CBM (m3)

16

H210-550-FPGC14

H210-550-FPGC14

RIL/PTH-J3-0016

SKID

ROOD MILL STRUCTURE

6.40

6.54

810

1413

6176

7.07

17

H210-550-FPGC15

H210-550-FPGC15

RIL/PTH-J3-0017

SKID

ROOD MILL STRUCTURE

7.42

7.56

885

1401

8425

10.45

18

H210-550-FPGC16

H210-550-FPGC16

RIL/PTH-J3-0018

SKID

ROOD MILL STRUCTURE

10.19

10.43

693

1931

10300

13.78

19

H210-550-FPGC16

H210-550-FPGC16

RIL/PTH-J3-0019

SKID

ROOD MILL STRUCTURE

10.19

10.43

693

1931

10300

13.78

20

H210-550-FPGC17

H210-550-FPGC17

RIL/PTH-J3-0020

SKID

ROOD MILL STRUCTURE

10.05

10.21

610

1241

10400

7.87

21

H210-550-FPGC18

H210-550-FPGC18

RIL/PTH-J3-0021

SKID

ROOD MILL STRUCTURE

9.76

9.93

706

1259

10300

9.16

22

H210-550-FPGC19

H210-550-FPGC19

RIL/PTH-J3-0022

SKID

ROOD MILL STRUCTURE

6.40

6.54

861

1405

6176

7.47

23

H210-550-FPGC20

H210-550-FPGC20

RIL/PTH-J3-0023

SKID

ROOD MILL STRUCTURE

7.48

7.62

1164

1486

8425

14.57

24

H210-550-FPGC21

H210-550-FPGC21

RIL/PTH-J3-0024

SKID

ROOD MILL STRUCTURE

10.18

10.55

696

3117

10300

22.35

25

H210-550-FPGC22

H210-550-FPGC22

RIL/PTH-J3-0025

SKID

ROOD MILL STRUCTURE

7.41

7.54

1129

1239

6525

9.13

26

H210-550-FPGC23

H210-550-FPGC23

RIL/PTH-J3-0026

SKID

ROOD MILL STRUCTURE

7.07

7.19

661

1242

6800

5.58

27

H210-550-FPGC24

H210-550-FPGC24

RIL/PTH-J3-0027

SKID

ROOD MILL STRUCTURE

7.78

7.92

696

1407

7375

7.22

28

H210-550-FPGC25

H210-550-FPGC25

RIL/PTH-J3-0028

SKID

ROOD MILL STRUCTURE

6.27

6.39

875

1240

6176

6.70

29

H210-550-FPGC26

H210-550-FPGC26

RIL/PTH-J3-0029

SKID

ROOD MILL STRUCTURE

7.56

7.69

1164

1401

8425

13.74

30

H210-550-FPGC27

H210-550-FPGC27

RIL/PTH-J3-0030

SKID

ROOD MILL STRUCTURE

11.58

11.76

1128

1402

11700

18.50

31

H210-550-FPGC28

H210-550-FPGC28

RIL/PTH-J3-0031

SKID

ROOD MILL STRUCTURE

9.06

9.20

808

1402

9000

10.20

32

H210-550-FPGC29

H210-550-FPGC29

RIL/PTH-J3-0032

SKID

ROOD MILL STRUCTURE

6.45

6.58

824

1239

6176

6.31

33

H210-550-FPGC30

H210-550-FPGC30

RIL/PTH-J3-0033

SKID

ROOD MILL STRUCTURE

7.34

7.48

1311

1401

8425

15.47

34

H210-550-FPGC31

H210-550-FPGC31

RIL/PTH-J3-0034

SKID

ROOD MILL STRUCTURE

10.18

10.55

696

3117

10300

22.35

35

H210-550-FPGC32

H210-550-FPGC32

RIL/PTH-J3-0035

SKID

ROOD MILL STRUCTURE

10.85

11.03

821

1408

11900

13.76

36

H210-550-FPGC33

H210-550-FPGC33

RIL/PTH-J3-0036

SKID

ROOD MILL STRUCTURE

11.13

11.31

676

1439

11726

11.41

37

H210-550-FPGC35

H210-550-FPGC35

RIL/PTH-J3-0037

SKID

ROOD MILL STRUCTURE

7.30

7.44

737

1401

8425

8.70

38

H210-550-FPGC36

H210-550-FPGC36

RIL/PTH-J3-0038

SKID

ROOD MILL STRUCTURE

10.19

10.55

695

3117

10300

22.31

39

H210-550-FPGC37

H210-550-FPGC37

RIL/PTH-J3-0039

SKID

ROOD MILL STRUCTURE

11.22

11.40

968

1402

11900

16.15

40

H210-550-FPGC38

H210-550-FPGC38

RIL/PTH-J3-0040

SKID

ROOD MILL STRUCTURE

11.16

11.35

711

1438

11726

11.99

41

H210-550-FPGC40

H210-550-FPGC40

RIL/PTH-J3-0041

SKID

ROOD MILL STRUCTURE

7.33

7.47

1312

1486

8425

16.43

42

H210-550-FPGC41

H210-550-FPGC41

RIL/PTH-J3-0042

SKID

ROOD MILL STRUCTURE

9.68

10.04

881

3110

10300

28.22

43

H210-550-FPGC42

H210-550-FPGC42

RIL/PTH-J3-0043

SKID

ROOD MILL STRUCTURE

11.45

11.64

1022

1408

11900

17.12

44

H210-550-FPGC43

H210-550-FPGC43

RIL/PTH-J3-0044

SKID

ROOD MILL STRUCTURE

11.13

11.32

904

1442

11726

15.29

45

H210-550-FPGC44

H210-550-FPGC44

RIL/PTH-J3-0045

SKID

ROOD MILL STRUCTURE

7.15

7.30

1141

1486

8425

14.28

46

H210-550-FPGC45

H210-550-FPGC45

RIL/PTH-J3-0046

SKID

ROOD MILL STRUCTURE

9.93

10.18

1136

1937

10300

22.66

47

H210-550-FPGC46

H210-550-FPGC46

RIL/PTH-J3-0047

SKID

ROOD MILL STRUCTURE

8.30

8.44

1101

1406

7250

11.22

48

H210-550-FPGC47

H210-550-FPGC47

RIL/PTH-J3-0048

SKID

ROOD MILL STRUCTURE

6.83

6.98

1141

1486

8425

14.28

49

H210-550-FPGC48

H210-550-FPGC48

RIL/PTH-J3-0049

SKID

ROOD MILL STRUCTURE

9.50

9.69

1132

1432

10380

16.83

50

H210-550-FPGC49

H210-550-FPGC49

RIL/PTH-J3-0050

SKID

ROOD MILL STRUCTURE

11.15

11.32

1099

1239

11955

16.28

Page 103 of 137

04/16/2015 09:40:02

SUMMARY PACKING LIST 2nd SHIPMENT


JAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number

: 1J/3HM/7558812

Item Code

: 4500190308

Description

: Fabrication Steel Structures

Quantity

: 308 Pckgs

Quantity of Weight

: 1012.12 TONS

Quantity of Cubic Meters

: 5075.49 CBM

Shipped from

: Hanjung Private Jetty, Lampung INDONESIA

Shipped to

: Kandla, INDIA

Date of Shipment to India

: 22-March-2015

PACK NO.

DRAWING NO.

MARKING NO.

PACKAGE
No.

TYPE

DESCRIPTION

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

CBM (m3)

