You are on page 1of 75

Pag

e1
Process

Ball Mill

L:\DATA\Dept150\Polysius Pres
entation and Training\Polysiu
Training
s Training\Grinding\Ball Mill
+ SEPOL
\ballm_sepol_process.ppt
150 WEI, 140 CD

Krupp Polysius Corp.

Pag
e2

L:\DATA\Dept150\Polysius Pres
Ball mill
entation and Training\Polysiu
s Training\Grinding\Ball Mill
Discharge diaphragm
\ballm_sepol_process.ppt
Intermediate diaphragm
150 WEI, 140 CD
Mill inlet
Mill discharge

Ball filling 2. compartment


Ball filling 1. compartment

Drive

Krupp Polysius Corp.

Pag
e3

L:\DATA\Dept150\Polysius Pres
Polysius cement mill
entation and Training\Polysiu
s Training\Grinding\Ball Mill
\ballm_sepol_process.ppt
150 WEI, 140 CD

Krupp Polysius Corp.

Pag
e4

A
B

L:\DATA\Dept150\Polysius Pres
Schematic possibilities of ball grinding
entation and Training\Polysiu
As Training\Grinding\Ball MillB
\ballm_sepol_process.ppt
150 WEI, 140 CD

Cataract movement (Grinding because of impact and friction)


Cascade movement (Grinding because of friction)

Krupp Polysius Corp.

Pag
L:\DATA\Dept150\Polysius Pres
e 5 Movement
entation
and Training\Polysiu
of grinding
media in a ball mill
s Training\Grinding\Ball Mill
\ballm_sepol_process.ppt
Movement depends on:
150 WEI, 140 CD
Mill speed
Ball charge
Liner shape
Mill diameter

Krupp Polysius Corp.

Ball charge: % of mill volume

Pag
L:\DATA\Dept150\Polysius Pres
of grinding media in a ball mill
e 6 Movement
entation
and Training\Polysiu
s Training\Grinding\Ball Mill
Mill revolutions: % of critical speed
\ballm_sepol_process.ppt
150 WEI, 140 CD

Krupp Polysius Corp.

Pag
e7
Vcrit: critical speed

L:\DATA\Dept150\Polysius Pres
Ball
mill
speed
entation
and
Training\Polysiu
s Training\Grinding\Ball Mill
balls stay on the mill wall due to centrifugal force
\ballm_sepol_process.ppt
NO GRINDING POSSIBLE!
150 WEI, 140 CD

Vcrit
Vmax: maximum speed

42.3

Di

circa 75% of the critical speed

Vmax

Di

Krupp Polysius Corp.

31.7

Di

= diameter inside liners

Pag
e8

L:\DATA\Dept150\Polysius Pres
Ball charge
entation and Training\Polysiu
s Training\Grinding\Ball Mill
\ballm_sepol_process.ppt
1. Compartment:
150 WEI, 140 CD
coarse balls

2. Compartment:
ball filling classified
because of liners

Krupp Polysius Corp.

Pag
L:\DATA\Dept150\Polysius Pres
Example
for ball
size distribution
for Ball Mills in
e9
entation
and Training\Polysiu
closed circuit with
a High Efficiency Separator
s Training\Grinding\Ball
Mill
separator (without
pregrinding)
\ballm_sepol_process.ppt
150 WEI, 140 CD

Krupp Polysius Corp.

Pag
e 10

L:\DATA\Dept150\Polysius Pres
Liner
entation
andShape
Training\Polysiu
-Classifying Liners- Mill
s Training\Grinding\Ball
\ballm_sepol_process.ppt
150 WEI, 140 CD

1 < 2
1

Flow of material
Mill cylinder

Krupp Polysius Corp.

Classifying liner

Pag
e 11

L:\DATA\Dept150\Polysius
Pres
Liner shape
entation
andliners
Training\Polysiu
- Lifting
s Training\Grinding\Ball Mill
\ballm_sepol_process.ppt
150 WEI, 140 CD
Mill shell
Lifting liners

Mill rotation

Krupp Polysius Corp.

