BILL NO 6.4.2 - SUPER STRUCTURE +0.78 m TO +18.78 m LEVEL


FOR BUILDING # 4
CONCRETE WORKS
Reinforced Concrete
Reinforced poured concrete Grade 30/37 and fill in to formwork and well
packed around bar reinforcements / steel sections

Suspended slabs, 200mm thick

1,356

Suspended slabs, 270mm thick

453

Suspended slabs, 300mm thk. for lift pit

Suspended slabs 350mm, thk. for pool

80

Suspended slabs 430mm, thk. for water tank

18

Suspended slabs, 570mm thk. for pool

22

Ramps, 200mm thick

292

Ramps, 220mm thick

162

Walls, 500mm thick

13

Walls, 300mm thick

Water tank walls, 300mm thick

26

Lift pit walls, 400mm thick

Beams

785

Staircase

50

Reinforced poured concrete Grade 40/50 and fill in to formwork and well
packed around bar reinforcements / steel sections

Core walls, 300mm thick

205

6.4.2/1

WATERFRONT INTEGRATED RESORT


COLOMBO - SRI LANKA
ITEM
R

23th March 2015

DESCRIPTION
Core walls, 600mm thick

QTY
682

TO COLLECTION
BILL NO 6.4.2 - SUPER STRUCTURE +0.78 m TO +18.78 m LEVEL
FOR BUILDING # 4 (Cont'd)
CONCRETE WORKS (Cont'd)
Reinforced Concrete (Cont'd)
Reinforced poured concrete Grade 50/60 and fill in to formwork and well
packed around bar reinforcements / steel sections
A

Columns

815

6.4.2/2

WATERFRONT INTEGRATED RESORT


COLOMBO - SRI LANKA
ITEM

23th March 2015

DESCRIPTION

QTY

TO COLLECTION
BILL NO 6.4.2 - SUPER STRUCTURE +0.78 m TO +18.78 m LEVEL
FOR BUILDING # 4 (Cont'd)
CONCRETE WORKS (Cont'd)
Reinforcement
High yield deformed bar reinforcement and mild steel stirrups to BS 4449
including bends, hooks, tying wire distance blocks and ordinary spacers (Laps
and designed chairs included in quantities)
In suspended slabs including ramps,pool & water tank slabs, diameter
A

6mm

6,687

8 mm

26,956

10 mm

74,687

12 mm

53,519

16 mm

56,228

20 mm

28,919

25 mm

29,898

32 mm

2,774

In suspended slabs for lift pit, diameter


J

12 mm

354

In walls, diameter
K

10 mm

914

6.4.2/3

WATERFRONT INTEGRATED RESORT


COLOMBO - SRI LANKA
ITEM

23th March 2015

DESCRIPTION

QTY

In water tank walls, diameter


L

10 mm

205

12 mm

395

TO COLLECTION
BILL NO 6.4.2 - SUPER STRUCTURE +0.78 m TO +18.78 m LEVEL
FOR BUILDING # 4 (Cont'd)
CONCRETE WORKS (Cont'd)
Reinforcement (Cont'd)
In lift pit walls, diameter
A

10 mm

157

12 mm

208

In core walls, diameter


C

8 mm

3,582

10 mm

5,180

12 mm

128

16 mm

37,563

20 mm

29,620

32 mm

134,676

In columns, diameter
J

8 mm

3,597

10 mm

7,741

6.4.2/4

WATERFRONT INTEGRATED RESORT


COLOMBO - SRI LANKA
ITEM

23th March 2015

DESCRIPTION

QTY

12 mm

1,774

16 mm

10,353

20 mm

32,673

25 mm

30,139

32 mm

49,588

TO COLLECTION
BILL NO 6.4.2 - SUPER STRUCTURE +0.78 m TO +18.78 m LEVEL
FOR BUILDING # 4 (Cont'd)
CONCRETE WORKS (Cont'd)
Reinforcement (Cont'd)
In beams, diameter
A

8 mm

16,763

10 mm

3,119

12 mm

19,859

16 mm

37,230

20 mm

24,371

25 mm

18,546

In staircases, diameter
G

6 mm

124

8 mm

1,228

10 mm

1,915

6.4.2/5

WATERFRONT INTEGRATED RESORT


COLOMBO - SRI LANKA
ITEM

23th March 2015

DESCRIPTION

QTY

12 mm

1,024

16 mm

1,164

TO COLLECTION
BILL NO 6.4.2 - SUPER STRUCTURE +0.78 m TO +18.78 m LEVEL
FOR BUILDING # 4 (Cont'd)
CONCRETE WORKS (Cont'd)
Formwork
Basic finish
A

Sides and soffits of suspended slabs

Sides and soffits of suspended slabs for lift pit

11

Sides and soffits of suspended slabs for pool

298

Sides and soffits of ramps

Sides of walls

91

Sides of water tank walls

41

Sides of lift pit walls

19

9,072

2,297

6.4.2/6

WATERFRONT INTEGRATED RESORT


COLOMBO - SRI LANKA
ITEM

23th March 2015

DESCRIPTION

QTY

Sides of core walls

3,461

Sides and soffits of beams

1,235

Sides of columns

3,862

Sides and soffits of staircases

359

TO COLLECTION

BILL NO 6.4.2 - SUPER STRUCTURE +0.78 m TO +18.78 m LEVEL


FOR BUILDING # 4 (Cont'd)
CONCRETE WORKS
COLLECTION
Page 6.4.2/1
Page 6.4.2/2
Page 6.4.2/3
Page 6.4.2/4
Page 6.4.2/5
Page 6.4.2/6

