You are on page 1of 11
Hs ENERGETICOS ENGINEERING STANDARS INSTRUMENTATION TYPICAL HOOK-UPS SUPPORT PDE-INS-TS-001 (E) -2 REPENS TESTI DRAWING No. DESCRIPTION (GENERAL NOTES SSNGLE.NSTRUWENT SUPPORT DOUBLE INSTRUMENTS. SUPPORT TRPLE INSTRUMENTS SUPPORT SSNGLE SUPPORT COLUMNS DOUBLE SUPPORT COLLANS SEAL CHAMBER PANEL OR JUNCTION BOX SUPPORT ARRWAL CONDUTS TO STORAGE TANKS ‘SUPPORT INSTRUMENT HOOK-UPS aa TNOEX POE-INS—1S-OO1(E)-2 CC oe GENERAL NOTES ALL INSTRUMENT PULSE LEADS UST SLOPE DOWN 1” FER FOOT MINMUM N’HORUONTAL PLINE TOWAOS THE UNE TAP FO VAPOR SERACE, AND TOWROS THE NSTRUVEMT FOR LQUD AND STEAM SERVICE. LNES MUST AE FREE OF KNKS, SAGS, FLATS, TRAPS OR OR LOOPS UNLESS SPECIFICALLY DESIGNED THET WA, A BIL OF WATEREL 6 REQUIRED FOR EXCH NSTALSTION ETAL, AND QUAMTTIES APPLY TO EACH STAULATON CALLED OUT IN THE ePeUCATION TLE INSTRUMENT FITERS SHELL PROVDE SUFRCIRST FLEXEILTY TURING INSTALLATONS TO ALLOW FOR THE WANSTENANCE AND REMOVAL OF THE INSTRUMENT, aD THERMAL EXPANSIONS OF VESSELS, LNES, aND EQUIPMENT TO. WHICH THEY ARE CONNECTED. INSTALL ALL TUBING RUNS PERPENDICULAR AND PARALLEL TO LINES OF STRICTURE AND/OR EQUPVEMT. USE BENDS IN PROCESS IMPULSE LES05 8ND KEEP THRESDED JOS TO A WINMLM. BENDS WV PABATC LEADS MUST BE REPT TO. & MINMUM, 4 MN AMOUNT OF FITINGS MUST BE USED FOR MSTALLNG ANY INSTRUVENT ALL TUBING RUNS SHALL BE SUPPORTED SUFFICIENTLY, To PROVIDE SUPPORT AND PROTECTION FROW MECHENICAL DAMAGE. THE CONTRACTOR SHELL ROVTE THE PPES 2ND INSTALL ALL SUPPORTS FO% THE AR SUPPLY SYSTEM FROM THE STRUMENT 2 HEADER TO WSTRUMENTS ALL LOCAL GAUGES WILL 2E MOUNTED IN THE VERTICAL UPRIGHT POSMION, AND ORIENTED SO THEY WAY BE READ EASILY FROW A (COMMON ACCESSIBLE POSTON, ALL TUBE FITINGS MUST GE SINEGELOK WMH TAO FERRULES (GACK/FRONT) AND A NUT TO. MAKE A UMN JONT AND MUST BE (CAGE FITED TO WAKE & PROPER SEAL LOCAL INSTRUMENTATIN SHALL BE ACSESBLE FROW THE GROUND, FROM A FLATFORU, O FROM AN 8 FL. LADDER AT GRADE WHERE ELECTFONIC ISTRUVENTS ARE USED, THE INSTRUVENT VANUFACTURERS FECONMENDATINS FOR KOLSTED GROUROING SHELL 1 FOLLOWED. DRAIN WRES AND SHELDS FROM ALL NSTRUMENTS SHALL GE CONTRUOUS AND GROUNDED AT THE REMOTE CONTROLLER CABINET ONLY (THIS CONNECTION SHALL BE DONE ONLY IN ONE PONT) 12. TRANSMITESS WHICH SESE GAS 0% VAPOR BUT ARE MOUNTED SELOW THER TAPS, WUST HIVE A SUALL RESERVOR FOR CONDENSED VABORS TWAT WOLLD COLLECT NV THE LEADS AND CAUSE VARHTIONS IN PRESSURE READINGS SUE TO CHANGING HEAD CONDMDNS. INSRIMENT