Pag
e 12

L:\DATA\Dept150\Polysius Pres
entation Ball
and filling
Training\Polysiu
The filling
of the grinding media is as
follows:
s level
Training\Grinding\Ball
Mill
\ballm_sepol_process.ppt
150 WEI, 140 CD

FP(%)

G(tons)

CD L i (D )
4
2
i

FP
CD

= Filling level (%)


= Charge density (approx 4.5 t/m3 1. Compartment)
(approx 4.6 t/m3 2. Compartment)

Li

= Effective grinding length

Di

= Inside diameter
= 3.14

Krupp Polysius Corp.

Pag
e 13

L:\DATA\Dept150\Polysius Pres
Drive power requirement of ball mills
entation and Training\Polysiu
s Training\Grinding\Ball Mill
The required power of a ball mill depends on:
\ballm_sepol_process.ppt
150
WEI, 140 CD
length)
Mill size (diameter,
Mill revolution speed
Amount of ginding media (%)
number of grinding compartments
type of material
type of mill liners
type of grinding media
type and length of a pre-drying compartment (if applicable)

Krupp Polysius Corp.

Pag
e 14

L:\DATA\Dept150\Polysius Pres
Calculation
of ball mill power
entation
and Training\Polysiu
s Training\Grinding\Ball Mill

\ballm_sepol_process.ppt
150 WEI, 140 CD

L
G

Krupp Polysius Corp.

P M
M G L

Pag
L:\DATA\Dept150\Polysius Pres
the power
requirement
at the mill shaft
eEstablishing
15
entation
and
Training\Polysiu
s Training\Grinding\Ball Mill
\ballm_sepol_process.ppt
150 WEI, 140 CD
G (tons) Di c
P (kW)
1.36
G weight of ball charge
Di internal diameter
c c-factor
1.36 conversion factor from HP to KW

Krupp Polysius Corp.

c-factor [m1.5/s3]

Pag
e 16

L:\DATA\Dept150\Polysius Pres
Basic c - factor for n = 75 % nkrit
entation and Training\Polysiu
s Training\Grinding\Ball Mill
\ballm_sepol_process.ppt
150 WEI, 140 CD

Krupp Polysius Corp.

2-compartment mill

Filling degree [%]

Pag
e 17

L:\DATA\Dept150\Polysius Pres
C - factor
correction
entation
and Training\Polysiu
s Training\Grinding\Ball Mill
\ballm_sepol_process.ppt
150 WEI, 140 CD

C = cbasic corr. speed corr. Blaine

Krupp Polysius Corp.

c - factor correction

Pag
L:\DATA\Dept150\Polysius Pres
C-factor correction for speed if n 75 % nkrit
e
18
entation and Training\Polysiu
1.1
1.09
s Training\Grinding\Ball Mill
1.08
\ballm_sepol_process.ppt
1.07
1.06
150 WEI, 140 CD
1.05
1.04
1.03
1.02
1.01
1
0.99
0.98
0.97
0.96
0.95
0.94
0.93
0.92
0.91
29.7

30.2

30.7

Krupp Polysius Corp.

31.2

31.7

32.2

n Di

32.7

33.2

33.7

Pag
e 19

L:\DATA\Dept150\Polysius Pres
C-factor
correction
for Blaine
entation
and Training\Polysiu
s Training\Grinding\Ball Mill
Above\ballm_sepol_process.ppt
3500 Blaine:
150 WEI, 140 CD
c decreases as Blaine increases

c is reduced by 0.175% per 100 Blaine

CBlaine

Blaine 3500
1
0.175
10000

Krupp Polysius Corp.

Pag
e 20

eff. gear box

L:\DATA\Dept150\Polysius Pres
Example
drive
losses
entation
and
Training\Polysiu
s Training\Grinding\Ball Mill
\ballm_sepol_process.ppt
150 WEI, 140 CD
= 96 %

eff. Motor

= 96 %

eff. Lines

= 99 %

given:

drive efficiency = eff. gear box eff. motor eff. lines

drive efficiency =

0.96

drive efficiency =

0.91 = 91 %

Krupp Polysius Corp.

