MATERIALES
UND
CANT.
AREA
C. TOTAL
C
(A*B)
COSTO DIRECTO
GASTOS GENERALES
SUB TOTAL
IGV
COSTO TOTAL POR
GAL
KG
GAL
GAL
2,015.72
2,015.72
2,015.72
2,015.72
4,031.44
2,418.86
987.70
30.24
5.00%
19.00%
2015.72 M2
2.00
1.20
0.49
0.02
MATERIALES
ESPESOR
UND
1 MANO DE OBRA
E= 2"
CUADRILLA
CANT.
CANT.
CAPATAZ
H-H
###
OFICIAL
H-H
###
PEON
H-H
###
2,015.72
2,015.72
2,015.72
2 HERRAMIENTAS
HERRAMIENTAS MANUALES
5.00
3 MATERIALES
ARENA GRUESA
M3
0.042
M3
0.028
CALENTADOR DE ACEITE
H-M
0.00211
H-M
0.00211
KW-H
0.00211
VOLQUETE DE 10 M3
H-M
0.01263
H-M
0.00211
H-M
0.00211
H-M
0.00211
H-M
0.00211
SECADOR DE ARIDOS
H-M
0.00211
2,015.72
2,015.72
4 MAQUINARIA
COSTO DIRECTO
GASTOS GENERALES
5.00%
2,015.72
2,015.72
2,015.72
2,015.72
2,015.72
2,015.72
2,015.72
2,015.72
2,015.72
SUB TOTAL
IGV
COSTO TOTAL POR
19.00%
2,015.72 M2
2,015.72 M2
E E=2"
P. UNIT.
D
PARCIAL
E
(C*D)
8.50
0.59
11.54
14.00
34,267.24
1,427.13
11,398.06
423.36
47,515.79
2375.79
49,891.58
9479.4
59,370.98
P. UNIT.
PARCIAL
7.10
5.70
4.50
120.52
193.51
305.54
619.57
30.98
33.61
33.61
2,845.43
1,896.95
9.64
90.76
40.00
75.63
87.39
588.24
82.35
82.35
11.21
40.91
385.15
169.74
1,925.67
370.85
2,496.27
349.46
349.46
47.57
11,528.01
576.4
7.145958
12,104.41
2,299.84
14,404.25
59,043.80
PRESUPUESTO ANALITICO
COSTO DIRECTO
PROYECTO: "ASFALTO DE CALLES 3 ETAPA CALLE BOLIVAR Y 1 DE MAYO"
Provincia: JAUJA
Cadena
Mod.
Gasto
Aplic.
2.6.2 3.2
11
DIST: ACOLLA
Especificacin del Gasto
Und.
Cant.
PRESUPUESTO
P. Unit.
P. Parc.
PERSONAL
Sub total
40,005.00
PERSONAL DE OBRA
2.6.2 3.2
Glb
1.00
31500.00
31,500.00
ESALUD y ONP
Glb
1.00
5670.00
5,670.00
AFP
Glb
1.00
2835.00
2,835.00
12.45
1,494.01
BIENES
23
COMBUSTIBLE Y LUBRICANTES
14,666.69
GASOLINA 90 OCTANOS
Galn
120.00
Galn
1,132.00
11.49
13,006.68
KEROSENE
Galn
8.00
14.50
116.00
ACEITE QUEMADO
Galn
10.00
5.00
50.00
Kg
30.00
5.50
165.00
Kg
20.00
5.50
110.00
Kg
45.00
5.50
247.50
Kg
35.00
5.50
192.50
Kg
10.00
5.50
55.00
Varilla
10.00
15.00
150.00
MATERIALES DE CONSTRUCCION
108,969.05
ARENA GRUESA
M3
30.00
45.00
1,350.00
HORMIGON DE 1/2"
M3
175.00
40.00
7,000.00
ARENA FINA
M3
10.00
90.00
900.00
Bolsa
1,128.00
18.80
21,206.40
YESO DE 14 KG
Bolsa
10.00
8.50
85.00
Kg
2.00
6.50
13.00
TIZA
Caja
2.00
3.50
7.00
Und.
12.00
4.20
50.40
Und.
144.00
25.00
3,600.00
Und.
4.00
30.00
120.00
Und.
36.00
6.00
216.00
Und.
130.00
12.00
1,560.00
Und.
40.00
15.00
600.00
Und.
14.00
25.00
350.00
Plancha
20.00
28.00
560.00
Galn
6.00
48.00
288.00
Galn
14.00
48.00
672.00
Galn
10.00
28.00
280.00
Und.
66.00
9.50
627.00
Und.
47.00
108.00
5,076.00
Und.
44.00
22.50
990.00
LLAVE DE TOMA
Und.
44.00
10.50
462.00
CINTA TEFLON
Und.
8.00
1.50
12.00
Und.
88.00
0.60
52.80
Und.
44.00
0.60
26.40
Und.
88.00
2.50
220.00
Und.
12.00
2.50
30.00
Und.
12.00
0.70
8.40
Und.
88.00
0.70
61.60
LLAVE DE PASO
Und.
44.00
5.80
255.20
Und.
44.00
30.00
1,320.00
Kg.
6.00
25.00
150.00
Und.
47.00
157.00
7,379.00
Und.
55.00
108.00
5,940.00
Galn
5.00
50.00
250.00
Und.
6.00
15.00
90.00
Galn
2.00
45.00
90.00
Und.
44.00
5.50
242.00
Und.
44.00
4.50
198.00
Und.
44.00
75.00
3,300.00
LIJA DE AGUA N 40
Und.
8.00
3.50
28.00
Und.
44.00
35.00
1,540.00
Galn
4,032.00
8.90
35,884.80
Kg
2,419.00
0.95
2,298.05
OCRE ROJO
TRIPLAY DE 6 MM.
