You are on page 1of 12
a ALRASHID-ABETONG ARK gq -weyl_s ii INTRODUCTION AlRashid Abetong. A Saudi-Swedish Company was established in 1877 and has grown rapidly to become ‘one of the largest and most successful precast concrete ‘companies in the Kingdom. The company has 2 full range of the Precast Conerete Proxucts lke: Holloweore Slabs, Double Tee (DT) Slabs, ARA Form Slabs and all lypes of precast concrete structures in addition to the unique Swede Beam System. ‘AlRashid Abetong Co. has four large factories located in the Second Industrial City in Riyadh, We serve our ‘customers through our main office in Riyadh and out two ‘branch offices situated in Jeddah and AlKhobar. ur production output from the factories in Riyadh exceeds 20,000 Cubic Meter of precast concrete elements every month. AlRashid Abetong is composed of dedicated teams of professionals fully qualified and knowiedgeable in their fields of expertise where they have gained a reputation for providing state-of-the-art products and services. The company is currently employing ‘more than 2.500 employees of various professions. When dealing with AlRashtd Abetong you can be sure that we will satisfy every need wherever and whenever required. ALRASHID-ABETONG ple Biase gigi Maley Sy cals WllecteasisR pape Hayes dSLA RAV Blyallalsys eal pST.s520] ped Seen Clete geen AS tll 6. ASledl b gall eal OLE Le pet artless Slat pose Tel, (DT) gadesalbdyaz dat! Aeeell QoleyN SleLOSY Flt eee sotapll Giggaall alll Litas NBL] ateall ila tay) Sey ayaa ist al Gor WLS Aas pp goal Heels Ree SLE iy als pent EE eoublly 5a 8 G6 ahs La ola Lyla aS HS ASliy dtl baal gn Lye Sn a Gea piel Gat AS SGI. ga Nal Spells Le apple cei ee onde? Pb eee lye SI ay eplec 2a Baa My Sbiselpet fuel ee oles dy cleats ayia abigeVOr* pe papa he Le aS yl cut aeal scibrauaiet BS 0 Byer Ae MYfeskty) Sit ee plaka Laat ety Sue bg 8S SI gla 25 35 te [gigs scopdas ISe gl cady gl 3 pSLe Lio! aigtweul ail (wane exam) ‘The “SWEDE BEAMS" and the columns are manufactured in ‘our precast factories and erected on site, by our erection teams, The cast in situ slabs ae poured onsite Aer erection the beams are jacked up t0 a carefully calculated level by shoring supports before the ‘modular form work is placed between the beams. The modular form work is placed on the flange of the “SWEDE BEAMS’. Thermal insulation (optional) is placed on top of forms (for roof) before concreting and connected to the slab by steel wires or plastic anchors. This insulation under the roof slab ensures that Installation of neccessary cooling capacity can be reduced to remarkably low levels, Sts psy Uhlan 2 hae y Ausgel cilpaS as Rlnaye CSL Losin All ln St SI Eth EAI yb Laat Weal ea sag oa, 6S ol Ja ly otis pl als Bay Gdns i pS) cg Fang Hl Myc At ibe pe Legion) Seg LN tiple Splat cape Retagell SilpaSSl lg le (ed (Ail SU ce th eaSlgall Ba (epleaed) wesbandl ccolihe sTASY 5S DL Rawls ALI ge Cass: EI gslpotl S9Ll op my Gatey ASTD (Gah oH say ail Ulla Gad 2 Lay Si ADL) aes During caring of the slab, the entire slab and beam structure are lowered. This ensures that the concrete slab will be compressed and becomes completely watertight. Concreting of roofslab by means of concrete pump, screed vibrator, vacuum suction mats, and mechanical trowelling machines, + Roofs are cast with required slopes for rof drainage. * The result is a smooth concrete