0.96

0.99

Pag
e 21

L:\DATA\Dept150\Polysius Pres
Drive losses
entation and Training\Polysiu
s Training\Grinding\Ball Mill
The losses due to the drive must be taken into consideration with this calculation.
\ballm_sepol_process.ppt
P(shaft)
150
WEI,
140
CD
P(counter)
drive eff.
Drive efficiency:

Ball mill

P(shaft)

Gear box

Motor

eff. gear box

eff. motor

Counter

eff. lines

drive efficiency = eff. gear box eff. motor eff. lines

Krupp Polysius Corp.

Pag
e 22

f e

L:\DATA\Dept150\Polysius Pres
Fineness
conversion
(clinker)
entation
and Training\Polysiu
s Training\Grinding\Ball Mill
\ballm_sepol_process.ppt
f
= fineness factor
(Bl2 - Bl1 )
0.49 150 WEI,
Bl1140 CD
= new Blaine
1000

Wsp (Bl1 )

Wsp (Bl2 )
f

M2 (Bl2 ) M1(Bl1 ) f

Krupp Polysius Corp.

Bl2

= base Blaine

Wsp

= specific work
= power consumption (kWh/t)

M1 = new capacity for new Blaine (t/h)


M2 = base capacity for base Blaine (t/h)

Pag
L:\DATA\Dept150\Polysius Pres
Example 1: adjustment of capacity (Clinker)
e 23
entation and Training\Polysiu
s Training\Grinding\Ball Mill 2
Conversion of existing system from 3500 to 5000 cm /g (Blaine)
\ballm_sepol_process.ppt
5000) CD
150 WEI,
( (35001000-140
0.49 )
f e

0.4795

Base capacity: M2 = 100 t/h @ 3500 Blaine


Therefore:

M1 100 t/h 0.4795


47.95 t/h @ 5000 Blaine

Krupp Polysius Corp.

Pag Example
L:\DATA\Dept150\Polysius
Pres
1: product fineness vs. mill
capacity
e 24
entation and Training\Polysiu
Capacity (%)
s Training\Grinding\Ball Mill
130%
\ballm_sepol_process.ppt
120%
150 WEI, 140 CD
110%
100%
90%
80%
70%
60%
50%
40%
30%
303132 3334353637 3839404142 4344454647 4849505152 5354555657 585960

Krupp Polysius Corp.

Blaine ( 100)

Pag
L:\DATA\Dept150\Polysius Pres
Example
of mill
power consumption (Clinker)
e 25 2: adjustment
entation and
Training\Polysiu
s Training\Grinding\Ball Mill 2
Conversion of existing system from 3500 to 5000 cm /g (Blaine)
\ballm_sepol_process.ppt
5000) CD
150 WEI,
( (35001000-140
0.49 )
f e

0.4795

Given:

Wsp = 35 kWh/t @ 3500 Blaine

Therefore:

Wsp

35 kWh/t
0.4795

73 kWh/t @ 5000 Blaine

Krupp Polysius Corp.

Pag
L:\DATA\Dept150\Polysius Pres
Example 2: adjustment of mill power consumption
e 26
entation and Training\Polysiu
specific work (%)
s Training\Grinding\Ball Mill
340%
\ballm_sepol_process.ppt
320%
150 WEI, 140 CD
300%
280%
260%
240%
220%
200%
180%
160%
140%
120%
100%
80%
60%
30 3132 3334 3536 37 3839 4041 4243 44 4546 4748 4950 5152 53 5455 5657 5859 60

Krupp Polysius Corp.

Blaine ( 100)

Pag
L:\DATA\Dept150\Polysius
Pres
KWH/T Shaft
Grindability
(at milland
shaft)
as a function of Blaine
e 27
entation
Training\Polysiu
250
s Training\Grinding\Ball Mill
\ballm_sepol_process.ppt
150 WEI, 140 CD
200

kWh/t

150

100

50

Range for Clinker


0
2000

4000
Blaine cm2/g

Krupp Polysius Corp.

