You are on page 1of 60

REKAPITULASI TOTAL

RENCANA ANGGARAN BIAYA


Pekerjaan : Struktur, Arsitektur, dan M/E
Proyek : RUKO
Lokasi :
Jumlah : 5 Unit
NO.

URAIAN

I.

PEKERJAAN PERSIAPAN

II.

PEKERJAAN TANAH

III.

PEKERJAAN STRUKTUR

IV.

PEKERJAAN DINDING

PEKERJAAN PELAPIS LANTAI

VI.

PEKERJAAN PINTU & JENDELA

VII.

PEKERJAAN PLAFOND

VIII.

PEKERJAAN PENGECATAN

IX.

PEKERJAAN SANITARY

X.

PEKERJAAN TAMPAK MUKA

XI.

PEKERJAAN TITIK LAMPU

XII.

PEKERJAAN ARMATUR

XIII.

PEKERJAAN AC, TELEPON, & OUTLET TV

XIV.

PEKERJAAN PLUMBING

XV.

PEKERJAAN ATAP

XVI. PEKERJAAN STAINLESS & BAJA


XVII. PEKERJAAN PENANGKAP PETIR
XVIII. PEKERJAAN LAIN LAIN

TOTAL-1
FEE (10%)
TOTAL-2
PPN 10%

GRAND TOTAL
Harga per m2 bangunan
LUAS lt 1
LUAS lt 2
LUAS lt 3
LUAS lt 4
KET: Penawaran diatas diluar pek Canopy baja
KET: Penawaran diatas diluar pek infrastruktur
KET: Penawaran diatas diluar pek penyambungan daya listrik
KET: Penawaran diatas diluar pek penyambungan air pdam / jetpump

AL
BIAYA

JUMLAH HARGA
Rp.

66,700,000

Rp.

39,314,936

Rp.

942,992,907

Rp.

647,771,110

Rp.

282,117,543

Rp.

467,209,113

Rp.

96,120,650

Rp.

87,139,140

Rp.

60,470,000

Rp.

35,304,000

Rp.

29,155,000

Rp.

19,455,000

Rp.

5,620,000

Rp.

116,592,100

Rp.

103,700,155

Rp.

104,151,247

Rp.

11,450,000

Rp.

8,024,384

3,123,287,284
312,328,728
3,435,616,012
343,561,601

3,779,177,613
2,605,908
376.25
408.125
408.125
125.895
1318.395 m2

RENCANA ANGGARAN
Pekerjaan : Struktur, Arsitektur, dan M/E
Proyek : RUKO
Lokasi :
NO.
I.

ITEM PEKERJAAN

PEKERJAAN PERSIAPAN
1 Pembersihan Site
2 Direksikeet dan Gudang Bahan
3 Pengukuran dan Pasang Bouwpalnk
4 Air Kerja
5 Listrik Kerja
6 Keamanan dan Koordinasi Lingkungan
7 Pagar Pengaman Proyek
8 Shop Drawing & As Built Drawing
9 Site Management +asuransi
10 Pembersihan selama pelaksanaan proyek & K3
Sub Total I.

II.

PEKERJAAN TANAH
1 Galian Tanah Pile Cap P1
2 Galian Tanah Sloof S1
3 Galian Pondasi Tangga
4 Galian Pondasi Batu kali
5 Urugan Pasir t = 10 cm di bawah Pile Cap P1
6 Urugan Pasir t = 10 cm di bawah Sloof S1
7 Urugan Pasir t = 10 cm di bawah Lantai
8 Lantai kerja 1:3:5 t = 5 cm di bawah Pile Cap P1
9 Lantai kerja 1:3:5 t = 5 cm di bawah Sloof S1
10 Lantai kerja 1:3:5 t = 5 cm di bawah Lantai
11 Pemadatan lantai dasar dibawah keramik
12 Urugan tanah Kembali
13 Buang tanah dan brangkal ke luar lokasi
Sub Total II.

III.

PEKERJAAN STRUKTUR
A
Lantai 1
1 Pondasi Batu kali
2 Borpile
- Besi Beton
- Beton k-225

2 Pile Cap Type P1


- Besi Beton
- Bekisting
- Beton k-225
4 Pondasi Tangga
- Besi Beton
- Bekisting
- Beton k-225
5 Sloof S1 (200x300)
- Besi Beton
- Bekisting
- Beton k-225
7 Kolom K1 (140x500)
- Besi Beton
- Bekisting
- Beton k-225
9 Tangga Beton
- Besi Beton
- Bekisting
- Beton k-225
B

Lantai 2
1 Kolom K3 (140x250)
- Besi Beton
- Bekisting
- Beton k-225
2 Balok B1 (200x500)
- Besi Beton
- Bekisting
- Beton k-225
3 Plat Beton (t=12cm)
- Besi 8
- Bekisting
- Beton k-225
- Waterproofing
4 Tangga Beton
- Besi Beton
- Bekisting
- Beton k-225
B
Lantai 3
1 Kolom K3 (140x250)
- Besi Beton

- Bekisting
- Beton k-225
2 Balok B1 (200x500)
- Besi Beton
- Bekisting
- Beton k-225
3 Plat Beton (t=12cm)
- Besi 8
- Bekisting
- Beton k-225
- Waterproofing
C

Lantai Atap
1 Balok B4 (140x450)
- Besi Beton
- Bekisting
- Beton k-225
2 Plat Beton Dak (t=12cm)
- Besi 8
- Bekisting
- Beton k-225
- Waterproofing
Sub Total III.

IV.

