The chosen project that will be completed in my workplace includes the
purchasing and shipment of pipe fittings and pipe bundles to a client on behalf of our Middle East office. Any products that can be allocated and withdrawn from stock will be used instead of purchasing more of the same product. Any required inspection or testing that was outlined during the quotation stage will be conducted before shipment and the relative material certificates to confirm inspection and/or testing will be supplied. All goods on order should be supplied before the agreed delivery date that was also confirmed during the quotation stages. Supplied pipe will be stencils with relative reference numbers and any required coloured striping requested by the client. To complete this, pipe will be sent to a paint shop sub contractor. Pipe will be sent back to the company facility and prepared along with all other parts on order to be shipped in order to reach the agreed due date.