51

H210-550-FPGC50

H210-550-FPGC50

RIL/PTH-J3-0051

SKID

ROOD MILL STRUCTURE

3.96

4.05

949

1395

2629

3.48

52

H210-550-FPGC51

H210-550-FPGC51

RIL/PTH-J3-0052

SKID

ROOD MILL STRUCTURE

7.35

7.49

1312

1401

8425

15.49

53

H210-550-FPGC52

H210-550-FPGC52

RIL/PTH-J3-0053

SKID

ROOD MILL STRUCTURE

7.14

7.29

696

1507

7140

7.49

54

H210-550-FPGC53

H210-550-FPGC53

RIL/PTH-J3-0054

SKID

ROOD MILL STRUCTURE

9.86

10.03

1006

1241

9700

12.11

55

H210-550-FPGC54

H210-550-FPGC54

RIL/PTH-J3-0055

SKID

ROOD MILL STRUCTURE

9.81

9.97

720

1241

9950

8.89

56

H210-550-FPGC55

H210-550-FPGC55

RIL/PTH-J3-0056

SKID

ROOD MILL STRUCTURE

6.53

6.66

849

1407

6256

7.47

57

H210-550-FPGC56

H210-550-FPGC56

RIL/PTH-J3-0057

SKID

ROOD MILL STRUCTURE

7.20

7.34

586

1486

8425

7.34

58

H210-550-FPGC57

H210-550-FPGC57

RIL/PTH-J3-0058

SKID

ROOD MILL STRUCTURE

5.01

5.10

511

1406

4210

3.02

59

H210-550-FPGC58

H210-550-FPGC58

RIL/PTH-J3-0059

SKID

ROOD MILL STRUCTURE

7.14

7.27

696

1407

7140

6.99

60

H210-550-FPGC59

H210-550-FPGC59

RIL/PTH-J3-0060

SKID

ROOD MILL STRUCTURE

9.13

9.31

695

1406

9200

8.99

61

H210-550-FPGC60

H210-550-FPGC60

RIL/PTH-J3-0061

SKID

ROOD MILL STRUCTURE

6.45

6.59

859

1404

6244

7.53

62

H210-550-FPGC61

H210-550-FPGC61

RIL/PTH-J3-0062

SKID

ROOD MILL STRUCTURE

7.15

7.29

878

1482

8425

10.96

63

H210-550-FPGC62

H210-550-FPGC62

RIL/PTH-J3-0063

SKID

ROOD MILL STRUCTURE

9.43

9.63

881

1506

10500

13.93

64

H210-550-FPGC63

H210-550-FPGC63

RIL/PTH-J3-0064

SKID

ROOD MILL STRUCTURE

9.75

9.93

1127

1402

10200

16.12

65

H210-550-FPGC64

H210-550-FPGC64

RIL/PTH-J3-0065

SKID

ROOD MILL STRUCTURE

9.37

9.54

695

1241

10300

8.88

66

H210-550-FPGC65

H210-550-FPGC65

RIL/PTH-J3-0066

SKID

ROOD MILL STRUCTURE

6.33

6.47

909

1426

6244

8.09

67

H210-550-FPGC66

H210-550-FPGC66

RIL/PTH-J3-0067

SKID

ROOD MILL STRUCTURE

7.47

7.61

1311

1402

8425

15.49

68

H210-550-FPGC67

H210-550-FPGC67

RIL/PTH-J3-0068

SKID

ROOD MILL STRUCTURE

9.61

9.79

1131

1406

9700

15.42

69

H210-550-FPGC68

H210-550-FPGC68

RIL/PTH-J3-0069

SKID

ROOD MILL STRUCTURE

10.16

10.42

1131

2056

10000

23.25

70

H210-550-FPGC69

H210-550-FPGC69

RIL/PTH-J3-0070

SKID

ROOD MILL STRUCTURE

6.97

7.11

660

1407

6660

6.18

71

H210-550-FPGC70

H210-550-FPGC70

RIL/PTH-J3-0071

SKID

ROOD MILL STRUCTURE

7.73

7.87

694

1404

7500

7.31

72

H210-550-FPGC71

H210-550-FPGC71

RIL/PTH-J3-0072

SKID

ROOD MILL STRUCTURE

6.37

6.51

876

1430

6244

7.82

73

H210-550-FPGC72

H210-550-FPGC72

RIL/PTH-J3-0073

SKID

ROOD MILL STRUCTURE

7.47

7.62

1308

1482

8425

16.33

74

H210-550-FPGC73

H210-550-FPGC73

RIL/PTH-J3-0074

SKID

ROOD MILL STRUCTURE

5.40

5.49

661

1407

4960

4.61

75

H210-550-FPGC74

H210-550-FPGC74

RIL/PTH-J3-0075

SKID

ROOD MILL STRUCTURE

7.14

7.27

696

1407

7140

6.99

76

H210-550-FPGC75

H210-550-FPGC75

RIL/PTH-J3-0076

SKID

ROOD MILL STRUCTURE

9.20

9.37

811

1241

9250

9.31

77

H210-550-FPGC76

H210-550-FPGC76

RIL/PTH-J3-0077

SKID

ROOD MILL STRUCTURE

6.52

6.66

862

1396

6244

7.51

78

H210-550-FPGC77

H210-550-FPGC77

RIL/PTH-J3-0078

SKID

ROOD MILL STRUCTURE

7.15

7.29

1311

1486

8425

16.41

79

H210-550-FPGC78

H210-550-FPGC78

RIL/PTH-J3-0079

SKID

ROOD MILL STRUCTURE

9.40

9.58

881

1406

10500

13.01

80

H210-550-FPGC79

H210-550-FPGC79

RIL/PTH-J3-0080

SKID

ROOD MILL STRUCTURE

9.39

9.57

971

1406

10000

13.65

81

H210-550-FPGC80

H210-550-FPGC80

RIL/PTH-J3-0081

SKID

ROOD MILL STRUCTURE

9.66

9.84

843

1402

10500

12.41

82

H210-550-FPGC81

H210-550-FPGC81

RIL/PTH-J3-0082

SKID

ROOD MILL STRUCTURE

3.94

4.03

876

1422

2994

3.73

83

H210-550-FPGC82

H210-550-FPGC82

RIL/PTH-J3-0083

SKID

ROOD MILL STRUCTURE

7.30

7.44

738

1486

8425

9.24

84

H210-550-FPGC83

H210-550-FPGC83

RIL/PTH-J3-0084

SKID

ROOD MILL STRUCTURE

6.93

7.07

695

1406

6840

6.68

85

H210-550-FPGC84

H210-550-FPGC84

RIL/PTH-J3-0085

SKID

ROOD MILL STRUCTURE

7.14

7.28

688

1407

7140

6.91

Page 104 of 137

04/16/2015 09:40:02

SUMMARY PACKING LIST 2nd SHIPMENT


JAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number

: 1J/3HM/7558812

Item Code

: 4500190308

Description

: Fabrication Steel Structures

Quantity

: 308 Pckgs

Quantity of Weight

: 1012.12 TONS

Quantity of Cubic Meters

: 5075.49 CBM

Shipped from

: Hanjung Private Jetty, Lampung INDONESIA

Shipped to

: Kandla, INDIA

Date of Shipment to India

: 22-March-2015

PACK NO.

DRAWING NO.

MARKING NO.

PACKAGE
No.

TYPE

DESCRIPTION

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

CBM (m3)

86

H210-550-FPGC85

H210-550-FPGC85

RIL/PTH-J3-0086

SKID

ROOD MILL STRUCTURE

9.50

9.68

661

1406

10100

87

H210-550-FPGC86

H210-550-FPGC86

RIL/PTH-J3-0087

SKID

ROOD MILL STRUCTURE

4.11

4.20

709

1419

2994

3.01

88

H210-550-FPGC87

H210-550-FPGC87

RIL/PTH-J3-0088

SKID

ROOD MILL STRUCTURE

7.46

7.60

1308

1482

8425

16.33

89

H210-550-FPGC88

H210-550-FPGC88

RIL/PTH-J3-0089

SKID

ROOD MILL STRUCTURE

9.92

10.11

1131

1406

9700

15.42

90

H210-550-FPGC90

H210-550-FPGC90

RIL/PTH-J3-0090

SKID

ROOD MILL STRUCTURE

11.57

11.76

674

1403

11794

11.15

91

H210-550-FPGC91

H210-550-FPGC91

RIL/PTH-J3-0091

SKID

ROOD MILL STRUCTURE

6.86

7.00

731

1397

8425

8.60

92

H210-550-FPGC92

H210-550-FPGC92

RIL/PTH-J3-0092

SKID

ROOD MILL STRUCTURE

9.41

9.57

965

1241

10385

12.44

93

H210-550-FPGC93

H210-550-FPGC93

RIL/PTH-J3-0093

SKID

ROOD MILL STRUCTURE

8.24

8.36

658

1237

7165

5.83

94

H210-550-FPGC94

H210-550-FPGC94

RIL/PTH-J3-0094

SKID

ROOD MILL STRUCTURE

5.50

5.58

659

1239

4910

4.01

95

H210-550-FPGC95

H210-550-FPGC95

RIL/PTH-J3-0095

SKID

ROOD MILL STRUCTURE

7.14

7.27

696

1242

7140

6.17

96

H210-550-FPGC96

H210-550-FPGC96

RIL/PTH-J3-0096

SKID

ROOD MILL STRUCTURE

9.61

9.79

1131

1406

9700

15.42

97

H210-550-FPGC97

H210-550-FPGC97

RIL/PTH-J3-0097

SKID

ROOD MILL STRUCTURE

4.72

4.81

661

1406

4060

3.77

98

H210-550-FPGC98

H210-550-FPGC98

RIL/PTH-J3-0098

SKID

ROOD MILL STRUCTURE

9.80

9.97

968

1237

9680

11.59

99

H210-550-FPGC99

H210-550-FPGC99

RIL/PTH-J3-0099

SKID

ROOD MILL STRUCTURE

701

1597

5380

SUB TOTAL A. H210-550 ROOD MILL STRUCTURE

5.74

5.84

99

807.81

824.20

9.39

6.02
1149.16

B. H220-550 ROOD MILL STRUCTURE


100

H220-550-FPGC1

H220-550-FPGC1

RIL/PTH-J3-0100

SKID

ROOD MILL STRUCTURE

4.59

4.69

1316

1351

6036

10.73

101

H220-550-FPGC2

H220-550-FPGC2

RIL/PTH-J3-0101

SKID

ROOD MILL STRUCTURE

6.99

6.99

1192

1450

8437

14.58

102

H220-550-FPGC3

H220-550-FPGC3

RIL/PTH-J3-0102

SKID

ROOD MILL STRUCTURE

5.59

5.74

1440

1495

5000

10.76

103

H220-550-FPGC4

H220-550-FPGC4

RIL/PTH-J3-0103

SKID

ROOD MILL STRUCTURE

11.87

12.17

1400

1540

12000

25.87

104

H220-550-FPGC5

H220-550-FPGC5

RIL/PTH-J3-0104

SKID

ROOD MILL STRUCTURE

11.48

11.75

1540

1250

10500

20.21

105

H220-550-FPGC6

H220-550-FPGC6

RIL/PTH-J3-0105

SKID

ROOD MILL STRUCTURE

7.16

7.40

1547

1608

8437

20.99

106

H220-550-FPGC7

H220-550-FPGC7

RIL/PTH-J3-0106

SKID

ROOD MILL STRUCTURE

5.44

5.57

1540

1180

5000

9.09

107

H220-550-FPGC8

H220-550-FPGC8

RIL/PTH-J3-0107

SKID

ROOD MILL STRUCTURE

11.97

12.24

2259

1271

12000

34.45

108

H220-550-FPGC9

H220-550-FPGC9

RIL/PTH-J3-0108

SKID

ROOD MILL STRUCTURE

10.08

10.33

1524

961

10500

15.38

109

H220-550-FPGC10

H220-550-FPGC10

RIL/PTH-J3-0109

SKID

ROOD MILL STRUCTURE

6.32

6.55

1125

1540

6036

10.46

110

H220-550-FPGC11

H220-550-FPGC11

RIL/PTH-J3-0110

SKID

ROOD MILL STRUCTURE

7.12

7.30

1550

885

8437

11.57

111

H220-550-FPGC12

H220-550-FPGC12

RIL/PTH-J3-0111

SKID

ROOD MILL STRUCTURE

5.67

5.79

1540

995

5000

7.66

112

H220-550-FPGC12

H220-550-FPGC12

RIL/PTH-J3-0112

SKID

ROOD MILL STRUCTURE

5.67

5.80

1540

995

5000

SUB TOTAL B. H220-550 ROOD MILL STRUCTURE

13

99.95

102.33

7.66
199.42

C. H360-013 SUB PIPE RACK ACR 001


113

H360-013-VB19 ~ 23

H360-013-VB19 ~ 23

RIL/PTH-J3-0113

BUNDLE

SUB PIPE RACK ACR 001 H360-013-VB19 ~ 23

10

0.16

0.52

361

375

1526

2.07

114

H360-013-HB2 ~ HB6, VB16 ~


VB18

H360-013-HB2 ~ HB6, VB16 ~


VB18

RIL/PTH-J3-0114

BUNDLE

SUB PIPE RACK ACR 001 H360-013-HB2 ~ HB6, VB16 ~ VB18

25

0.49

1.63

461

545

1987

12.48

Page 105 of 137

04/16/2015 09:40:02

SUMMARY PACKING LIST 2nd SHIPMENT


JAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number

: 1J/3HM/7558812

Item Code

: 4500190308

Description

: Fabrication Steel Structures

Quantity

: 308 Pckgs

Quantity of Weight

: 1012.12 TONS

Quantity of Cubic Meters

: 5075.49 CBM

Shipped from

: Hanjung Private Jetty, Lampung INDONESIA

Shipped to

: Kandla, INDIA

Date of Shipment to India

: 22-March-2015

PACK NO.

DRAWING NO.

MARKING NO.

PACKAGE
No.

