You are on page 1of 1

Condition Report - Air Compressor

Vessel Name:
Date:
Last examination Date:

IMO No.
Last surveyed:

Compressor no:
Place:

Reason for examination:


Surveyed by:

Verified by:

Place:

Date:

Cylinder Measurement:
Cylinder number
Cyl. dia. at
the upper
ring
Freespace

HT1

HT2

Original cylinder diameter


HT3
HT4
HT5
LT1

HT:
LT2

LT3

LT:
LT4

LT5

Athwartship
Fore-and-aft

Condition For every machinery part enter a

Machinery part
High-pressure valves
Low pressure valves
Cylinders
Piston with rings
Connecting rods with bearings
Crank shaft with bearings
Crank case and covers
Coupling
Safety valves
High-pressure cooler
Low-pressure cooler
Cooling-water system
Lubrication-oil system
Other fittings and valves
Electric motor
Special remarks:

in the "Good" column

Good

Remarks, enter if the condition is unsatisfactory.


Replaced:
Replaced:
Replacable liners:

Pressure
tested:

Cleaned:

Varnished:

Megger Test:

Please state below possible special repairs and renewals which as far as can be seen are necessary and proposal for the
execution.

Spare parts ordered according to ship requisition S-M number:


Spares.
C = Consumed during the examination
C
S
Cylinder cover
Piston
HT
Piston
rings
LT
Piston pin with lining
Scraper rings
Piston rod
lntake valve
HT
Crank bearing liner
complete
LT
Main bearing liner

Date:
S = Stock after the examination.
S
Pressure valve
HT
complete
LT
Suction valve
HT
flap complete
LT
Pressure valve
HT
flap complete
LT

Chief Engineer
Signature (Chief Engineer)