6.4.2/7

WATERFRONT INTEGRATED RESORT


COLOMBO - SRI LANKA
ITEM

23th March 2015

DESCRIPTION

TOTAL OF CONCRETE WORKS TO SUMMARY

6.4.2/8

QTY

WATERFRONT INTEGRATED RESORT


COLOMBO - SRI LANKA
UNIT

RATE

23th March 2015

AMOUNT
(US$)

m
m
m
m
m
m
m
m
m
m
m
m
m
m

6.4.2/9

WATERFRONT INTEGRATED RESORT


COLOMBO - SRI LANKA
UNIT

RATE

23th March 2015

AMOUNT
(US$)

6.4.2/10

WATERFRONT INTEGRATED RESORT


COLOMBO - SRI LANKA
UNIT

RATE

23th March 2015

AMOUNT
(US$)

kg
kg
kg
kg
kg
kg
kg
kg

kg

kg

6.4.2/11

WATERFRONT INTEGRATED RESORT


COLOMBO - SRI LANKA
UNIT

RATE

23th March 2015

AMOUNT
(US$)

kg
kg

kg
kg

kg
kg
kg
kg
kg
kg

kg
kg

6.4.2/12

WATERFRONT INTEGRATED RESORT


COLOMBO - SRI LANKA
UNIT

RATE

23th March 2015

AMOUNT
(US$)

kg
kg
kg
kg
kg

kg
kg
kg
kg
kg
kg

kg
kg
kg

6.4.2/13

WATERFRONT INTEGRATED RESORT


COLOMBO - SRI LANKA
UNIT

RATE

23th March 2015

AMOUNT
(US$)

kg
kg

m2
m2
m2
m2
m2
m2
m2

6.4.2/14

WATERFRONT INTEGRATED RESORT


COLOMBO - SRI LANKA
UNIT

RATE

23th March 2015

AMOUNT
(US$)

m2
m2
m2
m2

6.4.2/15

WATERFRONT INTEGRATED RESORT


COLOMBO - SRI LANKA
UNIT

RATE

23th March 2015

AMOUNT
(US$)

6.4.2/16

WATERFRONT INTEGRATED RESORT


COLOMBO - SRI LANKA
ITEM

23th March 2015

DESCRIPTION

QTY

BILL NO 6.4.2 - SUPER STRUCTURE +0.78 m TO +18.78 m LEVEL


FOR BUILDING # 4
SUMMARY
CONCRETE WORKS

6.4.2/8

PAGE NO.
6.4.2/7

WATERFRONT INTEGRATED RESORT


COLOMBO - SRI LANKA
ITEM

23th March 2015

DESCRIPTION
BILL NO 6.4.2 - SUPER STRUCTURE +0.78 m TO +18.78 m LEVEL
FOR BUILDING # 4 CARRIED TO GENERAL SUMMARY

6.4.2/9

QTY

WATERFRONT INTEGRATED RESORT


COLOMBO - SRI LANKA
UNIT

RATE

23th March 2015

AMOUNT
(US$)

6.4.2/10

WATERFRONT INTEGRATED RESORT


COLOMBO - SRI LANKA
UNIT

RATE

23th March 2015

AMOUNT
(US$)

6.4.2/11

WATERFRONT INTEGRATED RESORT


COLOMBO - SRI LANKA
ITEM

23th March 2015

DESCRIPTION

QTY

BILL NO 6.4.4 - SUPER STRUCTURE +0.78 m TO +18.78 m LEVEL


FOR BUILDING # 4
METAL WORKS
Structural steel work
H beam for composite columns
A

HD 400 x 187

2,374

HD 400 x 287

18,594

HD 400 x 347

5,001

HD 400 x 421

7,107

HD 400 x 509

19,294

HD 400 x 592

8,531

HD 400 x 677

5,715

HD 400 x 744

60,005

HD 400 x 900

15,193

HD 400 x 1086

91,028

6.4.4/1

WATERFRONT INTEGRATED RESORT


COLOMBO - SRI LANKA
ITEM

23th March 2015

DESCRIPTION

TOTAL OF METAL WORKS TO SUMMARY

6.4.4/2

QTY

WATERFRONT INTEGRATED RESORT


COLOMBO - SRI LANKA
UNIT

RATE

23th March 2015

AMOUNT
(US$)

kg
kg
kg
kg
kg
kg
kg
kg
kg
kg

6.4.4/3

WATERFRONT INTEGRATED RESORT


COLOMBO - SRI LANKA
UNIT

RATE

23th March 2015

AMOUNT
(US$)

6.4.4/4

WATERFRONT INTEGRATED RESORT


COLOMBO - SRI LANKA
ITEM

23th March 2015

DESCRIPTION

QTY

BILL NO 6.4.4 - SUPER STRUCTURE +0.78 m TO +18.78 m LEVEL


FOR BUILDING # 4
SUMMARY
METAL WORKS

6.4.2/2

PAGE NO.
6.4.4/1

WATERFRONT INTEGRATED RESORT


COLOMBO - SRI LANKA
ITEM

23th March 2015

DESCRIPTION
BILL NO 6.4.4 - SUPER STRUCTURE +0.78 m TO +18.78 m LEVEL
FOR BUILDING # 4 CARRIED TO GENERAL SUMMARY

6.4.2/3

QTY

WATERFRONT INTEGRATED RESORT


COLOMBO - SRI LANKA
UNIT

RATE

23th March 2015

AMOUNT
(US$)

6.4.2/4

WATERFRONT INTEGRATED RESORT


COLOMBO - SRI LANKA
UNIT

RATE

23th March 2015

AMOUNT
(US$)

6.4.2/5

You might also like