PROCEDURES
General Start-up Procedures
1. A quick inspection is performed to make sure that the equipment is in a proper
working condition.
2. Initially be sure that all the valves are closed, except V1 and V2.
3. Hot water tank is filled up via a water supply hose connected to valve V27.
The valves are closed when the tank is full.
4. Cold-water tank is filled up via a water supply hose connected to valve V28ave
the valve opened for continuous water supply.
5. A drain hose is connected to the cold water drain point.
6. The main power is switched on. The heater for the hot water tank is switched
on and the temperature controller is set to 50 0C.
7. The water temperature in hot water tank is allowed to reach the set point.
8. The equipment is ready to run.