slab which requires no future maintenance and is guaranteed water tight. No waterproofing membrane is required. + When "SWEDE BEAM ROOF" is used as parking, area, expansion joints are arranged in a special way in order to allow for trafic Lt ats pe Ro RN Le 8 ay Relays ee laa all pha lg as Falege Leia abet daddy Sl ped clay Leaps Leap Ape aby goal lpmbe apa tad stall Lae Baad LAD Saal Jae ga plant cad cope lal ASD lal la le Jpn ce ge ON lh Rok Jello ted gPRo g epLot UpLe fh A gli Yyolall SAL pad cleat! Kha cla Ng ad Goa Sl Cy SN pls pl el Lue (eed Bag oat onl Ppl Sle ehiliatt Leist Leal sana Aba, MST ena ec As large areas unobstructed ty columns can be arranged by using the SWEDE BEAM SYSTEM, the butlding can be designed in an economical way, which also gives possibilities for future changes in interior design. The SWEDE BEAM SYSTEM can be designed with primary and secondary beams to give an areas of about 20 x 30m (600m2) free from columns Re SR ZA Mouse ease? No other system for concrete structures can offer such Jong spans at a minimum construction depth as the "SWEDE BEAM SYSTEM" Normally. spans of about 20m are used in SWEDE BEAM STRUCTURES, but spans up to 40 m have been made. For @ 20 span, the total depth ‘of beam and slab is about 70cm for roofslats and 80cm for floorslabs. For a 30m span, total depth is zbout 1.20 for roofs and 1.40 for floors under normal loads, ARIN DEN ey agpteudye eesun Say SLAIYN saul cpl ll plazly AN eal pS RSLs) lad SLi) Aasglay all Sapa ALES pias Se US Sat Sip Spay Aap Sl yaSy Laan ilpaS platy gasp Hass Gane ge > gl) aa TY lap ca Le se AML Aa danel gh eee ee ee ghey igh pal iat ase 3) SLE lS ane Ladskae gtsy I Lal LAS ad GN pan thea gd gS 8p Lay pe h2 3,0Kll Spb patie Lb phe Yo 3p eSd had ate fr Gl Lalple doy genes coll Jee elas lady aha dlls 8 Ley 9S gy pal gL pain Vo pla! Lal gall ADL aus A+ MD pe tg ye NT ll lau AED ah ts ayalal Jlas¥ pAb cond sgl SHORT CONSTRUCTION TIME Since the precast part of the structutre is manufactured in factory while the foundation ts executed on site erection of the structure can be done quickly Cast-in-sita concreting is fast, since easily movable moulds are used for the slab casting. This reduces the financial costs during the construction period ACOUSTICS PROPERTIES The thermal insulation under the SWEDE BEAM roofslab gives excellent sound absorption. Therefore no special sound absorbent material and no additional suspended ceiling vill be needed in most cases, The thermal insulation can be spray painted in any desired colour FIREPROOF The thick concrete corer for all reinforcement, the absence of waterproofing membrane thermal ensures that the SWEDE BEAM STRUCTURE is classified in the lowest fire insurance cass. Uadiied 9 pial Saal Aplinp Sil Jee ow bes ObS gph LLY Slee! Leas oy Lay pinay Slee T ts Layee cyS) aizall Anal JLae Yl oS gee lg lata pes bgt ed tl Slay wae JSy ALS a St AASSY a aL agtlct Capen pe ial plas Rly cast slat Jib lane alicia) Gols sty flaca! pI) ele ¥ Glo ti fees epaatt seal gall cae Glaatle gLpal Be peace Gale eed Oem ey pall as gh Aa SN Aa ad fyb PAN Gages panty ISS Ol ola pe Re ageny Pde dete one AS sa all SL 8 pS Soiedieate waa) REACHES THE EAT. INSULATION Lave. ‘58S - ROOF STRUCTURE FROM ENERGY POINT-OF-VIEW ee Ureks noite Pash LSM L NCE As SWEDE BEAM roofs don't have any membrane or other material on top side, sunrays