PEKERJAAN DINDING
A
Lantai 1
1 Pasangan Dinding
2 Plesteran
3 Acian
4 plesteran Aci Beton Expose
5 Kolom Praktis 10/10
6 Balok Praktis 10/10
7 Glassblock
B
Lantai 2
1 Pasangan Dinding
2 Plesteran
3 Acian
4 Acian Beton Expose
5 Kolom Praktis 10/10
6 Balok Praktis 10/10
7 Glassblock
C
Lantai 3

1 Pasangan Dinding
2 Plesteran
3 Acian
4 Acian Beton Expose
5 Kolom Praktis 10/10
6 Balok Praktis 10/10
7 Glassblock
C
Lantai 4
1 Pasangan Dinding
2 Plesteran
3 Acian
4 Acian Beton Expose
5 Kolom Praktis 10/10
6 Balok Praktis 10/10
7 Glassblock

Sub Total IV.


V.

PEKERJAAN PELAPIS LANTAI


A
Lantai 1
1 Lantai Teras Granite Tile 60x60cm depan blkg
2 Lantai 1 Granite Tile 60x60cm
3 Lantai Tangga Granite Tile + Bordes
4 Plin 8cm
5 Lantai Toilet Keramik 20x20cm
6 Dinding Toilet Keramik 20x40cm
Lantai 2
B
1 Lantai 2 Granite Tile 60x60cm
2 Lantai Toilet Keramik 20x20cm
3 Lantai Tangga Granite Tile + Bordes
4 Dinding Toilet Keramik 20x40cm
5 Plin 8cm
Lantai 3
C
1 Lantai 2 Granite Tile 60x60cm
2 Lantai Toilet Keramik 20x20cm
3 Dinding Toilet Keramik 20x40cm+kitchenzink
4 Plin 8cm
Lantai 4
D
1 Lantai 2 Keramik 40x40cm
2 Lantai Toilet Keramik 20x20cm
3 Dinding Toilet Keramik 20x40cm

Sub Total V.
VI.

PEKERJAAN PINTU & JENDELA


1 Type Henderson lipat

2 Type P1 (Pintu double kaca) lt 1


- Daun Pintu
- Floorhing dorma entrance depan
- Handle stainless
- Kunci tanam entrance
- Plat fitting stainless
3 Kaca framless depan
4 Type P2 (Pintu WC)+kmr
- Kusen
- Daun Pintu
- Finishing kusen
- Finishing Daun Pintu
- Handle + Lockcase + cylinder
- Engsel
4 Type PJ belakang lt1
- Kusen Alumunium
- Daun Pintu kaca rangka aluminium
- Daun Jendela Aluminium
- Casement 20"
- Rambuncis
- Handle + Lockcase + cylinder
- Engsel
- Kaca polos 5mm
- Silicon tembok
- Rooster
5 Type J1 besar depan lantai 2,3 ruko besar
- Kusen Alumunium
- Daun Jendela Aluminium
- Kaca polos 6mm
- Silicon tembok
6 Type J2 depan sedang ruko lebar 5
- Kusen Alumunium
- Daun Jendela Aluminium

- Casement 22"
- Rambuncis
- Kaca polos 5mm
- Silicon tembok
7 Type J3 depan kecil
- Kusen Alumunium
- Daun Jendela Aluminium
- Kaca polos 5mm mati
- Silicon tembok
8 Type J5 blkg sedang
- Kusen Alumunium
- Daun Jendela Aluminium
- Casement 22"
- Rambuncis
- Kaca polos 5mm
- Silicon tembok
- Rooster
9 Alumunium composit
10 pintu besi
Sub Total VI.
VII.
A

PEKERJAAN PLAFOND
Lantai 1
1 Pek. Plafond Gypsum
2 Plafond teras

2 List Plafond
B
Lantai 2
1 Pek. Plafond Gypsum
2 List Plafond
C
Lantai 3
1 Pek. Plafond Gypsum
2 List Plafond
D
Lantai 4
1 Pek. Plafond Gypsum
Sub Total VII.
VIII.
A

PEKERJAAN PENGECATAN
Lantai 1
1 Pengecatan Dinding Luar

2 Pengecatan Dinding Dalam


3 Pengecatan Plafond Gypsum
4 Pengecatan List Plafond
B
Lantai 2
1 Pengecatan Dinding Luar
2 Pengecatan Dinding Dalam
3 Pengecatan Plafond Gypsum
4 Pengecatan List Plafond
C
Lantai 3
1 Pengecatan Dinding Luar
2 Pengecatan Dinding Dalam
3 Pengecatan Plafond Gypsum
4 Pengecatan List Plafond
D
Lantai 4
1 Pengecatan Dinding Luar
2 Pengecatan Dinding Dalam
3 Pengecatan Plafond Gypsum
Sub Total VIII.
IX.

PEKERJAAN SANITARY
A
Lantai 1
1 Wastafel
2 Closet Duduk
3 Shower Spray
4 Shower Set
5 Floor Drain
6 Cermin
7 Kran Taman
B
Lantai 2
1 Wastafel
2 Closet Duduk
3 Shower Spray
4 Shower Set
5 Floor Drain
6 Cermin
B
Lantai 3
1 Wastafel
2 Closet Duduk
3 Shower Spray
4 Shower Set
5 Floor Drain

6 Cermin
7 Kitchen zink
8 Kran bebek
9 Meja beton
C
Lantai Atap
1 Closet Jongkok
2 Floor Drain
3 Kran Dinding
4 Roof drain
Sub Total IX.
X.

PEKERJAAN TAMPAK MUKA


1 Rolag bata
2 Canopy Beton
3 Tali air Canopy Beton
4 Pembersihan Akhir
Sub Total X.

XI.

PEKERJAAN TITIK LAMPU


A Lantai 1
1 Inst. Penerangan Ruangan
2 Inst. Stop Kontak Ruangan
3 Kabel Feeder KWH ke Panel Lt.1
4 Pentanahan
B Lantai 2
1 Inst. Penerangan Ruangan
2 Inst. Stop Kontak Ruangan
3 Kabel Feeder Panel Lt.1 ke Panel Lt.2
B Lantai 3
1 Inst. Penerangan Ruangan
2 Inst. Stop Kontak Ruangan
3 Kabel Feeder Panel Lt.1 ke Panel Lt.2
B Lantai 4
1 Inst. Penerangan Ruangan
2 Inst. Stop Kontak Ruangan
3 Kabel Feeder Panel Lt.1 ke Panel Lt.2

Sub Total XI.


