Professional Documents
Culture Documents
Presupuesto
Presupuesto
Subpresupuesto
Cliente
Lugar
Item
01
01.01
02
02.01
02.02
02.03
02.04
02.05
02.06
02.07
02.08
02.09
02.10
03
03.01
03.02
03.03
03.04
03.05
03.06
03.07
03.08
03.09
03.10
03.11
04
04.01
04.02
04.03
04.04
04.05
04.06
04.07
04.08
04.09
05
05.01
05.02
05.03
05.04
05.05
05.06
06
06.01
06.02
06.03
06.04
06.05
06.06
07
07.01
Descripcin
CARTEL DE OBRA
CARTEL DE OBRA
CAMARA DE CARGA (02 Unid.)
TRAZO Y REPLANTEO
EXCAVACION MANUAL EN TERRENO NORMAL
RELLENO COMPAC. PARA ESTRUC. CON MATERIAL PROPIO
SOLADO DE CONCRETO 2" MEZCLA 1:12 C-H
CONCRETO SIMPLE FC=175 KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL
TARRAJEO CON CEMENTO-ARENA
SUMINISTRO Y COLOC. DE ACCESORIOS Y VALVULAS 1 1/2" - CAMARA
SUMINISTRO Y COLOC. DE TAPA METALICO 0.70 x 0.70
SUMINISTRO Y COLOC. DE TAPA METALICO 0.35 x 0.35
CAMARA ROMPE PRESION (03 Und)
TRAZO Y REPLANTEO
EXCAVACION MANUAL PARA ESTRUCTURAS
RELLENO COMPAC. PARA ESTRUC. CON MATERIAL PROPIO
SOLADO DE CONCRETO 2" MEZCLA 1:12 C-H
CONCRETO SIMPLE FC=175 KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL
ACERO GRADO 60
TARRAJEO CON CEMENTO-ARENA
SUMINISTRO Y COLOCACION DE ACCES. CRP - 7 1 1/2"
SUMINISTRO Y COLOC. DE TAPA METALICO 0.70 x 0.70
SUMINISTRO Y COLOCACION DE TAPA METALICO 0.35 x 0.40
LINEA DE ADUCCION Y DISTRIBUCION - TUBERIAS
TRAZO, NIVELACION Y REPLANTEO DE ZANJAS
EXCAVACION MANUAL DE ZANJA HASTA 0.60m
REFINE DE ZANJA P/ TUBERIA - FONDO
COLOCACION Y ACOMODO DE CAMA DE APOYO
RELLENO DE ZANJAS CON MATERIAL PROPIO SELECCIONADO
TUBERIA PVC SAP 1" C-7.5
TUBERIA PVC SAP 1.5" C - 7.5
ACCESORIOS COMPLEM. A LA RED
PRUEBA HIDRAULICA
VALVULAS DE CONTROL, DISTRUBUCION Y PURGA
EXCAVACION MANUAL PARA ESTRUCTURAS
CONCRETO SIMPLE FC=175 KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL
VALVULA DE CONTROL O DE PASO 1.5"
VALVULA DE PURGA 1"
SUMINISTRO Y COLOC. DE TAPA METALICO 0.30 x 0.40
HIDRANTES (116 UND)
EXCAVACION MANUAL PARA ESTRUCTURAS
CONCRETO SIMPLE FC=175 KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL
HIDRANTES DE 1" + Accesorios
ACCESORIOS COMPLEM. A HIDRANTES
SUMINISTRO Y COLOC. DE TAPA METALICO 0.25x 0.25
OBRAS COMPLEMENTARIAS
TRANSPORTE DEMATERIALES
Costo al
Und
Metrado
Precio S/.