TYPE

DESCRIPTION

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

CBM (m3)

115

H360-013-CT7 ~ CT13

H360-013-CT7 ~ CT13

RIL/PTH-J3-0115

BUNDLE

SUB PIPE RACK ACR 001 H360-013-CT7 ~ CT13

13

0.19

1.42

1270

871

1150

16.54

116

H360-013-B67 ~ B79, B88

H360-013-B67 ~ B79, B88

RIL/PTH-J3-0116

BUNDLE

SUB PIPE RACK ACR 001 H360-013-B67 ~ B79, B88

20

0.58

2.72

461

1020

2962

27.86

117

H360-013-B82

H360-013-B82

RIL/PTH-J3-0117

BUNDLE

SUB PIPE RACK ACR 001 H360-013-B82

0.14

0.26

400

275

1461

0.64

118

H360-013-CT1 ~ CT2

H360-013-CT1 ~ CT2

RIL/PTH-J3-0118

BUNDLE

SUB PIPE RACK ACR 001 H360-013-CT1 ~ CT2

0.11

0.53

1110

658

388

2.27

119

H360-013-B19, B80 ~ B81

H360-013-B19, B80 ~ B81

RIL/PTH-J3-0119

BUNDLE

SUB PIPE RACK ACR 001 H360-013-B19, B80 ~ B81

0.23

0.38

436

378

4657

3.07

120

H360-013-B7 ~ B11

H360-013-B7 ~ B11

RIL/PTH-J3-0120

BUNDLE

SUB PIPE RACK ACR 001 H360-013-B7 ~ B11

0.59

0.78

874

399

5942

10.36

121

H360-013-B4

H360-013-B4

RIL/PTH-J3-0121

BUNDLE

SUB PIPE RACK ACR 001 H360-013-B4

0.16

0.20

856

352

4827

1.45

122

H360-013-B5

H360-013-B5

RIL/PTH-J3-0122

BUNDLE

SUB PIPE RACK ACR 001 H360-013-B5

0.58

0.63

1722

578

5944

5.92

123

H360-013-B6

H360-013-B6

RIL/PTH-J3-0123

BUNDLE

SUB PIPE RACK ACR 001 H360-013-B6

0.58

0.63

1718

578

5944

5.90

124

H360-013-CT4

H360-013-CT4

RIL/PTH-J3-0124

SKID

SUB PIPE RACK ACR 001 H360-013-CT5

0.12

0.19

380

1031

1684

0.66

125

H360-013-B1

H360-013-B1

RIL/PTH-J3-0125

SKID

SUB PIPE RACK ACR 001 H30-013-B1

0.11

0.15

399

336

2904

0.39

126

H360-013-B2

H360-013-B2

RIL/PTH-J3-0126

BUNDLE

SUB PIPE RACK ACR 001 H360-013-B2

11

1.91

2.58

971

833

5673

50.47

127

H360-013-B3

H360-013-B3

RIL/PTH-J3-0128

BUNDLE

SUB PIPE RACK ACR 001 H360-013-B3

0.87

1.13

397

503

4827

5.78

128

H360-013-VB1

H360-013-VB1

RIL/PTH-J3-0128

BUNDLE

SUB PIPE RACK ACR 001 H360-013-VB1

0.17

0.32

397

413

1389

0.91

129

H360-013-B55

H360-013-B55

RIL/PTH-J3-0129

SKID

SUB PIPE RACK ACR 001 H360-013-B55

0.21

0.27

358

876

5673

1.78

130

H360-013-CT3

H360-013-CT3

RIL/PTH-J3-0130

BUNDLE

SUB PIPE RACK ACR 001 H360-013-CT3

0.20

0.35

900

649

1442

2.53

Page 106 of 137

04/16/2015 09:40:02

SUMMARY PACKING LIST 2nd SHIPMENT


JAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number

: 1J/3HM/7558812

Item Code

: 4500190308

Description

: Fabrication Steel Structures

Quantity

: 308 Pckgs

Quantity of Weight

: 1012.12 TONS

Quantity of Cubic Meters

: 5075.49 CBM

Shipped from

: Hanjung Private Jetty, Lampung INDONESIA

Shipped to

: Kandla, INDIA

Date of Shipment to India

: 22-March-2015

PACK NO.

DRAWING NO.

MARKING NO.

PACKAGE
No.

TYPE

DESCRIPTION

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

CBM (m3)

131

H360-013-CT5

H360-013-CT5

RIL/PTH-J3-0131

SKID

SUB PIPE RACK ACR 001 H360-013-CT5

0.13

0.23

380

1420

1684

0.91

132

H360-013-CT14

H360-013-CT14

RIL/PTH-J3-0132

SKID

SUB PIPE RACK ACR 001 H360-013-CT14

0.12

0.16

826

380

1684

0.53

133

H360-013-FR1

H360-013-FR1

RIL/PTH-J3-0133

SKID

SUB PIPE RACK ACR 001 H360-013-FR1

0.38

0.46

777

1242

4790

4.62

134

H360-013-B12 ~ B13, B7, B20 ~


B21, B23, B25, B27 and B36

H360-013-B12 ~ B13, B7, B20 ~


B21, B23, B25, B27 and B37

RIL/PTH-J3-0134

BUNDLE

SUB PIPE RACK ACR 001 H360-013-B12 ~ B13, B7, B20 ~ B21, B23, B25, B27
and B37

10

1.31

1.79

750

587

5673

24.98

135

H360-013-B29, B33, B38, B41,


B50 ~ B53, B56, B84 and SC1

H360-013-B29, B33, B38, B41,


B50 ~ B53, B56, B84 and SC1

RIL/PTH-J3-0135

BUNDLE

SUB PIPE RACK ACR 001 H360-013-B29, B33, B38, B41, B50 ~ B53, B56, B84
and SC1

20

5.55

6.91

1142

966

5673

125.17

136

H360-013-B14

H360-013-B14

RIL/PTH-J3-0136

SKID

SUB PIPE RACK ACR 001 H360-013-B14

0.85

0.89

1821

520

5942

5.63

137

H360-013-B15

H360-013-B15

RIL/PTH-J3-0137

SKID

SUB PIPE RACK ACR 001 H360-013-B15

0.63

0.67

1233

520

5942

3.81

138

H360-013-B16

H360-013-B16

RIL/PTH-J3-0138

SKID

SUB PIPE RACK ACR 001 H360-013-B16

0.78

0.83

1615

519

5944

4.98

139

H360-013-B18

H360-013-B18

RIL/PTH-J3-0139

SKID

SUB PIPE RACK ACR 001 H360-013-B18

0.37

0.42

410

642

5673

1.49

140

H360-013-B22

H360-013-B22

RIL/PTH-J3-0140

SKID

SUB PIPE RACK ACR 001 H360-013-B22

0.36

0.41

609

666

4594

1.86

141

H360-013-B24

H360-013-B24

RIL/PTH-J3-0141

SKID

SUB PIPE RACK ACR 001 H360-013-B24

0.73

0.77

1584

406

5607

3.61

142

H360-013-B26

H360-013-B26

RIL/PTH-J3-0142

SKID

SUB PIPE RACK ACR 001 H360-013-B26

0.09

0.15

633

662

1181

0.49

143

H360-013-B28

H360-013-B28

RIL/PTH-J3-0143

BUNDLE

SUB PIPE RACK ACR 001 H360-013-B28

0.69

0.82

793

864

4617

6.33

144

H360-013-B30

H360-013-B30

RIL/PTH-J3-0144

SKID

SUB PIPE RACK ACR 001 H360-013-B30

0.36

0.43

846

958

4594

3.72

145

H360-013-B31

H360-013-B31

RIL/PTH-J3-0145

BUNDLE

SUB PIPE RACK ACR 001 H360-013-B31

0.70

0.82

610

868

4617

4.89

146

H360-013-B32

H360-013-B32

RIL/PTH-J3-0146

SKID

SUB PIPE RACK ACR 001 H360-013-B32

0.37

0.42

610

745

4617

2.10

Page 107 of 137

04/16/2015 09:40:02

SUMMARY PACKING LIST 2nd SHIPMENT


JAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number

: 1J/3HM/7558812

Item Code

: 4500190308

Description

: Fabrication Steel Structures

Quantity

: 308 Pckgs

Quantity of Weight

: 1012.12 TONS

Quantity of Cubic Meters

: 5075.49 CBM

Shipped from

: Hanjung Private Jetty, Lampung INDONESIA

Shipped to

: Kandla, INDIA

Date of Shipment to India

: 22-March-2015

PACK NO.

DRAWING NO.

MARKING NO.

PACKAGE
No.

TYPE

DESCRIPTION

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

CBM (m3)