XII.
A

PEKERJAAN ARMATUR
Lantai 1

1 Fitting Lampu
2 Stop Kontak
3 Saklar Tunggal
4 Saklar Double
5 Panel Utama
B
Lantai 2
1 Fitting Lampu
2 Stop Kontak
3 Saklar Tunggal
4 Saklar Double
5 Panel Pembagi
B
Lantai 3
1 Fitting Lampu
2 Stop Kontak
3 Saklar Tunggal
4 Saklar Double
5 Panel Pembagi
B
Lantai 4
1 Fitting Lampu
2 Stop Kontak
3 Saklar Tunggal
4 Saklar Double
5 Panel Pembagi
Sub Total XII.
XIII.

PEKERJAAN AC, TELEPON, & OUTLET TV


1 Kabel Feeder dari KTB Telkom ke MDF
2 Instalasi Titik Telepon
3 Outlet Telepon
4 Outlet TV
Sub Total XIII.

XIV.

PEKERJAAN PLUMBING
1 Instalasi Air Bersih
2 Instalasi Air Bersih
3 Instalasi Air Bersih
4 Instalasi Air Kotor
5 Instalasi Air Kotor
6 Instalasi Air Hujan
7 Instalasi Air Hujan
8 Instalasi Air Panas
9 Instalasi Gas

10 Pelindung Pipa Gas


11 Accesoris
12 Torn Atas Kap.1m
13 Torn Tanam Kap.1m
14 Mesin Pompa + Rumah Pompa
15 Mesin Pompa Dorong
16 Pek. Septictank +cor samping
Sub Total XIV.
XV.

PEKERJAAN ATAP
1 Rangka Atap CNP 125.2,3mm
2 Penutup Atap Zincalum
3 Flashing
4 Talang
5 Lisplank
6 Waterproofing
Sub Total XV.

XVI.

PEKERJAAN STAINLESS & BAJA


1 Railling Tangga Ke Lantai 2
2 Railling Tangga Ke Lantai 3
3 Railling Tangga Ke Lantai Atap
4 Hand Railling Tangga Ke Lantai 2
5 Hand Railling Tangga Ke Lantai 3
6 Hand Railling Tangga Ke Lantai Atap
7 Tangga Putar
Sub Total XVI.

XVII.

PEKERJAAN PENANGKAP PETIR

1
2
3
4

Instalasi Penangkap Petir


Tiang Splitzen
Pentanahan
Bak Kontrol
Sub Total XVII.

XVII.

PEKERJAAN TAMBAHAN (Bila diperlukan)


1 Kabel radar torn nym 2x1,5
2 Bak kontrol air hujan depan+grill
3 Photocel teras 3Amp+kabel
4 Balok di Atas Folding Gate (140x250)
- Besi Beton

- Bekisting
- Beton k-225
Sub Total XVIII.

RENCANA ANGGARAN BIAYA

SPESIFIKASI

stamper

SII/Setara

SAT.

VOLUME

HAR-SAT

Ls
Ls
Ls
Ls
Ls
Ls
M'
Ls
Ls
Ls

1.00
1.00
1.00
1.00
1.00
1.00
94.00
1.00
1.00
1.00

2,800,000
7,000,000
3,500,000
8,000,000
8,000,000
9,000,000
100,000
2,000,000
14,000,000
3,000,000

M
M
M
M
M
M
M
M
M
M
m2
M
M

29.73
49.62
11.25
27.99
2.97
8.72
36.12
1.49
4.36
18.06
484.88
57.72
139.54

45,000
45,000
45,000
45,000
135,000
135,000
135,000
534,600
534,600
534,600
5,000
20,000
80,000