AGUA
CARPETA ASFALTICA
CEMENTO ASFALTICO PEN 85/100
FILLER (CAL)
Galn
90.00
14.00
1,260.00
GLB
1.00
1,400.00
1,400.00
30
BIENES DE CONSUMO-HERRAMIENTAS
Und.
6.00
220.00
1,320.00
FLEXOMETRO STANLEY DE 05 M
Und.
2.00
25.00
50.00
Und.
1.00
24.00
24.00
HOJA DE SIERRA
Und.
10.00
4.50
45.00
Und.
3.00
42.00
126.00
Und.
8.00
22.00
176.00
Und.
8.00
25.00
200.00
Und.
3.00
35.00
105.00
PUNTAS DE ACERO
Und.
2.00
15.00
30.00
Und.
4.00
14.00
56.00
Und.
2.00
12.00
24.00
WINCHA DE 100 M.
Und.
1.00
180.00
180.00
Und.
2.00
6.00
12.00
Und.
2.00
25.00
50.00
Und.
1.00
35.00
35.00
PILAS GRANDES
Und.
10.00
2.50
25.00
Rollo
2.00
40.00
80.00
Ml
80.00
4.00
320.00
Und.
5.00
7.00
35.00
Ml
100.00
2.50
250.00
Ml
15.00
1.00
15.00
BROCHA DE 4"
Und.
3.00
17.50
52.50
BROCHA DE 6"
Und.
3.00
22.00
66.00
Kg
2.00
4.00
8.00
RESPIRADORES
Und.
12.00
6.50
78.00
Und.
6.00
30.00
180.00
Und.
1.00
46.00
46.00
Und.
4.00
35.00
140.00
Und.
1.00
15.00
15.00
Und.
1.00
216.00
216.00
Und.
1.00
240.00
240.00
Und.
2.00
330.00
660.00
Und.
4.00
35.00
140.00
Und.
4.00
35.00
140.00
Glb.
1.00
3200.00
3,200.00
EXTRACCION Y APILAMIENTO
M3
1,250.82
14.75
18,449.60
M3
1,250.82
4.82
6,028.95
M3
1,250.82
2.17
2,714.28
M3
1,250.82
7.65
9,568.77
M3
1,250.82
9.95
12,445.66
M3
416.94
14.75
6,149.87
M3
416.94
5.10
2,126.39
M3
416.94
2.28
950.62
M3
416.94
7.65
3,189.59
M3
416.94
12.41
5,174.23
M3
416.94
14.75
6,149.87
M3
416.94
5.10
2,126.39
M3
416.94
2.28
950.62
M3
416.94
7.65
3,189.59
M3
416.94
12.41
5,174.23
IMPRIMACION ASFALTICA
M2
2,015.72
6.50
13,102.25
13,102.25
M2
2,015.72
7.15
14,404.25
14,404.25
Glb.
1.00
1500.00
1,500.00
1,500.00
Und.
1.00
220.00
220.00
220.00
Und.
2.00
150.00
300.00
300.00
Und.
10.00
15.00
150.00
150.00
Und.
6.00
20.00
120.00
120.00
ENSAYO PROCTOR
Und.
3.00
60.00
180.00
180.00
CBR DISEO
Und.
4.00
220.00
880.00
880.00
Glb.
1.00
3600.00
3,600.00
3,600.00
MANTENIMIENTO DE EQUIPOS
Glb.
1.00
1600.00
1,600.00
1,600.00
Glb.
1.00
2500.00
2,500.00
2,500.00
HUAYPE INDUSTRIAL
2.6.2 3.2
5,139.50
BUGGUIES REFORZADO
SERVICIOS
39
SERVICIOS DE TERCEROS
SERVICIO DE TOPOGRAFIA
3,200.00
49,207.26
17,590.70
17,590.70
CARPETA ASFALTICA
IMPREVISTOS
Glb.
1.00
1289.41
1,289.41
1,289.41
52
Hm.
24.00
130.00
3,120.00
3,120.00
VOLQUETE DE 15 M3
Hm.
79.00
130.00
10,270.00
10,270.00
EXCAVADORA S/ORUGA
Hm.
24.00
280.00
6,720.00
6,720.00
Hm.
48.00
120.00
5,760.00
5,760.00
Glb.
1.00
300.00
300.00
300.00
Glb.
1.00
600.00
600.00
600.00
Hm.
32.00
20.00
640.00
640.00
Hm.
64.00
25.00
1,600.00
1,600.00
Hm.
32.00
15.00
480.00
480.00
Hm.
80.00
20.00
1,600.00
1,600.00
TOTAL S/
327,304.80
PRESUPUESTO ANALITICO
COSTO DIRECTO - COSTO INDIRECTO
DIST: ACOLLA
Cadena
Gasto
2.6.2 3.2
PRESUPUESTO
PRESUPUESTADO
2.6.23.24
2.6.23.25
136,108.66
68,955.00
2.6.23.26
161,124.56
2.6.23.27
3,666.20
TOTAL PRESUPUESTADO
AYO"
DIST: ACOLLA
UPUESTO
TOTAL PRESUPUESTADO
369,854.42
PROVINCIA : JAUJA
Cadena
Mod.
de Gast
Aplic.
DISTRITO : ACOLLA
COSTO
PARCIAL
SUB TOTAL
TOTAL
GASTOS DE CAPITAL
INVERSIONES
2 6 2 APLICACIONES DIRECTAS
2623
#REF!
24
#REF!
25
#REF!
26
#REF!
TOTAL S/
#REF!
M2
150
M2
M2
27
M2
384
ML
39
M2
380
ML
86
UND
UND
UND
UND
240
UND
ML
GLB
ML
10
UND
UND
UND
14.02
14.05
14.08
UND
P2
7
1,715
2.00
UND
CANT.
