X-000-056-07
Tengizchevroil
Plant Firewater
Upgrade Project
1-031-L-TPP-10002
Hydro test of the Spools in the Contractors shop
TCO PLANT FIREWATER UPGRADE PROJECT
Subsystem: 05607-WF-Q758-01
: 05607-WF-Q758-01
Subsystem Description: KTL 1 -Fire Water Double Red Zone.DMC.
Installation & Modification of Fire Hydrant FH-173 (Old FH-A1), Fire Monitors
FM-47 (Old FM-B1), VP-109 (Old VP-13).
1 - ,
.
-173 ( -A1), -47
( -B1), -109 ( -13)
Job Package No:
No:
Contractor:
:
JPK-056-07-Q-0758
JPK-056-07-Q-0758
MUNAIGASKURYLYS (MGK)
()
TENGIZCHEVROIL
MAJOR CAPITAL PROJECT
X-000-056-07
Tengizchevroil
Plant Firewater
Upgrade Project
TENGIZCHEVROIL
MAJOR CAPITAL PROJECT
X-000-056-07
Tengizchevroil
Plant Firewater
Upgrade Project
Department
1.
Contractor /
2.
3.
4.
TCO OPS/
Position, initials
MGK QA/QC engineer/
Technical Piping Passport 1-200-L-TPP-10001 was checked and approved by after Hydro test:
1-200-L-TPP-10001 (
):
#
Department
1
.
Contractor /
2
.
3
.
6
.
TCO OPS /
7
.
Position, initials
MGK QA/QC engineer/
TENGIZCHEVROIL
MAJOR CAPITAL PROJECT
X-000-056-07
Tengizchevroil
Plant Firewater
Upgrade Project
, ,
/ ,
27 2009
176, :
.
.
-
(
).
, .
TENGIZCHEVROIL
MAJOR CAPITAL PROJECT
X-000-056-07
Tengizchevroil
Plant Firewater
Upgrade Project
Installation data
The piping was constructed by:
:
Munaigazkurylys LLP
PSN Kazstroy
All welding performed during the pipeline construction complies with the requirement
RD 38.13.004-86. All welders were qualified as per GGT approved Rules for
Electric and Gas Welder Qualification.
38. 13. 00486 ,
.
TENGIZCHEVROIL
MAJOR CAPITAL PROJECT
X-000-056-07
Tengizchevroil
Plant Firewater
Upgrade Project
Test Results
The pipeline/spool was leak tested at the following
pressure:
/
:
Pressure at test start:
:
as per design drawing(s):
:
The pipeline/Spool was visually
inspected with the followings
findings:
/
.
:
Pressure at test finish:
Test duration:
Pressure drop:
:
TENGIZCHEVROIL
MAJOR CAPITAL PROJECT
X-000-056-07
Tengizchevroil
Plant Firewater
Upgrade Project
Conclusion
The pipeline/Spool was fabricated and constructed in compliance with the effective
regulation. The pipeline was accepted for operation within design specifications.
/
, , .
______________________________________________________
______________________________________________________