Professional Documents
Culture Documents
TBI Partners
TBI thanks
Sponsors
TBI Project Advisory Committee (TPAC)
Case Studies
Designers
URS/SCEC P. Somerville
Introduction
Performance objectives
Design process
Design criteria documentation
Seismic input
Preliminary design
Service level evaluation
MCE level evaluation
Presentation of results
Project review
Serviceability
check
Stability
check
7 motions
Scaling or matching
Dispersion
Conditional mean spectra
0
0
T (sec)
Analysis
Acceptance criterion
Lexp = 0.25L
Q < 1.5Cn
Maximum Considered
Level Analysis
Performance goals:
Model
Analysis
Acceptance criteria
Non-ductile actions
Fu Fn ,e
Fu = 1.5 F
Fu =+
F 1.3 1.2 F
Introduction
Performance objectives
Design process
Design criteria documentation
Seismic input
Preliminary design
Service level evaluation
MCE level evaluation
Presentation of results
Project review
Sierra Madre
(Cucamonga)
42-story reinforced
42-story reinforced
Building 1
Core only
Design B
Design A
Design C
Design B/C
36 x 36
30th
36 x 36
42 x 42
10th
46 x 46
Bldg. 3A
Bldg. 3B
Bldg. 3C
T1NS = 5.3sec
Collapse Definition
T=5.0 Sec.
RP = 2475 Years
(R,M,) = 5.1, 6.6,1.6
(R,M,) = 60., 8.0,2.0
Response Spectra
2.5
Return
4975
2475
475
43
25
Sa/g
2.0
1.5
Period (years):
OVE
MCE
DBE
SLE-43
SLE-25
1.0
0.5
0.0
0
4
6
Period
10
Example results
Return
Period
GM set
4975 (years)
OVE
2475 (years)
MCE
475 (years)
DBE
43 (years)
SLE43
E-W
N-S
Building 3A
N-S
median
%16th and %84th
25 (years)
Individual
earthquake
SLE25
MAXIMUM IDR
E-W
Dual System
683,000 sq ft
BRB
959,000 sq ft
$140 M
$326/ sq ft
$149 M
$350/ sq ft
$341 M
$370/ sq ft
PBE-1
$140 M
$174 M
$329 M
PBE-2
$143 M
$174 M
$333 M
Code Design
Davis Langdon
Performance
Group i
Probability
EDP
1.0
y0
y1
0.5
y2
y3
0.0
0
Quantities
y0
y1
y2
y3
concrete
steel
wallboard
100
10,000
paint
100
1000
10,000
electrical
Total Cost
Annual
frequency of
exceedance
1.0
0.9
0.8
0.7
0.6
0.5
0.4
0.3
0.2
0.1
00
0.5
1.5
2.5
$C (dollar)
3.5
4
x 10 6
0.1
Structural
Shear walls
Shear cracking
Flexural damage
Link beams
Gravity columns
Moment joints
Buckling restrained
braces
Nonstructural
Curtain walls
Interior partitions
Ceilings
Elevators
Contents
Loss Results
Building 1AM (initial building cost = 140 million US dollars)
Probability of repair cost not exceeding indicated value
1
SLE25
SLE43
DBE
MCE
OVE
0.9
0.8
0.7
0.6
0.5
0.4
0.3
0.2
0.1
0
10
15
20
25
Repair cost (% of initial building cost)
30
35
Loss Results
5
IP
Elevator
Content
GC
CW
LB
SWBE
SW
15
x 10
10
200
400
600
800
1000
1200
Performance group number
1400
1600
Summary Results
Probable Maximum Loss
500 year
1
SLE25
SLE43
DBE
MCE
OVE
0.9
0.8
0.7
0.6
0.5
0.4
0.3
0.2
0.1
0
10
15
20
25
Repair cost (% of initial building cost)
Core Wall
Dual System
BRB
Code Design
14%
13%
3%
PBE-1
15%
9%
3%
PBE-2
12%
9%
3%
30
35
(Loss )(P(GM ))
Summary Results
GM i
Dual System
BRBF
Code
$326,000
$323,000
$206,000
PBE-1
$336,000
$269.000
$157,000
PBE-2
$282,000
$269,000
$141,000
Summary Results
Cost-Benefit Analysis
Dual System
BRB
Code
1.0
1.0
1.0
PBE-1
1.0
1.1
1.0
PBE-2
1.0
1.1
1.0
PEER Tall
Buildings
Initiative