S10
MPCP
Hoja resumen
Obra
0301032
Localizacin
250101
Fecha Al
31/10/2013
Presupuesto base
32,481.08
001
002
ESTRUCTURAS
565,922.33
003
ARQUITECTURA
360,250.62
004
INSTALACIONES SANITARIAS.
55,548.26
005
INSTALACIONES ELECTRICAS
267,364.29
006
24,033.36
(CD)
S/.
COSTO DIRECTO
1,305,599.94
1,305,599.94
104,448.00
104,448.00
================
SUB TOTAL
1,514,495.94
IGV (18%)
272,609.27
=================
1,787,105.21
TOTAL
S/.
496,317.10
MATERIALES
S/.
756,611.24
EQUIPOS
S/.
52,418.73
SUBCONTRATOS
S/.
31/10/2013
S/.