FITTERS UST FABRICATE SUPPORT BRECKETS FO AR SETS, RELAYS, SOLENOD VALVES, O@ ANY ISTRUMENTSTION THT TS NOT SUPEUED WH BRACKETS. TENG MUST NOT SUPPORT THE WECHT OF VALVES, AI SETS OR aN ISTRUVENTETION WHICH 15 CONNECTED TO M 1. GENES SUPPORTS ST ALON FREE AVAL MOVEVENT OF THE TUBING OLE TO THERMAL EMION AND ONLY SUPEORT THE \ECHT OF THE TUENG. ALL COMPONENTS ANO NTFLMEMTON SHAUL SE MOLMTED SEPARATE’ AO ROEFEEALY FROM THE TaN AN MS SUPPORTS 15, GH TUSE FING SHOULD SE A UVION JOT. STANLESS STEEL FTINGS WUST SE NSTALLED TH LQUD-SEAANT COMPOUND ONLY AVAEOBOAL SEALS MUST BE USED IV ALL UMONS. 16, ALL TWANG BENDS SHALL GE AT OST 43" ANGLE, AUL ORANNGS SHOWN W TAS COCUMENT HAVE ANGLES OF 90" FOR EASY READ OF Te TIAL Hook 17, QUAIES SHOW NACH TIAL HOOK-UP BONY FOR ONE (1) RSTRUVE INSTRUMENT HOOK-UPS GENERAL NOTES Ce rent POE-INS-TS-O1(F}-2 Se RTONS eo ROUNDING PLATE SPUCE PLATE GROUNOMNG SEE 0: 2 SUPPORT SHALL BE ASSEUGLED ON 5. FOR PLATARDRW SU>PO MENT STAND SHEL SE PANTED WAC amg FLooR NOTE I cm of | ne vote 3 : E “ FoUNDATEN GENERAL VIEW POE-ELE-TT-001 UF ELECTHIAL iE 0 SEE OPTION ROANCE TO PROVECT SPECIFICATIONS OF USTH FO WELING 0 OPTION 1 PLATAFORM SUPPORT DESCRPTON ores |_SauTtY Sa]sie 7 us a aE in Kin RR 2 oO One Ro = Te | Oo, WO PRESTR ONS 7 Tat [ PASE ET = ASW HA 7 ws WEL eOIG = ES aes fine Fe = SINGLE WSTROVENT SUPPORT INSTRUMENT HOOK-UPS ‘SUPPORT POE~INS~TS-001(E)-2 CC a eNEROETICOS -—vo.vsaracxer corounowve pute | a) note ey] ROUNDING PLATE one Jax ate 5 Leven anes vores FESS ef TON OPTION 1 pte | often ore GENERAL VIEW pec SPORT SPUCE PLATE GROUNDING SEE 0% 2 SUPPORT SHALL BE ASSEUGLED ON 5. FOR PLATAFDRW SU2POST SEE OPTION POE-ELE-TT-001 UF ELECHIAL iE 4 RSTRNT SND SHEL SE PADTED i ACCORHNCE TO PROECT SPEOROATENS SLABS Sr OF UH FO HELANG DESCRPTON noes |_ TH Ra OD Ti ae Se KO 2 oO One Ro = a [LL WTS, WO REAL ES 7 Tat [ PASE ET = ASW HA 7 ws WEL eOIG = ES wei Fe > —— DOUBLE WSTROMENTS. SUPPORT INSTRUMENT HOOK-UPS C SUPPORT = ‘ POE-NS-TS-0O1(E}-2 eventos ONG PUNE NOTE 1+] SPUCE PLATE GROUNOMNG SEE 0: 2 SUPPORT SHALL BE ASSEUGLED ON 5. FOR PLATARDRW SU>PO eve, sees onse— ote 3 wee GENERAL VIEW iE 0 SEE OPTION MENT STAND SHEL SE PANTED WAC Srm_OF LIST Fi WELING WO POE-ELE-TT-001 UF ELECTHIAL rE FOUNDATION ROANCE TO PROVECT SPECIFICATIONS RSMING FLX OPTION 1 PLATAFORM_ SUPPORT Tew cOoE DESCRIPTION notes |__QUANTTY REG ee ee aT WE SH = OS RW RO ric ° in [ie AME = 0S SW A it Om A aa zim Xm BOLT = 8" SR = 05 = ASW