Project:

Location:
Subject: BILL OF MATERIAL

Item

Description

I.

Steel Framing
C- channel 6"x6"x3/16 for framming
Anchor Bolt w/ 12m dia
Base plate 20mm 350x350

II.

Concrete Works
2.1 Formworks
2.1.1 Ord. Plywood 3/8'' thk.
2.1.2 Coco-Lumber 2'' x 3'' x 12' - 450pcs.
2.1.3 Coco-Lumber 2'' x 3'' x 12' - 535pcs.
2.1.4 CWN 4''
2.1.5 CWN 3''
2.1.6 CWN 2''
2.2 Rebars
2.2.1 16mm dia. X 6.00 meters
2.2.2 12mm dia. X 6.00 meters
2.2.3 10mm dia. X 6.00 meters
2.2.4 # 16 G.I. Tie Wire
2.3 Concrete
2.3.1 Cement
2.3.2 Sand
2.3.3 Crushed Gravel 3/4''

III.

Masonry Works
3.1 CHB Llaying
3.1.1 Cement
3.1.2 Sand
3.1.3 CHB 5'' thk.
3.1.4 CHB 4'' thk.
3.1.5 Rebar 12mm dia. X 6.00 meters
3.1.6 Rebar 10mm dia. X 6.00 meters
3.1.7 Waterproofing Cement (25kilos/bag)

IV.

Roofings & Roof Framings


4.1 Framing
4.1.1 C-Shape 2'' x 6'' x 6.00 meters
4.1.2 C-Purlins 2'' x 3'' x 6. 00 meters
4.1.3 Angle Bar 2'' x 2'' x 3/16'' x 6.00 meters
4.1.4 Flat Bar 3/16'' x 2'' x 6.00 meters
4.1.5 Wooden Fascia 1'' x 8'' x 10'
4.1.6 Welding Rods 1/8
4.1.7 Red Oxide Primer
4.2 Roofings
4.2.1 Pre-painted Long Span Roofings
(Rib Type - Gauge 0.400)
4.2.2 Pre-painted G.I. Gutter

Qty.

Unit

4.2.3 Pre-painted G.I. Flashing


4.2.4 Pre-painted G.I. Ridge Roll
V.

Wood Works
5.1 Ceiling
5.1.1 Good Lumber 2'' x 2'' x 8' - 46 pcs.
5.1.2 Good Lumber 2'' x 2'' x 12' - 68 pcs.
5.1.3 Hardiflex Plywood 1/4'' thk.
5.1.4 Hardiflex Nail 1''
5.1.5 CWN 2''
5.1.6 CWN 3''
5.1.7 Stikwel (Wood Glue)
5.1.8 Good Lumber 1'' x 1'' 8' - 60 pcs.
5.1.9 Plyboard 3/4'' thk.
5.2 Staircase
5.2.1 Good Lumber 2'' x 12'' x 14' - 5 pcs.
5.2.2 Square Bar 20mm
5.2.3 Square Bar 16mm
5.2.4 Square bar 12mm
5.2.5 Flat Bar 3/16'' x 1''
5.2.6 Welding Rod 1/8
5.2.7 Red Oxide Primer
5.2.8 Solid Wood Handrail 3'' x 6'' 12' KD
5.2.9 Wood Screw 1'' (Flat Head)

VI.

Doors & Windows & Hardwares


6.1 Doors
6.1.1 Panel Door (Main door)
6.1.2 Flush Door
6.1.3 PVC Door (t&b)
6.1.4 Cabinet Doora (kitchen)
6.1.5 Double Whole French Door(Master Bedrm.)
6.2 Windows
6.2.1 Steel Casement w/ Clear Glass (common)
6.2.2 Steel Casement w/ Clear Glass (fixed)
6.2.3 Steel Casement w/ Clear Glass (t&b)
6.3 Door Hardware
6.3.1 Double Handle with dead lock
6.3.2 Lockset (Door Knob)
6.3.3 Double dead lock
6.3.4 Hinges 4'' x 4''
6.3.5 Hinges 3'' x 3''
6.3.6 Cabinet Handle/Catches
6.3.7 Cabine Hinges 1'' x 3'' and Drawer rollers

VII.

