You are on page 1of 6

PRESUPUESTO DE MANO DE OBRA POR ACTIVIDAD

SISTEMA DE AGUA IQUIACA


bolivianos
Tipo de Cambio
Cdigo

Especialidad

5.03

Horas Hombre

Precio Unitario

Precio Total

1.19
0.59

3.471
13.350

4.12
7.92
12.05

7.12

3.471

24.72
24.72

17.15

3.471

59.53
59.53

14.85
14.85

3.521
3.471

52.29
51.54
103.83

9.90
9.90

3.521
3.471

34.86
34.36
69.22

1 REPLANTEO EN GENERAL
PEO001
TOP001

PEON
TOPOGRAFO
Subtotal Mano de Obra

2 LIMPIEZA Y DESBROCE
PEO001

PEON
Subtotal Mano de Obra

3 EXCAVACION COMUN PARA ESTRUCTURA


PEO001

PEON
Subtotal Mano de Obra

4 EMPEDRADO Y CONTRAPISO
ALB001
AYU001

ALBAIL
AYUDANTE
Subtotal Mano de Obra

5 PISO DE CEMENTO ENLUCIDO FINO


ALB001
AYU001

ALBAIL
AYUDANTE
Subtotal Mano de Obra

6 HORMIGON CICLOPEO CON 50% DE PIEDRA DESPLAZADORA 1:2:3


ALB001
PEO001

ALBAIL
PEON
Subtotal Mano de Obra

34.30
34.30

3.521
3.471

120.77
119.06
239.83

9.54
6.36
9.54

3.521
3.471
3.471

33.59
22.08
33.11
88.78

25.56
10.22

3.521
3.471

90.00
35.49
125.48

3.521
3.471

117.00
124.21
241.20

7 SOBRECIMIENTO DE HO CO
ALB001
AYU004
PEO001

ALBAIL
AYUDANTE ENCOFRADOR
PEON
Subtotal Mano de Obra

8 MURO DE LADRILLO 6H E=0.15 MTS


ALB001
PEO001

ALBAIL
PEON
Subtotal Mano de Obra

9 REVOQUE INTERIOR DE ESTUCO SOBRE MURO DE LADRILLO


ALB002
PEO001

ALBAIL DE PRIMERA
PEON
Subtotal Mano de Obra

33.23
35.78

10 CUBIERTA DE CALAMINA N. 28 INCLUYE MADERAMEN

PRESUPUESTO DE MANO DE OBRA POR ACTIVIDAD


SISTEMA DE AGUA IQUIACA
bolivianos
Tipo de Cambio
Cdigo
ALB002
AYU001

Especialidad
ALBAIL DE PRIMERA
AYUDANTE
Subtotal Mano de Obra

5.03

Horas Hombre
38.13
54.90

Precio Unitario
3.521
3.471

Precio Total
134.24
190.56
324.80

2.10
4.20

3.471
4.326

7.29
18.17
25.46

52.98
105.96

3.471
4.326

183.89
458.38
642.28

19.44
19.44

4.326
3.471

84.10
67.48
151.57

3.16
1.58

3.521
3.471

11.11
5.48
16.59

0.60

6.891

4.13
4.13

7.50
7.50

3.471
4.326

26.03
32.45
58.48

3.70
3.70

3.471
4.326

12.84
16.01
28.85

73.63
18.41

4.054
13.350

298.50
245.75
544.25

11 PUERTA DE METAL CON MALLA OLIMPICA


AYU001
ESP001

AYUDANTE
ESPECIALISTA
Subtotal Mano de Obra

12 CERCO DE MALLA OLIMPICA 6" X 6" # 8


AYU001
ESP001

AYUDANTE
ESPECIALISTA
Subtotal Mano de Obra

13 ALAMBRE DE PUAS
ESP001
PEO001

ESPECIALISTA
PEON
Subtotal Mano de Obra

14 CELOSIA DE CERAMICA
ALB001
PEO001

ALBAIL
PEON
Subtotal Mano de Obra

16 QUINCALLERIA (IQUIACA)
SOL001

SOLDADOR
Subtotal Mano de Obra

17 INSTALACION DE ACOMETIDA ELECTRICA


AYU003
ELE001

AYUDANTE ELECTRICISTA
ELECTRICISTA
Subtotal Mano de Obra

18 INSTALACION DE BOMBA Y ACCESORIOS


AYU003
ELE001

AYUDANTE ELECTRICISTA
ELECTRICISTA
Subtotal Mano de Obra

19 REPLANTEO Y TRAZADO DE TUBERIAS


ALA001
TOP001

ALARIFE
TOPOGRAFO
Subtotal Mano de Obra