147

H360-013-B34

H360-013-B34

RIL/PTH-J3-0147

SKID

SUB PIPE RACK ACR 001 H360-013-B34

0.73

0.76

1165

344

5607

2.25

148

H360-013-B35

H360-013-B35

RIL/PTH-J3-0148

SKID

SUB PIPE RACK ACR 001 H360-013-B35

0.87

0.91

1284

401

5942

3.06

149

H360-013-B36

H360-013-B36

RIL/PTH-J3-0149

SKID

SUB PIPE RACK ACR 001 H360-013-B36

0.06

0.10

659

406

731

0.20

150

H360-013-B39

H360-013-B39

RIL/PTH-J3-0150

SKID

SUB PIPE RACK ACR 001 H360-013-B39

0.37

0.42

410

657

5951

1.60

151

H360-013-B40

H360-013-B40

RIL/PTH-J3-0151

SKID

SUB PIPE RACK ACR 001 H360-013-B40

0.37

0.43

410

660

5951

1.61

152

H360-013-B42

H360-013-B42

RIL/PTH-J3-0152

SKID

SUB PIPE RACK ACR 001 H360-013-B42

0.32

0.38

410

867

4961

1.76

153

H360-013-B43

H360-013-B43

RIL/PTH-J3-0153

BUNDLE

SUB PIPE RACK ACR 001 H360-013-B43

0.95

1.11

344

660

4961

3.38

154

H360-013-B44

H360-013-B44

RIL/PTH-J3-0154

SKID

SUB PIPE RACK ACR 001 H360-013-B44

0.32

0.39

410

868

4961

1.77

155

H360-013-B45

H360-013-B45

RIL/PTH-J3-0155

SKID

SUB PIPE RACK ACR 001 H360-013-B45

0.34

0.40

410

868

4961

1.77

SUB TOTAL C. H360-013 SUB PIPE RACK ACR 001

176

25.15

35.77

363.58

D. H361-013 SUB PIPE RACK ACR 001


156

H360-013-VB19 ~ 23

H360-013-VB19 ~ 23

RIL/PTH-J3-0113

BUNDLE

SUB PIPE RACK ACR 001 H360-013-VB19 ~ 23

10

0.16

0.52

361

375

1526

2.07

157

H361-013-HB2 ~ HB6, VB16 ~


VB18

H361-013-HB2 ~ HB6, VB16 ~


VB18

RIL/PTH-J3-0157

BUNDLE

SUB PIPE RACK ACR 001 H361-013-HB2 ~ HB6, VB16 ~ VB18

25

0.49

1.63

461

545

1987

12.48

158

H361-013-CT7 ~ CT13

H361-013-CT7 ~ CT13

RIL/PTH-J3-0158

BUNDLE

SUB PIPE RACK ACR 001 H361-013-CT7 ~ CT13

13

0.19

1.42

1270

871

1150

16.54

159

H361-013-B67 ~ B79, B88

H361-013-B67 ~ B79, B88

RIL/PTH-J3-0159

BUNDLE

SUB PIPE RACK ACR 001 H360-013-B67 ~ B79, B88

20

0.58

2.72

461

1020

2962

27.86

160

H361-013-B82

H361-013-B82

RIL/PTH-J3-0160

BUNDLE

SUB PIPE RACK ACR 001 H361-013-B82

0.14

0.26

400

275

1461

0.64

161

H361-013-CT1 ~ CT2

H361-013-CT1 ~ CT2

RIL/PTH-J3-0161

BUNDLE

SUB PIPE RACK ACR 001 H361-013-CT1 ~ CT2

0.11

0.53

1110

658

388

2.27

162

H361-013-B19, B80 ~ B81

H361-013-B19, B80 ~ B81

RIL/PTH-J3-0162

BUNDLE

SUB PIPE RACK ACR 001 H361-013-B19, B80 ~ B81

0.23

0.38

436

378

4657

3.07

Page 108 of 137

04/16/2015 09:40:02

SUMMARY PACKING LIST 2nd SHIPMENT


JAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number

: 1J/3HM/7558812

Item Code

: 4500190308

Description

: Fabrication Steel Structures

Quantity

: 308 Pckgs

Quantity of Weight

: 1012.12 TONS

Quantity of Cubic Meters

: 5075.49 CBM

Shipped from

: Hanjung Private Jetty, Lampung INDONESIA

Shipped to

: Kandla, INDIA

Date of Shipment to India

: 22-March-2015

PACK NO.

DRAWING NO.

MARKING NO.

PACKAGE
No.

TYPE

DESCRIPTION

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

CBM (m3)

163

H361-013-B7 ~ B11

H361-013-B7 ~ B11

RIL/PTH-J3-0163

BUNDLE

SUB PIPE RACK ACR 001 H361-013-B7 ~ B11

0.59

0.78

874

399

5942

10.36

164

H361-013-B4

H361-013-B4

RIL/PTH-J3-0164

BUNDLE

SUB PIPE RACK ACR 001 H361-013-B4

0.16

0.20

856

352

4827

1.45

165

H361-013-B5

H361-013-B5

RIL/PTH-J3-0165

BUNDLE

SUB PIPE RACK ACR 001 H361-013-B5

0.58

0.63

1722

578

5944

5.92

166

H361-013-B6

H361-013-B6

RIL/PTH-J3-0166

BUNDLE

SUB PIPE RACK ACR 001 H361-013-B6

0.58

0.63

1718

578

5944

5.90

167

H361-013-CT4

H361-013-CT4

RIL/PTH-J3-0167

SKID

SUB PIPE RACK ACR 001 H361-013-CT5

0.12

0.19

380

1031

1684

0.66

168

H361-013-B1

H361-013-B1

RIL/PTH-J3-0168

SKID

SUB PIPE RACK ACR 001 H31-013-B1

0.11

0.15

399

336

2904

0.39

169

H361-013-B2

H361-013-B2

RIL/PTH-J3-0169

BUNDLE

SUB PIPE RACK ACR 001 H361-013-B2

11

1.91

2.58

971

833

5673

50.47

170

H361-013-B3

H361-013-B3

RIL/PTH-J3-0170

BUNDLE

SUB PIPE RACK ACR 001 H361-013-B3

0.87

1.13

397

503

4827

5.78

171

H361-013-VB1

H361-013-VB1

RIL/PTH-J3-0171

BUNDLE

SUB PIPE RACK ACR 001 H361-013-VB1

0.17

0.32

397

413

1389

0.91

172

H361-013-B55

H361-013-B55

RIL/PTH-J3-0172

SKID

SUB PIPE RACK ACR 001 H361-013-B55

0.21

0.27

358

876

5673

1.78

173

H361-013-CT3

H361-013-CT3

RIL/PTH-J3-0173

BUNDLE

SUB PIPE RACK ACR 001 H361-013-CT3

0.20

0.35

900

649

1442

2.53

174

H361-013-CT5

H361-013-CT5

RIL/PTH-J3-0174

SKID

SUB PIPE RACK ACR 001 H361-013-CT5

0.13

0.23

380

1420

1684

0.91

175

H361-013-CT14

H361-013-CT14

RIL/PTH-J3-0175

SKID

SUB PIPE RACK ACR 001 H361-013-CT14

0.12

0.16

826

380

1684

0.53

176

H361-013-FR1

H361-013-FR1

RIL/PTH-J3-0176

SKID

SUB PIPE RACK ACR 001 H361-013-FR1

0.38

0.46

777

1242

4790

4.62

177

H361-013-B12 ~ B13, B7, B20 ~


B21, B23, B25, B27 and B36

H361-013-B12 ~ B13, B7, B20 ~


B21, B23, B25, B27 and B37

RIL/PTH-J3-0177

BUNDLE

SUB PIPE RACK ACR 001 H361-013-B12 ~ B13, B7, B20 ~ B21, B23, B25, B27
and B37

10

1.31

1.79

750

587

5673

24.98

178

H361-013-B29, B33, B38, B41,


B50 ~ B53, B56, B84 and SC1

H361-013-B29, B33, B38, B41,


B50 ~ B53, B56, B84 and SC1

RIL/PTH-J3-0178

BUNDLE

SUB PIPE RACK ACR 001 H361-013-B29, B33, B38, B41, B50 ~ B53, B56, B84
and SC1

20

5.55

6.91

1142

966

5673

125.17

Page 109 of 137

04/16/2015 09:40:02

SUMMARY PACKING LIST 2nd SHIPMENT


JAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number

: 1J/3HM/7558812

Item Code

: 4500190308

Description

: Fabrication Steel Structures

Quantity

: 308 Pckgs

Quantity of Weight

: 1012.12 TONS

Quantity of Cubic Meters

: 5075.49 CBM

Shipped from

: Hanjung Private Jetty, Lampung INDONESIA

Shipped to

: Kandla, INDIA

Date of Shipment to India

: 22-March-2015

PACK NO.

DRAWING NO.

MARKING NO.

PACKAGE
No.

TYPE

DESCRIPTION

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

CBM (m3)

179

H361-013-B14

H361-013-B14

RIL/PTH-J3-0179

SKID

SUB PIPE RACK ACR 001 H361-013-B14

0.85

0.89

1821

520

5942

5.63

180

H361-013-B15

H361-013-B15

RIL/PTH-J3-0180

SKID

SUB PIPE RACK ACR 001 H361-013-B15

0.63

0.67

1233

520

5942

3.81

181

H361-013-B16

H361-013-B16

RIL/PTH-J3-0181

SKID

SUB PIPE RACK ACR 001 H361-013-B16

0.78

0.83

1615

519

5944

4.98

182

H361-013-B18

H361-013-B18

RIL/PTH-J3-0182

SKID

SUB PIPE RACK ACR 001 H361-013-B18

0.37

0.42

410

642

5673

1.49

183

H361-013-B22

H361-013-B22

RIL/PTH-J3-0183

SKID

SUB PIPE RACK ACR 001 H361-013-B22

0.36

0.41

609

666

4594

1.86

184

H361-013-B24

H361-013-B24

RIL/PTH-J3-0184

SKID

SUB PIPE RACK ACR 001 H361-013-B24

0.73

0.77

1584

406

5607

3.61

185

H361-013-B26

H361-013-B26

RIL/PTH-J3-0185

SKID

SUB PIPE RACK ACR 001 H361-013-B26

0.09

0.15

633

662

1181

0.49

186

H361-013-B28

H361-013-B28

RIL/PTH-J3-0186

BUNDLE

SUB PIPE RACK ACR 001 H361-013-B28

0.69

0.82

793

864

4617

6.33

187

H361-013-B30

H361-013-B30

RIL/PTH-J3-0187

SKID

SUB PIPE RACK ACR 001 H361-013-B30

0.36

0.43

846

958

4594

3.72

188

H361-013-B31

H361-013-B31

RIL/PTH-J3-0188

BUNDLE

SUB PIPE RACK ACR 001 H361-013-B31

0.70

0.82

610

868

4617

4.89

189

H361-013-B32

H361-013-B32

RIL/PTH-J3-0189

SKID

SUB PIPE RACK ACR 001 H361-013-B32

0.37

0.42

610

745

4617

2.10

190

H361-013-B34

H361-013-B34

RIL/PTH-J3-0190

SKID

SUB PIPE RACK ACR 001 H361-013-B34

0.73

0.76

1165

344

5607

2.25

191

H361-013-B35

H361-013-B35

RIL/PTH-J3-0191

SKID

SUB PIPE RACK ACR 001 H361-013-B35

0.87

0.91

1284

401

5942

3.06

192

H361-013-B36

H361-013-B36

RIL/PTH-J3-0192

SKID

SUB PIPE RACK ACR 001 H361-013-B36

0.06

0.10

659

406

731

0.20

193

H361-013-B39

H361-013-B39

RIL/PTH-J3-0193

SKID

SUB PIPE RACK ACR 001 H361-013-B39

0.37

0.42

410

657

5951

1.60

194

H361-013-B40

H361-013-B40

RIL/PTH-J3-0194

SKID

SUB PIPE RACK ACR 001 H361-013-B40

0.37

0.43

410

660

5951

1.61

195

H361-013-B42

H361-013-B42

RIL/PTH-J3-0195

SKID

SUB PIPE RACK ACR 001 H361-013-B42

0.32

0.38

410

867

4961

1.76

Page 110 of 137

04/16/2015 09:40:02

SUMMARY PACKING LIST 2nd SHIPMENT


JAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number

: 1J/3HM/7558812

Item Code

: 4500190308

Description

: Fabrication Steel Structures

Quantity

: 308 Pckgs

Quantity of Weight

: 1012.12 TONS

Quantity of Cubic Meters

: 5075.49 CBM

Shipped from

: Hanjung Private Jetty, Lampung INDONESIA

Shipped to

: Kandla, INDIA

Date of Shipment to India

: 22-March-2015

PACK NO.

DRAWING NO.

MARKING NO.

PACKAGE
No.

TYPE

DESCRIPTION

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

CBM (m3)

196

H361-013-B43

H361-013-B43

RIL/PTH-J3-0196

BUNDLE

SUB PIPE RACK ACR 001 H361-013-B43

0.95

1.11

344

660

4961

3.38

197

H361-013-B44

H361-013-B44

RIL/PTH-J3-0197

SKID

SUB PIPE RACK ACR 001 H361-013-B44

0.32

0.39

410

868

4961

1.77

198

H361-013-B45

H361-013-B45

RIL/PTH-J3-0198

SKID

SUB PIPE RACK ACR 001 H361-013-B45

0.34

0.40

410

868

4961

1.77

#REF!