14.11

479,400

kg
m3

2,451.42
65.50

9,078
809,000

SII/Setara

kg
m2
m3

1,064.60
36.48
9.98

9,078
69,353
809,000

Kg
M
M

242.08
6.00
2.00

9,078
69,353
809,000

Kg
M
M

1,974.33
159.36
18.80

9,078
69,353
809,000

Kg
M
M

3,289.88
177.48
16.47

9,078
106,353
809,000

Kg
M
M

1,234.28
89.35
7.92

9,078
106,353
809,000

Kg
M
M

1,762.92
106.40
8.79

9,078
106,353
809,000

Kg
M
M

5,286.30
460.05
39.68

9,078
98,353
820,000

M
M
M
M

3,839.45
361.22
43.35
23.00

9,078
98,353
820,000
100,000

Multi 9mm + Kaso 5/7

Kg
M
M

1,234.28
89.35
7.92

9,078
106,353
809,000

SII/Setara

Kg

1,354.13

9,078

Papan Alba + Kaso 5/7

SII/Setara
Papan Alba + Kaso 5/7

SII/Setara
Papan Alba + Kaso 5/7

SII/Setara
Multi 9mm + Kaso 5/7

SII/Setara
Multi 9mm + Kaso 5/7

SII/Setara
Multi 9mm + Kaso 5/7

SII/Setara
Multi 9mm + Kaso 5/7

SII/Setara
Multi 9mm + Kaso 5/7

ex. Penetron

SII/Setara

Multi 9mm + Kaso 5/7

M
M

95.20
6.58

106,353
859,000

SII/Setara

Kg
M
M

4,856.83
440.32
38.24

9,078
98,353
820,000

M
M
M
M

3,839.45
361.22
43.35
23.00

9,078
98,353
820,000
100,000

Kg
M
M

3,929.93
350.44
26.57

9,078
98,353
820,000

M
M
M
M

2,059.67
192.75
23.13
40.00

9,078
98,353
820,000
100,000

M
M
M
M
m1
m1
bh

894.10
1,232.30
1,232.30
182.70
288.00
15.50

84,610
39,170
18,930
46,200
55,000
55,000
28,000

M
M
M
M
m1
m1
bh

780.50
1,134.70
1,134.70
182.70
288.00
15.50

84,610
39,170
18,930
46,200
55,000
55,000
28,000

Multi 9mm + Kaso 5/7

SII/Setara
Multi 9mm + Kaso 5/7

ex. Penetron

SII/Setara
Multi 9mm + Kaso 5/7

SII/Setara
Multi 9mm + Kaso 5/7

ex. Penetron

Bata Beton lokal


Cam 1:5
Portland Cement
Portland Cement

ex. Mulia

Bata Beton lokal


Cam 1:5
Portland Cement
Portland Cement

ex. Mulia

M
M
M
M
M
M
bh

840.00
1,253.70
1,253.70
182.70
323.00
18.50

86,610
41,170
20,930
46,200
55,000
55,000
28,000

M
M
M
M
M
M
bh

552.00
1,104.00
1,104.00
143.00
174.00
144.00

86,610
41,170
20,930
46,200
55,000
55,000
28,000

M
M

69.23
356.06

159,680
142,000

ex. garuda, ( anti slip 3 baris)

196,947

ex. Garuda cream

M'
M
M

65.00
174.75
12.00
96.00

M
M
M
M
M'

368.99
12.75
65.00
96.00
254.80

M
M
M
M'

393.99
16.50
138.00
254.80

31,000
128,530
137,780
0
142,000
128,530
196,947
137,780
31,000
0
142,000
128,530
137,780
31,000

M
M
M

95.55
2.40
14.40

128,530
128,530
137,780

Bata Beton lokal


Cam 1:5
Portland Cement
Portland Cement

ex. Mulia

Bata Beton lokal


Cam 1:5
Portland Cement
Portland Cement

ex. Mulia

ex. Garuda kasar


ex. Garuda cream

ex kia
ex kaisar

ex. Garuda cream


ex kia
ex. garuda, ( anti slip 3 baris)
ex kaisar
ex. Garuda cream

ex. Garuda cream


ex kia
ex kaisar
ex. Garuda cream

ex. Milan
ex kia
ex kaisar

tinggi 3,8m

Tempered glass
Melamik
ex. Dekkson
ex. Dekkson
ex. Dekkson
Kaca polos 10mm

Engineering Wood + Melaminto


Engineering + Melaminto
Melamik
Melamik
ex. Dekkson
ex. Dekkson

ex. Indal 3" PC White


ex. Indal 3" PC White
ex. Indal 3" PC White
ex. Dekkson
ex. Dekkson
ex. Dekkson 2BB
ex. Dekkson 8485;058
ex. Asahi

ex. Indal 3" PC White


ex. Indal 3" PC White
ex. Asahi

ex. Indal 3" PC White


ex. Indal 3" PC White

unit

5.00

24,472,000

unit
bh
bh
bh
bh
m2

12.00

0
4,200,000

unit
unit
ls
ls
unit
psg

22.00
22.00
22.00
22.00
22.00
33.00

M'
unit
unit
unit
unit
unit
psg
M
M'
bh

57.00
5.00
5.00
5.00
5.00
5.00
7.50
29.50
228.00
15.00

M'
unit
M
M'

35.60
4.00
12.00
142.40

M'
unit

115.60
10.00

inc
inc
inc
inc
66.30

350,000
0
682,500
1,155,000
150,000
200,000
350,000
55,000
0
85,000
1,300,000
750,000
280,000
45,000
350,000
55,000
115,000
6,000
45,000
0
85,000
850,000
115,000
6,000
0
85,000
850,000

unit
unit
M
M'

10.00
10.00
39.60
462.40

M'
unit
M
M'

111.60
0.00
23.76
446.40

275,000
45,000
115,000
6,000
0
85,000
700,000
95,000
6,000

M'
unit
unit
unit
M
M'
bh
m2
bh

82.80
12.00
12.00
12.00
22.68
331.20
24.00
207.34
5.00

85,000
850,000
275,000
45,000
115,000
6,000
45,000
490,000
1,800,000

351.25

70,000

44.64
263.30

70,000

380.24
207.80

70,000

70,000

M'

380.24
207.80

ex. Jayaboard / knauf 9 mm rangka hollow 4x4 2x4

95.55

70,000

ex. Kemtone Exterior/mowilex

316.35

25,000

ex. Dekkson
ex. Dekkson
ex. Asahi

ex. Indal 3" PC White


ex. Indal 3" PC White
ex. Asahi

ex. Indal 3" PC White


ex. Indal 3" PC White
ex. Dekkson
ex. Dekkson
ex. Asahi

ex seven

ex. Jayaboard / knauf 9 mm rangka hollow 4x4 2x4

M'
ex. Jayaboard / knauf 9 mm rangka hollow 4x4 2x4

M
M'

ex. Jayaboard / knauf 9 mm rangka hollow 4x4 2x4

12,500

12,500

12,500

ex. Spectrum
ex. Spectrum
ex. Spectrum

ex. Kemtone Exterior/mowilex


ex. Spectrum
ex. Spectrum
ex. Spectrum

ex. Kemtone Exterior/mowilex


ex. Spectrum
ex. Spectrum
ex. Spectrum

ex. Kemtone Exterior/mowilex


ex. Spectrum
ex. Spectrum

ex. Toto LW 236 CJ


ex. Toto CW421J / SW421JP
ex. Toto TX20NB#W
ex. Toto TX433SDZ
ex. Toto TX1BN
t = 5mm ; uk. 60 x 75 cm (di bevel keliling)
ex. Toto T26-13

ex. Toto LW 236 CJ


ex. Toto CW421J / SW421JP
ex. Toto TX20NB#W
ex. Toto TX433SDZ
ex. Toto TX1BN
t = 5mm ; uk. 60 x 75 cm (di bevel keliling)

ex. Toto LW 236 CJ


ex. Toto CW421J / SW421JP
ex. Toto TX20NB#W
ex. Toto TX433SDZ
ex. Toto TX1BN

M
M
M'

