ENTREGA DEL POZO A PRODUCCION

EXPORACION Y PRODUCCION

Malas Cond. Climaticas


Esp. Cajas de Recortes
Prob. Operativos (Asent. TR)

= 1.89 dias
= 0.27 dia
= 0.71 dia

TERMINACION
Prueba en JSK ( 61.6 dias)
Atrapamiento de sarta
Apoyo p/aforar S-1, S-2 y S-3
Falla de equipo de Perf.
Falla de disparos
Malas cond. Climaticas
Esp. mat. (retenedor)
Fallas de TxC
Prob. Op. (Pez c/bna 8-1/2")

= 12.48 dias
= 4.42 dias
= 1.43 dias
= 0.50 dia
= 3.17 dias
= 1.29 dias
= 23.63 dias
= 30.46 dias

INFORMACION ESTIMADA DEL YACIMIENTO:


PRODUCCION ESTIMADA DE ACEITE (BLS/D):

6500

PRODUCCION ESTIMADA GAS (MMPCD):

PRODUCCION ESTIMADA DE AGUA (BLS/D):

107

SALINIDAD (PPM):

PRESION EN TP (KGS/CM2):

9.5

INTERVALO PROPUESTO (MVBMR):

3817-3654 / 3580-3430