20 EXCAVACION DE ZANJAS 0-2 M SUELO SEMIDURO (MANUAL)


PEO001

PEON
Subtotal Mano de Obra

21 TUBERIA PVC E-40 2 "

UNION FLEXIBLE

2,254.98

3.471

7,827.04
7,827.04

PRESUPUESTO DE MANO DE OBRA POR ACTIVIDAD


SISTEMA DE AGUA IQUIACA
bolivianos
Tipo de Cambio
Cdigo
AYU008
PLO001

Especialidad
AYUDANTE PLOMERO
PLOMERO
Subtotal Mano de Obra

5.03

Horas Hombre
147.26
36.82

Precio Unitario
3.471
4.326

Precio Total
511.15
159.27
670.42

36.82

3.471

127.79
127.79

34.98

3.471

121.40
121.40

138.06
690.30

3.521
3.471

486.11
2,396.03
2,882.14

920.40

3.471

3,194.71
3,194.71

0.22
0.44
0.22

3.471
3.471
13.350

0.76
1.51
2.91
5.18

56.46

3.471

195.96
195.96

215.44
403.95
26.93
188.51
538.60

3.521
4.326
3.471
4.326
3.471

758.56
1,747.49
93.47
815.49
1,869.48
5,284.50

129.60
57.60

3.521
3.471

456.32
199.93
656.25

3.521
3.471

152.11
149.95
302.05

22 DESINFECCION DE LA RED DE 0 - 4"


PEO001

PEON
Subtotal Mano de Obra

23 PRUEBA HIDRAULICA DE TUB. 1/2" A 4"


PEO001

PEON
Subtotal Mano de Obra

24 CAMA DE TIERRA CERNIDA


ALB001
PEO001

ALBAIL
PEON
Subtotal Mano de Obra

25 RELLENO Y COMPACTADO CON TIERRA COMUN


PEO001

PEON
Subtotal Mano de Obra

26 REPLANTEO EN GENERAL
AYU001
PEO001
TOP001

AYUDANTE
PEON
TOPOGRAFO
Subtotal Mano de Obra

27 EXCAVACION COMUN PARA ESTRUCTURA


PEO001

PEON
Subtotal Mano de Obra

28 HORMIGON ARMADO H35 INCL.ARMADURA


ALB001
ARM001
AYU001
ENC001
PEO001

ALBAIL
ARMADOR
AYUDANTE
ENCOFRADOR
PEON
Subtotal Mano de Obra

29 REVOQUE DE CEMENTO
ALB001
PEO001

ALBAIL
PEON
Subtotal Mano de Obra

30 ENLUCIDO DE MORTERO IMPERMEABLE (1:3) C/SIKA 1


ALB001
PEO001

ALBAIL
PEON
Subtotal Mano de Obra

43.20
43.20

PRESUPUESTO DE MANO DE OBRA POR ACTIVIDAD


SISTEMA DE AGUA IQUIACA
bolivianos
Tipo de Cambio
Cdigo

Especialidad

5.03

Horas Hombre

Precio Unitario

Precio Total

1.00

3.471

3.47
3.47

5.00
5.00

3.521
3.471

17.61
17.36
34.96

20.60
13.60

3.471
4.326

71.50
58.83
130.34

7.26
59.29
7.26

3.521
4.326
3.471

25.56
256.49
25.20
307.25

6.00
4.50

3.471
6.891

20.83
31.01
51.84

33.48
33.48

3.471
6.891

116.22
230.74
346.96

433.41
108.35

4.054
13.350

1,757.05
1,446.51
3,203.57

31 DESINFECCION DE TANQUES
PEO001

PEON
Subtotal Mano de Obra

32 CAMARA DE VALVULAS DE HO CO 70 X 7O X 70 CM
ALB001
PEO001

ALBAIL
PEON
Subtotal Mano de Obra

33 ACCESORIOS TANQUE DE ELEVADO


AYU001
PLO001

AYUDANTE
PLOMERO
Subtotal Mano de Obra

34 BARANDA FG 2"
ALB002
ESP001
PEO001

ALBAIL DE PRIMERA
ESPECIALISTA
PEON
Subtotal Mano de Obra

35 ESCALERA METALICA FG 1"


AYU001
SOL001

AYUDANTE
SOLDADOR
Subtotal Mano de Obra

36 ESCALERA METALICA CON GUARDACUERPO EXTERIOR


PEO001
SOL001

PEON
SOLDADOR
Subtotal Mano de Obra

37 REPLANTEO Y TRAZADO DE TUBERIAS


ALA001
TOP001

ALARIFE