2.01
KG
790
2.02
KG
700
2.03
KG
120
2.04
KG
25
2.05
KG
80
2.06
KG
80
2.07
KG
150
2.08
KG
175
2.09
varilla
280
2.10
varilla
900
2.11
varilla
460
2.12
varilla
520
2.13
varilla
28
2.00
UND
CANT.
2.01
ARENA FINA
M3
75
2.02
ARENA GRUESA
M3
120
2.03
HORMIGON DE 1/2"
M3
320
2.04
M3
100
2.05
M3
100
2.06
M3
40
2.07
M3
40
2.08
M3
40
2.09
M3
130
4.00
MADERAS
UND
4.01
4.02
4.03
CANT.
UND
115
UND
50
P. UNIT
PARCIAL
3.90
3,081.00
3.90
2,730.00
5.50
660.00
5.40
135.00
3.90
312.00
3.90
312.00
3.90
585.00
3.00
525.00
5.10
1,428.00
12.81 11,529.00
23.05 10,603.00
35.83 18,631.60
51.98
1,455.44
51,987.04
P. UNIT
PARCIAL
85.00
48.00
45.00
45.00
45.00
30.00
30.00
45.00
25.00
6,375.00
5,760.00
14,400.00
4,500.00
4,500.00
1,200.00
1,200.00
1,800.00
3,250.00
42,985.00
P. UNIT
PARCIAL
31.90
21.23
3,668.50
1,061.50
2,831.40
3,146.00
352.00
1,117.60
264.00
17,787.00
61.60
11,880.00
5,280.00
4,180.00
2,365.00
3,850.00
4.11
UND
200
4.12
UND
200
4.13
UND
100
4.14
UND
350
15.73
15.73
4.40
13.97
13.20
10.78
3.08
39.60
26.40
20.90
23.65
11.00
4.15
UND
100
26.40
2,640.00
4.16
UND
100
19.80
1,980.00
4.17
UND
64
4.18
UND
25
4.19
UND
10
56.32
42.68
34.76
3,604.48
1,067.00
347.60
PARA TECHO
UND
180
4.04
UND
200
4.05
UND
80
4.06
UND
80
4.07
UND
20
4.08
UND
1,650
4.09
UND
20
4.10
UND
300
67,483.68
CIELORRASO Y COBERTURA
5.00
5.01
5.02
5.03
5.04
INSTALACIONES ELECTRICAS
6.00
UND
P. UNIT
PARCIAL
460
28.00
12,880.00
40
33.00
1,320.00
PLANCHA
145
24.90
3,610.50
ML
550
5.00
2,750.00
20,560.50
P. UNIT
PARCIAL
PLANCHA
ML
UND
CANT.
CANT.
ROLLO
85.00
595.00
6.02
ROLLO
12
130.00
1,560.00
6.03
30
3.20
96.00
31.50
31.50
44.00
1,672.00
190.00
190.00
6.01
6.04
CAJA
6.05
UND
38
UND
UND
126.00
126.00
UND
58
5.80
336.40
6.06
6.07
6.08
6.09
UND
8.50
59.50
6.10
UND
17
5.80
98.60
6.11
UND
11
29.00
319.00
6.12
UND
10
29.00
290.00
6.13
UND
17
12.00
204.00
6.14
UND
60
0.80
48.00
6.15
UND
60
0.80
48.00
6.16
CARBON VEGETAL
KG
10
0.80
8.00
6.17
RLL
15
2.50
37.50
6.18
UND
139.00
139.00
6.19
SAL INDUSTRIAL
10
1.00
KG
10.00
5,868.50
8.00
CERAMICO Y MAYOLICAS
UND
CANT.
P. UNIT
PARCIAL
8.01
M2
145
20.00
2,900.00
8.02
M2
53
22.00
1,155.00
4,055.00
PINTURA
9.00
UND
CANT.
P. UNIT
PARCIAL
9.01
9.02
KG
1.80
9.00
9.03
THINER
GLN
14.00
56.00
9.04
GLN
70
15.00
1,050.00
9.05
GLN
11
31.00
341.00
9.06
BARNIZ MARINO
GLN
10
33.50
335.00
9.07
GLN
31.00
186.00
9.08
PRESERVANTE DE MADERA
GLN
10
31.00
310.00
BOLSA
17
20.00
340.00
9.09
GLN
30
14.00
420.00
3,047.00
VARIOS
10.00
10.01
10.02
TECNOPORT DE 1"
UND
CANT.
P. UNIT
PARCIAL
PLN
20
18.00
360.00
20
3.30
66.00
10.03
UND
20
70.00
1,400.00
10.04
LIJA DE ACERO
HOJA
2.00
8.00
10.05
UND
69.00
69.00
10.06
UND
6.00
36.00
10.07
UND
19.00
114.00
10.08
HUAYPE INDUSTRIAL
30
3.63
108.90
10.09
LINTERNA GRANDE DE 6V
UND
12.00
48.00
10.10
PILAS GRANDES
UND
50
1.60
80.00
10.11
44.00
44.00
10.12
CORDEL DE ALGODN
ML
50
0.21
10.50
10.13
M2
15
4.50
67.50
10.14
M2
15
4.50
67.50
10.15
ML
80
2.00
160.00
10.16
UND
38.00
266.00
10.17
UND
60
4.00
240.00
10.18
UND
10.19
10.20
10.21
GLN
10.22
UND
60
1.30
78.00
10.23
UND
78.00
156.00
10.24
YESO DE 25 Kg
BOL
10
6.50
65.00
10.25
BOLSA
55
15.00
825.00
10.26
KG
75
4.50
337.50
10.27
SIKA 1 IMPERMEABILIZANTE
GLN
22.00
44.00
10.28
ASFALTO RC-250
GLN
15
13.00
195.00
KG
ROLLO
6.50
26.00
ML
40
0.65
26.00
ML
100
1.00
100.00
20.00
120.00
5,117.90
HERRAMIENTAS
11.00
UND
CANT.