892.35
351.25
263.30

13,000
13,000
2,500

M
M
M
M'

291.95
842.75
380.24
207.80

25,000
13,000
13,000
2,500

M
M
M
M'

291.95
842.75
380.24
207.80

25,000
13,000
13,000
2,500

M
M
M

350.31
382.40
95.55

25,000
13,000
13,000

unit
unit
unit
unit
unit
unit
unit

5.00
5.00
5.00
5.00
5.00
5.00
5.00

unit
unit
unit
unit
unit
unit

5.00
5.00
5.00
5.00
5.00
5.00

unit
unit
unit
unit
unit

5.00
5.00
5.00
5.00
5.00

1,250,000
1,657,000
210,000
1,000,000
240,000
275,000
285,000
0
1,250,000
1,657,000
210,000
1,000,000
240,000
275,000
0
1,250,000
1,657,000
210,000
1,000,000
240,000

t = 5mm ; uk. 60 x 75 cm (di bevel keliling)

unit
unit
unit
m2

5.00
5.00
5.00
12.00

ex. Toto CW421J / SW421JP

unit
unit
unit
bh

1.00
5.00
5.00
20.00

275,000
750,000
150,000
300,000
0
400,000
240,000
205,000
100,000

M
M
M'
Ls

21.00
9.03
72.00
1.00

140,000
2,800,000
15,000
6,000,000

ttk
ttk
M'
ttk

33.00
20.00
72.00
5.00

135,000
135,000
30,000
350,000

ttk
ttk
M'

28.00
15.00
30.00

135,000
135,000
30,000

ttk
ttk
M'

28.00
15.00
30.00

135,000
135,000
30,000

ttk
ttk
M'

17.00
11.00
30.00

135,000
135,000
30,000

ex. Toto TX1BN


ex. Toto T23B13V7NB

U aluminium 1x1cm

Kabel NYM ex. Prima + pipa conduit


Kabel NYM ex. Prima + pipa conduit
Kabel NYM ex. Prima + pipa conduit
Pipa Galvanis + BC-6

Kabel NYM ex. Prima + pipa conduit


Kabel NYM ex. Prima + pipa conduit
Kabel NYM ex. Prima + pipa conduit

Kabel NYM ex. Prima + pipa conduit


Kabel NYM ex. Prima + pipa conduit
Kabel NYM ex. Prima + pipa conduit

Kabel NYM ex. Prima + pipa conduit


Kabel NYM ex. Prima + pipa conduit
Kabel NYM ex. Prima + pipa conduit

ex. Broco
ex. Clipsal
ex. Clipsal
ex. Clipsal
Panel ex. Hager ; MCB ex. MG

ex. Broco
ex. Clipsal
ex. Clipsal
ex. Clipsal
Panel Ex. Hager ; MCB ex. MG

ex. Broco
ex. Clipsal
ex. Clipsal
ex. Clipsal
Panel Ex. Hager ; MCB ex. MG

ex. Broco
ex. Clipsal
ex. Clipsal
ex. Clipsal
Panel Ex. Hager ; MCB ex. MG

ex. Clipsal
ex. Clipsal

1/2" PVC ex. Maspion AW-Abu


3/4" PVC ex. Maspion AW-Abu
1" PVC ex. Maspion AW-Abu
3" PVC ex. Maspion D-Abu
4" PVC ex. Maspion D-Abu
3" PVC ex. Maspion D-Abu
6" PVC ex. Maspion D-Abu
1/2" ex. Rifeng
Pipa BSP 5/8"

pcs
pcs
pcs
pcs
unit

33.00
20.00
5.00
10.00
5.00

pcs
pcs
pcs
pcs
unit

28.00
15.00
5.00
5.00
5.00

pcs
pcs
pcs
pcs
unit

28.00
15.00
5.00
5.00
5.00

13,000
25,000
16,000
28,000
850,000
0
13,000
25,000
16,000
28,000
750,000
0
13,000
25,000
16,000
28,000
750,000

pcs
pcs
pcs
pcs
unit

17.00
11.00
7.00
5.00
5.00

13,000
25,000
16,000
28,000
750,000

ttk
ttk
ttk
ttk

5.00
15.00
15.00
5.00

180,000
180,000
55,000
239,000

M'
M'
M'
M'
M'
M'
M'
M'
M'

133.20
99.00
162.00
143.50
156.00
162.00
140.00
15.00
35.00

13,000
15,000
18,000
41,000
49,000
41,000
91,000
25,000
40,000

M'
Ls
unit
unit
unit
unit
unit

35.00
1.00
5.00
5.00
5.00
5.00
5.00

472.86

90,000

Zinalum 0,4mm TANPA INSULASI

472.86

85,000

Zinalum 0,4mm

M'

78.02
27.90

75,000

Pipa PVC 3/4"

ex. Pinguin
ex. Pinguin
ex. Panasonic 200 Watt
ex. Panasonic 125 Watt
Bio septitank

m2
ex. Elephant GRC polos dicat warna Coklat ex. Siev

M'

talang

Hollow uk.2x4, uk.4x4, t=1,2 mm (finish cat duco)

m1
m1
m1
m1
m1
m1
unit

Hollow uk.2x4, uk.4x4, t=1,2 mm (finish cat duco)


Hollow uk.2x4, uk.4x4, t=1,2 mm (finish cat duco)
Stainless 2" Hairlines
Stainless 2" Hairlines
Stainless 2" Hairlines