176

25.15

35.77

363.58

D. H360-009 SULPHUR RECOVERY UNIT APR 002


199

H360-009-1HB1 ~ 1HB4, 1HB6 ~


1HB8, 1HB10 ~ 1HB15, 1VB1 ~
1VB11, 1VB26

H360-009-1HB1 ~ 1HB4, 1HB6 ~


1HB8, 1HB10 ~ 1HB15, 1VB1 ~
1VB11, 1VB26

RIL/PTH-J3-0199

BUNDLE

SULPHUR RECOVERY UNIT APR 002 H360-009-1HB1 ~ 1HB4, 1HB6 ~ 1HB8,


1HB10 ~ 1HB15, 1VB1 ~ 1VB11, 1VB26

48

3.00

5.36

698

610

3940

80.52

200

H360-009-1HB16 ~ 1HB17,
1VB12, 1VB25

H360-009-1HB16 ~ 1HB17,
1VB12, 1VB25

RIL/PTH-J3-0200

BUNDLE

SULPHUR RECOVERY UNIT APR 002 H360-009-1HB16 ~ 1HB17, 1VB12,


1VB25

0.13

0.43

326

319

2409

2.25

201

H360-009-1B5, 1B18 ~ 1B81,


1VB23 ~ 1VB24

H360-009-1B5, 1B18 ~ 1B81,


1VB23 ~ 1VB24

RIL/PTH-J3-0201

BUNDLE

SULPHUR RECOVERY UNIT APR 002 H360-009-1B5, 1B18 ~ 1B81, 1VB23 ~


1VB24

83

1.58

7.79

585

624

3480

105.44

202

H360-009-1B123 ~ 1B124

H360-009-1B123 ~ 1B124

RIL/PTH-J3-0202

BUNDLE

SULPHUR RECOVERY UNIT APR 002 H360-009-1B123 ~ 1B124

0.04

0.16

330

229

1099

0.33

203

H360-009-1B254 ~ 1B255

H360-009-1B254 ~ 1B255

RIL/PTH-J3-0203

BUNDLE

SULPHUR RECOVERY UNIT APR 002 H360-009-1B254 ~ 1B255

0.03

0.09

386

254

969

0.19

204

H360-009-1B166, 1B168, 1B171 ~


1B73, 1B175, 1B179 ~ 1B182,
1B187, 1B189, 1B191 ~ 1B192,
1B196 ~ 1B197, 1B199 ~ 1B200,
1B204, 1B206, 1B208 ~ 1B209

H360-009-1B166, 1B168, 1B171 ~


1B73, 1B175, 1B179 ~ 1B182,
1B187, 1B189, 1B191 ~ 1B192,
1B196 ~ 1B197, 1B199 ~ 1B200,
1B204, 1B206, 1B208 ~ 1B209

RIL/PTH-J3-0204

BUNDLE

SULPHUR RECOVERY UNIT APR 002 H360-009-1B166, 1B168, 1B171 ~


1B73, 1B175, 1B179 ~ 1B182, 1B187, 1B189, 1B191 ~ 1B192, 1B196 ~ 1B197,
1B199 ~ 1B200, 1B204, 1B206, 1B208 ~ 1B209

36

2.39

4.76

950

920

2961

93.16

Page 111 of 137

04/16/2015 09:40:02

SUMMARY PACKING LIST 2nd SHIPMENT


JAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number

: 1J/3HM/7558812

Item Code

: 4500190308

Description

: Fabrication Steel Structures

Quantity

: 308 Pckgs

Quantity of Weight

: 1012.12 TONS

Quantity of Cubic Meters

: 5075.49 CBM

Shipped from

: Hanjung Private Jetty, Lampung INDONESIA

Shipped to

: Kandla, INDIA

Date of Shipment to India

: 22-March-2015
PACKAGE

DESCRIPTION

MARKING NO.

205

H360-009-1B167, 1B169 ~ 1B170,


1B174, 1B176 ~ 1B178, 1B183 ~
1B186, 1B188, 1B190, 1B193 ~
1B195, 1B198, 1B201 ~ 1B205,
1B207, 1B210 ~ 1B219

H360-009-1B167, 1B169 ~ 1B170,


1B174, 1B176 ~ 1B178, 1B183 ~
1B186, 1B188, 1B190, 1B193 ~
1B195, 1B198, 1B201 ~ 1B205,
1B207, 1B210 ~ 1B219

RIL/PTH-J3-0205

BUNDLE

SULPHUR RECOVERY UNIT APR 002 H360-009-1B167, 1B169 ~ 1B170,


1B174, 1B176 ~ 1B178, 1B183 ~ 1B186, 1B188, 1B190, 1B193 ~ 1B195,
1B198, 1B201 ~ 1B205, 1B207, 1B210 ~ 1B219

68

2.67

11.36

1087

1278

2964

279.99

206

H360-009-1CT27

H360-009-1CT27

RIL/PTH-J3-0206

BUNDLE

SULPHUR RECOVERY UNIT APR 002 H360-009-1CT27

0.05

0.18

352

289

312

0.13

207

H360-009-1B115 ~ 1B121, 1B128,


1B133 ~ 1B136, 1B138 ~ 1B143,
1B145 ~ 1B147, 1B151, 1B154,
1B157 ~ 1B158, 1B161, 1B163 ~
1B165, 1FR10, 1SC2 ~ 1SC3

H360-009-1B115 ~ 1B121, 1B128,


1B133 ~ 1B136, 1B138 ~ 1B143,
1B145 ~ 1B147, 1B151, 1B154,
1B157 ~ 1B158, 1B161, 1B163 ~
1B165, 1FR10, 1SC2 ~ 1SC3

SULPHUR RECOVERY UNIT APR 002 H360-009-1B115 ~ 1B121, 1B128,


1B133 ~ 1B136, 1B138 ~ 1B143, 1B145 ~ 1B147, 1B151, 1B154, 1B157 ~
1B158, 1B161, 1B163 ~ 1B165, 1FR10, 1SC2 ~ 1SC3

33

2.09

6.41

1372

1314

5964

354.81

208

H360-009-1CT28 ~ 1CT32

H360-009-1CT28 ~ 1CT32

RIL/PTH-J3-0208

BUNDLE

SULPHUR RECOVERY UNIT APR 002 H360-009-1CT28 ~ 1CT32

0.32

1.60

1180

1457

1988

30.76

209

H360-009-1B114

H360-009-1B114

RIL/PTH-J3-0209

SKID

SULPHUR RECOVERY UNIT APR 002 H360-009-1B114

0.05

0.09

680

375

1463

0.37

210

H360-009-1B117

H360-009-1B117

RIL/PTH-J3-0210

SKID

SULPHUR RECOVERY UNIT APR 002 H360-009-1B117

0.11

0.16

682

591

3093

1.25

211

H360-009-1B122

H360-009-1B122

RIL/PTH-J3-0211

SKID

SULPHUR RECOVERY UNIT APR 002 H360-009-1B122

0.05

0.08

403

333

1463

0.20

212

H360-009-1B125

H360-009-1B125

RIL/PTH-J3-0212

SKID

SULPHUR RECOVERY UNIT APR 002 H360-009-1B125

0.08

0.12

403

333

2899

0.39

213

H360-009-1B126

H360-009-1B126

RIL/PTH-J3-0213

SKID

SULPHUR RECOVERY UNIT APR 002 H360-009-1B126

0.08

0.12

403

333

2963

0.40

214

H360-009-1B127

H360-009-1B127

RIL/PTH-J3-0214

SKID

SULPHUR RECOVERY UNIT APR 002 H360-009-1B127

0.05

0.09

403

333

1459

0.20

215

H360-009-1B129

H360-009-1B129

RIL/PTH-J3-0215

SKID

SULPHUR RECOVERY UNIT APR 002 H360-009-1B129

0.10

0.13

403

333

2964

0.40

216

H360-009-1B130

H360-009-1B130

RIL/PTH-J3-0216

SKID

SULPHUR RECOVERY UNIT APR 002 H360-009-1B130

0.09

0.13

403

333

2964

0.40

217

H360-009-1B131

H360-009-1B131

RIL/PTH-J3-0217

SKID

SULPHUR RECOVERY UNIT APR 002 H360-009-1B131

0.09

0.12

403

333

2964

0.40

Page 112 of 137

QTY

DIMENSION (mm)

DRAWING NO.

No.

TYPE

WEIGHT (ton)

PACK NO.

NETT.

GROSS

HEIGHT

WIDTH

LENGTH

CBM (m3)

04/16/2015 09:40:02

SUMMARY PACKING LIST 2nd SHIPMENT


JAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number

: 1J/3HM/7558812

Item Code

: 4500190308

Description

: Fabrication Steel Structures

Quantity

: 308 Pckgs

Quantity of Weight

: 1012.12 TONS

Quantity of Cubic Meters

: 5075.49 CBM

Shipped from

: Hanjung Private Jetty, Lampung INDONESIA

Shipped to

: Kandla, INDIA

Date of Shipment to India

: 22-March-2015

PACK NO.

DRAWING NO.

MARKING NO.

PACKAGE
No.