P. UNIT
PARCIAL
11.01
UND
8.00
16.00
11.02
UND
110.00
110.00
11.03
UND
31.00
155.00
11.04
BUGGUIES REFORZADO
UND
12
119.00
1,428.00
11.05
CINCELES DE ACERO
UND
10.00
80.00
11.06
UND
37.00
111.00
11.07
UND
46.00
138.00
11.08
ESCUADRA METALICO
UND
11.00
22.00
11.09
UND
18.00
54.00
11.10
UND
50
4.50
225.00
11.11
UND
15
17.50
262.50
11.12
UND
10
32.00
320.00
11.13
MARTILLO DE CARPINTERO
UND
10.40
20.80
11.14
UND
26.00
52.00
11.15
UND
15
19.00
285.00
11.16
UND
10.50
10.50
11.17
PUNTAS DE ACERO
UND
9.90
49.50
11.18
65.00
260.00
11.19
UND
39.00
117.00
11.20
UND
292.00
292.00
4,008.30
Provincia: JAUJA
Cadena
Und.
Cant.
de Gast
BIENES Y SERVICIOS
Viaticos y asignaciones
Movilidad Local
Residente de obra
Tecnico Administrativo
Vestuario
Guantes de Jebe
Casco
Botas de Jebe
Servicios no Personales
Ing. Residente de Obra
B/Ing. Asistente de obra
Almacenero
Topografo
Dibujante
Tecnico Administrativo
Guardianes (2)
Maestro de obra
Bines de Consumo
Materiales de Ofici y Escritorio
Toner impresora
Materiales de soporte Informatico
Pasajes y Gastos de Transporte
Gasto de Transporte
mes
mes
Par
Und.
Par
mes
mes
mes
mes
mes
mes
mes
mes
4
4
20
20
20
5
4
4
1
2
5
4
4
mes
5
4
4
mes
mes
mes
Und
1
1
1
2
20
mes
mes
mes
mes
5
5
5
4
mes
mes
mes
4
4
mes
Glb
Glb
Glb
Und
mes
mes
Provincia: JAUJA
Cadena
Und.
de Gast
BIENES Y SERVICIOS
Cant.
Viaticos y Asignaciones
Supervisor de obra
SERVICIOS NO PERSONALES
Ingeniero Evaluador delExpediente Tecnico
Fiscalizador Financiero
Coordinador de Obra
Servicios de Consultoria
Ing. Jefe de Supervision
Alquiler de computadoras
Pruebas en laboratorio de concreto
utiles de escritorio
SUPERVISION DE OBRA
SUPERVISION DE OBRA=(SUPER/CD+GG)x100
mes
glb
1
4
4
mes
mes
mes
mes
mes
mes
4
4
1
4
AHORRO
54622
51987.04
2634.96
42985.00
0.00
67483.68
61383.8
-6099.88
20,560.50
22,295.00
1734.50
5868.50
6011.75
143.25
4055.00
5202.25
1147.25
3047.00
4043
996.00
5117.90
5601.6
483.70
4008.30
205,112.92
4762.1
753.80
138
PRESUPUESTO ANALITICO
COSTO DIRECTO
DIST: ACOLLA
Especificacin del Gasto
Und.
Cant.
PRESUPUESTO
de Gast Aplic.
P. Unit.
P. Parc.
APLICACIONES DIRECTAS
6.5.11
TOPOGRAFO
mes
3.50
840.00
561.54
16.0002
OPERARIO
mes
3.50
840.00
47,040.66
6.7357
OFICIAL
mes
3.50
720.00
16,974.08
12.7679
PEON
mes
3.50
660.00
29,493.83
ESSALUD(9%)
0.09
104984.53
9,448.61
0.02
97883.76
1,087.70
glb.
0.10
94070.11
9,407.01
CTS
glb.
0.15
94070.11
14,110.52
Refrigerio y movilidad
glb.
5.00
91.80
459.02
Zona de emergencia
glb.
0.01
23517.53
235.18
AFP 3.30%
GLB
0.03
94529.13
3,119.46
Bonificaciones
***
18 ESCOLARIDAD Y GRATIFICACIONES
16.0002
OPERARIO
mes
1.00
200.00
3,200.05
6.7357
OFICIAL
mes
1.00
200.00
1,347.15
12.7679
PEON
mes
1.00
200.00
2,553.58
BIENES Y SERVICIOS
23 Combustible y Lubricantes
Gasolina 84 Octanos
Galon
400.00
10.80
4,320.00
Petroleo Diesel
Galon
450.00
10.60
4,770.00
Aceite Grado 90
Gln
5.00
40.00
200.00
Grasa
KG
6.00
12.00
72.00
Hidrolina
Gln
2.00
42.00
84.00
KG
790.00
3.90
3,081.00
KG
700.00
3.90
2,730.00
KG
120.00
5.50
660.00
KG
25.00
5.40
135.00
KG
80.00
3.90
312.00
KG
80.00
3.90
312.00
KG
150.00
3.90
585.00
KG
175.00
3.00
525.00
varilla
280.00
5.10
1,428.00
varilla
900.00
12.81
11,529.00
varilla
460.00
23.05
10,603.00
varilla
520.00
35.83
18,631.60
29 Materiales de construccin
**
varilla
46.00
51.98
2,391.08
UND
22.00
240.00
5,280.00
UND
20.00
12.00
240.00
TUERCAS DE 3/8"
UND
600.00
0.18
108.00
ARANDELAS DE 3/8"
UND
600.00
0.18
108.00
ARENA FINA
M3
75.00
85.00
6,375.00
CAJA
1.00
31.50
31.50
M3
100.00
45.00
4,500.00
M3
100.00
45.00
4,500.00
ARENA GRUESA
M3
170.00
48.00
8,160.00
HORMIGON DE 1/2"
M3
320.00
45.00
14,400.00
M3
50.00
60.00
3,000.00
M3
40.00
30.00
1,200.00
M3
40.00
30.00
1,200.00
M3
40.00
45.00
1,800.00
M3
130.00
25.00
3,250.00
30.00
3.20
96.00
ROLLO
7.00
85.00
595.00
ROLLO
12.00
130.00
1,560.00
GLN
1.00
31.00
31.00
UND
8.00
188.00
1,504.00
UND
5.00
55.00
275.00
**
*
DIST: ACOLLA
Especificacin del Gasto
Und.