Tile Works
7.1 T & B
7.1.1 Unglazed Cer. Tiles 8'' x 8''
7.1.2 Glazed Cer. Tiles 8'' x 8''
7.1.3 Listel
7.1.4 Cement
7.1.5 ABC Cement Grout
7.2 Ground Floor
7.2.1 Cer. Floor Tiles 16'' x 16''
7.2.2 Cement

7.2.3 ABC Cement Grout


7.3 2nd Floor
7.3.1 APO Vinyl Planks 4'' x 36''
7.3.2 Acrylic Flooring Adhesive
7.4 Counter Top
7.4.1 Glazed Cer. Tiles 8'' x 8''
7.4.2 Listel
7.4.3 Tile Trim
7.4.4 Cement
7.4.5 ABC Cement Grout
7.5 Terrace
7.5.1 Ceramic Floor Tiles 12'' x 12''
7.5.2 Cement
7.5.3 Grout
VIII. Painting Works
8.1 Masonry Painting
8.1.1 Latex Paint (Flat)
8.1.2 Latex Paint (Semi-Gloss)
8.1.3 Paint Roll 7''
8.1.4 Paint Brush 4''
8.1.5 Paint Brush 2''
8.1.6 Latex Color
8.1.7 Concrete Nuetralizer
8.1.8 Patching Compound
8.1.9 Sanding Paper
8.2 Wood Painting
8.2.1 Enamel (Flat)
8.2.2 Enamel (Gloss)
8.2.3 Paint Roller 4''
8.2.4 Paint Brush 4''
8.2.5 Paint Brush 2''
8.2.6 Paint Thinner
8.2.7 Laquer Paint
8.2.8 Tinting Color
8.2.9 Sanding Sealer
8.2.10 Clear Gloss Laquer
8.2.11 Wood Stain Maple
8.2.12 Plasolux
8.2.13 Fula Tite
IX.

Plumbing Works
9.1 Fixtures
9.1.1 Stainless Kitchen Sink
9.1.2 Lavatory
9.1.3 Water Closet
9.1.4 Cer. Soap Holder
9.1.5 Cer. Tissue Holer
9.1.6 Shower Head
9.2 Sanitary Water Lines
9.3 Sewer Lines
9.4 Septic Tank
9.4.1 Excavation
9.4.2 Backfilling

9.4.3 Concrete Works


9.4.4 Formworks
2'' x 4'' x 10'' Coco-Lumber-25 pcs
3/8'' Thk. Ord. Plywood
CWN 4''
CWN 3''
CWN 2''
9.4.5 Rebars
10mm Dia. X 6.00 meters
12mm Dia. X 6.00 meters
9.4.6 Concrete
Cement
Sand
3/4'' Crushed Gravel
9.4.7 Masonry Works
CHB 5'' thk.
Cement
Sand
9.4.8 Rebars 10mm dia. X 6.00 meters
9.4.9 Piping Works
PVC Tee 4'' Dia.
PVC End Cap 4'' Dia.
PVC Pipe 4" Dia. X 3.00 (w/ Hub)
X.

Electrical
10.1 Wires and Cable
10.1.1 # 10 AWG Wire
10.1.2 # 14 AWG Wire
10.2 Switches
10.2.1 One Gang Switches
10.2.2 Two Gang Switches
10.2.3 Three Gang Switches
10.3 Outlet
10.3.1 Double Power Outlet
10.3.2 ACU Outlet
10.3.3 Ref Outlet
10.3.4 Range Outlet
10.3.5 Lighting Outlet
10.4 Conduit
10.4.1 20mm x 3M. Conduit Pipe
10.4.2 12mm x 3M. Conduit Pipe
10.5 Safety Switches
10.6 Panel Board
10.7 Electrical Tape
Total Material Cost(Php):

Prepared by:ALVIN KENT F. JIMENEZ


REGISTERED ARCHITECT
PRC Reg. No.
IAPOA No.
PTR No.
Date:
Place:
TIN No.

Unit Cost
Material

Amount

st(Php):

Description

Item
I.

Site Clearing
Excavation
Backfilling/Compaction
Earthfill

cu.m.
1.8

Masonry Works
3.1 CHB Llaying
3.1.1 Cement
3.1.2 Sand
3.1.4 CHB 4'' thk.

VII.

Unit

Earthworks
1.1
1.2
1.3
1.4

III.

Qty.

0.8

bags
cu.m.
pcs.

Tile Works
7.4 Counter Top
7.4.1 Glazed Cer. Tiles 8'' x 8''
7.4.2 Listel
7.4.3 Tile Trim
7.4.4 Cement
7.4.5 ABC Cement Grout

2
1

pcs.
pcs.
pcs.
bag
kilos

Unit Cost
Material

Amount

1000
1,000.00

230
600
7.25

13
0
40
230
65

600.00

0.00
80.00
460.00
65.00