TYPE

DESCRIPTION

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

CBM (m3)

218

H360-009-1B132

H360-009-1B132

RIL/PTH-J3-0218

SKID

SULPHUR RECOVERY UNIT APR 002 H360-009-1B132

0.09

0.12

403

333

2964

0.40

219

H360-009-1B137

H360-009-1B137

RIL/PTH-J3-0219

SKID

SULPHUR RECOVERY UNIT APR 002 H360-009-1B137

0.05

0.09

403

333

1459

0.20

220

H360-009-1B144

H360-009-1B144

RIL/PTH-J3-0220

SKID

SULPHUR RECOVERY UNIT APR 002 H360-009-1B144

0.04

0.08

403

333

1411

0.19

221

H360-009-1B148

H360-009-1B148

RIL/PTH-J3-0221

SKID

SULPHUR RECOVERY UNIT APR 002 H360-009-1B148

0.10

0.13

403

333

2860

0.38

222

H360-009-1B149

H360-009-1B149

RIL/PTH-J3-0222

SKID

SULPHUR RECOVERY UNIT APR 002 H360-009-1B149

0.09

0.13

403

333

2860

0.38

223

H360-009-1B150

H360-009-1B150

RIL/PTH-J3-0223

BUNDLE

SULPHUR RECOVERY UNIT APR 002 H360-009-1B150

0.10

0.17

403

333

1461

0.39

224

H360-009-1B152

H360-009-1B152

RIL/PTH-J3-0224

SKID

SULPHUR RECOVERY UNIT APR 002 H360-009-1B152

0.06

0.09

403

333

1348

0.18

225

H360-009-1B153

H360-009-1B153

RIL/PTH-J3-0225

SKID

SULPHUR RECOVERY UNIT APR 002 H360-009-1B153

0.12

0.15

403

333

3093

0.42

226

H360-009-1B155

H360-009-1B155

RIL/PTH-J3-0226

SKID

SULPHUR RECOVERY UNIT APR 002 H360-009-1B155

0.15

0.19

403

333

5464

0.73

227

H360-009-1B156

H360-009-1B156

RIL/PTH-J3-0227

SKID

SULPHUR RECOVERY UNIT APR 002 H360-009-1B156

0.17

0.20

403

333

5964

0.80

228

H360-009-1B159

H360-009-1B159

RIL/PTH-J3-0228

SKID

SULPHUR RECOVERY UNIT APR 002 H360-009-1B159

0.07

0.11

403

333

2364

0.32

229

H360-009-1B160

H360-009-1B160

RIL/PTH-J3-0229

SKID

SULPHUR RECOVERY UNIT APR 002 H360-009-1B160

0.08

0.11

403

333

2364

0.32

230

H360-009-1B162

H360-009-1B162

RIL/PTH-J3-0230

SKID

SULPHUR RECOVERY UNIT APR 002 H360-009-1B162

0.23

0.27

403

333

7882

1.06

231

H360-009-1B259

H360-009-1B259

RIL/PTH-J3-0231

SKID

SULPHUR RECOVERY UNIT APR 002 H360-009-1B259

0.09

0.13

403

333

3062

0.41

232

H360-009-1FR6

H360-009-1FR6

RIL/PTH-J3-0232

SKID

SULPHUR RECOVERY UNIT APR 002 H360-009-1FR6

0.35

0.39

403

333

1744

0.23

233

H360-009-1FR7

H360-009-1FR7

RIL/PTH-J3-0233

SKID

SULPHUR RECOVERY UNIT APR 002 H360-009-1FR7

0.19

0.22

403

333

647

0.09

234

H360-009-1FR8

H360-009-1FR8

RIL/PTH-J3-0234

SKID

SULPHUR RECOVERY UNIT APR 002 H360-009-1FR8

0.18

0.21

403

333

647

0.09

Page 113 of 137

04/16/2015 09:40:02

SUMMARY PACKING LIST 2nd SHIPMENT


JAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number

: 1J/3HM/7558812

Item Code

: 4500190308

Description

: Fabrication Steel Structures

Quantity

: 308 Pckgs

Quantity of Weight

: 1012.12 TONS

Quantity of Cubic Meters

: 5075.49 CBM

Shipped from

: Hanjung Private Jetty, Lampung INDONESIA

Shipped to

: Kandla, INDIA

Date of Shipment to India

: 22-March-2015

PACK NO.

DRAWING NO.

MARKING NO.

PACKAGE
No.

TYPE

235

H360-009-1FR9

H360-009-1FR9

RIL/PTH-J3-0235

SKID

236

H360-009-1B40 ~ 1B45, 1B49 ~


1B50, 1B52, 1B56 ~ 1B57

H360-009-1B40 ~ 1B45, 1B49 ~


1B50, 1B52, 1B56 ~ 1B57

RIL/PTH-J3-0236

237

H360-009-1B41, 1B58 ~ 1B60,


H360-009-1B41, 1B58 ~ 1B60,
1B69, 1B72 ~ 1B78, 1B81 ~ 1B82, 1B69, 1B72 ~ 1B78, 1B81 ~ 1B82,
1B84 ~ 1B85, 1B90 and 1SC4
1B84 ~ 1B85, 1B90 and 1SC4

238

H360-009-1B46

239

DESCRIPTION

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

CBM (m3)

SULPHUR RECOVERY UNIT APR 002 H360-009-1FR9

0.16

0.19

403

333

1850

0.25

BUNDLE

SULPHUR RECOVERY UNIT APR 002 H360-009-1B40 ~ 1B45, 1B49 ~ 1B50,


1B52, 1B56 ~ 1B57

21

3.37

6.03

1218

1262

5963

192.48

RIL/PTH-J3-0237

BUNDLE

SULPHUR RECOVERY UNIT APR 002 H360-009-1B41, 1B58 ~ 1B60, 1B69,


1B72 ~ 1B78, 1B81 ~ 1B82, 1B84 ~ 1B85, 1B90 and 1SC4

24

2.56

7.11

1121

2042

5461

300.02

H360-009-1B46

RIL/PTH-J3-0238

BUNDLE

SULPHUR RECOVERY UNIT APR 002 H360-009-1B46

0.14

0.24

456

566

1464

0.76

H360-009-1B47

H360-009-1B47

RIL/PTH-J3-0239

SKID

SULPHUR RECOVERY UNIT APR 002 H360-009-1B47

0.22

0.28

456

787

5460

1.96

240

H360-009-1B48

H360-009-1B48

RIL/PTH-J3-0240

SKID

SULPHUR RECOVERY UNIT APR 002 H360-009-1B48

0.23

0.29

455

885

5460

2.20

241

H360-009-1B51

H360-009-1B51

RIL/PTH-J3-0241

SKID

SULPHUR RECOVERY UNIT APR 002 H360-009-1B51

0.25

0.31

455

845

5462

2.10

242

H360-009-1B53

H360-009-1B53

RIL/PTH-J3-0242

SKID

SULPHUR RECOVERY UNIT APR 002 H360-009-1B53

0.18

0.23

455

696

3962

1.25

243

H360-009-1B54

H360-009-1B54

RIL/PTH-J3-0243

SKID

SULPHUR RECOVERY UNIT APR 002 H360-009-1B54

0.18

0.23

456

699

3963

1.26

244

H360-009-1B55

H360-009-1B55

RIL/PTH-J3-0244

BUNDLE

SULPHUR RECOVERY UNIT APR 002 H360-009-1B55

1.19

1.39

634

456

5585

8.07

245

H360-009-1B61

H360-009-1B61

RIL/PTH-J3-0245

SKID

SULPHUR RECOVERY UNIT APR 002 H360-009-1B61

0.28

0.35

851

1010

5462

4.69

246

H360-009-1B62

H360-009-1B62

RIL/PTH-J3-0246

SKID

SULPHUR RECOVERY UNIT APR 002 H360-009-1B62

0.23

0.29

850

822

5462

3.82

247

H360-009-1B63

H360-009-1B63

RIL/PTH-J3-0247

SKID

SULPHUR RECOVERY UNIT APR 002 H360-009-1B63

0.23

0.28

850

612

5462

2.84

248

H360-009-1B64

H360-009-1B64

RIL/PTH-J3-0248

BUNDLE

SULPHUR RECOVERY UNIT APR 002 H360-009-1B64

1.07

1.25

641

346

5462

6.06

249

H360-009-1B65

H360-009-1B65

RIL/PTH-J3-0249

SKID

SULPHUR RECOVERY UNIT APR 002 H360-009-1B65

0.22

0.28

456

817

5462

2.03

250

H360-009-1B66

H360-009-1B66

RIL/PTH-J3-0250

SKID

SULPHUR RECOVERY UNIT APR 002 H360-009-1B66

0.23

0.29

455

814

5462

2.02

Page 114 of 137

04/16/2015 09:40:02

SUMMARY PACKING LIST 2nd SHIPMENT


JAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number

: 1J/3HM/7558812

Item Code

: 4500190308

Description

: Fabrication Steel Structures

Quantity

: 308 Pckgs

Quantity of Weight

: 1012.12 TONS

Quantity of Cubic Meters

: 5075.49 CBM

Shipped from

: Hanjung Private Jetty, Lampung INDONESIA

Shipped to

: Kandla, INDIA

Date of Shipment to India

: 22-March-2015

PACK NO.

DRAWING NO.

MARKING NO.

PACKAGE
No.

TYPE

DESCRIPTION

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

CBM (m3)

251

H360-009-1B67

H360-009-1B67

RIL/PTH-J3-0251

SKID

SULPHUR RECOVERY UNIT APR 002 H360-009-1B67

0.22

0.27

456

574

5462

1.43

252

H360-009-1B68

H360-009-1B68

RIL/PTH-J3-0252

SKID

SULPHUR RECOVERY UNIT APR 002 H360-009-1B68

0.23

0.29

456

847

5462

2.11

253

H360-009-1B70

H360-009-1B70

RIL/PTH-J3-0253

BUNDLE

SULPHUR RECOVERY UNIT APR 002 H360-009-1B70

0.67

0.86

456

849

5462

6.34

SUB TOTAL D. H360-009 SULPHUR RECOVERY UNIT APR 002

396

27.02

62.40

1499.88

E. H361-009 SULPHUR RECOVERY UNIT APR 002


254

H360-009-1HB1 ~ 1HB4, 1HB6 ~


1HB8, 1HB10 ~ 1HB15, 1VB1 ~
1VB11, 1VB26

H360-009-1HB1 ~ 1HB4, 1HB6 ~


1HB8, 1HB10 ~ 1HB15, 1VB1 ~
1VB11, 1VB26

RIL/PTH-J3-0254

BUNDLE

SULPHUR RECOVERY UNIT APR 002 H360-009-1HB1 ~ 1HB4, 1HB6 ~ 1HB8,


1HB10 ~ 1HB15, 1VB1 ~ 1VB11, 1VB26

48

3.00

5.36

698

610

3940

80.52

255

H361-009-1HB16 ~ 1HB17,
1VB12, 1VB25

H361-009-1HB16 ~ 1HB17,
1VB12, 1VB25

RIL/PTH-J3-0255

BUNDLE

SULPHUR RECOVERY UNIT APR 002 H361-009-1HB16 ~ 1HB17, 1VB12,


1VB25

0.13

0.43

326

319

2409

2.25

256

H361-009-1B5, 1B18 ~ 1B81,


1VB23 ~ 1VB24

H361-009-1B5, 1B18 ~ 1B81,


1VB23 ~ 1VB24

RIL/PTH-J3-0256

BUNDLE

SULPHUR RECOVERY UNIT APR 002 H361-009-1B5, 1B18 ~ 1B81, 1VB23 ~


1VB24

83

1.58

7.79

585

624

3480

105.44

257

H361-009-1B123 ~ 1B124

H360-009-1B123 ~ 1B124

RIL/PTH-J3-0257

BUNDLE

SULPHUR RECOVERY UNIT APR 002 H361-009-1B123 ~ 1B124

0.04

0.16

330

229

1099

0.33

258

H361-009-1B254 ~ 1B255

H360-009-1B254 ~ 1B255

RIL/PTH-J3-0258

BUNDLE

SULPHUR RECOVERY UNIT APR 002 H361-009-1B254 ~ 1B255

0.03

0.09

386

254

969

0.19

259

H361-009-1B166, 1B168, 1B171 ~


1B73, 1B175, 1B179 ~ 1B182,
1B187, 1B189, 1B191 ~ 1B192,
1B196 ~ 1B197, 1B199 ~ 1B200,
1B204, 1B206, 1B208 ~ 1B209

H361-009-1B166, 1B168, 1B171 ~


1B73, 1B175, 1B179 ~ 1B182,
1B187, 1B189, 1B191 ~ 1B192,
1B196 ~ 1B197, 1B199 ~ 1B200,
1B204, 1B206, 1B208 ~ 1B209

RIL/PTH-J3-0259

BUNDLE

SULPHUR RECOVERY UNIT APR 002 H361-009-1B166, 1B168, 1B171 ~


1B73, 1B175, 1B179 ~ 1B182, 1B187, 1B189, 1B191 ~ 1B192, 1B196 ~ 1B197,
1B199 ~ 1B200, 1B204, 1B206, 1B208 ~ 1B209

36

2.39

4.76

950

920

2961

93.16

Page 115 of 137

04/16/2015 09:40:02

SUMMARY PACKING LIST 2nd SHIPMENT


JAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number

: 1J/3HM/7558812

Item Code

: 4500190308

Description

: Fabrication Steel Structures

Quantity

: 308 Pckgs

Quantity of Weight

: 1012.12 TONS

Quantity of Cubic Meters

: 5075.49 CBM

Shipped from

: Hanjung Private Jetty, Lampung INDONESIA

Shipped to

: Kandla, INDIA

Date of Shipment to India

: 22-March-2015
PACKAGE

DESCRIPTION

MARKING NO.