6000

Pag
e 28

L:\DATA\Dept150\Polysius Pres
Infuence of fineness and
entation and Training\Polysiu
product/slope on the strength
s Training\Grinding\Ball
Mill
of the cement
\ballm_sepol_process.ppt
150 WEI, 140 CD

Example:

Krupp Polysius Corp.

3500
Blaine

5000
Blaine

Product Slope

Compressive Strength
after 2 days (N/mm2)

29

49.5

Compressive Strength
after 28 days (N/mm2)

56

65

Pag
L:\DATA\Dept150\Polysius Pres
29 inspection
entation
and Training\Polysiu
Ballemill
and audit
s Training\Grinding\Ball Mill
\ballm_sepol_process.ppt
150 WEI, 140 CD

Krupp Polysius Corp.

1.

Material level and


distribution

2.

Grinding media and


charge

3.

Shell liners and


diaphragm

4.

Water injection and


grinding aid lances

Pag
e 30

L:\DATA\Dept150\Polysius Pres
entation and Training\Polysiu
s Training\Grinding\Ball Mill
\ballm_sepol_process.ppt
150 WEI, 140 CD

1. Material Level and Distribution

Krupp Polysius Corp.

Pag
e 31

L:\DATA\Dept150\Polysius Pres
Material
load
too low
entation
and
Training\Polysiu
s Training\Grinding\Ball Mill
Chamber I
Chamber II
\ballm_sepol_process.ppt
150 WEI, 140 CD

Material level
Chamber I:
No material visible over a section
or over the entire length of the grinding
chamber.

Chamber II:
No material visible on the surface of the
grinding media charge.

Krupp Polysius Corp.

Pag
e 32

L:\DATA\Dept150\Polysius Pres
Material
load
too high
entation
and
Training\Polysiu
s Training\Grinding\Ball Mill
Chamber I
Chamber II
\ballm_sepol_process.ppt
150 WEI, 140 CD

Material level
Chamber I:
Large quantities or material above and between
the grinding media
no intensive grinding
Build-up of large material pieces in front of the
intermediate diaphragm
Chamber II:
Grinding media are covered with a 50 to 100mm
thick material layer
low degree of grinding

Krupp Polysius Corp.

Pag
e 33

L:\DATA\Dept150\Polysius Pres
Material
load
normal
entation
and
Training\Polysiu
s Training\Grinding\Ball Mill
Chamber I
Chamber II
\ballm_sepol_process.ppt
150 WEI, 140 CD

Material level
Chamber I:
Normal material load: approx. 1/3 of the grinding
media surface lies bare and the grinding media
lies next to each other with the material laying
in the space between

Chamber II:
Normal material load: grinding media are just
projecting on the surface or are just covered with
material

Krupp Polysius Corp.

Pag
e 34

Material load normal

L:\DATA\Dept150\Polysius Pres
Ball Filling
Compartment
entation
and1.Training\Polysiu
s Training\Grinding\Ball Mill
\ballm_sepol_process.ppt
150 WEI, 140 CD

Krupp Polysius Corp.

Material load too low

Pag
e 35
Material load normal

L:\DATA\Dept150\Polysius Pres
Ball Filling 2. Compartment
entation
and Training\Polysiu
s Training\Grinding\Ball Mill
\ballm_sepol_process.ppt
Material load too high
150 WEI, 140
CD

Krupp Polysius Corp.

Pag
e 36

L:\DATA\Dept150\Polysius Pres
entation and Training\Polysiu
s Training\Grinding\Ball Mill
\ballm_sepol_process.ppt
150 WEI, 140 CD

2. Grinding Media and Charge

Krupp Polysius Corp.

Pag
e 37

L:\DATA\Dept150\Polysius Pres
Grinding
and charge
entationmedia
and Training\Polysiu
s Training\Grinding\Ball Mill
To be checked: \ballm_sepol_process.ppt
150
140 CD
Ball size distribution and
ballWEI,
classification
in the 2. compartment
(if mill is equipped with segregation liners)
Shape of grinding balls (worn and/or broken balls) as well as foreign bodies
in the ball charge
Measurement of filling level in the empty mill
Coating of grinding balls

Krupp Polysius Corp.

