Target
Shelte
r ID
Physical Progress %
Man
Power
Based on
contractors
proposed
current program
Z3-598
Based on
original
contractual
program
51.181%
24.89%
22.02%
1.20%
0.03%
Z3-602
51.406%
25.60%
23.07%
1.31%
0%
Z3-603
49.30%
23.10%
21.08%
1.10%
0.02%
Z3-604
49.789%
27.50%
26.10%
0.65%
0.35%
Z3-605
52.00%
31.25%
29.28%
1.25%
0.06%
19
Z3-607
50.838%
35.17%
33.79%
0.595%
0.14%
13
Z3-609
49.789%
22.34%
21.91%
0.804%
0.03%
Z4-893
53.804%
26.50%
24.62%
1.50%
0.34%
15
Z4-894
55.839%
34.65%
34.00%
1.15%
1.25%
14
Z4-895
54.40%
29.848%
27.03%
1.538%
0.47%
13
Z4-896
55.839%
40.501%
40.01%
0.696%
0.13%
19
Z4-897
51.089%
19.166%
15.10%
2.666%
1.12%
Total
achieve
d
Achieve
Target
d this
this week
week
Total
Shelt
Z3598
25 mm 20 mm
16 mm
12
10 mm
mm
Z3602
casting
is
2.00
9.12
4.00
Cement
Stone
chips
Sylhet
Sand
Local
Sand
0.00 m3
5.00 m3
2 Bags
14.50 m3
Reinforcement (Ton)
25 mm 20 mm
16 mm
1.50
12
5.07
Shutter
10 mm
mm
Z3603
casting
is
2.50
9.72
4.03
Cement
Stone
chips
Sylhet
Sand
Local
Sand
62.00 m3
9.00 m3
292 Bags
50.00 m3
Reinforcement (Ton)
25 mm 20 mm
16 mm
1.50
12
5.07
Shutter
10 mm
mm
Z3604
2.50
9.00
3.40
1.00
Cement
Stone
chips
Sylhet
Sand
Local
Sand
0.00 Bags
39.00 m3
71.00 m3
0.00
5.00
Shutter
Reinforcement (Ton)
25 mm 20 mm
16 mm
12
10 mm
mm
2.34
6.44
2.48
2.14
Cement
Stone
chips
Sylhet
Sand
Local
Sand
256 Bags
45.53 m3
32.10 m3
6.50 m3
4.12
Shutter