Cant.
PRESUPUESTO
de Gast Aplic.
P. Unit.
P. Parc.
UND
2.00
6.00
12.00
UND
1.00
8.00
8.00
11.00
23.00
253.00
UND
38.00
44.00
1,672.00
UND
1.00
190.00
190.00
UND
1.00
126.00
126.00
58.00
5.80
336.40
UND
7.00
8.50
59.50
UND
17.00
5.80
98.60
UND
11.00
29.00
319.00
UND
10.00
29.00
290.00
UND
17.00
12.00
204.00
UND
60.00
0.80
UND
60.00
0.80
48.00
ASFALTO RC-250
GLN
15.00
13.00
195.00
UND
37,000.00
0.36
13,320.00
UND
2,500.00
1.37
3,425.00
UND
150.00
0.62
93.00
BOL
3,310.00
17.90
59,249.00
145.00
20.00
2,900.00
1,166.00
**
48.00
M2
53.00
22.00
CARBON VEGETAL
KG
10.00
0.80
8.00
RLL
15.00
2.50
37.50
UND
4.00
2.00
8.00
TECNOPORT DE 1"
PLN
20.00
18.00
360.00
YESO DE 25 Kg
BOL
10.00
6.50
65.00
UND
1.00
139.00
139.00
UND
20.00
3.30
66.00
UND
20.00
70.00
1,400.00
BOLSA
55.00
15.00
825.00
KG
75.00
4.50
337.50
SIKA 1 IMPERMEABILIZANTE
GLN
2.00
22.00
44.00
BOLSA
17.00
20.00
340.00
KG
5.00
1.80
9.00
LIJA DE ACERO
HOJA
4.00
2.00
8.00
UND
1.00
69.00
69.00
UND
6.00
6.00
36.00
UND
7.00
19.00
133.00
HUAYPE INDUSTRIAL
KG
30.00
3.63
108.90
LINTERNA GRANDE DE 6V
UND
4.00
12.00
48.00
FOCOS
UND
3.00
1.50
4.50
PILAS GRANDES
UND
50.00
1.60
80.00
ROLLO
1.00
44.00
44.00
CORDEL DE ALGODN
ML
50.00
0.21
10.50
M2
15.00
4.50
67.50
M2
15.00
4.50
67.50
ML
80.00
2.00
160.00
UND
7.00
38.00
266.00
UND
60.00
4.00
240.00
UND
4.00
6.50
26.00
ML
40.00
0.65
26.00
ML
100.00
1.00
100.00
DIST: ACOLLA
Especificacin del Gasto
Und.
Cant.
PRESUPUESTO
de Gast Aplic.
P. Unit.
CERA EN PASTA AMARILLA
GLN
6.00
P. Parc.
20.00
120.00
OCRE ROJO
KG
8.00
6.50
52.00
GLN
30.00
14.00
420.00
UND
60.00
1.30
78.00
SAL INDUSTRIAL
KG
10.00
1.00
10.00
UND
115.00
31.90
3,668.50
UND
50.00
21.23
1,061.50
UND
180.00
15.73
2,831.40
200.00
15.73
3,146.00
UND
80.00
4.40
352.00
UND
80.00
13.97
1,117.60
UND
20.00
13.20
264.00
UND
1,650.00
10.78
17,787.00
UND
20.00
3.08
61.60
UND
400.00
39.60
15,840.00
UND
200.00
26.40
5,280.00
UND
300.00
20.90
6,270.00
UND
100.00
23.65
2,365.00
UND
680.00
11.00
7,480.00
UND
100.00
26.40
2,640.00
UND
100.00
19.80
1,980.00
UND
64.00
56.32
3,604.48
UND
140.00
21.50
3,010.00
PZA
1.00
3.40
3.40
THINER
GLN
4.00
14.00
56.00
**
**
**
GLN
70.00
15.00
1,050.00
11.00
31.00
341.00
GLN
10.00
33.50
335.00
PINTURA DE 5KG
KG
5.00
2.50
12.50
PINTURA ESMALTE
GLN
0.25
8.00
2.00
GLN
6.00
31.00
186.00
PRESERVANTE DE MADERA
GLN
10.00
31.00
310.00
UND
25.00
42.68
1,067.00
UND
10.00
34.76
347.60
PLANC
460.00
28.00
12,880.00
ML
40.00
33.00
1,320.00
145.00
24.90
3,610.50
PLANC
ML
550.00
5.00
2,750.00
UND
2.00
4.00
8.00
PZA
12.00
0.80
9.60
PZA
10.00
0.80
8.00
DIST: ACOLLA
Especificacin del Gasto
Und.
Cant.
PRESUPUESTO
de Gast Aplic.