Pag
L:\DATA\Dept150\Polysius Pres
filling
level in the mill
e 38 Measurement
entationofand
Training\Polysiu
s Training\Grinding\Ball Mill
height above ball charge - h
\ballm_sepol_process.ppt
string above ball charge - s
150 WEI,
140 CD
Free liner plates above ball charge
Di

Liners

Ball charge
s

Krupp Polysius Corp.

Pag
L:\DATA\Dept150\Polysius Pres
for measurement
of filling level
e 39 Example
entation
and Training\Polysiu
s Training\Grinding\Ball Mill
\ballm_sepol_process.ppt
given: h = 2.284 m
(height above ball charge)
150 WEI,
140 CD
s = 3.240 m

(string above ball charge)

Di = 3.44 m

(diameter inside liner)

FP = 21.7

(free liner plates above ball charge

h/ Di

Fl (see diagram)

=
0.664
29.5%

Krupp Polysius Corp.

s/ Di
=
0.942
29.5%

360 - (FP x 10)/2


=
71.5
29.5%

Pag
e1 40

L:\DATA\Dept150\Polysius Pres
entation and Training\Polysiu
s Training\Grinding\Ball Mill
h/D\ballm_sepol_process.ppt
i
150 WEI, 140 CD

Filling level of ball charge vs. h/Di -, s/Di - and functions


s/Di

0.9
0.8

200
180
160

0.7

140

0.6

120

s/Di

0.5

100

0.4

80

0.3

60

360 - (FP x 10)/2

0.2

40

0.1

20

0
0

10

15

Krupp Polysius Corp.

20

25

30

35

Ball Filling Level (%)

40

45

50

360 - (FP x 10)/2

h/Di

Pag
e 41

L:\DATA\Dept150\Polysius Pres
entation and Training\Polysiu
s Training\Grinding\Ball Mill
\ballm_sepol_process.ppt
150 WEI, 140 CD

3. Shell Liners and Diaphragm

Krupp Polysius Corp.

Pag
e 42

L:\DATA\Dept150\Polysius Pres
Shell
liners
and
diaphragm
entation
and
Training\Polysiu
s Training\Grinding\Ball Mill
\ballm_sepol_process.ppt
Shape and150
wearWEI,
of liner140
platesCD

Coating
Shape of slots
Blocking of slots (if blocked, cleaning is required)

Krupp Polysius Corp.

Pag
e 43

L:\DATA\Dept150\Polysius Pres
liners
entationBall
andmill
Training\Polysiu
s Training\Grinding\Ball Mill
Ball Mill classifying liners,
Ball Mill lifting liners in \ballm_sepol_process.ppt
good
heavily
condition
150 WEI, 140
CDcoated

Krupp Polysius Corp.

Pag
e 44

L:\DATA\Dept150\Polysius Pres
entation and Training\Polysiu
s Training\Grinding\Ball Mill
\ballm_sepol_process.ppt
150 WEI, 140 CD

4. Water and Grinding Aid Injection Lances

Krupp Polysius Corp.

Pag
e 45

L:\DATA\Dept150\Polysius Pres
Water injection
lances
entation
and Training\Polysiu
s Training\Grinding\Ball Mill
\ballm_sepol_process.ppt
150 WEI, 140 CD
lances should be open and clean
no damages from impact
cleaning air in water spray should be checked

Krupp Polysius Corp.

Pag
e 46

L:\DATA\Dept150\Polysius Pres
Water spray system
entation and Training\Polysiu
s Training\Grinding\Ball Mill
\ballm_sepol_process.ppt
Spray lance totally blocked
Spray lance in good condition
150 WEI, 140 CD

Krupp Polysius Corp.

Pag
e 47

L:\DATA\Dept150\Polysius Pres
entation and Training\Polysiu
s Training\Grinding\Ball Mill
\ballm_sepol_process.ppt
150 WEI, 140 CD

5. Intermediate and Discharge Diaphragm

Krupp Polysius Corp.

