You are on page 1of 2

Weekly Basic Data Set (Part 1 of 2)

Target
Shelte
r ID

Physical Progress %

Man
Power

Based on
contractors
proposed
current program

Z3-598

Based on
original
contractual
program
51.181%

24.89%

22.02%

1.20%

0.03%

Z3-602

51.406%

25.60%

23.07%

1.31%

0%

Z3-603

49.30%

23.10%

21.08%

1.10%

0.02%

Z3-604

49.789%

27.50%

26.10%

0.65%

0.35%

Z3-605

52.00%

31.25%

29.28%

1.25%

0.06%

19

Z3-607

50.838%

35.17%

33.79%

0.595%

0.14%

13

Z3-609

49.789%

22.34%

21.91%

0.804%

0.03%

Z4-893

53.804%

26.50%

24.62%

1.50%

0.34%

15

Z4-894

55.839%

34.65%

34.00%

1.15%

1.25%

14

Z4-895

54.40%

29.848%

27.03%

1.538%

0.47%

13

Z4-896

55.839%

40.501%

40.01%

0.696%

0.13%

19

Z4-897

51.089%

19.166%

15.10%

2.666%

1.12%

Total
achieve
d

Achieve
Target
d this
this week
week

Total

Shelt
Z3598

Completed and ongoing main


activities
5 nos. pile cap casting is
completed out of 38

Materials available at site:


Reinforcement (Ton)

25 mm 20 mm

16 mm

12

10 mm

mm

Z3602

17 nos. pile cap


completed out of 38

casting

is

2.00

9.12

4.00

Cement

Stone
chips

Sylhet
Sand

Local
Sand

0.00 m3

5.00 m3

2 Bags
14.50 m3
Reinforcement (Ton)

25 mm 20 mm

16 mm

1.50

12

5.07
Shutter

10 mm

mm

Z3603

15 nos. pile cap


completed out of 38

casting

is

2.50

9.72

4.03

Cement

Stone
chips

Sylhet
Sand

Local
Sand

62.00 m3

9.00 m3

292 Bags
50.00 m3
Reinforcement (Ton)

25 mm 20 mm

16 mm

1.50

12

5.07
Shutter

10 mm

mm

Z3604

Bracing beam casting is


completed. 1st Layer of earth
filling is completed. To be started
GB casting

2.50

9.00

3.40

1.00

Cement

Stone
chips

Sylhet
Sand

Local
Sand

0.00 Bags

39.00 m3

71.00 m3

0.00

5.00
Shutter

Reinforcement (Ton)

25 mm 20 mm

16 mm

12

10 mm

mm
2.34

6.44

2.48

2.14

Cement

Stone
chips

Sylhet
Sand

Local
Sand

256 Bags

45.53 m3

32.10 m3

6.50 m3

4.12
Shutter

You might also like