P. Unit.
P. Parc.
PZA
4.00
1.40
5.60
PZA
11.00
3.30
36.30
UND
4.00
3.30
13.20
UND
30.00
8.00
240.00
UND
4.00
9.80
39.20
UND
5.00
9.00
45.00
UND
5.00
6.50
32.50
UND
20.00
0.65
13.00
UND
30.00
21.00
630.00
UND
5.00
9.00
45.00
PZA
20.00
0.70
14.00
PZA
8.00
1.00
8.00
PZA
8.00
22.00
176.00
PZA
3.00
11.00
33.00
PZA
15.00
5.00
75.00
UND
10.00
1.00
10.00
UND
10.00
2.60
26.00
UND
20.00
3.89
77.80
UND
2.00
13.00
26.00
UND
20.00
0.40
8.00
UND
5.00
1.30
6.50
UND
5.00
5.20
26.00
UND
4.00
5.20
20.80
UND
5.00
5.20
26.00
UND
1.00
7.80
7.80
UND
2.00
5.20
10.40
UND
40.00
2.60
104.00
UND
250.00
2.90
725.00
UND
20.00
0.26
5.20
UND
150.00
0.35
52.50
UND
2.00
2.52
5.04
UND
20.00
0.40
8.00
UND
3.00
2.10
6.30
UND
2.00
6.50
13.00
PZA
8.00
0.70
5.60
UND
16.00
90.00
1,440.00
UND
18.00
27.00
486.00
UND
5.00
53.00
265.00
UND
40.00
9.80
392.00
PZA
8.00
8.50
68.00
PZA
2.00
1.60
3.20
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
UND
8.00
7.80
62.40
UND
2.00
13.00
26.00
UND
2.00
25.20
50.40
PZA
1.00
25.20
25.20
PZA
2.00
6.00
12.00
UND
2.00
78.00
156.00
MT
88.00
12.00
1,056.00
UND
8.00
9.00
72.00
UND
4.00
5.00
20.00
UND
8.00
3.50
28.00
UND
14.00
1.50
21.00
TEE DE PRESION
UND
6.00
0.50
3.00
UND
5.00
18.00
90.00
UND
12.00
0.50
6.00
YEE 4'
UND
8.00
5.00
40.00
UND
8.00
1.50
12.00
CODOS DE 45 DE 2'
UND
10.00
0.80
8.00
SUMIDEROS DE 2'
UND
2.00
3.50
7.00
UND
6.00
3.00
18.00
UND
10.00
0.50
5.00
UND
4.00
6.50
26.00
UND
2.00
17.00
34.00
UND
2.00
80.00
160.00
DIST: ACOLLA
Especificacin del Gasto
Und.
Cant.
PRESUPUESTO
de Gast Aplic.
P. Unit.
P. Parc.
30 BIENES DE CONSUMO
ARCO DE SIERRA GALVANIZADA, REFORZADO
UND
2.00
8.00
16.00
UND
1.00
110.00
110.00
UND
5.00
31.00
155.00
BUGGUIES REFORZADO
UND
12.00
119.00
1,428.00
CINCELES DE ACERO
UND
8.00
10.00
80.00
UND
3.00
37.00
111.00
UND
3.00
46.00
138.00
ESCUADRA METALICO
UND
2.00
11.00
22.00
UND
3.00
18.00
54.00
UND
50.00
4.50
225.00
UND
15.00
17.50
262.50
UND
10.00
32.00
320.00
MARTILLO DE CARPINTERO
UND
2.00
10.40
20.80
UND
2.00
26.00
52.00
UND
15.00
19.00
285.00
UND
1.00
10.50
10.50
PUNTAS DE ACERO
UND
5.00
9.90
49.50
UND
4.00
65.00
260.00
UND
3.00
39.00
117.00
1.00
292.00
292.00
UND
1.00
300.00
300.00
UND
3.00
15.00
45.00
380.10
6.80
2,584.68
UND
240.00
4.50
1,080.00
UND
600.00
1.50
900.00
FLETE
GLB
1.00
13000.00
13,000.00
EST
1.00
678.30
678.30
M2
123.20
62.00
7,638.40
M2
4.52
56.00
253.12
6.72
112.00
752.64
5.00
33.00
165.00
M2
25.08
185.00
4,639.80
ML
85.70
17.50
1,499.75
UND
1.00
1100.00
1,100.00
UND
1.00
350.00
350.00
UND
8.00
290.00
2,320.00
UND
240.00
142.00
34,080.00
UND
8.00
1800.00
14,400.00
UND
7.00
510.00
3,570.00
7.00
610.00
4,270.00
7.00
460.00
3,220.00
1,374.23
3.62
4,974.71
P2
52 ALQUILER DE BIENES
COMPACTADOR VIBR. TIPO PLANCHA 4 HP
HM
80.00
10.00
800.00
HM
90.00
10.00
900.00
BANCO CIRCULAR
HM
80.00
12.00
960.00
HM
180.00
35.00
6,300.00
TEODOLITO
HM
20.00
12.00
240.00
PULIDORA
HM
60.00
9.00
540.00
CEPILLADORA ELECTRICA
HM
56.00
9.00
504.00
TOTAL S/
22.20
7.40
70.20
23.40
DIST: ACOLLA
Especificacin del Gasto
Und.
Cant.
PRESUPUESTO
P. Parc.
P. Unit.
BIENES Y SERVICIOS
22 Vestuario
Guantes de Jebe
Casco
Botas de Jebe
Par
Und.