Pag
e 48

L:\DATA\Dept150\Polysius Pres
Intermediate
diaphragm
entation and
and discharge
Training\Polysiu
s Training\Grinding\Ball Mill
\ballm_sepol_process.ppt
150 WEI, 140 CD

Diaphragms should be open to assure proper


material and air flow in the mill.

If diaphragms are blocked with worn balls or


material they should be cleaned. If blockage
occurs regularly, broken or worn balls have to be
removed from ball charge.

Krupp Polysius Corp.

Pag
e 49

L:\DATA\Dept150\Polysius
Pres
Diaphragm
entation and Training\Polysiu
s Training\Grinding\Ball Mill
\ballm_sepol_process.ppt
Diaphragm
Diaphragm not blocked 150 WEI, 140
CD heavily blocked and
coated with material

Krupp Polysius Corp.

Pag
e 50

L:\DATA\Dept150\Polysius Pres
entation and Training\Polysiu
s Training\Grinding\Ball Mill
\ballm_sepol_process.ppt
150 WEI, 140 CD

Longitudinal Sample

Krupp Polysius Corp.

Pag
e 51

L:\DATA\Dept150\Polysius Pres
Longitudinal
sample
(meter sample)
entation and
Training\Polysiu
s Training\Grinding\Ball
one sample of approx,
1lb every 1m (approx. 3 ft) ofMill
the mill length
\ballm_sepol_process.ppt
sample should consist of material from outer mill areas and mill center
150 WEI, 140 CD

sample should be taken approx. 25 mm (1 in) below surface

0m 1m 2m 3m 0m 2m 3m 4m...

sampling point

sieve residues and Blaine values should be taken for each sample
results are inserted into a diagram

Krupp Polysius Corp.

Pag
e 52

L:\DATA\Dept150\Polysius Pres
Purpose
of longitudinal
samples
entation
and Training\Polysiu
s Training\Grinding\Ball Mill
\ballm_sepol_process.ppt
150and
WEI,
140success
CD along the mill
judgment of grinding efficiency
grinding

An optimal ball mill filling will lead to steadily decreasing residues and
increasing Blaine values
A not optimal ball filling will lead to areas where residues and Blaine values
romaine unchanged for several feet of the mill.

Krupp Polysius Corp.

Pag
e 53

L:\DATA\Dept150\Polysius Pres
Mill Longitudinal Sample (Meter Sample)
entation and Training\Polysiu
s Training\Grinding\Ball
Mill
Good Example for Longitudinal
Sample
4500
\ballm_sepol_process.ppt
4000
3500
150 WEI, 140 CD
3000
100

90
80

B laine

70

2289 m = 8 M es h

60

Residue %

50
40
30
20
10
0
0

2500
2000
1500
1000
500
0

1089 m = 16 M esh
555,3 m = 30 M esh
321 m = 50 M esh
86,6 m = 170 M esh
72,7 m = 200 M esh
43,2 m = 325 M esh

Meter sample points / m

Bad Example for Longitudinal Sample


3500

100
90
80
70
60

Residue %

50

3000

B laine

2500

1089 m = 16 M es h

2000

321 m = 50 M esh

1500

40
30

1000

20

500

10
0
0

Meter sample points / m

Krupp Polysius Corp.

2289 m = 8 M esh

555,3 m = 30 M esh

86,6 m = 170 M esh


72,7 m = 200 M esh
43,2 m = 325 M esh

Pag
e 54

L:\DATA\Dept150\Polysius Pres
entation and Training\Polysiu
s Training\Grinding\Ball Mill
\ballm_sepol_process.ppt
150 WEI, 140 CD

SEPOL

Krupp Polysius Corp.

Pag
e 55

L:\DATA\Dept150\Polysius Pres
SEPOL
entation and Training\Polysiu
s Training\Grinding\Ball Mill
\ballm_sepol_process.ppt
Feed Material
150 WEI, 140 CD

Separating Air

Fines
Oversize Material

Krupp Polysius Corp.