260

H361-009-1B167, 1B169 ~ 1B170,


1B174, 1B176 ~ 1B178, 1B183 ~
1B186, 1B188, 1B190, 1B193 ~
1B195, 1B198, 1B201 ~ 1B205,
1B207, 1B210 ~ 1B219

H361-009-1B167, 1B169 ~ 1B170,


1B174, 1B176 ~ 1B178, 1B183 ~
1B186, 1B188, 1B190, 1B193 ~
1B195, 1B198, 1B201 ~ 1B205,
1B207, 1B210 ~ 1B219

RIL/PTH-J3-0260

BUNDLE

SULPHUR RECOVERY UNIT APR 002 H361-009-1B167, 1B169 ~ 1B170,


1B174, 1B176 ~ 1B178, 1B183 ~ 1B186, 1B188, 1B190, 1B193 ~ 1B195,
1B198, 1B201 ~ 1B205, 1B207, 1B210 ~ 1B219

68

2.67

11.36

1087

1278

2964

279.99

261

H361-009-1CT27

H361-009-1CT27

RIL/PTH-J3-0261

BUNDLE

SULPHUR RECOVERY UNIT APR 002 H361-009-1CT27

0.05

0.18

352

289

312

0.13

262

H361-009-1B115 ~ 1B121, 1B128,


1B133 ~ 1B136, 1B138 ~ 1B143,
1B145 ~ 1B147, 1B151, 1B154,
1B157 ~ 1B158, 1B161, 1B163 ~
1B165, 1FR10, 1SC2 ~ 1SC3

H361-009-1B115 ~ 1B121, 1B128,


1B133 ~ 1B136, 1B138 ~ 1B143,
1B145 ~ 1B147, 1B151, 1B154,
1B157 ~ 1B158, 1B161, 1B163 ~
1B165, 1FR10, 1SC2 ~ 1SC3

RIL/PTH-J3-0262

SULPHUR RECOVERY UNIT APR 002 H361-009-1B115 ~ 1B121, 1B128,


1B133 ~ 1B136, 1B138 ~ 1B143, 1B145 ~ 1B147, 1B151, 1B154, 1B157 ~
1B158, 1B161, 1B163 ~ 1B165, 1FR10, 1SC2 ~ 1SC3

33

2.09

6.41

1372

1314

5964

354.81

263

H361-009-1CT28 ~ 1CT32

H361-009-1CT28 ~ 1CT32

RIL/PTH-J3-0263

BUNDLE

SULPHUR RECOVERY UNIT APR 002 H360-009-1CT28 ~ 1CT32

0.32

1.60

1180

1457

1988

30.76

264

H361-009-1B114

H361-009-1B114

RIL/PTH-J3-0264

SKID

SULPHUR RECOVERY UNIT APR 002 H361-009-1B114

0.05

0.09

680

375

1463

0.37

265

H361-009-1B117

H361-009-1B117

RIL/PTH-J3-0265

SKID

SULPHUR RECOVERY UNIT APR 002 H361-009-1B117

0.11

0.16

682

591

3093

1.25

266

H361-009-1B122

H361-009-1B122

RIL/PTH-J3-0266

SKID

SULPHUR RECOVERY UNIT APR 002 H361-009-1B122

0.05

0.08

403

333

1463

0.20

267

H361-009-1B125

H361-009-1B125

RIL/PTH-J3-0267

SKID

SULPHUR RECOVERY UNIT APR 002 H361-009-1B125

0.08

0.12

403

333

2899

0.39

268

H361-009-1B126

H361-009-1B126

RIL/PTH-J3-0268

SKID

SULPHUR RECOVERY UNIT APR 002 H361-009-1B126

0.08

0.12

403

333

2963

0.40

269

H361-009-1B127

H361-009-1B127

RIL/PTH-J3-0269

SKID

SULPHUR RECOVERY UNIT APR 002 H361-009-1B127

0.05

0.09

403

333

1459

0.20

270

H361-009-1B129

H361-009-1B129

RIL/PTH-J3-0270

SKID

SULPHUR RECOVERY UNIT APR 002 H361-009-1B129

0.10

0.13

403

333

2964

0.40

271

H361-009-1B130

H361-009-1B130

RIL/PTH-J3-0271

SKID

SULPHUR RECOVERY UNIT APR 002 H361-009-1B130

0.09

0.13

403

333

2964

0.40

272

H361-009-1B131

H361-009-1B131

RIL/PTH-J3-0272

SKID

SULPHUR RECOVERY UNIT APR 002 H361-009-1B131

0.09

0.12

403

333

2964

0.40

Page 116 of 137

QTY

DIMENSION (mm)

DRAWING NO.

No.

TYPE

WEIGHT (ton)

PACK NO.

NETT.

GROSS

HEIGHT

WIDTH

LENGTH

CBM (m3)

04/16/2015 09:40:02

SUMMARY PACKING LIST 2nd SHIPMENT


JAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number

: 1J/3HM/7558812

Item Code

: 4500190308

Description

: Fabrication Steel Structures

Quantity

: 308 Pckgs

Quantity of Weight

: 1012.12 TONS

Quantity of Cubic Meters

: 5075.49 CBM

Shipped from

: Hanjung Private Jetty, Lampung INDONESIA

Shipped to

: Kandla, INDIA

Date of Shipment to India

: 22-March-2015

PACK NO.

DRAWING NO.

MARKING NO.

PACKAGE
No.

TYPE

DESCRIPTION

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

CBM (m3)

273

H361-009-1B132

H361-009-1B132

RIL/PTH-J3-0273

SKID

SULPHUR RECOVERY UNIT APR 002 H361-009-1B132

0.09

0.12

403

333

2964

0.40

274

H361-009-1B137

H361-009-1B137

RIL/PTH-J3-0274

SKID

SULPHUR RECOVERY UNIT APR 002 H361-009-1B137

0.05

0.09

403

333

1459

0.20

275

H361-009-1B144

H361-009-1B144

RIL/PTH-J3-0275

SKID

SULPHUR RECOVERY UNIT APR 002 H361-009-1B144

0.04

0.08

403

333

1411

0.19

276

H361-009-1B148

H361-009-1B148

RIL/PTH-J3-0276

SKID

SULPHUR RECOVERY UNIT APR 002 H361-009-1B148

0.10

0.13

403

333

2860

0.38

277

H361-009-1B149

H361-009-1B149

RIL/PTH-J3-0277

SKID

SULPHUR RECOVERY UNIT APR 002 H361-009-1B149

0.09

0.13

403

333

2860

0.38

278

H361-009-1B150

H361-009-1B150

RIL/PTH-J3-0278

BUNDLE

SULPHUR RECOVERY UNIT APR 002 H361-009-1B150

0.10

0.17

403

333

1461

0.39

279

H361-009-1B152

H361-009-1B152

RIL/PTH-J3-0279

SKID

SULPHUR RECOVERY UNIT APR 002 H361-009-1B152

0.06

0.09

403

333

1348

0.18

280

H361-009-1B153

H361-009-1B153

RIL/PTH-J3-0280

SKID

SULPHUR RECOVERY UNIT APR 002 H361-009-1B153

0.12

0.15

403

333

3093

0.42

281

H361-009-1B155

H361-009-1B155

RIL/PTH-J3-0281

SKID

SULPHUR RECOVERY UNIT APR 002 H361-009-1B155

0.15

0.19

403

333

5464

0.73

282

H361-009-1B156

H361-009-1B156

RIL/PTH-J3-0282

SKID

SULPHUR RECOVERY UNIT APR 002 H361-009-1B156

0.17

0.20

403

333

5964

0.80

283

H361-009-1B159

H361-009-1B159

RIL/PTH-J3-0283

SKID

SULPHUR RECOVERY UNIT APR 002 H361-009-1B159

0.07

0.11

403

333

2364

0.32

284

H361-009-1B160

H361-009-1B160

RIL/PTH-J3-0284

SKID

SULPHUR RECOVERY UNIT APR 002 H361-009-1B160

0.08

0.11

403

333

2364

0.32

285

H361-009-1B162

H361-009-1B162

RIL/PTH-J3-0285

SKID

SULPHUR RECOVERY UNIT APR 002 H361-009-1B162

0.23

0.27

403

333

7882

1.06

286

H361-009-1B259

H361-009-1B259

RIL/PTH-J3-0286

SKID

SULPHUR RECOVERY UNIT APR 002 H361-009-1B259

0.09

0.13

403

333

3062

0.41

287

H361-009-1FR6

H361-009-1FR6

RIL/PTH-J3-0287

SKID

SULPHUR RECOVERY UNIT APR 002 H361-009-1FR6

0.35

0.39

403

333

1744

0.23

288

H361-009-1FR7

H361-009-1FR7

RIL/PTH-J3-0288

SKID

SULPHUR RECOVERY UNIT APR 002 H361-009-1FR7

0.19

0.22

403

333

647

0.09

289

H361-009-1FR8

H361-009-1FR8

RIL/PTH-J3-0289

SKID

SULPHUR RECOVERY UNIT APR 002 H361-009-1FR8

0.18

0.21

403

333

647

0.09

Page 117 of 137

04/16/2015 09:40:02

SUMMARY PACKING LIST 2nd SHIPMENT


JAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number

: 1J/3HM/7558812

Item Code

: 4500190308

Description

: Fabrication Steel Structures

Quantity

: 308 Pckgs

Quantity of Weight

: 1012.12 TONS

Quantity of Cubic Meters

: 5075.49 CBM

Shipped from

: Hanjung Private Jetty, Lampung INDONESIA

Shipped to

: Kandla, INDIA

Date of Shipment to India

: 22-March-2015

PACK NO.