strike against the bright concrete surface to a high degree. In addition to this, the incoming heat energy is stored in the concrete slab during the day and radiated back to the sky during night time. Therefore, only a small portion of the heat energy is penetrating the insulation, and the result is that installed A/C capacity can be reduced to a ‘minimus. Also, yearly running costs for cooling of the building will be reduced to a minimum. (Less than 50% of comparable structures ina one-storey building) Ree Ueu Ln estas SWEDE BEAM ROOFS are guaranteed watertight without any waterproofing membrane. Therefore it is extremely asy to install equipment on the roof slb, since there is no tisk for penetration of any watemproofing. Normal water insulation needs maintenance and replacement after some years. With SWEDE BEAM ROOF such maintenance will not be needed , Mes epee he le tl ale ghol eal U5le Rab apey at cole AL Re AlN AB od guage cl al lls 5 MIS aL pA hae og) Quay QSAD laud I Lye Atay (yp eal lye le pen ese cl ISD. Juhl 3528 JS. gl ll aly Ll Spat ata oe pap gu ny ay)p al BLT gue cael Le DU yy Rall GSS AUS Ge etsy Eyloul iM add ial yy Alle AMIS of ae aa ssisly ap oa Aplite slay Ayla cuit gs Fagpaall Sap ASIN pls 3 glass of Sesall 4 S31 solgell Jple gl Jest cliss Ys, Bp sa Fe A lee te tall a3 fa ie glad till pla cle She Bis i BLE 5 gh Silphae pala tay dns ago Mile oll LI Jue vous fat LBL] ale kegs Y caapealt c aSIt pllss Blea! sll acersiaaes ela yau a Since SWEDE BEAM ROOFS are watertight, they can be used as parking areas where a ramp can be arranged, at a minor additional cost, and are very valuable for shopping centres and offices in areas where parking on ground Is limited or not possible Ris eese ena The diagram below shows normal savings for different items in the bul costs for a SWEDE BEAM STRUCTURE compared to another structure, n foundation, savings can be made due to less foundations for the SWEDE BEAM STRUCTURE. i together with capitalized running Soh Byam High guelty ere) shall BBL pad Satageall Sl peSIt AAs 9 pial paul plsele opal Sep Leste City Bl geS Leal aietal Sys slghenadl Ail ye S alco] Libsyy Wal pal (al) gl BL ob gl Caley aa ga jit AL aaa ue 8) le ays!) Gat eens ole Gal Slee nal lade olbsT JOAN os Bie eter aaa ge eka thn gp gL cit pe gpl they Sl Jel qi la Lge fa eoLutast ll ALY lb abel ose (ae geal pa i elt jal pihipuaaely Seal oles xr. BALUBAID SHOWROOM. JEDDAH AL SHEMEISY SHOWROOM, JEDDAH SALAAM MALL. RIVADH AL SADHAN, RIYADH EXIT 15 a Ani gta Gayest Ay. oa EAST RING ROAD ‘AL-KHARJ HIGHWAY = SIE ND IND. CITY | GAS MAIN EASTERN GATE|| | sTATION RIYAD} FURNITURE FACTORY WATER TANK SCECO STATION | saWA FACTORY FOR SWEETS POLICE + CIVIL DEFENSE SAUDI PAINTS. FACTORY ‘AL MUDAIFER FACTORY TRAFFIC LIGHT AL-TYSEER ALUMINUM FACTORY savorceramic |_| avo cimawe ncaaM STEPCO ‘AL-SHARG FACTORY f FOR PLASTIC = “|| —— ae ‘SEWAGE CHANNEL AL-KHARJ OLD ROAD A E IAB E>5VI Bala Saran —>__— 5 Iey EXIT ARAMCO : ce SECOND INDUSTRIAL CITY & — “Tormvaon Antena uta HNN STE aaa HAN DUNT oda EET Ga thane ANAL PO. Box 6058 Riyadh 11442 Tel: 4981222 Fax: 4981200 Jeddah Tek: 6600240 Fax: 6635891 Alkhobar Tel: 8969246 Fax: 8944464 nat Riyadh: aranuh@alashidabeong com AMhobar: aakho@akasidabeong com leddah:arsjed@alahidabetong.com Website: wuwlrashiaketong com a. see ALRASHID-ABETONG JAPA 29-wcyl_a ili

You might also like