Pag
e 56

L:\DATA\Dept150\Polysius Pres
SEPOL SV/x
entation and Training\Polysiu
FEED BOX
DISPERSION
PLATE
s Training\Grinding\Ball
Mill
ROTOR BLADES
AIR GUIDE \ballm_sepol_process.ppt
PLATE
150 WEI, 140 CD
GUIDE VANE

AIR INLET DUCT

CYCLONE
SEPARATOR FEED
SEPARATOR REJECTS
VENT AIR WITH FINES
FRESHAIR OR CIRCULATING AIR

Krupp Polysius Corp.

REJECT CONE

Pag
e 57

L:\DATA\Dept150\Polysius Pres
SEPOL SV
entation and Training\Polysiu
FEED BOX
s Training\Grinding\Ball
Mill
DISPERSION PLATE
\ballm_sepol_process.pptROTOR BLADES
AIR GUIDE PLATE
GUIDE VANE
150 WEI, 140 CD

AIR INLET DUCT

SEPARATOR FEED
SEPARATOR REJECTS
VENT AIR WITH FINES
FRESHAIR OR CIRCULATING AIR

Krupp Polysius Corp.

DISCHARGE BEND
REJECT CONE

Pag
e 58

L:\DATA\Dept150\Polysius Pres
SEPOL Separator
entation and Training\Polysiu
s Training\Grinding\Ball Mill
\ballm_sepol_process.ppt
150 WEI, 140 CD

Krupp Polysius Corp.

Pag
L:\DATA\Dept150\Polysius Pres
Completely
opened
air-inlet
(during commissioning)
e 59
entation
andlouvre
Training\Polysiu
s Training\Grinding\Ball
Millare being
Louvres
adjusted to wear pattern
\ballm_sepol_process.ppt
at the rotor
150 WEI, 140 CD

separating
air
Air channels

Krupp Polysius Corp.

Pag
e 60

L:\DATA\Dept150\Polysius Pres
Spiral inlet, guide vanes and rotor
entation and Training\Polysiu
s Training\Grinding\Ball Mill
\ballm_sepol_process.ppt
Rotor
150 WEI, 140 CD

Air flow
Guide vanes

Krupp Polysius Corp.

Air inlet

Pag
L:\DATA\Dept150\Polysius Pres
Setting of entation
guide vanes
Commissioning)
e 61
and (during
Training\Polysiu
s Training\Grinding\Ball Mill
\ballm_sepol_process.ppt
150 WEI, 140 CD

counter-clockwise rotation

clockwise rotation

Krupp Polysius Corp.

Pag
L:\DATA\Dept150\Polysius Pres
Setting of guide vanes (during Commissioning)
e 62
entation and Training\Polysiu
s Training\Grinding\Ball
guide vanes Mill
set to largely tangential
position (6065 to the radial)
\ballm_sepol_process.ppt
150 WEI, 140 CD
max. separating air

speed of separator rotor set to suit


the required cement fineness

Krupp Polysius Corp.

Pag
e 63

L:\DATA\Dept150\Polysius Pres
Separator formulas
entation and Training\Polysiu
s Training\Grinding\Ball Mill
SA, SF SG [t/h]: separator
\ballm_sepol_process.ppt
SA (a)
150 WEI, 140 CD feed, separator fines,
separator grits

SG (g)

a, f, g: fineness feed,
fines, grits (Blaine or
residue)

SF (f)

Circulation Factor = SA / SF

= (f - g) / (a - g)
Krupp Polysius Corp.

Pag
e 64
100 %

L:\DATA\Dept150\Polysius Pres
Particleand
Size
Distribution
entation
Training\Polysiu
s Training\Grinding\Ball Mill
Area Considered at a Tromp
Curve
\ballm_sepol_process.ppt
150 WEI, 140 CD
Rejects

50%

Fines
Feed

X Particle Size, Q - % Passing


Krupp Polysius Corp.

L:\DATA\Dept150\Polysius Pres
TROMP
CURVE
entation
and Training\Polysiu
s Training\Grinding\Ball Mill
\ballm_sepol_process.ppt
150 WEI, 140 CD
Separation

Pag
e 65

Fines

Coarse

X Particle Size
Krupp Polysius Corp.