und
1.00
450.00
m2
m3
m3
m2
m3
m2
m2
und
und
und
20.00
6.48
0.24
2.88
2.30
44.48
18.24
2.00
2.00
2.00
1.63
6.87
7.01
9.47
275.72
9.46
9.34
340.12
247.45
47.15
m2
m3
m3
m2
m3
m2
kg
m2
und
und
und
5.94
4.95
0.48
5.70
1.98
25.62
33.66
15.48
3.00
3.00
3.00
1.63
4.20
7.01
9.47
275.72
9.46
5.50
9.34
496.76
247.45
47.15
m
m3
m
m
m3
m
m
GLB
m
13,374.35
3,209.84
13,374.35
13,374.35
3,209.84
6,209.06
7,165.29
1.00
13,374.35
0.21
2.14
0.12
0.55
2.55
3.07
3.72
1,654.50
0.28
m3
m3
m2
und
und
und
4.93
1.16
24.36
29.00
11.00
40.00
4.20
275.72
9.46
146.50
107.50
47.15
m3
m3
m2
und
GLB
und
19.72
4.64
97.44
116.00
1.00
116.00
4.20
275.72
9.46
21.80
1,518.50
47.15
GLB
1.00
5,500.00
COSTO DIRECTO
GASTOS GENERALES 10%
GASTOS DE SUPERVISION 3.19%
PRESUPUESTO TOTAL
Parcial S/.
450.00
450.00
2,600.81
32.60
44.52
1.68
27.27
634.16
420.78
170.36
680.24
494.90
94.30
3,579.90
9.68
20.79
3.36
53.98
545.93
242.37
185.13
144.58
1,490.28
742.35
141.45
77,939.58
2,808.61
6,869.06
1,604.92
7,355.89
8,185.09
19,061.81
26,654.88
1,654.50
3,744.82
7,888.00
20.71
319.84
230.45
4,248.50
1,182.50
1,886.00
11,800.64
82.82
1,279.34
921.78
2,528.80
1,518.50
5,469.40
5,500.00
5,500.00
109,758.93
10,975.89
3,500.00
124,234.82
09/09/2009
UNIDAD
MES
MES
UNIDAD
GLB
GLB
UNIDAD
MES
UNIDAD
6956.80
725.00
240.00
7921.80
Dec-99 2010
UNIDAD
MES
TOTAL
CANTIDAD
2
2
PRECIO
2278.40
1200.00
PARCIAL
4556.80
2400.00
6956.80
CANTIDAD
1
1
PRECIO
700.00
25.00
PARCIAL
700.00
25.00
725.00
CANTIDAD
2
PRECIO
120.00
PARCIAL
240.00
240.00
DESAGREGADO
CANTIDAD
2
PRECIO
1750.00
PARCIAL
3500.00
3500.00
CRONOGRAMA CONSOLIDADO
0
PROYECTO:
REGION:
PROVINCIA:
DISTRITO:
COMUNIDAD:
CRONOGRAMA CONSOLIDADO DE METAS FISICAS
UNIDAD
CANTIDAD
MES 01
RUBROS DE INVERSION
COSTO DIRECTO
CARTEL DE OBRA
CAMARA DE CARGA (02 Unid.)
CAMARA ROMPE PRESION (03 Und)
LINEA DE ADUCCION Y DISTRIBUCION - TUBERIAS
VALVULAS DE CONTROL, DISTRUBUCION Y PURGA
HIDRANTES (116 UND)
OBRAS COMPLEMENTARIAS
GASTOS GENERALES
SUPERVISION
TOTAL
GLB
GLB
GLB
GLB
GLB
GLB
GLB
GLB
GLB
1
100%
1
100%
1
100%
1
50%
1
50%
1
50%
1
50%
1
50%
1
50%
100% HORIZONTAL
MES 02
TOTAL
0.0%
0.0%
0.0%
50%
50%
50%
50%
50%
50%
100%
100%
100%
100%
100%
100%
100%
100%
100%
ORIZONTAL
ERA
TOTAL
100%
100%
100%
100%
100%
100%
100%
100%
100%
HORIZONTAL
Item
CRONOGRAMA DE EJECUCION
ACTIVIDADES
MESES
1
1 CARTEL DE OBRA
2 CAMARA DE CARGA (02 Unid.)
3 CAMARA ROMPE PRESION (03 Und)
4 LINEA DE ADUCCION Y DISTRIBUCION - TUBERIAS
5 VALVULAS DE CONTROL, DISTRUBUCION Y PURGA
6 HIDRANTES (116 UND)
7 OBRAS COMPLEMENTARIAS
Descripcin
COSTO DIRECTO
SISTEMA DE RIEGO
GENERALES
(15.13%)
GASTOS DE
SUPERVISION
(5.43%)
TOTAL PRESUPUESTO
UNIDAD
Unid
Global
Global
CANTIDAD
1
1
1
P. UNITARIO TOTAL
109758.93
10975.89
3500.00
109758.93
10975.89
4 500.00
124234.823