DRAWING NO.

MARKING NO.

PACKAGE
No.

TYPE

290

H361-009-1FR9

H361-009-1FR9

RIL/PTH-J3-0290

SKID

291

H361-009-1B40 ~ 1B45, 1B49 ~


1B50, 1B52, 1B56 ~ 1B57

H361-009-1B40 ~ 1B45, 1B49 ~


1B50, 1B52, 1B56 ~ 1B57

RIL/PTH-J3-0291

292

H361-009-1B41, 1B58 ~ 1B60,


H361-009-1B41, 1B58 ~ 1B60,
1B69, 1B72 ~ 1B78, 1B81 ~ 1B82, 1B69, 1B72 ~ 1B78, 1B81 ~ 1B82,
1B84 ~ 1B85, 1B90 and 1SC4
1B84 ~ 1B85, 1B90 and 1SC4

293

H361-009-1B46

294

DESCRIPTION

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

CBM (m3)

SULPHUR RECOVERY UNIT APR 002 H361-009-1FR9

0.16

0.19

403

333

1850

0.25

BUNDLE

SULPHUR RECOVERY UNIT APR 002 H361-009-1B40 ~ 1B45, 1B49 ~ 1B50,


1B52, 1B56 ~ 1B57

21

3.37

6.03

1218

1262

5963

192.48

RIL/PTH-J3-0292

BUNDLE

SULPHUR RECOVERY UNIT APR 002 H361-009-1B41, 1B58 ~ 1B60, 1B69,


1B72 ~ 1B78, 1B81 ~ 1B82, 1B84 ~ 1B85, 1B90 and 1SC4

24

2.56

7.11

1121

2042

5461

300.02

H361-009-1B46

RIL/PTH-J3-0293

BUNDLE

SULPHUR RECOVERY UNIT APR 002 H361-009-1B46

0.14

0.24

456

566

1464

0.76

H361-009-1B47

H361-009-1B47

RIL/PTH-J3-0294

SKID

SULPHUR RECOVERY UNIT APR 002 H361-009-1B47

0.22

0.28

456

787

5460

1.96

295

H361-009-1B48

H361-009-1B48

RIL/PTH-J3-0295

SKID

SULPHUR RECOVERY UNIT APR 002 H361-009-1B48

0.23

0.29

455

885

5460

2.20

296

H361-009-1B51

H361-009-1B51

RIL/PTH-J3-0296

SKID

SULPHUR RECOVERY UNIT APR 002 H361-009-1B51

0.25

0.31

455

845

5462

2.10

297

H361-009-1B53

H361-009-1B53

RIL/PTH-J3-0297

SKID

SULPHUR RECOVERY UNIT APR 002 H361-009-1B53

0.18

0.23

455

696

3962

1.25

298

H361-009-1B54

H361-009-1B54

RIL/PTH-J3-0298

SKID

SULPHUR RECOVERY UNIT APR 002 H361-009-1B54

0.18

0.23

456

699

3963

1.26

299

H361-009-1B55

H361-009-1B55

RIL/PTH-J3-0299

BUNDLE

SULPHUR RECOVERY UNIT APR 002 H361-009-1B55

1.19

1.39

634

456

5585

8.07

300

H361-009-1B61

H361-009-1B61

RIL/PTH-J3-0300

SKID

SULPHUR RECOVERY UNIT APR 002 H361-009-1B61

0.28

0.35

851

1010

5462

4.69

301

H361-009-1B62

H361-009-1B62

RIL/PTH-J3-0301

SKID

SULPHUR RECOVERY UNIT APR 002 H361-009-1B62

0.23

0.29

850

822

5462

3.82

302

H361-009-1B63

H361-009-1B63

RIL/PTH-J3-0302

SKID

SULPHUR RECOVERY UNIT APR 002 H361-009-1B63

0.23

0.28

850

612

5462

2.84

303

H361-009-1B64

H361-009-1B64

RIL/PTH-J3-0303

BUNDLE

SULPHUR RECOVERY UNIT APR 002 H361-009-1B64

1.07

1.25

641

346

5462

6.06

304

H361-009-1B65

H361-009-1B65

RIL/PTH-J3-0304

SKID

SULPHUR RECOVERY UNIT APR 002 H361-009-1B65

0.22

0.28

456

817

5462

2.03

Page 118 of 137

04/16/2015 09:40:02

SUMMARY PACKING LIST 2nd SHIPMENT


JAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number

: 1J/3HM/7558812

Item Code

: 4500190308

Description

: Fabrication Steel Structures

Quantity

: 308 Pckgs

Quantity of Weight

: 1012.12 TONS

Quantity of Cubic Meters

: 5075.49 CBM

Shipped from

: Hanjung Private Jetty, Lampung INDONESIA

Shipped to

: Kandla, INDIA

Date of Shipment to India

: 22-March-2015

PACK NO.

DRAWING NO.

MARKING NO.

PACKAGE
No.

TYPE

DESCRIPTION

QTY

WEIGHT (ton)
NETT.

DIMENSION (mm)

GROSS

HEIGHT

WIDTH

LENGTH

CBM (m3)

305

H361-009-1B66

H361-009-1B66

RIL/PTH-J3-0305

SKID

SULPHUR RECOVERY UNIT APR 002 H361-009-1B66

0.23

0.29

455

814

5462

2.02

306

H361-009-1B67

H361-009-1B67

RIL/PTH-J3-0306

SKID

SULPHUR RECOVERY UNIT APR 002 H361-009-1B67

0.22

0.27

456

574

5462

1.43

307

H361-009-1B68

H361-009-1B68

RIL/PTH-J3-0307

SKID

SULPHUR RECOVERY UNIT APR 002 H361-009-1B68

0.23

0.29

456

847

5462

2.11

308

H361-009-1B70

H361-009-1B70

RIL/PTH-J3-0308

BUNDLE

SULPHUR RECOVERY UNIT APR 002 H361-009-1B70

0.67

0.86

456

849

5462

6.34

SUB TOTAL E. H361-009 SULPHUR RECOVERY UNIT APR 002


GRAND TOTAL

Page 119 of 137

396

27.02

62.40

1499.88

1256

1012.12

1122.86

5075.49

04/16/2015 09:40:02

ARY PACKING LIST 2nd SHIPMENT


GAR 3 (J3) GASIFICATION PROJECT

11-Mar-15
REV.02
BARGE/ CONTAINER

Page 120 of 137

REMARK

04/16/2015 09:40:02

ARY PACKING LIST 2nd SHIPMENT


GAR 3 (J3) GASIFICATION PROJECT

11-Mar-15
REV.02
BARGE/ CONTAINER

Page 121 of 137

REMARK

04/16/2015 09:40:02

ARY PACKING LIST 2nd SHIPMENT


GAR 3 (J3) GASIFICATION PROJECT

11-Mar-15
REV.02
BARGE/ CONTAINER

Page 122 of 137

REMARK

04/16/2015 09:40:02

ARY PACKING LIST 2nd SHIPMENT


GAR 3 (J3) GASIFICATION PROJECT

11-Mar-15
REV.02
BARGE/ CONTAINER

REMARK

99951

Page 123 of 137

04/16/2015 09:40:02

ARY PACKING LIST 2nd SHIPMENT


GAR 3 (J3) GASIFICATION PROJECT

11-Mar-15
REV.02
BARGE/ CONTAINER

Page 124 of 137

REMARK

04/16/2015 09:40:02

ARY PACKING LIST 2nd SHIPMENT


GAR 3 (J3) GASIFICATION PROJECT

11-Mar-15
REV.02
BARGE/ CONTAINER

Page 125 of 137

REMARK

04/16/2015 09:40:02

ARY PACKING LIST 2nd SHIPMENT


GAR 3 (J3) GASIFICATION PROJECT

11-Mar-15
REV.02
BARGE/ CONTAINER

Page 126 of 137

REMARK

04/16/2015 09:40:02

ARY PACKING LIST 2nd SHIPMENT


GAR 3 (J3) GASIFICATION PROJECT

11-Mar-15
REV.02
BARGE/ CONTAINER

Page 127 of 137

REMARK

04/16/2015 09:40:02

ARY PACKING LIST 2nd SHIPMENT


GAR 3 (J3) GASIFICATION PROJECT

11-Mar-15
REV.02
BARGE/ CONTAINER

Page 128 of 137

REMARK

04/16/2015 09:40:02

ARY PACKING LIST 2nd SHIPMENT


GAR 3 (J3) GASIFICATION PROJECT

11-Mar-15
REV.02
BARGE/ CONTAINER

REMARK

25155

Page 129 of 137

04/16/2015 09:40:02

ARY PACKING LIST 2nd SHIPMENT


GAR 3 (J3) GASIFICATION PROJECT

11-Mar-15
REV.02
BARGE/ CONTAINER

Page 130 of 137

REMARK

04/16/2015 09:40:02

ARY PACKING LIST 2nd SHIPMENT


GAR 3 (J3) GASIFICATION PROJECT

11-Mar-15
REV.02
BARGE/ CONTAINER

Page 131 of 137

REMARK

04/16/2015 09:40:02

ARY PACKING LIST 2nd SHIPMENT


GAR 3 (J3) GASIFICATION PROJECT

11-Mar-15
REV.02
BARGE/ CONTAINER

Page 132 of 137

REMARK

04/16/2015 09:40:02

ARY PACKING LIST 2nd SHIPMENT


GAR 3 (J3) GASIFICATION PROJECT

11-Mar-15
REV.02
BARGE/ CONTAINER

REMARK

62400

Page 133 of 137

04/16/2015 09:40:02

ARY PACKING LIST 2nd SHIPMENT


GAR 3 (J3) GASIFICATION PROJECT

11-Mar-15
REV.02
BARGE/ CONTAINER

Page 134 of 137

REMARK

04/16/2015 09:40:02

ARY PACKING LIST 2nd SHIPMENT


GAR 3 (J3) GASIFICATION PROJECT

11-Mar-15
REV.02
BARGE/ CONTAINER

Page 135 of 137

REMARK

04/16/2015 09:40:02

ARY PACKING LIST 2nd SHIPMENT


GAR 3 (J3) GASIFICATION PROJECT

11-Mar-15
REV.02
BARGE/ CONTAINER

Page 136 of 137

REMARK

04/16/2015 09:40:02

ARY PACKING LIST 2nd SHIPMENT


GAR 3 (J3) GASIFICATION PROJECT

11-Mar-15
REV.02
BARGE/ CONTAINER

Page 137 of 137

REMARK

You might also like