Professional Documents
Culture Documents
Introduction to Project
We, a group of 4 which contains Yang Jing Loo, Lim Hong Wei, Lee Lin Hui
and me have to find a specific empty land to initiate a small construction
project. The size of the land shall lay between 50m x 50m (2500 square
metres) 70m x 50m (3500 square metres). And individually, we have to
propose one project that serves on any one or combination of two of the
following purposes.
Our choices:-
Recreation area
Commercial area
Industrial area
Agricultural area
Tourism area
Residential area
The name of this project is called Resicom. This name came from the
word Residential and Commercial. The name itself has explained it all. It
involves a construction of residential area or commercial area.
The project brief is estimated to be done by 9 th June 2015. And the project
takes roughly around 4 to 5 months.
Commercial area is a place where people will visit. Including cafes in the
commercial block will be effective because of younger generation
nowadays like to chill and chit-chat at nearby cafes. As the commercial
areas are in the neighbourhood, residences nearby just have to walk a few
steps to reach the cafes. Making the surrounding people more convenient.
Residential area
Saga Park, Bandar Sri Damansara was the first park that has been ever
built and since the spaces are not maintain so often, might as well use the
vacant spaces to develop developments to benefits the surrounding
residences.