BC - 5 + Pipa PVC

SII/Setara

33.90
27.90

53.53
68.42
46.43
61.53
76.42
54.43
5.00

15,000
5,000,000
2,000,000
5,000,000
900,000
650,000
5,500,000

350,000
75,000
100,000

380,000
380,000
380,000
110,000
110,000
110,000
3,800,000

M'
ttk
ttk
unit

65.00
5.00
5.00
5

70,000
180,000
750,000
450,000

m1
bh
pcs

34.00
5.00
5.00

10,000
400,000
130,000

kg

217.15

8,663

Multi 9mm + Kaso 5/7

m2
m3

23.04
1.26

96,038
746,500

total

JUMLAH

2,800,000
7,000,000
3,500,000
8,000,000
8,000,000
9,000,000
9,400,000
2,000,000
14,000,000
3,000,000
66,700,000

1,337,850
2,232,770
506,250
1,259,685
401,355
1,177,268
4,876,470
794,683
2,330,990
9,655,411
2,424,375
1,154,460
11,163,370
39,314,936

6,764,034
0
22,252,749
52,991,285

0
9,663,889
2,529,989
8,077,056
0
2,197,511
416,117
1,618,000
0
17,922,021
11,052,059
15,208,067
0
29,863,894
18,875,491
13,326,657
0
11,204,211
9,502,902
6,403,640
0
0
0
16,002,915
11,315,936
7,107,065
0
47,986,368
45,246,950
32,535,345
0
34,852,599
35,526,990
35,544,048
2,300,000
0
11,204,211
9,502,902
6,403,640
0
0
12,292,136

10,124,784
5,652,220
0
44,087,918
43,306,557
31,358,309
0
34,852,599
35,526,990
35,544,048
2,300,000
0
0
35,673,927
34,466,502
21,787,605
0
18,696,674
18,957,498
18,966,600
4,000,000
942,992,907

75,649,463
48,269,348
23,327,515
8,440,740
15,840,000
852,500
0
0
66,038,105
44,446,199
21,479,871
8,440,740
15,840,000
852,500
0
0

72,752,400
51,614,829
26,239,941
8,440,740
17,765,000
1,017,500
0
0
47,808,720
45,451,680
23,106,720
6,606,600
9,570,000
7,920,000
0
0
647,771,110

11,053,848
50,559,810
12,801,533
5,417,250
1,542,360
13,226,880
0
52,396,580
1,638,758
12,801,533
13,226,880
7,898,800
0
55,946,580
2,120,745
19,013,640
7,898,800
0
12,281,042
308,472
1,984,032

282,117,543

122,360,000
hilton cek ke besannya istana
0
50,400,000

23,205,000
0
15,015,000
25,410,000
3,300,000
4,400,000
7,700,000
1,815,000
0
4,845,000
6,500,000
3,750,000
1,400,000
225,000
1,750,000
412,500
3,392,213
1,368,000
675,000
0
3,026,000
3,400,000
1,380,000
854,400
0
9,826,000
8,500,000

2,750,000
450,000
4,554,000
2,774,400
0
9,486,000
0
2,257,200
2,678,400
7,038,000
10,200,000
3,300,000
540,000
2,608,200
1,987,200
1,080,000
101,596,600
9,000,000
467,209,113

24,587,500
3,124,800
3,291,250
0
26,616,800
2,597,500
0
26,616,800
2,597,500
0
6,688,500
96,120,650

7,908,750

1,208.70

11,600,550
4,566,250
658,250
0
7,298,750
10,955,750
4,943,120
519,500
0
7,298,750
10,955,750
4,943,120
519,500
0
8,757,750
4,971,200
1,242,150
87,139,140

6,250,000
8,285,000
1,050,000
5,000,000
1,200,000
1,375,000
1,425,000
0
6,250,000
8,285,000
1,050,000
5,000,000
1,200,000
1,375,000
0
6,250,000
8,285,000
1,050,000
5,000,000
1,200,000

17427828

1,375,000
3,750,000
750,000
3,600,000
0
400,000
1,200,000
1,025,000
2,000,000
60,470,000

2,940,000
25,284,000
1,080,000
6,000,000
35,304,000

4,455,000
2,700,000
2,160,000
1,750,000
3,780,000
2,025,000
900,000
3,780,000
2,025,000
900,000
2,295,000
1,485,000
900,000

29,155,000

429,000
500,000
80,000
280,000
4,250,000
0
364,000
375,000
80,000
140,000
3,750,000
0
364,000
375,000
80,000
140,000
3,750,000
0
221,000
275,000
112,000
140,000
3,750,000
19,455,000

900,000
2,700,000
825,000
1,195,000
5,620,000

1,731,600
1,485,000
2,916,000
5,883,500
7,644,000
6,642,000
12,740,000
375,000
1,400,000

525,000
5,000,000
10,000,000
25,000,000
4,500,000
3,250,000
27,500,000
116,592,100

23,318,420.00

42,557,737
40,193,418
5,851,500
9,765,000
2,542,500
2,790,000
103,700,155

20,343,164
26,000,162
17,644,988
6,768,811
8,406,363
5,987,760
19,000,000
104,151,247

4,550,000
900,000
3,750,000
2,250,000
11,450,000
340,000
2,000,000
650,000
0
1,881,079

20,830,249.42

2,212,715
940,590
8,024,384

3,134,867,284
3,448,354,012
2,615,570
3,793,189,413
2,877,127

81905523500

DAFTAR BAHAN
Pekerjaan : Struktur, Arsitektur, dan M/E
Proyek : RUKO
Lokasi :

NO.