TOPOGRAFO
Subtotal Mano de Obra

38 EXCAVACION DE ZANJAS 0-2 M SUELO SEMIDURO (MANUAL)


PEO001

PEON
Subtotal Mano de Obra

9,101.64

3.471

31,591.81
31,591.81

133.77
44.59

3.471
4.326

464.31
192.89
657.20

123.38
61.69

3.471
4.326

428.27
266.88
695.15

39 TUBERIA PVC C-15 3/4" UNION FLEXIBLE


AYU008
PLO001

AYUDANTE PLOMERO
PLOMERO
Subtotal Mano de Obra

40 TUBERIA PVC C-15 1 " UNION FLEXIBLE


AYU008
PLO001

AYUDANTE PLOMERO
PLOMERO
Subtotal Mano de Obra

PRESUPUESTO DE MANO DE OBRA POR ACTIVIDAD


SISTEMA DE AGUA IQUIACA
bolivianos
Tipo de Cambio
Cdigo

Especialidad

5.03

Horas Hombre

Precio Unitario

Precio Total

67.47
16.39

3.471
4.326

234.20
70.89
305.09

103.97
25.99

3.471
4.326

360.90
112.45
473.34

205.87
65.01

3.471
4.326

714.58
281.24
995.82

216.71

3.471

752.19
752.19

650.12
3,250.60

3.521
3.471

2,289.07
11,282.83
13,571.91

3.471

11,282.83
11,282.83

3.521
3.471

88.03
86.78
174.80

20.00
20.00

3.521
3.471

70.42
69.42
139.84

6.00
6.00

3.521
3.471

21.13
20.83
41.95

3.471
4.326

27.77
30.28
58.05

41 TUBERIA PVC C-15 1 1/2" UNION FLEXIBLE


AYU008
PLO001

AYUDANTE PLOMERO
PLOMERO
Subtotal Mano de Obra

42 TUBERIA PVC C-15 2 " UNION FLEXIBLE


AYU008
PLO001

AYUDANTE PLOMERO
PLOMERO
Subtotal Mano de Obra

43 PRUEBA HIDRAULICA DE TUB. 1/2" A 4"


PEO001
PLO001

PEON
PLOMERO
Subtotal Mano de Obra

44 DESINFECCION DE LA RED DE 0 - 4"


PEO001

PEON
Subtotal Mano de Obra

45 CAMA DE TIERRA CERNIDA


ALB001
PEO001

ALBAIL
PEON
Subtotal Mano de Obra

46 RELLENO Y COMPACTADO CON TIERRA COMUN


PEO001

PEON
Subtotal Mano de Obra

3,250.60

47 CAMARA DE VALVULAS DE HO CO 7O X 7O X 70 CM
ALB001
PEO001

ALBAIL
PEON
Subtotal Mano de Obra

25.00
25.00

48 CAMARA DE PURGA DE HO CO 70 X 7O X 70 CM
ALB001
PEO001

ALBAIL
PEON
Subtotal Mano de Obra

49 PASO DE QUEBRADA L = 10 M
ALB001
PEO001

ALBAIL
PEON
Subtotal Mano de Obra

50 ACCESORIOS RED DE DISTRIBUCION (PUCARANI)


AYU008
PLO001

AYUDANTE PLOMERO
PLOMERO
Subtotal Mano de Obra

8.00
7.00

PRESUPUESTO DE MANO DE OBRA POR ACTIVIDAD


SISTEMA DE AGUA IQUIACA
bolivianos
Tipo de Cambio
Cdigo

Especialidad

5.03

Horas Hombre

Precio Unitario

Precio Total

51 EXCAVACION DE ZANJAS 0-2 M SUELO SEMIDURO (MANUAL)


PEO001

PEON
Subtotal Mano de Obra

1,016.40

3.471

3,527.92
3,527.92

28.80
19.20
33.60
86.40

3.521
3.420
4.326
3.471

101.40
65.66
145.35
299.89
612.32

3.471
3.471
4.326

520.65
2,603.25
648.90
3,772.80

52 HORMIGON SIMPLE 1:2:3 FCK=210 KG/CM2


ALB002
ALB003
ENC001
PEO001

ALBAIL DE PRIMERA
ALBAIL DE SEGUNDA
ENCOFRADOR
PEON
Subtotal Mano de Obra

53 ACCESORIOS CONEXION DOMICILIARIA PUCARANI


AYU001
PEO001
PLO001

AYUDANTE
PEON
PLOMERO
Subtotal Mano de Obra
TOTAL GENERAL

150.00
750.00
150.00

96,759.87

You might also like