L:\DATA\Dept150\Polysius Pres
TROMP
CURVE
(IDEAL
SEPARATION)
entation
and
Training\Polysiu
s Training\Grinding\Ball Mill
\ballm_sepol_process.ppt
150 WEI, 140 CD
Separation

Pag
e 66

Fines
Coarse

Xc Separation Particle Size


Krupp Polysius Corp.

Pag
Separation
e 67
100%
100%

90%
80%

L:\DATA\Dept150\Polysius Pres
Typical Tromp
entation and Training\Polysiu
Curve
s Training\Grinding\Ball Mill
\ballm_sepol_process.ppt
150 WEI, 140 CD

Fines

70%
60%
50%
40%
Coarse

30%
20%
10%
0%

10

100

Particle Size (Microns)

Krupp Polysius Corp.

1000

Pag
e 68

L:\DATA\Dept150\Polysius Pres
entation and Training\Polysiu
s Training\Grinding\Ball Mill
\ballm_sepol_process.ppt
150 WEI, 140 CD

Grinding Circuits

Krupp Polysius Corp.

Pag
L:\DATA\Dept150\Polysius Pres
The SEPOL in closed grinding circuit with circulating air
e 69
entation and Training\Polysiu
operation
s Training\Grinding\Ball Mill
\ballm_sepol_process.ppt
150 WEI, 140 CD

Krupp Polysius Corp.

Pag
L:\DATA\Dept150\Polysius Pres
The SEPOL in closed grinding circuit with direct air operation
e 70
entation and Training\Polysiu
and fresh air supply for fine material cooling (single pass)
s Training\Grinding\Ball Mill
\ballm_sepol_process.ppt
150 WEI, 140 CD

Krupp Polysius Corp.

Pag

L:\DATA\Dept150\Polysius Pres

The SEPOL in closed grinding circuit with circulating


71
entation
and Training\Polysiu
aire operation.
High
pressure
grinding roll as primary mill

s Training\Grinding\Ball Mill
\ballm_sepol_process.ppt
150 WEI, 140 CD

Krupp Polysius Corp.

Pag
L:\DATA\Dept150\Polysius Pres
The SEPOL in closed grinding circuit with circulating air
e 72
entation and Training\Polysiu
operation. Highpressure grinding roll and tube mill in hybrid
s Training\Grinding\Ball
Mill
operation
\ballm_sepol_process.ppt
150 WEI, 140 CD

Krupp Polysius Corp.

Pag

L:\DATA\Dept150\Polysius Pres

The SEPOL in closed grinding circuit with circulating air


e 73 SEPOLentation
and
Training\Polysiu
operation.
after high
pressure
grinding roll and tube
Training\Grinding\Ball
Mill
mill forscombination
and finish grinding.

\ballm_sepol_process.ppt
150 WEI, 140 CD

Krupp Polysius Corp.

Pag
e 74

L:\DATA\Dept150\Polysius Pres
Material
flows
in ball
mill circuits
entation
and
Training\Polysiu
s Training\Grinding\Ball Mill
\ballm_sepol_process.ppt
150 WEI, 140 CD
23-fold material circulation
Separator

SG(g)

tube mill

SF (f)

85 -90%

collecting
cyclones

SA (a)
10 -15%

100%
feed material F

Mill
waste air
filter

Separator
filter

sampling for
determination of
fineness

100%

Krupp Polysius Corp.

finished material F

Pag
e 75
Qconvection,

L:\DATA\Dept150\Polysius Pres
entation and Training\Polysiu
Q = Heat
s Training\Grinding\Ball
Mill
System II
\ballm_sepol_process.ppt Q
Q =Q
150 WEI, 140 CD
Q
Heat balance in ball mill circuits

sepol air

II in

radiation

II out

material

Qconvection,radiation

Qsepol air

Qwater,evaporated
Qfalse air

Qmaterial

Q exit air
Qinlet air
Qmaterial
Qfalse air
Qpower,converted
Qmaterial moisture

QI in = QI out

Qwater spray

Krupp Polysius Corp.

System I

You might also like