BAHAN

SATUAN

Semen Portland

Zak

2
3
4

Besi beton merk HIJ


Kawat beton
Paku

Kg
kg
kg

5
6
7
8
9
10

Kayu dolken kecil


Kayu Alba super
Multiplek 10 mm 120 x 240
Multiplek 12 mm 120 x 241
Genteng victoria slate
Ready Mix K. 225Pioner

Btg
m3
lbr
lbr
bh
m3

11
12
13
14

Pasir Pasang
Pasir Beton
Batu Splits
Batu Belah Pondasi

m3
m3
m3
m3

15
16
17

Bata beton lokal


Conblock ukr.390x190x140 Cisangkan

bh

Batu Oyster 30x100

bh
m2

18
19
20
21
22
23

Keramik dinding 25/45 kaisar/setara


Keramik granite teras 60x60
Keramik Lantai border Rocktile 15x30cm Teras
Granite Lantai 60x60cm ex garuda
Granite Tangga 30/50 Sehati ex garuda
Keramik Lantai 25x25cm Toilet KIA/setara

m2
m2
m2
m2
m2
m2

24

Grevel beton Cisangkan 30cm

bh

HARGA
(Rp)
63,000
7,500
13,500
10,500
12,000
1,500,000
120,000
140,000
6,800
650,000
120,000
160,000
160,000
130,000
650
8,910
250,000
85,000
100,000
110,000
92,000
92,000
85,000
37,000

ANALISA SATUAN PEKERJAAN


Pekerjaan : Struktur, Arsitektur, dan M/E
Proyek : RUKO
Lokasi :
No

Uraian Pekerjaan

Koef.

A Pekerjaan Fundasi
1 Fundasi batu kali 1:5
Batu belah
Pasir pasang
Semen
Upah

1.000
1.300
0.575
2.800
1.000

B Pekerjaan Besi
1 Besi beton
Besi beton
Kawat beton
Upah

1.000
1.050
0.015
1.000

C Pekerjaan Bekisting
1 Bekisting Sloof,Pooer
Multiplek 9mm
Kayu alba 4/6
Paku
Upah

1.000
0.231
0.010
0.150
1.000

2 Bekisting Kolom
Multiplek 9mm
Kayu alba 4/6 & 5/7
Dolken kecil
Paku
Upah

1.000
0.231
0.020
1.000
0.150
1.000

3 Bekisting Balok,Plat lantai,Tangga


Multiplek 9mm
Kayu alba 4/6 & 3/20
Dolken kecil
Paku
Upah

1.000
0.231
0.010
2.000
0.150
1.000

4 Bekisting kolom,ringbalk praktis


Papan albasia 3/20
Paku
Upah

1.000
0.023
0.150
1.000

D Pekerjaan Beton
1 Beton sitemixed K225/m3
Semen
Split Pecah Mesin
Pasir Beton
Upah

1.000
8.00
0.80
0.70
1.00

2 Beton sitemixed K175


Semen
Split
Pasir Beton
Upah

1.000
7.000
0.780
0.470
1.000

3 Beton ready mix K225 > 30m3


Beton ready mix K225
Pengawalan
Pompa beton
Upah

1.000
1.05
1.00
1.00
1.00

4 Beton sitemixed 1:3:5


Semen
Batu Splits
Pasir Beton
Upah

1.000
4.000
0.840
0.520
1.000

E Pekerjaan Beton bertulang


1 Kolom praktis,Ring Balk ; 10/12 (48+6-150)
Beton K175
Besi
Bekisting

1.000
1.000
192.808
25.000

2 Kolom praktis,Ring Balk ; 14/12 (48+6-150)


Beton K175
Besi
Bekisting

1.000
1.000
142.118
17.857

E PEKERJAAN DINDING
1 Pas dinding conblok 14cm
Conblock ukr.390x190x140

1.000
13.0

Semen
Pasir pasang
Alat bantu Steger
Upah pasang

0.140
0.035
1.000
1.000

2 Pas bata beton Lokal aduk 1:5/m2


Bata beton lokal
Semen
Pasir pasang
Alat bantu Steger
Upah pasang

1.000
70.0
0.170
0.045
1.000
1.000

3 Plesteran dinding 1:5


Pasir pasang
Semen
Alat bantu Steger
Upah pasang

1.000
0.035
0.190
1.000
1.00

4 Acian
Semen
Upah pasang

1.000
0.110
1.00

5 Plesteran beton 1:3 tebal 2cm


Pasir pasang
Semen
Upah pasang

1.000
0.030
0.200
1.00

6 Dinding keramik 25/45


Keramik dinding 25/45 Roman (type Alpine White)
Semen
Pasir Pasang
Upah pasang

1.000
1.100
0.160
0.035
1.000

6 Dinding Oyster
Batu Oyster Javastone
Semen
Pasir Pasang
Upah pasang
Coating

1.000
1.050
0.200
0.045
1.000
1.000

F PEKERJAAN LANTAI
1 Keramik Lantai teras 30x30cm

Keramik Lantai Roman Rocktile 30x30cm Teras

1.000
1.100

Semen
Pasir Pasang
Upah pasang

0.160
0.030
1.000

1 Granite Lantai 60x60cm


Granite Lantai 60x60cm Sehati (type Verona)
Semen
Pasir Pasang
Upah pasang

1.000
1.110
0.160
0.040
1.000

3 Granite Tangga 30/50

1.000
1.200
0.160
0.040
3.333
1.000

Granite Lantai 60x60cm Sehati (type Verona)


Semen
Pasir Pasang
Upah antislip
Upah pasang
4 Keramik Lantai 25x25cm
Keramik Lantai 25x25cm Toilet Roman (type Matric Grey)
Semen
Pasir Pasang
Upah pasang

G PEKERJAAN SEPTIC TANK 2M3 + RESAPAN


Septick tank
1 Galian tanah
2 Pasir bawah dinding dasar
3 Lantai kerja
3 Sloof 15/30
-besi
-bekisting
-cor K175
4 Lantai beton 12cm
-besi
-cor K175
5 Kolom 20/20
-besi
-bekisting
-cor K175
6 Dinding bata 1/2 batu
7 Plesteran
8 Ringbalk 20/30
-besi
-bekisting

1.000
1.050
0.160
0.035
1.000

12.60
0.39
0.20
54.05
5.28
0.33
16.77
0.20
50.67
5.76
0.29
12.41
16.40
66.63
7.04

