Project: PT. RANYZA ENERGI; KUALA TANJUNG 2x135MW CFSPP, COAL UNLOADING JETTY 12.000DWT, TRESTLE, WATER INTAKE,
TEMPORARY JETTY & DREDGING WORK PROJECT
Title: New Jetty 12.000 DWT and Facility (Civil Structure)
Date: 13-May-2008
Unit Price (Rp) Price (Rp)
No. Work Description Unit Q'ty Remark
Wage Material Sub Total Wage Material Sub Total
I General
6 Dutch Cone (CPT) 2.5 ton point 4.0 - - - All equipment from contractor
TOTAL - - -
TOTAL - - -
TOTAL - - -
IV Abutment
TOTAL - - -
V.j Guardrail
Railing Post WF. 150.75.5.7 (WT=
1 kg 11,069.10 - - - SS-41
14kg/m)
2 Base plate t=12 mm kg 2,837.30 - - - SS-41
TOTAL - - -
VI.a Piling
Steel Pipe Pile Supply (SPP D=711.2,
1 kg 476,743.7 - -
t=12mm L= 32 m)
2 Handling/Pitching Piles nos 96.0 - -
WF 350.350.12.19, L= 650 mm
5 kg 1,781.0 - - - SS-41
(WT=137 kg/m)
WF 200.200.8.12, L= 1500 mm (WT=
6 kg 3,743.8 - - - SS-41
49.917 kg/m)
Stiffener # 312x160x10mm
7 kg 1,097.6 - - - SS-41
(WT= 3.92 kg/nos)
TOTAL - - -
TOTAL - - -
VIII Miscellanious
TOTAL - - -