You are on page 1of 3

Drop wall (100mm) Cost break down and Total from

BOQ

I.

CONCRETING WORKS

A.) Material Cost of RMC


( agg., 6-8
slump @ 28days):
Batch cost / m3
1650 (including sand and
gravel)

Cement / m3
B.) Labor / m3

2340 (13 bags /m3)


645 (Crane and bucket

method)

Total
Labor & materials / m3
Total Volume
130m3
Total amount
602,550
II.

4635 / m3

FORMWORKS
A.) Material Cost / m2- 152.6
B.) Labor / m2
232.2
Total
Labor & materials / m2
384.8 / m2
Total Volume
2,572 m2
Total amount
989,705.60

III.

REBAR WORKS
A.) Material Cost / kg
- 32
B.) Labor / kg
6.45
Total
Labor & materials / kg
Total Volume
14,300 kg
Total amount
549,835

Total Cost
BOQ)

2,142,087.6

38.45 / kg

(as per

Total Cost / Area


=
Or

= 2,142,087.6 / 2752m2
778.38 / m2 (considering both sides)
1,556.76 / m2 (considering one

side only)

Retaining wall (200mm) Cost break down and


Total from BOQ

I.

CONCRETING WORKS

A.) Material Cost of RMC


( agg., 6-8
slump @ 28days):
Batch cost / m3
1650 (including sand and
gravel)

Cement / m3
B.) Labor / m3

2340 (13 bags /m3)


645 (Crane and bucket

method)

Total
Labor & materials / m3- 4635 / m3
Total Volume
104.61m3
Total amount
484,867.35
II.

FORMWORKS
A.) Material Cost / m2 - 414
B.) Labor / m2
232.2
Total
Labor & materials / m2- 646.2 / m2
Total Area
1006.00 m2
Total amount
650,077.2

III.

REBAR WORKS
A.) Material Cost / kg
- 32
B.) Labor / kg
6.45
Total
Labor & materials / kg38.45 / kg
Total kg
15,971.78 kg
Total amount
614,114.94

Total Cost
BOQ)

Total Cost / Area

= 1,749,059.49 / 1006 m2
1738.63 / m2
(considering

1,749,059.49

(as per

both sides)

Or
side only)

3477.25 / m2

(considering one

You might also like