-cor K175
9 Tutup beton 20cm
-besi
-bekisting
-cor K175
10 Urugan kembali
11 Buang sisa tanah
Resapan
1 Galian tanah
2 Dinding bata 1/2 batu
3 Plesteran
4 Tutup beton 12cm
-besi
-bekisting
-cor K175
5 Buang sisa tanah
Torren tanam 1m3
1 Galian tanah
2 Pasir bawah dinding dasar
4 Sloof 15/30
-besi
-bekisting
-cor K175
5 Kolom 20/20
-besi
-bekisting
-cor K175
6 Dinding bata 1/2 batu
7 Plesteran
8 Ringbalk 20/30
-besi
-bekisting
-cor K175
9 Tutup beton 20cm
-besi
-bekisting
-cor K175
10 Urugan kembali
11 Buang sisa tanah

0.53
33.55
2.00
0.40
8.46
9.18

2.39
5.42
2.17
32.50
1.33
0.16
2.87

4.74
0.26
31.71
3.84
0.19
42.67
5.76
0.29
8.96
8.96
49.01
3.84
0.38
20.22
2.56
0.31
0.60
6.16

RJAAN

Sat.

m3
m3
m3
zak
m3

kg
kg
kg
kg

m2
lbr
m3
kg
m2
m2
lbr
m3
bh
kg
m2
m2
lbr
m3
bh
kg
m2
m2
m3
kg
m2

Hrg.Satuan

Jumlah

(Rp)

(Rp)

130,000
120,000
63,000
65,000
Jumlah

169,000
69,000
176,400
65,000
479,400

7,500
13,500
1,000
Jumlah

7,875
203
1,000
9,078

120,000
1,500,000
10,500
25,000
Jumlah

27,778
15,000
1,575
25,000
69,353

120,000
1,500,000
12,000
10,500
35,000
Jumlah

27,778
30,000
12,000
1,575
35,000
106,353

120,000
1,500,000
12,000
10,500
30,000
Jumlah

27,778
15,000
24,000
1,575
30,000
98,353

1,500,000
10,500
13,000

35,000
1,575
13,000

Jumlah

m3
zak
m3
m3
m3
m3
zak
m3
m3
m3
m3
m3
m3
m3
m3
m3
zak
m3
m3
m3

m3
m3
kg
m2

m3
m3
kg
m2

m2
bh

49,575

63,000
160,000
160,000
65,000
Jumlah

504,000
128,000
112,000
65,000
809,000

63,000
160,000
160,000
65,000
Jumlah

441,000
124,800
75,200
65,000
706,000

650,000
10,000
75,000
52,500
Jumlah

682,500
10,000
75,000
52,500
820,000

63,000
160,000
160,000
65,000
Jumlah

252,000
134,400
83,200
65,000
534,600

706,000
9,078
49,575
Jumlah

706,000
1,750,214
1,239,375
3,695,589

706,000
9,078
49,575
Jumlah

706,000
1,290,077
885,268
2,881,345

8,910

115,830

zak
m3
m2
m2
m2
bh
zak
m3
m2
m2
m2
m3
zak
m2
m2
m2
zak
m2

m2
m3
zak
m2
m2
m2
zak
m3
m2
m2
m2
zak
m3
m2
m2

m2
m2

63,000
120,000
2,000
16,000
Jumlah

8,820
4,200
2,000
16,000
146,850

650
63,000
120,000
3,000
20,000
Jumlah

45,500
10,710
5,400
3,000
20,000
84,610

120,000
63,000
23,000
Jumlah

4,200
11,970
23,000
39,170

63,000
12,000
Jumlah

6,930
12,000
18,930

120,000
63,000
30,000
Jumlah

3,600
12,600
30,000
46,200

85,000
63,000
120,000
30,000
Jumlah

93,500
10,080
4,200
30,000
137,780

250,000
63,000
120,000
85,000
10,000
Jumlah

262,500
12,600
5,400
85,000
10,000
375,500

110,000

121,000

zak
m3
m2

63,000
120,000
25,000
Jumlah

10,080
3,600
25,000
159,680

92,000
63,000
120,000
25,000
Jumlah

102,120
10,080
4,800
25,000
142,000

92,000
63,000
120,000
12,500
30,000
Jumlah

110,400
10,080
4,800
41,667
30,000
196,947

85,000
63,000
120,000
25,000
Jumlah

89,250
10,080
4,200
25,000
128,530

m3
m3
m3

40,000
125,000
534,600

504,000
48,750
104,247

kg
m2
m3

9,078
49,575
706,000

490,609
261,756
232,980

kg
m3

9,078
706,000

kg
m2
m3
m2
m2

9,078
49,575
706,000
84,610
39,170

152,269
141,200
459,927
285,552
203,328
1,050,010
642,388

kg
m2

9,078
49,575

604,840
349,008

m2
m2
zak
m3
m2
m2
m2
zak
m3
m1
m2
m2
m2
zak
m3
m2

m3

706,000

372,768

kg
m2
m3
m3
m3

9,078
49,575
706,000
10,000
55,000

m3
m2
m2

40,000
84,610
39,170

kg
m2
m3
m3

9,078
49,575
706,000
55,000

304,538
99,150
282,400
84,595
504,928
7,179,242
95,567
458,524
84,909
295,019
65,802
112,451
157,686
1,269,958

m3
m3

35,000
125,000

165,760
32,000

kg
m2
m3

9,078
49,575
706,000

kg
m2
m3
m2
m2

9,078
49,575
706,000
84,610
39,170

287,885
190,368
135,552
387,307
285,552
203,328
758,106
350,963

kg
m2
m3

9,078
49,575
706,000

444,916
190,368
271,104

kg
m2
m3
m3
m3

9,078
49,575
706,000
10,000
55,000

183,583
126,912
216,883
5,955
338,624
4,575,166
15,628,442

Jumlah