Par
20.00
20.00
20.00
7.50
8.50
22.50
150.00
170.00
450.00
Gasolina 84 Octanos
Galon
30.00
10.80
324.00
Petroleo Diesel
Galon
30.00
10.60
318.00
mes
mes
mes
mes
mes
mes
mes
mes
4.50
4.50
4.50
1.00
3.50
4.50
4.00
4.00
3500.00
1900.00
950.00
800.00
1500.00
1780.00
900.00
1700.00
15,750.00
8,550.00
4,275.00
800.00
5,250.00
8,010.00
3,600.00
6,800.00
mes
mes
mes
4.50
3.50
3.50
450.00
500.00
95.00
2,025.00
1,750.00
332.50
Glb
Glb
Glb
Glb
Glb
Und
Und
1.00
1.00
1.00
1.00
1.00
3.00
20.00
800.00
500.00
500.00
937.73
80.80
350.00
15.00
800.00
500.00
500.00
937.73
80.80
1,050.00
300.00
mes
3.50
50.00
175.00
mes
3.50
190.00
665.00
mes
mes
mes
mes
4.50
4.50
4.50
4.00
210.00
700.00
300.00
450.00
945.00
3,150.00
1,350.00
1,800.00
mes
4.00
50.00
200.00
mes
4.00
240.00
960.00
23 Combustible y Lubricantes
27 Servicios no Personales
Ing. Residente de Obra
B/Ing. Asistente de obra
Almacenero
Topografo
Dibujante
Tecnico Administrativo
Guardianes (1)
Maestro de obra
30 Bines de Consumo
Materiales de Ofici y Escritorio
*
Tinta para impresora
Materiales de soporte Informatico
39 Otros Servicios de Terceros
Servicios de Copias Xeros Ozalid (Planos)
*
Impresin de formatos
*
Foocopias
Ploteo de Planos
Servicio de Mantenimiento de equipo Informatico
Diseo de Mezclas
Ensayo de compresion Simple
45 Medicamentos
Medicamentos y materiales de primeros auxilios
49 Materiales de Escritorio
Materiales y utiles de Oficina
52 Alquiler de bienes Muebles
Alquiler de Moviliario
Alquiler de Computadora Pentium IV ( 2 und)
Alquiler de Impresora ( 2und )
Alquiler de Movilidad para el personal tecnico
55 Servicio de Luz
Servicio de Energia Electrica Oficina de Obra
65 Alquiler de Bienes Inmuebles
Alquiler de Oficina
TOTAL S/
%
1 DE MAYO
MAESTRO DE OB
COLLA
OPERARIO
OFICIAL
PEON
PRESUPUESTO
Sub total
139,038.36
95626.14
-43412.22
94,070.11
68196.09
-25874.02
10,536.30
27,331.18
32.00
38.61
-522.93
31686.21
-15354.46
9690.41
-7283.66
26780.85
-2712.97
0.00
0.00
7485.90
-3050.40
6398.21
-3050.40
1087.70
0.00
19944.15
-7387.03
6819.61
-2587.40
10229.41
-3881.10
459.02
0.00
170.49
-64.69
2265.62
-853.84
453249.71
-142063.51
CARGO
28.00
24.00
22.00
JORNAL
TOPOGRAFO
OPERARIO
OFICIAL
PEON
28.00
28.00
24.00
22.00
POR
38.61
31686.21
9690.41
26780.85
BENEFICIOS SOCIALES
10%
3.86
3168.62
969.04
2678.09
68196.09
6819.61
7,100.77
436,705.90
9,446.00
311,186.20
592.00
Insumo
Unidad
KG
KG
KG
KG
KG
KG
KG
KG
Precio
4.2
4.2
4.2
4.2
4.2
4.2
4.2
4.2
Cantidad
1192.55
418.3
205.43
1.51
19.71
47.64
388.84
24
ADICIONAL
PRECIO REFERENCIAL
PRECIO BUENA PRO
M3
KG
M3
M3
M3
M3
80
16.1
50
50
60
60
33.11
5
115
33.48
184.86
94.54
M3
20
136.8
M3
M3
20
20
136.8
136.8
M3
M
M
M
GLN
20
6.9
1
0.9
15
136.8
15
697.6
1221.1
0.4
UND
235
UND
115
UND
UND
4.2
5.4
2
1
PZA
27
11
UND
35
32
UND
UND
27
28
2
2
UND
6.9
56
UND
4.8
6.4
UND
4.5
16.1
UND
42
UND
UND
46.5
16.5
2
17
ATAL EN LA
COLLA
PRESUPUESTO
Sub total
UND
UND
GLN
UND
2.8
2.8
14
0.36
27.31
62.4
15.6
36092.42
UND
UND
BOL
1.8
0.36
18.5
2183.13
144
3310.07
M2
25
47.34
KG
RLL
PZA
M
BOL
UND
11
1.5
1.5
1.5
5.5
23
2.5
9
1.2
171.78
6.76
1
4.5
26.54
M
KG
KG
KG
GLN
7.5
15
4
18.5
16.2
14.65
34.35
59.93
8.52
267.7
PLG
UND
1.5
35
4.11
2.03
GLB
13000
EST
UND
678.3
3.5
1
19.8
ATAL EN LA
COLLA
PRESUPUESTO
Sub total
VERIFICAR CANTIDAD
VERIFICAR PRECIO
GLN
UND
KG
PZA
PZA
18.5
1.5
3.5
20
20
158.08
184.14
5
198
198
PZA
12
195
2.2
234.84
P2
P2
4.5
3
374
358.74
UND
P2
12
3
1386
13.51
PZA
GLN
GLN
GLN
GLN
8
9
23
40
37.5
1
56.74
89.29
10.34
3.33
GLN
GLN
42
18.5
3.02
39.6
PZA
19.8
46.2
PZA
19.8
46.2
UND
PZA
PZA
4.5
4.2
4.6
2
11
10
PZA
PZA
UND
M
M
M
UND
UND
UND
M
PZA
PZA
PZA
PZA
PZA
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
PZA
UND
UND
UND
UND
PZA
PZA
5
4.2
4.2
4.3
4.5
5
4.2
2.5
21
7.9
2
3
8
4.5
3.5
3
4
5
7.8
4.5
5.5
5.5
4.5
5.5
4.2
3.5
10.5
4.5
1
1.5
1.5
1
3
4.2
5
8
8
15
18.5
8
8
4
11
4
84.6
8.24
5.15
2
40.4
4
2
20
8
8
3
15
2
5
21
1.05
20
5
10.5
2.1
3.15
1
2
24.18
253.74
6
214
2
40
3.15
2.1
8
16
18.5
3
30
10.5
2
ATAL EN LA
COLLA
PRESUPUESTO
Sub total
UND
UND
UND
PZA
PZA
27
30
29
35
5.5
5
2
2
1
2
43
especifica nueva
Insumo Nuevo
Insumo dicional
***
*
**
UND
ATAL EN LA
COLLA
PRESUPUESTO
Sub total
SUB-TOTAL
4,353.30
-4353.30
18,242.98
83,233.42
242.924
142.021
10,244.00
#REF!
