Professional Documents
Culture Documents
BOQ
I.
CONCRETING WORKS
Cement / m3
B.) Labor / m3
method)
Total
Labor & materials / m3
Total Volume
130m3
Total amount
602,550
II.
4635 / m3
FORMWORKS
A.) Material Cost / m2- 152.6
B.) Labor / m2
232.2
Total
Labor & materials / m2
384.8 / m2
Total Volume
2,572 m2
Total amount
989,705.60
III.
REBAR WORKS
A.) Material Cost / kg
- 32
B.) Labor / kg
6.45
Total
Labor & materials / kg
Total Volume
14,300 kg
Total amount
549,835
Total Cost
BOQ)
2,142,087.6
38.45 / kg
(as per
= 2,142,087.6 / 2752m2
778.38 / m2 (considering both sides)
1,556.76 / m2 (considering one
side only)
I.
CONCRETING WORKS
Cement / m3
B.) Labor / m3
method)
Total
Labor & materials / m3- 4635 / m3
Total Volume
104.61m3
Total amount
484,867.35
II.
FORMWORKS
A.) Material Cost / m2 - 414
B.) Labor / m2
232.2
Total
Labor & materials / m2- 646.2 / m2
Total Area
1006.00 m2
Total amount
650,077.2
III.
REBAR WORKS
A.) Material Cost / kg
- 32
B.) Labor / kg
6.45
Total
Labor & materials / kg38.45 / kg
Total kg
15,971.78 kg
Total amount
614,114.94
Total Cost
BOQ)
= 1,749,059.49 / 1006 m2
1738.63 / m2
(considering
1,749,059.49
(as per
both sides)
Or
side only)
3477.25 / m2
(considering one