Professional Documents
Culture Documents
PROYECTO / PROJECT:
PROPIETARIO / OWNER:
CMC
N DE CONTRATO :
CONTRATISTA / CONTRACTOR:
ENCOTEC
A)
MANO DE OBRA:
B)
TURNO / SHIFT: Da
HORARIO / 17:00
WORKING
HOURS
EQUIPOS / MACHINES:
Descripcin / Descripcin
Cantidad /
Quantity
H. Anterior /
Previous
H. Actual /
Actual
H. Acum. /
Accumulated
Directa / Direct:
Descripcin / Descripcin
Cantidad /
Quantity
H. Anterior
H. Actual /
Acum. /
Actual
Previous
H. Acum.
Actual /
Accumulated
Luminaria
00
0.0
0.0
0.0
Supervisor
0.0
0.0
0.0
Camioneta / Da
01
0.0
0.0
0.0
Tcnico Geosintticos
0.0
0.0
0.0
Generador / Dia
01
0.0
0.0
0.0
Operador de Equipos
0.0
0.0
0.0
Motobomba / Dia
02
0.0
0.0
0.0
Total / Total:
0.0
0.0
0.0
Contenedor
00
0.0
0.0
0.0
Total / Total:
04
Indirecta / Indirect:
1
Supervisor / Supervisor
0.0
0.0
0.0
Soldadora de Extrusin
01
0.0
0.0
0.0
Tcnico / Technician
0.0
0.0
0.0
Soldadora de Fusin
01
0.0
0.0
0.0
Operador de Equipos
0.0
0.0
0.0
Tensimetro
01
0.0
0.0
0.0
Total / Total:
0.0
0.0
0.0
Leister
01
0.0
0.0
0.0
Unid. de Med.
C.Ant./Q.Prev.
C.Act./Q.Act.
C.Acum./Q.Accu.
Amoladora
01
0.0
0.0
0.0
01
0.0
0.0
0.0
01
0.0
0.0
0.0
01
0.0
0.0
0.0
01
0.0
0.0
0.0
10
Cuponera
01
0.0
0.0
0.0
0.0
0.0
0.0
Total / Total:
Dique Principal Cota 4357 msnm
1
Unid. de Med.
C.Ant./Q.Prev.
C.Act./Q.Act.
Total Equipos:
Unid. de Med.
C.Ant./Q.Prev.
C.Act./Q.Act.
C.Acum./Q.Accu.
Luminaria 21
Luminaria 22
Luminaria 23
Luminaria 24
Luminaria 25
Total / Total:
Vertedero de Demasas 2 Etapa
1
Unid. de Med.
C.Ant./Q.Prev.
C.Act./Q.Act.
C.Acum./Q.Accu.
14
H. Equipos / H. Machines:
Item
Total / Total:
Sistema de Impermeabilizacin
C.Acum./Q.Accu.
H. Inicio / Previous
Total / Total:
Trabajos Adicionales
H. Termino / Previous
Unid. o Med.
C.Ant./Q.Prev.
C.Act./Q.Act.
Descripcin / Description
C.Acum./Q.Accu.
H. Anterior /
Previous
H. Actual /
Actual
H. Acum. /
Accumulated
Lluvia
0.0
0.0
0.0
Nevada
0.0
0.0
0.0
Tormenta Elctrica
Total
0.0
0.0
0.0
0.0
0.0
0.0
Horas / Hours
6
Item
Descripcin / Descripcin
Cantidad /
Quantity
H. Anterior /
Previous
H. Actual /
Actual
H. Acum. /
Accumulated
Directa / Direct:
0.0
0.0
0.0
10
Indirecta / Indirect:
0.0
0.0
0.0
11
1.2.3.4.5.-
H) PRINCIPALES ACTIVIDADES DE CONTROL DE CALIDAD (QC) / MAIN ACTIVITIES OF QUALITY CONTROL (QC):
1.2.3.4.5.J) NOTAS POR EL CONTRATISTA: Aspectos relevantes y/o crticos / NOTES BY THE CONTRACTOR: Relevant and/or critical aspects
1.2.3.K) SEGURIDAD Y MEDIO AMBIENTE
1.2.3.FIRMA CONTRATISTA / CONTRACTOR'S SIGNATURE
L)
CARGO / POSITION
CARGO / POSITION