#REF!
COMPACTADOR
HM
VIBRADOR DEHM
MOTONIVELAD
HM
MEZCLADORAHM
TEODOLITO HM
PULIDORA
HM
CEPILLADORAHM
575,744.27
575744.27
0.00
12
12
110
30
11
7
7.8
188.77
86.72
5.69
247.94
10.8
15.84
96.12
S GENERALES
ATAL EN LA
COLLA
PRESUPUESTO
Sub total
71,968.03
770.00
642.00
53,035.00
4,107.50
4,168.53
0.00
942.93
175.00
665.00
7,245.00
200.00
960.00
71,968.03
12.50
71968.03
0.00
0.00
BENEFICIOS SOCIALES
15%
5.79
4752.93
1453.56
4017.13
10229.41
BONIFICACIONES
Movil.
9.65
0.23
7921.55
188.61
2422.60
67.29
6695.21
202.89
17049.02
Parcial
Presupuestado
5008.71
4968.9
1756.86
1755.65
862.806
862.79
6.342
6.45
82.782
82.88
200.088
200.51
1633.128
1627.88
100.8
100.8
459.02
1.00%
0.10
79.22
24.23
66.95
170.49
629.51
6398.21
2648.8
80.5
5750
1674
11091.6
5672.4
2647.2
80.5
5749.25
1673.91
11090.47
5672
2736
2736
2736
2736
2736
2736
2736
103.5
697.6
1098.99
6
2736
103.5
697.6
1098.99
6
1880
1880
575
575
8.4
5.4
8.4
5.4
297
297
1120
1120
54
56
54
56
386.4
386.4
30.72
30.72
72.45
72.45
168
168
93
280.5
93
280.5
76.468
174.72
218.4
12993.2712
76.4
174.72
218.4
12993.27
3929.634
51.84
61236.295
3929.63
51.84
61234.44
1183.5
1183.42
27.5
13.5
1.8
257.67
37.18
23
27.5
13.5
1.8
258.49
40.55
23
119.43
119.45
109.875
515.25
239.72
157.62
4336.74
109.88
515.18
239.74
157.62
4344.75
6.165
71.05
6.47
74.33
13000
13000
678.3
69.3
678.3
71.28
2924.48
276.21
17.5
3960
3960
2924.19
277.11
17.5
3960
3960
2340
2340
516.648
517.56
1683
1076.22
1682.98
1081.37
16632
40.53
16632
40.55
8
510.66
2053.67
413.6
124.875
8
510.62
2063.26
414.24
125.27
126.84
732.6
127.01
732.6
914.76
914.76
914.76
914.76
9
46.2
46
9
46.2
46
20
46.2
16.8
363.78
37.08
25.75
8.4
101
84
15.8
40
24
64
13.5
52.5
6
20
105
8.19
90
27.5
57.75
9.45
17.325
4.2
7
253.89
1141.83
6
321
3
40
9.45
8.82
40
128
148
45
555
84
16
20
46.2
16.8
363.8
37.12
25.75
8.4
101.2
84
15.8
40
24
64
13.5
52.5
6
20
105
8.19
90
27.5
57.8
9.46
17.34
4.2
7
253.93
1142.22
6
321.1
3
40
9.45
8.82
40
128
148
45
555
84
16
135
60
58
35
11
135
60
58
35
11
86
86
453249.7092
453174.02
2265.24
1040.64
625.9
7438.2
118.8
110.88
749.736
2265.66
1040.44
625.86
7438
121.64
110.88
749.73
Insumo
Unidad
Precio
TOPOGRAFO
HH
4.90
OPERARIO
HH
4.90
OFICIAL
HH
4.21
PEON
HH
3.86
SUB-TOTAL
0.00
1.53%
0.62
504.99
154.59
427.50
1087.70
1087.70
0.00
0.00
0.00
0.00
4.24
3475.52
1063.94
2942.20
0.00
7485.90
AFP
TOTAL
TOTAL
0.033
1.28
54.11
0.23
1051.87
44402.97
185.01
322.00
13590.49
56.63
890.46
37578.57
156.58
2265.62
resultado de
95626.14
0.00
Cantidad Parcial
Presupuestado
Cantidad de lo preseupuestado
10.80
52.92
54.06
11.03
0.05
9,040.95
44,300.66
44,360.69
9053.20
37.72
3,252.49
13,692.98
13,598.88
9,744.75
37,614.74
37,612.51
95,661.29
95,626.14
3230.14
9744.17
0.00
0.00
0.00
0.00
13.46
40.60
0.00
0.00
0.00
0.00
11.03
0.01313411
10.77762148
3.84540210
11.60020664
95,626.14
3.50
4.90
4.90
4.21
3.86
0.013134
10.777621
3.845402
11.593442
26.229600
TOPOGRAFO
OPERARIO
OFICIAL
PEON
9053.20
3230.14
9744.17
1.5 meses
4.5 mese
1177.120921
1009.776343
926.1040535
182.41