BOLT, NUS, A PRESSURE WASHES 7 PANGEN SOT — : LEL SRO = os _ [a0 INSTRUMENT HOOKUPS TRPLE INSTRUMENTS. SUPPORT Cz SUPPORT = ( POE-INS~TS-OO1(E)-2 eneReETICOS OPTION 1 OPTION 2 SUPPORT WETALC CLM SUPPORT CONCRETE COUN | | | ! ! ! TOP VIEW \ s] 1 | s ! ! I \ Mae 2 7 HRN, oN LEFT SIDE VIEW > — Moe LEFT SIDE VIEW 1. ALL SRUMENTS STEND SHELL PALL PENERATDN WELDED TO THE DECK OR STRUCTURAL WEMEER 2) tei srw OF LETH For HELING WOKS ITEM | CODE ‘DESCRIPTION ‘NOTES: a sia] 548 O [are 5 1 @ ace amo Tie ae 5) [oy = ASTM ASE 1 a TW ‘ WSIRMENT HOCUS SINGLE SUPPORT COLUMNS e SPPoRT = POE-INS~T5-001(E)-2 Se ssenoerene OPTION 2 OPTION 1 SUPPORT METALUC COLLMA SUPPORT CONCRETE COLUMN \ \ \ \ 1 eld a 1 Si Nove 2 7 Ser TOP VIEW TOP VIEW \ sj I tT I | - | Vu wae we? NOTES: LEFT SIDE VIEW LEFT SIDE VIEW 1 ALL SRUMENTS SHO SHEL BE FUL PENERTDN WELDED TOTHE DECK SUCTUAL WBMES 2. BRE Sem OF LETH FO HELONG WORKS MEM | CODE ‘DESCRIPTION ‘NOTES: a Sen] S58] @ [ome [ar-? sw a - cs aes a [2 @ [ae TESAW KORE ea 5) | om = ASTM ASE 1 a TE ‘ INSTRUMENT HOOK-UPS DOUBLE SUPPORT COLUMNS ‘SUPPORT POE~INS~TS-001(E)-2 CC nstRLweNT SUPPORT PRE 2" RS +) {see oem 4 | Por ne : @ di 2 DETAIL 1 i "UT BOLT TABLE soup T+ Prom PPE oi] eeleul + [9 [© \— see vt sour ste Dee Pete SE cra Ste a OER CORSTRETON SEE Doe. “NSTRWEI fe OWE 610 FENG eee Oy ingens wr cove DESCRPTON noes |_™ LGW WE) ONEEING CE =O ST WP a]? ait = P1058 aa ed ee Ta [UBT WH Lok MT ANDES = 2 = SEA CHEER INSTRUMENT HOOK-UPS C SUPPORT a ‘ POE-NS-TS-0O1(E}-2 eventos hone | JUNCTION BOX Y jee JUNCTION BOX TBOVETRIC EW GENERAL VIEW ie | ! | | | ‘SUPPORT LATaFORN SUPPORT PLANT VIEW NOTES: THIS DRAWING 5 FO SUPPORT SHAUL BE MEROATION FERENCE, PLESSE CHECK MANUFACTURER NSTALLATIN REC VLE ON SME 5. AL WE VERA STILCICE OFTHE SSID WIST GE HCT OP CALANZED W ACCODANCE WHE PROUT ASEERCATONS i Ta eae SWE SEBASTES SCCORONE TO THE ANCTDY 9 10 BE \SED ND OEFDOS BYE MURCTAER ASSEMBLY THE INET S00 AEEAT FOU FIGE LL TE CEMTEN OF TAS, SHALL OT BE LESS TH con Cg DESCRIPTON NOTES a7 NETO OT waar TF FROME PAF HO CAND SL 75 A PTE 171 ete OLNEY TEL TAL ON - F- we [io EAN HET WP TRS WW ¢ Ua Ba PX 2 ENE RO WIE oi > —PaNEL OR JUNCTION BOK SUPPORT INSTRUMENT HOOK-UPS CA SUPPORT POE-INS-75-001(F)-2 sr ENeRCETICGS TANK tL. ING 6 FOR REFERENOE FOR ASRNAL COAOUMS 10 DETAL 2 /ONDUIT ROUTE ORBCE MES OETA 3 DESCRIPTION ‘Quay [sea] INSTRUMENT HOOK-UPS SUPPORT "ARRIVAL CONDUTS TO STORAGE TANKS POE~INS~TS-001(E)-2 CC

You might also like