1- DATOS GENERALES
A-POR PESO
MATERIALES
CEMENTO
FIERRO, CLAV. ETC
MADERA
LADRILLO
CALAMINA
YESO
TAPA BUZON
EXPLOSIVOS
OTROS
UNIDAD
PESO.UNIT.
BL.
KG
P2
UN
UN
BL
UN
KG
KG
F. RURAL
(SIN IGV)
42.5
1.00
1.50
4.50
3.00
25.00
130.00
1.00
1.00
F. TERRESTRE
(AFECTO IGV)
PESO TOTAL
SIN IGV
500.00
1,720.00
6,663.00
21,250.00
1,720.00
9,994.50
2,400.00
2,400.00
PESOS TOTALES
35,364.50
B-POR VOLUMEN
DESCRIPCION
ARENA
PIEDRA
HORMIGN
PIEDRA GRANDE
MAT. SELECCIONADO
MADERA
UNIDAD
SIN IGV
M3
M3
M3
M3
M3
P2
VOLUMEN TOTAL
CAPACIDAD DEL VOLQUETE (M3)
NUMERO DE VIAJES
REDONDEO
EN TUBERIA
51.00
60.00
111.00
AFECTO IGV
3.00
5.00
252.00
51.00
311.00 311.00
4.00 4.00
77.75
78
Tub, 3/4"
Tub, 1"
Tub, 1 1/2"
Tub, 2"
Tub, 3"
Tub, 4"
Tub 6:" U-PVC
Tub 8" U-PVC
Tub 6'; CSN
Tub 8'; CSN
PESO TOTAL
AFECTO IGV
2- FLETE TERRESTRE
UNIDAD DE TRANSPORTE
18,075.52
3- FLETE FLUVIAL
UNIDAD DE TRANSPORTE QUE NO DA COMPROBANTE
UNIDAD DE TRANSPORTE QUE DA COMPROBANTE
CAPACIDAD DEL BOTE EN PESO
(KG)
CAPACIDAD DEL BOTE EN VOLUMEN (M3)
COSTO POR VIAJE
SIN IGV
4- FLETE EN ACEMILA
La tubera ser transportada por peones
Costos de transporte por viaje
Acemila S/.
1.00
Peon S/.
1.00
Imprevistos:
Cantidad
3,552.00
3,552.00
FLETE TERRESTRE
FLETE RURAL ( FLUVIAL )
FLETE RURAL ( MANUAL / ACEMILA )
FLETES TOTALES S/.
Flete no
Afecto a IGV
AFECTO IGV
18,075.52
3,552.00
3,552.00
18,075.52
PESP-RURAL / DEPI
1- DATOS GENERALES
A-POR PESO
MATERIALES
CEMENTO
FIERRO, CLAV. ETC
MADERA
LADRILLO
CALAMINA
YESO
TAPA BUZON
EXPLOSIVOS
OTROS
UNIDAD
PESO.UNIT.
BL.
KG
P2
UN
UN
BL
UN
KG
KG
42.5
1.00
1.50
4.50
3.00
25.00
130.00
1.00
1.00
F. RURAL
(SIN IGV)
F. TERRESTRE
(AFECTO IGV)
PESO TOTAL
SIN IGV
500.00
1,200.00
3,010.00
500.00
1,720.00
6,663.00
21,250.00
1,200.00
4,515.00
21,250.00
1,720.00
9,994.50
400.00
2,400.00
400.00
2,400.00
27,365.00
35,364.50
PESOS TOTALES
B-POR VOLUMEN
DESCRIPCION
ARENA
PIEDRA
HORMIGN
PIEDRA GRANDE
MAT. SELECCIONADO
MADERA
UNIDAD
SIN IGV
M3
M3
M3
M3
M3
P2
VOLUMEN TOTAL
CAPACIDAD DEL VOLQUETE (M3)
NUMERO DE VIAJES
REDONDEO
EN TUBERIA
111.00
AFECTO IGV
3.00
5.00
252.00
51.00
311.00 311.00
4.00 4.00
77.75
78
Tub, 3/4"
Tub, 1"
Tub, 1 1/2"
Tub, 2"
Tub, 3"
Tub, 4"
Tub 6:" U-PVC
Tub 8" U-PVC
Tub 6'; CSN
Tub 8'; CSN
51.00
60.00
PESO TOTAL
AFECTO IGV
2- FLETE TERRESTRE
UNIDAD DE TRANSPORTE
18,075.52
3- FLETE EN ACEMILA
La tubera ser transportada por peones
Costos de transporte por viaje
Acemila S/.
1.00
Peon S/.
1.00
Imprevistos:
Cantidad
500.00
122.30
3,552.00
4,174.30
FLETE TERRESTRE
FLETE RURAL ( MANUAL / ACEMILA )
FLETES TOTALES S/.
Flete no
Afecto a IGV
AFECTO IGV
18,075.52
4,174.30
4,174.30
18,075.52
FONCODES / DEPI
1- DATOS GENERALES
A-POR PESO
MATERIALES
CEMENTO
FIERRO, CLAV. ETC
MADERA
LADRILLO
CALAMINA
YESO
TAPA BUZON
EXPLOSIVOS
OTROS
UNIDAD
PESO.UNIT.
BL.
KG
P2
UN
UN
BL
UN
KG
KG
42.5
1.00
1.50
4.50
3.00
25.00
130.00
1.00
1.00
AFECTO IGV
PESO TOTAL
332.00
430.00
757.00
14,110.00
430.00
1,135.50
3.00
75.00
35.00
1,500.00
35.00
1,500.00
PESOS TOTALES
17,285.50
B-POR VOLUMEN
DESCRIPCION
ARENA
PIEDRA
HORMIGN
PIEDRA GRANDE
PIEDRA LABRADA
MAT. SELECCIONADO
MADERA
UNIDAD
M3
M3
M3
M3
M3
M3
P2
VOLUMEN TOTAL
CAPACIDAD DEL VOLQUETE (M3)
NUMERO DE VIAJES
REDONDEO
EN TUBERIA
20.00
16.00
10.00
17.00
50%
316.00 100%/5
379.00 379.00
10.00 10.00
37.90
38
Tub, 3/4"
Tub, 1"
Tub, 1 1/2"
Tub, 2"
Tub, 3"
Tub, 4"
Tub 6:" U-PVC
Tub 8" U-PVC
Tub 6'; CSN
Tub 8'; CSN
AFECTO IGV
2- FLETE TERRESTRE
UNIDAD DE TRANSPORTE
17,100.00
3,803.00
0.00440
0.00440