ty Boilers
team has
ficiently
can
don’t be
gh by 1
HYDROCARBON
PROCESSING’ excmermrn
‘SPECIAL REPORT: LIQUEFIED NATURAL GAS DEVELOPMENTS
25 sveted natural gas and North American
shale gas: Room for both?
lat tae alook at the ver affecting these commodities
Gibbs and, Wochner, Sutherland Asbil & Brennan LLP Washington, D.C
‘Materials market update: Opportunities in a challenging economy
Ascamanis emerge rom the downtun. nev capa project models wil be vital
1. Scot Fluor Corp, Houston, Texas
Dynamic simulation of liquefied natural gas processes
Here's how to impo the process design and operation of our fality
4. tephenson, Honeywell Process Solutions, London, Ontario, Canada;
nd Vong, Honeyarel Process Solutions, Calgary, Alberta, Canada
Perfecting liquefied natural gas analysis techniques and methods
Folin these precedes wil improve measurement acurac and elability
5. Hale, Emerson Process Management, Houston, Texas
Liquefied natural gas terminal with low environmental impact
Inplenent thet ep to mitigate esormance rks
Nanda, Techno, Houston Texas; P Linda, PX Thermal Equipment & Service,
‘Overland Fark Kansas and D Eyermann, A Tower LLG Houston, Texas
Finetune boil-off gas generation from refrigeration storage facilities
proved estimation metho accrataly calla vaporize produc fr liquefied raul
ge tart syste
‘AM. Gott and H. Kr, Sazeh Consultants, Tran an
BONUS REPORT: WATER MANAGEMENT
Ee Ducover new trends In olly wastewater redamation
63 "
Retna can Fi profs by parading! treatment and recycling process water
D.Rujawaki, Refinery Water Engineering & Associates, Los Angeles, California
(J Automation improves asset reliability for refiners.
BO eal cae ede tat voting tise con el teers
improvement in equiment uptime and lower total operating costs
1M Gerty, Nalco Co,, Energy Services Division, Sugar Land, Texas
INSTRUMENTATION
75, Boosting temperature inferentialiControl performance
2 in distillation columns
An fective compensation method improves performance
K. HUANG and X. LUO, Beijing University of Chemical Technology,
Beding PR. china
ENGINEERING CASE HISTORIES
Q)5 Case 57: Troubleshooting the cause of sudden impacts
1 Fn he cause con be elusive but caeuations help
A Sfronas, Consulting Engineer, Houston Texas
DEPARTMENTS
‘THPIN BRIEF * 19 HPIN CONSTRUCTION
22 WPICONSTRUCTION 8OXSCORE UPDATE
86 HPIMARKETPLACE + 89 ADVERTISER INDEX
Cover Angola INS facitycrenty
Sar cretracon ne Sn, hog
‘has npytne fac meh ens ;
the Conohiige Optimaes Coes
Moan tegument
cary S078 Pogaph cute oF
ogo. =
HPIMPACT
Sees
epee
Sean
ustry face
npetition from
US chemical
legislation could
eet)
PHY RELIABILITY
Not ready for 29-year
cold pump packing,
HPI EUROPE
‘Advice for 2011
dynamic, be flexible;
MPINTEGRATION
STRATEGIES
‘The three dimensions of
‘energy management
MPIN CONTROL
Continuous
Improvement or
core-competency?